Project No. 23843

NGNP System Requirements Manual

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: i of x

Approved by: �

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: ii of x

This page intentionally left blank.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: iii of x

REVISION LOG

Rev. Date Affected Pages Revision Description

3 9/10/09 Various Incorporated INL/EXT-16548, NGNP Requirements Verification Traceability Report

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: iv of x

This page intentionally left blank.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: v of x

SUMMARY

This revision of the Next Generation Nuclear Plant (NGNP) System Requirements Manual (SRM) contains requirements derived or taken from key source documents, which include the Energy Policy Act of 2005 (EPAct), reports from the Nuclear Energy Research Advisory Council (NERAC) and the National Research Council of the National Academics, and previous versions of the NGNP SRM. The latter document consolidated requirements from prior reactor supplier reports and the preconceptual design report. These requirements were then categorized as high-level programmatic requirements and functional, operational, and technical requirements for the NGNP Project. This report contains the categorized programmatic and technical requirements associated with the NGNP, as well as the derived project requirements, and describes the requirements hierarchy. Project requirements are traceable to initial project baseline documents and are being designed to follow the good practices suggested in the Systems Engineering and Interface Management document, which states that project requirements are:

� Identified, defined, and approved as early as possible

� Documented and placed under change control

� Available to all project participants

� Refined and developed as the project progresses.

This report also provides definition of the design entity’s and design authority’s responsibilities for future design documents. This document presents in detail the attributes of a fully relational database (i.e., DOORS®), which contains the requirements.

As the project matures, a verification method will be selected for each requirement to ensure full implementation. Programmatic requirements are derived from the legislative directives, including the EPAct, and other regulatory requirements through the Nuclear Regulatory Commission (NRC) licensing process. The technical requirements are assigned to the applicable Plant, Areas, Systems, Subsystems, and Components (PASSCs) and include assumptions that are made during the design process. These assumptions are tagged as verified and unverified assumptions. For unverified assumptions, the project either knowingly accepts the risk of proceeding with the unverified assumption or completes the necessary tasks to validate the assumption. Changes to the requirements will be controlled in the database and formally adopted by the project via revision control.

By developing, deriving, and documenting the requirements and assumptions associated with NGNP, requirements are tracked with full accounting of each requirement to ensure customer and stakeholder needs are met. Fully implemented requirements are necessary to verify that the project has successfully met customer and stakeholder needs.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: vi of x

This page intentionally left blank.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: vii of x

CONTENTS

REVISION LOG .......................................................................................................................................... iii�

SUMMARY .................................................................................................................................................. v�

ACRONYMS ............................................................................................................................................... ix�

DEFINITIONS .............................................................................................................................................. x�

1.� INTRODUCTION .............................................................................................................................. 1�1.1� Areas, Systems, Subsystems, and Components ....................................................................... 1�1.2� Requirements Hierarchy .......................................................................................................... 2�

2.� REQUIREMENTS DATABASE ....................................................................................................... 3�2.1� Database Modules .................................................................................................................... 3�2.2� Database Attributes .................................................................................................................. 4�

2.2.1� Reference and Alternative Designs ............................................................................. 6�2.2.2� Verification Methods .................................................................................................. 6�

2.3� Allocation and Traceability ...................................................................................................... 7�2.4� Configuration Control .............................................................................................................. 8�

3.� NGNP REQUIREMENTS ................................................................................................................. 9�

4.� REFERENCES ................................................................................................................................. 11�

Appendix A NGNP Programmatic Requirements ..................................................................................... 13�A-1.� Regulatory Requirements ....................................................................................................... 14�A-2.� Legislative Requirements ....................................................................................................... 23�A-3.� End User Requirements ......................................................................................................... 35�A-4.� Stakeholder Requirements ..................................................................................................... 36�

Appendix B NGNP Functional, Operational, and Technical Requirements ............................................. 65�B-1.� Nuclear Heat Supply Requirements ....................................................................................... 66�B-2.� Heat Transport System Requirements .................................................................................... 80�B-3.� Hydrogen Production System Requirements ......................................................................... 85�B-4.� Power Conversion System Requirements .............................................................................. 91�B-5.� Balance of Plant Requirements .............................................................................................. 94�

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: viii of x

FIGURESFigure 1. NGNP plant architecture. .............................................................................................................. 1�

Figure 2. Sample DOORS® screen .............................................................................................................. 3�

Figure 3. INL-controlled DOORS® modules. .............................................................................................. 4�

Figure 4. Sample DOORS® Attributes screen ............................................................................................. 6�

Figure 5. DOORS® Graphics Mode screen .................................................................................................. 8�

Figure 6. Requirements processing. .............................................................................................................. 9�

TABLESTable 1. Critical PASSCs for Different Reference Designs. ........................................................................ 2�

Table 2. Cited source documents for NGNP requirements. ........................................................................ 10�

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: ix of x

ACRONYMSCFR Code of Federal Regulations

CM Configuration Management

COLA Combined Operating License Application

CORE® Unknown. Automated requirements management/systems engineering tool, produced by ViTech Corporation

DOE U.S. Department of Energy

DOORS® Dynamic Object Orientated Requirements System (produced by IBM Rational / Telelogic)

EPAct Energy Policy Act of 2005

FOAK first of a kind

HTE High-Temperature Electrolysis

HyS Hybrid Sulfur

ICD Interface Control Document

INCOSE International Council on Systems Engineering

INL Idaho National Laboratory

ITAAC Integrated Test Analysis and Acceptance Criteria

NGNP Next Generation Nuclear Plant

NOAK nth of a kind

RC Nuclear Regulatory Commission

OECM Office of Engineering and Construction Management

PASSC Plant, Areas, Systems, Subsystems, and Components

RAI Request for Additional Information

RAM Requirements Allocation Matrix

RMIP Requirements Management Implementation Plan

SAG Senior Advisory Group

SE Systems Engineering

SRM System Requirements Manual

TDRM Technology Development Roadmap

TRL Technology Readiness Level

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: x of x

DEFINITIONS

Design Entity Organization responsible for supplying the plant design specifications for the design authority’s approval. Currently, this role is fulfilled by the reactor suppliers.

Design Authority Organization responsible for establishing and maintaining the high-level requirements and acceptance criteria and ensuring the design documents accurately reflect the design basis. Currently, this role is fulfilled by the Idaho National Laboratory under the direction of the U.S. Department of Energy.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 1 of 104

1. INTRODUCTION This document constitutes the 3rd revision of the Next Generation Nuclear Plant (NGNP) System

Requirements Manual (SRM) for the programmatic requirements and the Plant, Areas, Systems, Subsystems, and Components (PASSC) level requirements. The SRM defines and contains the initial requirements for the current maturity of the NGNP Project. These initial requirements are design-neutral; in other words, they remain in force regardless of the specific design decisions made in the future. Similar to a requirements allocation matrix (RAM), this SRM was prepared at the early stages of conceptual design and allocates, traces, and ensures requirements are properly met via verification methods (i.e., analysis, test, inspection, or demonstration).

As the project matures, particularly after the nuclear system design, plant operating conditions, and plant configuration are finalized, detailed design requirements for the five NGNP areas will be generated, documented, and maintained by the design entity with design authority approval. The SRM is the means of documenting programmatic and technical requirements and tracking those requirements to full implementation. The requirements are assigned to the applicable PASSCs and will include assumptions that are made during the design process. The requirements in this report represent only those requirements identified at the current state of plant design and additional requirements or modifications identified via early conceptual design work. As the requirements identification and documentation process evolves, the scope of these requirements may change. Detailed requirements will be documented in this SRM for all PASSCs as the NGNP matures.

It is the intent of the NGNP Project to meet Energy Policy Act of 2005 (EPAct). As such, EPAct language is adopted as requirements for the project. This SRM was developed under the assumption that funding levels necessary to meet the requirements contained herein will be available, as projected by the NGNP Project.

1.1 Areas, Systems, Subsystems, and Components The NGNP is comprised of five areas: Nuclear Heat Supply, Heat Transport, Hydrogen Production,

Power Conversion, and Balance of Plant. Each area is broken down further into systems, which are comprised of subsystems, which are further comprised of components, as shown in Figure 1.

The requirements captured in this SRM are the high-level functional requirements as well as the operational requirements assigned to the appropriate PASSC requirements. The technical processes contained in the Requirements Management Implementation Plan (RMIP) apply to both the existing requirements contained in this SRM and the future requirements to be developed through various design phases of the project. Table 1 shows the critical PASSCs for a 750°C – 800°C reactor outlet temperature ROT; (see

Figure 1. NGNP plant architecture.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 2 of 104

INL/EXT-09-16598)1 and for a 950°C ROT (see INL/EXT-08-15148)2. These critical PASSCs may change as the NGNP is further developed. The reactor suppliers have developed updates to the PASSCs to incorporate changes in reactor outlet temperatures (750°C – 800°C) and in configurations (prismatic design utilizing a steam generator in the primary loop).

Table 1. Critical PASSCs for Different Reference Designs.

NGNP Areas 750 – 800�C ROT INL-Consolidated Critical PASSCs

950�C ROT INL-Consolidated Critical PASSCs

Nuclear Heat Supply

Reactor Pressure Vessel Reactor Pressure Vessel Reactor Vessel Internals Reactor Vessel Internals Reactor Core & Core Structure Reactor Core & Core Structure Fuel Elements Fuel Elements Reserve Shutdown System Reserve Shutdown System Reactivity Control System Reactivity Control System Core Conditioning System (Shutdown Cooling)

Core Conditioning System (Shutdown Cooling)

Reactor Cavity Cooling System Reactor Cavity Cooling System

Heat Transport

Intermediate Heat Exchangers Intermediate Heat Exchangers Circulators Circulators Hot Duct – Cross Vessel Hot Duct – Cross Vessel High Temperature Valves (Isolation, Flapper, & Relief)

High Temperature Valves (Isolation, Flapper, & Relief) Mixing Chamber

Hydrogen Production

HTE, S-I, and HyS (currently identifying all three technologies until one is selected for NGNP)

HTE, S-I, and HyS (currently identifying all three technologies until one is selected for NGNP)

Power Conversion Steam Generator Steam Generator Power Conversion System

Balance of Plant Fuel Handling System Fuel Handling System Instrumentation and Control Instrumentation and Control

1.2 Requirements Hierarchy The requirements hierarchy is based on the physical structure of the plant, and its associated areas,

systems, subsystems, and components for both hydrogen production and electricity production. The lowest levels of requirements are at the plant design level. The requirements hierarchy is structured in a way that allows for further enhancement and the derivation of additional requirements without changing the original structure as the project is further defined. This SRM currently contains the NGNP’s legislative and regulatory, end-user, and functional and operational requirements for the PASSC levels. Assumptions made during the design process are also captured, as verified or unverified assumptions. For unverified assumptions, the project either knowingly accepts the risk of proceeding with the unverified assumption or completes the necessary tasks to validate the assumption.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 3 of 104

2. REQUIREMENTS DATABASE The NGNP requirements are managed in an internationally recognized, structured database tool that

aids in the development and management of requirements throughout the life cycle of any given project. The Dynamic Object Orientated Requirements System (DOORS®), produced by IBM Rational/Telelogic, was specifically designed with the ability to link and track the flow-down of requirements through a complex series of requirements modules. DOORS® has been used on large projects of similar size and complexity to the NGNP project and, as such, was selected to manage NGNP requirements. The design entities may initially implement design specification requirements in other software packages. This is acceptable provided the design requirements are received in a format approved by the design authority.

DOORS® enables its users to store data in formal modules, organize requirements in a template, relate different levels of requirements through linked modules, restrict access to the data, enter data directly into the modules, run reports, search requirements, and trace requirements through the various stages of development. Figure 2 is a sample screen of the DOORS® tool.

Figure 2. Sample DOORS® screen

2.1 Database Modules The current requirements sets that apply to various aspects of the NGNP are contained in the Idaho

National Laboratory (INL) DOORS® database, and future, more encompassing requirements will continue to be tracked and stored in the database as the NGNP project matures. The NGNP requirements stored in the DOORS© database are presented in Appendices A and B of this SRM. Figure 3 lists the modules that contain the NGNP requirements.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 4 of 104

Figure 3. INL-controlled DOORS® modules.

2.2 Database Attributes The DOORS® tool allows the user to filter requirements based on user selected attributes. From these

filtered requirements, a report can be generated for a specific design. For example, one may filter a module of requirements for a prismatic reactor type with an outlet temperature of 750�C, and the tool will

DOORS® Modules Programmatic Requirements

� Regulatory – Top Level Design Criteria – Top Level Safety Criteria – ITAAC Validation Requirements – Request for Additional Information Requirements

� Legislative � End-User Requirements � Stakeholder Requirements

Functional, Operational, and Technical Requirements

� Nuclear Heat Supply Requirements – Reactor Pressure Vessel – Reactor Vessel Internals – Reactor Core and Core Structures – Nuclear Instrumentation – Fuel Elements – Reserve Shutdown Systems – Reactivity Control Systems – Core Conditioning System (Shutdown Cooling) – Reactor Cavity Cooling system

� Heat Transport System Requirements – Circulators – Intermediate Heat Exchangers – Cross Vessel Piping – Mixing Changer – High Temperature Valves

� Hydrogen Production System Requirements – Hydrogen Production System

� Power Conversion System Requirements – Steam Generator – Power Conversion System Equipment for Direct Combined Cycle

� Balance of Plant Requirements – Fuel Handling System – Instrumentation and Control

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 5 of 104

output a listing of the requirements applicable to this scenario. The attributes currently contained in each of the DOORS® modules for each requirement include the following:

� ID (Created by DOORS – unique for each requirement)

� Object # (Level hierarchy of requirements)

� Requirement Text

� 950�C or 750�C

� Reactor Type (Pebble Bed or Prismatic)

� Source of Requirement.

Future attributes may include the following:

� Additional Sets for various outlet temperatures

� Subsection or type of requirement may include the following selections:

– Performance Requirement – Structural or Construction Requirement – Environmental Requirement – Instrumentation and Control Requirement – Startup or Shutdown Requirement – Monitoring or Surveillance Requirement – In-Service Requirement – Availability, Maintainability, Reliability or Testability Requirement – Safety Requirement Codes and Standards Requirement – Quality Assurance Requirement – Decommission Requirement – Interface Requirement – Other Requirement

� Verification Method

� Verification Document

� Comment / Basis.

A sample screen of the attributes for each requirement currently in a DOORS® module is provided in Figure 4.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 6 of 104

Figure 4. Sample DOORS® Attributes screen

2.2.1 Reference and Alternative Designs

Due to the current development stage of the project, requirements for both the initial design and the anticipated updates are included. The initial requirements are for maximum operating temperatures of 950°C and the steam generator in the primary loop. The updated requirements reflect a plant with maximum operating temperatures between 750°C and 800°C and a steam generator in the primary loop. Each set of requirements are designated by their respective headings of 950°C or 750°C in the appropriate attribute field. In some instances, requirements apply to both scenarios and will be clearly indicated. As the project continues to mature, more alternative designs and their related requirements may be developed while other designs are retired.

2.2.2 Verification Methods

Each requirement will have a verification method documented in the DOORS® database. The verification method options include those listed in the International Council on Systems Engineering (INCOSE) Systems Engineering Handbook, v3.13, as follows:

� Inspection – an examination of the item against applicable documentation to confirm compliance with requirements. Inspection is used to verify properties best determined by examination and observation (e.g., - paint color, weight, etc.).

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 7 of 104

� Analysis – use of analytical data or simulations under defined conditions to show theoretical compliance. Used where testing to realistic conditions cannot be achieved or is not cost-effective. Analysis (including simulation) may be used when such means establish that the appropriate requirement, specification, or derived requirement is met by the proposed solution.

� Demonstration – a qualitative exhibition of functional performance, usually accomplished with no or minimal instrumentation. Demonstration (a set of test activities with system stimuli selected by the system developer) may be used to show that system or subsystem response to stimuli is suitable.

� Test – an action by which the operability, supportability, or performance capability of an item is verified when subjected to controlled conditions that are real or simulated. These verifications often use special test equipment or instrumentation to obtain very accurate quantitative data for analysis.

2.3 Allocation and Traceability The NGNP requirements are organized in a way to show traceability to the source documents. The

DOORS® tool has the capability to link requirements and visibly show the traceability flow of requirements through the graphics mode view provided by DOORS®. Many requirements currently contained in DOORS® are linked and their flows can be viewed as shown in Figure 5.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 8 of 104

Figure 5. DOORS® Graphics Mode screen

2.4 Configuration Control The design authority will maintain configuration control over the programmatic and functional,

operational, and technical requirements, as shown Figure 6. The design authority is the single organization responsible for establishing and maintaining the design requirements and for ensuring that design output documents accurately reflect the design basis (DOE-STD-107-2003)4. The design entities will capture and maintain configuration control over the plant level design requirements.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 9 of 104

Functional Requirements

DOEPrivate Partners

Technical Commitments

SAGRequirements

Functions

Plant Design Specifications

Operational & Technical

Requirements

End User Requirements

Private-Public Partnership

Requirements

Design Specific Requirements

Legislative & Regulatory

Requirements

Application Specific

Requirements Func

tiona

l A

naly

sis

INL Captures & Tracks in DOORS

INL Captures & Tracks in DOORS

INL Captures & Tracks in DOORS

INL Performs Functional Analysis, Captures & Tracks

in DOORS

Design Entity Captures &

Maintains Design Authority Approves

High Level Requirements Under Design Authority Configuration Control

Under Design Entity Configuration Control

Stakeholder Requirements

Figure 6. Requirements processing.

