The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance.
Document ID: INL/EXT-07-12999Revision ID: 3
Effective Date: 09/10/09
Report
Project No. 23843
NGNP System Requirements Manual
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: i of x
Approved by: �
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: ii of x
This page intentionally left blank.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: iii of x
REVISION LOG
Rev. Date Affected Pages Revision Description
3 9/10/09 Various Incorporated INL/EXT-16548, NGNP Requirements Verification Traceability Report
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: iv of x
This page intentionally left blank.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: v of x
SUMMARY
This revision of the Next Generation Nuclear Plant (NGNP) System Requirements Manual (SRM) contains requirements derived or taken from key source documents, which include the Energy Policy Act of 2005 (EPAct), reports from the Nuclear Energy Research Advisory Council (NERAC) and the National Research Council of the National Academics, and previous versions of the NGNP SRM. The latter document consolidated requirements from prior reactor supplier reports and the preconceptual design report. These requirements were then categorized as high-level programmatic requirements and functional, operational, and technical requirements for the NGNP Project. This report contains the categorized programmatic and technical requirements associated with the NGNP, as well as the derived project requirements, and describes the requirements hierarchy. Project requirements are traceable to initial project baseline documents and are being designed to follow the good practices suggested in the Systems Engineering and Interface Management document, which states that project requirements are:
� Identified, defined, and approved as early as possible
� Documented and placed under change control
� Available to all project participants
� Refined and developed as the project progresses.
This report also provides definition of the design entity’s and design authority’s responsibilities for future design documents. This document presents in detail the attributes of a fully relational database (i.e., DOORS®), which contains the requirements.
As the project matures, a verification method will be selected for each requirement to ensure full implementation. Programmatic requirements are derived from the legislative directives, including the EPAct, and other regulatory requirements through the Nuclear Regulatory Commission (NRC) licensing process. The technical requirements are assigned to the applicable Plant, Areas, Systems, Subsystems, and Components (PASSCs) and include assumptions that are made during the design process. These assumptions are tagged as verified and unverified assumptions. For unverified assumptions, the project either knowingly accepts the risk of proceeding with the unverified assumption or completes the necessary tasks to validate the assumption. Changes to the requirements will be controlled in the database and formally adopted by the project via revision control.
By developing, deriving, and documenting the requirements and assumptions associated with NGNP, requirements are tracked with full accounting of each requirement to ensure customer and stakeholder needs are met. Fully implemented requirements are necessary to verify that the project has successfully met customer and stakeholder needs.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: vi of x
This page intentionally left blank.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: vii of x
CONTENTS
REVISION LOG .......................................................................................................................................... iii�
SUMMARY .................................................................................................................................................. v�
ACRONYMS ............................................................................................................................................... ix�
DEFINITIONS .............................................................................................................................................. x�
1.� INTRODUCTION .............................................................................................................................. 1�1.1� Areas, Systems, Subsystems, and Components ....................................................................... 1�1.2� Requirements Hierarchy .......................................................................................................... 2�
2.� REQUIREMENTS DATABASE ....................................................................................................... 3�2.1� Database Modules .................................................................................................................... 3�2.2� Database Attributes .................................................................................................................. 4�
2.2.1� Reference and Alternative Designs ............................................................................. 6�2.2.2� Verification Methods .................................................................................................. 6�
2.3� Allocation and Traceability ...................................................................................................... 7�2.4� Configuration Control .............................................................................................................. 8�
3.� NGNP REQUIREMENTS ................................................................................................................. 9�
4.� REFERENCES ................................................................................................................................. 11�
Appendix A NGNP Programmatic Requirements ..................................................................................... 13�A-1.� Regulatory Requirements ....................................................................................................... 14�A-2.� Legislative Requirements ....................................................................................................... 23�A-3.� End User Requirements ......................................................................................................... 35�A-4.� Stakeholder Requirements ..................................................................................................... 36�
Appendix B NGNP Functional, Operational, and Technical Requirements ............................................. 65�B-1.� Nuclear Heat Supply Requirements ....................................................................................... 66�B-2.� Heat Transport System Requirements .................................................................................... 80�B-3.� Hydrogen Production System Requirements ......................................................................... 85�B-4.� Power Conversion System Requirements .............................................................................. 91�B-5.� Balance of Plant Requirements .............................................................................................. 94�
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: viii of x
FIGURESFigure 1. NGNP plant architecture. .............................................................................................................. 1�
Figure 2. Sample DOORS® screen .............................................................................................................. 3�
Figure 3. INL-controlled DOORS® modules. .............................................................................................. 4�
Figure 4. Sample DOORS® Attributes screen ............................................................................................. 6�
Figure 5. DOORS® Graphics Mode screen .................................................................................................. 8�
Figure 6. Requirements processing. .............................................................................................................. 9�
TABLESTable 1. Critical PASSCs for Different Reference Designs. ........................................................................ 2�
Table 2. Cited source documents for NGNP requirements. ........................................................................ 10�
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: ix of x
ACRONYMSCFR Code of Federal Regulations
CM Configuration Management
COLA Combined Operating License Application
CORE® Unknown. Automated requirements management/systems engineering tool, produced by ViTech Corporation
DOE U.S. Department of Energy
DOORS® Dynamic Object Orientated Requirements System (produced by IBM Rational / Telelogic)
EPAct Energy Policy Act of 2005
FOAK first of a kind
HTE High-Temperature Electrolysis
HyS Hybrid Sulfur
ICD Interface Control Document
INCOSE International Council on Systems Engineering
INL Idaho National Laboratory
ITAAC Integrated Test Analysis and Acceptance Criteria
NGNP Next Generation Nuclear Plant
NOAK nth of a kind
RC Nuclear Regulatory Commission
OECM Office of Engineering and Construction Management
PASSC Plant, Areas, Systems, Subsystems, and Components
RAI Request for Additional Information
RAM Requirements Allocation Matrix
RMIP Requirements Management Implementation Plan
SAG Senior Advisory Group
SE Systems Engineering
SRM System Requirements Manual
TDRM Technology Development Roadmap
TRL Technology Readiness Level
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: x of x
DEFINITIONS
Design Entity Organization responsible for supplying the plant design specifications for the design authority’s approval. Currently, this role is fulfilled by the reactor suppliers.
Design Authority Organization responsible for establishing and maintaining the high-level requirements and acceptance criteria and ensuring the design documents accurately reflect the design basis. Currently, this role is fulfilled by the Idaho National Laboratory under the direction of the U.S. Department of Energy.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 1 of 104
1. INTRODUCTION This document constitutes the 3rd revision of the Next Generation Nuclear Plant (NGNP) System
Requirements Manual (SRM) for the programmatic requirements and the Plant, Areas, Systems, Subsystems, and Components (PASSC) level requirements. The SRM defines and contains the initial requirements for the current maturity of the NGNP Project. These initial requirements are design-neutral; in other words, they remain in force regardless of the specific design decisions made in the future. Similar to a requirements allocation matrix (RAM), this SRM was prepared at the early stages of conceptual design and allocates, traces, and ensures requirements are properly met via verification methods (i.e., analysis, test, inspection, or demonstration).
As the project matures, particularly after the nuclear system design, plant operating conditions, and plant configuration are finalized, detailed design requirements for the five NGNP areas will be generated, documented, and maintained by the design entity with design authority approval. The SRM is the means of documenting programmatic and technical requirements and tracking those requirements to full implementation. The requirements are assigned to the applicable PASSCs and will include assumptions that are made during the design process. The requirements in this report represent only those requirements identified at the current state of plant design and additional requirements or modifications identified via early conceptual design work. As the requirements identification and documentation process evolves, the scope of these requirements may change. Detailed requirements will be documented in this SRM for all PASSCs as the NGNP matures.
It is the intent of the NGNP Project to meet Energy Policy Act of 2005 (EPAct). As such, EPAct language is adopted as requirements for the project. This SRM was developed under the assumption that funding levels necessary to meet the requirements contained herein will be available, as projected by the NGNP Project.
1.1 Areas, Systems, Subsystems, and Components The NGNP is comprised of five areas: Nuclear Heat Supply, Heat Transport, Hydrogen Production,
Power Conversion, and Balance of Plant. Each area is broken down further into systems, which are comprised of subsystems, which are further comprised of components, as shown in Figure 1.
The requirements captured in this SRM are the high-level functional requirements as well as the operational requirements assigned to the appropriate PASSC requirements. The technical processes contained in the Requirements Management Implementation Plan (RMIP) apply to both the existing requirements contained in this SRM and the future requirements to be developed through various design phases of the project. Table 1 shows the critical PASSCs for a 750°C – 800°C reactor outlet temperature ROT; (see
Figure 1. NGNP plant architecture.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 2 of 104
INL/EXT-09-16598)1 and for a 950°C ROT (see INL/EXT-08-15148)2. These critical PASSCs may change as the NGNP is further developed. The reactor suppliers have developed updates to the PASSCs to incorporate changes in reactor outlet temperatures (750°C – 800°C) and in configurations (prismatic design utilizing a steam generator in the primary loop).
Table 1. Critical PASSCs for Different Reference Designs.
NGNP Areas 750 – 800�C ROT INL-Consolidated Critical PASSCs
950�C ROT INL-Consolidated Critical PASSCs
Nuclear Heat Supply
Reactor Pressure Vessel Reactor Pressure Vessel Reactor Vessel Internals Reactor Vessel Internals Reactor Core & Core Structure Reactor Core & Core Structure Fuel Elements Fuel Elements Reserve Shutdown System Reserve Shutdown System Reactivity Control System Reactivity Control System Core Conditioning System (Shutdown Cooling)
Core Conditioning System (Shutdown Cooling)
Reactor Cavity Cooling System Reactor Cavity Cooling System
Heat Transport
Intermediate Heat Exchangers Intermediate Heat Exchangers Circulators Circulators Hot Duct – Cross Vessel Hot Duct – Cross Vessel High Temperature Valves (Isolation, Flapper, & Relief)
High Temperature Valves (Isolation, Flapper, & Relief) Mixing Chamber
Hydrogen Production
HTE, S-I, and HyS (currently identifying all three technologies until one is selected for NGNP)
HTE, S-I, and HyS (currently identifying all three technologies until one is selected for NGNP)
Power Conversion Steam Generator Steam Generator Power Conversion System
Balance of Plant Fuel Handling System Fuel Handling System Instrumentation and Control Instrumentation and Control
1.2 Requirements Hierarchy The requirements hierarchy is based on the physical structure of the plant, and its associated areas,
systems, subsystems, and components for both hydrogen production and electricity production. The lowest levels of requirements are at the plant design level. The requirements hierarchy is structured in a way that allows for further enhancement and the derivation of additional requirements without changing the original structure as the project is further defined. This SRM currently contains the NGNP’s legislative and regulatory, end-user, and functional and operational requirements for the PASSC levels. Assumptions made during the design process are also captured, as verified or unverified assumptions. For unverified assumptions, the project either knowingly accepts the risk of proceeding with the unverified assumption or completes the necessary tasks to validate the assumption.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 3 of 104
2. REQUIREMENTS DATABASE The NGNP requirements are managed in an internationally recognized, structured database tool that
aids in the development and management of requirements throughout the life cycle of any given project. The Dynamic Object Orientated Requirements System (DOORS®), produced by IBM Rational/Telelogic, was specifically designed with the ability to link and track the flow-down of requirements through a complex series of requirements modules. DOORS® has been used on large projects of similar size and complexity to the NGNP project and, as such, was selected to manage NGNP requirements. The design entities may initially implement design specification requirements in other software packages. This is acceptable provided the design requirements are received in a format approved by the design authority.
DOORS® enables its users to store data in formal modules, organize requirements in a template, relate different levels of requirements through linked modules, restrict access to the data, enter data directly into the modules, run reports, search requirements, and trace requirements through the various stages of development. Figure 2 is a sample screen of the DOORS® tool.
Figure 2. Sample DOORS® screen
2.1 Database Modules The current requirements sets that apply to various aspects of the NGNP are contained in the Idaho
National Laboratory (INL) DOORS® database, and future, more encompassing requirements will continue to be tracked and stored in the database as the NGNP project matures. The NGNP requirements stored in the DOORS© database are presented in Appendices A and B of this SRM. Figure 3 lists the modules that contain the NGNP requirements.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 4 of 104
Figure 3. INL-controlled DOORS® modules.
2.2 Database Attributes The DOORS® tool allows the user to filter requirements based on user selected attributes. From these
filtered requirements, a report can be generated for a specific design. For example, one may filter a module of requirements for a prismatic reactor type with an outlet temperature of 750�C, and the tool will
DOORS® Modules Programmatic Requirements
� Regulatory – Top Level Design Criteria – Top Level Safety Criteria – ITAAC Validation Requirements – Request for Additional Information Requirements
� Legislative � End-User Requirements � Stakeholder Requirements
Functional, Operational, and Technical Requirements
� Nuclear Heat Supply Requirements – Reactor Pressure Vessel – Reactor Vessel Internals – Reactor Core and Core Structures – Nuclear Instrumentation – Fuel Elements – Reserve Shutdown Systems – Reactivity Control Systems – Core Conditioning System (Shutdown Cooling) – Reactor Cavity Cooling system
� Heat Transport System Requirements – Circulators – Intermediate Heat Exchangers – Cross Vessel Piping – Mixing Changer – High Temperature Valves
� Hydrogen Production System Requirements – Hydrogen Production System
� Power Conversion System Requirements – Steam Generator – Power Conversion System Equipment for Direct Combined Cycle
� Balance of Plant Requirements – Fuel Handling System – Instrumentation and Control
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 5 of 104
output a listing of the requirements applicable to this scenario. The attributes currently contained in each of the DOORS® modules for each requirement include the following:
� ID (Created by DOORS – unique for each requirement)
� Object # (Level hierarchy of requirements)
� Requirement Text
� 950�C or 750�C
� Reactor Type (Pebble Bed or Prismatic)
� Source of Requirement.
Future attributes may include the following:
� Additional Sets for various outlet temperatures
� Subsection or type of requirement may include the following selections:
– Performance Requirement – Structural or Construction Requirement – Environmental Requirement – Instrumentation and Control Requirement – Startup or Shutdown Requirement – Monitoring or Surveillance Requirement – In-Service Requirement – Availability, Maintainability, Reliability or Testability Requirement – Safety Requirement Codes and Standards Requirement – Quality Assurance Requirement – Decommission Requirement – Interface Requirement – Other Requirement
� Verification Method
� Verification Document
� Comment / Basis.
A sample screen of the attributes for each requirement currently in a DOORS® module is provided in Figure 4.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 6 of 104
Figure 4. Sample DOORS® Attributes screen
2.2.1 Reference and Alternative Designs
Due to the current development stage of the project, requirements for both the initial design and the anticipated updates are included. The initial requirements are for maximum operating temperatures of 950°C and the steam generator in the primary loop. The updated requirements reflect a plant with maximum operating temperatures between 750°C and 800°C and a steam generator in the primary loop. Each set of requirements are designated by their respective headings of 950°C or 750°C in the appropriate attribute field. In some instances, requirements apply to both scenarios and will be clearly indicated. As the project continues to mature, more alternative designs and their related requirements may be developed while other designs are retired.
2.2.2 Verification Methods
Each requirement will have a verification method documented in the DOORS® database. The verification method options include those listed in the International Council on Systems Engineering (INCOSE) Systems Engineering Handbook, v3.13, as follows:
� Inspection – an examination of the item against applicable documentation to confirm compliance with requirements. Inspection is used to verify properties best determined by examination and observation (e.g., - paint color, weight, etc.).
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 7 of 104
� Analysis – use of analytical data or simulations under defined conditions to show theoretical compliance. Used where testing to realistic conditions cannot be achieved or is not cost-effective. Analysis (including simulation) may be used when such means establish that the appropriate requirement, specification, or derived requirement is met by the proposed solution.
� Demonstration – a qualitative exhibition of functional performance, usually accomplished with no or minimal instrumentation. Demonstration (a set of test activities with system stimuli selected by the system developer) may be used to show that system or subsystem response to stimuli is suitable.
� Test – an action by which the operability, supportability, or performance capability of an item is verified when subjected to controlled conditions that are real or simulated. These verifications often use special test equipment or instrumentation to obtain very accurate quantitative data for analysis.
2.3 Allocation and Traceability The NGNP requirements are organized in a way to show traceability to the source documents. The
DOORS® tool has the capability to link requirements and visibly show the traceability flow of requirements through the graphics mode view provided by DOORS®. Many requirements currently contained in DOORS® are linked and their flows can be viewed as shown in Figure 5.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 8 of 104
Figure 5. DOORS® Graphics Mode screen
2.4 Configuration Control The design authority will maintain configuration control over the programmatic and functional,
operational, and technical requirements, as shown Figure 6. The design authority is the single organization responsible for establishing and maintaining the design requirements and for ensuring that design output documents accurately reflect the design basis (DOE-STD-107-2003)4. The design entities will capture and maintain configuration control over the plant level design requirements.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 9 of 104
Functional Requirements
DOEPrivate Partners
Technical Commitments
SAGRequirements
Functions
Plant Design Specifications
Operational & Technical
Requirements
End User Requirements
Private-Public Partnership
Requirements
Design Specific Requirements
Legislative & Regulatory
Requirements
Application Specific
Requirements Func
tiona
l A
naly
sis
INL Captures & Tracks in DOORS
INL Captures & Tracks in DOORS
INL Captures & Tracks in DOORS
INL Performs Functional Analysis, Captures & Tracks
in DOORS
Design Entity Captures &
Maintains Design Authority Approves
High Level Requirements Under Design Authority Configuration Control
Under Design Entity Configuration Control
Stakeholder Requirements
Figure 6. Requirements processing.
3. NGNP REQUIREMENTS Programmatic requirements (see Appendix A) and Functional, Operational, and Technical
Requirements (see Appendix B) are traceable to initial project baseline documents and follow the good practices suggested in Systems Engineering and Interface Management 5, which states that project requirements are:
� Identified, defined, and approved as early as possible
� Documented and placed under change control
� Available to all project participants
� Refined and developed as the project progresses.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 10 of 104
Programmatic requirements comprise regulatory (including the Environmental Policy Act of 2005 [EPAct 2005]6) and licensing (i.e., NRC) requirements pertinent to NGNP PASSCs, including high-level functional and location requirement. The Top Level Design Criteria, Top Level Safety Criteria, and requirements resulting from Integrated Test Analysis and Acceptance Criteria (ITAAC) Validation are also included as regulatory requirements. The ITAAC is developed and submitted with the design and the Combined Operating License Application (COLA). These requirements reflect the verification tests and analyses performed to provide evidence that the system was built as designed and performs the function intended.
Additionally, following the licensing submittals, it is anticipated that the NRC will issue Requests for Additional Information (RAIs). The RAI and any derived requirements from the responses will be tracked as requirements to ensure that each commitment is fully implemented in the design developed and systems built.
End-user requirements are specific to the intended application of NGNP. For example, an NGNP that provides process heat for an oil refinery will have different end-user requirements than an NGNP that provides electricity and hydrogen. Specific site requirements and technical direction or commitments are also included in the end-user requirements.
Per EPAct, the NGNP documentation and project definition were reviewed by the independent Nuclear Energy Research Advisory Committee (NERAC), resulting in the A Review of the NGNP Project report, which provides additional high-level requirements. Other reports and publications by internal and external entities to the NGNP Project provided feedback into this requirements document. The publications include nationally recognized entities, such as the National Research Council of the National Academies.
Table 2 lists the cited source documents for the requirements contained herein.
Table 2. Cited source documents for NGNP requirements. Source Document Requirement Source Key
Energy Policy Act of 2005 EPAct2005 Summary of Bounding Conditions for Development of the NGNP Project, INL/EXT-08-14370, June 2008 Bounding Conditions
A Review of the NGNP Project NERAC Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999 Rev. 1, June 2008 SRM Rev 1
Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999 Rev. 2, March 2009 SRM Rev 2
Review of DOE’s Nuclear Energy Research and Development Program by The National Research Council of the National Academies, 2008 NAS
SAG Meeting Minutes (as of October 22, 2008) SAG
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 11 of 104
4. REFERENCES 1. Collins, John, Next Generation Nuclear Plant Project Technology Development Roadmaps: The
Technical Path Forward for 750 – 800°C Reactor Outlet Temperature, INL/EXT-08-16598, Idaho National Laboratory, August 2009.
2 Collins, John, Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward, INL/EXT-08-15148, Idaho National Laboratory, January 12, 2009.
3 INCOSE, Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, International Council on Systems Engineering, version 3.1, International Council on Systems Engineering, August 2007.
4. DOE-STD-1073-2003, Configuration Management, U.S. Department of Energy, October 2003.
5. OECM, 2003, Systems Engineering and Interface Management, Office of Engineering and Construction Management, Rev. E, June 2003.
6. Public Law 109-58, Energy Policy Act (EPAct) of 2005, Department of Energy, Office of Energy Efficiency and Renewable Energy, August 2005.
Cited Requirements Source Documents
INL, 2008, Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999, Rev. 1, June 2008.
INL, 2008, Summary of Bounding Conditions for Development of the NGNP Project, INL/EXT-08-14370, June 2008.
INL, 2009, Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999, Rev. 2, March 2009.
Review of DOE’s Nuclear Energy Research and Development Program, The National Research Council of the National Academics, 2008.
Review of the NGNP Project, Nuclear Energy Research Advisory Committee.
Additional Requirements Documents
29 CFR 1910.103, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Hydrogen,” Code of Federal Regulations, Office of Federal Register, January 2009.
29 CFR 1910.104, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Oxygen,” Code of Federal Regulations, Office of Federal Register, January 2009.
29 CFR 1910.119, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Process Safety Management of Highly Hazardous Chemicals,” Code of Federal Regulations, Office of Federal Register, January 2009.
DOE G 413.3-1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A, U.S. Department of Energy, September 2008.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 12 of 104
FR Doc E8-24268, “Policy Statement on the Regulation of Advanced Reactors,” Federal Register,
October 14, 2008 (NRC Document ID NRC-2008-0237-0010, effective date November 13, 2008).
INEEL 2003, Next Generation Nuclear Plant – High Level Functions and Requirements, INEEL/EXT-03-01163, Idaho National Laboratory, September 2003.
INEEL, 2004, Independent Technology Review Group, Design Features and Technology Uncertainties for the Next Generation Nuclear Plant, INEEL/EXT-04-01816, Idaho National Laboratory, June 30, 2004.
PLN-2489 (INL/MIS-08-14339), “Next Generation Nuclear Plant Project (NGNP) Preliminary Project Management Plan,” Rev. 2, NGNP, Idaho National Laboratory, June 2008 (NOTE: suspended by Rev. 3, October 2008).
PLN-2825, “NGNP Preliminary Project Execution Plan,” Rev. 0, NGNP, September 30, 2008.
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 13 of 104
Appendix A
NGNP Programmatic Requirements
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 14
of10
4
App
endi
x A
N
GN
P Pr
ogra
mm
atic
Req
uire
men
ts
NO
TE: I
tem
s ap
pear
ing
in b
rack
ets
([ ])
repr
esen
t app
roxi
mat
ions
and
/or u
ndef
ined
val
ues.
A-1
. R
egul
ator
y R
equi
rem
ents
O
bjec
t #
Req
uire
men
t ID
Req
uire
men
ts S
tate
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Reg
ulat
ory
Doc
umen
ts
SRM
Rev
1
3.3
Reg
ulat
ory
Doc
umen
ts
2.1
N
RC
/EPA
Reg
ulat
ory
Doc
umen
ts
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
1 Th
e fo
llow
ing
docu
men
ts sh
all,
as a
min
imum
, bec
ome
com
plie
d w
ith fo
r the
NG
NP
Proj
ect
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
2 51
CFR
280
44 -
Polic
y St
atem
ent o
n Sa
fety
Goa
ls fo
r the
O
pera
tion
of N
ucle
ar P
ower
Pla
nts
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
3 10
CFR
20
- Sta
ndar
ds fo
r Pro
tect
ion
Aga
inst
Rad
iatio
n,
(Per
mis
sibl
e do
se le
vels
and
act
ivity
con
cent
ratio
ns in
rest
ricte
d an
d un
rest
ricte
d ar
eas)
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
4 10
CFR
50
- Dom
estic
Lic
ensi
ng o
f Pro
duct
ion
and
Util
izat
ion
Faci
litie
s (ap
plic
able
por
tions
as n
eede
d)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
5 10
CFR
51
- Env
ironm
enta
l Pro
tect
ion
Reg
ulat
ion
for D
omes
tic
Lice
nsin
g an
d R
elat
ed R
egul
ator
y Fu
nctio
ns
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
7 10
CFR
52
- Lic
ense
s, C
ertif
icat
ions
, and
App
rova
ls fo
r Nuc
lear
Po
wer
Pla
nts
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
9 10
CFR
50,
App
endi
x I -
Num
eric
al G
uide
s for
Des
ign
Obj
ectiv
es a
nd L
imiti
ng C
ondi
tions
for O
pera
tion
to M
eet t
he
Crit
erio
n “a
s Low
as i
s Rea
sona
bly
Ach
ieva
ble.
”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 15
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1-10
10
CFR
73
- Phy
sica
l Pro
tect
ion
of P
lant
s and
Mat
eria
ls
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
11
10 C
FR 7
4 - M
ater
ial C
ontro
l and
Acc
ount
ing
of S
peci
al
Nuc
lear
Mat
eria
l 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.1
NR
C/E
PA
Reg
ulat
ory
Doc
umen
ts
2.
1-12
10
CFR
75
- Saf
egua
rds o
n N
ucle
ar M
ater
ial -
Impl
emen
tatio
n of
US/
IAEA
(Int
erna
tiona
l Ato
mic
Ene
rgy
Age
ncy)
Agr
eem
ent
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
14
10 C
FR 9
5, F
acili
ty S
ecur
ity C
lear
ance
and
Saf
egua
rdin
g of
N
atio
nal S
ecur
ity In
form
atio
n an
d R
estri
cted
Dat
a 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.1
NR
C/E
PA
Reg
ulat
ory
Doc
umen
ts
2.
1-15
10
CFR
100
- R
eact
or S
ite C
riter
ia, (
Num
eric
al d
ose
guid
elin
es
for d
eter
min
ing
the
excl
usio
n ar
ea b
ound
ary,
low
pop
ulat
ion
zone
, and
pop
ulat
ion
cent
er d
ista
nces
)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
16
10 C
FR 8
35 -
Occ
upat
iona
l Rad
iatio
n Pr
otec
tion
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
17
29 C
FR 1
910
- Occ
upat
iona
l Saf
ety
and
Hea
lth S
tand
ards
, Su
bpar
t H, H
azar
dous
Mat
eria
ls
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
18
40 C
FR 5
0-99
- C
lean
Air
Act
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.1
NR
C/E
PA
Reg
ulat
ory
Doc
umen
ts
2.
1-19
40
CFR
100
-149
- C
lean
Wat
er A
ct
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
20
40 C
FR 1
90 -
Envi
ronm
enta
l Rad
iatio
n Pr
otec
tion
Stan
dard
s for
N
ucle
ar P
ower
Ope
ratio
ns
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
21
40 C
FR 1
502
- Env
ironm
enta
l Im
pact
Sta
tem
ent
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 16
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1-22
EP
A -
520/
1-75
-001
- Pr
otec
tive
Act
ion
Gui
de D
oses
for
Prot
ectiv
e A
ctio
ns fo
r Nuc
lear
Inci
dent
s 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.1
NR
C/E
PA
Reg
ulat
ory
Doc
umen
ts
2.
1-23
47
CFR
470
73 -
Acc
iden
t Rad
ioac
tive
Con
tam
inat
ion
of H
uman
Fo
od a
nd A
nim
al F
eed;
Rec
omm
enda
tions
for S
tate
and
Loc
al
Age
ncie
s
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
25
Nuc
lear
Reg
ulat
ory
Com
mis
sion
, NU
REG
-186
0, V
ols.
1 an
d 2,
Fe
asib
ility
Stu
dy fo
r a R
isk-
Info
rmed
and
Per
form
ance
-Bas
ed
Reg
ulat
ory
Stru
ctur
e fo
r Fut
ure
Plan
t Lic
ensi
ng, D
ecem
ber
2007
. (N
GN
P pl
ant l
icen
sing
shal
l be
cons
iste
nt w
ith th
e N
RC
ne
w re
gula
tory
fram
ewor
k de
velo
ped
as a
gui
de fo
r fut
ure
plan
t lic
ensi
ng fo
r adv
ance
d [n
on-li
ght w
ater
] rea
ctor
s).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.
1-26
N
ucle
ar R
egul
ator
y C
omm
issi
on, 1
0 C
FR P
art 5
0 [N
RC
-200
8-02
37],
Polic
y St
atem
ent o
n th
e R
egul
atio
n of
Adv
ance
d R
eact
ors,
Fina
l pol
icy
stat
emen
t (FR
Doc
E8-
2426
8), e
ffec
tive
Nov
embe
r 13,
200
8.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.
1-27
N
ucle
ar R
egul
ator
y C
omm
issi
on, R
egul
ator
y G
uide
1.2
06,
Com
bine
d Li
cens
e A
pplic
atio
ns fo
r Nuc
lear
Pow
er P
lant
s (LW
R
Editi
on),
June
200
7
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.1-
28
Nuc
lear
Reg
ulat
ory
Com
mis
sion
, NU
REG
-080
0, S
tand
ard
Rev
iew
Pla
n fo
r the
Rev
iew
of S
afet
y A
naly
sis R
epor
ts fo
r N
ucle
ar P
ower
Pla
nts,
Mar
ch 2
007
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
1 N
RC
/EPA
R
egul
ator
y D
ocum
ents
2.
2
DO
E D
ocum
ents
SR
M R
ev 2
3.
3.2
DO
E D
ocum
ents
2.2-
1 Th
e ac
quis
ition
stra
tegy
for t
he N
GN
P pr
ojec
t may
incl
ude
a co
mbi
natio
n of
requ
irem
ents
from
bot
h th
e fe
dera
l and
co
mm
erci
al se
ctor
s. U
ntil
a be
tter d
efin
ition
of t
he c
omm
erci
al
parti
cipa
nt(s
) is o
btai
ned,
the
DO
E A
cqui
sitio
n M
anag
emen
t sy
stem
will
be
used
, inc
ludi
ng th
e do
cum
ents
list
ed b
elow
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
2 D
OE
Doc
umen
ts
2.
2-2
DO
E O
413
.3A
- Pr
ogra
m a
nd P
roje
ct M
anag
emen
t for
the
Acq
uisi
tion
of C
apita
l Ass
ets
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
2 D
OE
Doc
umen
ts
2.
2-3
DO
E O
420
.1B
- Fa
cilit
y Sa
fety
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.2
DO
E D
ocum
ents
2.2-
4 D
OE
O 4
35.1
- R
adio
activ
e W
aste
Man
agem
ent
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
2 D
OE
Doc
umen
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 17
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
2-5
DO
E Po
licy
450.
4 - S
afet
y M
anag
emen
t Sys
tem
Pol
icy
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
2 D
OE
Doc
umen
ts
2.
2-6
DO
E O
450
.1A
- En
viro
nmen
tal P
rote
ctio
n Pr
ogra
m
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
2 D
OE
Doc
umen
ts
2.
2-7
10 C
FR 8
51 -
Wor
ker S
afet
y an
d H
ealth
Pro
gram
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.2
DO
E D
ocum
ents
2.2-
8 D
OE
M 4
70.4
-2 C
hg.1
, Phy
sica
l Pro
tect
ion.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.2
DO
E D
ocum
ents
2.
3
FER
C R
egul
atio
ns
SRM
Rev
2
3.3.
3 FE
RC
R
egul
atio
ns
2.
3-1
Sinc
e th
e N
GN
P is
exp
ecte
d to
pro
duce
ele
ctric
ity fo
r co
mm
erci
al u
se, i
t sha
ll fo
llow
app
licab
le F
ERC
requ
irem
ents
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
3.3
FER
C
Reg
ulat
ions
2.
4
Stat
e of
Idah
o R
egul
atio
ns
SRM
Rev
2
3.3.
4 St
ate
of Id
aho
Reg
ulat
ions
2.4-
2a
If th
e N
GN
P is
site
d at
the
INL,
as i
ndic
ated
in th
e 20
05 E
PAct
, th
e N
GN
P sh
all m
eet a
pplic
able
stat
e re
quire
men
ts a
nd o
bser
ve
treat
ies w
ith so
vere
ign
natio
ns su
ch a
s the
Sho
shon
e -B
anno
ck.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
4 St
ate
of Id
aho
Reg
ulat
ions
2.
4-2b
If
the
NG
NP
is si
ted
at th
e IN
L, a
s ind
icat
ed in
the
2005
EPA
ct,
the
NG
NP
shal
l obs
erve
trea
ties w
ith so
vere
ign
natio
ns su
ch a
s th
e Sh
osho
ne -B
anno
ck.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
4 St
ate
of Id
aho
Reg
ulat
ions
2.5
In
dian
Res
erva
tion
Rig
hts
SRM
Rev
2
3.3.
5 In
dian
R
eser
vatio
n R
ight
s
2.5-
1 D
OE
has c
omm
itted
to a
dditi
onal
inte
ract
ion
and
exch
ange
of
info
rmat
ion
with
the
Shos
hone
-Ban
nock
Trib
es a
t the
For
t Hal
l R
eser
vatio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.3.
5 In
dian
R
eser
vatio
n R
ight
s
3
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
3.1
E
nvir
onm
enta
l Req
uire
men
ts
SRM
Rev
2
4.1.
4 En
viro
nmen
tal
Req
uire
men
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 18
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
1-2
The
NG
NP
plan
t sha
ll be
cap
able
of c
ontro
lling
the
trans
port
of
radi
onuc
lides
to th
e en
d pr
oduc
ts a
t lev
els b
elow
the
conc
entra
tion
or e
xpos
ure
requ
irem
ents
for t
he p
rodu
ct (e
.g.,
tritiu
m in
stea
m, g
as, h
ydro
gen)
. (In
itial
acc
epta
ble
tritiu
m le
vels
w
ill b
e se
t at a
frac
tion
of th
e U
.S. E
nviro
nmen
tal P
rote
ctio
n A
genc
y [E
PA] l
imits
for d
rinki
ng w
ater
and
air.
)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
3.
1-3
The
NG
NP
and
hydr
ogen
pro
duct
ion
faci
litie
s (if
appl
icab
le)
shal
l com
ply
with
app
licab
le re
quire
men
ts o
f the
Cle
an A
ir A
ct/A
ir Pr
ogra
ms.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
4 En
viro
nmen
tal
Req
uire
men
ts
3.
1-4a
Th
e N
GN
P sh
all i
dent
ify a
ll w
aste
stre
ams g
ener
ated
in N
GN
P by
type
and
est
imat
ed q
uant
ity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
4 En
viro
nmen
tal
Req
uire
men
ts
3.
1-4b
Th
e N
GN
P sh
all p
rovi
de a
dis
posi
tion
path
way
with
in th
e ap
plic
able
regu
lato
ry fr
amew
ork.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.4
Envi
ronm
enta
l R
equi
rem
ents
3.1-
5a
The
NG
NP
Proj
ect s
hall
min
imiz
e th
e ge
nera
tion
of a
ll w
aste
, in
clud
ing
radi
oact
ive,
non
radi
oact
ive,
and
mix
ed w
aste
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.4
Envi
ronm
enta
l R
equi
rem
ents
3.1-
5b
The
NG
NP
Proj
ect s
hall
com
ply
with
app
licab
le D
OE
orde
rs,
NR
C re
gula
tions
, and
EPA
regu
latio
ns in
the
treat
men
t of t
hese
w
aste
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
4 En
viro
nmen
tal
Req
uire
men
ts
3.2
C
odes
and
Sta
ndar
ds R
equi
rem
ents
SR
M R
ev 2
4.
1.10
Cod
es a
nd
Stan
dard
s R
equi
rem
ents
3.2-
1a
The
desi
gn o
f the
NG
NP
shal
l com
ply
with
all
appl
icab
le
fede
ral,
stat
e, a
nd lo
cal c
odes
and
stan
dard
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
3.
