P.O. Box 63 Lycoming, NY 13093 July II , 2008 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: SUBJECT: Document Control Desk Nine Mile Point Nuclear Station Unit No.2; Docket No. 50-410 Second Inservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC is submitting the enclosed Second Inservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations for the Nine Mile Point Unit 2. This report summarizes the results of examinations performed during the last refueling outage (RFO-II) of the Third Inservice Inspection Period of the Second Ten-Year Inspection Interval (April 5, 1998 through April 4, 2008). This report meets the requirements of the American Society of Mechanical Engineers (ASME), Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1," as approved for use by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division I." Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Director Licensing, at (315) 349-5219. Very truly yours, Manager, Engineering Services GJLIMHS/ Enclosure: Second Inservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations

Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

P.O. Box 63Lycoming, NY 13093

July II , 2008

U.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001

ATTENTION:

SUBJECT:

Document Control Desk

Nine Mile Point Nuclear StationUnit No.2; Docket No. 50-410

Second Inservice Inspection Interval 2008 Owners' Activity Report for InserviceExaminations

Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC is submitting the enclosed SecondInservice Inspection Interval 2008 Owners' Activity Report for Inservice Examinations for the Nine MilePoint Unit 2. This report summarizes the results of examinations performed during the last refuelingoutage (RFO-II) of the Third Inservice Inspection Period of the Second Ten-Year Inspection Interval(April 5, 1998 through April 4, 2008).

This report meets the requirements of the American Society of Mechanical Engineers (ASME), CodeCase N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements andInservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1," as approved for use by Regulatory Guide 1.147, "Inservice Inspection CodeCase Acceptability, ASME Section XI, Division I."

Should you have any questions regarding the information in this submittal, please contact T. F. Syrell,Director Licensing, at (315) 349-5219.

Very truly yours,

Manager, Engineering Services

GJLIMHS/

Enclosure: Second Inservice Inspection Interval 2008 Owners' Activity Report for InserviceExaminations

Page 2: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Document Control DeskJuly 11,2008Page 2

cc: NRC Regional Administrator, Region INRC Project ManagerNRC Senior Resident Inspector

Page 3: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

ENCLOSURE

SECOND INSERVICE INSPECTION INTERVAL

2008 OWNERS' ACTIVITY REPORT

FOR INSERVICE EXAMINATIONS

Nine Mile Point Nuclear Station, LLCJuly 11,2008

Page 4: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

ConstellationEnergy GroupNine Mile PointNuclear Station

Constellation Nuclear GenerationCorporate Engineering Programs

111 Market PlaceBaltimore Maryland 21201

Prepared For

Nine Mile Point Nuclear S1ation, LLC" P.O. Box 63 Lake Road

Lycoming, New York 13093

SECOND INSERVICE INSPECTION INTERVALand

FIRST CONTAINMENT INSPECTION INTERVAL

THIRD INSERVICE INSPECTION PERIOD2008 OWNER'S ACTIVITY REPORT

FORRFO-11 INSERVICE EXAMINATIONS

(March 22, 2008 through April 17, 2008)

Commercial Service Date: April 5, 1988

NRC Docket Number: 50-410

Document Number: NMP2-0AR-006-1 1

Revision Number: 00 Date: June 4, 2008

~ ' 0 0<&

/i..'2dCU<' ) 'T" V~VO-/dward L. Anderson - Principal Engineer Analyst

Corporate En ine , g rograms\

A l~ _ ~ \ J'~'-..t". _ _ • 1./

Roy H1;i11 - Principal Engineer AnalystCor'potate Engineering Programs

/ :. /J vf c::/ . -.1 ~)a,' /Z00 (}L-#t1VoC. v /Zkr/!wT L/_ 1/ ; DCarl L Friant - 'General SupervisorCorporate,Engi ering Programs