3. NGNP REQUIREMENTS Programmatic requirements (see Appendix A) and Functional, Operational, and Technical

Requirements (see Appendix B) are traceable to initial project baseline documents and follow the good practices suggested in Systems Engineering and Interface Management 5, which states that project requirements are:

� Identified, defined, and approved as early as possible

� Documented and placed under change control

� Available to all project participants

� Refined and developed as the project progresses.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 10 of 104

Programmatic requirements comprise regulatory (including the Environmental Policy Act of 2005 [EPAct 2005]6) and licensing (i.e., NRC) requirements pertinent to NGNP PASSCs, including high-level functional and location requirement. The Top Level Design Criteria, Top Level Safety Criteria, and requirements resulting from Integrated Test Analysis and Acceptance Criteria (ITAAC) Validation are also included as regulatory requirements. The ITAAC is developed and submitted with the design and the Combined Operating License Application (COLA). These requirements reflect the verification tests and analyses performed to provide evidence that the system was built as designed and performs the function intended.

Additionally, following the licensing submittals, it is anticipated that the NRC will issue Requests for Additional Information (RAIs). The RAI and any derived requirements from the responses will be tracked as requirements to ensure that each commitment is fully implemented in the design developed and systems built.

End-user requirements are specific to the intended application of NGNP. For example, an NGNP that provides process heat for an oil refinery will have different end-user requirements than an NGNP that provides electricity and hydrogen. Specific site requirements and technical direction or commitments are also included in the end-user requirements.

Per EPAct, the NGNP documentation and project definition were reviewed by the independent Nuclear Energy Research Advisory Committee (NERAC), resulting in the A Review of the NGNP Project report, which provides additional high-level requirements. Other reports and publications by internal and external entities to the NGNP Project provided feedback into this requirements document. The publications include nationally recognized entities, such as the National Research Council of the National Academies.

Table 2 lists the cited source documents for the requirements contained herein.

Table 2. Cited source documents for NGNP requirements. Source Document Requirement Source Key

Energy Policy Act of 2005 EPAct2005 Summary of Bounding Conditions for Development of the NGNP Project, INL/EXT-08-14370, June 2008 Bounding Conditions

A Review of the NGNP Project NERAC Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999 Rev. 1, June 2008 SRM Rev 1

Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999 Rev. 2, March 2009 SRM Rev 2

Review of DOE’s Nuclear Energy Research and Development Program by The National Research Council of the National Academies, 2008 NAS

SAG Meeting Minutes (as of October 22, 2008) SAG

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 11 of 104

4. REFERENCES 1. Collins, John, Next Generation Nuclear Plant Project Technology Development Roadmaps: The

Technical Path Forward for 750 – 800°C Reactor Outlet Temperature, INL/EXT-08-16598, Idaho National Laboratory, August 2009.

2 Collins, John, Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward, INL/EXT-08-15148, Idaho National Laboratory, January 12, 2009.

3 INCOSE, Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, International Council on Systems Engineering, version 3.1, International Council on Systems Engineering, August 2007.

4. DOE-STD-1073-2003, Configuration Management, U.S. Department of Energy, October 2003.

5. OECM, 2003, Systems Engineering and Interface Management, Office of Engineering and Construction Management, Rev. E, June 2003.

6. Public Law 109-58, Energy Policy Act (EPAct) of 2005, Department of Energy, Office of Energy Efficiency and Renewable Energy, August 2005.

Cited Requirements Source Documents

INL, 2008, Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999, Rev. 1, June 2008.

INL, 2008, Summary of Bounding Conditions for Development of the NGNP Project, INL/EXT-08-14370, June 2008.

INL, 2009, Next Generation Nuclear Plant System Requirements Manual, INL/EXT-07-12999, Rev. 2, March 2009.

Review of DOE’s Nuclear Energy Research and Development Program, The National Research Council of the National Academics, 2008.

Review of the NGNP Project, Nuclear Energy Research Advisory Committee.

Additional Requirements Documents

29 CFR 1910.103, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Hydrogen,” Code of Federal Regulations, Office of Federal Register, January 2009.

29 CFR 1910.104, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Oxygen,” Code of Federal Regulations, Office of Federal Register, January 2009.

29 CFR 1910.119, “Occupational Safety and Health Standards,” Subpart H, “Hazardous Materials-Process Safety Management of Highly Hazardous Chemicals,” Code of Federal Regulations, Office of Federal Register, January 2009.

DOE G 413.3-1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A, U.S. Department of Energy, September 2008.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 12 of 104

FR Doc E8-24268, “Policy Statement on the Regulation of Advanced Reactors,” Federal Register,

October 14, 2008 (NRC Document ID NRC-2008-0237-0010, effective date November 13, 2008).

INEEL 2003, Next Generation Nuclear Plant – High Level Functions and Requirements, INEEL/EXT-03-01163, Idaho National Laboratory, September 2003.

INEEL, 2004, Independent Technology Review Group, Design Features and Technology Uncertainties for the Next Generation Nuclear Plant, INEEL/EXT-04-01816, Idaho National Laboratory, June 30, 2004.

PLN-2489 (INL/MIS-08-14339), “Next Generation Nuclear Plant Project (NGNP) Preliminary Project Management Plan,” Rev. 2, NGNP, Idaho National Laboratory, June 2008 (NOTE: suspended by Rev. 3, October 2008).

PLN-2825, “NGNP Preliminary Project Execution Plan,” Rev. 0, NGNP, September 30, 2008.

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 13 of 104

Appendix A

NGNP Programmatic Requirements

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 14

of10

4

App

endi

x A

N

GN

P Pr

ogra

mm

atic

Req

uire

men

ts

NO

TE: I

tem

s ap

pear

ing

in b

rack

ets

([ ])

repr

esen

t app

roxi

mat

ions

and

/or u

ndef

ined

val

ues.

A-1

. R

egul

ator

y R

equi

rem

ents

O

bjec

t #

Req

uire

men

t ID

Req

uire

men

ts S

tate

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Reg

ulat

ory

Doc

umen

ts

SRM

Rev

1

3.3

Reg

ulat

ory

Doc

umen

ts

2.1

N

RC

/EPA

Reg

ulat

ory

Doc

umen

ts

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

1 Th

e fo

llow

ing

docu

men

ts sh

all,

as a

min

imum

, bec

ome

com

plie

d w

ith fo

r the

NG

NP

Proj

ect

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

2 51

CFR

280

44 -

Polic

y St

atem

ent o

n Sa

fety

Goa

ls fo

r the

O

pera

tion

of N

ucle

ar P

ower

Pla

nts

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

3 10

CFR

20

- Sta

ndar

ds fo

r Pro

tect

ion

Aga

inst

Rad

iatio

n,

(Per

mis

sibl

e do

se le

vels

and

act

ivity

con

cent

ratio

ns in

rest

ricte

d an

d un

rest

ricte

d ar

eas)

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

4 10

CFR

50

- Dom

estic

Lic

ensi

ng o

f Pro

duct

ion

and

Util

izat

ion

Faci

litie

s (ap

plic

able

por

tions

as n

eede

d)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

5 10

CFR

51

- Env

ironm

enta

l Pro

tect

ion

Reg

ulat

ion

for D

omes

tic

Lice

nsin

g an

d R

elat

ed R

egul

ator

y Fu

nctio

ns

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

7 10

CFR

52

- Lic

ense

s, C

ertif

icat

ions

, and

App

rova

ls fo

r Nuc

lear

Po

wer

Pla

nts

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

9 10

CFR

50,

App

endi

x I -

Num

eric

al G

uide

s for

Des

ign

Obj

ectiv

es a

nd L

imiti

ng C

ondi

tions

for O

pera

tion

to M

eet t

he

Crit

erio

n “a

s Low

as i

s Rea

sona

bly

Ach

ieva

ble.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 15

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1-10

10

CFR

73

- Phy

sica

l Pro

tect

ion

of P

lant

s and

Mat

eria

ls

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

11

10 C

FR 7

4 - M

ater

ial C

ontro

l and

Acc

ount

ing

of S

peci

al

Nuc

lear

Mat

eria

l 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.1

NR

C/E

PA

Reg

ulat

ory

Doc

umen

ts

2.

1-12

10

CFR

75

- Saf

egua

rds o

n N

ucle

ar M

ater

ial -

Impl

emen

tatio

n of

US/

IAEA

(Int

erna

tiona

l Ato

mic

Ene

rgy

Age

ncy)

Agr

eem

ent

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

14

10 C

FR 9

5, F

acili

ty S

ecur

ity C

lear

ance

and

Saf

egua

rdin

g of

N

atio

nal S

ecur

ity In

form

atio

n an

d R

estri

cted

Dat

a 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.1

NR

C/E

PA

Reg

ulat

ory

Doc

umen

ts

2.

1-15

10

CFR

100

- R

eact

or S

ite C

riter

ia, (

Num

eric

al d

ose

guid

elin

es

for d

eter

min

ing

the

excl

usio

n ar

ea b

ound

ary,

low

pop

ulat

ion

zone

, and

pop

ulat

ion

cent

er d

ista

nces

)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

16

10 C

FR 8

35 -

Occ

upat

iona

l Rad

iatio

n Pr

otec

tion

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

17

29 C

FR 1

910

- Occ

upat

iona

l Saf

ety

and

Hea

lth S

tand

ards

, Su

bpar

t H, H

azar

dous

Mat

eria

ls

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

18

40 C

FR 5

0-99

- C

lean

Air

Act

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.1

NR

C/E

PA

Reg

ulat

ory

Doc

umen

ts

2.

1-19

40

CFR

100

-149

- C

lean

Wat

er A

ct

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

20

40 C

FR 1

90 -

Envi

ronm

enta

l Rad

iatio

n Pr

otec

tion

Stan

dard

s for

N

ucle

ar P

ower

Ope

ratio

ns

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

21

40 C

FR 1

502

- Env

ironm

enta

l Im

pact

Sta

tem

ent

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 16

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1-22

EP

A -

520/

1-75

-001

- Pr

otec

tive

Act

ion

Gui

de D

oses

for

Prot

ectiv

e A

ctio

ns fo

r Nuc

lear

Inci

dent

s 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.1

NR

C/E

PA

Reg

ulat

ory

Doc

umen

ts

2.

1-23

47

CFR

470

73 -

Acc

iden

t Rad

ioac

tive

Con

tam

inat

ion

of H

uman

Fo

od a

nd A

nim

al F

eed;

Rec

omm

enda

tions

for S

tate

and

Loc

al

Age

ncie

s

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

25

Nuc

lear

Reg

ulat

ory

Com

mis

sion

, NU

REG

-186

0, V

ols.

1 an

d 2,

Fe

asib

ility

Stu

dy fo

r a R

isk-

Info

rmed

and

Per

form

ance

-Bas

ed

Reg

ulat

ory

Stru

ctur

e fo

r Fut

ure

Plan

t Lic

ensi

ng, D

ecem

ber

2007

. (N

GN

P pl

ant l

icen

sing

shal

l be

cons

iste

nt w

ith th

e N

RC

ne

w re

gula

tory

fram

ewor

k de

velo

ped

as a

gui

de fo

r fut

ure

plan

t lic

ensi

ng fo

r adv

ance

d [n

on-li

ght w

ater

] rea

ctor

s).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.

1-26

N

ucle

ar R

egul

ator

y C

omm

issi

on, 1

0 C

FR P

art 5

0 [N

RC

-200

8-02

37],

Polic

y St

atem

ent o

n th

e R

egul

atio

n of

Adv

ance

d R

eact

ors,

Fina

l pol

icy

stat

emen

t (FR

Doc

E8-

2426

8), e

ffec

tive

Nov

embe

r 13,

200

8.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.

1-27

N

ucle

ar R

egul

ator

y C

omm

issi

on, R

egul

ator

y G

uide

1.2

06,

Com

bine

d Li

cens

e A

pplic

atio

ns fo

r Nuc

lear

Pow

er P

lant

s (LW

R

Editi

on),

June

200

7

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.1-

28

Nuc

lear

Reg

ulat

ory

Com

mis

sion

, NU

REG

-080

0, S

tand

ard

Rev

iew

Pla

n fo

r the

Rev

iew

of S

afet

y A

naly

sis R

epor

ts fo

r N

ucle

ar P

ower

Pla

nts,

Mar

ch 2

007

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

1 N

RC

/EPA

R

egul

ator

y D

ocum

ents

2.

2

DO

E D

ocum

ents

SR

M R

ev 2

3.

3.2

DO

E D

ocum

ents

2.2-

1 Th

e ac

quis

ition

stra

tegy

for t

he N

GN

P pr

ojec

t may

incl

ude

a co

mbi

natio

n of

requ

irem

ents

from

bot

h th

e fe

dera

l and

co

mm

erci

al se

ctor

s. U

ntil

a be

tter d

efin

ition

of t

he c

omm

erci

al

parti

cipa

nt(s

) is o

btai

ned,

the

DO

E A

cqui

sitio

n M

anag

emen

t sy

stem

will

be

used

, inc

ludi

ng th

e do

cum

ents

list

ed b

elow

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

2 D

OE

Doc

umen

ts

2.

2-2

DO

E O

413

.3A

- Pr

ogra

m a

nd P

roje

ct M

anag

emen

t for

the

Acq

uisi

tion

of C

apita

l Ass

ets

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

2 D

OE

Doc

umen

ts

2.

2-3

DO

E O

420

.1B

- Fa

cilit

y Sa

fety

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.2

DO

E D

ocum

ents

2.2-

4 D

OE

O 4

35.1

- R

adio

activ

e W

aste

Man

agem

ent

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

2 D

OE

Doc

umen

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 17

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

2-5

DO

E Po

licy

450.

4 - S

afet

y M

anag

emen

t Sys

tem

Pol

icy

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

2 D

OE

Doc

umen

ts

2.

2-6

DO

E O

450

.1A

- En

viro

nmen

tal P

rote

ctio

n Pr

ogra

m

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

2 D

OE

Doc

umen

ts

2.

2-7

10 C

FR 8

51 -

Wor

ker S

afet

y an

d H

ealth

Pro

gram

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.2

DO

E D

ocum

ents

2.2-

8 D

OE

M 4

70.4

-2 C

hg.1

, Phy

sica

l Pro

tect

ion.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.2

DO

E D

ocum

ents

2.

3

FER

C R

egul

atio

ns

SRM

Rev

2

3.3.

3 FE

RC

R

egul

atio

ns

2.

3-1

Sinc

e th

e N

GN

P is

exp

ecte

d to

pro

duce

ele

ctric

ity fo

r co

mm

erci

al u

se, i

t sha

ll fo

llow

app

licab

le F

ERC

requ

irem

ents

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

3.3

FER

C

Reg

ulat

ions

2.

4

Stat

e of

Idah

o R

egul

atio

ns

SRM

Rev

2

3.3.

4 St

ate

of Id

aho

Reg

ulat

ions

2.4-

2a

If th

e N

GN

P is

site

d at

the

INL,

as i

ndic

ated

in th

e 20

05 E

PAct

, th

e N

GN

P sh

all m

eet a

pplic

able

stat

e re

quire

men

ts a

nd o

bser

ve

treat

ies w

ith so

vere

ign

natio

ns su

ch a

s the

Sho

shon

e -B

anno

ck.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

4 St

ate

of Id

aho

Reg

ulat

ions

2.

4-2b

If

the

NG

NP

is si

ted

at th

e IN

L, a

s ind

icat

ed in

the

2005

EPA

ct,

the

NG

NP

shal

l obs

erve

trea

ties w

ith so

vere

ign

natio

ns su

ch a

s th

e Sh

osho

ne -B

anno

ck.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

4 St

ate

of Id

aho

Reg

ulat

ions

2.5

In

dian

Res

erva

tion

Rig

hts

SRM

Rev

2

3.3.

5 In

dian

R

eser

vatio

n R

ight

s

2.5-

1 D

OE

has c

omm

itted

to a

dditi

onal

inte

ract

ion

and

exch

ange

of

info

rmat

ion

with

the

Shos

hone

-Ban

nock

Trib

es a

t the

For

t Hal

l R

eser

vatio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.3.

5 In

dian

R

eser

vatio

n R

ight

s

3

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

3.1

E

nvir

onm

enta

l Req

uire

men

ts

SRM

Rev

2

4.1.