2-1b
C
odes
and
stan
dard
s per
tinen
t to
the
nucl
ear i
ndus
try sh
all o
nly
be u
tiliz
ed in
the
desi
gn, f
abric
atio
n, a
nd in
stal
latio
n of
the
stru
ctur
es, s
yste
ms,
and
equi
pmen
t whe
re su
ch c
odes
and
st
anda
rds a
re a
pplic
able
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
3.
2-1c
Th
e pl
ant d
esig
ner s
hall
list a
ll ap
plic
able
cod
es a
nd st
anda
rds,
and
the
appl
icab
le re
visi
on o
f eac
h do
cum
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 19
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
2-2
NU
REG
/CR
-597
3 sh
all b
e us
ed a
s a st
artin
g po
int f
or th
e id
entif
icat
ion
of c
odes
and
stan
dard
s to
be fo
llow
ed d
urin
g co
ncep
tual
des
ign.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
3.3
Q
ualit
y A
ssur
ance
Req
uire
men
ts
SRM
Rev
2
4.1.
11 Q
ualit
y A
ssur
ance
R
equi
rem
ents
3.3-
1 Th
e N
GN
P pr
ojec
t sha
ll us
e th
e U
.S. n
atio
nal c
onse
nsus
st
anda
rd A
SME
Nuc
lear
Qua
lity
Ass
uran
ce (N
QA
)-1-
2000
, “Q
ualit
y A
ssur
ance
Pro
gram
Req
uire
men
ts fo
r Nuc
lear
Fa
cilit
ies A
pplic
atio
ns.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11 Q
ualit
y A
ssur
ance
R
equi
rem
ents
3.4
Ph
ysic
al P
rote
ctio
n, M
ater
ial C
ontr
ol a
nd S
afeg
uard
s -
IAE
A
3.
4-1
The
NG
NP
shal
l com
ply
with
the
follo
win
g st
atem
ent.
“D
esig
ns
that
incl
ude
cons
ider
atio
ns fo
r saf
ety
and
secu
rity
requ
irem
ents
to
geth
er in
the
desi
gn p
roce
ss su
ch th
at se
curit
y is
sues
(e.g
., ne
wly
iden
tifie
d th
reat
s of t
erro
rist a
ttack
s) c
an b
e ef
fect
ivel
y re
solv
ed th
roug
h fa
cilit
y de
sign
and
eng
inee
red
secu
rity
feat
ures
, and
form
ulat
ion
of m
itiga
tion
mea
sure
s, w
ith re
duce
d re
lianc
e on
hum
an a
ctio
ns.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11 P
hysi
cal
Prot
ectio
n,
Mat
eria
l Con
trol
and
Safe
guar
ds -
IAEA
3.
4-2
The
NG
NP
shal
l com
ply
with
the
follo
win
g st
atem
ent “
Des
igns
w
ith fe
atur
es to
elim
inat
e or
redu
ce th
e po
tent
ial t
heft
of n
ucle
ar
mat
eria
ls.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11 P
hysi
cal
Prot
ectio
n,
Mat
eria
l Con
trol
and
Safe
guar
ds -
IAEA
3.4-
3 Th
e N
GN
P sh
all c
ompl
y w
ith th
e fo
llow
ing
stat
emen
t. “D
esig
ns
that
em
phas
ize
pass
ive
barr
iers
to p
oten
tial t
heft
of n
ucle
ar
mat
eria
ls.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11 P
hysi
cal
Prot
ectio
n,
Mat
eria
l Con
trol
and
Safe
guar
ds -
IAEA
3.4-
4 Th
e N
GN
P sh
all c
ompl
y w
ith th
e fo
llow
ing
stat
emen
t. “
Fina
lly,
the
NR
C a
lso
belie
ves t
hat i
t will
be
in th
e in
tere
st o
f the
pub
lic
as w
ell a
s the
des
ign
Supp
liers
and
the
pros
pect
ive
licen
se
appl
ican
ts to
add
ress
secu
rity
issu
es e
arly
in th
e de
sign
stag
e to
ac
hiev
e a
mor
e ro
bust
and
eff
ectiv
e se
curit
y po
stur
e fo
r fut
ure
nucl
ear p
ower
reac
tors
.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11 P
hysi
cal
Prot
ectio
n,
Mat
eria
l Con
trol
and
Safe
guar
ds -
IAEA
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 20
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
4-7
The
desi
gn o
f the
NG
NP
shal
l com
ply
with
10
CFR
73.
55,
Req
uire
men
ts fo
r phy
sica
l pro
tect
ion
of li
cens
ed a
ctiv
ities
in
nucl
ear p
ower
reac
tors
aga
inst
radi
olog
ical
sabo
tage
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
3.4-
8 Th
e de
sign
of t
he N
GN
P sh
all c
ompl
y w
ith 1
0 C
FR 7
3.67
, Li
cens
ee fi
xed
site
and
in-tr
ansi
t req
uire
men
ts fo
r the
phy
sica
l pr
otec
tion
of sp
ecia
l nuc
lear
mat
eria
l of m
oder
ate
and
low
st
rate
gic
sign
ifica
nce.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
3.
4-9a
Th
e de
sign
of t
he N
GN
P sh
all i
nclu
de p
repa
ratio
n an
d up
date
of
a Se
curit
y A
sses
smen
t, “H
igh
Ass
uran
ce E
valu
atio
n an
d M
itiga
tive
Mea
sure
s Eva
luat
ion”
per
NU
REG
-800
Sec
tions
13
.6.4
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
3.
4-9b
Th
e de
sign
of t
he N
GN
P sh
all i
nclu
de th
e de
velo
pmen
t of
Phys
ical
Sec
urity
Har
dwar
e In
spec
tions
, Tes
ts, A
naly
ses,
and
Acc
epta
nce
Crit
eria
(ITA
AC
) per
NU
REG
-080
0 Se
ctio
n 14
.3.1
2.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
3.
4-9c
Th
e re
sults
of a
nd in
sigh
t fro
m th
e ab
ove
eval
uatio
ns a
nd th
e IT
AA
C sh
all b
e us
ed to
inte
grat
e sa
fegu
ards
by
desi
gn in
to th
e N
GN
P.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
3.4-
11
The
NG
NP
desi
gn sh
all c
ompl
y w
ith N
RC
requ
irem
ents
for t
he
cont
rol a
nd a
ccou
ntin
g of
spec
ial n
ucle
ar m
ater
ial i
nclu
ding
10
CFR
74.
19, R
ecor
dkee
ping
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.2
Mat
eria
l C
ontro
l and
A
ccou
ntin
g of
Sp
ecia
l Nuc
lear
M
ater
ial
3.
4-12
Th
e de
sign
of t
he N
GN
P sh
all c
ompl
y w
ith 1
0 C
FR 7
5,
Safe
guar
ds o
n N
ucle
ar M
ater
ial-I
mpl
emen
tatio
n of
US/
IAEA
A
gree
men
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.3
Saf
egua
rds
on N
ucle
ar
Mat
eria
l -
Impl
emen
tatio
n of
U
S/IA
EA
Agr
eem
ent
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 21
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
4-13
Th
e de
sign
of t
he N
GN
P sh
all i
ncor
pora
te d
esig
n fe
atur
es to
fa
cilit
ate
the
appl
icat
ion
of in
tern
atio
nal s
afeg
uard
s und
er
INFC
IRC
/57,
The
Tex
t of t
he A
gree
men
t for
the
App
licat
ion
of
Age
ncy
Safe
guar
ds to
Uni
ted
Stat
es R
eact
or F
acili
ties,
and
INFC
IRC
/540
, Mod
el P
roto
col A
dditi
onal
to th
e A
gree
men
ts(s
) B
etw
een
Stat
e(s)
and
the
Inte
rnat
iona
l Ato
mic
Ene
rgy
Age
ncy
for t
he A
pplic
atio
n of
Saf
egua
rds.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.3
Saf
egua
rds
on N
ucle
ar
Mat
eria
l -
Impl
emen
tatio
n of
U
S/IA
EA
Agr
eem
ent
4
Publ
ic a
nd W
orke
r Ex
posu
re L
imits
B
ound
ing
Con
ditio
n 4.
5 Pu
blic
and
W
orke
r Exp
osur
e Li
mits
4.
1
Prot
ectio
n C
rite
ria
for
the
Wor
ker
and
the
Publ
ic
4.
1-1
Upp
er b
ound
off
site
dos
es d
urin
g de
sign
bas
is e
vent
s sha
ll m
eet
10 C
FR 5
0.34
with
mar
gin.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.9
Safe
ty
Req
uire
men
ts
4.
1-2a
Th
ere
shal
l be
a te
chni
cal b
asis
for e
limin
atin
g or
min
imiz
ing
the
need
for o
ffsi
te e
mer
genc
y pl
anni
ng. .
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.9
Safe
ty
Req
uire
men
ts
4.
1-2b
Th
is te
chni
cal b
asis
(for
elim
inat
ing
or m
inim
izin
g th
e ne
ed fo
r of
fsite
em
erge
ncy
plan
ning
) sha
ll co
nsid
er a
risk
-info
rmed
, re
alis
tic a
sses
smen
t of d
esig
n ba
sis a
nd b
eyon
d de
sign
bas
is
acci
dent
s and
shal
l dem
onst
rate
hig
h co
nfid
ence
that
the
EPA
Pr
otec
tion
Act
ion
Gui
delin
es a
re m
et.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
9 Sa
fety
R
equi
rem
ents
4.
1-2c
Th
e N
GN
P de
sign
shal
l eff
ectiv
ely
dem
onst
rate
that
off
-site
em
erge
ncy
plan
requ
irem
ents
may
be
min
imiz
ed (e
.g.,
elim
inat
e re
quire
men
ts fo
r em
erge
ncy
drill
s, si
rens
, etc
.).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
9 Sa
fety
R
equi
rem
ents
4.
1-3
Expo
sure
to th
e W
orke
r and
the
Publ
ic u
nder
nor
mal
ope
ratio
n sh
all m
eet 1
0 C
FR 2
0 an
d A
LAR
A (a
s low
as r
easo
nabl
y ac
hiev
able
) as q
uant
ified
in A
ppen
dix
I of 1
0 C
FR 5
0.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
9 Sa
fety
R
equi
rem
ents
4.2
B
ound
ing
Con
ditio
n - 0
05
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-1
Fuel
spec
ifica
tions
, ope
ratin
g co
nditi
ons,
and
plan
t shi
eldi
ng
shal
l be
suff
icie
nt to
mee
t NR
C a
nd E
nviro
nmen
tal P
rote
ctio
n A
genc
y (E
PA) e
xpos
ure
limits
for t
he p
ublic
and
wor
kers
und
er
norm
al o
pera
tion
and
calc
ulat
ed a
ccid
ent c
ondi
tions
. The
se
limits
are
as f
ollo
ws:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 22
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
4.
2-2
Und
er a
ccid
ent c
ondi
tions
, the
rele
ase
rate
s sha
ll be
lim
ited
to
mee
t the
EPA
Pro
tect
ive
Act
ion
Gui
delin
es li
mits
and
10%
of
the
10 C
FR 1
00 li
mit
at th
e ex
clus
ion
area
bou
ndar
y (E
AB
; 40
0+ m
eter
s).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-3
Expo
sure
to th
e pu
blic
und
er n
orm
al p
lant
ope
ratio
n sh
all n
ot
exce
ed 0
.1 re
m in
a y
ear,
excl
usiv
e of
the
dose
con
tribu
tions
fr
om b
ackg
roun
d ra
diat
ion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-4
The
occu
patio
nal d
ose
to in
divi
dual
adu
lts sh
all b
e lim
ited
on a
n an
nual
bas
is to
10%
of t
he 1
0 C
FR 2
0 lim
its.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-5
Triti
um c
once
ntra
tion
cont
rol s
hall
be su
ffic
ient
to m
eet a
ctiv
ity
limits
in th
e pr
oduc
ts o
f the
pla
nt.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-6a
Tr
itium
con
cent
ratio
ns in
pro
duct
s sha
ll no
t exc
eed
100
Bq/
liter
(~
10%
of t
he E
PA li
mit
for d
rinki
ng w
ater
, 740
Bq/
liter
). 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
B
ound
ing
Con
ditio
n 4.
5.1
Bou
ndin
g C
ondi
tion
- 005
4.2-
6b
Triti
um c
once
ntra
tions
in li
quid
eff
luen
ts sh
all n
ot e
xcee
d 10
0 B
q/lit
er (~
10%
of t
he E
PA li
mit
for d
rinki
ng w
ater
, 740
B
q/lit
er).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.
2-7
Triti
um c
once
ntra
tions
in g
aseo
us e
fflu
ents
and
pro
duct
s sha
ll no
t exc
eed
3.7
Bq/
liter
(the
NR
C li
mit
for a
ir).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
1 B
ound
ing
Con
ditio
n - 0
05
4.3
B
ound
ing
Con
ditio
n - 0
06
Bou
ndin
g C
ondi
tion
4.5.
2 B
ound
ing
Con
ditio
n - 0
06
4.
3-1
Met
hods
shal
l be
deve
lope
d an
d im
plem
ente
d to
con
trol t
he
conc
entra
tions
of t
ritiu
m su
ffic
ient
to m
eet o
r exc
eed
the
activ
ity
conc
entra
tion
limits
for t
he p
rodu
cts u
sing
the
HTG
R
tech
nolo
gy a
nd th
e N
RC
and
EPA
lim
its o
n pl
ant g
aseo
us a
nd
liqui
d ef
fluen
ts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
2 B
ound
ing
Con
ditio
n - 0
06
4.4
B
ound
ing
Con
ditio
n - 0
07
Bou
ndin
g C
ondi
tion
4.5.
3 B
ound
ing
Con
ditio
n - 0
07
4.
4-1a
C
hara
cter
izat
ion
of d
ust c
ircul
atio
n in
the
prim
ary
syst
em sh
all
be re
quire
d to
ens
ure
acce
ptab
le le
vels
of d
ust-b
orne
act
ivity
in
the
syst
em.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
3 B
ound
ing
Con
ditio
n - 0
07
4.
4-1b
C
ontro
l of d
ust c
ircul
atio
n in
the
prim
ary
syst
em sh
all b
e re
quire
d to
ens
ure
acce
ptab
le le
vels
of d
ust-b
orne
act
ivity
in th
e sy
stem
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
3 B
ound
ing
Con
ditio
n - 0
07
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 23
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
Sta
tem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
4.
4-1c
C
hara
cter
izat
ion
of d
ust c
ircul
atio
n in
the
prim
ary
syst
em sh
all
be re
quire
d to
min
imiz
e th
e im
pact
on
oper
abili
ty o
f prim
ary
syst
em c
ompo
nent
s (e.
g., t
he c
ontro
l rod
s and
circ
ulat
ors)
and
ab
rasi
on o
f prim
ary
syst
em c
ompo
nent
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
3 B
ound
ing
Con
ditio
n - 0
07
4.
4-1d
C
ontro
l of d
ust c
ircul
atio
n in
the
prim
ary
syst
em sh
all b
e re
quire
d to
min
imiz
e th
e im
pact
on
oper
abili
ty o
f prim
ary
syst
em c
ompo
nent
s (e.
g., t
he c
ontro
l rod
s and
circ
ulat
ors)
and
ab
rasi
on o
f prim
ary
syst
em c
ompo
nent
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.5.
3 B
ound
ing
Con
ditio
n - 0
07
A-2
. Le
gisl
ativ
e R
equi
rem
ents
O
bjec
t #
Req
uire
men
ts
IDL
egis
lativ
e R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3
TIT
LE
VI -
- NU
CL
EA
R M
AT
TE
RS
EPA
ct20
05
3.
1
Subt
itle
C--
Nex
t Gen
erat
ion
Nuc
lear
Pla
nt P
roje
ct
EPA
ct20
05
3.
1.1
SE
C. 6
41. P
RO
JEC
T E
STA
BL
ISH
ME
NT
.
EP
Act
2005
3.
1.1-
1 (a
) Est
ablis
hmen
t- Th
e Se
cret
ary
shal
l est
ablis
h a
proj
ect t
o be
kn
own
as th
e N
ext G
ener
atio
n N
ucle
ar P
lant
Pro
ject
' (re
ferr
ed to
in
this
subt
itle
as th
e Pr
ojec
t').
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.1-
2 (b
) Con
tent
- The
Pro
ject
shal
l con
sist
of t
he re
sear
ch,
deve
lopm
ent,
desi
gn, c
onst
ruct
ion,
and
ope
ratio
n of
a p
roto
type
pl
ant,
incl
udin
g a
nucl
ear r
eact
or th
at--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.1-
2-1
(1) i
s bas
ed o
n re
sear
ch a
nd d
evel
opm
ent a
ctiv
ities
supp
orte
d by
th
e G
ener
atio
n IV
Nuc
lear
Ene
rgy
Syst
ems I
nitia
tive
unde
r se
ctio
n 94
2(d)
; and
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.1-
2-2
(2) s
hall
be u
sed-
- 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.1-
2-2-
1 (A
) to
gene
rate
ele
ctric
ity;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.1-
2-2-
2 (B
) to
prod
uce
hydr
ogen
; or
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.1-
2-2-
3 (C
) bot
h to
gen
erat
e el
ectri
city
and
to p
rodu
ce h
ydro
gen.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.1.
2
SEC
. 642
. PR
OJE
CT
MA
NA
GEM
EN
T.
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 24
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.2-
1-1
(1) I
N G
ENER
AL-
The
Pro
ject
shal
l be
man
aged
in th
e D
epar
tmen
t by
the
Off
ice
of N
ucle
ar E
nerg
y, S
cien
ce, a
nd
Tech
nolo
gy.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
1-2
(2) G
ENER
ATI
ON
IV N
UC
LEA
R E
NER
GY
SY
STEM
S PR
OG
RA
M- T
he S
ecre
tary
may
com
bine
the
Proj
ect w
ith th
e G
ener
atio
n IV
Nuc
lear
Ene
rgy
Syst
ems I
nitia
tive.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
1-3
(3) E
XIS
TIN
G D
OE
PRO
JEC
T M
AN
AG
EMEN
T EX
PER
TISE
- The
Sec
reta
ry m
ay u
tiliz
e ca
pabi
litie
s for
revi
ew
of c
onst
ruct
ion
proj
ects
for a
dvan
ced
scie
ntifi
c fa
cilit
ies w
ithin
th
e O
ffic
e of
Sci
ence
to tr
ack
the
prog
ress
of t
he P
roje
ct.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-1
(1) L
EAD
LA
BO
RA
TOR
Y- T
he Id
aho
Nat
iona
l Lab
orat
ory
shal
l be
the
lead
Nat
iona
l Lab
orat
ory
for t
he P
roje
ct a
nd sh
all
colla
bora
te w
ith o
ther
Nat
iona
l Lab
orat
orie
s, in
stitu
tions
of
high
er e
duca
tion,
oth
er re
sear
ch in
stitu
tes,
indu
stria
l res
earc
hers
, an
d in
tern
atio
nal r
esea
rche
rs to
car
ry o
ut th
e Pr
ojec
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-2
(2) I
ND
UST
RIA
L PA
RTN
ERSH
IPS-
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.2-
2-2-
1 (A
) IN
GEN
ERA
L- T
he Id
aho
Nat
iona
l Lab
orat
ory
shal
l or
gani
ze a
con
sorti
um o
f app
ropr
iate
indu
stria
l par
tner
s tha
t will
ca
rry
out c
ost-s
hare
d re
sear
ch, d
evel
opm
ent,
desi
gn, a
nd
cons
truct
ion
activ
ities
, and
ope
rate
rese
arch
faci
litie
s, on
beh
alf
of th
e Pr
ojec
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-2-
2 (B
) CO
ST-S
HA
RIN
G- A
ctiv
ities
of i
ndus
trial
par
tner
s fun
ded
by th
e Pr
ojec
t sha
ll be
cos
t-sha
red
in a
ccor
danc
e w
ith se
ctio
n 98
8.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-2-
3 (C
) PR
EFER
ENC
E- P
refe
renc
e in
det
erm
inin
g th
e fin
al
stru
ctur
e of
the
cons
ortiu
m o
r any
par
tner
ship
s und
er th
is
subt
itle
shal
l be
give
n to
a st
ruct
ure
(incl
udin
g de
sign
atin
g as
a
lead
indu
stria
l par
tner
an
entit
y in
corp
orat
ed in
the
Uni
ted
Stat
es) t
hat r
etai
ns U
nite
d St
ates
tech
nolo
gica
l lea
ders
hip
in th
e Pr
ojec
t whi
le m
axim
izin
g co
st sh
arin
g op
portu
nitie
s and
m
inim
izin
g Fe
dera
l fun
ding
resp
onsi
bilit
ies.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-3
(3) P
RO
TOTY
PE P
LAN
T SI
TIN
G- T
he p
roto
type
nuc
lear
re
acto
r and
ass
ocia
ted
plan
t sha
ll be
site
d at
the
Idah
o N
atio
nal
Labo
rato
ry in
Idah
o.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 25
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.2-
2-4
(4) R
EAC
TOR
TES
T C
APA
BIL
ITIE
S- T
he P
roje
ct sh
all u
se, i
f ap
prop
riate
, rea
ctor
test
cap
abili
ties a
t the
Idah
o N
atio
nal
Labo
rato
ry.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.2-
2-5
(5) O
THER
LA
BO
RA
TOR
Y C
APA
BIL
ITIE
S- T
he P
roje
ct m
ay
use,
if a
ppro
pria
te, f
acili
ties a
t oth
er N
atio
nal L
abor
ator
ies.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.1.
3
SEC
. 643
. PR
OJE
CT
OR
GA
NIZ
AT
ION
.
EP
Act
2005
3.
1.3-
1 (a
) Maj
or P
roje
ct E
lem
ents
- The
Pro
ject
shal
l con
sist
of t
he
follo
win
g m
ajor
pro
gram
ele
men
ts:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
1-1
(1) H
igh-
tem
pera
ture
hyd
roge
n pr
oduc
tion
tech
nolo
gy
deve
lopm
ent a
nd v
alid
atio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
1-2
(2) E
nerg
y co
nver
sion
tech
nolo
gy d
evel
opm
ent a
nd v
alid
atio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
1-3
(3) N
ucle
ar fu
el d
evel
opm
ent,
char
acte
rizat
ion,
and
qu
alifi
catio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
1-4
(4) M
ater
ials
sele
ctio
n, d
evel
opm
ent,
test
ing,
and
qua
lific
atio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
1-5
(5) R
eact
or a
nd b
alan
ce-o
f-pl
ant d
esig
n, e
ngin
eerin
g, sa
fety
an
alys
is, a
nd q
ualif
icat
ion.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2 (b
) Pro
ject
Pha
ses-
The
Pro
ject
shal
l be
cond
ucte
d in
the
follo
win
g ph
ases
: 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2-1
(1) F
IRST
PR
OJE
CT
PHA
SE- A
firs
t pro
ject
pha
se sh
all b
e co
nduc
ted
to--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2-1-
1 (A
) sel
ect a
nd v
alid
ate
the
appr
opria
te te
chno
logy
und
er
subs
ectio
n (a
)(1)
; 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2-1-
2 (B
) car
ry o
ut e
nabl
ing
rese
arch
, dev
elop
men
t, an
d de
mon
stra
tion
activ
ities
on
tech
nolo
gies
and
com
pone
nts u
nder
par
agra
phs (
2)
thro
ugh
(4) o
f sub
sect
ion
(a);
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
2-1-
3 (C
) det
erm
ine
whe
ther
it is
app
ropr
iate
to c
ombi
ne e
lect
ricity
ge
nera
tion
and
hydr
ogen
pro
duct
ion
in a
sing
le p
roto
type
nu
clea
r rea
ctor
and
pla
nt; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
2-1-
4 (D
) car
ry o
ut in
itial
des
ign
activ
ities
for a
pro
toty
pe n
ucle
ar
reac
tor a
nd p
lant
, inc
ludi
ng d
evel
opm
ent o
f des
ign
met
hods
and
sa
fety
ana
lytic
al m
etho
ds a
nd st
udie
s und
er su
bsec
tion
(a)(
5).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
2-2
(2) S
ECO
ND
PR
OJE
CT
PHA
SE- A
seco
nd p
roje
ct p
hase
shal
l be
con
duct
ed to
--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 26
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.3-
2-2-
1 (A
) con
tinue
app
ropr
iate
act
iviti
es u
nder
par
agra
phs (
1) th
roug
h (5
) of s
ubse
ctio
n (a
); 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2-2-
2 (B
) dev
elop
, thr
ough
a c
ompe
titiv
e pr
oces
s, a
final
des
ign
for t
he
prot
otyp
e nu
clea
r rea
ctor
and
pla
nt;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
2-2-
3 (C
) app
ly fo
r lic
ense
s to
cons
truct
and
ope
rate
the
prot
otyp
e nu
clea
r rea
ctor
from
the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
; and
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
2-2-
4 (D
) con
stru
ct a
nd st
art u
p op
erat
ions
of t
he p
roto
type
nuc
lear
re
acto
r and
its a
ssoc
iate
d hy
drog
en o
r ele
ctric
ity p
rodu
ctio
n fa
cilit
ies.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3 (c
) Pro
ject
Req
uire
men
ts-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1
(1) I
N G
ENER
AL-
The
Sec
reta
ry sh
all e
nsur
e th
at th
e Pr
ojec
t is
stru
ctur
ed so
as t
o m
axim
ize
the
tech
nica
l int
erch
ange
and
tra
nsfe
r of t
echn
olog
ies a
nd id
eas i
nto
the
Proj
ect f
rom
oth
er
sour
ces o
f rel
evan
t exp
ertis
e, in
clud
ing-
-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1-
1 (A
) the
nuc
lear
pow
er in
dust
ry, i
nclu
ding
nuc
lear
pow
er p
lant
co
nstru
ctio
n fir
ms,
parti
cula
rly w
ith re
spec
t to
issu
es a
ssoc
iate
d w
ith p
lant
des
ign,
con
stru
ctio
n, a
nd o
pera
tiona
l and
safe
ty
issu
es;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1-
2 (B
) the
che
mic
al p
roce
ssin
g in
dust
ry, p
artic
ular
ly w
ith re
spec
t to
issu
es re
latin
g to
--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1-
2-1
(i) th
e us
e of
pro
cess
ene
rgy
for p
rodu
ctio
n of
hyd
roge
n; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1-
2-2
(ii) t
he in
tegr
atio
n of
tech
nolo
gies
dev
elop
ed b
y th
e Pr
ojec
t int
o ch
emic
al p
roce
ssin
g en
viro
nmen
ts; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-1-
3 (C
) int
erna
tiona
l eff
orts
in a
reas
rela
ted
to th
e Pr
ojec
t, pa
rticu
larly
with
resp
ect t
o hy
drog
en p
rodu
ctio
n te
chno
logi
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-2
(2) I
NTE
RN
ATI
ON
AL
CO
LLA
BO
RA
TIO
N-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-2-
1 (A
) IN
GEN
ERA
L- T
he S
ecre
tary
shal
l see
k in
tern
atio
nal
coop
erat
ion,
par
ticip
atio
n, a
nd fi
nanc
ial c
ontri
butio
ns fo
r the
Pr
ojec
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 27
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.3-
3-2-
2 (B
) ASS
ISTA
NC
E FR
OM
INTE
RN
ATI
ON
AL
PAR
TNER
S-
The
Secr
etar
y, th
roug
h th
e Id
aho
Nat
iona
l Lab
orat
ory,
may
co
ntra
ct fo
r ass
ista
nce
from
spec
ialis
ts o
r fac
ilitie
s fro
m m
embe
r co
untri
es o
f the
Gen
erat
ion
IV In
tern
atio
nal F
orum
, the
Rus
sian
Fe
dera
tion,
or o
ther
inte
rnat
iona
l par
tner
s if t
he sp
ecia
lists
or
faci
litie
s pro
vide
acc
ess t
o co
st-e
ffec
tive
and
rele
vant
skill
s or
test
cap
abili
ties.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-2-
3 (C
) PA
RTN
ER N
ATI
ON
S- T
he P
roje
ct m
ay in
volv
e de
mon
stra
tion
of se
lect
ed p
roje
ct o
bjec
tives
in a
par
tner
cou
ntry
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.3-
3-2-
4 (D
) GEN
ERA
TIO
N IV
INTE
RN
ATI
ON
AL
FOR
UM
- The
Se
cret
ary
shal
l ens
ure
that
inte
rnat
iona
l act
iviti
es o
f the
Pro
ject
ar
e co
ordi
nate
d w
ith th
e G
ener
atio
n IV
Inte
rnat
iona
l For
um.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3
(3) R
EVIE
W B
Y N
UC
LEA
R E
NER
GY
RES
EAR
CH
A
DV
ISO
RY
CO
MM
ITTE
E-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
1 (A
) IN
GEN
ERA
L- T
he N
ucle
ar E
nerg
y R
esea
rch
Adv
isor
y C
omm
ittee
of t
he D
epar
tmen
t (re
ferr
ed to
in th
is p
arag
raph
as
the
NER
AC
') sh
all--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
1-1
(i) re
view
all
prog
ram
pla
ns fo
r the
Pro
ject
and
all
prog
ress
un
der t
he P
roje
ct o
n an
ong
oing
bas
is; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
1-2
(ii) e
nsur
e th
at im
porta
nt sc
ient
ific,
tech
nica
l, sa
fety
, and
pr
ogra
m m
anag
emen
t iss
ues r
ecei
ve a
ttent
ion
in th
e Pr
ojec
t and
by
the
Secr
etar
y.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
2 (B
) AD
DIT
ION
AL
EXPE
RTI
SE- T
he N
ERA
C sh
all s
uppl
emen
t th
e ex
perti
se o
f the
NER
AC
or a
ppoi
nt su
bpan
els t
o in
corp
orat
e in
to th
e re
view
by
the
NER
AC
the
rele
vant
sour
ces o
f exp
ertis
e de
scrib
ed u
nder
par
agra
ph (1
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
3 (C
) IN
ITIA
L R
EVIE
W- N
ot la
ter t
han
180
days
afte
r the
dat
e of
en
actm
ent o
f thi
s Act
, the
NER
AC
shal
l--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
3-1
(i) re
view
exi
stin
g pr
ogra
m p
lans
for t
he P
roje
ct in
ligh
t of t
he
reco
mm
enda
tions
of t
he d
ocum
ent e
ntitl
ed D
esig
n Fe
atur
es a
nd
Tech
nolo
gy U
ncer
tain
ties f
or th
e N
ext G
ener
atio
n N
ucle
ar
Plan
t,' d
ated
June
30,
200
4; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
3-2
(ii) a
ddre
ss a
ny re
com
men
datio
ns o
f the
doc
umen
t not
in
corp
orat
ed in
pro
gram
pla
ns fo
r the
Pro
ject
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 28
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.3-
3-3-
4 (D
) FIR
ST P
RO
JEC
T PH
ASE
REV
IEW
- On
a de
term
inat
ion
by
the
Secr
etar
y th
at th
e ap
prop
riate
act
iviti
es u
nder
the
first
pro
ject
ph
ase
unde
r sub
sect
ion
(b)(
1) a
re n
early
com
plet
e, th
e Se
cret
ary
shal
l req
uest
the
NER
AC
to c
ondu
ct a
com
preh
ensi
ve re
view
of
the
Proj
ect a
nd to
repo
rt to
the
Secr
etar
y th
e re
com
men
datio
n of
th
e N
ERA
C c
once
rnin
g w
heth
er th
e Pr
ojec
t is r
eady
to p
roce
ed
to th
e se
cond
pro
ject
pha
se u
nder
subs
ectio
n (b
)(2)
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.3-
3-3-
5 (E
) TR
AN
SMIT
TAL
OF
REP
OR
TS T
O C
ON
GR
ESS-
Not
late
r th
an 6
0 da
ys a
fter r
ecei
ving
any
repo
rt fr
om th
e N
ERA
C re
late
d to
the
Proj
ect,
the
Secr
etar
y sh
all s
ubm
it to
the
appr
opria
te
com
mitt
ees o
f the
Sen
ate
and
the
Hou
se o
f Rep
rese
ntat
ives
a
copy
of t
he re
port,
alo
ng w
ith a
ny a
dditi
onal
vie
ws o
f the
Se
cret
ary
that
the
Secr
etar
y m
ay c
onsi
der a
ppro
pria
te.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.1.
4
SEC
. 644
. NU
CL
EA
R R
EG
UL
AT
OR
Y C
OM
MIS
SIO
N.
EPA
ct20
05
3.1.
4-1
(a) I
n ac
cord
ance
with
sect
ion
202
of th
e En
ergy
Reo
rgan
izat
ion
Act
of 1
974
(42
U.S
.C. 5
842)
, the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
shal
l hav
e lic
ensi
ng a
nd re
gula
tory
aut
horit
y fo
r an
y re
acto
r aut
horiz
ed u
nder
this
subt
itle.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
2 (b
) Lic
ensi
ng S
trate
gy- N
ot la
ter t
han
3 ye
ars a
fter t
he d
ate
of
enac
tmen
t of t
his A
ct, t
he S
ecre
tary
and
the
Cha
irman
of t
he
Nuc
lear
Reg
ulat
ory
Com
mis
sion
shal
l joi
ntly
subm
it to
the
appr
opria
te c
omm
ittee
s of t
he S
enat
e an
d th
e H
ouse
of
Rep
rese
ntat
ives
a li
cens
ing
stra
tegy
for t
he p
roto
type
nuc
lear
re
acto
r, in
clud
ing-
-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
2-1
(1) a
des
crip
tion
of w
ays i
n w
hich
cur
rent
lice
nsin
g re
quire
men
ts
rela
ting
to li
ght-w
ater
reac
tors
nee
d to
be
adap
ted
for t
he ty
pes
of p
roto
type
nuc
lear
reac
tor b
eing
con
side
red
by th
e Pr
ojec
t;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
2-2
(2) a
des
crip
tion
of a
naly
tical
tool
s tha
t the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
will
hav
e to
dev
elop
to in
depe
nden
tly v
erify
de
sign
s and
per
form
ance
cha
ract
eris
tics o
f com
pone
nts,
equi
pmen
t, sy
stem
s, or
stru
ctur
es a
ssoc
iate
d w
ith th
e pr
otot
ype
nucl
ear r
eact
or;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 29
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.4-
2-3
(3) o
ther
rese
arch
or d
evel
opm
ent a
ctiv
ities
that
may
be
requ
ired
on th
e pa
rt of
the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
in o
rder
to
revi
ew a
lice
nse
appl
icat
ion
for t
he p
roto
type
nuc
lear
reac
tor;
and
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
2-4
(4) a
n es
timat
e of
the
budg
etar
y re
quire
men
ts a
ssoc
iate
d w
ith th
e lic
ensi
ng st
rate
gy.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
3 (c
) Ong
oing
Inte
ract
ion-
The
Sec
reta
ry sh
all s
eek
the
activ
e pa
rtici
patio
n of
the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
thro
ugho
ut
the
dura
tion
of th
e Pr
ojec
t to-
-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
3-1
(1) a
void
des
ign
deci
sion
s tha
t will
com
prom
ise
adeq
uate
safe
ty
mar
gins
in th
e de
sign
of t
he re
acto
r or i
mpa
ir th
e ac
cess
ibili
ty o
f nu
clea
r saf
ety-
rela
ted
com
pone
nts o
f the
pro
toty
pe re
acto
r for
in
spec
tion
and
mai
nten
ance
;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.4-
3-2
(2) d
evel
op to
ols t
o fa
cilit
ate
insp
ectio
n an
d m
aint
enan
ce n
eede
d fo
r saf
ety
purp
oses
; and
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.4-
3-3
(3) d
evel
op ri
sk-b
ased
crit
eria
for a
ny fu
ture
com
mer
cial
de
velo
pmen
t of s
imila
r rea
ctor
arc
hite
ctur
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.1.
5
SEC
. 645
. PR
OJE
CT
TIM
EL
INE
S A
ND
A
UT
HO
RIZ
AT
ION
OF
APP
RO
PRIA
TIO
NS.
EP
Act
2005
3.