," ," ,;/·/ 7 tr / -QTOd~~.G,:·Davis -~,' ' IS rogram Implementer

/~ / ' 0It ;1.1&0 ( , <z..., -/&r ~D

1 1chael Conway - Genefsupervisor, Site Engineering Programs

I '

Page 5: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station , Unit 2 CNG-NMP2-0AR-006-11oConstellation.' ., Energy Group SECOND INSERVICE INSPECTION INTERVAL Rev. 00

...._...- .......... _......•...._...-- ~ ...~..... ......2008 OWNERS' ACTIVITY REPORTNine Mile Point

Nuclear Station FOR Date: June 4, 2008

INSERVICE EXAMINATIONS Page 2 of 11

TABLE OF CONTENTS

Table of Contents 2

Abstract. 3

Form OAR-1 Owner's Activity Report for Inservice (lSI) inspection Plan NMP2·ISI-006 5

Form OAR·1 Owner's Activity Report for Risk-Informed (RI-ISI) Inspection Pian NMP2-Ri-ISI-006 6

Form OAR·1 Owner's Activity Report for Containment (CISi) Inspection Plan NMP2-CISI-006 7

Table 1 Abstract of Examination and Tests 8

Table 2 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service 9

Table 3 Abstract of Repairs, Replaceme nts. or Corrective Measures Required for Continued Service 10

Page 6: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11ConstellationEnergyGmup SECOND INSERVICE INSPECTION INTERVAL Rev. 00,., ............_...~._._.._~..

2008 OWNERS' ACTIVITY REPORTNineMUe PoirnNuclear Station FOR Date: June 4, 2008

INSERV1CE EXAMINATIONSPage 3 of 11

ABSTRACT

This Owner's Activity Report summarizes the results of the Nine Mile Point Nuclear Station (NMPNS). Unit 2,American Society of Mechanical Engineers (ASME) Section XI Inservice Inspection, Risk-Informed Inspection andContainment Examinations performed during the 2008 Refueling Outage (RFO-11) , from March 22, 2008 throughApril 17. 2008, and the second and last refueling outage of the Third Inservice Inspection Period that started on 5 April2005 and ended on 4 April 2008.

As an alternate to the requirements otthe ASME, Boiler and Pressure Vessel Code (B&PVC), Section XI, Article IWA­6000, NMPNS has implemented ASME Code Case N-532-1, "Alternative Requirements to Repair and ReplacementDocumentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000and IWA-6000, Section Xl, Division 1",

This report provides the close-out of the Nine Mile Point Nuclear Station, Unit 2 Second Ten-Year In-serviceInspection Interval and the Unit 2 First Ten-Year Containment Inspection Interval.

OWNER'S ACTIVITY REPORTS - FORM OAR-1

Owner's Activity Report Form OAR-1 were prepared and certified upon completion of the 2008 refueling outage(RFO-11) Examination activity for the following inspection plans:

• NMP2-ISI-006, lnservice Inspection Plan and Schedule• NMP2-RHSI-006, Risk-Informed Inspection Plan and Schedule• NMP2-CISI -006. Containment Inspection Plan and Schedule .

In addition to the Owner's Activity Report, Form OAR-1, the following Tables are also included:

a. Abstract of Examinations and Tests, Table 1, provides such information as ASME Code ExaminationCategory, Total Examinations Required for the Inspection Interval , Tota l Examinations Required for thisPeriod, Total Examinations Credited (%) for this Period, Total Examinations Credited (%) to Date for theInterval, and any remarks that may be applicable to each Exam ination Category.

b. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 2,provides a listing of item(s) with flaws or relevant conditions that required evaluation to determineacceptability for continued service, whether or not the flaw or relevant condition was discovered during ascheduled examination or test, and provides such information as Examination Category, Examination ItemNumber, Item Description, Flaw Characterization (as required by IWA-3300) , and whether the flaw orrelevant condition was found during a scheduled Section XI examination or test.