4 En

viro

nmen

tal

Req

uire

men

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 18

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

1-2

The

NG

NP

plan

t sha

ll be

cap

able

of c

ontro

lling

the

trans

port

of

radi

onuc

lides

to th

e en

d pr

oduc

ts a

t lev

els b

elow

the

conc

entra

tion

or e

xpos

ure

requ

irem

ents

for t

he p

rodu

ct (e

.g.,

tritiu

m in

stea

m, g

as, h

ydro

gen)

. (In

itial

acc

epta

ble

tritiu

m le

vels

w

ill b

e se

t at a

frac

tion

of th

e U

.S. E

nviro

nmen

tal P

rote

ctio

n A

genc

y [E

PA] l

imits

for d

rinki

ng w

ater

and

air.

)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

3.

1-3

The

NG

NP

and

hydr

ogen

pro

duct

ion

faci

litie

s (if

appl

icab

le)

shal

l com

ply

with

app

licab

le re

quire

men

ts o

f the

Cle

an A

ir A

ct/A

ir Pr

ogra

ms.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

4 En

viro

nmen

tal

Req

uire

men

ts

3.

1-4a

Th

e N

GN

P sh

all i

dent

ify a

ll w

aste

stre

ams g

ener

ated

in N

GN

P by

type

and

est

imat

ed q

uant

ity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

4 En

viro

nmen

tal

Req

uire

men

ts

3.

1-4b

Th

e N

GN

P sh

all p

rovi

de a

dis

posi

tion

path

way

with

in th

e ap

plic

able

regu

lato

ry fr

amew

ork.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.4

Envi

ronm

enta

l R

equi

rem

ents

3.1-

5a

The

NG

NP

Proj

ect s

hall

min

imiz

e th

e ge

nera

tion

of a

ll w

aste

, in

clud

ing

radi

oact

ive,

non

radi

oact

ive,

and

mix

ed w

aste

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.4

Envi

ronm

enta

l R

equi

rem

ents

3.1-

5b

The

NG

NP

Proj

ect s

hall

com

ply

with

app

licab

le D

OE

orde

rs,

NR

C re

gula

tions

, and

EPA

regu

latio

ns in

the

treat

men

t of t

hese

w

aste

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

4 En

viro

nmen

tal

Req

uire

men

ts

3.2

C

odes

and

Sta

ndar

ds R

equi

rem

ents

SR

M R

ev 2

4.

1.10

Cod

es a

nd

Stan

dard

s R

equi

rem

ents

3.2-

1a

The

desi

gn o

f the

NG

NP

shal

l com

ply

with

all

appl

icab

le

fede

ral,

stat

e, a

nd lo

cal c

odes

and

stan

dard

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

3.

2-1b

C

odes

and

stan

dard

s per

tinen

t to

the

nucl

ear i

ndus

try sh

all o

nly

be u

tiliz

ed in

the

desi

gn, f

abric

atio

n, a

nd in

stal

latio

n of

the

stru

ctur

es, s

yste

ms,

and

equi

pmen

t whe

re su

ch c

odes

and

st

anda

rds a

re a

pplic

able

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

3.

2-1c

Th

e pl

ant d

esig

ner s

hall

list a

ll ap

plic

able

cod

es a

nd st

anda

rds,

and

the

appl

icab

le re

visi

on o

f eac

h do

cum

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 19

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

2-2

NU

REG

/CR

-597

3 sh

all b

e us

ed a

s a st

artin

g po

int f

or th

e id

entif

icat

ion

of c

odes

and

stan

dard

s to

be fo

llow

ed d

urin

g co

ncep

tual

des

ign.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

3.3

Q

ualit

y A

ssur

ance

Req

uire

men

ts

SRM

Rev

2

4.1.

11 Q

ualit

y A

ssur

ance

R

equi

rem

ents

3.3-

1 Th

e N

GN

P pr

ojec

t sha

ll us

e th

e U

.S. n

atio

nal c

onse

nsus

st

anda

rd A

SME

Nuc

lear

Qua

lity

Ass

uran

ce (N

QA

)-1-

2000

, “Q

ualit

y A

ssur

ance

Pro

gram

Req

uire

men

ts fo

r Nuc

lear

Fa

cilit

ies A

pplic

atio

ns.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11 Q

ualit

y A

ssur

ance

R

equi

rem

ents

3.4

Ph

ysic

al P

rote

ctio

n, M

ater

ial C

ontr

ol a

nd S

afeg

uard

s -

IAE

A

3.

4-1

The

NG

NP

shal

l com

ply

with

the

follo

win

g st

atem

ent.

“D

esig

ns

that

incl

ude

cons

ider

atio

ns fo

r saf

ety

and

secu

rity

requ

irem

ents

to

geth

er in

the

desi

gn p

roce

ss su

ch th

at se

curit

y is

sues

(e.g

., ne

wly

iden

tifie

d th

reat

s of t

erro

rist a

ttack

s) c

an b

e ef

fect

ivel

y re

solv

ed th

roug

h fa

cilit

y de

sign

and

eng

inee

red

secu

rity

feat

ures

, and

form

ulat

ion

of m

itiga

tion

mea

sure

s, w

ith re

duce

d re

lianc

e on

hum

an a

ctio

ns.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11 P

hysi

cal

Prot

ectio

n,

Mat

eria

l Con

trol

and

Safe

guar

ds -

IAEA

3.

4-2

The

NG

NP

shal

l com

ply

with

the

follo

win

g st

atem

ent “

Des

igns

w

ith fe

atur

es to

elim

inat

e or

redu

ce th

e po

tent

ial t

heft

of n

ucle

ar

mat

eria

ls.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11 P

hysi

cal

Prot

ectio

n,

Mat

eria

l Con

trol

and

Safe

guar

ds -

IAEA

3.4-

3 Th

e N

GN

P sh

all c

ompl

y w

ith th

e fo

llow

ing

stat

emen

t. “D

esig

ns

that

em

phas

ize

pass

ive

barr

iers

to p

oten

tial t

heft

of n

ucle

ar

mat

eria

ls.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11 P

hysi

cal

Prot

ectio

n,

Mat

eria

l Con

trol

and

Safe

guar

ds -

IAEA

3.4-

4 Th

e N

GN

P sh

all c

ompl

y w

ith th

e fo

llow

ing

stat

emen

t. “

Fina

lly,

the

NR

C a

lso

belie

ves t

hat i

t will

be

in th

e in

tere

st o

f the

pub

lic

as w

ell a

s the

des

ign

Supp

liers

and

the

pros

pect

ive

licen

se

appl

ican

ts to

add

ress

secu

rity

issu

es e

arly

in th

e de

sign

stag

e to

ac

hiev

e a

mor

e ro

bust

and

eff

ectiv

e se

curit

y po

stur

e fo

r fut

ure

nucl

ear p

ower

reac

tors

.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11 P

hysi

cal

Prot

ectio

n,

Mat

eria

l Con

trol

and

Safe

guar

ds -

IAEA

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 20

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

4-7

The

desi

gn o

f the

NG

NP

shal

l com

ply

with

10

CFR

73.

55,

Req

uire

men

ts fo

r phy

sica

l pro

tect

ion

of li

cens

ed a

ctiv

ities

in

nucl

ear p

ower

reac

tors

aga

inst

radi

olog

ical

sabo

tage

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

3.4-

8 Th

e de

sign

of t

he N

GN

P sh

all c

ompl

y w

ith 1

0 C

FR 7

3.67

, Li

cens

ee fi

xed

site

and

in-tr

ansi

t req

uire

men

ts fo

r the

phy

sica

l pr

otec

tion

of sp

ecia

l nuc

lear

mat

eria

l of m

oder

ate

and

low

st

rate

gic

sign

ifica

nce.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

3.

4-9a

Th

e de

sign

of t

he N

GN

P sh

all i

nclu

de p

repa

ratio

n an

d up

date

of

a Se

curit

y A

sses

smen

t, “H

igh

Ass

uran

ce E

valu

atio

n an

d M

itiga

tive

Mea

sure

s Eva

luat

ion”

per

NU

REG

-800

Sec

tions

13

.6.4

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

3.

4-9b

Th

e de

sign

of t

he N

GN

P sh

all i

nclu

de th

e de

velo

pmen

t of

Phys

ical

Sec

urity

Har

dwar

e In

spec

tions

, Tes

ts, A

naly

ses,

and

Acc

epta

nce

Crit

eria

(ITA

AC

) per

NU

REG

-080

0 Se

ctio

n 14

.3.1

2.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

3.

4-9c

Th

e re

sults

of a

nd in

sigh

t fro

m th

e ab

ove

eval

uatio

ns a

nd th

e IT

AA

C sh

all b

e us

ed to

inte

grat

e sa

fegu

ards

by

desi

gn in

to th

e N

GN

P.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

3.4-

11

The

NG

NP

desi

gn sh

all c

ompl

y w

ith N

RC

requ

irem

ents

for t

he

cont

rol a

nd a

ccou

ntin

g of

spec

ial n

ucle

ar m

ater

ial i

nclu

ding

10

CFR

74.

19, R

ecor

dkee

ping

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.2

Mat

eria

l C

ontro

l and

A

ccou

ntin

g of

Sp

ecia

l Nuc

lear

M

ater

ial

3.

4-12

Th

e de

sign

of t

he N

GN

P sh

all c

ompl

y w

ith 1

0 C

FR 7

5,

Safe

guar

ds o

n N

ucle

ar M

ater

ial-I

mpl

emen

tatio

n of

US/

IAEA

A

gree

men

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.3

Saf

egua

rds

on N

ucle

ar

Mat

eria

l -

Impl

emen

tatio

n of

U

S/IA

EA

Agr

eem

ent

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 21

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

4-13

Th

e de

sign

of t

he N

GN

P sh

all i

ncor

pora

te d

esig

n fe

atur

es to

fa

cilit

ate

the

appl

icat

ion

of in

tern

atio

nal s

afeg

uard

s und

er

INFC

IRC

/57,

The

Tex

t of t

he A

gree

men

t for

the

App

licat

ion

of

Age

ncy

Safe

guar

ds to

Uni

ted

Stat

es R

eact

or F

acili

ties,

and

INFC

IRC

/540

, Mod

el P

roto

col A

dditi

onal

to th

e A

gree

men

ts(s

) B

etw

een

Stat

e(s)

and

the

Inte

rnat

iona

l Ato

mic

Ene

rgy

Age

ncy

for t

he A

pplic

atio

n of

Saf

egua

rds.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.3

Saf

egua

rds

on N

ucle

ar

Mat

eria

l -

Impl

emen

tatio

n of

U

S/IA

EA

Agr

eem

ent

4

Publ

ic a

nd W

orke

r Ex

posu

re L

imits

B

ound

ing

Con

ditio

n 4.

5 Pu

blic

and

W

orke

r Exp

osur

e Li

mits

4.

1

Prot

ectio

n C

rite

ria

for

the

Wor

ker

and

the

Publ

ic

4.

1-1

Upp

er b

ound

off

site

dos

es d

urin

g de

sign

bas

is e

vent

s sha

ll m

eet

10 C

FR 5

0.34

with

mar

gin.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.9

Safe

ty

Req

uire

men

ts

4.

1-2a

Th

ere

shal

l be

a te

chni

cal b

asis

for e

limin

atin

g or

min

imiz

ing

the

need

for o

ffsi

te e

mer

genc

y pl

anni

ng. .

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.9

Safe

ty

Req

uire

men

ts

4.

1-2b

Th

is te

chni

cal b

asis

(for

elim

inat

ing

or m

inim

izin

g th

e ne

ed fo

r of

fsite

em

erge

ncy

plan

ning

) sha

ll co

nsid

er a

risk

-info

rmed

, re

alis

tic a

sses

smen

t of d

esig

n ba

sis a

nd b

eyon

d de

sign

bas

is

acci

dent

s and

shal

l dem

onst

rate

hig

h co

nfid

ence

that

the

EPA

Pr

otec

tion

Act

ion

Gui

delin

es a

re m

et.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

9 Sa

fety

R

equi

rem

ents

4.

1-2c

Th

e N

GN

P de

sign

shal

l eff

ectiv

ely

dem

onst

rate

that

off

-site

em

erge

ncy

plan

requ

irem

ents

may

be

min

imiz

ed (e

.g.,

elim

inat

e re

quire

men

ts fo

r em

erge

ncy

drill

s, si

rens

, etc

.).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

9 Sa

fety

R

equi

rem

ents

4.

1-3

Expo

sure

to th

e W

orke

r and

the

Publ

ic u

nder

nor

mal

ope

ratio

n sh

all m

eet 1

0 C

FR 2

0 an

d A

LAR

A (a

s low

as r

easo

nabl

y ac

hiev

able

) as q

uant

ified

in A

ppen

dix

I of 1

0 C

FR 5

0.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

9 Sa

fety

R

equi

rem

ents

4.2

B

ound

ing

Con

ditio

n - 0

05

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-1

Fuel

spec

ifica

tions

, ope

ratin

g co

nditi

ons,

and

plan

t shi

eldi

ng

shal

l be

suff

icie

nt to

mee

t NR

C a

nd E

nviro

nmen

tal P

rote

ctio

n A

genc

y (E

PA) e

xpos

ure

limits

for t

he p

ublic

and

wor

kers

und

er

norm

al o

pera

tion

and

calc

ulat

ed a

ccid

ent c

ondi

tions

. The

se

limits

are

as f

ollo

ws:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 22

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

4.

2-2

Und

er a

ccid

ent c

ondi

tions

, the

rele

ase

rate

s sha

ll be

lim

ited

to

mee

t the

EPA

Pro

tect

ive

Act

ion

Gui

delin

es li

mits

and

10%

of

the

10 C

FR 1

00 li

mit

at th

e ex

clus

ion

area

bou

ndar

y (E

AB

; 40

0+ m

eter

s).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-3

Expo

sure

to th

e pu

blic

und

er n

orm

al p

lant

ope

ratio

n sh

all n

ot

exce

ed 0

.1 re

m in

a y

ear,

excl

usiv

e of

the

dose

con

tribu

tions

fr

om b

ackg

roun

d ra

diat

ion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-4

The

occu

patio

nal d

ose

to in

divi

dual

adu

lts sh

all b

e lim

ited

on a

n an

nual

bas

is to

10%

of t

he 1

0 C

FR 2

0 lim

its.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-5

Triti

um c

once

ntra

tion

cont

rol s

hall

be su

ffic

ient

to m

eet a

ctiv

ity

limits

in th

e pr

oduc

ts o

f the

pla

nt.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-6a

Tr

itium

con

cent

ratio

ns in

pro

duct

s sha

ll no

t exc

eed

100

Bq/

liter

(~

10%

of t

he E

PA li

mit

for d

rinki

ng w

ater

, 740

Bq/

liter

). 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

B

ound

ing

Con

ditio

n 4.

5.1

Bou

ndin

g C

ondi

tion

- 005

4.2-

6b

Triti

um c

once

ntra

tions

in li

quid

eff

luen

ts sh

all n

ot e

xcee

d 10

0 B

q/lit

er (~

10%

of t

he E

PA li

mit

for d

rinki

ng w

ater

, 740

B

q/lit

er).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.

2-7

Triti

um c

once

ntra

tions

in g

aseo

us e

fflu

ents

and

pro

duct

s sha

ll no

t exc

eed

3.7

Bq/

liter

(the

NR

C li

mit

for a

ir).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

1 B

ound

ing

Con

ditio

n - 0

05

4.3

B

ound

ing

Con

ditio

n - 0

06

Bou

ndin

g C

ondi

tion

4.5.

2 B

ound

ing

Con

ditio

n - 0

06

4.

3-1

Met

hods

shal

l be

deve

lope

d an

d im

plem

ente

d to

con

trol t

he

conc

entra

tions

of t

ritiu

m su

ffic

ient

to m

eet o

r exc

eed

the

activ

ity

conc

entra

tion

limits

for t

he p

rodu

cts u

sing

the

HTG

R

tech

nolo

gy a

nd th

e N

RC

and

EPA

lim

its o

n pl

ant g

aseo

us a

nd

liqui

d ef

fluen

ts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

2 B

ound

ing

Con

ditio

n - 0

06

4.4

B

ound

ing

Con

ditio

n - 0

07

Bou

ndin

g C

ondi

tion

4.5.

3 B

ound

ing

Con

ditio

n - 0

07

4.

4-1a

C

hara

cter

izat

ion

of d

ust c

ircul

atio

n in

the

prim

ary

syst

em sh

all

be re

quire

d to

ens

ure

acce

ptab

le le

vels

of d

ust-b

orne

act

ivity

in

the

syst

em.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

3 B

ound

ing

Con

ditio

n - 0

07

4.

4-1b

C

ontro

l of d

ust c

ircul

atio

n in

the

prim

ary

syst

em sh

all b

e re

quire

d to

ens

ure

acce

ptab

le le

vels

of d

ust-b

orne

act

ivity

in th

e sy

stem

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

3 B

ound

ing

Con

ditio

n - 0

07

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 23

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

Sta

tem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

4.