1.5-
1 (a
) Tar
get D
ate
to C
ompl
ete
the
Firs
t Pro
ject
Pha
se- N
ot la
ter
than
Sep
tem
ber 3
0, 2
011,
the
Secr
etar
y sh
all--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.5-
1-1
(1) s
elec
t the
tech
nolo
gy to
be
used
by
the
Proj
ect f
or h
igh-
tem
pera
ture
hyd
roge
n pr
oduc
tion
and
the
initi
al d
esig
n pa
ram
eter
s for
the
prot
otyp
e nu
clea
r pla
nt; o
r
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
1-2
(2) s
ubm
it to
Con
gres
s a re
port
esta
blis
hing
an
alte
rnat
ive
date
fo
r mak
ing
the
sele
ctio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
2 (b
) Des
ign
Com
petit
ion
for S
econ
d Pr
ojec
t Pha
se-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
2-1
The
Secr
etar
y, a
ctin
g th
roug
h th
e Id
aho
Nat
iona
l Lab
orat
ory,
sh
all f
und
not m
ore
than
4 te
ams f
or n
ot m
ore
than
2 y
ears
to
deve
lop
deta
iled
prop
osal
s for
com
petit
ive
eval
uatio
n an
d se
lect
ion
of a
sing
le p
ropo
sal f
or a
fina
l des
ign
of th
e pr
otot
ype
nucl
ear r
eact
or.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 30
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.5-
2-2
(2) S
YST
EMS
INTE
GR
ATI
ON
- The
Sec
reta
ry m
ay st
ruct
ure
Proj
ect a
ctiv
ities
in th
e se
cond
pro
ject
pha
se to
use
the
lead
in
dust
rial p
artn
er o
f the
com
petit
ivel
y se
lect
ed d
esig
n un
der
para
grap
h (1
) in
a sy
stem
s int
egra
tion
role
for f
inal
des
ign
and
cons
truct
ion
of th
e Pr
ojec
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
3 (c
) Tar
get D
ate
to C
ompl
ete
Proj
ect C
onst
ruct
ion-
Not
late
r tha
n Se
ptem
ber 3
0, 2
021,
the
Secr
etar
y sh
all--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.5-
3-1
(1) c
ompl
ete
cons
truct
ion
and
begi
n op
erat
ions
of t
he p
roto
type
nu
clea
r rea
ctor
and
ass
ocia
ted
ener
gy o
r hyd
roge
n fa
cilit
ies;
or
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
3-2
(2) s
ubm
it to
Con
gres
s a re
port
esta
blis
hing
an
alte
rnat
ive
date
fo
r com
plet
ion.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.5-
4 (d
) Aut
horiz
atio
n of
App
ropr
iatio
ns- T
here
is a
utho
rized
to b
e ap
prop
riate
d to
the
Secr
etar
y fo
r res
earc
h an
d co
nstru
ctio
n ac
tiviti
es u
nder
this
subt
itle
(incl
udin
g fo
r tra
nsfe
r to
the
Nuc
lear
R
egul
ator
y C
omm
issi
on fo
r act
iviti
es u
nder
sect
ion
644
as
appr
opria
te)-
-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
3.
1.5-
4-1
(1) $
1,25
0,00
0,00
0 fo
r the
per
iod
of fi
scal
yea
rs 2
006
thro
ugh
2015
; and
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
3.
1.5-
4-2
(2) s
uch
sum
s as a
re n
eces
sary
for e
ach
of fi
scal
yea
rs 2
016
thro
ugh
2021
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
4
TIT
LE
VII
I--H
YD
RO
GEN
EP
Act
2005
4.1
SE
C. 8
01. H
YD
RO
GEN
AN
D F
UE
L C
ELL
PR
OG
RA
M.
EPA
ct20
05
5.
2
Subt
itle
E--
Nuc
lear
Ene
rgy
EPA
ct20
05
5.
2.1
SE
C. 9
52. N
UC
LE
AR
EN
ERG
Y R
ESE
AR
CH
PR
OG
RA
MS.
EP
Act
2005
5.
2.1-
1 (a
) Nuc
lear
Ene
rgy
Res
earc
h In
itiat
ive-
The
Sec
reta
ry sh
all c
arry
ou
t a N
ucle
ar E
nerg
y R
esea
rch
Initi
ativ
e fo
r res
earc
h an
d de
velo
pmen
t rel
ated
to n
ucle
ar e
nerg
y.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
2 (b
) Nuc
lear
Ene
rgy
Syst
ems S
uppo
rt Pr
ogra
m- T
he S
ecre
tary
sh
all c
arry
out
a N
ucle
ar E
nerg
y Sy
stem
s Sup
port
Prog
ram
to
supp
ort r
esea
rch
and
deve
lopm
ent a
ctiv
ities
add
ress
ing
relia
bilit
y, a
vaila
bilit
y, p
rodu
ctiv
ity, c
ompo
nent
agi
ng, s
afet
y,
and
secu
rity
of e
xist
ing
nucl
ear p
ower
pla
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
3 (c
) Nuc
lear
Pow
er 2
010
Prog
ram
- 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 31
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
5.
2.1-
3-1
(1) I
N G
ENER
AL-
The
Sec
reta
ry sh
all c
arry
out
a N
ucle
ar
Pow
er 2
010
Prog
ram
, con
sist
ent w
ith re
com
men
datio
ns o
f the
N
ucle
ar E
nerg
y R
esea
rch
Adv
isor
y C
omm
ittee
of t
he
Dep
artm
ent i
n th
e re
port
entit
led
A R
oadm
ap to
Dep
loy
New
N
ucle
ar P
ower
Pla
nts i
n th
e U
nite
d St
ates
by
2010
' and
dat
ed
Oct
ober
200
1.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
3-2
(2) A
DM
INIS
TRA
TIO
N- T
he P
rogr
am sh
all i
nclu
de--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
2.1-
3-2-
1 (A
) use
of t
he e
xper
tise
and
capa
bilit
ies o
f ind
ustry
, ins
titut
ions
of
hig
her e
duca
tion,
and
Nat
iona
l Lab
orat
orie
s in
eval
uatio
n of
ad
vanc
ed n
ucle
ar fu
el c
ycle
s and
fuel
s tes
ting;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
3-2-
2 (B
) con
side
ratio
n of
a v
arie
ty o
f rea
ctor
des
igns
suita
ble
for b
oth
deve
lope
d an
d de
velo
ping
nat
ions
; 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
2.1-
3-2-
3 (C
) par
ticip
atio
n of
inte
rnat
iona
l col
labo
rato
rs in
rese
arch
, de
velo
pmen
t, an
d de
sign
eff
orts
, as a
ppro
pria
te; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
3-2-
4 (D
) enc
oura
gem
ent f
or p
artic
ipat
ion
by in
stitu
tions
of h
ighe
r ed
ucat
ion
and
indu
stry
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
2.1-
4 (d
) Gen
erat
ion
IV N
ucle
ar E
nerg
y Sy
stem
s Ini
tiativ
e-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
4-1
(1) I
N G
ENER
AL-
The
Sec
reta
ry sh
all c
arry
out
a G
ener
atio
n IV
Nuc
lear
Ene
rgy
Syst
ems I
nitia
tive
to d
evel
op a
n ov
eral
l te
chno
logy
pla
n fo
r and
to su
ppor
t res
earc
h an
d de
velo
pmen
t ne
cess
ary
to m
ake
an in
form
ed te
chni
cal d
ecis
ion
abou
t the
mos
t pr
omis
ing
cand
idat
es fo
r eve
ntua
l com
mer
cial
app
licat
ion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
4-2
(2) A
DM
INIS
TRA
TIO
N- I
n co
nduc
ting
the
Initi
ativ
e, th
e Se
cret
ary
shal
l exa
min
e ad
vanc
ed p
rolif
erat
ion-
resi
stan
t and
pa
ssiv
ely
safe
reac
tor d
esig
ns, i
nclu
ding
des
igns
that
--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
4-2-
1 (A
) are
eco
nom
ical
ly c
ompe
titiv
e w
ith o
ther
ele
ctric
pow
er
gene
ratio
n pl
ants
; 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
2.1-
4-2-
2 (B
) hav
e hi
gher
eff
icie
ncy,
low
er c
ost,
and
impr
oved
safe
ty
com
pare
d to
reac
tors
in o
pera
tion
on th
e da
te o
f ena
ctm
ent o
f th
is A
ct;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
2.1-
4-2-
3 (C
) use
fuel
s tha
t are
pro
lifer
atio
n re
sist
ant a
nd h
ave
subs
tant
ially
redu
ced
prod
uctio
n of
hig
h-le
vel w
aste
per
uni
t of
outp
ut; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 32
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
5.
2.1-
4-2-
4 (D
) use
impr
oved
inst
rum
enta
tion.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
2.1-
5 (e
) Rea
ctor
Pro
duct
ion
of H
ydro
gen-
The
Sec
reta
ry sh
all c
arry
ou
t res
earc
h to
exa
min
e de
sign
s for
hig
h-te
mpe
ratu
re re
acto
rs
capa
ble
of p
rodu
cing
larg
e-sc
ale
quan
titie
s of h
ydro
gen.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.3
Su
btitl
e I-
-Res
earc
h A
dmin
istr
atio
n an
d O
pera
tions
EP
Act
2005
5.3.
1
SEC
. 988
. CO
ST S
HA
RIN
G.
EPA
ct20
05
5.3.
1-1
(a) A
pplic
abili
ty- N
otw
ithst
andi
ng a
ny o
ther
pro
visi
on o
f law
, in
carr
ying
out
a re
sear
ch, d
evel
opm
ent,
dem
onst
ratio
n, o
r co
mm
erci
al a
pplic
atio
n pr
ogra
m o
r act
ivity
that
is in
itiat
ed a
fter
the
date
of e
nact
men
t of t
his s
ectio
n, th
e Se
cret
ary
shal
l req
uire
co
st-s
harin
g in
acc
orda
nce
with
this
sect
ion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
2 (b
) Res
earc
h an
d D
evel
opm
ent-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
2-1
(1) I
N G
ENER
AL-
Exc
ept a
s pro
vide
d in
par
agra
phs (
2) a
nd (3
) an
d su
bsec
tion
(f),
the
Secr
etar
y sh
all r
equi
re n
ot le
ss th
an 2
0 pe
rcen
t of t
he c
ost o
f a re
sear
ch o
r dev
elop
men
t act
ivity
de
scrib
ed in
subs
ectio
n (a
) to
be p
rovi
ded
by a
non
-Fed
eral
so
urce
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
2-2
(2) E
XC
LUSI
ON
- Par
agra
ph (1
) sha
ll no
t app
ly to
a re
sear
ch o
r de
velo
pmen
t act
ivity
des
crib
ed in
subs
ectio
n (a
) tha
t is o
f a b
asic
or
fund
amen
tal n
atur
e, a
s det
erm
ined
by
the
appr
opria
te o
ffic
er
of th
e D
epar
tmen
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
2-3
(3) R
EDU
CTI
ON
- The
Sec
reta
ry m
ay re
duce
or e
limin
ate
the
requ
irem
ent o
f par
agra
ph (1
) for
a re
sear
ch a
nd d
evel
opm
ent
activ
ity o
f an
appl
ied
natu
re if
the
Secr
etar
y de
term
ines
that
the
redu
ctio
n is
nec
essa
ry a
nd a
ppro
pria
te.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
3 (c
) Dem
onst
ratio
n an
d C
omm
erci
al A
pplic
atio
n-
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
3-1
(1) I
N G
ENER
AL-
Exc
ept a
s pro
vide
d in
par
agra
ph (2
) and
su
bsec
tion
(f),
the
Secr
etar
y sh
all r
equi
re th
at n
ot le
ss th
an 5
0 pe
rcen
t of t
he c
ost o
f a d
emon
stra
tion
or c
omm
erci
al a
pplic
atio
n ac
tivity
des
crib
ed in
subs
ectio
n (a
) to
be p
rovi
ded
by a
non
-Fe
dera
l sou
rce.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 33
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
5.
3.1-
3-2
(2) R
EDU
CTI
ON
OF
NO
N-F
EDER
AL
SHA
RE-
The
Sec
reta
ry
may
redu
ce th
e no
n-Fe
dera
l sha
re re
quire
d un
der p
arag
raph
(1)
if th
e Se
cret
ary
dete
rmin
es th
e re
duct
ion
to b
e ne
cess
ary
and
appr
opria
te, t
akin
g in
to c
onsi
dera
tion
any
tech
nolo
gica
l ris
k re
latin
g to
the
activ
ity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4 (d
) Cal
cula
tion
of A
mou
nt- I
n ca
lcul
atin
g th
e am
ount
of a
non
-Fe
dera
l con
tribu
tion
unde
r thi
s sec
tion,
the
Secr
etar
y--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4-1
(1) m
ay in
clud
e al
low
able
cos
ts in
acc
orda
nce
with
the
appl
icab
le c
ost p
rinci
ples
, inc
ludi
ng--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
4-1-
1 (A
) cas
h;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4-1-
2 (B
) per
sonn
el c
osts
; 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
4-1-
3 (C
) the
val
ue o
f a se
rvic
e, o
ther
reso
urce
, or t
hird
par
ty in
-kin
d co
ntrib
utio
n de
term
ined
in a
ccor
danc
e w
ith th
e ap
plic
able
ci
rcul
ar o
f the
Off
ice
of M
anag
emen
t and
Bud
get;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4-1-
4 (D
) ind
irect
cos
ts o
r fac
ilitie
s and
adm
inis
trativ
e co
sts;
or
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4-1-
5 (E
) any
fund
s rec
eive
d un
der t
he p
ower
pro
gram
of t
he
Tenn
esse
e V
alle
y A
utho
rity
(exc
ept t
o th
e ex
tent
that
such
fund
s ar
e m
ade
avai
labl
e un
der a
n an
nual
app
ropr
iatio
n A
ct);
and
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
4-2
(2) s
hall
not i
nclu
de--
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
4-2-
1 (A
) rev
enue
s or r
oyal
ties f
rom
the
pros
pect
ive
oper
atio
n of
an
activ
ity b
eyon
d th
e tim
e co
nsid
ered
in th
e aw
ard;
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
4-2-
2 (B
) pro
ceed
s fro
m th
e pr
ospe
ctiv
e sa
le o
f an
asse
t of a
n ac
tivity
; or
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
4-2-
3 (C
) oth
er a
ppro
pria
ted
Fede
ral f
unds
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
EP
Act
2005
5.
3.1-
5 (e
) Rep
aym
ent o
f Fed
eral
Sha
re- T
he S
ecre
tary
shal
l not
requ
ire
repa
ymen
t of t
he F
eder
al sh
are
of a
cos
t-sha
red
activ
ity u
nder
th
is se
ctio
n as
a c
ondi
tion
of m
akin
g an
aw
ard.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
6 (f
) Exc
lusi
ons-
Thi
s sec
tion
shal
l not
app
ly to
--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 34
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
5.
3.1-
6-1
(1) a
coo
pera
tive
rese
arch
and
dev
elop
men
t agr
eem
ent u
nder
the
Stev
enso
n-W
ydle
r Tec
hnol
ogy
Inno
vatio
n A
ct o
f 198
0 (1
5 U
.S.C
. 370
1 et
seq.
);
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
6-2
(2) a
fee
char
ged
for t
he u
se o
f a D
epar
tmen
t fac
ility
; or
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
6-3
(3) a
n aw
ard
unde
r--
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
6-3-
1 (A
) the
smal
l bus
ines
s inn
ovat
ion
rese
arch
pro
gram
und
er
sect
ion
9 of
the
Smal
l Bus
ines
s Act
(15
U.S
.C. 6
38);
or
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
5.
3.1-
6-3-
2 (B
) the
smal
l bus
ines
s tec
hnol
ogy
trans
fer p
rogr
am u
nder
that
se
ctio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
EPA
ct20
05
6
"A R
evie
w o
f the
NG
NP
Proj
ect"
N
ERA
C
6.
1
APP
END
IX A
: EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EV
IEW
N
ERA
C
APP
END
IX A
: EP
AC
T C
HA
RG
E to
NER
AC
for
NG
NP
REV
IEW
6.
1-1
(3
) RE
VIE
W B
Y N
UC
LE
AR
EN
ERG
Y R
ESE
AR
CH
A
DV
ISO
RY
CO
MM
ITT
EE
-
N
ERA
C
APP
END
IX A
: EP
AC
T C
HA
RG
E to
NER
AC
for
NG
NP
REV
IEW
6.1-
1-1
(A) I
N G
ENER
AL-
The
Nuc
lear
Ene
rgy
Res
earc
h A
dvis
ory
Com
mitt
ee o
f the
Dep
artm
ent (
refe
rred
to in
this
par
agra
ph a
s th
e ‘N
ERA
C’)
shal
l -
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
1-1
(i) re
view
a11
pro
gram
pla
ns fo
r the
Pro
ject
and
a11
pro
gres
s un
der t
he P
roje
ct o
n an
ong
oing
bas
is; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
1-2
(ii) e
nsur
e th
at im
porta
nt sc
ient
ific,
tech
nica
l, sa
fety
, and
pr
ogra
m m
anag
emen
t iss
ues r
ecei
ve a
ttent
ion
in th
e Pr
ojec
t and
by
the
Secr
etar
y.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 35
of10
4
Obj
ect
#R
equi
rem
ents
ID
Leg
isla
tive
Req
uire
men
ts
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
6.
1-1-
2 (B
) AD
DIT
ION
AL
EXPE
RTI
SE- T
he N
ERA
C sh
all s
uppl
emen
t th
e ex
perti
se o
f the
NER
AC
or a
ppoi
nt su
bpan
els t
o in
corp
orat
e in
to th
e re
view
by
the
NER
AC
the
rele
vant
sour
ces o
f exp
ertis
e de
scrib
ed u
nder
par
agra
ph (I
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
3 (C
) IN
ITIA
L R
EVIE
W- N
ot la
ter t
han
180
days
afte
r the
dat
e of
en
actm
ent o
f thi
s Act
, the
NER
AC
shal
l -
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
3-1
(i) re
view
exi
stin
g pr
ogra
m p
lans
for t
he P
roje
ct in
ligh
t of t
he
reco
mm
enda
tions
of t
he d
ocum
ent e
ntitl
ed 'D
esig
n Fe
atur
es a
nd
Tech
nolo
gy U
ncer
tain
ties f
or th
e N
ext G
ener
atio
n N
ucle
ar
Plan
t,' d
ated
June
30,
200
4; a
nd
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
3-2
(ii) a
ddre
ss a
ny re
com
men
datio
ns o
f the
doc
umen
t not
in
corp
orat
ed in
pro
gram
pla
ns fo
r the
Pro
ject
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
ERA
C
APP
END
IX A
: EP
AC
T C
HA
RG
E to
NER
AC
for
NG
NP
REV
IEW
6.1-
1-4
(D) F
IRST
PR
OJE
CT
PHA
SE R
EVIE
W- O
n a
dete
rmin
atio
n by
th
e Se
cret
ary
that
the
appr
opria
te a
ctiv
ities
und
er th
e fir
st p
roje
ct
phas
e un
der s
ubse
ctio
n (b
)(l)
are
near
ly c
ompl
ete,
the
Secr
etar
y sh
all r
eque
st th
e N
ERA
C to
con
duct
a c
ompr
ehen
sive
revi
ew o
f th
e Pr
ojec
t and
to re
port
to th
e Se
cret
ary
the
reco
mm
enda
tion
of
the
NER
AC
con
cern
ing
whe
ther
the
Proj
ect i
s rea
dy to
pro
ceed
to
the
seco
nd p
roje
ct p
hase
und
er su
bsec
tion
(b)(
2).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
6.
1-1-
5 (E
)TR
AN
SMIT
TAL
OF
REP
OR
TS T
O C
ON
GR
ESS-
Not
late
r th
an 6
0 da
ys a
fter r
ecei
ving
any
repo
rt fr
om th
e N
ERA
C re
late
d to
the
Proj
ect,
the
Secr
etar
y sh
all s
ubm
it to
the
appr
opria
te
com
mitt
ees o
f' th
e Se
nate
and
the
Hou
se o
f Rep
rese
ntat
ives
a
copy
of t
he re
port,
alo
ng w
ith a
ny a
dditi
onal
vie
ws o
f the
Se
cret
ary
that
the
Secr
etar
y m
ay c
onsi
der a
ppro
pria
te.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
A
PPEN
DIX
A:
EPA
CT
CH
AR
GE
to N
ERA
C fo
r N
GN
P R
EVIE
W
A-3
. En
d U
ser R
equi
rem
ents
No
requ
irem
ents
cur
rent
ly e
xist
.
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 36
of10
4
A-4
. St
akeh
olde
r Req
uire
men
ts
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
NG
NP
TO
P-LE
VE
L R
EQ
UIR
EM
ENT
S
3. N
GN
P TO
P-LE
VEL
R
EQU
IREM
ENTS
2.
1
NG
NP
Prog
ram
Req
uire
men
ts
3.
2 N
GN
P Pr
ogra
m
Req
uire
men
ts
2.1.
1
Ove
rall
Obj
ectiv
es
3.
2.1
Ove
rall
Obj
ectiv
es
2.
1.1-
2 Th
e pl
ant s
hall
be c
apab
le o
f com
plet
ing
desi
gn, l
icen
sing
, co
nstru
ctio
n, a
nd st
artu
p te
stin
g fo
r ini
tial o
pera
tion
by 2
021.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SA
G
Mee
ting
Agr
eem
ents
O
ctob
er 2
2, 2
008
2.
1.1-
3 Th
e N
GN
P Pr
ojec
t mis
sion
is th
e de
velo
pmen
t of a
full-
scal
e co
mm
erci
al p
lant
dem
onst
ratio
n th
at p
rovi
des (
a) h
igh-
effic
ienc
y el
ectri
city
gen
erat
ion
and
(b) C
O2-
free
hyd
roge
n pr
oduc
tion
base
d on
hig
h te
mpe
ratu
re, m
odul
ar g
as-c
oole
d,
grap
hite
mod
erat
ed re
acto
r tec
hnol
ogy
as th
e he
at so
urce
. The
m
issi
on n
eed
stat
emen
t dev
elop
ed fo
r NG
NP
was
app
rove
d by
th
e D
OE
Dep
uty
Secr
etar
y on
Oct
ober
18,
200
4, o
ffic
ially
co
mpl
etin
g C
D-0
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.1
NG
NP
Mis
sion
N
eed
2.
1.1-
5 Es
tabl
ish
the
basi
s for
lice
nsin
g th
e co
mm
erci
al v
ersi
on o
f the
N
GN
P by
the
Nuc
lear
Reg
ulat
ory
Com
mis
sion
(NR
C).
This
will
be
ach
ieve
d in
maj
or p
art t
hrou
gh li
cens
ing
of th
e pr
otot
ype
by
the
NR
C a
nd in
itiat
ing
the
proc
ess f
or c
ertif
icat
ion
of th
e nu
clea
r sys
tem
des
ign.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.1
NG
NP
Mis
sion
N
eed
2.
1.1-
6 Fo
ster
rebu
ildin
g of
the
U.S
. nuc
lear
indu
stria
l inf
rast
ruct
ure
and
cont
ribut
ing
to m
akin
g th
e U
.S. i
ndus
try se
lf-su
ffic
ient
for
our n
ucle
ar e
nerg
y pr
oduc
tion
need
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.1
NG
NP
Mis
sion
N
eed
2.1.
2
NG
NP
Proj
ect R
equi
rem
ents
3.2.
2 N
GN
P Pr
ojec
t R
equi
rem
ents
2.1.
2-10
C
osts
for a
ntic
ipat
ed “
Nth
”-of
-a-k
ind
(NO
AK
), ba
sed
on d
esig
n ce
rtific
atio
n, c
onst
ruct
ion,
and
ope
ratio
n of
firs
t-of-
a-ki
nd
(FO
AK
) des
ign,
shal
l sup
port
a vi
able
eco
nom
ic b
usin
ess m
odel
(c
ompe
titiv
e w
ith n
atur
al g
as p
rice
at $
8/M
MB
tu)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 37
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1.2-
12a
Bec
ause
the
NG
NP
will
be
built
with
in a
DO
E fa
cilit
y an
d w
ill
inte
rfac
e w
ith o
ther
exi
stin
g fa
cilit
ies,
the
plan
t des
igne
r sha
ll ev
alua
te D
OE
orde
rs to
ens
ure
that
the
NG
NP
can
inte
rfac
e w
ith
the
DO
E si
te.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
2.
1.2-
12b
Bec
ause
the
NG
NP
will
be
built
with
in a
DO
E fa
cilit
y an
d w
ill
inte
rfac
e w
ith o
ther
exi
stin
g fa
cilit
ies,
the
plan
t des
igne
r sha
ll ev
alua
te D
OE
orde
rs to
ens
ure
that
it is
acc
epta
ble
to D
OE.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
10 C
odes
and
St
anda
rds
Req
uire
men
ts
3
NG
NP
Proj
ect S
cope
1.2
NG
NP
Proj
ect
Scop
e
3-1-
4a
The
NG
NP
proj
ect s
hall
iden
tify,
tech
nolo
gy d
evel
opm
ent a
nd
syst
em c
onfir
mat
ory
and
verif
icat
ion
task
s nee
ded
for d
esig
n.
1.
4 Pr
ojec
t D
escr
iptio
n
3-1-
4b
The
NG
NP
proj
ect s
hall
iden
tify,
tech
nolo
gy d
evel
opm
ent a
nd
syst
em c
onfir
mat
ory
and
verif
icat
ion
task
s nee
ded
for l
icen
sing
.
1.4
Proj
ect
Des
crip
tion
3-
1-4c
Th
e N
GN
P pr
ojec
t sha
ll id
entif
y, te
chno
logy
dev
elop
men
t and
sy
stem
con
firm
ator
y an
d ve
rific
atio
n ta
sks n
eede
d fo
r, co
nstru
ctio
n,.
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-4d
Th
e N
GN
P pr
ojec
t sha
ll id
entif
y, te
chno
logy
dev
elop
men
t and
sy
stem
con
firm
ator
y an
d ve
rific
atio
n ta
sks n
eede
d fo
r des
ign,
lic
ensi
ng, c
onst
ruct
ion,
and
test
ing
at p
ower
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-4e
Th
e N
GN
P pr
ojec
t sha
ll in
tegr
ate
tech
nolo
gy d
evel
opm
ent a
nd
syst
em c
onfir
mat
ory
and
verif
icat
ion
task
s nee
ded
for d
esig
n.
1.
4 Pr
ojec
t D
escr
iptio
n
3-1-
4f
The
NG
NP
proj
ect s
hall
inte
grat
e te
chno
logy
dev
elop
men
t and
sy
stem
con
firm
ator
y an
d ve
rific
atio
n ta
sks n
eede
d fo
r lic
ensi
ng,.
1.
4 Pr
ojec
t D
escr
iptio
n
3-1-
4g
The
NG
NP
proj
ect s
hall
inte
grat
e te
chno
logy
dev
elop
men
t and
sy
stem
con
firm
ator
y an
d ve
rific
atio
n ta
sks n
eede
d fo
r co
nstru
ctio
n.
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-4h
Th
e N
GN
P pr
ojec
t sha
ll in
tegr
ate
tech
nolo
gy d
evel
opm
ent a
nd
syst
em c
onfir
mat
ory
and
verif
icat
ion
task
s nee
ded
for d
esig
n,
licen
sing
, con
stru
ctio
n, a
nd te
stin
g at
pow
er
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-4i
Th
e N
GN
P pr
ojec
t sha
ll co
mpl
ete
tech
nolo
gy d
evel
opm
ent a
nd
syst
em c
onfir
mat
ory
and
verif
icat
ion
task
s nee
ded
for t
estin
g at
po
wer
.
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-6
The
NG
NP
proj
ect s
hall
com
plet
e al
l fed
eral
per
mitt
ing
requ
ired
for o
pera
tion,
incl
udin
g su
ppor
t for
DO
E N
atio
nal
Envi
ronm
enta
l Pol
icy
Act
(NEP
A) a
ctiv
ities
.
1.
4 Pr
ojec
t D
escr
iptio
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 38
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3-
1-6
The
NG
NP
proj
ect s
hall
com
plet
e al
l sta
te p
erm
ittin
g re
quire
d fo
r con
stru
ctio
n, in
clud
ing
supp
ort f
or D
OE
Nat
iona
l En
viro
nmen
tal P
olic
y A
ct (N
EPA
) act
iviti
es.
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-6
The
NG
NP
proj
ect s
hall
com
plet
e al
l fed
eral
per
mitt
ing
requ
ired
for o
pera
tion,
incl
udin
g su
ppor
t for
DO
E N
atio
nal
Envi
ronm
enta
l Pol
icy
Act
(NEP
A) a
ctiv
ities
.
1.
4 Pr
ojec
t D
escr
iptio
n
3-
1-6
The
NG
NP
proj
ect s
hall
com
plet
e al
l sta
te p
erm
ittin
g re
quire
d fo
r con
stru
ctio
n, in
clud
ing
supp
ort f
or D
OE
Nat
iona
l En
viro
nmen
tal P
olic
y A
ct (N
EPA
) act
iviti
es.
1.
4 Pr
ojec
t D
escr
iptio
n
5
Pre-
Con
cept
ual D
esig
n Sc
ope,
Pla
nnin
g, a
nd E
xecu
tion
2.
1 Pr
e-C
once
ptua
l D
esig
n Sc
ope,
Pl
anni
ng, a
nd
Exec
utio
n 5-
1.1
Pr
e-C
once
ptua
l Des
ign
Proj
ect R
equi
rem
ents
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
5-
1.1-
1 N
GN
P sh
all b
e de
sign
ed, c
onst
ruct
ed, l
icen
sed,
and
ope
ratin
g by
20
21.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
5-
1.1-
2 N
GN
P de
sign
con
figur
atio
n sh
all c
onsi
der c
ost a
nd ri
sk p
rofil
es
to e
nsur
e th
at N
GN
P es
tabl
ishe
s a so
und
foun
datio
n fo
r fut
ure
com
mer
cial
dep
loym
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
5-
1.1-
3 N
GN
P sh
all b
e lic
ense
d by
the
NR
C a
s a c
omm
erci
al
coge
nera
tion
faci
lity
prod
ucin
g el
ectri
city
and
hyd
roge
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 39
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
5-
1.1-
4 Th
e pr
ojec
t sha
ll in
clud
e id
entif
icat
ion
of n
eces
sary
and
su
ffic
ient
rese
arch
and
dev
elop
men
t tec
hnic
al sc
ope
and
prio
ritie
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
5-
1.1-
5 N
GN
P lic
ensi
ng sh
all s
uppo
rt po
tent
ial f
utur
e N
RC
tech
nolo
gy
neut
ral r
ule-
mak
ing
activ
ities
(i.e
., R
isk-
Info
rmed
, Per
form
ance
-B
ased
Alte
rnat
ive
to 1
0 C
FR P
art 5
0).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
7
"A R
evie
w o
f the
NG
NP
Proj
ect"
N
ERA
C
7.
1
The
subc
omm
ittee
rec
omm
ends
a se
ries
of a
ctio
ns to
mak
e th
e N
GN
P pr
ogra
m a
s eff
ectiv
e as
pos
sibl
e.
NER
AC
Ex
ecut
ive
Sum
mar
y
7.1-
1a
The
curr
ent m
issi
on fo
r the
NG
NP
is to
des
ign
and
build
a
reac
tor t
hat g
ener
ates
ele
ctric
ity a
nd p
rodu
ces h
ydro
gen.
The
su
bcom
mitt
ee re
com
men
ds th
at th
is d
ual m
issi
on sh
all b
e re
cons
ider
ed a
nd n
ot b
e ac
cept
ed w
ithou
t fur
ther
ana
lysi
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.
1-1b
Th
e su
bcom
mitt
ee fu
rther
reco
mm
ends
that
this
ana
lysi
s be
done
as o
utlin
ed in
the
follo
win
g di
scus
sion
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
ERA
C
Exec
utiv
e Su
mm
ary
7.
1-2
The
DO
E-N
E st
aff s
hall
cond
uct,
with
the
assi
stan
ce o
f key
in
dust
ry re
pres
enta
tives
, eco
nom
ic a
nd e
ngin
eerin
g tra
de st
udie
s th
at c
onsi
der:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.
1-3
The
targ
ets f
or h
ydro
gen
prod
uctio
n fo
r var
ious
scen
ario
s ove
r th
e ne
xt fe
w d
ecad
es;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.1-
4 Th
e D
OE
targ
et fo
r hyd
roge
n pr
oduc
tion
via
nucl
ear p
ower
in
this
ove
rall
cont
ext;
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.1-
5 Th
e lik
ely
hydr
ogen
pro
duct
ion
and
elec
trici
ty p
rodu
ctio
n al
tern
ativ
es a
nd h
ow th
ose
alte
rnat
ives
wou
ld b
e fa
ctor
ed in
to
dete
rmin
ing
the
prop
er m
issi
on fo
r the
NG
NP.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.
1-6
The
sele
ctio
n of
the
ultim
ate
NG
NP
mis
sion
can
driv
e th
e re
acto
r des
ign
in d
iffer
ent d
irect
ions
. The
subc
omm
ittee
re
com
men
ds th
at th
ese
trade
stud
ies b
e fu
nded
, ini
tiate
d im
med
iate
ly a
nd c
ompl
eted
as s
oon
as p
ossi
ble.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 40
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
1-7
DO
E sh
all d
evel
op th
e N
GN
P as
a re
acto
r fac
ility
that
can
be
upgr
aded
as t
he te
chno
logy
adv
ance
s. C
once
ptua
lly, t
he fa
cilit
y w
ould
be
built
usi
ng a
smal
ler r
eact
or, c
aref
ully
cho
osin
g th
e sc
ale
to b
e th
e sm
alle
st re
acto
r tha
t cou
ld b
e re
ason
ably
ex
trapo
late
d to
supp
ort f
ull s
ize
com
mer
cial
app
licat
ions
, as a
‘te
chno
logy
dem
onst
rato
r’.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.
1-8
The
DO
E-N
E st
aff s
hall
upda
te it
s R&
D p
lans
and
dev
elop
op
tions
that
can
supp
ort a
reac
tor d
eplo
ymen
t muc
h be
fore
the
2017
-202
1 tim
efra
me.
EPA
CT
requ
ires t
he o
vera
ll co
st o
f the
N
GN
P pr
ojec
t be
shar
ed w
ith U
.S. i
ndus
try a
s wel
l as m
embe
rs
of th
e in
tern
atio
nal c
omm
unity
. The
subc
omm
ittee
bel
ieve
s tha
t th
e ch
ance
s of s
ubst
antia
l ind
ustri
al c
ontri
butio
ns a
nd
inte
rnat
iona
l col
labo
ratio
ns to
NG
NP
are
grea
tly d
ecre
ased
with
a
com
plet
ion
targ
et d
ate
of 2
021.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.
1-8
Thes
e pl
ans s
houl
d en
hanc
e th
e IT
RG
per
spec
tive
that
to
achi
eve
a su
cces
sful
pro
ject
eve
n in
the
late
r tim
e pe
riod,
less
ag
gres
sive
pro
ject
obj
ectiv
es m
ust b
e ad
opte
d; e
.g.,
for r
eact
or
outle
t tem
pera
ture
s, fu
el se
lect
ion
and
perf
orm
ance
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
Ex
ecut
ive
Sum
mar
y
7.2
IV
. NER
AC
Com
mitt
ee R
evie
w A
ppro
ach
NER
AC
IV
. NER
AC
C
omm
ittee
Rev
iew
A
ppro
ach
7.3
V
. NG
NP
Tec
hnol
ogy
Mis
sion
NER
AC
V
. NG
NP
Tech
nolo
gy
Mis
sion
7.3-
1 Th
e su
bcom
mitt
ee re
com
men
ds th
at th
e N
GN
P du
al m
issi
on
shal
l be
reco
nsid
ered
and
not
be
acce
pted
with
out f
urth
er
anal
ysis
. The
re a
re se
vera
l rea
sons
for t
his c
oncl
usio
n:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
. NG
NP
Tech
nolo
gy
Mis
sion
7.
5
VII
. IT
RG
NG
NP
Rec
omm
enda
tions
N
ERA
C
VII
. ITR
G N
GN
P R
ecom
men
datio
ns
7.6
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent P
rogr
am P
lan
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 41
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
6-3-
1 A
n in
tegr
ated
sche
dule
shal
l be
deve
lope
d of
all
plan
ned
activ
ities
, sim
ilar t
o th
e co
mpu
ter-
base
d sc
hedu
ling
prog
ram
cu
rren
tly u
sed
by D
OE
staf
f for
the
Nuc
lear
Hyd
roge
n pr
ogra
m.