Page 7: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11o ConsteUationSECOND INSERVICE INSPECTION INTERVAL Rev.. . ~~!.~Group 00

NineMile Point 2008 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: June 4, 2008

INSERVICE EXAMINATIONSPage 4 of 11

c. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Tab le 3,identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptancecriteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery ofthe flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not haveresulted from an exam ination or test required by Section Xl, and provides such information as Code Class ,whether the item is a repair , replacement or corrective action , item description, description of work, if the flawor relevant condition was found during a scheduled Section XI Examination or test, date completed and therepair replacement plan number.

In accordance with ASME Section XI, IWB-2412 (a), with the exception of the examinations that may bedeferred until the end of the inspection interval as specified in Table IWB-2500-1 , and for those examinationswhich NMPNS has requested and received approva l in the form of relief request, the required examinationsin each examination category have been completed for the Third Inservice Inspection Period in accordancewith Tab le IWB-2412-1 .

Page 8: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11ConstellationEnergy Group SECOND INSERVICE INSPECTION INTERVAL Rev. 00-~---~--_.. 2008 OWNERS' ACTIVITY REPORTNin(~ Mile PointNuclearStation FOR Date: June 4 , 2008

INSERVICE EXAMINATIONSPage 5 of 11

FORM OAR-1OWNER'S ACTIVITY REPORT

As required by the provisions of the ASM E Code Case N-532-1

NMP2-0AR-006-11Report Number --.!.=L.:::.~~~~.w..

Nine Mile Point Nuclear Station, LLC, P.O. Box 63 Lake Road. Lycoming. New York 13093(Name and Address of Owner)

Nine Mile Point Nuclear Station. P. O. Box 63, Lycominq, New York 13093(Name and Address of Plant)

Refueling Outage Number RFO-11April 5, 1988Commerc ial Service Date2Plant Unit _ -,=-_

Second Inservice Inspection Interval - April 5, 1998 to April 4. 2008(1 st, 2nd, 3rd, 4th, Other)

Third Inservice Inspection Period - April 5. 2005 to April 4, 2008(1st, 2nd, 3rd)

Current Inspection Period ~~.!.!..!.>~~=:....!J~~~:!...!..!.~~!"':"'~!..!.!....l:!.:..:.~~~~'-!.!....:~~~

1989 Edition, No AddendaEdition and Addenda of Section Xl applicable to the Inspection Plan _ _ ...!..2:!:!£..~~~~~!.!:!.2~!:!

CERTIFICATE OF CONFORMANCE

I certify that the statements made in this Owner's Activity Report are correct. and that the examinations, tests, repairs, replacements,evaluations and correct ive measures represented by this repo rt conform to the requirements of Section XI.

N/AExpirat ion Date ....!.:!.1.~

6h,b oo )(Date --=c::.,L-L,,L.::.="'::::"'-l.lo-- -

Certificate of Authorization No, --'-"Nu:./A:!...-_ ....,.,-;_,.",--,--,-,- _(If applicable )

Signed L-CMJ!/ ;;(r;;;;/~A(General Supervisor - Corporate Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION

I, the under signed , holding a val id commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of New York and employed by Harford Steam Boiler (HSBCD of Harford. Connecticut have inspected theitems described in this Owner's Activity Report, dur ing the period 03122/200 8 to 04/17/2008 , and state that to the best of myknowl edge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of SectionXI.

Date

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations.tests, repairs, replacements, evaluations and corrective measures described in this report . Furthermore , neither the Inspector nor hisemployer shall be liable in any er for any personal injury or property damage or a loss of any kind arising from or connected with

thisins~. "

lc:::.e,V\.~,., . t "Inspecto r's Signature

~ )J& log

Page 9: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11~eliation

.~~~Gr~~ SECOND INSERVICE INSPECTION INTERVAL Rev. 00

NineMilePoin! 2008 OWNERS' ACTIVITY REPORTNuclea; Station FOR Date: June 4, 2008

INSERVICE EXAMINATIONSPage 6 of 11

FORM OAR-1OWNER'S ACTIVITY REPORT

As required by the provisions of the ASME Code Case N-532-'

NMP2-0AR-006-11Report Number --!.=:....=.~~~~l...!.