4-1c

C

hara

cter

izat

ion

of d

ust c

ircul

atio

n in

the

prim

ary

syst

em sh

all

be re

quire

d to

min

imiz

e th

e im

pact

on

oper

abili

ty o

f prim

ary

syst

em c

ompo

nent

s (e.

g., t

he c

ontro

l rod

s and

circ

ulat

ors)

and

ab

rasi

on o

f prim

ary

syst

em c

ompo

nent

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

3 B

ound

ing

Con

ditio

n - 0

07

4.

4-1d

C

ontro

l of d

ust c

ircul

atio

n in

the

prim

ary

syst

em sh

all b

e re

quire

d to

min

imiz

e th

e im

pact

on

oper

abili

ty o

f prim

ary

syst

em c

ompo

nent

s (e.

g., t

he c

ontro

l rod

s and

circ

ulat

ors)

and

ab

rasi

on o

f prim

ary

syst

em c

ompo

nent

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.5.

3 B

ound

ing

Con

ditio

n - 0

07

A-2

. Le

gisl

ativ

e R

equi

rem

ents

O

bjec

t #

Req

uire

men

ts

IDL

egis

lativ

e R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3

TIT

LE

VI -

- NU

CL

EA

R M

AT

TE

RS

EPA

ct20

05

3.

1

Subt

itle

C--

Nex

t Gen

erat

ion

Nuc

lear

Pla

nt P

roje

ct

EPA

ct20

05

3.

1.1

SE

C. 6

41. P

RO

JEC

T E

STA

BL

ISH

ME

NT

.

EP

Act

2005

3.

1.1-

1 (a

) Est

ablis

hmen

t- Th

e Se

cret

ary

shal

l est

ablis

h a

proj

ect t

o be

kn

own

as th

e N

ext G

ener

atio

n N

ucle

ar P

lant

Pro

ject

' (re

ferr

ed to

in

this

subt

itle

as th

e Pr

ojec

t').

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.1-

2 (b

) Con

tent

- The

Pro

ject

shal

l con

sist

of t

he re

sear

ch,

deve

lopm

ent,

desi

gn, c

onst

ruct

ion,

and

ope

ratio

n of

a p

roto

type

pl

ant,

incl

udin

g a

nucl

ear r

eact

or th

at--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.1-

2-1

(1) i

s bas

ed o

n re

sear

ch a

nd d

evel

opm

ent a

ctiv

ities

supp

orte

d by

th

e G

ener

atio

n IV

Nuc

lear

Ene

rgy

Syst

ems I

nitia

tive

unde

r se

ctio

n 94

2(d)

; and

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.1-

2-2

(2) s

hall

be u

sed-

- 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.1-

2-2-

1 (A

) to

gene

rate

ele

ctric

ity;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.1-

2-2-

2 (B

) to

prod

uce

hydr

ogen

; or

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.1-

2-2-

3 (C

) bot

h to

gen

erat

e el

ectri

city

and

to p

rodu

ce h

ydro

gen.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.1.

2

SEC

. 642

. PR

OJE

CT

MA

NA

GEM

EN

T.

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 24

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.2-

1-1

(1) I

N G

ENER

AL-

The

Pro

ject

shal

l be

man

aged

in th

e D

epar

tmen

t by

the

Off

ice

of N

ucle

ar E

nerg

y, S

cien

ce, a

nd

Tech

nolo

gy.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

1-2

(2) G

ENER

ATI

ON

IV N

UC

LEA

R E

NER

GY

SY

STEM

S PR

OG

RA

M- T

he S

ecre

tary

may

com

bine

the

Proj

ect w

ith th

e G

ener

atio

n IV

Nuc

lear

Ene

rgy

Syst

ems I

nitia

tive.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

1-3

(3) E

XIS

TIN

G D

OE

PRO

JEC

T M

AN

AG

EMEN

T EX

PER

TISE

- The

Sec

reta

ry m

ay u

tiliz

e ca

pabi

litie

s for

revi

ew

of c

onst

ruct

ion

proj

ects

for a

dvan

ced

scie

ntifi

c fa

cilit

ies w

ithin

th

e O

ffic

e of

Sci

ence

to tr

ack

the

prog

ress

of t

he P

roje

ct.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-1

(1) L

EAD

LA

BO

RA

TOR

Y- T

he Id

aho

Nat

iona

l Lab

orat

ory

shal

l be

the

lead

Nat

iona

l Lab

orat

ory

for t

he P

roje

ct a

nd sh

all

colla

bora

te w

ith o

ther

Nat

iona

l Lab

orat

orie

s, in

stitu

tions

of

high

er e

duca

tion,

oth

er re

sear

ch in

stitu

tes,

indu

stria

l res

earc

hers

, an

d in

tern

atio

nal r

esea

rche

rs to

car

ry o

ut th

e Pr

ojec

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-2

(2) I

ND

UST

RIA

L PA

RTN

ERSH

IPS-

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.2-

2-2-

1 (A

) IN

GEN

ERA

L- T

he Id

aho

Nat

iona

l Lab

orat

ory

shal

l or

gani

ze a

con

sorti

um o

f app

ropr

iate

indu

stria

l par

tner

s tha

t will

ca

rry

out c

ost-s

hare

d re

sear

ch, d

evel

opm

ent,

desi

gn, a

nd

cons

truct

ion

activ

ities

, and

ope

rate

rese

arch

faci

litie

s, on

beh

alf

of th

e Pr

ojec

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-2-

2 (B

) CO

ST-S

HA

RIN

G- A

ctiv

ities

of i

ndus

trial

par

tner

s fun

ded

by th

e Pr

ojec

t sha

ll be

cos

t-sha

red

in a

ccor

danc

e w

ith se

ctio

n 98

8.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-2-

3 (C

) PR

EFER

ENC

E- P

refe

renc

e in

det

erm

inin

g th

e fin

al

stru

ctur

e of

the

cons

ortiu

m o

r any

par

tner

ship

s und

er th

is

subt

itle

shal

l be

give

n to

a st

ruct

ure

(incl

udin

g de

sign

atin

g as

a

lead

indu

stria

l par

tner

an

entit

y in

corp

orat

ed in

the

Uni

ted

Stat

es) t

hat r

etai

ns U

nite

d St

ates

tech

nolo

gica

l lea

ders

hip

in th

e Pr

ojec

t whi

le m

axim

izin

g co

st sh

arin

g op

portu

nitie

s and

m

inim

izin

g Fe

dera

l fun

ding

resp

onsi

bilit

ies.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-3

(3) P

RO

TOTY

PE P

LAN

T SI

TIN

G- T

he p

roto

type

nuc

lear

re

acto

r and

ass

ocia

ted

plan

t sha

ll be

site

d at

the

Idah

o N

atio

nal

Labo

rato

ry in

Idah

o.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 25

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.2-

2-4

(4) R

EAC

TOR

TES

T C

APA

BIL

ITIE

S- T

he P

roje

ct sh

all u

se, i

f ap

prop

riate

, rea

ctor

test

cap

abili

ties a

t the

Idah

o N

atio

nal

Labo

rato

ry.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.2-

2-5

(5) O

THER

LA

BO

RA

TOR

Y C

APA

BIL

ITIE

S- T

he P

roje

ct m

ay

use,

if a

ppro

pria

te, f

acili

ties a

t oth

er N

atio

nal L

abor

ator

ies.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.1.

3

SEC

. 643

. PR

OJE

CT

OR

GA

NIZ

AT

ION

.

EP

Act

2005

3.

1.3-

1 (a

) Maj

or P

roje

ct E

lem

ents

- The

Pro

ject

shal

l con

sist

of t

he

follo

win

g m

ajor

pro

gram

ele

men

ts:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

1-1

(1) H

igh-

tem

pera

ture

hyd

roge

n pr

oduc

tion

tech

nolo

gy

deve

lopm

ent a

nd v

alid

atio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

1-2

(2) E

nerg

y co

nver

sion

tech

nolo

gy d

evel

opm

ent a

nd v

alid

atio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

1-3

(3) N

ucle

ar fu

el d

evel

opm

ent,

char

acte

rizat

ion,

and

qu

alifi

catio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

1-4

(4) M

ater

ials

sele

ctio

n, d

evel

opm

ent,

test

ing,

and

qua

lific

atio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

1-5

(5) R

eact

or a

nd b

alan

ce-o

f-pl

ant d

esig

n, e

ngin

eerin

g, sa

fety

an

alys

is, a

nd q

ualif

icat

ion.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2 (b

) Pro

ject

Pha

ses-

The

Pro

ject

shal

l be

cond

ucte

d in

the

follo

win

g ph

ases

: 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2-1

(1) F

IRST

PR

OJE

CT

PHA

SE- A

firs

t pro

ject

pha

se sh

all b

e co

nduc

ted

to--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2-1-

1 (A

) sel

ect a

nd v

alid

ate

the

appr

opria

te te

chno

logy

und

er

subs

ectio

n (a

)(1)

; 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2-1-

2 (B

) car

ry o

ut e

nabl

ing

rese

arch

, dev

elop

men

t, an

d de

mon

stra

tion

activ

ities

on

tech

nolo

gies

and

com

pone

nts u

nder

par

agra

phs (

2)

thro

ugh

(4) o

f sub

sect

ion

(a);

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

2-1-

3 (C

) det

erm

ine

whe

ther

it is

app

ropr

iate

to c

ombi

ne e

lect

ricity

ge

nera

tion

and

hydr

ogen

pro

duct

ion

in a

sing

le p

roto

type

nu

clea

r rea

ctor

and

pla

nt; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

2-1-

4 (D

) car

ry o

ut in

itial

des

ign

activ

ities

for a

pro

toty

pe n

ucle

ar

reac

tor a

nd p

lant

, inc

ludi

ng d

evel

opm

ent o

f des

ign

met

hods

and

sa

fety

ana

lytic

al m

etho

ds a

nd st

udie

s und

er su

bsec

tion

(a)(

5).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

2-2

(2) S

ECO

ND

PR

OJE

CT

PHA

SE- A

seco

nd p

roje

ct p

hase

shal

l be

con

duct

ed to

--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 26

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.3-

2-2-

1 (A

) con

tinue

app

ropr

iate

act

iviti

es u

nder

par

agra

phs (

1) th

roug

h (5

) of s

ubse

ctio

n (a

); 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2-2-

2 (B

) dev

elop

, thr

ough

a c

ompe

titiv

e pr

oces

s, a

final

des

ign

for t

he

prot

otyp

e nu

clea

r rea

ctor

and

pla

nt;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

2-2-

3 (C

) app

ly fo

r lic

ense

s to

cons

truct

and

ope

rate

the

prot

otyp

e nu

clea

r rea

ctor

from

the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

; and

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

2-2-

4 (D

) con

stru

ct a

nd st

art u

p op

erat

ions

of t

he p

roto

type

nuc

lear

re

acto

r and

its a

ssoc

iate

d hy

drog

en o

r ele

ctric

ity p

rodu

ctio

n fa

cilit

ies.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3 (c

) Pro

ject

Req

uire

men

ts-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1

(1) I

N G

ENER

AL-

The

Sec

reta

ry sh

all e

nsur

e th

at th

e Pr

ojec

t is

stru

ctur

ed so

as t

o m

axim

ize

the

tech

nica

l int

erch

ange

and

tra

nsfe

r of t

echn

olog

ies a

nd id

eas i

nto

the

Proj

ect f

rom

oth

er

sour

ces o

f rel

evan

t exp

ertis

e, in

clud

ing-

-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1-

1 (A

) the

nuc

lear

pow

er in

dust

ry, i

nclu

ding

nuc

lear

pow

er p

lant

co

nstru

ctio

n fir

ms,

parti

cula

rly w

ith re

spec

t to

issu

es a

ssoc

iate

d w

ith p

lant

des

ign,

con

stru

ctio

n, a

nd o

pera

tiona

l and

safe

ty

issu

es;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1-

2 (B

) the

che

mic

al p

roce

ssin

g in

dust

ry, p

artic

ular

ly w

ith re

spec

t to

issu

es re

latin

g to

--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1-

2-1

(i) th

e us

e of

pro

cess

ene

rgy

for p

rodu

ctio

n of

hyd

roge

n; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1-

2-2

(ii) t

he in

tegr

atio

n of

tech

nolo

gies

dev

elop

ed b

y th

e Pr

ojec

t int

o ch

emic

al p

roce

ssin

g en

viro

nmen

ts; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-1-

3 (C

) int

erna

tiona

l eff

orts

in a

reas

rela

ted

to th

e Pr

ojec

t, pa

rticu

larly

with

resp

ect t

o hy

drog

en p

rodu

ctio

n te

chno

logi

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-2

(2) I

NTE

RN

ATI

ON

AL

CO

LLA

BO

RA

TIO

N-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-2-

1 (A

) IN

GEN

ERA

L- T

he S

ecre

tary

shal

l see

k in

tern

atio

nal

coop

erat

ion,

par

ticip

atio

n, a

nd fi

nanc

ial c

ontri

butio

ns fo

r the

Pr

ojec

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 27

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.3-

3-2-

2 (B

) ASS

ISTA

NC

E FR

OM

INTE

RN

ATI

ON

AL

PAR

TNER

S-

The

Secr

etar

y, th

roug

h th

e Id

aho

Nat

iona

l Lab

orat

ory,

may

co

ntra

ct fo

r ass

ista

nce

from

spec

ialis

ts o

r fac

ilitie

s fro

m m

embe

r co

untri

es o

f the

Gen

erat

ion

IV In

tern

atio

nal F

orum

, the

Rus

sian

Fe

dera

tion,

or o

ther

inte

rnat

iona

l par

tner

s if t

he sp

ecia

lists

or

faci

litie

s pro

vide

acc

ess t

o co

st-e

ffec

tive

and

rele

vant

skill

s or

test

cap

abili

ties.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-2-

3 (C

) PA

RTN

ER N

ATI

ON

S- T

he P

roje

ct m

ay in

volv

e de

mon

stra

tion

of se

lect

ed p

roje

ct o

bjec

tives

in a

par

tner

cou

ntry

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.3-

3-2-

4 (D

) GEN

ERA

TIO

N IV

INTE

RN

ATI

ON

AL

FOR

UM

- The

Se

cret

ary

shal

l ens

ure

that

inte

rnat

iona

l act

iviti

es o

f the

Pro

ject

ar

e co

ordi

nate

d w

ith th

e G

ener

atio

n IV

Inte

rnat

iona

l For

um.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3

(3) R

EVIE

W B

Y N

UC

LEA

R E

NER

GY

RES

EAR

CH

A

DV

ISO

RY

CO

MM

ITTE

E-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

1 (A

) IN

GEN

ERA

L- T

he N

ucle

ar E

nerg

y R

esea

rch

Adv

isor

y C

omm

ittee

of t

he D

epar

tmen

t (re

ferr

ed to

in th

is p

arag

raph

as

the

NER

AC

') sh

all--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

1-1

(i) re

view

all

prog

ram

pla

ns fo

r the

Pro

ject

and

all

prog

ress

un

der t

he P

roje

ct o

n an

ong

oing

bas

is; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

1-2

(ii) e

nsur

e th

at im

porta

nt sc

ient

ific,

tech

nica

l, sa

fety

, and

pr

ogra

m m

anag

emen

t iss

ues r

ecei

ve a

ttent

ion

in th

e Pr

ojec

t and

by

the

Secr

etar

y.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

2 (B

) AD

DIT

ION

AL

EXPE

RTI

SE- T

he N

ERA

C sh

all s

uppl

emen

t th

e ex

perti

se o

f the

NER

AC

or a

ppoi

nt su

bpan

els t

o in

corp

orat

e in

to th

e re

view

by

the

NER

AC

the

rele

vant

sour

ces o

f exp

ertis

e de

scrib

ed u

nder

par

agra

ph (1

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

3 (C

) IN

ITIA

L R

EVIE

W- N

ot la

ter t

han

180

days

afte

r the

dat

e of

en

actm

ent o

f thi

s Act

, the

NER

AC

shal

l--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

3-1

(i) re

view

exi

stin

g pr

ogra

m p

lans

for t

he P

roje

ct in

ligh

t of t

he

reco

mm

enda

tions

of t

he d

ocum

ent e

ntitl

ed D

esig

n Fe

atur

es a

nd

Tech

nolo

gy U

ncer

tain

ties f

or th

e N

ext G

ener

atio

n N

ucle

ar

Plan

t,' d

ated

June

30,

200

4; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

3-2

(ii) a

ddre

ss a

ny re

com

men

datio

ns o

f the

doc

umen

t not

in

corp

orat

ed in

pro

gram

pla

ns fo

r the

Pro

ject

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 28

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.3-

3-3-

4 (D

) FIR

ST P

RO

JEC

T PH

ASE

REV

IEW

- On

a de

term

inat

ion

by

the

Secr

etar

y th

at th

e ap

prop

riate

act

iviti

es u

nder

the

first

pro

ject

ph

ase

unde

r sub

sect

ion

(b)(

1) a

re n

early

com

plet

e, th

e Se

cret

ary

shal

l req

uest

the

NER

AC

to c

ondu

ct a

com

preh

ensi

ve re

view

of

the

Proj

ect a

nd to

repo

rt to

the

Secr

etar

y th

e re

com

men

datio

n of

th

e N

ERA

C c

once

rnin

g w

heth

er th

e Pr

ojec

t is r

eady

to p

roce

ed

to th

e se

cond

pro

ject

pha

se u

nder

subs

ectio

n (b

)(2)

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.3-

3-3-

5 (E

) TR

AN

SMIT

TAL

OF

REP

OR

TS T

O C

ON

GR

ESS-

Not

late

r th

an 6

0 da

ys a

fter r

ecei

ving

any

repo

rt fr

om th

e N

ERA

C re

late

d to

the

Proj

ect,

the

Secr

etar

y sh

all s

ubm

it to

the

appr

opria

te

com

mitt

ees o

f the

Sen

ate

and

the

Hou

se o

f Rep

rese

ntat

ives

a

copy

of t

he re

port,

alo

ng w

ith a

ny a

dditi

onal

vie

ws o

f the

Se

cret

ary

that

the

Secr

etar

y m

ay c

onsi

der a

ppro

pria

te.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.1.