This
inte
grat
ed sc
hedu
le a
nd a
ssoc
iate
d w
ork
brea
kdow
n st
ruct
ure
can
be u
sed
to id
entif
y a
base
line
R&
D p
lan
for h
ighe
st
prio
rity
R&
D a
ctiv
ities
(and
ass
ess t
he im
pact
of
alte
rnat
ive/
addi
tiona
l R&
D ta
sks)
. Suc
h a
sche
dule
shou
ld
faci
litat
e th
e ad
just
men
ts th
at w
ill b
e ne
eded
to th
e N
GN
P R
&D
pr
ogra
m a
fter i
ts m
issi
on is
sele
cted
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.
6-3-
2 A
serie
s of s
truct
ured
wor
ksho
ps w
ith in
dust
ry, r
egul
ator
y,
labo
rato
ry, a
nd in
tern
atio
nal r
epre
sent
ativ
es sh
all b
e co
nduc
ted
to d
iscu
ss th
e fo
llow
ing:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.6-
3-2-
1 Tr
ade
stud
y re
sults
to se
lect
the
NG
NP’
s mis
sion
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
ERA
C
VII
I. N
GN
P R
esea
rch
and
Dev
elop
men
t Pr
ogra
m P
lan
7.
6-3-
2-2
Des
ign
optim
izat
ion
stud
ies t
o m
eet t
he se
lect
ed N
GN
P m
issi
on
(e.g
., pl
ant p
ower
leve
l, fu
el c
onfig
urat
ion,
fuel
mat
eria
l, op
erat
ing
tem
pera
ture
s, st
ruct
ural
mat
eria
ls)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.6-
3-2-
3 R
&D
pro
gram
ele
men
ts (a
naly
sis c
odes
and
ass
ocia
ted
data
ne
eds,
mat
eria
ls re
sear
ch, f
uels
deve
lopm
ent a
nd c
ertif
icat
ion)
. A
s not
ed b
elow
, ste
erin
g co
mm
ittee
s may
be
requ
ired
to e
nsur
e th
at a
ppro
pria
te p
artie
s pro
vide
con
tinue
d in
put i
n so
me
of th
ese
area
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.
6-3-
2-4
App
ropr
iate
cos
t sha
ring
by N
GN
P st
akeh
olde
rs (i
ndus
try,
inte
rnat
iona
l, re
gula
tory
age
ncie
s, D
OE)
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
ERA
C
VII
I. N
GN
P R
esea
rch
and
Dev
elop
men
t Pr
ogra
m P
lan
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 42
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
6-3-
3 M
ater
ials
R&
D: T
he su
bcom
mitt
ee is
aw
are
that
ther
e is
als
o re
sear
ch b
eing
con
duct
ed in
this
are
a in
the
nucl
ear h
ydro
gen
prog
ram
and
reco
mm
ends
that
the
wor
k fo
r NG
NP
be b
ette
r co
ordi
nate
d w
ith th
at w
ork
to a
void
ove
rlap
and
assu
re th
e w
ork
is c
ompl
emen
tary
. Afte
r tra
de st
udie
s are
com
plet
ed a
nd a
n N
GN
P m
issi
on se
lect
ed, t
he fo
llow
ing
item
s sho
uld
be
cons
ider
ed:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.
6-3-
3-1
Focu
s on
key
mat
eria
l res
earc
h ne
eds.
For e
xam
ple,
if h
ydro
gen
prod
uctio
n w
ere
sele
cted
as t
he k
ey m
issi
on a
nd a
n In
term
edia
te
Hea
t Exc
hang
er (I
HX
) con
cept
wer
e in
clud
ed in
the
optim
ized
de
sign
for t
hat m
issi
on, t
he u
se o
f dev
elop
men
tal m
ater
ials
sh
ould
be
limite
d to
the
IHX
(and
a sy
stem
atic
eva
luat
ion
shou
ld b
e co
nduc
ted
to id
entif
y an
app
ropr
iate
mat
eria
l for
the
IHX
ope
ratin
g co
nditi
ons
and
deve
lop
a “c
ode
case
” fo
r the
id
entif
ied
mat
eria
l). T
o th
e ex
tent
pos
sibl
e, th
e re
mai
nder
of t
he
plan
t sho
uld
rely
on
conv
entio
nal,
prov
en m
ater
ials
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.
6-3-
3-2
Gra
phite
cer
tific
atio
n ac
tiviti
es, w
hich
are
requ
ired
irres
pect
ive
of th
e N
GN
P m
issi
on a
nd re
acto
r des
ign,
shal
l be
revi
ewed
and
ac
cele
rate
d so
that
an
appr
opria
te m
ater
ial i
s cer
tifie
d w
ithin
the
requ
ired
timef
ram
e fo
r dep
loym
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n 7.
6-3-
4
Des
ign
Met
hods
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
ERA
C
VII
I. N
GN
P R
esea
rch
and
Dev
elop
men
t Pr
ogra
m P
lan
7.
6-3-
4-1
Usi
ng re
sults
from
Item
2 w
orks
hops
, ide
ntify
ana
lysi
s too
ls o
f in
tere
st a
nd a
reas
whe
re d
ata
are
need
ed fo
r dev
elop
ing,
ve
rifyi
ng a
nd v
alid
atin
g th
ese
code
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.6-
3-4-
2 D
evel
op a
join
t USN
RC
/indu
stry
/regu
lato
ry N
GN
P st
eerin
g gr
oup
to d
efin
e re
quire
d te
sts,
need
ed fa
cilit
ies,
and
data
to b
e co
llect
ed (i
nclu
ding
par
amet
er d
efin
ition
, acc
urac
y, e
tc.).
D
eter
min
e da
ta q
ualit
y le
vel a
nd n
eed
for s
eque
ster
ing
som
e da
ta fo
r use
with
“bl
ind”
pre
dict
ions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 43
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
6-3-
4-3
Def
ine
appr
opria
te c
ost s
harin
g re
quire
d by
indu
stry
, reg
ulat
ory,
D
OE,
and
inte
rnat
iona
l org
aniz
atio
ns to
com
plet
e su
ch te
sts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.6-
3-5
Plan
t Ope
ratio
ns -
The
need
to p
oten
tially
cou
ple
two
dive
rse
proc
esse
s (el
ectri
c po
wer
gen
erat
ion
and
hydr
ogen
pro
duct
ion)
co
mpl
icat
es th
e du
al m
issi
on a
nd th
e di
ffer
ing
dyna
mic
re
spon
ses o
f the
reac
tor p
lant
and
the
hydr
ogen
pro
duct
ion
proc
ess o
r the
ele
ctric
ity p
rodu
ctio
n pr
oces
s mus
t be
care
fully
as
sess
ed fo
r the
sing
le m
issi
on p
roje
ct. D
esig
n an
d an
alyt
ical
st
udie
s nee
d to
be
perf
orm
ed to
inve
stig
ate
poss
ible
co
nfig
urat
ions
and
con
trol s
chem
es. T
he re
sults
of t
hese
stud
ies
will
pro
vide
insi
ghts
as t
o th
e re
acto
r des
ign
cond
ition
s, pr
ovis
ion
of d
irect
ver
sus i
ndire
ct p
roce
ss h
eat c
ycle
s, et
c. (T
he
subc
omm
ittee
is a
war
e th
at th
e th
ere
is a
lso
rese
arch
in th
is a
rea
bein
g pe
rfor
med
und
er th
e nu
clea
r hyd
roge
n pr
ogra
m, w
hich
is
also
man
aged
by
DO
E-N
E; th
e w
ork
for N
GN
P sh
ould
be
coor
dina
ted
with
that
wor
k to
avo
id o
verla
p an
d as
sure
the
wor
k is
com
plem
enta
ry.)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
7.
6-3-
6 Sa
fety
and
Lic
ensi
ng -
A c
onve
rsat
ion
shou
ld b
e be
gun
with
the
NR
C re
gard
ing
the
key
aspe
cts o
f saf
ety
and
licen
sing
that
nee
d to
be
addr
esse
d if
the
NG
NP
wer
e de
ploy
ed p
rior t
o th
e 20
17-
2021
tim
efra
me.
The
subc
omm
ittee
not
es th
at th
e N
RC
staf
f has
al
read
y be
gun
a co
ncer
ted
effo
rt fo
r a “
tech
nolo
gy-n
eutra
l”
licen
sing
fram
ewor
k th
at th
e N
GN
P pr
ojec
t can
util
ize
as in
itial
gu
idan
ce (S
ECY
-05-
0130
). H
owev
er, t
his s
taff
doc
umen
t has
no
t yet
bee
n ad
opte
d by
the
NR
C c
omm
issi
on, b
ut is
und
er o
n-go
ing
disc
ussi
on a
nd re
view
by
the
NR
C st
aff a
nd A
CR
S.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 44
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
6-3-
7 Fu
els D
evel
opm
ent -
The
Sub
com
mitt
ee n
otes
this
is a
com
plex
su
bjec
t are
a. T
he IT
RG
reco
mm
ende
d th
at th
e N
GN
P fu
el R
&D
pr
ogra
m fo
cus o
n U
O2,
whi
ch h
as th
e la
rges
t exp
erie
nce
base
w
orld
wid
e, in
stea
d of
its c
urre
nt fo
cus o
n U
CO
fuel
, whi
ch is
al
so T
RIS
O fu
el b
ut w
ith k
erne
ls th
at h
ave
a m
ixtu
re o
f UO
2 an
d U
C fu
el p
artic
les.
U.S
. and
inte
rnat
iona
l exp
erts
con
cur t
hat
UC
O fu
el h
as th
e po
tent
ial t
o ex
hibi
t sup
erio
r per
form
ance
ove
r th
e U
O2
kern
el fu
el. I
f UC
O c
an b
e su
cces
sful
ly d
evel
oped
and
de
mon
stra
ted,
incl
udin
g de
velo
ping
and
pro
ving
the
need
ed
man
ufac
turin
g m
etho
ds a
nd p
aram
eter
s, it
shou
ld a
llow
hig
her
burn
-ups
, ope
rate
at h
ighe
r pow
er d
ensi
ties,
and
rele
ase
less
fis
sion
pro
duct
s at h
ighe
r acc
iden
t tem
pera
ture
s. Th
e us
e of
U
CO
fuel
is p
artic
ular
ly im
porta
nt to
the
even
tual
eco
nom
ic
succ
ess o
f rea
ctor
s with
pris
mat
ic fu
el, a
s com
pare
d to
the
pebb
le b
ed fu
el, s
ince
the
pris
mat
ic re
acto
r pus
hes t
he fu
el
hard
er to
avo
id th
e un
desi
rabl
e co
mpl
exity
of t
he p
ebbl
e be
d re
acto
r’s r
efue
ling
sche
me.
Nev
erth
eles
s, U
CO
fuel
wou
ld
conf
er p
erfo
rman
ce a
dvan
tage
s on
both
reac
tors
and
if it
wor
ked
wou
ld li
kely
be
adop
ted
for b
oth.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 45
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
7.
6-3-
7-1
How
ever
, UC
O fu
el p
erfo
rman
ce is
not
pro
ven
and
requ
ires
fund
amen
tal r
esea
rch
and
deve
lopm
ent t
o es
tabl
ish
that
its
prop
ertie
s are
supe
rior t
o U
O2.
In a
dditi
on, R
&D
is re
quire
d to
de
mon
stra
te th
at it
is p
ossi
ble
to m
anuf
actu
re fu
el o
f the
re
quis
ite q
ualit
y, g
et it
acc
epte
d by
the
regu
lato
r and
then
pr
oduc
e th
e la
rge
quan
tity
of fu
el n
eede
d to
load
the
reac
tor.
UO
2 fu
el is
muc
h fu
rther
alo
ng in
this
pro
cess
. The
inte
rnat
iona
l co
mm
unity
, (Fr
ance
, Sou
th A
fric
a, C
hina
, Jap
an) h
ave
focu
sed
on fi
rst d
emon
stra
ting
thei
r abi
lity
to fa
bric
ate
UO
2 an
d de
mon
stra
ting
that
it m
eets
the
requ
ired
perf
orm
ance
. Onc
e th
is
is a
ccom
plis
hed,
they
will
con
side
r goi
ng fo
rwar
d w
ith U
CO
. In
the
near
term
, it a
ppea
rs th
ey w
ould
be
will
ing
to c
oope
rate
with
th
e U
S on
wor
k on
UO
2, b
ut a
re le
ss e
nthu
sed
abou
t UC
O
coop
erat
ion
beca
use
obta
inin
g a
succ
essf
ul a
nd p
rove
n ca
pabi
lity
in U
O2
for T
RIS
O fu
el is
such
a la
rge
unde
rtaki
ng (o
f th
e sa
me
orde
r as t
he c
ost a
nd o
f lon
ger d
urat
ion
than
bui
ldin
g th
e ca
pabi
lity
to m
anuf
actu
re th
e re
acto
r pla
nt).
Onc
e U
O2
can
be m
anuf
actu
red
succ
essf
ully
and
is p
rove
n to
the
regu
lato
rs, t
he
inte
rnat
iona
l com
mun
ity p
lans
to a
dapt
thei
r app
roac
h to
UC
O,
whi
ch c
an th
en b
e lo
aded
into
exi
stin
g an
d fu
ture
reac
tors
as
desi
red.
Tha
t is,
the
inte
rnat
iona
l com
mun
ity d
e-co
uple
s the
re
acto
r des
ign,
con
stru
ctio
n, a
nd o
pera
tion
proc
esse
s fro
m th
e ne
ed to
succ
essf
ully
dev
elop
UC
O.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NER
AC
V
III.
NG
NP
Res
earc
h an
d D
evel
opm
ent
Prog
ram
Pla
n
9
NG
NP
PEP
PEP
10
NA
S R
evie
w
NA
S
10.1
Sum
mar
y
N
AS
Sum
mar
y
10.1
-1
Dep
loym
ent a
nd In
fras
truct
ure
Issu
es
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-1
-1
NE
shal
l im
med
iate
ly in
itiat
e a
coop
erat
ive
proj
ect w
ith in
dust
ry
to id
entif
y pr
oble
ms t
hat h
ave
aris
en in
the
cons
truct
ion
and
star
t-up
of n
ew p
lant
s and
def
ine
best
pra
ctic
es fo
r use
by
the
indu
stry
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-1
-2
DO
E sh
all f
und
a ta
skfo
rce
to w
ork
with
indu
stry
gro
ups o
n co
nstru
ctio
n te
chno
logy
and
pla
nnin
g to
ens
ure
that
con
sorti
a co
nstru
ctio
n tim
e go
als o
f 4 y
ears
or l
ess w
ill b
e m
et.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 46
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10.1
-2
N
ext-
Gen
erat
ion
Nuc
lear
Pla
nt
NA
S Su
mm
ary
10
.1-2
-3
The
mai
n ris
k as
soci
ated
with
NG
NP
is th
at th
e cu
rren
t bus
ines
s pl
an c
alls
for t
he p
rivat
e se
ctor
to m
atch
the
gove
rnm
ent (
DO
E)
fund
ing.
So
far,
how
ever
, not
a si
ngle
pro
gram
has
bee
n ar
ticul
ated
that
coo
rdin
ates
all
the
elem
ents
requ
ired
to
succ
essf
ully
com
mis
sion
the
NG
NP.
The
cur
rent
dis
conn
ect
betw
een
the
base
NG
NP
prog
ram
pla
n an
d th
e co
mpl
emen
tary
pu
blic
/priv
ate
partn
ersh
ip in
itiat
ive
mus
t be
reso
lved
. DO
E sh
all
deci
de w
heth
er to
pur
sue
a di
ffer
ent d
emon
stra
tion
with
a
smal
ler c
ontri
butio
n fr
om in
dust
ry o
r, al
tern
ativ
ely,
a m
ore
basi
c te
chno
logy
app
roac
h fo
r the
VH
TR.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-4
In a
sses
sing
NG
NP
conc
eptu
al d
esig
ns, N
E sh
all f
avor
des
ign
appr
oach
es th
at c
an a
chie
ve a
var
iety
of o
bjec
tives
at a
n ac
cept
able
tech
nica
l ris
k.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-5
NE
shal
l siz
e th
e N
GN
P re
acto
r sys
tem
to fa
cilit
ate
tech
nolo
gy
dem
onst
ratio
n fo
r fut
ure
com
mer
cial
uni
ts, i
nclu
ding
safe
ty.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-6
Bec
ause
of t
he v
ery
high
tem
pera
ture
s and
seve
re m
ater
ial
perf
orm
ance
requ
irem
ents
for t
herm
o ch
emic
al w
ater
split
ting,
N
E sh
all m
aint
ain
the
flexi
bilit
y to
firs
t ope
rate
the
NG
NP
usin
g hi
gh-te
mpe
ratu
re st
eam
ele
ctro
lysi
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-7a
DO
E sh
all f
ocus
on
deve
lopi
ng a
dvan
ced
mat
eria
ls fo
r in-
reac
tor o
pera
tion
at te
mpe
ratu
res a
bove
900
ºC a
nd fu
el p
artic
les
that
can
with
stan
d hi
gh b
urn-
up a
nd a
dver
se tr
ansi
ents
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-7b
NE
shal
l ens
ure
that
suff
icie
nt fu
nds a
re a
vaila
ble
to a
dvan
ce
thes
e te
chno
logi
es w
heth
er o
r not
indu
stry
mat
chin
g fu
nds a
re
avai
labl
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-8
To e
nsur
e th
e go
od p
erfo
rman
ce o
f hyd
roge
n pr
oduc
ed in
an
NG
NP,
NE
shal
l put
mor
e em
phas
is o
n th
e fo
llow
ing:
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
AS
Sum
mar
y
10
.1-2
-9
• Con
cept
ual i
nteg
rate
d pr
oces
s dev
elop
men
t and
opt
imiz
ing
plan
flow
shee
ts, b
efor
e m
ovin
g to
eng
inee
ring
desi
gns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-2
-10
• Sel
ectin
g th
e in
terf
ace
betw
een
the
reac
tor a
nd th
e hy
drog
en
plan
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
AS
Sum
mar
y
10
.1-2
-11
• Dev
elop
ing
syst
em p
erfo
rman
ce to
ols t
o ad
dres
s uns
tead
y co
nditi
ons,
such
as p
lant
star
t-up,
pla
nt tr
ip, a
nd m
aint
enan
ce
need
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 47
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.1-2
-12
• Ass
essm
ent o
f tot
al sy
stem
eco
nom
ics.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10.1
-3
N
ucle
ar H
ydro
gen
Initi
ativ
e
N
AS
Sum
mar
y
10.1
-3-2
D
OE
shal
l exp
and
NH
I pro
gram
inte
ract
ions
with
indu
stria
l and
in
tern
atio
nal r
esea
rch
orga
niza
tions
exp
erie
nced
in c
hem
ical
pr
oces
ses a
nd o
pera
ting
tem
pera
ture
s sim
ilar t
o th
ose
in th
erm
o ch
emic
al w
ater
split
ting.
NE
shou
ld a
lso
broa
den
the
hydr
ogen
pr
oduc
tion
syst
em p
erfo
rman
ce m
etric
s bey
ond
econ
omic
s-fo
r ex
ampl
e, it
cou
ld u
se th
e G
ener
atio
n IV
per
form
ance
met
ric o
f ec
onom
ics,
safe
ty, a
nd su
stai
nabi
lity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10.1
-4
O
ther
Gen
erat
ion
IV N
ucle
ar E
nerg
y Sy
stem
Pro
gram
s
N
AS
Sum
mar
y
10.1
-4-1
W
ithin
the
Gen
erat
ion
IV p
rogr
am, N
E sh
all m
odes
tly a
nd
reas
onab
ly su
ppor
t lon
g-te
rm b
ase
tech
nolo
gy o
ptio
ns o
ther
than
th
e V
HTR
and
the
SFR
, par
ticul
arly
for a
ctin
ide
man
agem
ent,
usin
g th
erm
al a
nd fa
st re
acto
rs a
nd a
ppro
pria
te fu
els.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-4
-2
Thou
gh N
E cu
rren
tly fo
cuse
s on
the
VH
TR fo
r pro
cess
hea
t and
th
e SF
R fo
r adv
ance
d fu
el c
ycle
s, it
shou
ld a
sses
s the
cos
t-be
nefit
of a
sing
le re
acto
r sys
tem
to m
eet b
oth
need
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10.1
-5
ID
AH
O N
AT
ION
AL
LA
BO
RA
TO
RY
N
AS
Sum
mar
y
10.1
-5-2
N
E sh
all s
et u
p an
d do
cum
ent a
pro
cess
for e
valu
atin
g al
tern
ativ
e ap
proa
ches
for a
ccom
plis
hing
NE-
spon
sore
d ac
tiviti
es, a
ssig
ning
thes
e ta
sks a
ppro
pria
tely
, and
avo
idin
g du
plic
atio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-3
NE
shal
l set
up
a fo
rmal
, hig
h-le
vel w
orki
ng g
roup
join
tly w
ith
the
Idah
o O
pera
tion
Off
ice
(ID
) and
INL
(Bat
telle
Ene
rgy
Alli
ance
[BEA
]). C
onsi
dera
tion
shou
ld b
e gi
ven
to a
lso
havi
ng
one
or m
ore
know
ledg
eabl
e ou
tsid
ers p
artic
ipat
e on
an
ongo
ing
basi
s to
prov
ide
a w
ider
per
spec
tive.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 48
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.1-5
-4
For I
NL
to a
ccom
plis
h its
exp
ecte
d m
issi
on, a
num
ber o
f lar
ge,
soph
istic
ated
and
uni
que
faci
litie
s will
be
need
ed. T
hese
cou
ld
incl
ude
larg
e ho
t cel
ls a
nd a
ssoc
iate
d la
bora
torie
s for
pos
t-irr
adia
tion
exam
inat
ion
of m
ater
ials
and
test
reac
tors
such
as t
he
Adv
ance
d Te
st R
eact
or (A
TR).
The
inte
nt is
for I
NL
to h
ave
mag
net f
acili
ties a
ttrac
ting
rese
arch
ers a
nd in
dust
rial u
sers
. For
th
ese
faci
litie
s to
attra
ct u
sers
, the
full
cost
s can
not b
e ch
arge
d,
and
the
user
wou
ld p
ay o
nly
the
just
ified
incr
emen
tal c
osts
as
soci
ated
with
use
. Thi
s arr
ange
men
t is t
ypic
al o
f use
r fac
ilitie
s in
the
Off
ice
of S
cien
ce la
bora
torie
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-5
The
NE/
INL
budg
etin
g sy
stem
and
the
budg
et d
ocum
ents
th
emse
lves
are
opa
que
and
hard
to u
nder
stan
d. It
is d
iffic
ult t
o tra
ce b
udge
t am
ount
s to
parti
cula
r pro
ject
s and
pro
gram
s or t
o sp
ecifi
c ac
tiviti
es w
ithin
the
INL
sub
budg
et. T
he c
omm
ittee
co
nclu
des t
hat a
muc
h m
ore
trans
pare
nt, s
truct
ured
pla
nnin
g an
d bu
dget
ing
proc
ess i
s nee
ded.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-6
NE,
ID, a
nd IN
L (B
EA) s
hall
agre
e on
a m
ultiy
ear,
reso
urce
-lo
aded
, hig
h-le
vel s
ched
ule
and
plan
for t
he IN
L fa
cilit
ies,
such
as
the
Prim
aver
a Pr
ojec
t Pla
nner
(P3)
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-7
NE,
ID, a
nd IN
L (B
EA) s
hall
impr
ove
the
form
and
con
tent
of
the
INL
faci
litie
s bud
get d
ocum
enta
tion.
The
y sh
ould
supp
ort a
m
uch
mor
e tra
nspa
rent
, stru
ctur
ed p
lann
ing
and
budg
et p
roce
ss.
Bud
get i
tem
s sho
uld
be re
adily
trac
eabl
e to
spec
ific
item
s in
the
over
all p
lan
and
sche
dule
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-8a
NE
shal
l mee
t with
DO
E an
d N
atio
nal N
ucle
ar S
ecur
ity
Adm
inis
tratio
n or
gani
zatio
ns th
at a
re P
SOs f
or o
ther
la
bora
torie
s to
revi
ew a
nd d
iscu
ss th
eir p
ract
ices
and
pro
cess
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-5
-8b
Bas
ed o
n th
e le
sson
s the
y le
arne
d, it
shou
ld d
evel
op a
nd
docu
men
t its
ow
n in
tern
al p
roce
sses
and
pro
cedu
res f
or
disc
harg
ing
its re
spon
sibi
litie
s as t
he le
ad P
SO fo
r IN
L.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10.1
-6
PR
OG
RA
M P
RIO
RIT
IES,
BA
LA
NC
E, A
ND
OV
ER
SIG
HT
NA
S Su
mm
ary
10.1
-6-1
Prog
ram
Bal
ance
N
AS
Sum
mar
y
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 49
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.1-6
-1-1
• U
nive
rsity
infr
astru
ctur
e su
ppor
t. A
size
able
bui
ldup
in n
ucle
ar
ener
gy p
rodu
ctio
n, re
sear
ch, a
nd d
evel
opm
ent n
eces
sita
tes
stre
ngth
enin
g un
iver
sity
cap
abili
ties t
o ed
ucat
e a
grow
ing
num
ber o
f you
ng p
rofe
ssio
nals
and
scie
ntis
ts in
the
rele
vant
ar
eas.
DO
E sh
ould
incl
ude
this
pro
gram
in it
s bud
get a
t the
le
vels
aut
horiz
ed b
y th
e En
ergy
Pol
icy
Act
of 2
005.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-6
-1-2
• I
NL.
It is
ess
entia
l to
prov
ide
reas
onab
le a
nd p
redi
ctab
le
fund
ing
to su
ppor
t the
PSO
resp
onsi
bilit
y fo
r site
con
ditio
n an
d ca
paci
ty b
uild
ing.
DO
E sh
ould
cre
ate
a st
rate
gic
plan
bas
ed o
n co
ncep
ts la
id o
ut in
Cha
pter
6 (s
ee T
able
6-2
) to
esta
blis
h th
e ta
rget
fund
ing
leve
l for
the
Idah
o Fa
cilit
ies M
anag
emen
t ac
coun
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-6
-2
Prog
ram
Ove
rsig
ht
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10
.1-6
-2-1
R
ecom
men
datio
n. A
s a c
ount
erba
lanc
e to
the
shor
t-ter
m n
atur
e of
the
fede
ral b
udge
t pro
cess
, NE
shou
ld a
dopt
an
over
sigh
t pr
oces
s for
eva
luat
ing
the
adeq
uacy
of p
rogr
am p
lans
, ev
alua
ting
prog
ress
aga
inst
thes
e pl
ans a
nd a
djus
ting
reso
urce
al
loca
tions
as p
lann
ed d
ecis
ion
poin
ts a
re re
ache
d.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S Su
mm
ary
10.2
The
Gen
erat
ion
IV a
nd N
ucle
ar H
ydro
gen
Initi
ativ
e Pr
ogra
ms
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-1
NEX
T-G
EN
ERA
TIO
N N
UC
LE
AR
PLA
NT
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10.2
-1-1
Prog
ram
Des
crip
tion
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 50
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-1
-1-1
Th
e N
GN
P pr
ogra
m is
aut
horiz
ed u
nder
EPA
ct05
at t
otal
fu
ndin
g of
$1.
25 b
illio
n fo
r Pha
se I,
whi
ch e
xten
ds to
201
1.
Dur
ing
this
pha
se, f
unda
men
tal R
&D
wou
ld b
e ca
rrie
d ou
t for
th
e as
soci
ated
tech
nolo
gies
and
com
pone
nts.
This
incl
udes
the
reac
tor a
nd it
s fue
l, th
e en
ergy
con
vers
ion
syst
em, m
ater
ials
, and
hy
drog
en g
ener
atio
n te
chno
logi
es. I
n ad
ditio
n, c
erta
in
fund
amen
tal d
ecis
ions
are
to b
e m
ade,
incl
udin
g se
lect
ion
of th
e m
issi
on o
f the
NG
NP
(eff
icie
nt e
lect
ricity
pro
duct
ion,
pro
cess
he
at, h
ydro
gen
gene
ratio
n, o
r a c
ombi
natio
n of
thes
e) a
nd th
e sp
ecifi
c hy
drog
en g
ener
atio
n te
chno
logy
. EPA
ct05
als
o di
scus
ses P
hase
II, w
hich
ext
ends
from
201
2 to
202
1 an
d w
here
in a
det
aile
d de
sign
shou
ld b
e co
mpe
titiv
ely
deve
lope
d, a
lic
ense
shou
ld b
e ob
tain
ed fr
om th
e U
.S. N
ucle
ar R
egul
ator
y C
omm
issi
on (U
SNR
C),
and
the
plan
t sho
uld
be c
onst
ruct
ed a
nd
com
mis
sion
ed.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10
.2-1
-1-2
A
ccor
ding
to E
PAct
05, t
he p
rogr
am w
ill b
e ba
sed
on th
e R
&D
ac
tiviti
es o
f the
Gen
erat
ion
IV p
rogr
am, t
he Id
aho
Nat
iona
l La
bora
tory
(IN
L) w
ill b
e th
e le
ad n
atio
nal l
abor
ator
y, a
nd th
e N
GN
P de
mon
stra
tion
will
be
site
d at
INL.
INL
is c
harg
ed to
or
gani
ze a
con
sorti
um o
f ind
ustri
al p
artn
ers t
o co
st-s
hare
the
proj
ect.
The
NG
NP
proj
ect i
s to
max
imiz
e te
chni
cal e
xcha
nge
and
trans
fer f
rom
oth
er re
leva
nt so
urce
s, in
clud
ing
othe
r in
dust
ries a
nd in
tern
atio
nal G
ener
atio
n IV
par
tner
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-1-2
HT
R/N
GN
P T
echn
olog
y C
halle
nges
and
Dev
elop
men
t Nee
ds
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-1
-2-
1-2
Fu
els D
evel
opm
ent a
nd R
equi
rem
ents
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10.2
-1-
2-1-
4
Plan
t Ope
ratio
ns
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 51
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10.2
-1-
2-1-
5
Safe
ty a
nd L
icen
sing
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10
.2-1
-2-1
-5-1
Th
ere
shal
l be
a di
scus
sion
with
the
USN
RC
on
the
key
aspe
cts
of sa
fety
and
lice
nsin
g th
at sh
ould
be
addr
esse
d if
the
NG
NP
is
depl
oyed
in th
e 20
17 to
202
1 tim
e fr
ame.
It is
kno
wn
that
U
SNR
C st
aff h
as a
lread
y be
gun
to d
evel
op a
tech
nolo
gy-n
eutra
l lic
ensi
ng fr
amew
ork
that
the
NG
NP
proj
ect c
an u
se a
s ini
tial
guid
ance
(SEC
Y-0
5-01
30).
How
ever
, thi
s sta
ff d
ocum
ent h
as
not y
et b
een
adop
ted
by th
e U
SNR
C b
ut is
still
bei
ng re
view
ed
by th
e st
aff a
nd th
e A
dvis
ory
Com
mitt
ee o
n R
eact
or S
afeg
uard
s. EP
Act
05 re
quire
s tha
t DO
E an
d U
SNR
C d
evel
op a
join
t ap
proa
ch to
lice
nsin
g N
GN
P by
Aug
ust 2
008.
Thi
s act
ivity
is
curr
ently
und
er w
ay w
ith in
puts
from
the
Phas
e 1
NG
NP
prog
ram
. The
DO
E-U
SNR
C d
iscu
ssio
ns re
late
d to
NG
NP
licen
sing
are
focu
sed
on d
efin
ing
the
appr
oach
that
will
be
used
. It
is p
ossi
ble
the
tech
nolo
gy-n
eutra
l app
roac
h w
ill b
e us
ed, b
ut it
is
not
cle
ar if
that
app
roac
h w
ould
be
read
y in
tim
e fo
r the
en
gine
erin
g ph
ase
of th
e N
GN
P. In
add
ition
, the
PB
MR
is
curr
ently
in p
re-a
pplic
atio
n re
view
for d
esig
n ce
rtific
atio
n by
th
e U
SNR
C. T
he is
sues
bei
ng a
ddre
ssed
are
gen
eric
to H
TR
licen
sing
, and
this
eff
ort w
ill p
rovi
de a
tang
ible
foru
m in
whi
ch
to m
ake
prog
ress
on
a lic
ensi
ng st
rate
gy fo
r NG
NP.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-1-
2-1-
6
Fuel
Cyc
le a
nd W
aste
Tec
hnol
ogy
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-1
-3
N
GN
P Ev
alua
tion
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 52
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-1
-3-1
-1
The
prog
ram
is d
esig
ned
to d
evel
op a
n ad
vanc
ed n
ew re
acto
r th
at c
an p
rovi
de p
roce
ss h
eat a
nd/o
r ele
ctric
ity. T
he
coge
nera
tion
func
tion
appe
ars t
o be
a c
ompl
icat
ion
sinc
e el
ectri
city
mig
ht b
e ge
nera
ted
mor
e ec
onom
ical
ly b
y ad
vanc
ed
LWR
s. H
owev
er, n
o ot
her n
ucle
ar te
chno
logy
can
gen
erat
e th
e hi
gh te
mpe
ratu
res n
eede
d fo
r the
bro
ad ra
nge
of p
roce
ss h
eat
appl
icat
ions
dis
cuss
ed. I
t has
bee
n re
com
men
ded
by N
ERA
C
that
this
dua
l mis
sion
be
reco
nsid
ered
and
not
be
acce
pted
w
ithou
t fur
ther
ana
lysi
s. It
was
felt
that
the
dual
mis
sion
wou
ld
driv
e th
e de
sign
, inc
reas
e th
e co
st o
f the
pro
gram
, and
ext
end
the
sche
dule
. It i
s im
porta
nt to
mai
ntai
n fle
xibi
lity
in th
e si
zing
of
the
NG
NP
reac
tor t
o fa
cilit
ate
obta
inin
g th
e ne
eded
in
tern
atio
nal c
olla
bora
tion
or c
o-fu
ndin
g by
end
use
rs.
Furth
erm
ore,
whi
le a
dua
l-pur
pose
mis
sion
wou
ld n
ot b
e ne
cess
ary
for f
utur
e co
mm
erci
al p
lant
s, it
coul
d se
rve
as a
n en
gine
erin
g-sc
ale
heat
exc
hang
er fo
r the
NG
NP
plan
t to
dem
onst
rate
the
viab
ility
of c
oupl
ing
of a
nuc
lear
pla
nt w
ith a
hy
drog
en p
rodu
ctio
n pl
ant.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10
.2-1
-3-4
-1
The
budg
et fo
r NG
NP
curr
ently
requ
este
d by
DO
E is
not
ad
equa
te to
mee
t the
pre
ferr
ed sc
hedu
le: T
o re
med
y th
is st
ate
of
affa
irs, a
sign
ifica
nt ra
mp-
up o
f rou
ghly
$10
0 m
illio
n pe
r yea
r w
ould
be
requ
ired
with
in 1
or 2
yea
rs. T
he b
udge
t for
FY
200
8 sh
ould
be
at le
ast $
60 m
illio
n if
the
prog
ram
is to
be
laun
ched
on
a tr
ajec
tory
that
will
mee
t the
201
7 op
erat
ions
dat
e. D
OE’
s no
tiona
l bud
get p
roje
ctio
n fo
r the
nex
t 6 y
ears
is o
nly
abou
t 20
perc
ent o
f wha
t is r
equi
red
to m
eet t
he st
ated
sche
dule
. The
bu
dget
s for
NH
I are
als
o pr
obab
ly n
ot a
dequ
ate
if th
is p
refe
rred
sc
hedu
le is
to b
e m
aint
aine
d. F
inal
ly, i
t is i
mpe
rativ
e th
at p
rivat
e se
ctor
fund
ing
be b
roug
ht in
to th
e pr
ogra
m to
supp
lem
ent t
he
requ
ired
rese
arch
, dev
elop
men
t, an
d de
mon
stra
tion.
