    New JerseysRenewable Energy Incentives:Past, Present, and Future

    Matthew Singer

  • 7/30/2019 NJ and Federal Incentives

    2/33

  • 7/30/2019 NJ and Federal Incentives

    3/33

    RPS

    Electricity suppliers with retail customers instate

    Must procure 20.38% of sold electricity fromrenewable energy resources by 2021

    Goals by classification

    Class 1 = 27.88% by 2021 Solar, Wind, Geothermal, Landfill Gas, Tidal, Fuel Cells,

    Biomass, and Tidal

    Class 2 = 2.50% by 2021 Hydro 30 MW or less & Resource Recovery

  • 7/30/2019 NJ and Federal Incentives

    4/33

    NJ RPS ScheduleEnergy Year

    (EY)Solar Carve-Out

    (GWh)Class I

    (%)Class II

    (%)

    2010 -- 4.685 2.5

    2011 306 5.492 2.5

    2012 442 6.320 2.5

    2013 596 7.143 2.5

    2014 772 7.977 2.5

    2015 965 8.807 2.5

    2016 1150 9.649 2.5

    2017 1357 10.485 2.5

    2018 1591 12.325 2.5

    2019 1858 14.175 2.5

    2020 2164 16.029 2.5

    2021 2518 17.880 2.5

  • 7/30/2019 NJ and Federal Incentives

    5/33

    NJ Electricity by Fuel Type

  • 7/30/2019 NJ and Federal Incentives

    6/33

    RPS Cont

  • 7/30/2019 NJ and Federal Incentives

    7/33

    RPS Cont

    2010

    MWh sold in NJ

    Total electric industry = 79,179,427 MWh

    EY 2011 RPS requirements

    5.492% Class I = 4,348,534 MWh

    2.5% Class II = 1,979,486 MWh

  • 7/30/2019 NJ and Federal Incentives

    8/33

    Past Incentives

    Customer On-Site Renewable Energy Program(CORE)

    Ended 12/31/08

    2008 budget falls $20 million short of rebateapplications on hold

    Renewable Energy Incentive Program (REIP)

    Solar- ended 12/31/10

  • 7/30/2019 NJ and Federal Incentives

    9/33

  • 7/30/2019 NJ and Federal Incentives

    10/33

    SREC Registration Program (SRP)

    REIP Solar rebates not available to new projects

    New projects register for SRECs through SRP

    Must register prior to construction

    Rebated projects through REIP solar programdo not need to submit SRP materials

    15 year SREC shelf life

  • 7/30/2019 NJ and Federal Incentives

    11/33

    SREC Pricing

    Oversupply of SRECs EY 2012 & 2013 requirements already satisfied

    Feb. 2012 SRECS = $205

    Legislation to increase RPS (S.2371) failed

    Remedies? Reauthorize incentives Accelerate RPS schedule Banks SRECs

  • 7/30/2019 NJ and Federal Incentives

    12/33

    SREC Pricing

    EY 2012 RPS requirement = 442,000 SRECs

    596,800 - 611,000 SRECs predicted for EY 2012

    Predicted SREC generation = 135 138.3%

    Supply > Demand

  • 7/30/2019 NJ and Federal Incentives

    13/33

    Biopower

  • 7/30/2019 NJ and Federal Incentives

    14/33

    REIP: Biopower Eligibility

    Energy crop or waste has a sustainable supply

    Biogas satisfies NJs emissions standards

    Allowable fuel manufacturing processes: Anaerobic digestion

    Gasification

    Pyrolysis

  • 7/30/2019 NJ and Federal Incentives

    15/33

    REIP: Biopower Incentives

    Net metered

    Rates

    Capacity Rebate Rebate w/ CHP

    First 500,000 watts $2.00/watt $3.00/watt

    Next 500,000 watts $1.00/watt $2.00/watt

  • 7/30/2019 NJ and Federal Incentives

    16/33

    Small Wind Systems (SWS)

  • 7/30/2019 NJ and Federal Incentives

    17/33

    REIP: Wind Incentives Rebates

    Based on expected energy production not capacity

    Federal Investment Tax Credits (FITCs)

    Class 1 Renewable Energy Certificates (RECs)