Nine Mile Point Nuclear Station . LLC, P.O. Box 63 Lake Road. Lycoming . New York 13093(Name and Address of Owner)

Nine Mile Point Nuclear Station. P. O. Box 63. Lvcoming, New York 13093(Name and Address of Plant)

Refueling Outage Number RFO-11April 5. 1988Commercial Service Date _~~~':""':'="'-_2Plant Unit _-,=,-_

Second Inservice Inspection Interval - April 5, 1998 to April 4. 2008(1st, 2nd, 3rd, 4th, Other)

Current Inspection Interval__~~~~!.!.:::!.l~~'-!.!..!£!£~~!....!..!J~.!!.E.L::.J~!..!.!..l::!.l-!..2.0~~:::!!:!!..!.!....:~~~

Third lnservice Inspection Period - Aoril 5, 2005 to April 4. 2008(1st, 2nd, 3rd)

Current Inspection Period ..!..1..!~...!ll~!...ll!:!.E....!l.!:i!.l::!.S~.!l.!..!..!....!~~:...c:~~"-=~~!:L!~..!.!...:!:..:...=::.l8!2

1989 Edition. No AddendaEdition and Addenda of Section XI applicable to the Inspection Plan __~~..!::l;~~~~~~.s

CERTIFICATE OF CONFORMANCE

I certify that the statements made in this Owner's Activity Report are correct, and that the examinations. tests. repairs. replacements.evaluations and corrective measures represen ted by this report conform to the requirements of Section XI.

N/AExpiration Date ~l!:l

Date _.:=.;,.e-""':""'L.:::"::::.!::::..-4l.-_

Certificate of Authorization No. --'-"'''''-- _

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of New York and employed by Harford Steam Boiler {HSBCTl of Harford , Connecticut have inspected the itemsdescribed in this Owner's Activity Report, during the period 03/22108 to 04/17f08 t and state that to the best of my knowiedgeand belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty , expressed or implied. concaming the examinations,tests, repairs, replacements, evaluations and correct ive measures described in this report . Furthermore, neither the Inspector nor hisemployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this ins~n. ," (\ '

\~\.c~& \> ''=t:\~d'~ Commissions NB9889 A. B. N. I NY 3061Inspector's Signature "~ National Board, State, Province, and Endorsements

Date C"l ) \ \p IOC?

Page 10: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11Comrt~~ati£.m- - SECOND INSERVICE INSPECTION INTERVAL Rev. 00. £if'"

Nine MilePoint 2008 OWNERS' ACTIVITY REPORTNuclear S",ztlon FOR Date: June 4, 2008

INSERVICE EXAMINATIONSPage 7 of 11

FORM OAR-1OWNER'S ACTIVITY REPORT

As required by the provisions of the ASME Code Case N-532-1

NMP2-0AR-006-11Report Number ----'c.:.:.:.:.:...:::....::::.'-"'-'-=:<.:::....-'--'-

Nine Mile Point Nuclear Station . LLC, P.O. Box 63 Lake Road, Lycoming , New York 13093(Name and Address of Owner)

Nine Mile Point Nuclear Station, P, O. Box 63, Lycoming. New York 13093(Name and Address of Plant)

Refueling Outage Number RFO-11April 5, 1988Commercial Service Date _-,-,,,,,,,-,,,_=,-,-=::=:,-_2Plant Unit _-,=-_

First Inservice Insoection Interval - Apri l 5. 1998 to April 4 , 2008(tst, 2nd, 3rd, 4th, Other)

