PLCS – A technical introduction
Nigel ShawEurostep Limited PLCS Technical Lead
Acknowledgements
The PLCS sponsor companies
Advanced Technology Inc. Charleston SC
Eurostep colleagues:John Dunford, PLCS Program ManagerRob Bodington
FinnishDefence Forces
Product Life Cycle Support (PLCS)Membership
Scope of STEP Today
Product Life Cycle Support (PLCS)The Vision
Shared Data
Product Representations
Product Performance
Product Structure
Support Performance
Change Directives
Support Environment
Failure Analysis
Maintenance Analysis
Task Resource Data
Life Life Cycle Cycle DataData Maintain/DisposeMaintain/DisposeQueryQuery
Derived Derived Disposable DataDisposable Data
UseUseRespond
Respond
Support and Operational Feedback
Standard Standard Commercial Commercial TransactionsTransactionsFeed and
Feed and
ExtractExtract
PLCS – Part of ISO 10303 - STEP
PLCS is being published as a part of STEP� ISO 10303-239
This means that it is a data model� In the EXPRESS language (ISO 10303-11)
It is a “modular Application Protocol”� Builds on (and extends) the “PDM Modules” � Use 132 modules
Bei
ngD
oing
Composition, structure & definition
Properties
States of a product:
Named states: operating states, fault states, repair status
Activities performed by a product
Embedded support functions (diagnostics, BITE etc).
Activities (work, tasks) by people or machines acting on a product( asses impact, design, manufacture, test, repair, move etc)
Operational behavior (functions, I/O, sequence etc.)
States of activities: off/on, started, paused, step 3 completed
States of environment: windy, acidic, peacetime, transatlantic operations
States of people: available, trained to skill level 4, occupied
Required PlannedDesignedRealized
Realization Use
PLCS: The things we need to talk about (and distinguish between).
Ap239_Task_specification_resourced
Activity_method
Ap239_work_definitiionProduct_as_individual
Individual
Type
Ap239_activity_recording
Activity_as_realized
Resource_as_realized
Observation
Ap239_product_status_recording
State_observed
ap239_properties work_order
work_request
Scheme
Ap239_product_definition_information`
Ap239_product_lifecycle_support
AP module: Ap239_product_lifecycle_support
Condition
Scope of STEP Today
Product Life Cycle Support (PLCS)Life Cycle Data
Shared Data
Product Representations
Product Performance
Product Structure
Support Performance
Change Directives
Support Environment
Failure Analysis
Maintenance Analysis
Task Resource Data
Life Life Cycle Cycle DataData Maintain/DisposeMaintain/DisposeQueryQuery
Derived Derived Disposable DataDisposable Data
UseUseRespond
Respond
Support and Operational Feedback
Standard Standard Commercial Commercial TransactionsTransactionsFeed and
Feed and
ExtractExtract
HistoryOf product configurationOf product state
FailuresOperating states
Of ActivitiesPlannedPerformed
+ relations between them
PLCS covers a big scope
At present:� Few enterprises have integrated sets of data covering
the entire scope of PLCS� Many enterprises need to exchange and share
information that is a part of the PLCS scopeData exchange sets
� Subsets of PLCS to meet exchange needs
� Under development now and transitioning to OASIS
D6 Work Order
NODE: TITLE: NUMBER:Provide supportA4
1£0
Plan & control supportdelivery
2£0
Manage supportelement resource
3£0
Implement authorizedtask
4£0
Collect data &provide feedback
support element
productneedingsupport
operator feedback
change directive
operationalschedule
reference informationfrom support provider
standard commercialtransaction
information from supportelement provider
released support system
product status
maintenancestatus
released task resource information tosupport delivery planning
information for financialmanagement purposes
information to supportelement provider
disposedelement
supportsolutionfeedback
supported product
maintenance data
maintenance needconfigurationmanagementfeedback
informationto systemoperator
supportfeedback
authorizedschedule formaintenance &support
APSI or relatedinformation
life-cycle directive information managementrule
assured supportsolution definition
D6 Work Order
D13 SupportSolution
(includes D12 and D2s and D3)
D8 Work Schedule
D9 ResourceSchedule
D10a Activity Report
D10b Resource Report
D4b Product Status Report
D9 ResourceSchedule
D8 Work Schedule
Using DEXs with the Activity ModelD19b
Realized Product Use
D22b Support
Opportunity