4

SEC

. 644

. NU

CL

EA

R R

EG

UL

AT

OR

Y C

OM

MIS

SIO

N.

EPA

ct20

05

3.1.

4-1

(a) I

n ac

cord

ance

with

sect

ion

202

of th

e En

ergy

Reo

rgan

izat

ion

Act

of 1

974

(42

U.S

.C. 5

842)

, the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

shal

l hav

e lic

ensi

ng a

nd re

gula

tory

aut

horit

y fo

r an

y re

acto

r aut

horiz

ed u

nder

this

subt

itle.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

2 (b

) Lic

ensi

ng S

trate

gy- N

ot la

ter t

han

3 ye

ars a

fter t

he d

ate

of

enac

tmen

t of t

his A

ct, t

he S

ecre

tary

and

the

Cha

irman

of t

he

Nuc

lear

Reg

ulat

ory

Com

mis

sion

shal

l joi

ntly

subm

it to

the

appr

opria

te c

omm

ittee

s of t

he S

enat

e an

d th

e H

ouse

of

Rep

rese

ntat

ives

a li

cens

ing

stra

tegy

for t

he p

roto

type

nuc

lear

re

acto

r, in

clud

ing-

-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

2-1

(1) a

des

crip

tion

of w

ays i

n w

hich

cur

rent

lice

nsin

g re

quire

men

ts

rela

ting

to li

ght-w

ater

reac

tors

nee

d to

be

adap

ted

for t

he ty

pes

of p

roto

type

nuc

lear

reac

tor b

eing

con

side

red

by th

e Pr

ojec

t;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

2-2

(2) a

des

crip

tion

of a

naly

tical

tool

s tha

t the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

will

hav

e to

dev

elop

to in

depe

nden

tly v

erify

de

sign

s and

per

form

ance

cha

ract

eris

tics o

f com

pone

nts,

equi

pmen

t, sy

stem

s, or

stru

ctur

es a

ssoc

iate

d w

ith th

e pr

otot

ype

nucl

ear r

eact

or;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 29

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.4-

2-3

(3) o

ther

rese

arch

or d

evel

opm

ent a

ctiv

ities

that

may

be

requ

ired

on th

e pa

rt of

the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

in o

rder

to

revi

ew a

lice

nse

appl

icat

ion

for t

he p

roto

type

nuc

lear

reac

tor;

and

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

2-4

(4) a

n es

timat

e of

the

budg

etar

y re

quire

men

ts a

ssoc

iate

d w

ith th

e lic

ensi

ng st

rate

gy.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

3 (c

) Ong

oing

Inte

ract

ion-

The

Sec

reta

ry sh

all s

eek

the

activ

e pa

rtici

patio

n of

the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

thro

ugho

ut

the

dura

tion

of th

e Pr

ojec

t to-

-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

3-1

(1) a

void

des

ign

deci

sion

s tha

t will

com

prom

ise

adeq

uate

safe

ty

mar

gins

in th

e de

sign

of t

he re

acto

r or i

mpa

ir th

e ac

cess

ibili

ty o

f nu

clea

r saf

ety-

rela

ted

com

pone

nts o

f the

pro

toty

pe re

acto

r for

in

spec

tion

and

mai

nten

ance

;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.4-

3-2

(2) d

evel

op to

ols t

o fa

cilit

ate

insp

ectio

n an

d m

aint

enan

ce n

eede

d fo

r saf

ety

purp

oses

; and

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.4-

3-3

(3) d

evel

op ri

sk-b

ased

crit

eria

for a

ny fu

ture

com

mer

cial

de

velo

pmen

t of s

imila

r rea

ctor

arc

hite

ctur

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.1.

5

SEC

. 645

. PR

OJE

CT

TIM

EL

INE

S A

ND

A

UT

HO

RIZ

AT

ION

OF

APP

RO

PRIA

TIO

NS.

EP

Act

2005

3.

1.5-

1 (a

) Tar

get D

ate

to C

ompl

ete

the

Firs

t Pro

ject

Pha

se- N

ot la

ter

than

Sep

tem

ber 3

0, 2

011,

the

Secr

etar

y sh

all--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.5-

1-1

(1) s

elec

t the

tech

nolo

gy to

be

used

by

the

Proj

ect f

or h

igh-

tem

pera

ture

hyd

roge

n pr

oduc

tion

and

the

initi

al d

esig

n pa

ram

eter

s for

the

prot

otyp

e nu

clea

r pla

nt; o

r

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

1-2

(2) s

ubm

it to

Con

gres

s a re

port

esta

blis

hing

an

alte

rnat

ive

date

fo

r mak

ing

the

sele

ctio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

2 (b

) Des

ign

Com

petit

ion

for S

econ

d Pr

ojec

t Pha

se-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

2-1

The

Secr

etar

y, a

ctin

g th

roug

h th

e Id

aho

Nat

iona

l Lab

orat

ory,

sh

all f

und

not m

ore

than

4 te

ams f

or n

ot m

ore

than

2 y

ears

to

deve

lop

deta

iled

prop

osal

s for

com

petit

ive

eval

uatio

n an

d se

lect

ion

of a

sing

le p

ropo

sal f

or a

fina

l des

ign

of th

e pr

otot

ype

nucl

ear r

eact

or.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 30

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.5-

2-2

(2) S

YST

EMS

INTE

GR

ATI

ON

- The

Sec

reta

ry m

ay st

ruct

ure

Proj

ect a

ctiv

ities

in th

e se

cond

pro

ject

pha

se to

use

the

lead

in

dust

rial p

artn

er o

f the

com

petit

ivel

y se

lect

ed d

esig

n un

der

para

grap

h (1

) in

a sy

stem

s int

egra

tion

role

for f

inal

des

ign

and

cons

truct

ion

of th

e Pr

ojec

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

3 (c

) Tar

get D

ate

to C

ompl

ete

Proj

ect C

onst

ruct

ion-

Not

late

r tha

n Se

ptem

ber 3

0, 2

021,

the

Secr

etar

y sh

all--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.5-

3-1

(1) c

ompl

ete

cons

truct

ion

and

begi

n op

erat

ions

of t

he p

roto

type

nu

clea

r rea

ctor

and

ass

ocia

ted

ener

gy o

r hyd

roge

n fa

cilit

ies;

or

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

3-2

(2) s

ubm

it to

Con

gres

s a re

port

esta

blis

hing

an

alte

rnat

ive

date

fo

r com

plet

ion.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.5-

4 (d

) Aut

horiz

atio

n of

App

ropr

iatio

ns- T

here

is a

utho

rized

to b

e ap

prop

riate

d to

the

Secr

etar

y fo

r res

earc

h an

d co

nstru

ctio

n ac

tiviti

es u

nder

this

subt

itle

(incl

udin

g fo

r tra

nsfe

r to

the

Nuc

lear

R

egul

ator

y C

omm

issi

on fo

r act

iviti

es u

nder

sect

ion

644

as

appr

opria

te)-

-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

3.

1.5-

4-1

(1) $

1,25

0,00

0,00

0 fo

r the

per

iod

of fi

scal

yea

rs 2

006

thro

ugh

2015

; and

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

3.

1.5-

4-2

(2) s

uch

sum

s as a

re n

eces

sary

for e

ach

of fi

scal

yea

rs 2

016

thro

ugh

2021

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

4

TIT

LE

VII

I--H

YD

RO

GEN

EP

Act

2005

4.1

SE

C. 8

01. H

YD

RO

GEN

AN

D F

UE

L C

ELL

PR

OG

RA

M.

EPA

ct20

05

5.

2

Subt

itle

E--

Nuc

lear

Ene

rgy

EPA

ct20

05

5.

2.1

SE

C. 9

52. N

UC

LE

AR

EN

ERG

Y R

ESE

AR

CH

PR

OG

RA

MS.

EP

Act

2005

5.

2.1-

1 (a

) Nuc

lear

Ene

rgy

Res

earc

h In

itiat

ive-

The

Sec

reta

ry sh

all c

arry

ou

t a N

ucle

ar E

nerg

y R

esea

rch

Initi

ativ

e fo

r res

earc

h an

d de

velo

pmen

t rel

ated

to n

ucle

ar e

nerg

y.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

2 (b

) Nuc

lear

Ene

rgy

Syst

ems S

uppo

rt Pr

ogra

m- T

he S

ecre

tary

sh

all c

arry

out

a N

ucle

ar E

nerg

y Sy

stem

s Sup

port

Prog

ram

to

supp

ort r

esea

rch

and

deve

lopm

ent a

ctiv

ities

add

ress

ing

relia

bilit

y, a

vaila

bilit

y, p

rodu

ctiv

ity, c

ompo

nent

agi

ng, s

afet

y,

and

secu

rity

of e

xist

ing

nucl

ear p

ower

pla

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

3 (c

) Nuc

lear

Pow

er 2

010

Prog

ram

- 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 31

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

5.

2.1-

3-1

(1) I

N G

ENER

AL-

The

Sec

reta

ry sh

all c

arry

out

a N

ucle

ar

Pow

er 2

010

Prog

ram

, con

sist

ent w

ith re

com

men

datio

ns o

f the

N

ucle

ar E

nerg

y R

esea

rch

Adv

isor

y C

omm

ittee

of t

he

Dep

artm

ent i

n th

e re

port

entit

led

A R

oadm

ap to

Dep

loy

New

N

ucle

ar P

ower

Pla

nts i

n th

e U

nite

d St

ates

by

2010

' and

dat

ed

Oct

ober

200

1.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

3-2

(2) A

DM

INIS

TRA

TIO

N- T

he P

rogr

am sh

all i

nclu

de--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

2.1-

3-2-

1 (A

) use

of t

he e

xper

tise

and

capa

bilit

ies o

f ind

ustry

, ins

titut

ions

of

hig

her e

duca

tion,

and

Nat

iona

l Lab

orat

orie

s in

eval

uatio

n of

ad

vanc

ed n

ucle

ar fu

el c

ycle

s and

fuel

s tes

ting;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

3-2-

2 (B

) con

side

ratio

n of

a v

arie

ty o

f rea

ctor

des

igns

suita

ble

for b

oth

deve

lope

d an

d de

velo

ping

nat

ions

; 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

2.1-

3-2-

3 (C

) par

ticip

atio

n of

inte

rnat

iona

l col

labo

rato

rs in

rese

arch

, de

velo

pmen

t, an

d de

sign

eff

orts

, as a

ppro

pria

te; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

3-2-

4 (D

) enc

oura

gem

ent f

or p

artic

ipat

ion

by in

stitu

tions

of h

ighe

r ed

ucat

ion

and

indu

stry

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

2.1-

4 (d

) Gen

erat

ion

IV N

ucle

ar E

nerg

y Sy

stem

s Ini

tiativ

e-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

4-1

(1) I

N G

ENER

AL-

The

Sec

reta

ry sh

all c

arry

out

a G

ener

atio

n IV

Nuc

lear

Ene

rgy

Syst

ems I

nitia

tive

to d

evel

op a

n ov

eral

l te

chno

logy

pla

n fo

r and

to su

ppor

t res

earc

h an

d de

velo

pmen

t ne

cess

ary

to m

ake

an in

form

ed te

chni

cal d

ecis

ion

abou

t the

mos

t pr

omis

ing

cand

idat

es fo

r eve

ntua

l com

mer

cial

app

licat

ion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

4-2

(2) A

DM

INIS

TRA

TIO

N- I

n co

nduc

ting

the

Initi

ativ

e, th

e Se

cret

ary

shal

l exa

min

e ad

vanc

ed p

rolif

erat

ion-

resi

stan

t and

pa

ssiv

ely

safe

reac

tor d

esig

ns, i

nclu

ding

des

igns

that

--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

4-2-

1 (A

) are

eco

nom

ical

ly c

ompe

titiv

e w

ith o

ther

ele

ctric

pow

er

gene

ratio

n pl

ants

; 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

2.1-

4-2-

2 (B

) hav

e hi

gher

eff

icie

ncy,

low

er c

ost,

and

impr

oved

safe

ty

com

pare

d to

reac

tors

in o

pera

tion

on th

e da

te o

f ena

ctm

ent o

f th

is A

ct;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

2.1-

4-2-

3 (C

) use

fuel

s tha

t are

pro

lifer

atio

n re

sist

ant a

nd h

ave

subs

tant

ially

redu

ced

prod

uctio

n of

hig

h-le

vel w

aste

per

uni

t of

outp

ut; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 32

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

5.

2.1-

4-2-

4 (D

) use

impr

oved

inst

rum

enta

tion.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

2.1-

5 (e

) Rea

ctor

Pro

duct

ion

of H

ydro

gen-

The

Sec

reta

ry sh

all c

arry

ou

t res

earc

h to

exa

min

e de

sign

s for

hig

h-te

mpe

ratu

re re

acto

rs

capa

ble

of p

rodu

cing

larg

e-sc

ale

quan

titie

s of h

ydro

gen.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.3

Su

btitl

e I-

-Res

earc

h A

dmin

istr

atio

n an

d O

pera

tions

EP

Act

2005

5.3.

1

SEC

. 988

. CO

ST S

HA

RIN

G.

EPA

ct20

05

5.3.

1-1

(a) A

pplic

abili

ty- N

otw

ithst

andi

ng a

ny o

ther

pro

visi

on o

f law

, in

carr

ying

out

a re

sear

ch, d

evel

opm

ent,

dem

onst

ratio

n, o

r co

mm

erci

al a

pplic

atio

n pr

ogra

m o

r act

ivity

that

is in

itiat

ed a

fter

the

date

of e

nact

men

t of t

his s

ectio

n, th

e Se

cret

ary

shal

l req

uire

co

st-s

harin

g in

acc

orda

nce

with

this

sect

ion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

2 (b

) Res

earc

h an

d D

evel

opm

ent-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

2-1

(1) I

N G

ENER

AL-

Exc

ept a

s pro

vide

d in

par

agra

phs (

2) a

nd (3

) an

d su

bsec

tion

(f),

the

Secr

etar

y sh

all r

equi

re n

ot le

ss th

an 2

0 pe

rcen

t of t

he c

ost o

f a re

sear

ch o

r dev

elop

men

t act

ivity

de

scrib

ed in

subs

ectio

n (a

) to

be p

rovi

ded

by a

non

-Fed

eral

so

urce

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

2-2

(2) E

XC

LUSI

ON

- Par

agra

ph (1

) sha

ll no

t app

ly to

a re

sear

ch o

r de

velo

pmen

t act

ivity

des

crib

ed in

subs

ectio

n (a

) tha

t is o

f a b

asic

or

fund

amen

tal n

atur

e, a

s det

erm

ined

by

the

appr

opria

te o

ffic

er

of th

e D

epar

tmen

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

2-3

(3) R

EDU

CTI

ON

- The

Sec

reta

ry m

ay re

duce

or e

limin

ate

the

requ

irem

ent o

f par

agra

ph (1

) for

a re

sear

ch a

nd d

evel

opm

ent

activ

ity o

f an

appl

ied

natu

re if

the

Secr

etar

y de

term

ines

that

the

redu

ctio

n is

nec

essa

ry a

nd a

ppro

pria

te.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

3 (c

) Dem

onst

ratio

n an

d C

omm

erci

al A

pplic

atio

n-

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

3-1

(1) I

N G

ENER

AL-

Exc

ept a

s pro

vide

d in

par

agra

ph (2

) and

su

bsec

tion

(f),

the

Secr

etar

y sh

all r

equi

re th

at n

ot le

ss th

an 5

0 pe

rcen

t of t

he c

ost o

f a d

emon

stra

tion

or c

omm

erci

al a

pplic

atio

n ac

tivity

des

crib

ed in

subs

ectio

n (a

) to

be p

rovi

ded

by a

non

-Fe

dera

l sou

rce.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 33

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

5.