The
te
chno
logy
par
tner
s mus
t be
sele
cted
and
end
use
rs m
ust b
e co
nvin
ced
to jo
in th
e pu
blic
/priv
ate
partn
ersh
ip a
t sig
nific
ant
leve
ls.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 53
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-1
-3-5
-1
Sinc
e th
e lo
ng-te
rm p
erfo
rman
ce g
oals
are
not
fully
est
ablis
hed-
for e
xam
ple,
the
final
tem
pera
ture
des
ign
for t
he V
HTR
is n
ot
defin
ed-it
is n
ot p
ossi
ble
to ju
dge
the
NG
NP’
s pro
gram
on
this
cr
iterio
n ye
t. Th
e ac
tual
NG
NP
prog
ram
rem
ains
in a
n ea
rly
form
ativ
e st
age.
Thi
s crit
erio
n sh
ould
be
held
in a
beya
nce
until
m
ore
prog
ress
is m
ade
on th
e pr
ogra
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-2
N
UC
LE
AR
HY
DR
OG
EN
INIT
IAT
IVE
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-2
-1
N
ucle
ar H
ydro
gen
Prod
uctio
n
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10.2
-2-3
Nuc
lear
Hyd
roge
n In
itiat
ive
Eva
luat
ion
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-2-3
-1-1
M
uch
of th
e cu
rren
t NH
I R&
D is
uni
vers
ity b
ased
, whi
ch is
ap
prop
riate
for m
any
aspe
cts o
f the
cur
rent
labo
rato
ry-s
cale
R
&D
. How
ever
, as i
nteg
rate
d ex
perim
ents
are
star
ted,
an
incr
easi
ng fr
actio
n of
the
prog
ram
supp
ort w
ill n
eed
to b
e di
rect
ed to
the
natio
nal l
abor
ator
ies a
nd in
dust
rial p
artic
ipan
ts in
th
e pr
ogra
m. M
ore
atte
ntio
n to
indu
stria
l-sca
le im
plic
atio
ns o
f th
e te
chno
logy
is n
eede
d, st
artin
g w
ith st
udyi
ng th
e im
plic
atio
ns
of o
pera
ting
cond
ition
s for
cos
t, re
liabi
lity,
and
safe
ty.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 54
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-2
-3-3
Th
e N
HI p
rogr
am is
eva
luat
ed u
sing
the
Gen
erat
ion
IV p
rogr
am
perf
orm
ance
mea
sure
s. Fo
r the
NH
I pro
gram
, the
eco
nom
ics
and
the
safe
ty a
nd re
liabi
lity
crite
ria a
re th
e m
ost i
mpo
rtant
. H
owev
er, s
peci
fic m
etric
s for
eva
luat
ing
perf
orm
ance
hav
e no
t be
en e
stab
lishe
d. T
he c
omm
ittee
reco
mm
ends
that
the
NH
I pr
ogra
m se
lect
spec
ific
econ
omic
met
rics t
hat c
an b
e lin
ked
to
the
cost
of h
ydro
gen
prod
uced
by
com
petin
g te
chno
logi
es, s
uch
as n
atur
al g
as st
eam
refo
rmin
g. It
is re
ason
able
that
unt
il m
ater
ials
and
fabr
icat
ion
met
hods
hav
e be
en id
entif
ied
for a
ll of
th
e m
ajor
syst
em c
ompo
nent
s, a
grea
t dea
l of u
ncer
tain
ty w
ill
surr
ound
thes
e ev
alua
tions
. The
des
ign
info
rmat
ion
will
bec
ome
avai
labl
e on
ce d
ecis
ions
hav
e be
en m
ade
befo
re e
nter
ing
the
pilo
t-sca
le d
emon
stra
tion
phas
e in
201
1. T
hese
dec
isio
ns sh
ould
be
bas
ed o
n th
e po
tent
ial t
o m
eet s
peci
fic e
cono
mic
crit
eria
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-3
O
TH
ER
GE
NE
RA
TIO
N IV
RE
AC
TO
R N
UC
LE
AR
E
NE
RG
Y S
YST
EM
S
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10.2
-3-1
Oth
er G
ener
atio
n IV
Sys
tem
Pro
gram
Des
crip
tions
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10
.2-3
-1-1
C
ross
cutti
ng R
&D
can
ben
efit
mor
e th
an o
ne re
acto
r con
cept
. Im
porta
nt fu
ndam
enta
l inf
orm
atio
n is
nee
ded
in th
e fo
llow
ing
cros
scut
ting
area
s:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-3-1
-1-1
• D
ata
to v
alid
ate
the
mod
els f
or th
e ef
fect
s of i
rrad
iatio
n on
m
ater
ials
cha
ract
eris
tics s
ince
the
expe
cted
serv
ice
time
for
nucl
ear p
ower
pla
nts h
as e
ffec
tivel
y be
com
e at
leas
t 60
year
s an
d co
uld
soon
be
as m
uch
as 8
0 ye
ars.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-3-1
-1-2
• D
ata
on th
e be
havi
or o
f UO
2 an
d no
nfer
tile
(neu
troni
cally
in
ert)
actin
ide-
bear
ing
fuel
s ope
ratin
g at
hig
h te
mpe
ratu
res f
or
long
tim
es. F
or e
xam
ple,
cer
ia, m
agne
sia,
and
zirc
onia
cou
ld b
e us
ed in
the
Gen
erat
ion
IV re
acto
rs to
hos
t the
act
inid
e fu
el.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 55
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-3
-1-1
-3
• Inf
orm
atio
n on
adv
ance
d en
ergy
con
vers
ion
syst
ems,
incl
udin
g eq
uipm
ent t
hat i
nter
face
s bet
wee
n th
e co
olan
t and
the
turb
ine
wor
king
flui
ds in
adv
ance
d cy
cles
, suc
h as
the
supe
rcrit
ical
CO
2 po
wer
cyc
le.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-3-1
-1-4
• I
nfor
mat
ion
on th
e ap
plic
atio
n of
tech
nolo
gy-n
eutra
l ap
proa
ches
to re
acto
r lic
ensi
ng a
nd a
dvan
ces i
n th
e re
gula
tory
sy
stem
to in
clud
e pe
rfor
man
ce-b
ased
crit
eria
for m
onito
ring.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-4
FIN
DIN
GS
AN
D R
ECO
MM
EN
DA
TIO
NS
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s 10
.2-4
-1
N
ext-
Gen
erat
ion
Nuc
lear
Pla
nt
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-4
A sc
hedu
le th
at c
oord
inat
es th
e re
quire
d el
emen
ts fo
r pub
lic-
priv
ate
partn
ersh
ip, d
esig
n ev
olut
ion,
def
ined
regu
lato
ry
appr
oach
, and
R&
D re
sults
shou
ld b
e ar
ticul
ated
to e
nhan
ce th
e po
tent
ial f
or p
rogr
am su
cces
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-5
DO
E sh
ould
dec
ide
whe
ther
to p
ursu
e a
diff
eren
t dem
onst
ratio
n pl
ant (
perh
aps a
smal
ler o
ne w
ith le
ss to
tal e
nerg
y ou
tput
or a
pl
ant w
ith fe
wer
hyd
roge
n pr
oduc
tion
optio
ns o
r a m
ore
basi
c te
chno
logy
app
roac
h fo
r the
VH
TR) w
ith a
smal
ler c
ontri
butio
n fr
om in
dust
ry.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10
.2-4
-1-6
In
ass
essi
ng N
GN
P co
ncep
tual
des
igns
, NE
shou
ld fa
vor d
esig
n ap
proa
ches
that
can
ach
ieve
a v
arie
ty o
f obj
ectiv
es a
t an
acce
ptab
le te
chni
cal r
isk-
for e
xam
ple,
hyd
roge
n pr
oduc
tion,
ot
her h
igh-
tem
pera
ture
pro
cess
hea
t pro
duct
s, en
ablin
g de
ep-
burn
act
inid
e m
anag
emen
t, an
d im
prov
ing
econ
omic
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10
.2-4
-1-7
N
E sh
ould
size
the
NG
NP
reac
tor s
yste
m to
faci
litat
e te
chno
logy
dem
onst
ratio
n fo
r fut
ure
com
mer
cial
uni
ts, i
nclu
ding
sa
fety
. Con
sist
ent w
ith re
sour
ces a
vaila
ble,
NE
shou
ld a
dopt
an
appr
opria
te p
ower
leve
l to
dem
onst
rate
com
pone
nts a
nd
func
tiona
lity
of p
ract
ical
sign
ifica
nce
to c
omm
erci
al si
ze.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 56
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-4
-1-8
B
ecau
se o
f the
ver
y hi
gh te
mpe
ratu
res a
nd se
vere
mat
eria
l pe
rfor
man
ce re
quire
men
ts fo
r the
rmo
chem
ical
wat
er sp
littin
g,
NE
shou
ld m
aint
ain
the
flexi
bilit
y to
firs
t ope
rate
the
NG
NP
usin
g hi
gh-te
mpe
ratu
re st
eam
ele
ctro
lysi
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-9
DO
E sh
ould
focu
s on
the
follo
win
g N
GN
P te
chno
logi
es th
at
requ
ire si
gnifi
cant
dev
elop
men
t and
ens
ure
that
suff
icie
nt fu
nds
are
avai
labl
e to
adv
ance
thes
e te
chno
logi
es w
heth
er o
r not
in
dust
ry m
atch
ing
fund
s are
ava
ilabl
e:
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-10
• Adv
ance
d m
ater
ials
for i
n-re
acto
r ope
ratio
n at
tem
pera
ture
s ab
ove
900º
C.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-11
• Fue
l par
ticle
s tha
t can
with
stan
d hi
gh b
urn-
up a
nd a
dver
se
trans
ient
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10
.2-4
-1-1
2 • T
he h
eat t
rans
port
syst
em fo
r pro
cess
hea
t app
licat
ions
, sp
ecifi
cally
to im
prov
e its
eff
icie
ncy
and
relia
bilit
y.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-1
-13
• Was
te m
anag
emen
t tec
hnol
ogie
s rel
ated
to c
omm
erci
al
depl
oym
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-2
N
ucle
ar H
ydro
gen
Initi
ativ
e
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
10
.2-4
-2-1
N
HI i
s wel
l for
mul
ated
to id
entif
y an
d de
velo
p w
orka
ble
tech
nolo
gies
, but
the
sche
dule
s and
bud
gets
nee
d to
be
adju
sted
to
ass
ure
appr
opria
te c
oupl
ing
to th
e la
rger
NG
NP
prog
ram
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 57
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
10
.2-4
-2-3
D
OE
shou
ld e
xpan
d N
HI p
rogr
am in
tera
ctio
ns w
ith in
dust
rial
and
inte
rnat
iona
l res
earc
h or
gani
zatio
ns e
xper
ienc
ed in
che
mic
al
proc
esse
s and
ope
ratin
g te
mpe
ratu
res s
imila
r to
thos
e in
ther
mo
chem
ical
wat
er sp
littin
g. N
E sh
ould
als
o br
oade
n th
e hy
drog
en
prod
uctio
n sy
stem
per
form
ance
met
rics b
eyon
d ec
onom
ics-
for
exam
ple,
it c
ould
use
the
Gen
erat
ion
IV p
erfo
rman
ce m
etric
s of
econ
omic
s, sa
fety
, and
sust
aina
bilit
y.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10
.2-4
-3
Oth
er G
ener
atio
n IV
Nuc
lear
Ene
rgy
Syst
em P
rogr
ams
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-3
-1
With
in th
e G
ener
atio
n IV
pro
gram
, NE
shou
ld m
odes
tly a
nd
reas
onab
ly su
ppor
t lon
g-te
rm b
ase
tech
nolo
gy o
ptio
ns o
ther
than
th
e V
HTR
and
the
SFR
, par
ticul
arly
for a
ctin
ide
man
agem
ent,
usin
g th
erm
al a
nd fa
st re
acto
rs a
nd a
ppro
pria
te fu
els.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-3
-2
Thou
gh N
E cu
rren
tly fo
cuse
s on
the
VH
TR fo
r pro
cess
hea
t and
th
e SF
R fo
r adv
ance
d fu
el c
ycle
s, it
shou
ld a
sses
s the
cos
t-be
nefit
of a
sing
le re
acto
r sys
tem
des
ign
to m
eet b
oth
need
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
NA
S 3.
The
Gen
erat
ion
IV a
nd N
ucle
ar
Hyd
roge
n In
itiat
ive
Prog
ram
s
10.2
-4-3
-3
Fund
ing
for N
GN
P an
d N
HI s
houl
d be
incr
ease
d if
the
sche
dule
is
to b
e ac
cele
rate
d to
attr
act m
ore
indu
stria
l sup
port.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
N
AS
3. T
he G
ener
atio
n IV
and
Nuc
lear
H
ydro
gen
Initi
ativ
e Pr
ogra
ms
2
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
B
uild
ings
and
Str
uctu
res
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
B
uild
ings
and
St
ruct
ures
2.
1
Ope
ratio
nal R
equi
rem
ents
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
2.
1-3
The
NG
NP
shal
l dem
onst
rate
a m
inim
um 1
8-m
onth
refu
elin
g in
terv
al c
apab
ility
(if a
pplic
able
). 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 58
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1-4
The
NG
NP
shal
l im
plem
ent t
he te
chno
logi
es im
porta
nt to
ac
hiev
ing
the
func
tiona
l per
form
ance
and
des
ign
requ
irem
ents
de
term
ined
thro
ugh
clos
e co
llabo
ratio
n w
ith c
omm
erci
al
indu
stry
end
-use
rs.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.1
NG
NP
Mis
sion
N
eed
2.
1-5
The
NG
NP
shal
l de
mon
stra
te th
e ba
sis f
or c
omm
erci
aliz
atio
n of
the
nucl
ear s
yste
m, a
hea
t tra
nsfe
r/tra
nspo
rt sy
stem
, a
hydr
ogen
pro
duct
ion
proc
ess,
and
a po
wer
con
vers
ion
conc
ept.
An
esse
ntia
l par
t of t
he h
ydro
gen
oper
atio
ns w
ill b
e de
mon
stra
ting
that
the
requ
isite
relia
bilit
y an
d ca
paci
ty fa
ctor
ca
n be
ach
ieve
d ov
er a
n ex
tend
ed p
erio
d of
ope
ratio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.1
NG
NP
Mis
sion
N
eed
2.
1-6a
N
GN
P nu
clea
r hea
t sou
rce
shal
l be
base
d on
the
HTG
R c
once
pt
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
2.1-
6b
The
NG
NP
nucl
ear h
eat s
ourc
e sh
all u
tiliz
e pa
ssiv
e sa
fety
fe
atur
es to
coo
l the
cor
e fr
om fu
ll po
wer
to sa
fe sh
utdo
wn
cond
ition
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
2.1-
7a
The
NG
NP
shal
l pro
duce
hig
h-ef
ficie
ncy
elec
trici
ty a
nd
gene
rate
hyd
roge
n on
a sc
ale
that
sets
a fo
unda
tion
for f
utur
e co
mm
erci
al d
eplo
ymen
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
2.
1-7b
N
GN
P sh
all g
ener
ate
hydr
ogen
on
a sc
ale
that
sets
a fo
unda
tion
for f
utur
e co
mm
erci
al d
eplo
ymen
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
2.1
NG
NP
Proj
ect
Req
uire
men
ts a
t Pr
e-C
once
ptua
l D
esig
n
2.1-
8 N
GN
P sh
all i
nclu
de p
rovi
sion
s for
futu
re te
stin
g.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 59
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1-9a
Th
e N
GN
P sh
all e
nabl
e de
mon
stra
tion
of e
nerg
y pr
oduc
ts
utili
zing
its n
ucle
ar h
eat s
ourc
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
2.
1-9b
Th
e N
GN
P sh
all e
nabl
e de
mon
stra
tion
of e
nerg
y pr
oces
ses
utili
zing
its n
ucle
ar h
eat s
ourc
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
1 N
GN
P Pr
ojec
t R
equi
rem
ents
at
Pre-
Con
cept
ual
Des
ign
2.
1-10
Th
e N
GN
P sh
all l
imit
norm
al m
aint
enan
ce e
xpos
ure
of n
o m
ore
than
50
pers
on-R
EM/y
ear p
er m
odul
e in
a re
fuel
ing
year
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
SA
G
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
M
eetin
g A
gree
men
ts
Oct
ober
22,
200
8 M
eetin
g M
inut
es
2.
1-11
Th
e N
GN
P sh
all
have
an
avai
labi
lity
fact
or o
f gre
ater
than
or
equa
l to
90%
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
2.2
HTG
R
Fund
amen
tal
Req
uire
men
ts
2.
1-12
Th
e N
GN
P sh
all h
ave
a pl
ant d
esig
n lif
etim
e of
60
year
s (c
alen
dar)
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
2.2
HTG
R
Fund
amen
tal
Req
uire
men
ts
2.
1-14
Th
e N
GN
P re
acto
r gas
out
let t
empe
ratu
re sh
all b
e in
the
rang
e of
750
°C to
800
°C
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SAG
M
eetin
g A
gree
men
ts
Oct
ober
22,
200
8 M
eetin
g M
inut
es
3
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
3.
1
Rea
ctor
Sys
tem
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
3.1-
2 Th
e N
GN
P co
re sh
all u
se fo
rced
circ
ulat
ion
heliu
m a
s the
hea
t tra
nspo
rt flu
id.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1 R
eact
or
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 60
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
1-3a
Th
e N
GN
P no
n-re
plac
eabl
e st
ruct
ural
mat
eria
ls in
con
tact
with
he
lium
shal
l res
ist e
rosi
on d
urin
g pl
ant c
ycle
life
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
3.1-
3b
The
NG
NP
non-
repl
acea
ble
stru
ctur
al m
ater
ials
in c
onta
ct w
ith
heliu
m sh
all r
esis
t ero
sion
dur
ing
plan
t cyc
le li
fe.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1 R
eact
or
Syst
em
4
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
4.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
5
R
eact
or T
ype
Bou
ndin
g C
ondi
tion
4.1
Rea
ctor
Typ
e
5.1
B
ound
ing
Con
ditio
n - 0
01
Bou
ndin
g C
ondi
tion
4.1.
1 B
ound
ing
Con
ditio
n - 0
01
6
Rea
ctor
Des
ign
Pow
er L
evel
B
ound
ing
Con
ditio
n 4.
2 R
eact
or D
esig
n Po
wer
Lev
el
6.1
B
ound
ing
Con
ditio
n - 0
02
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02
6.
1-1
The
NG
NP
shal
l be
capa
ble
of o
pera
tion
at p
ower
leve
ls u
p to
60
0 M
wt,
depe
ndin
g on
the
core
des
ign,
and
cor
e po
wer
de
nsiti
es th
at w
ill d
emon
stra
te th
e te
chni
cal a
nd e
cono
mic
fe
asib
ility
of c
omm
erci
al H
TGR
s with
a p
assi
ve sa
fety
bas
is
such
that
max
imum
fuel
tem
pera
ture
s und
er n
orm
al a
nd
abno
rmal
con
ditio
ns a
re a
ccep
tabl
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02
6.
1-3-
1 Th
e pe
ak ti
me
aver
aged
fuel
tem
pera
ture
doe
s not
exc
eed
1250
°C u
nder
nor
mal
ope
ratin
g co
nditi
ons.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02
6.
1-3-
2 Th
e pe
ak fu
el te
mpe
ratu
re sh
all n
ot e
xcee
d 16
00°C
und
er
acci
dent
con
ditio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02
6.
1-4
In a
dditi
on, t
he c
ore
desi
gn sh
all r
esul
t in
a se
lf-co
nsis
tent
set o
f op
erat
ing
para
met
ers (
e.g.
, pow
er d
ensi
ty, c
ore
delta
T) a
nd
mat
eria
l cho
ices
(e.g
., fu
el, g
raph
ite, c
ore
barr
el, r
eact
or v
esse
l) th
at d
emon
stra
te a
dequ
ate
safe
ty m
argi
n w
hen
unce
rtain
ties i
n op
erat
ing
para
met
ers a
nd in
the
asso
ciat
ed c
alcu
latio
n m
etho
ds
(typi
cally
at 9
5% c
onfid
ence
) are
exp
licitl
y ac
coun
ted.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 61
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
6.
1-5
Fina
l des
ign
wor
k is
requ
ired
to v
erify
that
the
calc
ulat
ed fu
el
tem
pera
ture
s mee
t the
spec
ified
rang
es u
nder
all
cond
ition
s afte
r ap
prop
riate
ly a
ccou
ntin
g fo
r unc
erta
intie
s in
the
calc
ulat
ions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02,
Sum
mar
y of
Bas
es
6.
1-6
The
desi
gn o
f the
nuc
lear
isla
nd fo
r the
nuc
lear
syst
em se
lect
ed
for N
GN
P ne
eds t
o be
com
plet
ed a
long
with
the
rese
arch
and
de
velo
pmen
t (R
&D
) sup
porti
ng th
e qu
alifi
catio
n of
fuel
, gr
aphi
te, m
ater
ials
, and
met
hods
requ
ired
to su
ppor
t the
lic
ensi
ng b
asis
of t
he p
lant
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02,
Sum
mar
y of
Bas
es
6.
1-7
Add
ition
al w
ork
is re
quire
d to
dev
elop
the
char
acte
ristic
s of t
he
nucl
ear s
yste
m w
ith a
low
er p
ower
ratin
g (e
.g.,
one
half
the
max
imum
pow
er d
esig
n) in
con
junc
tion
with
an
eval
uatio
n of
de
sign
and
any
add
ition
al R
&D
that
wou
ld b
e re
quire
d to
in
clud
e or
evo
lve
certi
ficat
ion
of th
is lo
wer
-pow
er d
esig
n un
der
that
for t
he h
ighe
r-po
wer
des
ign.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02,
Sum
mar
y of
Bas
es
6.
1-9
Cle
arly
iden
tify
the
low
er-p
ower
des
ign
requ
irem
ents
in fu
rther
ev
alua
tions
with
the
priv
ate
sect
or a
nd th
roug
h ev
alua
tion
of
othe
r fac
tors
(e.g
., av
aila
bilit
y of
com
pone
nts,
trans
porta
tion
of
larg
e ve
ssel
s and
com
pone
nts,
pote
ntia
l for
mas
s pro
duct
ion,
lic
ensi
ng)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02,
Sum
mar
y of
Bas
es
6.
1-10
Th
e lo
wer
-pow
er d
esig
ns b
y th
e ve
ndor
s sha
ll be
dev
elop
ed
thro
ugh
scal
ing,
whe
re p
ossib
le, o
f the
cur
rent
des
igns
to m
eet
the
priv
ate
sect
or n
eeds
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.2.
1 B
ound
ing
Con
ditio
n - 0
02,
Sum
mar
y of
Bas
es
7
Rea
ctor
Gas
Out
let T
empe
ratu
re
Bou
ndin
g C
ondi
tion
4.3
Rea
ctor
Gas
O
utle
t Tem
pera
ture
7.
1
Bou
ndin
g C
ondi
tion
- 003
B
ound
ing
Con
ditio
n 4.
3.1
Bou
ndin
g C
ondi
tion
- 003
7.1-
1 Th
e re
acto
r isl
and
shal
l be
desi
gned
for o
pera
tion
at th
e hi
ghes
t te
mpe
ratu
re a
chie
vabl
e fo
r the
reac
tor c
ore
desi
gn (i
.e.,
pebb
le
bed,
the
pris
mat
ic c
ores
) and
the
max
imum
pow
er le
vel (
see
spec
ific
fuel
tem
pera
ture
requ
irem
ents
abo
ve).
950
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.3.
1 B
ound
ing
Con
ditio
n - 0
03
7.
1-2
NG
NP
shal
l be
capa
ble
of o
pera
ting
at lo
wer
pow
er a
nd
tem
pera
ture
to a
ccom
mod
ate
a pe
riod
of p
lant
ope
ratio
n be
low
de
sign
con
ditio
ns.
950
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.3.
1 B
ound
ing
Con
ditio
n - 0
03
8
Rea
ctor
Gas
Inle
t Tem
pera
ture
B
ound
ing
Con
ditio
n 4.
4 R
eact
or G
as
Inle
t Tem
pera
ture
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 62
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
8.1
B
ound
ing
Con
ditio
n - 0
04
Bou
ndin
g C
ondi
tion
4.4.
1 B
ound
ing
Con
ditio
n - 0
04
8.
1-1
The
reac
tor g
as in
let t
empe
ratu
re sh
all b
e co
mpa
tible
with
the
max
imum
reac
tor p
ower
, gas
out
let t
empe
ratu
re, a
nd re
quire
d ga
s flo
w ra
te to
ach
ieve
acc
epta
ble
fuel
ope
ratin
g te
mpe
ratu
res
(see
des
ign
limits
abo
ve) a
nd m
ater
ial c
hoic
es, p
artic
ular
ly th
e R
PV.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.4.
1 B
ound
ing
Con
ditio
n - 0
04
9
Con
tain
men
t
B
ound
ing
Con
ditio
n 4.
11 C
onta
inm
ent
9.1
B
ound
ing
Con
ditio
n - 0
15
Bou
ndin
g C
ondi
tion
4.11
.1 B
ound
ing
Con
ditio
n - 0
15
9.
1-1
NG
NP
shal
l inc
lude
reac
tor a
nd re
acto
r bui
ldin
g co
ntai
nmen
t fe
atur
es th
at, i
n co
mbi
natio
n w
ith th
e ot
her m
echa
nism
s for
ra
dion
uclid
e co
ntai
nmen
t (e.
g., f
issi
on p
rodu
ct re
tent
ion
capa
bilit
ies o
f the
fuel
) and
tran
spor
t, (e
.g.,
entra
inm
ent,
plat
e ou
t), re
sult
in c
alcu
late
d do
se ra
tes a
t the
EA
B th
at m
eet t
he
crite
ria e
stab
lishe
d ab
ove
(see
Pub
lic a
nd W
orke
r Exp
osur
e Li
mits
) for
nor
mal
ope
ratio
n, a
bnor
mal
con
ditio
ns, a
nd a
ccid
ent
cond
ition
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.11
.1 B
ound
ing
Con
ditio
n - 0
15
10
L
icen
sing
B
ound
ing
Con
ditio
n 4.
12 L
icen
sing
10.1
Bou
ndin
g C
ondi
tion
- 016
B
ound
ing
Con
ditio
n 4.
12.1
Bou
ndin
g C
ondi
tion
- 016
11
Ris
k M
anag
emen
t
B
ound
ing
Con
ditio
n 4.
13 R
isk
Man
agem
ent
11.1
Bou
ndin
g C
ondi
tion
- 017
B
ound
ing
Con
ditio
n 4.
13.1
Bou
ndin
g C
ondi
tion
- 017
12
Com
pone
nt T
est F
acili
ty
Bou
ndin
g C
ondi
tion
4.14
Com
pone
nt
Test
Fac
ility
12
.1
B
ound
ing
Con
ditio
n - 0
18
Bou
ndin
g C
ondi
tion
4.14
.1 B
ound
ing
Con
ditio
n - 0
18
12
.1-1
A
CTF
shal
l be
prov
ided
as p
art o
f the
infr
astru
ctur
e su
ppor
ting
HTG
R te
chno
logi
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.14
.1 B
ound
ing
Con
ditio
n - 0
18
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 63
of10
4
Obj
ect
#R
equi
rem
ent
IDSt
akeh
olde
r R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
12
.1-2
Th
e fa
cilit
y sh
all b
e ca
pabl
e of
com
plet
ing
proo
f-of
-pe
rfor
man
ce te
stin
g of
maj
or H
TGR
and
NG
NP
com
pone
nts a
t en
gine
erin
g or
full
scal
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.14
.1 B
ound
ing
Con
ditio
n - 0
18
Form 412.09 (Rev. 10)
Idaho National Laboratory
NGNP SYSTEM REQUIREMENTS MANUAL
Identifier: Revision: Effective Date:
INL/EXT-07-12999 3 09/10/09 Page: 65 of 104
Appendix B
NGNP Functional, Operational, andTechnical Requirements
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 66
of10
4
App
endi
x B
N
GN
P Fu
nctio
nal,
Ope
ratio
nal,
and
Tech
nica
l Req
uire
men
ts
B-1
. N
ucle
ar H
eat S
uppl
y R
equi
rem
ents
B
-1.1
R
eact
or P
ress
ure
Vess
el
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Pre
ssur
e V
esse
l Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
Bui
ldin
gs
and
Stru
ctur
es
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
2.1
Su
rvei
llanc
e an
d In
-Ser
vice
Insp
ectio
n re
quir
emen
ts
SRM
Rev
2
4.1.
6 Su
rvei
llanc
e an
d In
-Ser
vice
In
spec
tion
requ
irem
ents
2.1-
1 Th
e N
GN
P de
sign
shal
l pro
vide
acc
ess t
o th
e pr
imar
y an
d se
cond
ary
loop
pre
ssur
e bo
unda
ry to
per
mit
In-S
ervi
ce
Insp
ectio
n a
s req
uire
d by
app
ropr
iate
sect
ions
of t
he A
mer
ican
So
ciet
y of
Mec
hani
cal E
ngin
eers
(ASM
E) B
oile
r and
Pre
ssur
e V
esse
l (B
&PV
) Cod
e.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
6 Su
rvei
llanc
e an
d In
-Ser
vice
In
spec
tion
requ
irem
ents
2.2
V
esse
l Sys
tem
Fun
ctio
n an
d D
esig
n
SRM
Rev
2
2.2-
2 Th
e du
ratio
n of
mai
nten
ance
shal
l be
min
imiz
ed.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2 V
esse
l Sy
stem
2.2-
2 Th
e du
ratio
n of
, In-
Serv
ice
shal
l be
min
imiz
ed.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2 V
esse
l Sy
stem
2.2-
2 Th
e du
ratio
n of
repa
ir/re
plac
emen
t ope
ratio
ns o
f the
ves
sel
syst
em sh
all b
e m
inim
ized
. 95
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2
Ves
sel
Syst
em
2.
2-3
All
parts
of t
he v
esse
l sys
tem
shal
l be
desi
gned
for a
n op
erat
ing
dura
tion
of 6
0 ye
ars.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2 V
esse
l Sy
stem
2.2-
4 Li
fetim
e of
isol
atio
n va
lves
, pip
ing
and
cros
s-ve
ssel
s (w
here
ap
plic
able
) of t
he v
esse
l sys
tem
shal
l be
optim
ized
acc
ordi
ng to
th
e in
vest
men
t cos
t and
repl
acem
ent d
urat
ion.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2 V
esse
l Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 67
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Pre
ssur
e V
esse
l Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
2-5
The
vess
el sy
stem
shal
l be
desi
gned
for d
esig
n ba
sis d
uty-
cycl
e ev
ents
. 95
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2
Ves
sel
Syst
em
3
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
3.
1
Ves
sel S
yste
m
SRM
Rev
2
4.3.
2 V
esse
l Sy
stem
3.
1.1
R
eact
or V
esse
l
SR
M R
ev 2
4.
3.2.
1 R
eact
or
Ves
sel
3.
1.1-
3 D
urin
g no
rmal
ope
ratio
n, th
e re
acto
r ves
sel s
hall
mai
ntai
n its
op
erat
ing
tem
pera
ture
thro
ugh
a th
erm
al b
alan
ce b
etw
een
the
core
hea
t flu
x, c
ore
inle
t hel
ium
flow
, and
the
reac
tor c
avity
co
olin
g sy
stem
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.1
Rea
ctor
V
esse
l
3.
1.1-
4 Th
e re
acto
r ves
sel s
hall
mai
ntai
n th
e pr
imar
y pr
essu
re b
ound
ary
inte
grity
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
1 R
eact
or
Ves
sel
3.
1.1-
5 Th
e op
erat
ing
cond
ition
s sha
ll be
con
side
red
acco
rdin
g to
the
follo
win
g st
atem
ents
: 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
1 R
eact
or
Ves
sel
3.
1.1-
5-1
In n
orm
al o
pera
tion,
cre
ep e
ffec
ts o
n th
e re
acto
r ves
sel s
hall
be
avoi
ded
(neg
ligib
le c
reep
). 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
1 R
eact
or
Ves
sel
3.
1.1-
5-2
No
leak
age
shal
l res
ult f
rom
Ant
icip
ated
Ope
ratin
g O
ccur
renc
es
(AO
O).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.1
Rea
ctor
V
esse
l
3.1.
1-5-
3 Fo
r AO
Os a
nd D
BA
s, th
e re
acto
r ves
sel s
hall
not p
reve
nt
rest
artin
g of
the
plan
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
1 R
eact
or
Ves
sel
3.1.
1.1
V
esse
l Sys
tem
SRM
Rev
1
4.3.
2 V
esse
l Sy
stem
3.1.
1.1-
1
The
vess
el sy
stem
shal
l con
tain
and
supp
ort t
he c
ompo
nent
s of
the
reac
tor c
ore,
reac
tor i
nter
nal s
uppo
rts a
nd st
ruct
ures
, and
the
nucl
ear h
eat t
rans
port
com
pone
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
2 V
esse
l Sy
stem
3.
1.2
C
ross
Ves
sels
(whe
re a
pplie
d)
SRM
Rev
2
3.1.
2-2
The
cros
s ves
sels
shal
l mai
ntai
n th
e pr
imar
y pr
essu
re b
ound
ary
inte
grity
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
2 C
ross
V
esse
ls (w
here
ap
plie
d)
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 68
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Pre
ssur
e V
esse
l Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3.
1.2-
3 Th
e cr
oss v
esse
ls sh
all p
rovi
de th
e pr
imar
y he
at tr
ansp
ort p
ath
to/fr
om th
e re
acto
r ves
sel a
nd IH
X v
esse
ls, o
r ste
am g
ener
ator
ve
ssel
s, as
app
licab
le.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.2
Cro
ss
Ves
sels
(whe
re
appl
ied)
3.
1.3
IH
X V
esse
ls (w
here
app
lied)
SR
M R
ev 2
3.
1.3-
1 Th
e fu
nctio
n of
the
IHX
ves
sel s
hall
be to
supp
ort t
he IH
X
mod
ules
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
3 IH
X
Ves
sels
(whe
re
appl
ied)
3.1.
3-2
The
IHX
ves
sels
shal
l mai
ntai
n th
e pr
imar
y pr
essu
re b
ound
ary
inte
grity
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
3 IH
X
Ves
sels
(whe
re
appl
ied)
3.
1.4
V
esse
l Sup
port
s
SR
M R
ev 2
3.
1.4-
1 Th
e IH
X v
esse
l sup
ports
shal
l sup
port
the
verti
cal l
oad.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
4 V
esse
l Su
ppor
ts
3.
1.4-
2 Th
e IH
X v
esse
l sup
ports
shal
l inc
lude
key
ing
for l
ater
al
supp
ort.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.4
Ves
sel
Supp
orts
3.1.
4-3
The
IHX
ves
sel s
uppo
rts sh
all a
ccom
mod
ate
ther
mal
exp
ansi
on.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.4
Ves
sel
Supp
orts
3.1.
4-4
The
IHX
ves
sel s
uppo
rts sh
all a
ccom
mod
ate
duty
-cyc
le e
vent
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
4 V
esse
l Su
ppor
ts
3.
1.4-
5 Th
e IH
X v
esse
l sup
ports
shal
l with
stan
d co
uple
d vi
brat
ion
from
th
e ci
rcul
ator
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
4 V
esse
l Su
ppor
ts
3.
1.4-
6 Th
e re
acto
r ves
sel s
hall
prov
ide
core
supp
ort a
nd m
aint
ain
its
rela
tive
posi
tion
to th
e co
ntro
l rod
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.2.
1 R
eact
or
Ves
sel
3.
1.4-
7 Th
e re
acto
r ves
sel s
hall
prov
ide
deca
y he
at a
nd re
sidu
al h
eat
rem
oval
by
radi
al c
ondu
ctio
n du
ring
loss
-of-
forc
ed c
ircul
atio
n ev
ents
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.2.
1 R
eact
or
Ves
sel
3.1.
5
Pres
sure
Rel
ief S
yste
m
SRM
Rev
2
3.1.
5-2
In c
ase
of p
rimar
y ov
erpr
essu
re, t
he sa
fety
val
ves s
hall
open
to
elim
inat
e th
e ov
erpr
essu
re a
nd re
clos
e on
ce th
e ov
erpr
essu
re
cond
ition
term
inat
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.5
Pres
sure
R
elie
f Sys
tem
3.
