NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
SMT pedestal managementWeekly NIKHEF – NIJMEGEN – D0 meeting
June 6, 2001Freya Blekman
Summary:Outline of current SMT statusWhat is the next step?SDAQ vs. PDAQYet again: DatabasesThe smt_ped_tools Some results
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
SMT status (current)100% of the SMT is now cabled95 % of the barrels has been read outFor the F-disks and H-disks, this is a bit lower (around 90%)Still some HV problems, nothing major.Still only running in full-readout mode.
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
What is the next step?We can now only run whilst reading out all (=800,000) channels of the SMT. This load is not possible for the DAQ (nor will it ever be)SMT will eventually be running in sparse mode‘sparse’ = with pedestal subtraction on the
svx readout chip (~= ADC) and zero-surpression.
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
What to do: get those Pedestals!Every channel has its own ADC.The pedestal values have only been measured in lab, and even there not very well.When downloading the chip, the pedestals can be set.Pedestal values are retrieved (per channel) in the calibration database and in the online (=‘hardware’) database
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Pedestal measurementAt D0, there are two ways to measure the pedestal values of the silicon
1. Take data and look at the average data per channel (= Primary Data Acquisition)
2. When not running, put charge on every channel and do a raw pedestal measurement. (=Secondary Data Acquisition)
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
SDAQ vs. PDAQ (1)
PDAQ + : Use the data you already have to compensate. ‘Standard’ way to do it.
PDAQ - : You need data ! (and lots of it)
PDAQ - : Cannot readout full SMT unless sparse mode: will only be reading out channel with hit and two neighbors.
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
PDAQ vs. SDAQ (2)
SDAQ + : It’s relatively quick.(few hours)
SDAQ - : It’s not clear that charge deposition on Si strips has the same result as real life.
SDAQ - : Remove SMT from global run.
SDAQ - : Program still very unreliable(for instance, it ignores the 9th chip on 9-chip
ladders. 50% of the SMT barrel detectors are 9-chip ladders.)
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Several SDAQ runs (unbiased ladders)Database problems (solved now)smt_ped_tools (in cvs)
ROOT-based guiCreate_ntuple program
SMT_pedestals.root
Some small macros
Last few weeks:
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
create_ntuple.xCPP codeUses 2 packages:
D0omORACLEConnects to ORACLE calibration DB
HepTuple Creates root files
Creates root ntuple
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
create_ntuple.x (2)Why not directly in root?Too much trouble with TSQL classes in root. TSQL works (after a lot of work) on linux, when you have administrator privileges.One of the CDF ORACLE gurus recently (last month) got it working at fnal.I decided that it wasn’t worth wile trying, you don’t want to connect to the database every time anyway.
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Smt_ped_gui.CUses ROOTROOT has gui classesIs essentially a big root MacroPlots averages as a function of run number.Options for HDI type selection
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Smt_ped_gui/rootMacros/Ready:
Channel maps (semi-interactive)
Near future:Pedestals as a function of integrated luminosityis dependent of availability of1. My time2. Luminosity data (Mike Begel)
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Results (1)
Direct output of
smt_ped_tools/
smt_ped_gui.C
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Results (2)Run 121545Ladder type
Barrel 4Layer 2Ladder3
Double-sided, 6 svx chips
one of the detectors closest to (0,0,0)
NIKHEF –D0 meeting,June 6, 2001
Freya Blekman, NIKHEF Amsterdam
Results (3)Run 121545Ladder type
Barrel 4Layer 3Ladder3
Double-sided, 9 svx chips
SDAQ 9th chip problem visible