3.1-

3-2

(2) R

EDU

CTI

ON

OF

NO

N-F

EDER

AL

SHA

RE-

The

Sec

reta

ry

may

redu

ce th

e no

n-Fe

dera

l sha

re re

quire

d un

der p

arag

raph

(1)

if th

e Se

cret

ary

dete

rmin

es th

e re

duct

ion

to b

e ne

cess

ary

and

appr

opria

te, t

akin

g in

to c

onsi

dera

tion

any

tech

nolo

gica

l ris

k re

latin

g to

the

activ

ity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4 (d

) Cal

cula

tion

of A

mou

nt- I

n ca

lcul

atin

g th

e am

ount

of a

non

-Fe

dera

l con

tribu

tion

unde

r thi

s sec

tion,

the

Secr

etar

y--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4-1

(1) m

ay in

clud

e al

low

able

cos

ts in

acc

orda

nce

with

the

appl

icab

le c

ost p

rinci

ples

, inc

ludi

ng--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

4-1-

1 (A

) cas

h;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4-1-

2 (B

) per

sonn

el c

osts

; 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

4-1-

3 (C

) the

val

ue o

f a se

rvic

e, o

ther

reso

urce

, or t

hird

par

ty in

-kin

d co

ntrib

utio

n de

term

ined

in a

ccor

danc

e w

ith th

e ap

plic

able

ci

rcul

ar o

f the

Off

ice

of M

anag

emen

t and

Bud

get;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4-1-

4 (D

) ind

irect

cos

ts o

r fac

ilitie

s and

adm

inis

trativ

e co

sts;

or

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4-1-

5 (E

) any

fund

s rec

eive

d un

der t

he p

ower

pro

gram

of t

he

Tenn

esse

e V

alle

y A

utho

rity

(exc

ept t

o th

e ex

tent

that

such

fund

s ar

e m

ade

avai

labl

e un

der a

n an

nual

app

ropr

iatio

n A

ct);

and

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

4-2

(2) s

hall

not i

nclu

de--

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

4-2-

1 (A

) rev

enue

s or r

oyal

ties f

rom

the

pros

pect

ive

oper

atio

n of

an

activ

ity b

eyon

d th

e tim

e co

nsid

ered

in th

e aw

ard;

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

4-2-

2 (B

) pro

ceed

s fro

m th

e pr

ospe

ctiv

e sa

le o

f an

asse

t of a

n ac

tivity

; or

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

4-2-

3 (C

) oth

er a

ppro

pria

ted

Fede

ral f

unds

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

EP

Act

2005

5.

3.1-

5 (e

) Rep

aym

ent o

f Fed

eral

Sha

re- T

he S

ecre

tary

shal

l not

requ

ire

repa

ymen

t of t

he F

eder

al sh

are

of a

cos

t-sha

red

activ

ity u

nder

th

is se

ctio

n as

a c

ondi

tion

of m

akin

g an

aw

ard.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

6 (f

) Exc

lusi

ons-

Thi

s sec

tion

shal

l not

app

ly to

--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 34

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

5.

3.1-

6-1

(1) a

coo

pera

tive

rese

arch

and

dev

elop

men

t agr

eem

ent u

nder

the

Stev

enso

n-W

ydle

r Tec

hnol

ogy

Inno

vatio

n A

ct o

f 198

0 (1

5 U

.S.C

. 370

1 et

seq.

);

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

6-2

(2) a

fee

char

ged

for t

he u

se o

f a D

epar

tmen

t fac

ility

; or

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

6-3

(3) a

n aw

ard

unde

r--

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

6-3-

1 (A

) the

smal

l bus

ines

s inn

ovat

ion

rese

arch

pro

gram

und

er

sect

ion

9 of

the

Smal

l Bus

ines

s Act

(15

U.S

.C. 6

38);

or

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

5.

3.1-

6-3-

2 (B

) the

smal

l bus

ines

s tec

hnol

ogy

trans

fer p

rogr

am u

nder

that

se

ctio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

EPA

ct20

05

6

"A R

evie

w o

f the

NG

NP

Proj

ect"

N

ERA

C

6.

1

APP

END

IX A

: EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EV

IEW

N

ERA

C

APP

END

IX A

: EP

AC

T C

HA

RG

E to

NER

AC

for

NG

NP

REV

IEW

6.

1-1

(3

) RE

VIE

W B

Y N

UC

LE

AR

EN

ERG

Y R

ESE

AR

CH

A

DV

ISO

RY

CO

MM

ITT

EE

-

N

ERA

C

APP

END

IX A

: EP

AC

T C

HA

RG

E to

NER

AC

for

NG

NP

REV

IEW

6.1-

1-1

(A) I

N G

ENER

AL-

The

Nuc

lear

Ene

rgy

Res

earc

h A

dvis

ory

Com

mitt

ee o

f the

Dep

artm

ent (

refe

rred

to in

this

par

agra

ph a

s th

e ‘N

ERA

C’)

shal

l -

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

1-1

(i) re

view

a11

pro

gram

pla

ns fo

r the

Pro

ject

and

a11

pro

gres

s un

der t

he P

roje

ct o

n an

ong

oing

bas

is; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

1-2

(ii) e

nsur

e th

at im

porta

nt sc

ient

ific,

tech

nica

l, sa

fety

, and

pr

ogra

m m

anag

emen

t iss

ues r

ecei

ve a

ttent

ion

in th

e Pr

ojec

t and

by

the

Secr

etar

y.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 35

of10

4

Obj

ect

#R

equi

rem

ents

ID

Leg

isla

tive

Req

uire

men

ts

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

6.

1-1-

2 (B

) AD

DIT

ION

AL

EXPE

RTI

SE- T

he N

ERA

C sh

all s

uppl

emen

t th

e ex

perti

se o

f the

NER

AC

or a

ppoi

nt su

bpan

els t

o in

corp

orat

e in

to th

e re

view

by

the

NER

AC

the

rele

vant

sour

ces o

f exp

ertis

e de

scrib

ed u

nder

par

agra

ph (I

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

3 (C

) IN

ITIA

L R

EVIE

W- N

ot la

ter t

han

180

days

afte

r the

dat

e of

en

actm

ent o

f thi

s Act

, the

NER

AC

shal

l -

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

3-1

(i) re

view

exi

stin

g pr

ogra

m p

lans

for t

he P

roje

ct in

ligh

t of t

he

reco

mm

enda

tions

of t

he d

ocum

ent e

ntitl

ed 'D

esig

n Fe

atur

es a

nd

Tech

nolo

gy U

ncer

tain

ties f

or th

e N

ext G

ener

atio

n N

ucle

ar

Plan

t,' d

ated

June

30,

200

4; a

nd

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

3-2

(ii) a

ddre

ss a

ny re

com

men

datio

ns o

f the

doc

umen

t not

in

corp

orat

ed in

pro

gram

pla

ns fo

r the

Pro

ject

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

ERA

C

APP

END

IX A

: EP

AC

T C

HA

RG

E to

NER

AC

for

NG

NP

REV

IEW

6.1-

1-4

(D) F

IRST

PR

OJE

CT

PHA

SE R

EVIE

W- O

n a

dete

rmin

atio

n by

th

e Se

cret

ary

that

the

appr

opria

te a

ctiv

ities

und

er th

e fir

st p

roje

ct

phas

e un

der s

ubse

ctio

n (b

)(l)

are

near

ly c

ompl

ete,

the

Secr

etar

y sh

all r

eque

st th

e N

ERA

C to

con

duct

a c

ompr

ehen

sive

revi

ew o

f th

e Pr

ojec

t and

to re

port

to th

e Se

cret

ary

the

reco

mm

enda

tion

of

the

NER

AC

con

cern

ing

whe

ther

the

Proj

ect i

s rea

dy to

pro

ceed

to

the

seco

nd p

roje

ct p

hase

und

er su

bsec

tion

(b)(

2).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

6.

1-1-

5 (E

)TR

AN

SMIT

TAL

OF

REP

OR

TS T

O C

ON

GR

ESS-

Not

late

r th

an 6

0 da

ys a

fter r

ecei

ving

any

repo

rt fr

om th

e N

ERA

C re

late

d to

the

Proj

ect,

the

Secr

etar

y sh

all s

ubm

it to

the

appr

opria

te

com

mitt

ees o

f' th

e Se

nate

and

the

Hou

se o

f Rep

rese

ntat

ives

a

copy

of t

he re

port,

alo

ng w

ith a

ny a

dditi

onal

vie

ws o

f the

Se

cret

ary

that

the

Secr

etar

y m

ay c

onsi

der a

ppro

pria

te.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

A

PPEN

DIX

A:

EPA

CT

CH

AR

GE

to N

ERA

C fo

r N

GN

P R

EVIE

W

A-3

. En

d U

ser R

equi

rem

ents

No

requ

irem

ents

cur

rent

ly e

xist

.

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 36

of10

4

A-4

. St

akeh

olde

r Req

uire

men

ts

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

NG

NP

TO

P-LE

VE

L R

EQ

UIR

EM

ENT

S

3. N

GN

P TO

P-LE

VEL

R

EQU

IREM

ENTS

2.

1

NG

NP

Prog

ram

Req

uire

men

ts

3.

2 N

GN

P Pr

ogra

m

Req

uire

men

ts

2.1.

1

Ove

rall

Obj

ectiv

es

3.

2.1

Ove

rall

Obj

ectiv

es

2.

1.1-

2 Th

e pl

ant s

hall

be c

apab

le o

f com

plet

ing

desi

gn, l

icen

sing

, co

nstru

ctio

n, a

nd st

artu

p te

stin

g fo

r ini

tial o

pera

tion

by 2

021.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SA

G

Mee

ting

Agr

eem

ents

O

ctob

er 2

2, 2

008

2.

1.1-

3 Th

e N

GN

P Pr

ojec

t mis

sion

is th

e de

velo

pmen

t of a

full-

scal

e co

mm

erci

al p

lant

dem

onst

ratio

n th

at p

rovi

des (

a) h

igh-

effic

ienc

y el

ectri

city

gen

erat

ion

and

(b) C

O2-

free

hyd

roge

n pr

oduc

tion

base

d on

hig

h te

mpe

ratu

re, m

odul

ar g

as-c

oole

d,

grap

hite

mod

erat

ed re

acto

r tec

hnol

ogy

as th

e he

at so

urce

. The

m

issi

on n

eed

stat

emen

t dev

elop

ed fo

r NG

NP

was

app

rove

d by

th

e D

OE

Dep

uty

Secr

etar

y on

Oct

ober

18,

200

4, o

ffic

ially

co

mpl

etin

g C

D-0

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.1

NG

NP

Mis

sion

N

eed

2.

1.1-

5 Es

tabl

ish

the

basi

s for

lice

nsin

g th

e co

mm

erci

al v

ersi

on o

f the

N

GN

P by

the

Nuc

lear

Reg

ulat

ory

Com

mis

sion

(NR

C).

This

will

be

ach

ieve

d in

maj

or p

art t

hrou

gh li

cens

ing

of th

e pr

otot

ype

by

the

NR

C a

nd in

itiat

ing

the

proc

ess f

or c

ertif

icat

ion

of th

e nu

clea

r sys

tem

des

ign.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.1

NG

NP

Mis

sion

N

eed

2.

1.1-

6 Fo

ster

rebu

ildin

g of

the

U.S

. nuc

lear

indu

stria

l inf

rast

ruct

ure

and

cont

ribut

ing

to m

akin

g th

e U

.S. i

ndus

try se

lf-su

ffic

ient

for

our n

ucle

ar e

nerg

y pr

oduc

tion

need

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.1

NG

NP

Mis

sion

N

eed

2.1.

2

NG

NP

Proj

ect R

equi

rem

ents

3.2.

2 N

GN

P Pr

ojec

t R

equi

rem

ents

2.1.

2-10

C

osts

for a

ntic

ipat

ed “

Nth

”-of

-a-k

ind

(NO

AK

), ba

sed

on d

esig

n ce

rtific

atio

n, c

onst

ruct

ion,

and

ope

ratio

n of

firs

t-of-

a-ki

nd

(FO

AK

) des

ign,

shal

l sup

port

a vi

able

eco

nom

ic b

usin

ess m

odel

(c

ompe

titiv

e w

ith n

atur

al g

as p

rice

at $

8/M

MB

tu)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 37

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1.2-

12a

Bec

ause

the

NG

NP

will

be

built

with

in a

DO

E fa

cilit

y an

d w

ill

inte

rfac

e w

ith o

ther

exi

stin

g fa

cilit

ies,

the

plan

t des

igne

r sha

ll ev

alua

te D

OE

orde

rs to

ens

ure

that

the

NG

NP

can

inte

rfac

e w

ith

the

DO

E si

te.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

2.

1.2-

12b

Bec

ause

the

NG

NP

will

be

built

with

in a

DO

E fa

cilit

y an

d w

ill

inte

rfac

e w

ith o

ther

exi

stin

g fa

cilit

ies,

the

plan

t des

igne

r sha

ll ev

alua

te D

OE

orde

rs to

ens

ure

that

it is

acc

epta

ble

to D

OE.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

10 C

odes

and

St

anda

rds

Req

uire

men

ts

3

NG

NP

Proj

ect S

cope

1.2

NG

NP

Proj

ect

Scop

e

3-1-

4a

The

NG

NP

proj

ect s

hall

iden

tify,

tech

nolo

gy d

evel

opm

ent a

nd

syst

em c

onfir

mat

ory

and

verif

icat

ion

task

s nee

ded

for d

esig

n.

1.

4 Pr

ojec

t D

escr

iptio

n

3-1-

4b

The

NG

NP

proj

ect s

hall

iden

tify,

tech

nolo

gy d

evel

opm

ent a

nd

syst

em c

onfir

mat

ory

and

verif

icat

ion

task

s nee

ded

for l

icen

sing

.

1.4

Proj

ect

Des

crip

tion

3-

1-4c

Th

e N

GN

P pr

ojec

t sha

ll id

entif

y, te

chno

logy

dev

elop

men

t and

sy

stem

con

firm

ator

y an

d ve

rific

atio

n ta

sks n

eede

d fo

r, co

nstru

ctio

n,.

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-4d

Th

e N

GN

P pr

ojec

t sha

ll id

entif

y, te

chno

logy

dev

elop

men

t and

sy

stem

con

firm

ator

y an

d ve

rific

atio

n ta

sks n

eede

d fo

r des

ign,

lic

ensi

ng, c

onst

ruct

ion,

and

test

ing

at p

ower

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-4e

Th

e N

GN

P pr

ojec

t sha

ll in

tegr

ate

tech

nolo

gy d

evel

opm

ent a

nd

syst

em c

onfir

mat

ory

and

verif

icat

ion

task

s nee

ded

for d

esig

n.

1.

4 Pr

ojec

t D

escr

iptio

n

3-1-

4f

The

NG

NP

proj

ect s

hall

inte

grat

e te

chno

logy

dev

elop

men

t and

sy

stem

con

firm

ator

y an

d ve

rific

atio

n ta

sks n

eede

d fo

r lic

ensi

ng,.

1.

4 Pr

ojec

t D

escr

iptio

n

3-1-

4g

The

NG

NP

proj

ect s

hall

inte

grat

e te

chno

logy

dev

elop

men

t and

sy

stem

con

firm

ator

y an

d ve

rific

atio

n ta

sks n

eede

d fo

r co

nstru

ctio

n.

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-4h

Th

e N

GN

P pr

ojec

t sha

ll in

tegr

ate

tech

nolo

gy d

evel

opm

ent a

nd

syst

em c

onfir

mat

ory

and

verif

icat

ion

task

s nee

ded

for d

esig

n,

licen

sing

, con

stru

ctio

n, a

nd te

stin

g at

pow

er

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-4i

Th

e N

GN

P pr

ojec

t sha

ll co

mpl

ete

tech

nolo

gy d

evel

opm

ent a

nd

syst

em c

onfir

mat

ory

and

verif

icat

ion

task

s nee

ded

for t

estin

g at

po

wer

.

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-6

The

NG

NP

proj

ect s

hall

com

plet

e al

l fed

eral

per

mitt

ing

requ

ired

for o

pera

tion,

incl

udin

g su

ppor

t for

DO

E N

atio

nal

Envi

ronm

enta

l Pol

icy

Act

(NEP

A) a

ctiv

ities

.

1.

4 Pr

ojec

t D

escr

iptio

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 38

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3-

1-6

The

NG

NP

proj

ect s

hall

com

plet

e al

l sta

te p

erm

ittin

g re

quire

d fo

r con

stru

ctio

n, in

clud

ing

supp

ort f

or D

OE

Nat

iona

l En

viro

nmen

tal P

olic

y A

ct (N

EPA

) act

iviti

es.