Current Inspection lnterval__~~~=c:..:.:.=:..:.:.:.::==.:::.:..:...=:..::=.;:..=~.=..:..~.:.....:..=::....:.:=-=-="-':.:.......:.."-==

Third inservice Inspection Period - Aoril5, 2005 to April 4, 2008(1 st, 2nd, 3rd)

Current Inspection Period -'-'-':.:...:::.'"""-"=:...:.:.::=-'"'-"===~~~"-'=:--'-'''''_'_'''_=~==_>.=....:.._'=_'_'_:..L..:::==

1998 Edition, No AddendaEdition and Addenda of Section XI applicable to the Inspection Plan __-,-"=:",=:;=",-,-,-,-,--,-""--,--,=="-,,,,,,,-

Edition and Addenda of ASME Section XI a

CERTIFICATE OF CONFORMANCE

I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements,evaluations and corre ctive measures represented by this report conform to the requ irements of Sect ion Xl.

N/AExpiration Date --'-'""-'

Date _..:.;.~'"""-__.=_......_

Cert ificate of Authorization No . -'N""I""A'--_-;::-_-::---;-:---;- _

tJ '-/ c..'~ • ... (I applicable)

Signed ",A> ' 0( - rt-~ '" lA./'?/Y(General Supervisor - rporate Engineering Programs)

CERTIFICATE OF INSERVJCE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of New York and employed by Harford Steam Boiler (HSBCn of Harford, Connecticut have inspected the itemsdescribed in this Owner'S Activity Report, during the period 03/22/08 to 04 /17/08 , and state that to the best of my knowledge andbelief, the Owner has performed all activities represented by this report in accordance with the requirements of Sect ion XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or impl ied , concerning the examinations,tests, repairs, replacements, evaluations and corrective measures described in this report Furthermore. neither the Inspector nor hisemployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this insp~ction , ' \ '\(.1..~' .\2.u.r-..{).~dl ~~~\ Commissions NB9889 A B. N, I NY 3061

<;.........

Inspector's Signature National Board, State, Province, and Endorsements

Date G, 1/ (, loa

Page 11: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

CNG-NMP2-0AR-006-1 1Cor.stelmtionEnergy Group.._-,.~_.~.._-~~._ _ __._ _-_.,..

MHe PointS1:ation

Nine Mile Point Nuclear Station, Unit 2

SECOND INSERVICE INSPECTION INTERVAL2008 OWNERS' ACTIVITY REPORT

FORINSERVICE EXAMINATIONS

Rev.

Date:

Page

00

June 4, 2008

8 of 11

TABLE 1ABSTRACT OF EXAMINATIO~ AND TESTS

As required by the provisions at the ASME Code Case N-532-1

Does not Include examinations require d only when c tsassembtedt example. 185 CRD S)100% of access ible surfaces examined each periodAll examinations are performed during 2"" or 3fd periodCategory requires 100% examination every 5 years .Reference RR-RI-ISI-2, all examinations to be completed in the 2"" and 3rd periods

1.2.3.4.5.