1.5-
3 Th
e pr
essu
re re
lief s
yste
m sh
all p
rovi
de th
e pr
imar
y co
olan
t lo
op’s
ove
rpre
ssur
e pr
otec
tion
as re
quire
d by
ASM
E pr
essu
re
relie
f cod
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
2.5
Pres
sure
R
elie
f Sys
tem
4
Pr
imar
y Sy
stem
Pre
ssur
e V
esse
ls
Bou
ndin
g C
ondi
tion
4.6
Prim
ary
Syst
em
Pres
sure
Ves
sels
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 69
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Pre
ssur
e V
esse
l Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
4.1
B
ound
ing
Con
ditio
n - 0
08
Bou
ndin
g C
ondi
tion
4.6.
1 B
ound
ing
Con
ditio
n - 0
08
4.
1-1
The
nucl
ear h
eat s
uppl
y sy
stem
, whi
ch in
clud
es th
e he
at
trans
fer/t
rans
port
syst
em, s
hall
be d
esig
ned
to m
inim
ize
sche
dule
risk
for t
he p
rimar
y pr
essu
re v
esse
ls a
t ful
l des
ign
pow
er le
vel a
nd in
let a
nd o
utle
t tem
pera
ture
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.6.
1 B
ound
ing
Con
ditio
n - 0
08
4.
1-2
In th
is re
gard
, the
des
ign
of th
e pr
imar
y pr
essu
re v
esse
ls,
incl
udin
g th
e R
PV, s
hall
inco
rpor
ate
stan
dard
LW
R R
PV
mat
eria
l (e.
g., S
A 5
08/5
33).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.6.
1 B
ound
ing
Con
ditio
n - 0
08
4.
1-3
A p
aral
lel e
ffor
t sha
ll be
con
tinue
d by
the
NG
NP
Proj
ect i
n co
llabo
ratio
n w
ith th
e ap
prop
riate
reac
tor v
endo
rs to
dev
elop
th
e m
odifi
ed 9
Cr (
Gra
de 9
1) m
ater
ial a
s a v
iabl
e al
tern
ativ
e to
th
e SA
508
/533
mat
eria
l.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.6.
1 B
ound
ing
Con
ditio
n - 0
08
4.
1-4
If re
quire
d, u
se o
f act
ive
cool
ing
or o
ther
mea
sure
s sha
ll be
id
entif
ied
and
the
desi
gn d
evel
oped
as n
eces
sary
to m
eet t
his
requ
irem
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.6.
1 B
ound
ing
Con
ditio
n - 0
08
4.
1-5
The
reac
tor s
yste
m sh
all b
e de
sign
ed to
pro
vide
pas
sive
resi
dual
he
at re
mov
al u
nder
con
ditio
ns o
f los
s of f
orce
d co
olin
g an
d lo
ss
of c
oola
nt.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1 R
eact
or
Syst
em
4.
1-6
The
reac
tor s
yste
m sh
all b
e de
sign
ed su
ch th
at th
e re
acto
r cor
e is
mai
ntai
ned
in a
coo
labl
e ge
omet
ry u
nder
all
norm
al
oper
atin
g, a
bnor
mal
ope
ratin
g, a
nd p
ostu
late
d de
sign
bas
is a
nd
beyo
nd d
esig
n ba
sis a
ccid
ent c
ondi
tions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
4.1-
7 Th
e re
acto
r sys
tem
shal
l be
desi
gned
for a
n op
erat
iona
l life
time
of 6
0 ye
ars (
cale
ndar
). Ex
clud
ing
thos
e po
rtion
s of t
he sy
stem
th
at c
an b
e re
plac
ed.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1 R
eact
or
Syst
em
4.
1-8
The
core
shal
l use
forc
ed c
ircul
atio
n he
lium
as t
he h
eat
trans
port
fluid
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
4.1-
9 N
on-r
epla
ceab
le st
ruct
ural
mat
eria
ls in
con
tact
with
hel
ium
sh
all r
esis
t cor
rosi
on a
nd e
rosi
on d
urin
g pl
ant l
ife a
s to
avoi
d fa
ilure
and
or n
eed
for r
epla
cem
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1 R
eact
or
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 70
of10
4 B
-1.2
R
eact
or V
esse
l Int
erna
ls
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Ves
sel I
nter
nals
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
2.
1
Rea
ctor
Sys
tem
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
2.
1.1
R
eact
or In
tern
als
SRM
Rev
2
4.3.
1.2
Rea
ctor
In
tern
als
2.
1.1-
1 Th
e re
acto
r int
erna
ls sh
all b
e de
sign
ed to
pro
perly
con
trol
bypa
ss fl
ows.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.2
Rea
ctor
In
tern
als
2.
1.1-
2 Th
e re
acto
r int
erna
ls sh
all b
e de
sign
ed to
tran
spor
t res
idua
l de
cay
heat
from
the
reac
tor c
ore
to th
e re
acto
r ves
sel.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.2
Rea
ctor
In
tern
als
2.
1.1-
3 Th
e re
acto
r int
erna
ls sh
all b
e de
sign
ed to
cha
nnel
prim
ary
cool
ant t
o an
d fr
om th
e re
acto
r cor
e fo
r tra
nsfe
r of h
eat t
o th
e Pr
imar
y H
eat T
rans
port
Syst
em (P
HTS
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.2
Rea
ctor
In
tern
als
2.
1.1-
4 Th
e re
acto
r int
erna
ls sh
all b
e de
sign
ed to
pro
vide
radi
olog
ical
sh
ield
ing
to li
mit
neut
ron
fluen
ce to
the
reac
tor v
esse
l. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1.
2 R
eact
or
Inte
rnal
s
2.1.
1-5
The
reac
tor i
nter
nals
shal
l be
desi
gned
to li
mit
gam
ma
radi
atio
n ex
posu
re to
the
plan
t per
sonn
el a
nd e
quip
men
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1.
2 R
eact
or
Inte
rnal
s
2.1.
1-6
The
reac
tor i
nter
nals
shal
l be
desi
gned
to li
mit
dam
age
to p
lant
co
mpo
nent
s dur
ing
cond
uctio
n co
oldo
wn
even
ts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.2
Rea
ctor
In
tern
als
2.
1.1-
7 Th
e re
acto
r int
erna
ls sh
all m
aint
ain
reac
tor c
ore
geom
etry
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.1.
2 R
eact
or
Inte
rnal
s
2.1.
1-8
The
reac
tor i
nter
nals
shal
l pro
vide
hea
t tra
nsfe
r dur
ing
cond
uctio
n co
oldo
wn.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.1.
2 R
eact
or
Inte
rnal
s
2.1.
1-9
The
reac
tor i
nter
nals
shal
l con
serv
e ne
utro
ns in
the
reac
tor c
ore
and
prov
ide
shie
ldin
g.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
1.2
Rea
ctor
In
tern
als
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 71
of10
4 B
-1.3
R
eact
or C
ore
and
Cor
e St
ruct
ures
O
bjec
t #
Req
uire
men
t ID
Req
uire
men
ts fo
r C
ore
and
Cor
e St
ruct
ures
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
1
Not
e: It
ems a
ppea
ring
in b
rack
ets (
[ ]) r
epre
sent
ap
prox
imat
ions
and
/or
unde
fined
val
ues.
2
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
2.
1
Rea
ctor
Sys
tem
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
2.
1.1
R
eact
or C
ore
950
C
750
C
SR
M R
ev 2
4.
3.1.
1 R
eact
or
Cor
e
2.1.
1-1
The
deca
y he
at re
mov
al sh
all b
e po
ssib
le b
y pa
ssiv
e he
at
trans
fer m
eans
(con
duct
ion
and
radi
atio
n) fr
om th
e fu
el to
the
reac
tor i
nter
nals
with
out r
each
ing
unac
cept
able
fuel
te
mpe
ratu
res d
urin
g al
l DB
A c
ondi
tions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
2 Th
e co
re sh
all u
tiliz
e th
erm
al sp
ectru
m n
eutro
ns fo
r fis
sion
re
actio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
3 Th
e co
re sh
all b
e m
oder
ated
with
gra
phite
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1.
1 R
eact
or
Cor
e
2.1.
1-4
The
activ
e co
re h
eigh
t sha
ll en
sure
the
axia
l sta
bilit
y of
the
neut
ron
flux
and
prec
lude
the
risk
of x
enon
osc
illat
ions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1.
1 R
eact
or
Cor
e
2.1.
1-5
Ref
eren
ce fu
el sh
all b
e LE
U-b
ased
(UC
O o
r UO
2) w
ith a
n en
richm
ent l
imite
d to
<20
.0%
(in
mas
s) a
nd w
ith a
pea
k bu
rn-u
p lim
ited
to 2
0% fi
ssio
ns p
er in
itial
met
al io
n (F
IMA
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
7 Th
e co
re b
ypas
s flo
w sh
all b
e m
aint
aine
d w
ithin
an
acce
ptab
le
rang
e [T
BD
], to
ens
ure
fuel
tem
pera
ture
s in
norm
al a
nd
acci
dent
al c
ondi
tions
are
mai
ntai
ned
with
in [T
BD
] lim
its
(exi
sten
ce o
f a m
inim
um a
mou
nt o
f byp
ass i
n la
tera
l ref
lect
or).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
8 Th
e re
activ
ity te
mpe
ratu
re c
oeff
icie
nt sh
all b
e su
ffic
ient
ly
nega
tive
to sh
utdo
wn
the
nucl
ear c
hain
reac
tion
befo
re a
n un
acce
ptab
le fu
el te
mpe
ratu
re is
reac
hed,
and
mai
ntai
n th
e co
re
in a
safe
stat
e fo
r a ti
me
offe
ring
the
certa
inty
to re
liabl
y in
trodu
ce a
bsor
ber e
lem
ents
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
9 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e re
acto
r cor
e:
Gen
erat
e he
at.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.1
Rea
ctor
C
ore
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 72
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cor
e an
d C
ore
Stru
ctur
es
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
1.1-
10
The
reac
tor c
ore
shal
l gen
erat
e he
at.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
1.1
Rea
ctor
C
ore
2.
1.1-
11
The
reac
tor c
ore
shal
l tra
nsfe
r hea
t to
cool
ant a
nd/o
r rea
ctor
in
tern
als.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
1.1
Rea
ctor
C
ore
B-1
.4
Nuc
lear
Inst
rum
enta
tion
Cur
rent
ly, n
o re
quire
men
ts e
xist
.
B-1
.5
Fuel
Ele
men
ts
Obj
ect
#R
equi
rem
ents
ID
Req
uire
men
ts fo
r Fu
el E
lem
ents
N
ote:
Item
s app
earin
g in
bra
cket
s ([ ]
) rep
rese
nt
appr
oxim
atio
ns a
nd/o
r und
efin
ed v
alue
s. Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
Bui
ldin
gs
and
Stru
ctur
es
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
2.1
O
pera
tiona
l Req
uire
men
ts
SRM
Rev
2
4.1.
2 O
pera
tiona
l R
equi
rem
ents
2.1-
1 Th
e N
GN
P sh
all b
e de
sign
ed to
use
low
enr
iche
d ur
aniu
m
(LEU
) TR
ISO
-coa
ted
parti
cle
fuel
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
3
Req
uire
men
ts A
pplic
able
to F
uel
3-
3 Th
e fu
el p
erfo
rman
ce sh
all a
llow
for a
sour
ce te
rm c
alcu
latio
n ca
pabl
e of
obt
aini
ng a
n N
RC
lice
nse
with
an
excl
usio
n zo
ne o
f no
mor
e th
an 4
00 m
eter
s (ap
prox
imat
ely)
for t
he d
esig
n po
wer
le
vel.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.2
Req
uire
men
ts
App
licab
le to
Fue
l
3-
4 Th
e fu
el sh
all m
eet f
ollo
win
g re
quire
men
t: A
s-m
anuf
actu
red
Qua
lity
Req
uire
men
ts, a
t a 9
5% c
onfid
ence
leve
l: H
eavy
met
al
cont
amin
atio
n: �
2 ×
10 -5
(Pris
mat
ic B
lock
); �6
.0 ×
10
-5
(Peb
ble
Bed
)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.2
Req
uire
men
ts
App
licab
le to
Fue
l
3-
5 Th
e fu
el sh
all m
eet
the
follo
win
g re
quire
men
t: A
s-m
anuf
actu
red
Qua
lity
Req
uire
men
ts, a
t a 9
5% c
onfid
ence
leve
l: Si
C D
efec
t Fra
ctio
n: �
1 ×
10 -4
(Pris
mat
ic B
lock
); �6
.0 ×
10
-5
(Peb
ble
Bed
)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.2
Req
uire
men
ts
App
licab
le to
Fue
l
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 73
of10
4
Obj
ect
#R
equi
rem
ents
ID
Req
uire
men
ts fo
r Fu
el E
lem
ents
N
ote:
Item
s app
earin
g in
bra
cket
s ([ ]
) rep
rese
nt
appr
oxim
atio
ns a
nd/o
r und
efin
ed v
alue
s. Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3-
6 Th
e fu
el sh
all m
eet
the
follo
win
g re
quire
men
t: In
-ser
vice
Fue
l Pe
rfor
man
ces R
equi
rem
ents
, at a
95%
con
fiden
ce le
vel:
Fuel
fa
ilure
dur
ing
norm
al o
pera
tions
: �2
× 1
0 -4
(Pris
mat
ic B
lock
); �4
.6 ×
10
-5 (P
ebbl
e B
ed)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.2
Req
uire
men
ts
App
licab
le to
Fue
l
3-
7 Th
e fu
el sh
all m
eet t
he fo
llow
ing
requ
irem
ent:
In-s
ervi
ce F
uel
Perf
orm
ance
s Req
uire
men
ts, a
t a 9
5% c
onfid
ence
leve
l: In
crem
enta
l fue
l fai
lure
s dur
ing
acci
dent
con
ditio
ns:
�6.0
× 1
0 -
4 (P
rism
atic
Blo
ck);
�5.0
× 1
0 -4
(Peb
ble
Bed
)
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.2
Req
uire
men
ts
App
licab
le to
Fue
l
B-1
.6
Res
erve
Shu
tdow
n Sy
stem
No
requ
irem
ents
cur
rent
ly.
B-1
.7
Rea
ctiv
ity C
ontr
ol S
yste
m
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctiv
ity C
ontr
ol S
yste
m
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
2.
1
Rea
ctor
Sys
tem
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
2.
1-1
The
reac
tor s
yste
m sh
all g
ener
ate
heat
and
tran
sfer
it to
the
prim
ary
cool
ant.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
1 R
eact
or
Syst
em
2.1-
2 Th
e re
acto
r sys
tem
shal
l mai
ntai
n re
acto
r shu
tdow
n.95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.1
Rea
ctor
Sy
stem
2.
1.1
N
eutr
on C
ontr
ol E
lem
ents
SR
M R
ev 2
4.
3.1.
3 N
eutro
n C
ontro
l Ele
men
ts
2.
1.1-
1 Th
e ne
utro
n co
ntro
l ele
men
ts sh
all b
e de
sign
ed to
pro
vide
su
ffic
ient
neg
ativ
e re
activ
ity to
shut
dow
n th
e re
acto
r and
m
aint
ain
it in
subc
ritic
al c
ondi
tion
for a
ny st
ate
whi
le
com
pens
atin
g fo
r the
wor
st p
ositi
ve re
activ
ity in
serti
on.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
1.3
Neu
tron
Con
trol E
lem
ents
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 74
of10
4
2.1.
1-2
The
neut
ron
cont
rol e
lem
ents
shal
l con
trol t
he n
ucle
ar c
hain
re
actio
n in
the
reac
tor c
ore
by a
bsor
bing
neu
trons
in a
ny
oper
atio
nal m
ode.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
1.3
Neu
tron
Con
trol E
lem
ents
2.2
N
HS
Prot
ectio
n Sy
stem
SR
M R
ev 2
4.
3.4
NH
S Pr
otec
tion
Syst
em
2.
2-1
The
prot
ectio
n sy
stem
shal
l im
plem
ent t
he re
leva
nt m
onito
ring,
an
alys
is, a
nd a
ctua
tion
func
tions
nec
essa
ry to
reac
h th
e co
ntro
lled
stat
e in
cas
e of
abn
orm
al e
vent
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
4 N
HS
Prot
ectio
n Sy
stem
2.3
N
HS
Con
trol
Roo
m a
nd O
pera
tor
Inte
rfac
e Sy
stem
SR
M R
ev 2
4.
3.6
NH
S C
ontro
l R
oom
and
Ope
rato
r In
terf
ace
Syst
em
2.
3-1
The
NG
NP
faci
lity
desi
gn sh
all p
erm
it th
e op
erat
ors t
o ta
ke
cont
rol o
f the
reac
tor a
nd su
ppor
t pro
cess
es fr
om w
ithin
a si
ngle
in
tegr
ated
con
trol r
oom
usi
ng th
e m
anua
l mod
e at
any
tim
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
6 N
HS
Con
trol
Roo
m a
nd O
pera
tor
Inte
rfac
e Sy
stem
B-1
.8
Cor
e C
ondi
tioni
ng S
yste
m (S
hutd
own
Coo
ling)
O
bjec
t #
Req
uire
men
t ID
Req
uire
men
ts fo
r C
ore
Con
ditio
ning
Sys
tem
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
2.
1
Rea
ctor
Sup
port
Sys
tem
s
SR
M R
ev 2
4.
3.3
Rea
ctor
Su
ppor
t Sys
tem
s 2.
1.1
Sh
utdo
wn
Coo
ling
Syst
em
SRM
Rev
2
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.1.
1-9
The
Shut
dow
n C
oolin
g Sy
stem
(SC
S) sh
all l
imit
the
ingr
ess o
f po
tent
ial c
onta
min
ants
into
the
prim
ary
heliu
m c
ircui
t fro
m
com
pone
nts o
f the
SC
S ex
tern
al to
the
prim
ary
HPB
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
10
The
Shut
dow
n C
oolin
g Sy
stem
(SC
S) sh
all r
etai
n he
lium
and
ra
dion
uclid
es w
ithin
the
parts
of t
he S
CS
com
pris
ing
the
prim
ary
Hel
ium
Pre
ssur
e B
ound
ary
(HPB
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 75
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cor
e C
ondi
tioni
ng S
yste
m
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
1.1-
11
The
Shut
dow
n C
oolin
g Sy
stem
shal
l tra
nspo
rt co
re re
sidu
al a
nd
deca
y he
at fr
om th
e re
acto
r sys
tem
to th
e en
viro
nmen
t whe
n th
e re
acto
r sys
tem
is sh
utdo
wn
and
the
PHTS
is n
ot o
pera
tiona
l.
The
heliu
m p
rimar
y co
olan
t may
be
pres
suriz
ed o
r de
pres
suriz
ed.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
12
The
Shut
dow
n C
oolin
g Sy
stem
shal
l tra
nspo
rt co
re re
sidu
al a
nd
deca
y he
at fr
om th
e re
acto
r sys
tem
to th
e en
viro
nmen
t whe
n th
e he
lium
prim
ary
cool
ant i
s dep
ress
uriz
ed d
urin
g re
acto
r cor
e re
fuel
ing
oper
atio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
13
The
Shut
dow
n C
oolin
g Sy
stem
shal
l tra
nspo
rt co
re re
sidu
al a
nd
deca
y he
at fr
om th
e re
acto
r sys
tem
to th
e en
viro
nmen
t whe
n th
e he
lium
prim
ary
cool
ant i
s dep
ress
uriz
ed d
urin
g sc
hedu
led
mai
nten
ance
of c
ore,
ves
sel,
and
inte
rnal
com
pone
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
14
The
Shut
dow
n C
oolin
g Sy
stem
shal
l tra
nspo
rt co
re re
sidu
al a
nd
deca
y he
at fr
om th
e re
acto
r sys
tem
to th
e en
viro
nmen
t whe
n th
e he
lium
prim
ary
cool
ant i
s dep
ress
uriz
ed d
urin
g ce
rtain
pot
entia
l un
sche
dule
d m
aint
enan
ce o
r rep
air a
ctiv
ities
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
15
The
Shut
dow
n C
oolin
g Sy
stem
shal
l sup
port
cool
ing
of th
e IH
X, a
s nee
ded,
and
pot
entia
lly fo
r oth
er c
ompo
nent
s whe
n th
e PH
TS is
not
ope
ratin
g.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
2.
1.1-
16
The
Shut
dow
n C
oolin
g Sy
stem
shal
l lim
it co
re b
ypas
s flo
w
thro
ugh
its c
ompo
nent
s dur
ing
PHTS
ope
ratio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.1
Shut
dow
n C
oolin
g Sy
stem
B-1
.9
Rea
ctor
Cav
ity C
oolin
g Sy
stem
O
bjec
t #
Req
uire
men
t ID
Req
uire
men
ts fo
r R
eact
or C
avity
Coo
ling
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to N
ucle
ar H
eat S
ourc
e
SR
M R
ev 2
4.
3 R
equi
rem
ents
A
pplic
able
to
Nuc
lear
Hea
t So
urce
2.
1
Rea
ctor
Sys
tem
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
2.1-
1 Th
e re
acto
r sys
tem
shal
l be
desi
gned
to p
rovi
de p
assi
ve re
sidu
al
heat
rem
oval
und
er c
ondi
tions
of l
oss o
f coo
ling.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.1
Rea
ctor
Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 76
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Cav
ity C
oolin
g Sy
stem
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.2
R
eact
or S
uppo
rt S
yste
ms
SRM
Rev
2
4.3.
3 R
eact
or
Supp
ort S
yste
m
2.2.
1
Rea
ctor
Cav
ity C
oolin
g Sy
stem
SR
M R
ev 2
4.
3.3.
2 R
eact
or
Cav
ity C
oolin
g Sy
stem
2.2.
1-3
The
Rea
ctor
Cav
ity C
oolin
g Sy
stem
(RC
CS)
shal
l ope
rate
co
ntin
uous
ly a
nd m
aint
ain
reac
tor c
avity
con
cret
e te
mpe
ratu
res
to le
ss th
an [9
0ºC
] dur
ing
norm
al o
pera
tions
and
less
than
[1
50ºC
] for
off
-nor
mal
eve
nts (
shor
t ter
m).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
4 Th
e R
CC
S sh
all b
e de
sign
ed to
ope
rate
thro
ugh
the
utili
ty/u
ser
duty
-cyc
le e
vent
s for
the
num
ber o
f cyc
les s
peci
fied
[TB
D] p
lus
thos
e ev
ents
and
eve
nt c
ombi
natio
ns d
eter
min
ed to
be
requ
ired
by p
lant
tran
sient
ana
lysi
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
5 In
acce
ssib
le p
arts
of t
he R
CC
S sh
all b
e de
sign
ed fo
r an
oper
atin
g lif
e of
60
year
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.3.
2 R
eact
or
Cav
ity C
oolin
g Sy
stem
2.2.
1-6
The
need
for a
cces
s to
indi
vidu
al c
ompo
nent
s dur
ing
norm
al
plan
t ope
ratio
n an
d un
der a
ccid
ent c
ondi
tions
shal
l be
cons
ider
ed in
dev
elop
ing
build
ing
and
com
pone
nt a
rran
gem
ents
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
8 Th
e R
CC
S sh
all a
ccom
mod
ate
cont
inuo
us o
pera
tion
at a
ny
pow
er le
vel u
p to
100
% o
f rat
ed p
ower
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.3.
2 R
eact
or
Cav
ity C
oolin
g Sy
stem
2.2.
1-9
The
RC
CS
shal
l inc
orpo
rate
feat
ures
requ
ired
to im
plem
ent o
n-lin
e su
rvei
llanc
e an
d pe
rfor
man
ce m
onito
ring.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.3.
2 R
eact
or
Cav
ity C
oolin
g Sy
stem
2.2.
1-10
Th
e R
CC
S sh
all i
ncor
pora
te th
ose
feat
ures
requ
ired
to
acco
mpl
ish
ISI a
ctiv
ities
with
in th
e tim
e an
d sc
hedu
ling
cons
train
ts im
pose
d by
the
allo
tted
desi
gn p
lann
ed o
utag
e tim
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
11
The
RC
CS
shal
l be
requ
ired
to o
pera
te c
ontin
uous
ly in
all
plan
t st
ates
, inc
ludi
ng sh
utdo
wn
follo
win
g lo
ss o
f for
ced
reac
tor
cool
ing
by th
e PH
TS a
nd S
CS
with
sim
ulta
neou
s los
s of
pum
ped
circ
ulat
ion
of R
CC
S co
olin
g w
ater
and
an
SSE.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 77
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Rea
ctor
Cav
ity C
oolin
g Sy
stem
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
2.1-
12
The
RC
CS
shal
l ope
rate
con
tinuo
usly
in a
ll pl
ant s
tate
s, in
clud
ing
shut
dow
n fo
llow
ing
loss
of f
orce
d re
acto
r coo
ling
by
the
PHTS
and
SC
S w
ith si
mul
tane
ous l
oss o
f pum
ped
circ
ulat
ion
of R
CC
S co
olin
g w
ater
, whe
re a
pplic
able
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
13
All
com
pone
nts a
nd p
ipin
g of
the
RC
CS
shal
l mee
t se
ism
ic
load
s req
uire
men
ts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
14
All
com
pone
nts a
nd p
ipin
g in
side
the
reac
tor b
uild
ing,
incl
udin
g th
e co
nnec
tions
for e
mer
genc
y w
ater
supp
ly (f
ire b
rigad
e), s
hall
be d
esig
ned
agai
nst e
xter
nal e
vent
s (e.
g., a
ircra
ft cr
ash
or
pres
sure
wav
es).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
15
The
Rea
ctor
Cav
ity C
oolin
g Sy
stem
shal
l pro
tect
the
reac
tor
cavi
ty c
oncr
ete
stru
ctur
e, in
clud
ing
the
supp
ort s
truct
ures
of t
he
reac
tor p
ress
ure
vess
el, f
rom
ove
rhea
ting
durin
g al
l mod
es o
f op
erat
ion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.
2.1-
16
The
Rea
ctor
Cav
ity C
oolin
g Sy
stem
shal
l pro
vide
an
alte
rnat
e m
eans
of r
eact
or c
ore
heat
rem
oval
from
the
reac
tor s
yste
m to
th
e en
viro
nmen
t whe
n ne
ither
the
PHTS
nor
the
SCS
is
avai
labl
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.2
Rea
ctor
C
avity
Coo
ling
Syst
em
2.2.
2
Nuc
lear
Isla
nd C
oolin
g Sy
stem
SR
M R
ev 2
4.
3.3.
5 N
ucle
ar
Isla
nd C
oolin
g Sy
stem
2.2.
2-3
The
nucl
ear i
slan
d co
olin
g sy
stem
shal
l ser
ve th
e ne
eds o
f the
re
acto
r and
its a
ssoc
iate
d co
mpo
nent
s at a
ll tim
es u
nder
full-
pow
er o
pera
ting
cond
ition
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.5
Nuc
lear
Is
land
Coo
ling
Syst
em
2.
2.2-
4 Sy
stem
mak
eup
shal
l be
prov
ided
from
the
plan
t Wat
er S
uppl
y Tr
eatm
ent S
yste
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.5
Nuc
lear
Is
land
Coo
ling
Syst
em
2.
2.2-
5a
Red
unda
nt c
ompo
nent
s sha
ll be
pro
vide
d fo
r the
nuc
lear
isla
nd
cool
ing
syst
em, a
s nee
ded,
to su
ppor
t con
tinuo
us o
pera
tion
of
the
reac
tor..
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.5
Nuc
lear
Is
land
Coo
ling
Syst
em
2.
2.2-
5b
Red
unda
nt c
ompo
nent
s sha
ll be
pro
vide
d fo
r the
nuc
lear
isla
nd
cool
ing
syst
em, a
s nee
ded,
to p
rovi
de fo
r on-
line
mai
nten
ance
of
the
cool
ing
syst
em c
ompo
nent
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.5
Nuc
lear
Is
land
Coo
ling
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 78
of10
4 B
-1.1
0 G
ener
al
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Nuc
lear
Hea
t Sup
ply
Syst
em -
Gen
eral
Req
uire
men
ts
2.1
R
equi
rem
ents
App
licab
le to
Nuc
lear
Hea
t Sup
ply
2.1-
1 Th
e N
ucle
ar H
eat S
uppl
y Sy
stem
shal
l be
desi
gn c
ertif
ied
for a
br
oad
rang
e of
app
licat
ions
and
site
s. N
ote
that
the
Nuc
lear
Hea
t Su
pply
Sys
tem
incl
udes
the
nucl
ear i
slan
d (e
.g.,
the
reac
tor,
prim
ary
cool
ant s
yste
m, a
nd su
ppor
ting
syst
ems)
and
the
heat
tra
nsfe
r/tra
nspo
rt sy
stem
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
2.
1-2
The
NH
SS sh
all b
e lic
ense
d in
depe
nden
t of t
he a
pplic
atio
n. In
th
is re
gard
the
licen
sing
bou
ndar
y an
d in
terf
ace
requ
irem
ents
sh
all b
e de
fined
for t
he re
fere
nce
conf
igur
atio
ns (e
.g.,
trans
ient
s, fe
ed a
nd g
as re
turn
che
mis
try.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
2.
1-5
App
licab
le to
bro
ad ra
nge
of c
ogen
erat
ion
appl
icat
ions
su
pply
ing,
sing
ly o
r in
com
bina
tion,
ele
ctric
ity, s
team
, and
hot
ga
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
2.1-
6 R
eact
or g
as o
utle
t tem
pera
ture
in th
e ra
nge
of 7
50 to
800
°C.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
2.1-
7 C
apab
le o
f com
plet
ing
desi
gn, l
icen
sing
, con
stru
ctio
n, a
nd
star
tup
test
ing
for i
nitia
l ope
ratio
n by
202
1.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.2.
2 H
TGR
Fu
ndam
enta
l R
equi
rem
ents
2.1-
8 C
apab
le o
f fol
low
ing
proc
ess l
oad
varia
tions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
2.2
HTG
R
Fund
amen
tal
Req
uire
men
ts
2.
1-9
The
NG
NP
desi
gn w
ill b
e ap
plic
able
to a
bro
ad ra
nge
of
coge
nera
tion
appl
icat
ions
supp
lyin
g, si
ngly
or i
n co
mbi
natio
n,
elec
trici
ty, s
team
, and
hot
gas
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
1 Sy
stem
C
onfig
urat
ion
and
Esse
ntia
l Fea
ture
s R
equi
rem
ents
2.1-
10
For t
he N
GN
P (F
OA
K),
the
desi
gned
reac
tor g
as o
utle
t te
mpe
ratu
re sh
all b
e in
the
rang
e of
750
to 8
00°C
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.1
Syst
em
Con
figur
atio
n an
d Es
sent
ial F
eatu
res
Req
uire
men
ts
2.
1-11
Th
e N
HSS
shal
l be
capa
ble
of c
ontro
lling
the
trans
port
of
radi
onuc
lides
to th
e en
d pr
oduc
ts a
t lev
els b
elow
the
conc
entra
tion
or e
xpos
ure
requ
irem
ents
for t
he p
rodu
ct (e
.g.,
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SAG
M
eetin
g A
gree
men
ts
Oct
ober
22,
200
8
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 79
of10
4
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
tritiu
m in
stea
m, g
as, h
ydro
gen)
[Ini
tial a
ccep
tabl
e tri
tium
leve
ls
will
be
set a
t a T
BD
frac
tion
of th
e EP
A li
mits
for d
rinki
ng
wat
er a
nd a
ir]
2.
1-12
Th
e N
ucle
ar H
eat S
uppl
y Sy
stem
(NH
SS) s
hall
be d
esig
n ce
rtifie
d fo
r a b
road
rang
e of
app
licat
ions
and
site
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SA
G
Mee
ting
Agr
eem
ents
O
ctob
er 2
2, 2
008
2.
1-13
Th
e N
HSS
shal
l be
licen
sed
inde
pend
ent o
f the
app
licat
ion.
In
this
rega
rd th
e lic
ensi
ng b
ound
ary
and
inte
rfac
e re
quire
men
ts
shal
l be
defin
ed fo
r the
refe
renc
e co
nfig
urat
ions
, (e.
g.,
trans
ient
s, fe
ed a
nd g
as re
turn
che
mis
try).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SAG
M
eetin
g A
gree
men
ts
Oct
ober
22,
200
8
2.
1-14
Th
e N
HSS
des
igns
shal
l be
appl
icab
le, o
n ec
onom
ic,
avai
labi
lity
and
relia
bilit
y ba
ses,
to a
bro
ad ra
nge
of c
o-ge
nera
tion
appl
icat
ions
supp
lyin
g, si
ngly
or i
n co
mbi
natio
n,
elec
trici
ty, s
team
, and
hot
gas
(hel
ium
).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SAG
M
eetin
g A
gree
men
ts
Oct
ober
22,
200
8
2.2
Sy
stem
Con
figur
atio
n an
d E
ssen
tials
Feat
ures
R
equi
rem
ents
The
NG
NP
nucl
ear h
eat s
ourc
e (N
HS)
shal
l use
the
HTG
R
conc
ept.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
1 Sy
stem
C
onfig
urat
ion
and
Esse
ntia
l Fea
ture
s R
equi
rem
ents
2.2-
1 Th
e N
GN
P N
HS
shal
l dem
onst
rate
com
mer
cial
via
bilit
y of
the
HTG
R.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
1 Sy
stem
C
onfig
urat
ion
and
Esse
ntia
l Fea
ture
s R
equi
rem
ents
2.2-
2 Th
e N
GN
P N
HS
shal
l be
desi
gned
such
that
it c
an b
e de
sign
ce
rtifie
d fo
r a b
road
rang
e of
app
licat
ions
and
site
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.1
Syst
em
Con
figur
atio
n an
d Es
sent
ial F
eatu
res
Req
uire
men
ts
2.3
2.2-
3O
pera
tiona
l Req
uire
men
ts
2.3-
1 Th
e N
GN
P N
HS
shal
l hav
e an
ope
ratio
nal l
ifetim
e of
60
year
s (c
alen
dar)
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
2.
3-4
The
NG
NP
shal
l be
desi
gned
to o
pera
te d
urin
g lo
ss o
f hyd
roge
n pr
oduc
tion
and
stab
ilize
in th
e el
ectri
city
gen
erat
ion
phas
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.1.
2 O
pera
tiona
l R
equi
rem
ents
2.3-
5 Th
e N
GN
P pl
ant s
hall
be c
apab
le o
f fol
low
ing
proc
ess l
oad
varia
tions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 80
of10
4
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
3-7
The
NG
NP
shal
l dem
onst
rate
a m
inim
um 1
8-m
onth
refu
elin
g in
terv
al c
apab
ility
(if a
pplic
able
). 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.2
Ope
ratio
nal
Req
uire
men
ts
2.
3-8
The
NG
NP
shal
l be
desi
gned
to o
pera
te fo
llow
ing
loss
of a
se
cond
ary
heat
pro
cess
, suc
h as
hyd
roge
n pr
oduc
tion,
and
st
abili
ze in
the
elec
trici
ty g
ener
atio
n ph
ase.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
2 O
pera
tiona
l R
equi
rem
ents
2.4
Su
rvei
llanc
e an
d In
-Ser
vice
Insp
ectio
n R
equi
rem
ents
2.4-
1 Th
e N
GN
P de
sign
shal
l pro
vide
acc
ess t
o th
e pr
imar
y an
d se
cond
ary,
if a
pplic
able
, loo
p pr
essu
re b
ound
ary
to p
erm
it IS
I as
requ
ired
by a
ppro
pria
te se
ctio
ns o
f the
Am
eric
an S
ocie
ty o
f M
echa
nica
l Eng
inee
rs (A
SME)
Boi
ler a
nd P
ress
ure
Ves
sel
(B&
PV) C
ode,
min
imiz
ing
the
need
for r
eque
sts f
or C
ode
relie
f du
e to
acc
essi
bilit
y co
nstra
ints
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
6 Su
rvei
llanc
e an
d In
-Ser
vice
In
spec
tion
Req
uire
men
ts
B-2
. H
eat T
rans
port
Sys
tem
Req
uire
men
ts
B-2
.1
Circ
ulat
ors
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cir
cula
tors
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
2.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
2.
