Upload
leane
View
48
Download
0
Embed Size (px)
DESCRIPTION
NJEDge.net Portal Proof Of Concept (POC) Update. Joe Walter Enterprise Solutions Center (ESC) Verizon ESG June 11, 2003. NJEDge – Proof of Concept Update. AGENDA Why Proof Of Concept (POC)? Enterprise Solution Center (ESC) Role Test Update Q & A. Why POC?. Network Design Validation - PowerPoint PPT Presentation
Citation preview
1
NJEDge.net PortalNJEDge.net Portal Proof Of Concept (POC) Update Proof Of Concept (POC) Update
Joe Walter
Enterprise Solutions Center (ESC)
Verizon ESG
June 11, 2003
2
NJEDge – Proof of Concept UpdateNJEDge – Proof of Concept Update
AGENDA
• Why Proof Of Concept (POC)?
• Enterprise Solution Center (ESC) Role
• Test Update
• Q & A
3
Why POC?Why POC?
• Network Design Validation
• Vendor Interoperability
• Service Provider Interoperability
• Portal Implementation Strategy Development
4
The Challenge The Challenge
• Take the Idea to Reality
• Complex Network Design in a Multi-vendor Environment
• Emerging IP Video Technology– H.323 standard (V1 - V4, with
options)
– Real Time Applications on a Non-Deterministic Data Network
5
ESC InvolvementESC Involvement
PEOPLE PROCESS
TECHNOLOGY
ISO 9001CERTIFIED
ENGINEERS
LAB FACILITY
• Complex Solutions
• Network Integration Focused
6
Enterprise Solutions CenterEnterprise Solutions Center
NETWORK ARCHITECTURE
NETWORK DESIGN
PROOF OF CONCEPT TESTING
KNOWLEDGE TRANSFER
Solving Enterprise Business Problems with Technology
7
ESC CharterESC Charter Develop Integrated SolutionsDevelop Integrated Solutions
– Research new products and technologies
– Conduct product assessments & evaluations
– Conduct proof-of-concept integration testing
– Provide skills transfer Design Complex, Large-scale NetworksDesign Complex, Large-scale Networks
– Consult on design portion of strategic engagements
– Provide technical leadership and design review Support Laboratory ServicesSupport Laboratory Services
– Support customer trials
– Provide customized testing and evaluations
– Provide ongoing development of technical staff
8
TE
ST
T
OO
LS
TRANSPORT
SONET DWDM
CORE NETWORK SERVICES
IP ATM Frame Relay
MULTI-SERVICE ACCESS
Wireless T1/T3 OC-N Ethernet
APPLICATIONS
IP Video IP Telephony
CO
MP
UT
ING
EN
VIR
ON
ME
NT
ESC Lab FacilityESC Lab Facility
9
NJEDge.net DesignNJEDge.net Design
10
ANJ/NJEDge Interop Test BedANJ/NJEDge Interop Test Bed
Internet
IP VPN/ATMCloud
Polycom FX
Cisco 2651Gatekeeper
DelawareATM
DE-7204-GK
Newark-GK
DEL-3660/GKHigh School
DEL_2651
Polycom FX
ANJ_FX
Internet(ISP)
Data
Data
NEWARK LATA
NJ ATM Core
DELAWARE LATA
.1
Newark-WAN
NJEDge Portal
ANJ Polycom MCU
ANJ Portal
NJEDge-GK1
NJEDge-GK2
CTM Servers Polycom VS_4000
HSRP
Cat_5505 NJEDge Polycom MCU
Cisco 7200WAN
NJEDgeRemote Site
Cascade MCM GK
CAT 6509/MSFC
ISDN
11
Proof Of Concept Test OutlineProof Of Concept Test Outline
• FVC Click To Meet Premier (CTMP) Validation
• CTM/H.323 with Security - Firewall • IP Addressing scheme (Private vs. Public)• Dialing Plan (Private vs. Public)• Quality of Service (Marked vs. Unmarked)• Inter-Portal Gatekeeper Interoperability• Vendor Interoperability• Remote to Portal - IP VPN Connectivity • Trouble Shooting Procedure for NJEDge
network
12
Current Status in Test BedCurrent Status in Test Bed
• Test Plan developed • IP Addressing and Dial Plan validated• Inter-Portal design and connectivity confirmed• Gatekeeper Redundancy configured and
tested• FVC Click-to-Meet scheduling application
staged and verified between devices• Cisco IOS software validated• Tandberg Endpoint Interoperability tested
13
FVC Screen CaptureFVC Screen Capture
14
Screen Shot of Conference SetupScreen Shot of Conference Setup
15
Next StepsNext Steps
• Security Enhancement via Cisco PIX Firewall
• Quality Of Service (QoS) Validation
• Deployment and Pilot testing in early July
16
Q & AQ & A
THANK YOU!