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-6

The

NG

NP

proj

ect s

hall

com

plet

e al

l fed

eral

per

mitt

ing

requ

ired

for o

pera

tion,

incl

udin

g su

ppor

t for

DO

E N

atio

nal

Envi

ronm

enta

l Pol

icy

Act

(NEP

A) a

ctiv

ities

.

1.

4 Pr

ojec

t D

escr

iptio

n

3-

1-6

The

NG

NP

proj

ect s

hall

com

plet

e al

l sta

te p

erm

ittin

g re

quire

d fo

r con

stru

ctio

n, in

clud

ing

supp

ort f

or D

OE

Nat

iona

l En

viro

nmen

tal P

olic

y A

ct (N

EPA

) act

iviti

es.

1.

4 Pr

ojec

t D

escr

iptio

n

5

Pre-

Con

cept

ual D

esig

n Sc

ope,

Pla

nnin

g, a

nd E

xecu

tion

2.

1 Pr

e-C

once

ptua

l D

esig

n Sc

ope,

Pl

anni

ng, a

nd

Exec

utio

n 5-

1.1

Pr

e-C

once

ptua

l Des

ign

Proj

ect R

equi

rem

ents

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

5-

1.1-

1 N

GN

P sh

all b

e de

sign

ed, c

onst

ruct

ed, l

icen

sed,

and

ope

ratin

g by

20

21.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

5-

1.1-

2 N

GN

P de

sign

con

figur

atio

n sh

all c

onsi

der c

ost a

nd ri

sk p

rofil

es

to e

nsur

e th

at N

GN

P es

tabl

ishe

s a so

und

foun

datio

n fo

r fut

ure

com

mer

cial

dep

loym

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

5-

1.1-

3 N

GN

P sh

all b

e lic

ense

d by

the

NR

C a

s a c

omm

erci

al

coge

nera

tion

faci

lity

prod

ucin

g el

ectri

city

and

hyd

roge

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 39

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

5-

1.1-

4 Th

e pr

ojec

t sha

ll in

clud

e id

entif

icat

ion

of n

eces

sary

and

su

ffic

ient

rese

arch

and

dev

elop

men

t tec

hnic

al sc

ope

and

prio

ritie

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

5-

1.1-

5 N

GN

P lic

ensi

ng sh

all s

uppo

rt po

tent

ial f

utur

e N

RC

tech

nolo

gy

neut

ral r

ule-

mak

ing

activ

ities

(i.e

., R

isk-

Info

rmed

, Per

form

ance

-B

ased

Alte

rnat

ive

to 1

0 C

FR P

art 5

0).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

7

"A R

evie

w o

f the

NG

NP

Proj

ect"

N

ERA

C

7.

1

The

subc

omm

ittee

rec

omm

ends

a se

ries

of a

ctio

ns to

mak

e th

e N

GN

P pr

ogra

m a

s eff

ectiv

e as

pos

sibl

e.

NER

AC

Ex

ecut

ive

Sum

mar

y

7.1-

1a

The

curr

ent m

issi

on fo

r the

NG

NP

is to

des

ign

and

build

a

reac

tor t

hat g

ener

ates

ele

ctric

ity a

nd p

rodu

ces h

ydro

gen.

The

su

bcom

mitt

ee re

com

men

ds th

at th

is d

ual m

issi

on sh

all b

e re

cons

ider

ed a

nd n

ot b

e ac

cept

ed w

ithou

t fur

ther

ana

lysi

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.

1-1b

Th

e su

bcom

mitt

ee fu

rther

reco

mm

ends

that

this

ana

lysi

s be

done

as o

utlin

ed in

the

follo

win

g di

scus

sion

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

ERA

C

Exec

utiv

e Su

mm

ary

7.

1-2

The

DO

E-N

E st

aff s

hall

cond

uct,

with

the

assi

stan

ce o

f key

in

dust

ry re

pres

enta

tives

, eco

nom

ic a

nd e

ngin

eerin

g tra

de st

udie

s th

at c

onsi

der:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.

1-3

The

targ

ets f

or h

ydro

gen

prod

uctio

n fo

r var

ious

scen

ario

s ove

r th

e ne

xt fe

w d

ecad

es;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.1-

4 Th

e D

OE

targ

et fo

r hyd

roge

n pr

oduc

tion

via

nucl

ear p

ower

in

this

ove

rall

cont

ext;

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.1-

5 Th

e lik

ely

hydr

ogen

pro

duct

ion

and

elec

trici

ty p

rodu

ctio

n al

tern

ativ

es a

nd h

ow th

ose

alte

rnat

ives

wou

ld b

e fa

ctor

ed in

to

dete

rmin

ing

the

prop

er m

issi

on fo

r the

NG

NP.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.

1-6

The

sele

ctio

n of

the

ultim

ate

NG

NP

mis

sion

can

driv

e th

e re

acto

r des

ign

in d

iffer

ent d

irect

ions

. The

subc

omm

ittee

re

com

men

ds th

at th

ese

trade

stud

ies b

e fu

nded

, ini

tiate

d im

med

iate

ly a

nd c

ompl

eted

as s

oon

as p

ossi

ble.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 40

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

1-7

DO

E sh

all d

evel

op th

e N

GN

P as

a re

acto

r fac

ility

that

can

be

upgr

aded

as t

he te

chno

logy

adv

ance

s. C

once

ptua

lly, t

he fa

cilit

y w

ould

be

built

usi

ng a

smal

ler r

eact

or, c

aref

ully

cho

osin

g th

e sc

ale

to b

e th

e sm

alle

st re

acto

r tha

t cou

ld b

e re

ason

ably

ex

trapo

late

d to

supp

ort f

ull s

ize

com

mer

cial

app

licat

ions

, as a

‘te

chno

logy

dem

onst

rato

r’.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.

1-8

The

DO

E-N

E st

aff s

hall

upda

te it

s R&

D p

lans

and

dev

elop

op

tions

that

can

supp

ort a

reac

tor d

eplo

ymen

t muc

h be

fore

the

2017

-202

1 tim

efra

me.

EPA

CT

requ

ires t

he o

vera

ll co

st o

f the

N

GN

P pr

ojec

t be

shar

ed w

ith U

.S. i

ndus

try a

s wel

l as m

embe

rs

of th

e in

tern

atio

nal c

omm

unity

. The

subc

omm

ittee

bel

ieve

s tha

t th

e ch

ance

s of s

ubst

antia

l ind

ustri

al c

ontri

butio

ns a

nd

inte

rnat

iona

l col

labo

ratio

ns to

NG

NP

are

grea

tly d

ecre

ased

with

a

com

plet

ion

targ

et d

ate

of 2

021.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.

1-8

Thes

e pl

ans s

houl

d en

hanc

e th

e IT

RG

per

spec

tive

that

to

achi

eve

a su

cces

sful

pro

ject

eve

n in

the

late

r tim

e pe

riod,

less

ag

gres

sive

pro

ject

obj

ectiv

es m

ust b

e ad

opte

d; e

.g.,

for r

eact

or

outle

t tem

pera

ture

s, fu

el se

lect

ion

and

perf

orm

ance

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

Ex

ecut

ive

Sum

mar

y

7.2

IV

. NER

AC

Com

mitt

ee R

evie

w A

ppro

ach

NER

AC

IV

. NER

AC

C

omm

ittee

Rev

iew

A

ppro

ach

7.3

V

. NG

NP

Tec

hnol

ogy

Mis

sion

NER

AC

V

. NG

NP

Tech

nolo

gy

Mis

sion

7.3-

1 Th

e su

bcom

mitt

ee re

com

men

ds th

at th

e N

GN

P du

al m

issi

on

shal

l be

reco

nsid

ered

and

not

be

acce

pted

with

out f

urth

er

anal

ysis

. The

re a

re se

vera

l rea

sons

for t

his c

oncl

usio

n:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

. NG

NP

Tech

nolo

gy

Mis

sion

7.

5

VII

. IT

RG

NG

NP

Rec

omm

enda

tions

N

ERA

C

VII

. ITR

G N

GN

P R

ecom

men

datio

ns

7.6

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent P

rogr

am P

lan

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 41

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

6-3-

1 A

n in

tegr

ated

sche

dule

shal

l be

deve

lope

d of

all

plan

ned

activ

ities

, sim

ilar t

o th

e co

mpu

ter-

base

d sc

hedu

ling

prog

ram

cu

rren

tly u

sed

by D

OE

staf

f for

the

Nuc

lear

Hyd

roge

n pr

ogra

m.

This

inte

grat

ed sc

hedu

le a

nd a

ssoc

iate

d w

ork

brea

kdow

n st

ruct

ure

can

be u

sed

to id

entif

y a

base

line

R&

D p

lan

for h

ighe

st

prio

rity

R&

D a

ctiv

ities

(and

ass

ess t

he im

pact

of

alte

rnat

ive/

addi

tiona

l R&

D ta

sks)

. Suc

h a

sche

dule

shou

ld

faci

litat

e th

e ad

just

men

ts th

at w

ill b

e ne

eded

to th

e N

GN

P R

&D

pr

ogra

m a

fter i

ts m

issi

on is

sele

cted

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.

6-3-

2 A

serie

s of s

truct

ured

wor

ksho

ps w

ith in

dust

ry, r

egul

ator

y,

labo

rato

ry, a

nd in

tern

atio

nal r

epre

sent

ativ

es sh

all b

e co

nduc

ted

to d

iscu

ss th

e fo

llow

ing:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.6-

3-2-

1 Tr

ade

stud

y re

sults

to se

lect

the

NG

NP’

s mis

sion

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

ERA

C

VII

I. N

GN

P R

esea

rch

and

Dev

elop

men

t Pr

ogra

m P

lan

7.

6-3-

2-2

Des

ign

optim

izat

ion

stud

ies t

o m

eet t

he se

lect

ed N

GN

P m

issi

on

(e.g

., pl

ant p

ower

leve

l, fu

el c

onfig

urat

ion,

fuel

mat

eria

l, op

erat

ing

tem

pera

ture

s, st

ruct

ural

mat

eria

ls)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.6-

3-2-

3 R

&D

pro

gram

ele

men

ts (a

naly

sis c

odes

and

ass

ocia

ted

data

ne

eds,

mat

eria

ls re

sear

ch, f

uels

deve

lopm

ent a

nd c

ertif

icat

ion)

. A

s not

ed b

elow

, ste

erin

g co

mm

ittee

s may

be

requ

ired

to e

nsur

e th

at a

ppro

pria

te p

artie

s pro

vide

con

tinue

d in

put i

n so

me

of th

ese

area

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.

6-3-

2-4

App

ropr

iate

cos

t sha

ring

by N

GN

P st

akeh

olde

rs (i

ndus

try,

inte

rnat

iona

l, re

gula

tory

age

ncie

s, D

OE)

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

ERA

C

VII

I. N

GN

P R

esea

rch

and

Dev

elop

men

t Pr

ogra

m P

lan

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 42

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

6-3-

3 M

ater

ials

R&

D: T

he su

bcom

mitt

ee is

aw

are

that

ther

e is

als

o re

sear

ch b

eing

con

duct

ed in

this

are

a in

the

nucl

ear h

ydro

gen

prog

ram

and

reco

mm

ends

that

the

wor

k fo

r NG

NP

be b

ette

r co

ordi

nate

d w

ith th

at w

ork

to a

void

ove

rlap

and

assu

re th

e w

ork

is c

ompl

emen

tary

. Afte

r tra

de st

udie

s are

com

plet

ed a

nd a

n N

GN

P m

issi

on se

lect

ed, t

he fo

llow

ing

item

s sho

uld

be

cons

ider

ed:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.

6-3-

3-1

Focu

s on

key

mat

eria

l res

earc

h ne

eds.

For e

xam

ple,

if h

ydro

gen

prod

uctio

n w

ere

sele

cted

as t

he k

ey m

issi

on a

nd a

n In

term

edia

te

Hea

t Exc

hang

er (I

HX

) con

cept

wer

e in

clud

ed in

the

optim

ized

de

sign

for t

hat m

issi

on, t

he u

se o

f dev

elop

men

tal m

ater

ials

sh

ould

be

limite

d to

the

IHX

(and

a sy

stem

atic

eva

luat

ion

shou

ld b

e co

nduc

ted

to id

entif

y an

app

ropr

iate

mat

eria

l for

the

IHX

ope

ratin

g co

nditi

ons

and

deve

lop

a “c

ode

case

” fo

r the

id

entif

ied

mat

eria

l). T

o th

e ex

tent

pos

sibl

e, th

e re

mai

nder

of t

he

plan

t sho

uld

rely

on

conv

entio

nal,

prov

en m

ater

ials

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.

6-3-

3-2

Gra

phite

cer

tific

atio

n ac

tiviti

es, w

hich

are

requ

ired

irres

pect

ive

of th

e N

GN

P m

issi

on a

nd re

acto

r des

ign,

shal

l be

revi

ewed

and

ac

cele

rate

d so

that

an

appr

opria

te m

ater

ial i

s cer

tifie

d w

ithin

the

requ

ired

timef

ram

e fo

r dep

loym

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n 7.

6-3-

4

Des

ign

Met

hods

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

ERA

C

VII

I. N

GN

P R

esea

rch

and

Dev

elop

men

t Pr

ogra

m P

lan

7.

6-3-

4-1

Usi

ng re

sults

from

Item

2 w

orks

hops

, ide

ntify

ana

lysi

s too

ls o

f in

tere

st a

nd a

reas

whe

re d

ata

are

need

ed fo

r dev

elop

ing,

ve

rifyi

ng a

nd v

alid

atin

g th

ese

code

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.6-

3-4-

2 D

evel

op a

join

t USN

RC

/indu

stry

/regu

lato

ry N

GN

P st

eerin

g gr

oup

to d

efin

e re

quire

d te

sts,

need

ed fa

cilit

ies,

and

data

to b

e co

llect

ed (i

nclu

ding

par

amet

er d

efin

ition

, acc

urac

y, e

tc.).

D

eter

min

e da

ta q

ualit

y le

vel a

nd n

eed

for s

eque

ster

ing

som

e da

ta fo

r use

with

“bl

ind”

pre

dict

ions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 43

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

6-3-

4-3

Def

ine

appr

opria

te c

ost s

harin

g re

quire

d by

indu

stry

, reg

ulat

ory,

D

OE,

and

inte

rnat

iona

l org

aniz

atio

ns to

com

plet

e su

ch te

sts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.6-

3-5

Plan

t Ope

ratio

ns -

The

need

to p

oten

tially

cou

ple

two

dive

rse

proc

esse

s (el

ectri

c po

wer

gen

erat

ion

and

hydr

ogen

pro

duct

ion)

co

mpl

icat

es th

e du

al m

issi

on a

nd th

e di

ffer

ing

dyna

mic

re

spon

ses o

f the

reac

tor p

lant

and

the

hydr

ogen

pro

duct

ion

proc

ess o

r the

ele

ctric

ity p

rodu

ctio

n pr

oces

s mus

t be

care

fully

as

sess

ed fo

r the

sing

le m

issi

on p

roje

ct. D

esig

n an

d an

alyt

ical

st

udie

s nee

d to

be

perf

orm

ed to

inve

stig

ate

poss

ible

co

nfig

urat

ions

and

con

trol s

chem

es. T

he re

sults

of t

hese

stud

ies

will

pro

vide

insi

ghts

as t

o th

e re

acto

r des

ign

cond

ition

s, pr

ovis

ion

of d

irect

ver

sus i

ndire

ct p

roce

ss h

eat c

ycle

s, et

c. (T

he

subc

omm

ittee

is a

war

e th

at th

e th

ere

is a

lso

rese

arch

in th

is a

rea

bein

g pe

rfor

med

und

er th

e nu

clea

r hyd

roge

n pr

ogra

m, w

hich

is

also

man

aged

by

DO

E-N

E; th

e w

ork

for N

GN

P sh

ould

be

coor

dina

ted

with

that

wor

k to

avo

id o

verla

p an

d as

sure

the

wor

k is

com

plem

enta

ry.)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

7.

6-3-

6 Sa

fety

and

Lic

ensi

ng -

A c

onve

rsat

ion

shou

ld b

e be

gun

with

the

NR

C re

gard

ing

the

key

aspe

cts o

f saf

ety

and

licen

sing

that

nee

d to

be

addr

esse

d if

the

NG

NP

wer

e de

ploy

ed p

rior t

o th

e 20

17-

2021

tim

efra

me.