1-1
The
Prim
ary
Hea
t Tra
nspo
rt Sy
stem
shal
l tra
nsfe
r hea
t fro
m th
e re
acto
r cor
e to
the
seco
ndar
y ci
rcui
t.95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
4.1
Prim
ary
Hea
t Tr
ansp
ort S
yste
m
2.1.
1
Mai
n H
eliu
m C
ircu
lato
r (M
HC
)
SR
M R
ev 2
4.
4.1.
1 M
ain
Hel
ium
Circ
ulat
or
2.
1.1-
2 Th
e M
HC
shal
l be
driv
en b
y el
ectri
cal m
otor
s cap
able
of r
ated
an
d va
riabl
e sp
eeds
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
4.1.
1 M
ain
Hel
ium
Circ
ulat
or
2.
1.1-
4 B
earin
g de
sign
shal
l pre
clud
e co
ntam
inan
t (e.
g., l
ubric
atin
g pr
oduc
t) in
gres
s in
the
prim
ary
circ
uit.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.1
Mai
n H
eliu
m C
ircul
ator
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 81
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cir
cula
tors
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1.1-
5 Th
erm
al in
sula
tion
shal
l be
requ
ired
to p
rote
ct th
e in
tern
al
com
pone
nts b
y re
duci
ng h
eat m
igra
tion
due
to p
rimar
y sy
stem
te
mpe
ratu
res.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.1
Mai
n H
eliu
m C
ircul
ator
2.
1.1-
6 Th
e M
HC
shal
l be
desi
gned
with
a m
inim
um li
fetim
e of
10
year
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
4.1.
1 M
ain
Hel
ium
Circ
ulat
or
2.
1.1-
7 Th
e M
HC
shal
l be
desi
gned
with
hyd
raul
ic c
hara
cter
istic
s as
stab
le a
s pos
sibl
e ov
er th
e re
quire
d sp
eed
rang
e w
ithou
t di
stin
ctiv
e re
vers
al p
oint
s and
with
out p
rono
unce
d pe
aks.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.1
Mai
n H
eliu
m C
ircul
ator
2.
1.1-
8 Th
e M
HC
shal
l mai
ntai
n pr
imar
y pr
essu
re b
ound
ary
inte
grity
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
4.1.
1 M
ain
Hel
ium
Circ
ulat
or
2.
1.1-
9 Th
e M
ain
Hel
ium
Circ
ulat
or sh
all c
ontro
l the
flow
of h
eliu
m to
m
atch
the
heat
gen
erat
ion
of th
e re
acto
r cor
e w
ith th
e he
at
rem
oval
of t
he P
HTS
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.4.
1.1
Mai
n H
eliu
m C
ircul
ator
3
Hel
ium
Cir
cula
tors
B
ound
ing
Con
ditio
n 4.
8 H
eliu
m
Circ
ulat
ors
3.1
B
ound
ing
Con
ditio
n - 0
12
Bou
ndin
g C
ondi
tion
4.8.
1 B
ound
ing
Con
ditio
n - 0
12
3.
1-1
The
abili
ty to
ope
rate
mul
tiple
circ
ulat
ors i
n pa
ralle
l sha
ll be
ev
alua
ted
and
test
ed a
s an
alte
rnat
ive
to in
stal
latio
n of
a si
ngle
hi
gh-p
ower
des
ign
that
requ
ires s
igni
fican
t dev
elop
men
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.8.
1 B
ound
ing
Con
ditio
n - 0
12
3.
1-2
Dev
elop
men
t of h
igh-
pow
er d
esig
ns th
at a
re re
quire
d fo
r ap
plic
atio
n in
the
seco
ndar
y lo
op sh
all b
e co
ntin
ued.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
B
ound
ing
Con
ditio
n 4.
8.1
Bou
ndin
g C
ondi
tion
- 012
B-2
.2
Inte
rmed
iate
Hea
t Exc
hang
ers
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Inte
rmed
iate
Hea
t Exc
hang
ers
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
4
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
4.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
4.
1.1
In
term
edia
te H
eat E
xcha
nger
(IH
X)
SRM
Rev
2
4.4.
1.3
Inte
rmed
iate
Hea
t Ex
chan
ger (
IHX
)
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 82
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Inte
rmed
iate
Hea
t Exc
hang
ers
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
5
Inte
rmed
iate
Hea
t Exc
hang
er D
esig
n
B
ound
ing
Con
ditio
n 4.
7 In
term
edia
te
Hea
t Exc
hang
er
Des
ign
5.1
G
ener
al
Bou
ndin
g C
ondi
tion
4.7.
1 G
ener
al
5.2
B
ound
ing
Con
ditio
n - 0
09
Bou
ndin
g C
ondi
tion
4.7.
2 B
ound
ing
Con
ditio
n - 0
09
B-2
.3
Cro
ss V
esse
l Pip
ing
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cro
ss V
esse
l Pip
ing
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
2.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
2.
1.1
H
ot D
uct A
ssem
bly
(HD
A) (
whe
re a
pplie
d)
SRM
Rev
2
4.4.
1.2
Hot
Duc
t A
ssem
bly
(whe
re
appl
ied)
2.1.
1-2
Rad
ial k
eys s
hall
prov
ide
a ra
dial
supp
ort d
urin
g op
erat
ing
and
seis
mic
con
ditio
ns.
950
C75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
4.1.
2 H
ot D
uct
Ass
embl
y (w
here
ap
plie
d)
2.
1.1-
3 Th
e H
DA
shal
l pro
vide
hel
ium
leak
tigh
tnes
s at e
ach
end
(with
C
ore
supp
ort s
truct
ure
and
IHX
). 95
0 C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.2
Hot
Duc
t A
ssem
bly
(whe
re
appl
ied)
2.1.
1-4
The
Hot
Duc
t Ass
embl
y (w
here
app
lied)
shal
l cha
nnel
hig
h-te
mpe
ratu
re h
eliu
m fr
om th
e re
acto
r cor
e ou
tlet p
lenu
m to
the
IHX
inle
t.
950
C75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
4.1.
2 H
ot D
uct
Ass
embl
y (w
here
ap
plie
d)
3.1.
1
Cro
ss V
esse
ls (w
here
app
lied)
4.3.
2.2
Cro
ss
Ves
sels
(whe
re
appl
ied)
3.1.
1-1
The
cros
s ves
sels
shal
l mai
ntai
n th
e pr
imar
y pr
essu
re b
ound
ary
inte
grity
. 95
0 C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
2.2
Cro
ss
Ves
sels
(whe
re
appl
ied)
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 83
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Cro
ss V
esse
l Pip
ing
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.1-
2 Th
e cr
oss v
esse
ls sh
all p
rovi
de th
e pr
imar
y he
at tr
ansp
ort p
ath
to/fr
om th
e re
acto
r ves
sel a
nd IH
X v
esse
ls.
950
C75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.2.
2 C
ross
V
esse
ls (w
here
ap
plie
d)
4
Inte
rmed
iate
Hea
t Exc
hang
er D
esig
n
B
ound
ing
Con
ditio
n 4.
7 In
term
edia
te
Hea
t Exc
hang
er
Des
ign
4-1
The
Inte
rmed
iate
Hea
t Exc
hang
er (I
HX
) sha
ll tra
nsfe
r hea
t fro
m
the
prim
ary
loop
to th
e se
cond
ary
loop
dur
ing
spec
ified
nor
mal
op
erat
ing
cond
ition
s and
cer
tain
abn
orm
al a
nd a
ccid
ent
cond
ition
s.
950
C75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
4.1.
3 In
term
edia
te H
eat
Exch
ange
r (IH
X)
4-2
The
Inte
rmed
iate
Hea
t Exc
hang
er (I
HX
) sha
ll se
para
te th
e pr
imar
y lo
op fr
om th
e se
cond
ary
loop
dur
ing
all n
orm
al a
nd
abno
rmal
con
ditio
ns a
nd d
urin
g ac
cide
nt c
ondi
tions
for a
sp
ecifi
ed ti
me.
950
C75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
4.1.
3 In
term
edia
te H
eat
Exch
ange
r (IH
X)
4.1
B
ound
ing
Con
ditio
n - 0
10
Bou
ndin
g C
ondi
tion
4.7.
3 B
ound
ing
Con
ditio
n - 0
10
4.
1-1
Mat
eria
ls b
eing
eva
luat
ed fo
r the
NG
NP
heat
tran
sfer
/tran
spor
t sy
stem
shal
l be
capa
ble
of su
stai
ned
oper
atio
n (i.
e., 1
0 ef
fect
ive
full-
pow
er y
ears
of o
pera
tion
or lo
nger
) at t
he u
pper
bou
nds o
f th
e re
acto
r gas
out
let a
nd in
let t
empe
ratu
res.
950
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.7.
3 B
ound
ing
Con
ditio
n - 0
10
4.
1-2
R&
D sh
all b
e co
nduc
ted
to su
ppor
t dev
elop
men
t and
cod
ifica
tion
of th
ese
mat
eria
ls fo
r use
in N
GN
P an
d fu
ture
HTG
R c
omm
erci
al
appl
icat
ions
.
950
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.7.
3 B
ound
ing
Con
ditio
n - 0
10
4.2
B
ound
ing
Con
ditio
n - 0
11
Bou
ndin
g C
ondi
tion
4.7.
4 B
ound
ing
Con
ditio
n - 0
11
4.
2-1
At l
east
two
prim
ary
loop
s sha
ll be
pro
vide
d: a
full
pow
er lo
op(s
) fo
r the
PC
S an
d a
smal
ler l
oop
(e.g
., up
to 6
0 M
wt)
for t
he
hydr
ogen
pla
nt.
950
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.7.
4 B
ound
ing
Con
ditio
n - 0
11
B-2
.4
Mix
ing
Cha
mbe
r
No
requ
irem
ents
cur
rent
ly.
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 84
of10
4 B
-2.5
H
igh
Tem
pera
ture
Val
ves
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hig
h T
empe
ratu
re V
alve
s Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
2.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
2.
1.1
Se
cond
ary
Gas
Isol
atio
n V
alve
s
SR
M R
ev 2
4.
4.1.
4 Se
cond
ary
Gas
Isol
atio
n V
alve
s
2.1.
1-2
The
seco
ndar
y ga
s iso
latio
n va
lves
shal
l acc
omm
odat
e a
pres
sure
diff
eren
tial o
f [5-
9 M
Pa].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.4
Seco
ndar
y G
as Is
olat
ion
Val
ves
2.
1.1-
3 Th
e se
cond
ary
gas i
sola
tion
valv
es sh
all m
aint
ain
prim
ary
pres
sure
bou
ndar
y in
tegr
ity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.4
Seco
ndar
y G
as Is
olat
ion
Val
ves
2.
1.1-
4 Th
e se
cond
ary
gas i
sola
tion
valv
es sh
all h
ave
a m
axim
um
leak
age
rate
whe
n sh
ut o
f [TB
D].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.4.
1.4
Seco
ndar
y G
as Is
olat
ion
Val
ves (
whe
re
appl
ied)
2.
2
Seco
ndar
y H
eat T
rans
port
Sys
tem
SR
M R
ev 1
4.
4.2
Seco
ndar
y H
eat T
rans
port
Syst
em
2.
2-1
The
Seco
ndar
y H
eat T
rans
port
Syst
em sh
all p
rovi
de h
ot h
eliu
m
to th
e hy
drog
en p
rodu
ctio
n pl
ant a
nd re
ceiv
es th
e ci
rcul
atin
g he
lium
at a
low
er te
mpe
ratu
re fr
om th
e hy
drog
en p
rodu
ctio
n pl
ant.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.4.
2 Se
cond
ary
Hea
t Tra
nspo
rt Sy
stem
2.
2-2
The
Seco
ndar
y H
eat T
rans
port
Syst
em sh
all p
rovi
de h
ot h
eliu
m
to th
e PC
S an
d re
ceiv
ed th
e ci
rcul
atin
g he
lium
at a
low
er
tem
pera
ture
from
the
PCS.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.4.
2 Se
cond
ary
Hea
t Tra
nspo
rt Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 85
of10
4 B
-2.6
G
ener
al
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
for
Hea
t Tra
nspo
rt S
yste
m
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to H
eat T
rans
port
Sys
tem
SR
M R
ev 2
4.
4 R
equi
rem
ents
A
pplic
able
to H
eat
Tran
spor
t Sys
tem
2.
1
Prim
ary
Hea
t Tra
nspo
rt S
yste
m
SRM
Rev
2
4.4.
1 Pr
imar
y H
eat
Tran
spor
t Sys
tem
B-3
. H
ydro
gen
Prod
uctio
n Sy
stem
Req
uire
men
ts
B-3
.1
Hyd
roge
n Pr
oduc
tion
Syst
em
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to H
ydro
gen
Prod
uctio
n Pl
ant
SRM
Rev
2
4.6
Req
uire
men
ts
App
licab
le to
H
ydro
gen
Prod
uctio
n Pl
ant
2.1
H
ydro
gen
Prod
uctio
n Pl
ant P
aram
eter
s and
Per
form
ance
SR
M R
ev 2
4.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t Pa
ram
eter
s and
Pe
rfor
man
ce
2.
1-1
The
hydr
ogen
pro
duct
ion
plan
t sha
ll re
ceiv
e pr
oces
s hel
ium
at
tem
pera
ture
s up
to [9
00°C
] and
util
ize
heat
at a
rate
of u
p to
[60
MW
th] i
n th
e pr
oduc
tion
of h
ydro
gen.
950
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.6.
1 H
ydro
gen
Prod
uctio
n Pl
ant
Para
met
ers a
nd
Perf
orm
ance
2.1-
2 Th
e hy
drog
en p
rodu
ctio
n pl
ant s
hall
rece
ive
proc
ess h
eliu
m a
t te
mpe
ratu
res u
p to
800
°C a
nd u
tiliz
e he
at a
t a ra
te o
f up
to
[TB
D M
Wth
] in
the
prod
uctio
n of
hyd
roge
n.
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
1 H
ydro
gen
Prod
uctio
n Pl
ant
Para
met
ers a
nd
Perf
orm
ance
2.1-
3 Th
e hy
drog
en p
rodu
ctio
n pl
ant p
roce
ss e
ffic
ienc
y sh
all b
e no
le
ss th
an [4
0% h
ighe
r hea
ting
valu
e].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
1 H
ydro
gen
Prod
uctio
n Pl
ant
Para
met
ers a
nd
Perf
orm
ance
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 86
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.2
H
ydro
gen
Prod
uctio
n Pl
ant C
onfig
urat
ion
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
2 Th
e hy
drog
en p
rodu
ctio
n pl
ant s
hall
be p
hysi
cally
sepa
rate
d fr
om th
e re
mai
nder
of t
he N
GN
P co
nsis
tent
with
com
mer
cial
pl
ant e
cono
mic
and
risk
trad
eoff
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
3 Th
e in
terf
aces
bet
wee
n th
e hy
drog
en p
rodu
ctio
n pl
ant a
nd th
e re
mai
nder
of t
he N
GN
P sh
all b
e de
sign
ed to
ens
ure
that
failu
res
or u
pset
con
ditio
ns in
the
hydr
ogen
pro
duct
ion
plan
t do
not
resu
lt in
failu
res o
r adv
erse
impa
cts t
o th
e re
mai
nder
of t
he
NG
NP
faci
lity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.
2-4
The
inte
rfac
es b
etw
een
the
hydr
ogen
pro
duct
ion
plan
t and
the
rem
aind
er o
f the
NG
NP
shal
l be
desi
gned
to e
nsur
e th
at fa
ilure
s or
ups
et c
ondi
tions
in th
e N
GN
P fa
cilit
y do
not
resu
lt in
failu
res
or a
dver
se im
pact
s to
the
hydr
ogen
pro
duct
ion
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.
2-5
The
hydr
ogen
pro
duct
ion
plan
t sha
ll pr
ovid
e fo
r sto
rage
of
feed
stoc
k (e
.g.,
wat
er a
nd m
akeu
p ch
emic
als)
, as r
equi
red.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
6.2
Hyd
roge
n Pr
oduc
tion
Plan
t C
onfig
urat
ion
2.
2-6
The
hydr
ogen
pro
duct
ion
plan
t sha
ll in
clud
e al
l nec
essa
ry
pret
reat
men
t or c
ondi
tioni
ng o
f rea
dily
ava
ilabl
e ra
w m
ater
ials
ne
eded
for t
he sp
ecifi
c hy
drog
en p
roce
ss (e
.g.,
wat
er tr
eatm
ent).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
7 H
ydro
gen
prod
uced
in th
e hy
drog
en p
rodu
ctio
n pl
ant s
hall
be
mad
e av
aila
ble
for d
istri
butio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
9a
No
cent
ral s
tora
ge sh
all b
e in
clud
ed a
t the
hyd
roge
n pr
oduc
tion
plan
t oth
er th
an b
uffe
r sto
rage
, as r
equi
red
for e
ffic
ient
op
erat
ions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
9b
Stor
age
of h
ydro
gen
shal
l pro
vide
for p
ress
ure
relie
f, ve
ntin
g,
valv
ing,
inst
rum
enta
tion,
and
max
imum
allo
wab
le q
uant
ities
to
limit
post
ulat
ed c
onfla
grat
ion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
10
The
oxyg
en b
y-pr
oduc
t gas
shal
l hav
e pu
rity
leve
ls c
onsi
sten
t w
ith c
urre
nt in
dust
ry st
anda
rds f
or b
ulk
oxyg
en a
pplic
atio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 87
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
2-11
Th
e hy
drog
en d
eliv
ery
pres
sure
shal
l be
[TB
D M
Pa].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.2-
12
The
hydr
ogen
pro
duct
gas
shal
l hav
e pu
rity
leve
ls c
onsi
sten
t w
ith c
urre
nt in
dust
ry st
anda
rds f
or b
ulk
hydr
ogen
app
licat
ions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
6.2
Hyd
roge
n Pr
oduc
tion
Plan
t C
onfig
urat
ion
2.
2-13
Th
e in
terf
ace
syst
em b
etw
een
the
hydr
ogen
pro
duct
ion
plan
t an
d th
e re
mai
nder
of t
he N
GN
P sh
all b
e de
sign
ed to
ens
ure
that
tri
tium
mig
ratio
n in
to th
e hy
drog
en p
rodu
ctio
n pl
ant w
ill b
e lim
ited,
such
that
the
max
imum
am
ount
of t
ritiu
m re
leas
ed to
th
e hy
drog
en p
rodu
ctio
n pl
ant d
oes n
ot e
xcee
d [T
BD
] sta
ndar
ds.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.
2-15
Th
e to
tal c
once
ntra
tion
of ra
dioa
ctiv
e co
ntam
inan
ts in
the
hydr
ogen
pro
duct
gas
and
ass
ocia
ted
hydr
ogen
pro
duct
ion
syst
ems s
hall
be m
inim
ized
to e
nsur
e th
at p
ublic
dos
e lim
its d
o no
t exc
eed
NR
C re
gula
tory
lim
its.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.
2-15
Th
e to
tal c
once
ntra
tion
of ra
dioa
ctiv
e co
ntam
inan
ts in
the
hydr
ogen
pro
duct
gas
and
ass
ocia
ted
hydr
ogen
pro
duct
ion
syst
ems s
hall
be m
inim
ized
to e
nsur
e th
at w
orke
r dos
e lim
its d
o no
t exc
eed
NR
C re
gula
tory
lim
its.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
Con
figur
atio
n
2.3
H
ydro
gen
Prod
uctio
n Pl
ant W
aste
SR
M R
ev 2
4.
6.3
Hyd
roge
n Pr
oduc
tion
Plan
t W
aste
2.3-
2 Th
e hy
drog
en p
rodu
ctio
n pl
ant d
esig
n sh
all b
e su
ch th
at th
ere
is
a di
spos
al p
ath
for a
ll w
aste
. Haz
ardo
us w
aste
stre
ams i
dent
ified
in
40
CFR
261
.3 sh
all b
e di
spos
ed o
f acc
ordi
ngly
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
3 H
ydro
gen
Prod
uctio
n Pl
ant
Was
te
2.
3-3
A m
eans
of d
ispo
sing
(suc
h as
flar
ing)
of o
ut-o
f-sp
ecifi
catio
n hy
drog
en p
rodu
ct d
urin
g up
sets
or s
tartu
p/sh
utdo
wn
shal
l be
incl
uded
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
3 H
ydro
gen
Prod
uctio
n Pl
ant
Was
te
2.4
H
ydro
gen
Prod
uctio
n Pl
ant S
afet
y an
d L
icen
sing
SR
M R
ev 2
4.
6.4
Hyd
roge
n Pr
oduc
tion
Plan
t Sa
fety
and
Li
cens
ing
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 88
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
4-1
The
hydr
ogen
pro
duct
ion
faci
litie
s, in
clud
ing
the
conv
ersi
on,
stor
age,
and
dis
tribu
tion
syst
ems,
shal
l com
ply
with
the
requ
irem
ents
of 2
9 C
FR 1
910.
103,
Occ
upat
iona
l Saf
ety
and
Hea
lth S
tand
ards
, Sub
part
H -
Haz
ardo
us M
ater
ials
, Hyd
roge
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty a
nd
Lice
nsin
g
2.4-
2 In
the
even
t tha
t the
hyd
roge
n pr
oduc
tion
plan
t als
o pr
oduc
es
and
stor
es si
gnifi
cant
qua
ntiti
es o
f oxy
gen,
the
requ
irem
ents
of
29 C
FR 1
910.
104,
“O
xyge
n,”
shal
l app
ly.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty a
nd
Lice
nsin
g
2.4-
3a
The
oper
atio
n, o
f the
hyd
roge
n pr
oduc
tion
plan
t sha
ll co
mpl
y w
ith 2
9 C
FR 1
910.
119,
“Pr
oces
s Saf
ety
Man
agem
ent o
f Hig
hly
Haz
ardo
us C
hem
ical
s.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty a
nd
Lice
nsin
g
2.4-
3b
The
mai
nten
ance
of t
he h
ydro
gen
prod
uctio
n pl
ant s
hall
com
ply
with
29
CFR
191
0.11
9, “
Proc
ess S
afet
y M
anag
emen
t of H
ighl
y H
azar
dous
Che
mic
als.”
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty a
nd
Lice
nsin
g
2.4-
4 St
andb
y po
wer
to th
e hy
drog
en p
rodu
ctio
n fa
cilit
y ve
ntila
tion,
tre
atm
ent s
yste
ms,
tem
pera
ture
con
trols
, ala
rms,
dete
ctio
n sy
stem
s, an
d ot
her e
lect
roni
cally
ope
rate
d sy
stem
s sha
ll be
pr
ovid
ed in
acc
orda
nce
with
Nat
iona
l Fire
Pro
tect
ion
Ass
ocia
tion
(NFP
A) r
equi
rem
ents
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty
2.
4-5
Hea
t exc
hang
ers a
nd/o
r ste
am g
ener
ator
s sha
ll m
eet t
he
appl
icab
le p
ress
ure
vess
el re
quire
men
ts in
the
ASM
E B
&PV
C
ode.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty
2.
4-6a
H
PS P
ipin
g sy
stem
s sha
ll pr
even
t ele
ctro
stat
ic d
isch
arge
from
ac
oust
ical
ly in
duce
d fa
tigue
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
6.4
Hyd
roge
n Pr
oduc
tion
Plan
t Sa
fety
2.4-
6b
HPS
stor
age
syst
ems s
hall
prev
ent e
lect
rost
atic
dis
char
ge fr
om
acou
stic
ally
indu
ced
fatig
ue.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
4 H
ydro
gen
Prod
uctio
n Pl
ant
Safe
ty
2.
4-6c
H
PS P
ipin
g sy
stem
s sha
ll pr
even
t equ
ipm
ent f
ailu
res f
rom
hy
drog
en e
mbr
ittle
men
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
6.4
Hyd
roge
n Pr
oduc
tion
Plan
t Sa
fety
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 89
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
4-6d
H
PS st
orag
e sy
stem
s sha
ll pr
even
t equ
ipm
ent f
ailu
res f
rom
hy
drog
en e
mbr
ittle
men
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
6.4
Hyd
roge
n Pr
oduc
tion
Plan
t Sa
fety
2.
5
Hyd
roge
n Pr
oduc
tion
Plan
t Rel
iabi
lity
and
Ava
ilabi
lity
SRM
Rev
2
4.6.
5 H
ydro
gen
Prod
uctio
n Pl
ant
Rel
iabi
lity
and
Ava
ilabi
lity
2.5.
1
Cap
acity
Fac
tor
SRM
Rev
2
4.6.
5.1
Cap
acity
Fa
ctor
2.5.
1-1
Excl
udin
g N
GN
P m
issi
on-s
peci
fic o
utag
es fo
r ins
pect
ion
and
test
ing,
the
hydr
ogen
pro
duct
ion
plan
t des
ign
capa
city
fact
or fo
r hy
drog
en p
rodu
ctio
n av
erag
ed o
ver t
he p
lant
life
time
shal
l be
at
leas
t [TB
D %
] whe
n m
odel
ed w
ith e
quip
men
t mea
n tim
e to
fa
ilure
and
mea
n tim
e to
repa
ir da
ta fo
r the
sam
e or
sim
ilar
syst
ems a
nd/o
r com
pone
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
5.1
Cap
acity
Fa
ctor
2.5.
2
Plan
ned
Out
ages
SR
M R
ev 2
4.
6.5.
2 Pl
anne
d O
utag
es
2.
5.2-
1 Ex
clud
ing
NG
NP
mis
sion
-spe
cific
out
ages
for i
nspe
ctio
n an
d te
stin
g, th
e ca
paci
ty fa
ctor
loss
due
to h
ydro
gen
prod
uctio
n pl
ant p
lann
ed o
utag
es a
vera
ged
over
the
plan
t life
time
shal
l be
no g
reat
er th
an [T
BD
%],
incl
udin
g al
l pla
nned
insp
ectio
n an
d m
aint
enan
ce a
ctiv
ities
that
mus
t be
acco
mpl
ishe
d w
ith th
e hy
drog
en p
rodu
ctio
n pl
ant s
hutd
own.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
5.2
Plan
ned
Out
ages
2.5.
3
Hyd
roge
n Pr
oduc
tion
Plan
t Inv
estm
ent P
rote
ctio
n
SR
M R
ev 2
4.
6.5.
3 H
ydro
gen
Prod
uctio
n Pl
ant
Inve
stm
ent
Prot
ectio
n
2.5.
3-1
Excl
udin
g N
GN
P m
issi
on-s
peci
fic o
utag
es fo
r ins
pect
ion
and
test
ing,
the
calc
ulat
ed c
apac
ity fa
ctor
loss
due
to u
npla
nned
hy
drog
en p
rodu
ctio
n pl
ant o
utag
es a
vera
ged
over
the
lifet
ime
of
the
plan
t sha
ll no
t exc
eed
[TB
D. %
].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
5.3
Hyd
roge
n Pr
oduc
tion
Plan
t In
vest
men
t Pr
otec
tion
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 90
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.6
H
ydro
gen
Prod
uctio
n Pl
ant M
aint
enan
ce a
nd In
-Ser
vice
In
spec
tion
SRM
Rev
2
4.6.
6 H
ydro
gen
Prod
uctio
n Pl
ant
Mai
nten
ance
and
In
-Ser
vice
In
spec
tion
2.6.
1
Hyd
roge
n Pr
oduc
tion
Plan
t Mai
nten
ance
Req
uire
men
ts
SRM
Rev
2
4.6.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t M
aint
enan
ce
Req
uire
men
ts
2.
6.1-
1 Th
e hy
drog
en p
rodu
ctio
n pl
ant s
hall
be d
esig
ned
to a
llow
all
com
pone
nts t
o be
rem
oved
, rep
lace
d (if
nec
essa
ry),
and
rein
stal
led.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t M
aint
enan
ce
Req
uire
men
ts
2.
6.1-
2 Th
e hy
drog
en p
rodu
ctio
n pl
ant d
esig
n sh
all i
nclu
de p
rovi
sion
s fo
r mon
itorin
g eq
uipm
ent s
tatu
s, co
nfig
urat
ion,
and
pe
rfor
man
ce a
nd fo
r det
ectin
g an
d di
agno
sing
mal
func
tions
as a
ba
sis f
or p
redi
ctiv
e m
aint
enan
ce p
lans
and
dec
isio
n m
akin
g.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t M
aint
enan
ce
Req
uire
men
ts
2.
6.1-
3 Th
e hy
drog
en p
rodu
ctio
n pl
ant d
esig
n sh
all p
rovi
de st
orag
e fa
cilit
ies f
or a
n ad
equa
te a
mou
nt o
f spa
re p
arts
as d
eter
min
ed b
y a
prev
entiv
e m
aint
enan
ce a
nd fa
cilit
y av
aila
bilit
y pl
an.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t M
aint
enan
ce
Req
uire
men
ts
2.
6.1-
4 H
ydro
gen
dete
ctor
s, re
lief v
alve
s, al
arm
s, an
d is
olat
ion
valv
es
requ
ired
for s
afet
y w
ill b
e de
sign
ed fo
r per
iodi
c te
stin
g an
d ca
libra
tion.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
6.1
Hyd
roge
n Pr
oduc
tion
Plan
t M
aint
enan
ce
Req
uire
men
ts
2.6.
2
Hyd
roge
n Pr
oduc
tion
Plan
t In-
Serv
ice
Insp
ectio
n
SR
M R
ev 2
4.
6.6.
2 H
ydro
gen
Prod
uctio
n Pl
ant
In-S
ervi
ce
Insp
ectio
n
2.6.
2-2
The
hydr
ogen
pro
duct
ion
plan
t des
ign
shal
l pro
vide
acc
ess t
o th
e pr
essu
re b
ound
ary
to p
erm
it op
erat
iona
l ins
pect
ion
as
requ
ired
by a
ppro
pria
te se
ctio
ns o
f the
ASM
E B
&PV
Cod
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.6.
6.2
Hyd
roge
n Pr
oduc
tion
Plan
t O
pera
tiona
l In
spec
tion
3
Hyd
roge
n Pl
ant
Bou
ndin
g C
ondi
tion
4.10
Hyd
roge
n Pl
ant
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 91
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Hyd
roge
n Pr
oduc
tion
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.1
B
ound
ing
Con
ditio
n - 0
14
Bou
ndin
g C
ondi
tion
4.10
.1 B
ound
ing
Con
ditio
n - 0
14
3.
1-1
The
inte
rfac
e fo
r the
hyd
roge
n pl
ant s
hall
be v
ia a
sepa
rate
pa
ralle
l prim
ary
loop
with
an
IHX
des
igne
d to
acc
omm
odat
e th
e pr
oces
s with
the
high
est p
rodu
ctio
n m
odul
e en
ergy
requ
irem
ent
(exp
ecte
d to
be
in th
e 60
Mw
t ran
ge).
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.10
.1 B
ound
ing
Con
ditio
n - 0
14
3.
1-2
This
loop
shal
l be
desi
gned
to o
pera
te a
t tem
pera
ture
s up
to
950°
C a
t pow
er le
vels
from
5 M
wt t
o 60
MW
t. 95
0 C
Pe
bble
Bed
Pr
ism
atic
B
ound
ing
Con
ditio
n 4.
10.1
Bou
ndin
g C
ondi
tion
- 014
3.1-
3 Th
e he
at tr
ansf
er/ t
rans
port
syst
em su
pply
ing
thes
e pr
oces
ses
mus
t be
capa
ble
of a
turn
dow
n ra
tio o
f 10:
1 to
acc
omm
odat
e th
ese
varia
tions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.10
.1 B
ound
ing
Con
ditio
n - 0
14,
Sum
mar
y of
Bas
es
3.
1-4
The
inte
rfac
e be
twee
n N
GN
P an
d th
e hy
drog
en p
roce
ss m
ust b
e de
sign
ed to
acc
omm
odat
e th
e th
erm
o-ch
emic
al p
roce
sses
as
they
bec
ome
avai
labl
e fo
r dem
onst
ratio
n at
the
prod
uctio
n m
odul
e le
vel.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.10
.1 B
ound
ing
Con
ditio
n - 0
14,
Sum
mar
y of
Bas
es
B-4
. Po
wer
Con
vers
ion
Syst
em R
equi
rem
ents
B
-4.1
St
eam
Gen
erat
or
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Stea
m G
ener
ator
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to P
ower
Con
vers
ion
Syst
em
SRM
Rev
2
4.5
Req
uire
men
ts
App
licab
le to
Po
wer
Con
vers
ion
Syst
em
2-1
The
Pow
er C
onve
rsio
n Sy
stem
shal
l con
vert
ener
gy fr
om th
e PH
TS o
r ste
am g
ener
ator
, as a
pplic
able
, int
o el
ectri
city
for
dist
ribut
ion
on th
e co
mm
erci
al g
ird.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5
Req
uire
men
ts
App
licab
le to
Po
wer
Con
vers
ion
Syst
em
2.1
St
eam
Tur
bine
and
Gen
erat
or
SRM
Rev
2
4.5.
1 St
eam
Tu
rbin
e an
d G
ener
ator
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 92
of10
4
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Stea
m G
ener
ator
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
1-2
The
stea
m tu
rbin
e an
d ge
nera
tor s
hall
be d
esig
ned
for
supe
rhea
ted
stea
m a
t a p
ress
ure
of [T
BD
] and
tem
pera
ture
of
[TB
D] a
t the
turb
ine
thro
ttle.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5.
1 St
eam
Tu
rbin
e an
d G
ener
ator
2.1-
3 Th
e st
eam
turb
ine
and
gene
rato
r sha
ll be
des
igne
d w
ith a
sing
le
shaf
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
5.1
Stea
m
Turb
ine
and
Gen
erat
or
2.
1-4
The
turb
ine
shal
l be
desi
gned
for m
ain
stea
m te
mpe
ratu
re
varia
tions
of u
p to
[TB
D].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5.
1 St
eam
Tu
rbin
e an
d G
ener
ator
2.1-
5 Th
e st
eam
turb
ine
gene
rato
r rat
ing
shal
l be
[TB
D].
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5.
1 St
eam
Tu
rbin
e an
d G
ener
ator
2.1-
6 Th
e St
eam
Tur
bine
and
Gen
erat
or sh
all p
rodu
ce e
lect
ricity
usi
ng
stea
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5.
1 St
eam
Tu
rbin
e an
d G
ener
ator
B-4
.2
Pow
er C
onve
rsio
n Sy
stem
Equ
ipm
ent f
or D
irect
Com
bine
d C
ycle
O
bjec
t #
Req
uire
men
t ID
Req
uire
men
ts fo
r PC
S Eq
uipm
ent f
or D
irec
t Com
bine
d C
ycle
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
3
Pow
er C
onve
rsio
n Sy
stem
B
ound
ing
Con
ditio
n 4.
9 Po
wer
C
onve
rsio
n Sy
stem
3.
1
Bou
ndin
g C
ondi
tion
- 013
B
ound
ing
Con
ditio
n 4.
9.1
Bou
ndin
g C
ondi
tion
- 013
3.1-
1 Th
e N
GN
P PC
S sh
all b
e an
indi
rect
sub-
criti
cal R
anki
ne c
ycle
(i.
e., t
he st
eam
gen
erat
or sh
all b
e in
stal
led
in th
e se
cond
ary
loop
su
pply
ing
a st
anda
rd st
eam
turb
ine
gene
rato
r) w
ith a
ratin
g eq
uiva
lent
to th
e nu
clea
r sys
tem
pow
er ra
ting.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.9.
1 B
ound
ing
Con
ditio
n - 0
13
3.
1-2
The
stea
m c
ondi
tions
and
con
figur
atio
n of
the
cycl
e sh
all b
e se
lect
ed to
resu
lt in
a n
et g
ener
atio
n ef
ficie
ncy
of a
t lea
st 4
2%;
bala
ncin
g co
st w
ith e
ffic
ienc
y an
d re
liabi
lity.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
Bou
ndin
g C
ondi
tion
4.9.
1 B
ound
ing
Con
ditio
n - 0
13
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 93
of10
4 B
-4.3
G
ener
al
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
for
Pow
er C
onve
rsio
n Sy
stem
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
1
Not
e: It
ems a
ppea
ring
in b
rack
ets (
[ ]) r
epre
sent
ap
prox
imat
ions
and
/or
unde
fined
val
ues.