TOTALTOTAL 'TOTAL TOTAL EXAMINATIONS

CODE EXAMINATIONS EXAMINATIONS EXAMINATIONS CREDITED(%}TOEXAMINATION REQUIRED FOR REQUIRED FOR CREDITED (%) DATEFORTHE

REMARKSCATEGORY INTERVAL THISPERIOD FORTHE PERIOD INTERVAL

B-A 35 13 13 - 100% 35 -100% Deferral Permissible

B-D 66 22 22 -100% 66 -1 00% Deferral Permissible

B-G-1 307 129 129-100% 307- 100% Deferral Permissible

B-G-2 65 10 10- 100% 65 - 100% Note 1

B-K 8 4 4- 100% 8 -1 00% CC N-509

B-L-2 1 1 0 - 0.0% 0 - 0.0% Deferral Permissible, ,Pump wasnot Disassembled

B-M-2 35 20 2-0.1% 15-42.8% Deferral Permissible, 20 valveswere not Disassembled

B-N-1 254 112 112-100% 254- 100% Note 2

B-N-2 14 2 2 - 100% 14 - 100% Deferral Permissible

B-O 14 6 6 - 100% 14 -1 00% Deferral Permissible

C-A 2 1 1 - 100% 2 -100% Note 3

CoB 4 2 2 - 1000/0 4-1 00% Note 3

C-C 8 5 5 -1 00% 8-1 00% CC N-509

CoD 1 0 0- 0.0% 1 - 100%

. CoG 58 33 12 - 100% 37-.63.7% RR-IWC-1, Pump was notDisassembled

D-A 24 10 10 -100% 24 -100% CC-N-509

E-A 2764 887 887- 100% 2764 -100% Note 2

F-A 268 83 83 - 100% 268 -100% CC N-491-1

L-A 122 61 61 - 100% 122-100% Note 4

R-A 153 50 50-100% 153-100% RI-ISI, Note 5

R-C 30 6 6-100% 30-100% RI-BER's. Note 5

, .Notes.

Page 12: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station , Unit 2 CNG-NMp2-0AR-006-11ConS'tel~atwnEnergy Group SECOND INSERVICE INSPECTION INTERVAL Rev. 00.._..._..._....__._~---_ .._--_..

2008 OWNERS' ACTIVITY REPORTNine Mile PointNudearStation FOR Date: June 4, 2008

INSERVICE EXAMINATIONSPage 9 of 11

TABLE 2ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE

As required by the provisions of the ASME Code Case N·532-1

FLAW OR RELEVANTFLAW CONDITION

EXAMINATION ITEM ITEM CHARACTERIZATION FOUND DURINGCATEGORY NUMBER DESCRIPTION (IWA-3300} SCHEDULED

SECTION Xl EXAMINATIONOR TEST

rYES OR NO)

N/A N/A Reactor Pressure Vessel Flange Relevant Condition NOSurface

Page 13: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

CNG-NMP2-0AR-00&-11

Energy Group_···_···_,<,,·_,~·.m"·~'__~~~' ~'~

Mile PointStatlon

Nine Mile Point Nuclear Station, Unit 2

SECOND INSERVICE INSPECTION INTERVAL2008 OWNERS' ACTIVITY REPORT

FORINSERVICE EXAMINATIONS

Rev.

Date:

Page

00

June 4,2008

10 of 11

TABLE 3ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE

As required by the provisions of the ASM E Gode Case N-532-1

FLAW OR RELEVANTREPAIR CONDITION FOUND

REPLACEMENT DURING SCHEDULED REPAIROR DESCRIPTION SECTION XI REPLACEMENT

CODE CORRECTIVE ITEM OF EXAMINAT ION OR TEST DATE PLANCLASS MEASURE DESCRIPTION WORK (YES OR NO) COMPLETE NUMBER

1 Reoair 2MSS*AOV6A Repair Thread Hole No 04/10 /08 07-09559-09

1 Reoair 2MSS*AOV6D Reoair Thread Hole No 04/10/08 07-09559-08

Page 14: Nine Mile Point, Unit 2 - Second Inservice Inspection ...Plant Unit _ -,=-_2 Commercial Service Date April 5, 1988 Refueling Outage Number RFO-11 Second Inservice Inspection Interval

Nine Mile Point Nuclear Station, Unit 2 CNG-NMP2-0AR-006-11ComriellationEneg}f Group SECOND INSERVICE INSPECTION INTERVAL Rev. 00_.._._..................h.,.....,>___ ·_~___

2008 OWNERS' ACTIVITY REPORTNineMilePointNu{;Jear Strition FOR Date: June 4,2008

INSERVICE EXAMINATIONS Page 11 of 11

End of Inservice Inspection

Owner's Activity Report

For

Refueling Outage Eleven (RFO-11)

And

Ten-Year In-service I Containment Inspection Interval