    Net Metering

    Residential SWS 30% net cost of system

    Business SWS 30% gross cost of system &accelerated depreciationschedule

  • 7/30/2019 NJ and Federal Incentives

    18/33

    REIP: SWS Program Delays

    Wind program currently on hold

    No new application processing or rebate

    commitments

    Based upon the comments receivedStaff does

    not feel the proposed changes adequately protectpublic safety -OCE

  • 7/30/2019 NJ and Federal Incentives

    19/33

    Business Energy Investment Tax Credit

    (ITC)Expires 12/31/2016

  • 7/30/2019 NJ and Federal Incentives

    20/33

    ITC Eligibility

    Solar (30% exp w/ no max)

    Eligible

    Electricity

    Heating/Cooling Process Heat

    Lighting

    Not Eligible Passive

    Pool Heating

  • 7/30/2019 NJ and Federal Incentives

    21/33

    ITC Eligibility cont

    Fuel Cell (30% exp w/ no max)

    Cap = $1,500/kW

    Pre 10/4/08 = $500/kW

    Minimum Capacity = 0.5kW

    Electricity-only efficiency = 30% +

  • 7/30/2019 NJ and Federal Incentives

    22/33

    ITC Eligibility cont

    SWS (30% w/ no max post-12/31/08)

    Up to 100 kW eligible

    $4,000 max credit 10/3/08 1/1/09 Removed by ARRA

  • 7/30/2019 NJ and Federal Incentives

    23/33

    ITC Eligibility cont

    Geothermal (10% exp w/ no max)

    Eligible equipment Heat pump (HP)

    Equipment used to produce/distribute/use energyfrom deposit

    Geothermal electric up to but not including

    transmission

    Geothermal heat (minus HP)- no exp date oncredit (post 10/3/08)

  • 7/30/2019 NJ and Federal Incentives

    24/33

    ITC Eligibility cont

    Micro-turbines (10% exp w/ no max)

    Cap = $200/kW

    Up to 2MW capacity eligible

    Electricity-only efficiency = 26%+

  • 7/30/2019 NJ and Federal Incentives

    25/33

    ITC Eligibility cont

    CHP (10% exp w/ no max)

    Up to 50 MW

    Must exceed 60% energy efficiency Not applicable to systems using 90%+ biomass

  • 7/30/2019 NJ and Federal Incentives

    26/33

    Renewable Electricity Production Tax Credit

    (PTC)

  • 7/30/2019 NJ and Federal Incentives

    27/33

    PTC Eligibility

    Marine/Hydrokinetic = min 150 kW

    Agricultural Livestock Waste = min 150 kW

    In Service Deadlines

    12/31/12 Wind

    12/31/13

    Biomass/Geothermal/LFG/MSW/Marine/Hydro

  • 7/30/2019 NJ and Federal Incentives

    28/33

    PTC Amounts 2.2/kWh

    Wind

    Geothermal

    Closed-loop Biomass

    1.1/kWh

    Open-loop Biomass

    LFG

    MSW

    Marine/Hydrokinetic

  • 7/30/2019 NJ and Federal Incentives

    29/33

  • 7/30/2019 NJ and Federal Incentives

    30/33

    PTC Future

    American Wind Energy Association (AWEA)

    Failure to extend PTC Annual installations = 2GW Jobs 78,000 41,000

    Extending PTC to 2016 Annual installations = 8-10 GW Wind supported jobs grow to 95,000

    MAKE Consulting

    Rushed build cycle for 2012

    Reduced development plans for 2013

  • 7/30/2019 NJ and Federal Incentives

    31/33

    PTC Future cont

    PTC extension amendments not passing

    Failed to pass twice Payroll Tax Cut Bill

    Highway & Highway Safety Bill

    American Energy & Job Promotion Act (S.2201)

    2 year extension to Wind PTC

    Proposed expiration = 1/1/2015 1 year extension to biomass, geothermal, landfill

    gas, trash, hydropower, marine, and hydrokinetic

    Proposed expiration = 1/1/2015

  • 7/30/2019 NJ and Federal Incentives

    32/33

    Energy Freedom &Economic Prosperity Act

    (EFEPA)

  • 7/30/2019 NJ and Federal Incentives

    33/33

    EFEPAS.2064

    Senator Jim Demint (R- SC) Senator Mike Lee (R- UT)

    Would repeal all energy specific tax credits Revenue Neutral

    Reduction in corporate tax rate

    Voted down as S. Amdt. 1589 26 - 72