2
Pow
er C
onve
rsio
n Sy
stem
- G
ener
al R
equi
rem
ents
2.
1
Req
uire
men
ts A
pplic
able
to P
ower
Con
vers
ion
Syst
em
2.
1-2
The
NG
NP
PCS
shal
l be
conn
ecte
d to
a lo
cal p
ublic
tra
nsm
issi
on li
ne fo
r ext
erna
l dis
tribu
tion
and
sale
of u
p to
[250
-30
0] M
We.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5
Req
uire
men
ts
App
licab
le to
Po
wer
Con
vers
ion
Syst
em
2.
1-3
The
NG
NP
PCS
shal
l pro
duce
ele
ctric
ity a
t nom
inal
60
Hz.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
5 R
equi
rem
ents
A
pplic
able
to
Pow
er C
onve
rsio
n Sy
stem
2.1-
4 Th
e N
GN
P PC
S sh
all b
e si
zed
to p
rodu
ce e
lect
ricity
at
com
mer
cial
scal
e us
ing
100%
of t
he N
GN
P th
erm
al e
nerg
y fr
om th
e re
acto
r.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5
Req
uire
men
ts
App
licab
le to
Po
wer
Con
vers
ion
Syst
em
2.
1-5
The
NG
NP
elec
trica
l out
put s
hall
be d
eliv
ered
to th
e op
erat
ing
utili
ty a
t the
low
-vol
tage
bus
hing
s of t
he m
ain
pow
er
trans
form
er.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.5
Req
uire
men
ts
App
licab
le to
Po
wer
Con
vers
ion
Syst
em
2.2
M
ain
Feed
-Wat
er S
yste
m
2.
2-1
The
Mai
n Fe
edw
ater
Sys
tem
shal
l del
iver
feed
wat
er to
the
stea
m g
ener
ator
at t
he sp
ecifi
ed te
mpe
ratu
re, p
ress
ure,
flow
rate
, an
d w
ater
che
mis
try.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5.
3 M
ain
Feed
wat
er S
yste
m
2.
2-2
The
Mai
n Fe
edw
ater
Sys
tem
shal
l pro
vide
stor
age
to
acco
mm
odat
e pr
oces
s flu
id su
rge
and
volu
me
fluct
uatio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5.
3 M
ain
Feed
wat
er S
yste
m
2.
2-3
The
Mai
n Fe
edw
ater
Sys
tem
shal
l pro
vide
isol
atio
n of
the
feed
wat
er to
pre
vent
wat
er in
flow
to a
faile
d st
eam
gen
erat
or.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5.
3 M
ain
Feed
wat
er S
yste
m
2.3
M
ain
Stea
m S
yste
m
2.
3-1
The
Mai
n St
eam
Sys
tem
shal
l con
vey
stea
m fr
om th
e st
eam
ge
nera
tor o
utle
t noz
zles
to th
e in
let n
ozzl
es o
f the
hig
h-pr
essu
re
turb
ines
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.5.
4 M
ain
Stea
m
Syst
em
2.4
M
ain
Con
dens
ate
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 94
of10
4
Obj
ect
#R
equi
rem
ent
IDG
ener
al R
equi
rem
ents
for
Pow
er C
onve
rsio
n Sy
stem
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2.
4-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
5.5
Mai
n C
onde
nsat
e Sy
stem
2.
5
PCS
Con
trol
and
Inst
rum
enta
tion
Syst
em
2.
5-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
5.6
PCS
Con
trol
and
Inst
rum
enta
tion
Syst
em
B-5
. B
alan
ce o
f Pla
nt R
equi
rem
ents
B
-5.1
Fu
el H
andl
ing
Syst
em
Obj
ect
#R
equi
rem
ents
ID
Req
uire
men
ts fo
r Fu
el H
andl
ing
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
Bui
ldin
gs
and
Stru
ctur
es
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
2.1
D
ecom
mis
sion
ing
Req
uire
men
ts
950
C
750
C
SR
M R
ev 2
4.
1.13
D
ecom
mis
sion
ing
Req
uire
men
ts
2.
1-1a
U
pon
com
plet
ion
of it
s use
ful l
ife, t
he N
GN
P nu
clea
r hea
t so
urce
shal
l be
put i
nto
a co
nditi
on o
f saf
e st
orag
e fo
r 10
year
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
14
Dec
omm
issi
onin
g R
equi
rem
ents
2.1-
1b
Afte
r the
safe
stor
age
perio
d of
10
year
s, th
e N
GN
P sh
all b
e
deco
mm
issi
oned
and
dis
man
tled
to a
llow
con
tinue
d us
e of
the
land
as a
pow
er p
lant
or i
ndus
trial
site
.
2.
1.1
The
desi
gn o
f the
NG
NP
shal
l inc
orpo
rate
feat
ures
con
sist
ent
with
dec
omm
issi
onin
g an
d de
cont
amin
atio
n be
st p
ract
ices
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.4
Envi
ronm
enta
l R
equi
rem
ents
3
R
equi
rem
ents
App
licab
le to
Nuc
lear
Hea
t Sou
rce
SRM
Rev
2
4.3
Req
uire
men
ts
App
licab
le to
N
ucle
ar H
eat
Sour
ce
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 95
of10
4
Obj
ect
#R
equi
rem
ents
ID
Req
uire
men
ts fo
r Fu
el H
andl
ing
Syst
em
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.1
R
eact
or S
uppo
rt S
yste
ms
SRM
Rev
2
4.3.
3 R
eact
or
Supp
ort S
yste
ms
3.1.
1
Fuel
Han
dlin
g Sy
stem
s
SR
M R
ev 2
4.
3.3.
3 Fu
el
Han
dlin
g Sy
stem
s
3.1.
1-8
For t
he p
rism
atic
reac
tor d
esig
n du
ring
reac
tor s
hutd
own,
the
Fuel
Han
dlin
g Sy
stem
(FH
S) sh
all r
ecei
ve n
ew a
nd ir
radi
ated
fu
el, r
efle
ctor
blo
cks,
and
othe
r cor
e el
emen
ts fr
om th
e sp
ent
fuel
stor
age
syst
em (S
FSS)
and
pla
ce th
em in
the
reac
tor v
esse
l, ph
ysic
ally
repl
acin
g an
d re
stac
king
the
core
.
950
C
750
C
Pris
mat
ic
SRM
Rev
2
4.3.
3.3
Fuel
H
andl
ing
Syst
ems
3.
1.1-
9 Fo
r the
peb
ble
bed
reac
tor d
esig
n, th
e FH
S sh
all b
e de
velo
ped
such
that
the
fuel
peb
bles
are
circ
ulat
ed th
roug
h th
e co
re to
af
fect
on-
line
plan
t ref
uelin
g.
950
C
750
C
Pebb
le B
ed
SRM
Rev
2
4.3.
3.3
Fuel
H
andl
ing
Syst
ems
3.
1.1-
10
The
FHS
shal
l pro
vide
shie
ldin
g to
pro
tect
wor
kers
from
ra
diat
ion
durin
g ce
rtain
fuel
han
dlin
g op
erat
ions
, as a
pplic
able
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.3.
3 Fu
el
Han
dlin
g Sy
stem
s
3.1.
1-11
Th
e FH
S sh
all l
imit
the
ingr
ess o
f pot
entia
l con
tam
inan
ts in
to
the
prim
ary
heliu
m c
ircui
t fro
m c
ompo
nent
s of t
he F
HS
exte
rnal
to
the
prim
ary
HPB
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.3
Fuel
H
andl
ing
Syst
ems
3.
1.1-
12
For t
he p
rism
atic
reac
tor d
esig
n, th
e FH
S sh
all b
e de
sign
ed to
ac
com
plis
h pl
ant r
efue
ling
with
in a
tim
e in
terv
al sp
ecifi
ed in
pl
anne
d ou
tage
allo
catio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.3
Fuel
H
andl
ing
Syst
ems
3.
1.1-
13
The
Fuel
Han
dlin
g Sy
stem
shal
l rem
ove
and
repl
ace
fuel
from
th
e re
acto
r cor
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.3.
3.3
Fuel
H
andl
ing
Syst
ems
3.
1.1-
14
The
Fuel
Han
dlin
g Sy
stem
shal
l pre
pare
new
fuel
for u
se in
the
reac
tor c
ore.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.3.
3 Fu
el
Han
dlin
g Sy
stem
s
3.1.
1-15
Th
e Fu
el H
andl
ing
Syst
em sh
all s
tore
spen
t fue
l. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.3.
3 Fu
el
Han
dlin
g Sy
stem
s 3.
1.2
Sp
ent F
uel C
oolin
g Sy
stem
SR
M R
ev 2
3.
1.2-
2 Th
e sp
ent f
uel c
oolin
g sy
stem
shal
l con
tinuo
usly
rem
ove
[TB
D
MW
t] of
hea
t abs
orbe
d by
the
cool
ing
wat
er a
t am
bien
t at
mos
pher
ic c
ondi
tions
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.4
Spen
t Fue
l C
oolin
g Sy
stem
3.
1.2-
3 Th
e sp
ent f
uel c
oolin
g sy
stem
shal
l be
desi
gned
to o
pera
te
cont
inuo
usly
whe
neve
r spe
nt fu
el is
loca
ted
in st
orag
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.4
Spen
t Fue
l C
oolin
g Sy
stem
3.1.
2-4
Wat
er q
ualit
y re
quire
men
ts sh
all b
e m
aint
aine
d at
all
times
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.3.
4 Sp
ent F
uel
Coo
ling
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 96
of10
4 B
-5.2
In
stru
men
tatio
n an
d C
ontr
ol
Obj
ect
#R
equi
rem
ent
IDR
equi
rem
ents
for
Inst
rum
enta
tion
and
Con
trol
Se
t R
eact
or T
ype
Sour
ce
Sour
ce S
ectio
n
2
Req
uire
men
ts A
pplic
able
to M
ultip
le S
yste
ms,
Bui
ldin
gs
and
Stru
ctur
es
SRM
Rev
2
4.1
Req
uire
men
ts
App
licab
le to
M
ultip
le S
yste
ms,
Bui
ldin
gs a
nd
Stru
ctur
es
2.1
In
stru
men
tatio
n an
d C
ontr
ol R
equi
rem
ents
SR
M R
ev 2
4.
1.5
Inst
rum
enta
tion
and
Con
trol
Req
uire
men
ts
2.
1-2
The
NG
NP
shal
l be
capa
ble
of b
eing
con
trolle
d fr
om a
sing
le
cont
rol r
oom
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.5
Inst
rum
enta
tion
and
Con
trol
Req
uire
men
ts
2.
1-3
The
mai
n co
ntro
l roo
m sh
all i
nclu
de c
ontro
ls fo
r the
PC
S an
d hi
gh-te
mpe
ratu
re h
eat t
rans
port
syst
em.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
5 In
stru
men
tatio
n an
d C
ontro
l R
equi
rem
ents
2.1-
4 Th
e N
GN
P de
sign
shal
l opt
imiz
e th
e hu
man
-mac
hine
inte
rfac
e ba
sed
on h
uman
fact
ors e
ngin
eerin
g pr
inci
ples
and
ope
ratin
g ex
perie
nce
to th
e ex
tent
pos
sibl
e w
ithou
t com
prom
isin
g pl
ant
safe
ty.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
5 In
stru
men
tatio
n an
d C
ontro
l R
equi
rem
ents
2.
2
Mai
nten
ance
Req
uire
men
ts
SRM
Rev
2
4.1.
8 M
aint
enan
ce
Req
uire
men
ts
2.
2-1
The
NG
NP
desi
gn sh
all i
nclu
de p
rovi
sion
s for
mon
itorin
g eq
uipm
ent s
tatu
s, co
nfig
urat
ion,
and
per
form
ance
and
for
dete
ctin
g an
d di
agno
sing
mal
func
tions
as a
bas
is fo
r pre
dict
ive
mai
nten
ance
pla
ns a
nd d
ecis
ion
mak
ing.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
8 M
aint
enan
ce
Req
uire
men
ts
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 97
of10
4 B
-5.3
G
ener
al
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2
Req
uire
men
ts A
pplic
able
to B
alan
ce o
f Pla
nt
SRM
Rev
2
2.
1
Coo
ling
Wat
er S
yste
ms
2.
1-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.1
Coo
ling
Wat
er S
yste
ms
2.2
L
iqui
d an
d G
as S
uppl
ies
2.
2-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.2
Liqu
id a
nd
Gas
Sup
plie
s 2.
3
Pipi
ng S
yste
ms
2.
3-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.3
Pipi
ng
Syst
ems
2.4
E
lect
rica
l Sys
tem
s
2.4-
1 Th
e El
ectri
cal S
yste
ms s
hall
deliv
er p
ower
gen
erat
ed b
y th
e pl
ant t
o th
e of
fsite
tran
smis
sion
net
wor
k.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4 El
ectri
cal
Syst
ems
2.
4-2
The
Elec
trica
l Sys
tem
s sha
ll ta
ke p
ower
from
the
off-
site
tra
nsm
issi
on n
etw
ork
for v
ario
us p
lant
ope
ratio
ns, i
nclu
ding
st
artu
p.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4 El
ectri
cal
Syst
ems
2.
4-3
The
Elec
trica
l Sys
tem
s sha
ll pr
ovid
e ba
ckup
pow
er to
sele
ct
auxi
liarie
s whe
n th
e pl
ant p
ower
uni
ts a
nd o
ff-s
ite p
ower
are
not
av
aila
ble.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4 El
ectri
cal
Syst
ems
2.4-
5.1
H
igh
Vol
tage
Pow
er S
yste
m
2.
4-5.
1-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.4.
1 H
igh
Vol
tage
Pow
er
Syst
em
2.4-
5.2
M
ediu
m V
olta
ge P
ower
Sys
tem
2.4-
5.2-
1 TB
D
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.7.
4.2
Med
ium
V
olta
ge P
ower
Sy
stem
2.
4-5.
3
Low
Vol
tage
Pow
er S
yste
m
2.
4-5.
3-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.4.
3 Lo
w
Vol
tage
Pow
er
Syst
em
2.4-
5.4
B
acku
p Po
wer
Sys
tem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 98
of10
4
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.4.
4 B
acku
p Po
wer
Sys
tem
2.
4-5.
5
Dir
ect C
urre
nt/U
nint
erru
ptib
le P
ower
Sup
ply
Syst
em
2.
4-5.
4-1
The
Dire
ct C
urre
nt (D
C)/U
nint
erru
ptib
le P
ower
Sup
ply
(UPS
) Sy
stem
shal
l pro
vide
a st
ored
ene
rgy
sour
ce fo
r the
all
plan
t DC
lo
ads.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4.5
DC
/UPS
Sy
stem
2.4-
5.6
G
roun
ding
Sys
tem
2.4-
5.6-
1 Th
e G
roun
ding
Sys
tem
shal
l pro
tect
per
sonn
el a
nd e
quip
men
t fr
om sy
stem
faul
ts a
nd li
ghtn
ing
strik
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4.6
Gro
undi
ng
Syst
em
2.
4-5.
6-2
The
Gro
undi
ng S
yste
m sh
all m
inim
ize
elec
trica
l noi
se in
sign
al
cabl
es.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4.6
Gro
undi
ng
Syst
em
2.4-
5.7
C
omm
unic
atio
n an
d L
ight
ing
2.4-
5.7-
1 C
omm
unic
atio
n an
d Li
ghtin
g sh
all p
rovi
de in
tra-p
lant
co
mm
unic
atio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4.7
Com
mun
icat
ion
and
Ligh
ting
2.
4-5.
7-2
Com
mun
icat
ion
and
Ligh
ting
shal
l pro
vide
inte
rnal
and
ext
erna
l lig
htin
g.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
4.7
Com
mun
icat
ion
and
Ligh
ting
2.5
Pl
ant C
ontr
ol R
oom
Sys
tem
2.5-
1 Th
e N
GN
P fa
cilit
y de
sign
shal
l per
mit
the
oper
ator
s to
take
co
ntro
l of t
he re
acto
r and
supp
ort p
roce
sses
from
with
in a
sing
le
inte
grat
ed c
ontro
l roo
m u
sing
the
man
ual m
ode
at a
ny ti
me.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
6 N
HS
Con
trol
Roo
m a
nd
Ope
rato
r Int
erfa
ce
Syst
em
2.
5-2
The
cont
rol r
oom
shal
l rem
ain
oper
able
and
cap
able
of
occu
patio
n du
ring
cred
ible
ext
erna
l eve
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
6 N
HS
Con
trol
Roo
m a
nd
Ope
rato
r Int
erfa
ce
Syst
em
2.
5-3
TBD
for a
dditi
onal
con
trol r
oom
and
ope
rato
r int
erfa
ce
requ
irem
ents
, suc
h as
hum
an fa
ctor
s, pr
otec
tion
in D
BA
s, et
c.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
6 N
HS
Con
trol
Roo
m a
nd
Ope
rato
r Int
erfa
ce
Syst
em
2.
5-4
The
Plan
t Con
trol R
oom
Sys
tem
shal
l pro
vide
an
inte
rfac
e be
twee
n pl
ant o
pera
tors
and
eac
h of
the
nece
ssar
y sy
stem
s w
ithin
the
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
5 Pl
ant C
ontro
l R
oom
Sys
tem
2.6
Pl
ant M
echa
nica
l Ser
vice
s Sys
tem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 99
of10
4
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
6-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.6
Plan
t M
echa
nica
l Se
rvic
es S
yste
m
2.7
Fi
re D
etec
tion
and
Supp
ress
ion
Syst
em
2.
7-1
The
Fire
Det
ectio
n an
d Su
ppre
ssio
n Sy
stem
shal
l rap
idly
det
ect
and
annu
ncia
te th
e pr
esen
ce a
nd lo
catio
n of
com
bust
ion
by-
prod
ucts
or t
he p
rese
nce
of fi
re w
ithin
the
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
7 Fi
re
Det
ectio
n an
d Su
ppre
ssio
n Sy
stem
2.7-
2 Th
e Fi
re D
etec
tion
and
Supp
ress
ion
Syst
em sh
all c
ontro
l and
ex
tingu
ish
fires
that
do
occu
r. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
7.7
Fire
D
etec
tion
and
Supp
ress
ion
Syst
em
2.
7-3
The
Fire
Det
ectio
n an
d Su
ppre
ssio
n Sy
stem
shal
l pro
vide
pr
otec
tion
for P
ASS
Cs s
uch
that
the
perf
orm
ance
of s
afet
y fu
nctio
ns a
re n
ot p
reve
nted
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.7.
7 Fi
re
Det
ectio
n an
d Su
ppre
ssio
n Sy
stem
2.
8
Com
mun
icat
ions
Sys
tem
2.8-
1 Th
e C
omm
unic
atio
ns S
yste
m sh
all p
rovi
de p
lant
to o
ff-s
ite
com
mun
icat
ions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
7.8
Com
mun
icat
ions
Sy
stem
2.
9
Safe
guar
ds a
nd S
ecur
ity S
yste
m
2.
9-1
The
Safe
guar
ds a
nd S
ecur
ity S
yste
m sh
all p
rovi
de p
hysi
cal
prot
ectio
n of
the
plan
t. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
7.9
Safe
guar
ds
and
Secu
rity
Syst
em
2.10
Plan
t I&
C a
nd P
rote
ctio
n
2.10
-1
TBD
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
7.10
Pla
nt I&
C
and
Prot
ectio
n 2.
11
N
GN
P Su
perv
isor
y an
d C
ontr
ol S
yste
m
2.
11-1
TB
D
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.7.
11 N
GN
P Su
perv
isor
y an
d C
ontro
l Sys
tem
2.
12
Si
te a
nd C
ivil
Wor
ks
2.
12-1
TB
D
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.7.
12 S
ite a
nd
Civ
il W
orks
2.
13
St
ruct
ural
Req
uire
men
ts
SRM
Rev
2
4.1.
3 St
ruct
ural
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 100
of1
04
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
Req
uire
men
ts
2.
13-5
C
an b
e co
lloca
ted
with
the
proc
ess;
Pro
tect
ive
Act
ion
Gui
delin
es li
mits
at s
ite b
ound
ary
of a
ppro
xim
atel
y 40
0 m
eter
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
3.
2.2
HTG
R
Fund
amen
tal
Req
uire
men
ts
2.
13-6
Th
e N
GN
P de
sign
will
be
such
that
the
HTG
R c
an b
e co
lloca
ted
with
the
proc
ess;
PA
G li
mits
met
at t
he si
te b
ound
ary
of
appr
oxim
atel
y 40
0 m
eter
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
1 Sy
stem
C
onfig
urat
ion
and
Esse
ntia
l Fea
ture
s R
equi
rem
ents
2.13
-7
NG
NP
PASS
Cs s
hall
be d
esig
ned
and
cons
truct
ed u
sing
and
de
mon
stra
ting
mod
ular
pla
nt c
onst
ruct
ion.
95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
1.3
Stru
ctur
al
Req
uire
men
ts
2.
13-8
Th
e N
GN
P sh
all b
e de
sign
ed fo
r a re
fere
nce
safe
shut
dow
n ea
rthqu
ake
(SSE
) hor
izon
tal p
eak
grou
nd a
ccel
erat
ion
(PG
A) o
f [0
.3g]
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
3 St
ruct
ural
R
equi
rem
ents
2.
13-9
Th
e N
GN
P sh
all b
e de
sign
ed su
ch th
at th
e m
inim
um le
vel a
t w
hich
a sh
utdo
wn
is re
quire
d to
eva
luat
e th
e co
nditi
on o
f the
pl
ant f
ollo
win
g an
ear
thqu
ake
shal
l be
[0.1
g] P
GA
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
3 St
ruct
ural
R
equi
rem
ents
2.
13-1
0 A
seis
mic
mar
gin
asse
ssm
ent s
hall
be p
erfo
rmed
to d
emon
stra
te
that
ther
e is
seis
mic
mar
gin
in th
e N
GN
P be
yond
the
desi
gn
leve
l SSE
. The
seis
mic
mar
gin
earth
quak
e us
ed in
the
seis
mic
m
argi
n as
sess
men
t pro
cess
shal
l be
the
NU
REG
/CR
-009
8 m
edia
n sh
ape
curv
e an
chor
ed to
a [0
.5g]
PG
A.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
3 St
ruct
ural
R
equi
rem
ents
2.
13-1
1 N
GN
P pl
ant e
xter
nal s
truct
ures
, im
porta
nt to
safe
ty, s
hall
be
desi
gned
and
con
stru
cted
with
con
side
ratio
n of
airc
raft
impa
cts,
as re
quire
d by
NR
C fi
nal r
ule
RIN
315
0-A
I19.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
3 St
ruct
ural
R
equi
rem
ents
2.14
Con
stru
ctio
n R
equi
rem
ents
SR
M R
ev 2
4.
1.12
Con
stru
ctio
n R
equi
rem
ents
2.14
-1
Adv
ance
d te
chni
ques
, suc
h as
the
use
of fa
ctor
y or
fiel
d-fa
bric
ated
and
ass
embl
ed m
odul
es c
onta
inin
g po
rtion
s of
syst
ems a
nd/o
r stru
ctur
es, s
hall
be u
tiliz
ed (a
s app
ropr
iate
) to
redu
ce e
rect
ion
cost
s and
sche
dule
risk
s and
to e
nhan
ce q
ualit
y co
ntro
l.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
12 C
onst
ruct
ion
Req
uire
men
ts
2.
14-2
Th
e de
sign
of b
uild
ings
and
equ
ipm
ent s
hall
faci
litat
e pl
ant
cons
truct
ion
and
the
inst
alla
tion,
repa
ir, a
nd re
plac
emen
t of
equi
pmen
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
12 C
onst
ruct
ion
Req
uire
men
ts
2.15
Safe
ty R
equi
rem
ents
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 101
of1
04
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
15-1
Th
e nu
clea
r sys
tem
safe
ty b
asis
shal
l not
dep
end
on a
ctiv
e co
olin
g sy
stem
s dur
ing
desi
gn b
asis
acc
iden
t (D
BA
) con
ditio
ns.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
9 Sa
fety
R
equi
rem
ents
2.
16
Ph
ysic
al P
rote
ctio
n of
Pla
nts a
nd M
ater
ials
Req
uire
men
ts
2.
16-1
Th
e de
sign
of N
GN
P sh
all p
osse
ss fe
atur
es to
elim
inat
e or
re
duce
the
pote
ntia
l the
ft of
nuc
lear
mat
eria
ls.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
2.16
-2
The
desi
gn o
f NG
NP
shal
l em
phas
ize
pass
ive
barr
iers
to
pote
ntia
l the
ft of
nuc
lear
mat
eria
ls.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
2.16
-3
The
desi
gn o
f the
NG
NP
shal
l inc
orpo
rate
des
ign
feat
ures
in
tend
ed to
pro
vide
phy
sica
l pro
tect
ion
agai
nst a
cts o
f sab
otag
e th
at c
ould
cre
ate
a ra
diol
ogic
al h
azar
d to
the
pers
onne
l or a
po
tent
ial r
adio
activ
e re
leas
e to
the
publ
ic a
nd th
e en
viro
nmen
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
2.
16-4
M
easu
res t
hat h
ave
been
des
igne
d in
to th
e N
GN
P fo
r saf
ety
purp
oses
shal
l be
take
n in
to a
ccou
nt, t
o th
e ex
tent
pra
ctic
able
; th
ese
safe
ty fe
atur
es sh
ould
be
desi
gned
and
loca
ted
with
in th
e N
GN
P in
a m
anne
r tha
t fac
ilita
tes s
abot
age
and
thef
t pro
tect
ion,
in
clud
ing
cons
ider
atio
n of
dam
age
cont
rol/r
ecov
ery
actio
ns
from
sabo
tage
atte
mpt
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
2.
16-5
Th
ere
shal
l be
conc
urre
nt c
onsi
dera
tion
of sa
fety
and
secu
rity,
w
hich
will
com
men
ce a
t the
beg
inni
ng o
f the
des
ign
proc
ess.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.1
Phy
sica
l Pr
otec
tion
of P
lant
s an
d M
ater
ials
2.16
-6
The
NG
NP
shal
l inc
orpo
rate
des
ign
feat
ures
faci
litat
ing
impl
emen
tatio
n of
mat
eria
l con
trol a
nd a
ccou
ntin
g pr
oced
ures
th
at a
re su
ffic
ient
to e
nabl
e th
e N
GN
P op
erat
ing
orga
niza
tion
to
acco
unt f
or th
e sp
ecia
l nuc
lear
mat
eria
l in
its p
osse
ssio
n.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
11.2
Mat
eria
l C
ontro
l and
A
ccou
ntin
g of
Sp
ecia
l Nuc
lear
M
ater
ial
2.
17
M
aint
enan
ce R
equi
rem
ents
2.17
-1
The
NG
NP
desi
gn sh
all i
nclu
de p
rovi
sion
s for
mon
itorin
g eq
uipm
ent s
tatu
s, co
nfig
urat
ion,
and
per
form
ance
and
for
dete
ctin
g an
d di
agno
sing
mal
func
tions
as a
bas
is fo
r pre
dict
ive
mai
nten
ance
pla
ns a
nd d
ecis
ion
mak
ing.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.1.
8 M
aint
enan
ce
Req
uire
men
ts
2.18
NH
S Pr
otec
tion
Syst
em
2.
18-1
Th
e N
HS
Prot
ectio
n Sy
stem
shal
l mai
ntai
n pl
ant p
aram
eter
s w
ithin
acc
epta
ble
limits
est
ablis
hed
for D
BA
s. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 1
4.
3.4
NH
S Pr
otec
tion
Syst
em
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 102
of1
04
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
2.
18-2
Th
e pr
otec
tion
syst
em sh
all i
mpl
emen
t the
rele
vant
mon
itorin
g,
anal
ysis
, and
act
uatio
n fu
nctio
ns n
eces
sary
to re
ach
the
cont
rolle
d st
ate
in c
ase
of a
bnor
mal
eve
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
4 N
HS
Prot
ectio
n Sy
stem
2.
18-3
Th
e pr
otec
tion
syst
em sh
all p
rovi
de re
dund
ant,
fail-
safe
pr
otec
tive
func
tions
. 95
0 C
75
0 C
Pe
bble
Bed
Pr
ism
atic
SR
M R
ev 2
4.
3.4
NH
S Pr
otec
tion
Syst
em
2.
18-4
Th
e pr
otec
tion
syst
em sh
all r
emai
n op
erab
le o
r fai
l-saf
e du
ring
cred
ible
ext
erna
l eve
nts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
4 N
HS
Prot
ectio
n Sy
stem
3
R
equi
rem
ents
App
licab
le to
Nuc
lear
Hea
t Sou
rce
SRM
Rev
2
4.3
Req
uire
men
ts
App
licab
le to
N
ucle
ar H
eat
Sour
ce
3.1
R
eact
or S
uppo
rt S
yste
ms
SRM
Rev
2
4.3.
3 R
eact
or
Supp
ort S
yste
ms
3.1.
1
Hel
ium
Ser
vice
Sys
tem
SR
M R
ev 2
4.
3.3.
6 H
eliu
m
Serv
ice
Syst
em
3.
1.1-
1 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e he
lium
serv
ice
syst
em: R
emov
e ch
emic
al a
nd p
artic
ulat
e co
ntam
inan
ts fr
om th
e pr
imar
y co
olan
t to
mai
ntai
n sp
ecifi
ed v
alue
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
3.
1.1-
2 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e he
lium
serv
ice
syst
em: S
uppl
y pu
rifie
d he
lium
to sy
stem
s fill
ed w
ith h
eliu
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
3.1.
1-3
The
follo
win
g is
a re
quire
d fu
nctio
n of
the
heliu
m se
rvic
e sy
stem
: Rem
ove
heliu
m fr
om th
e pr
imar
y sy
stem
and
the
heliu
m-f
illed
supp
ortin
g sy
stem
s and
stor
e in
a g
as st
ore
for
purif
ied
heliu
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
3.
1.1-
4 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e he
lium
serv
ice
syst
em: A
ccep
t hel
ium
from
hel
ium
-fill
ed a
uxili
ary
and
supp
ortin
g sy
stem
s dur
ing
depr
essu
rizat
ion
activ
ities
and
, po
ssib
ly, s
tore
radi
oact
ivel
y co
ntam
inat
ed h
eliu
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
3.
1.1-
5 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e he
lium
serv
ice
syst
em: E
vacu
ate
prim
ary
syst
ems a
nd h
eliu
m su
ppor
ting
syst
ems.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
3.
1.1-
6 Th
e fo
llow
ing
is a
requ
ired
func
tion
of th
e he
lium
serv
ice
syst
em: M
aint
ain
chem
ical
con
tam
inan
ts w
ithin
requ
ired
conc
entra
tion
band
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.6
Hel
ium
Se
rvic
e Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 103
of1
04
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.1-
7 Th
e Se
cond
ary
Hel
ium
Pur
ifica
tion
Syst
em sh
all p
roce
ss a
sm
all s
ide-
stre
am o
f hel
ium
from
the
Seco
ndar
y H
eat T
rans
port
Syst
em to
rem
ove
chem
ical
and
radi
oact
ive
impu
ritie
s.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.4.
2.1
Seco
ndar
y H
eliu
m
Purif
icat
ion
Syst
em
3.
1.1-
8 Th
e Se
cond
ary
Hel
ium
Pur
ifica
tion
Syst
em sh
all p
rovi
de fo
r tri
tium
rem
oval
as r
equi
red
to m
eet t
ritiu
m tr
ansp
ort l
imits
to
plan
t eff
luen
ts a
nd p
rodu
cts.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
1
4.4.
2.1
Seco
ndar
y H
eliu
m
Purif
icat
ion
Syst
em
3.1.
2
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-1
The
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em sh
all
prov
ide
for c
olle
ctin
g ra
dioa
ctiv
e (o
r pot
entia
lly ra
dioa
ctiv
e)
liqui
d an
d ga
seou
s was
tes,
incl
udin
g va
rious
form
s of s
olid
w
aste
gen
erat
ed w
ithin
the
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-1
The
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em sh
all
prov
ide
for s
torin
g ra
dioa
ctiv
e (o
r pot
entia
lly ra
dioa
ctiv
e) li
quid
an
d ga
seou
s was
tes,
incl
udin
g va
rious
form
s of s
olid
was
te
gene
rate
d w
ithin
the
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-1
The
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em sh
all
prov
ide
for p
roce
ssin
g, ra
dioa
ctiv
e (o
r pot
entia
lly ra
dioa
ctiv
e)
liqui
d an
d ga
seou
s was
tes,
incl
udin
g va
rious
form
s of s
olid
w
aste
gen
erat
ed w
ithin
the
plan
t.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-1
The
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em sh
all
prov
ide
for m
onito
ring
radi
oact
ive
(or p
oten
tially
radi
oact
ive)
liq
uid
and
gase
ous w
aste
s, in
clud
ing
vario
us fo
rms o
f sol
id
was
te g
ener
ated
with
in th
e pl
ant.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-2
The
Rad
ioac
tive
Was
te a
nd D
econ
tam
inat
ion
Syst
em sh
all
prov
ide
equi
pmen
t to
rem
ove
radi
oact
ive
surf
ace
cont
amin
atio
n fr
om c
ompo
nent
s, as
nec
essa
ry, t
o fa
cilit
ate
cont
rol a
nd
min
imiz
e m
igra
tion
of ra
dioa
ctiv
e co
ntam
inat
ion
and
to li
mit
pers
onne
l exp
osur
e to
radi
onuc
lides
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
Fo
rm 4
12.0
9 (R
ev. 1
0)
Id
aho
Nat
iona
l Lab
orat
ory
NG
NP
SYST
EM
RE
QU
IRE
ME
NT
S M
AN
UA
L
Iden
tifie
r: R
evis
ion:
Ef
fect
ive
Dat
e:
INL/
EXT-
07-1
2999
3 09
/10/
09
Page
: 104
of1
04
Obj
ect
#R
equi
rem
ents
ID
Gen
eral
Req
uire
men
ts fo
r B
alan
ce o
f Pla
nt
Set
Rea
ctor
Typ
e So
urce
So
urce
Sec
tion
3.
1.2-
3 Th
e ra
dioa
ctiv
e an
d po
tent
ially
radi
oact
ive
floor
and
equ
ipm
ent
liqui
d ru
noff
. was
te st
ream
s sha
ll be
rout
ed to
the
liqui
d ra
dioa
ctiv
e w
aste
subs
yste
m.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
3.
1.2-
4 Pr
ovis
ions
shal
l be
incl
uded
to re
duce
act
ivity
leve
ls c
onta
ined
in
liqu
id e
fflu
ent.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-5
Rad
ioac
tive
liqui
d w
aste
syst
em c
ompo
nent
s sha
ll be
redu
ndan
t to
pro
vide
for b
oth
syst
em re
liabi
lity
and
on-li
ne m
aint
enan
ce.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-6
The
gas w
aste
por
tion
of th
e ra
dioa
ctiv
e w
aste
syst
em sh
all h
ave
suff
icie
nt st
orag
e ca
paci
ty to
allo
w fo
r rad
ioac
tive
deca
y pr
ior t
o re
leas
e.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-7
Dec
onta
min
atio
n eq
uipm
ent s
hall
be sk
id m
ount
ed. E
ach
deco
ntam
inat
ion
skid
shal
l pro
vide
stea
m, w
ash
wat
er
(incl
udin
g de
terg
ent a
nd/o
r add
itive
s), r
inse
wat
er, d
ryin
g ai
r, an
d va
cuum
ing
serv
ice.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-8
Dec
onta
min
atio
n sy
stem
was
tes s
hall
be c
olle
cted
loca
lly a
nd
rout
ed to
the
appr
opria
te ra
dioa
ctiv
e w
aste
syst
ems.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem
3.1.
2-9
All
radi
oact
ive
was
tes g
ener
ated
with
in th
e fa
cilit
y sh
all b
e co
llect
ed, m
onito
red,
trea
ted,
and
pro
cess
ed o
nsite
prio
r to
ship
men
t off
site
.
950
C
750
C
Pebb
le B
ed
Pris
mat
ic
SRM
Rev
2
4.3.
3.7
Rad
ioac
tive
Was
te a
nd
Dec
onta
min
atio
n Sy
stem