The

subc

omm

ittee

not

es th

at th

e N

RC

staf

f has

al

read

y be

gun

a co

ncer

ted

effo

rt fo

r a “

tech

nolo

gy-n

eutra

l”

licen

sing

fram

ewor

k th

at th

e N

GN

P pr

ojec

t can

util

ize

as in

itial

gu

idan

ce (S

ECY

-05-

0130

). H

owev

er, t

his s

taff

doc

umen

t has

no

t yet

bee

n ad

opte

d by

the

NR

C c

omm

issi

on, b

ut is

und

er o

n-go

ing

disc

ussi

on a

nd re

view

by

the

NR

C st

aff a

nd A

CR

S.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 44

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

6-3-

7 Fu

els D

evel

opm

ent -

The

Sub

com

mitt

ee n

otes

this

is a

com

plex

su

bjec

t are

a. T

he IT

RG

reco

mm

ende

d th

at th

e N

GN

P fu

el R

&D

pr

ogra

m fo

cus o

n U

O2,

whi

ch h

as th

e la

rges

t exp

erie

nce

base

w

orld

wid

e, in

stea

d of

its c

urre

nt fo

cus o

n U

CO

fuel

, whi

ch is

al

so T

RIS

O fu

el b

ut w

ith k

erne

ls th

at h

ave

a m

ixtu

re o

f UO

2 an

d U

C fu

el p

artic

les.

U.S

. and

inte

rnat

iona

l exp

erts

con

cur t

hat

UC

O fu

el h

as th

e po

tent

ial t

o ex

hibi

t sup

erio

r per

form

ance

ove

r th

e U

O2

kern

el fu

el. I

f UC

O c

an b

e su

cces

sful

ly d

evel

oped

and

de

mon

stra

ted,

incl

udin

g de

velo

ping

and

pro

ving

the

need

ed

man

ufac

turin

g m

etho

ds a

nd p

aram

eter

s, it

shou

ld a

llow

hig

her

burn

-ups

, ope

rate

at h

ighe

r pow

er d

ensi

ties,

and

rele

ase

less

fis

sion

pro

duct

s at h

ighe

r acc

iden

t tem

pera

ture

s. Th

e us

e of

U

CO

fuel

is p

artic

ular

ly im

porta

nt to

the

even

tual

eco

nom

ic

succ

ess o

f rea

ctor

s with

pris

mat

ic fu

el, a

s com

pare

d to

the

pebb

le b

ed fu

el, s

ince

the

pris

mat

ic re

acto

r pus

hes t

he fu

el

hard

er to

avo

id th

e un

desi

rabl

e co

mpl

exity

of t

he p

ebbl

e be

d re

acto

r’s r

efue

ling

sche

me.

Nev

erth

eles

s, U

CO

fuel

wou

ld

conf

er p

erfo

rman

ce a

dvan

tage

s on

both

reac

tors

and

if it

wor

ked

wou

ld li

kely

be

adop

ted

for b

oth.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 45

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

7.

6-3-

7-1

How

ever

, UC

O fu

el p

erfo

rman

ce is

not

pro

ven

and

requ

ires

fund

amen

tal r

esea

rch

and

deve

lopm

ent t

o es

tabl

ish

that

its

prop

ertie

s are

supe

rior t

o U

O2.

In a

dditi

on, R

&D

is re

quire

d to

de

mon

stra

te th

at it

is p

ossi

ble

to m

anuf

actu

re fu

el o

f the

re

quis

ite q

ualit

y, g

et it

acc

epte

d by

the

regu

lato

r and

then

pr

oduc

e th

e la

rge

quan

tity

of fu

el n

eede

d to

load

the

reac

tor.

UO

2 fu

el is

muc

h fu

rther

alo

ng in

this

pro

cess

. The

inte

rnat

iona

l co

mm

unity

, (Fr

ance

, Sou

th A

fric

a, C

hina

, Jap

an) h

ave

focu

sed

on fi

rst d

emon

stra

ting

thei

r abi

lity

to fa

bric

ate

UO

2 an

d de

mon

stra

ting

that

it m

eets

the

requ

ired

perf

orm

ance

. Onc

e th

is

is a

ccom

plis

hed,

they

will

con

side

r goi

ng fo

rwar

d w

ith U

CO

. In

the

near

term

, it a

ppea

rs th

ey w

ould

be

will

ing

to c

oope

rate

with

th

e U

S on

wor

k on

UO

2, b

ut a

re le

ss e

nthu

sed

abou

t UC

O

coop

erat

ion

beca

use

obta

inin

g a

succ

essf

ul a

nd p

rove

n ca

pabi

lity

in U

O2

for T

RIS

O fu

el is

such

a la

rge

unde

rtaki

ng (o

f th

e sa

me

orde

r as t

he c

ost a

nd o

f lon

ger d

urat

ion

than

bui

ldin

g th

e ca

pabi

lity

to m

anuf

actu

re th

e re

acto

r pla

nt).

Onc

e U

O2

can

be m

anuf

actu

red

succ

essf

ully

and

is p

rove

n to

the

regu

lato

rs, t

he

inte

rnat

iona

l com

mun

ity p

lans

to a

dapt

thei

r app

roac

h to

UC

O,

whi

ch c

an th

en b

e lo

aded

into

exi

stin

g an

d fu

ture

reac

tors

as

desi

red.

Tha

t is,

the

inte

rnat

iona

l com

mun

ity d

e-co

uple

s the

re

acto

r des

ign,

con

stru

ctio

n, a

nd o

pera

tion

proc

esse

s fro

m th

e ne

ed to

succ

essf

ully

dev

elop

UC

O.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NER

AC

V

III.

NG

NP

Res

earc

h an

d D

evel

opm

ent

Prog

ram

Pla

n

9

NG

NP

PEP

PEP

10

NA

S R

evie

w

NA

S

10.1

Sum

mar

y

N

AS

Sum

mar

y

10.1

-1

Dep

loym

ent a

nd In

fras

truct

ure

Issu

es

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-1

-1

NE

shal

l im

med

iate

ly in

itiat

e a

coop

erat

ive

proj

ect w

ith in

dust

ry

to id

entif

y pr

oble

ms t

hat h

ave

aris

en in

the

cons

truct

ion

and

star

t-up

of n

ew p

lant

s and

def

ine

best

pra

ctic

es fo

r use

by

the

indu

stry

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-1

-2

DO

E sh

all f

und

a ta

skfo

rce

to w

ork

with

indu

stry

gro

ups o

n co

nstru

ctio

n te

chno

logy

and

pla

nnin

g to

ens

ure

that

con

sorti

a co

nstru

ctio

n tim

e go

als o

f 4 y

ears

or l

ess w

ill b

e m

et.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 46

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10.1

-2

N

ext-

Gen

erat

ion

Nuc

lear

Pla

nt

NA

S Su

mm

ary

10

.1-2

-3

The

mai

n ris

k as

soci

ated

with

NG

NP

is th

at th

e cu

rren

t bus

ines

s pl

an c

alls

for t

he p

rivat

e se

ctor

to m

atch

the

gove

rnm

ent (

DO

E)

fund

ing.

So

far,

how

ever

, not

a si

ngle

pro

gram

has

bee

n ar

ticul

ated

that

coo

rdin

ates

all

the

elem

ents

requ

ired

to

succ

essf

ully

com

mis

sion

the

NG

NP.

The

cur

rent

dis

conn

ect

betw

een

the

base

NG

NP

prog

ram

pla

n an

d th

e co

mpl

emen

tary

pu

blic

/priv

ate

partn

ersh

ip in

itiat

ive

mus

t be

reso

lved

. DO

E sh

all

deci

de w

heth

er to

pur

sue

a di

ffer

ent d

emon

stra

tion

with

a

smal

ler c

ontri

butio

n fr

om in

dust

ry o

r, al

tern

ativ

ely,

a m

ore

basi

c te

chno

logy

app

roac

h fo

r the

VH

TR.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-4

In a

sses

sing

NG

NP

conc

eptu

al d

esig

ns, N

E sh

all f

avor

des

ign

appr

oach

es th

at c

an a

chie

ve a

var

iety

of o

bjec

tives

at a

n ac

cept

able

tech

nica

l ris

k.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-5

NE

shal

l siz

e th

e N

GN

P re

acto

r sys

tem

to fa

cilit

ate

tech

nolo

gy

dem

onst

ratio

n fo

r fut

ure

com

mer

cial

uni

ts, i

nclu

ding

safe

ty.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-6

Bec

ause

of t

he v

ery

high

tem

pera

ture

s and

seve

re m

ater

ial

perf

orm

ance

requ

irem

ents

for t

herm

o ch

emic

al w

ater

split

ting,

N

E sh

all m

aint

ain

the

flexi

bilit

y to

firs

t ope

rate

the

NG

NP

usin

g hi

gh-te

mpe

ratu

re st

eam

ele

ctro

lysi

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-7a

DO

E sh

all f

ocus

on

deve

lopi

ng a

dvan

ced

mat

eria

ls fo

r in-

reac

tor o

pera

tion

at te

mpe

ratu

res a

bove

900

ºC a

nd fu

el p

artic

les

that

can

with

stan

d hi

gh b

urn-

up a

nd a

dver

se tr

ansi

ents

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-7b

NE

shal

l ens

ure

that

suff

icie

nt fu

nds a

re a

vaila

ble

to a

dvan

ce

thes

e te

chno

logi

es w

heth

er o

r not

indu

stry

mat

chin

g fu

nds a

re

avai

labl

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-8

To e

nsur

e th

e go

od p

erfo

rman

ce o

f hyd

roge

n pr

oduc

ed in

an

NG

NP,

NE

shal

l put

mor

e em

phas

is o

n th

e fo

llow

ing:

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

AS

Sum

mar

y

10

.1-2

-9

• Con

cept

ual i

nteg

rate

d pr

oces

s dev

elop

men

t and

opt

imiz

ing

plan

flow

shee

ts, b

efor

e m

ovin

g to

eng

inee

ring

desi

gns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-2

-10

• Sel

ectin

g th

e in

terf

ace

betw

een

the

reac

tor a

nd th

e hy

drog

en

plan

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

AS

Sum

mar

y

10

.1-2

-11

• Dev

elop

ing

syst

em p

erfo

rman

ce to

ols t

o ad

dres

s uns

tead

y co

nditi

ons,

such

as p

lant

star

t-up,

pla

nt tr

ip, a

nd m

aint

enan

ce

need

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 47

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.1-2

-12

• Ass

essm

ent o

f tot

al sy

stem

eco

nom

ics.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10.1

-3

N

ucle

ar H

ydro

gen

Initi

ativ

e

N

AS

Sum

mar

y

10.1

-3-2

D

OE

shal

l exp

and

NH

I pro

gram

inte

ract

ions

with

indu

stria

l and

in

tern

atio

nal r

esea

rch

orga

niza

tions

exp

erie

nced

in c

hem

ical

pr

oces

ses a

nd o

pera

ting

tem

pera

ture

s sim

ilar t

o th

ose

in th

erm

o ch

emic

al w

ater

split

ting.

NE

shou

ld a

lso

broa

den

the

hydr

ogen

pr

oduc

tion

syst

em p

erfo

rman

ce m

etric

s bey

ond

econ

omic

s-fo

r ex

ampl

e, it

cou

ld u

se th

e G

ener

atio

n IV

per

form

ance

met

ric o

f ec

onom

ics,

safe

ty, a

nd su

stai

nabi

lity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10.1

-4

O

ther

Gen

erat

ion

IV N

ucle

ar E

nerg

y Sy

stem

Pro

gram

s

N

AS

Sum

mar

y

10.1

-4-1

W

ithin

the

Gen

erat

ion

IV p

rogr

am, N

E sh

all m

odes

tly a

nd

reas

onab

ly su

ppor

t lon

g-te

rm b

ase

tech

nolo

gy o

ptio

ns o

ther

than

th

e V

HTR

and

the

SFR

, par

ticul

arly

for a

ctin

ide

man

agem

ent,

usin

g th

erm

al a

nd fa

st re

acto

rs a

nd a

ppro

pria

te fu

els.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-4

-2

Thou

gh N

E cu

rren

tly fo

cuse

s on

the

VH

TR fo

r pro

cess

hea

t and

th

e SF

R fo

r adv

ance

d fu

el c

ycle

s, it

shou

ld a

sses

s the

cos

t-be

nefit

of a

sing

le re

acto

r sys

tem

to m

eet b

oth

need

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10.1

-5

ID

AH

O N

AT

ION

AL

LA

BO

RA

TO

RY

N

AS

Sum

mar

y

10.1

-5-2

N

E sh

all s

et u

p an

d do

cum

ent a

pro

cess

for e

valu

atin

g al

tern

ativ

e ap

proa

ches

for a

ccom

plis

hing

NE-

spon

sore

d ac

tiviti

es, a

ssig

ning

thes

e ta

sks a

ppro

pria

tely

, and

avo

idin

g du

plic

atio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-3

NE

shal

l set

up

a fo

rmal

, hig

h-le

vel w

orki

ng g

roup

join

tly w

ith

the

Idah

o O

pera

tion

Off

ice

(ID

) and

INL

(Bat

telle

Ene

rgy

Alli

ance

[BEA

]). C

onsi

dera

tion

shou

ld b

e gi

ven

to a

lso

havi

ng

one

or m

ore

know

ledg

eabl

e ou

tsid

ers p

artic

ipat

e on

an

ongo

ing

basi

s to

prov

ide

a w

ider

per

spec

tive.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 48

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.1-5

-4

For I

NL

to a

ccom

plis

h its

exp

ecte

d m

issi

on, a

num

ber o

f lar

ge,

soph

istic

ated

and

uni

que

faci

litie

s will

be

need

ed. T

hese

cou

ld

incl

ude

larg

e ho

t cel

ls a

nd a

ssoc

iate

d la

bora

torie

s for

pos

t-irr

adia

tion

exam

inat

ion

of m

ater

ials

and

test

reac

tors

such

as t

he

Adv

ance

d Te

st R

eact

or (A

TR).

The

inte

nt is

for I

NL

to h

ave

mag

net f

acili

ties a

ttrac

ting

rese

arch

ers a

nd in

dust

rial u

sers

. For

th

ese

faci

litie

s to

attra

ct u

sers

, the

full

cost

s can

not b

e ch

arge

d,

and

the

user

wou

ld p

ay o

nly

the

just

ified

incr

emen

tal c

osts

as

soci

ated

with

use

. Thi

s arr

ange

men

t is t

ypic

al o

f use

r fac

ilitie

s in

the

Off

ice

of S

cien

ce la

bora

torie

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-5

The

NE/

INL

budg

etin

g sy

stem

and

the

budg

et d

ocum

ents

th

emse

lves

are

opa

que

and

hard

to u

nder

stan

d. It

is d

iffic

ult t

o tra

ce b

udge

t am

ount

s to

parti

cula

r pro

ject

s and

pro

gram

s or t

o sp

ecifi

c ac

tiviti

es w

ithin

the

INL

sub

budg

et. T

he c

omm

ittee

co

nclu

des t

hat a

muc

h m

ore

trans

pare

nt, s

truct

ured

pla

nnin

g an

d bu

dget

ing

proc

ess i

s nee

ded.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-6

NE,

ID, a

nd IN

L (B

EA) s

hall

agre

e on

a m

ultiy

ear,

reso

urce

-lo

aded

, hig

h-le

vel s

ched

ule

and

plan

for t

he IN

L fa

cilit

ies,

such

as

the

Prim

aver

a Pr

ojec

t Pla

nner

(P3)

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-7

NE,

ID, a

nd IN

L (B

EA) s

hall

impr

ove

the

form

and

con

tent

of

the

INL

faci

litie

s bud

get d

ocum

enta

tion.

The

y sh

ould

supp

ort a

m

uch

mor

e tra

nspa

rent

, stru

ctur

ed p

lann

ing

and

budg

et p

roce

ss.

Bud

get i

tem

s sho

uld

be re

adily

trac

eabl

e to

spec

ific

item

s in

the

over

all p

lan

and

sche

dule

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-8a

NE

shal

l mee

t with

DO

E an

d N

atio

nal N

ucle

ar S

ecur

ity

Adm

inis

tratio

n or

gani

zatio

ns th

at a

re P

SOs f

or o

ther

la

bora

torie

s to

revi

ew a

nd d

iscu

ss th

eir p

ract

ices

and

pro

cess

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-5

-8b

Bas

ed o

n th

e le

sson

s the

y le

arne

d, it

shou

ld d

evel

op a

nd

docu

men

t its

ow

n in

tern

al p

roce

sses

and

pro

cedu

res f

or

disc

harg

ing

its re

spon

sibi

litie

s as t

he le

ad P

SO fo

r IN

L.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10.1

-6

PR

OG

RA

M P

RIO

RIT

IES,

BA

LA

NC

E, A

ND

OV

ER

SIG

HT

NA

S Su

mm

ary

10.1

-6-1

Prog

ram

Bal

ance

N

AS

Sum

mar

y

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 49

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.1-6

-1-1

• U

nive

rsity

infr

astru

ctur

e su

ppor

t. A

size

able

bui

ldup

in n

ucle

ar

ener

gy p

rodu

ctio

n, re

sear

ch, a

nd d

evel

opm

ent n

eces

sita

tes

stre

ngth

enin

g un

iver

sity

cap

abili

ties t

o ed

ucat

e a

grow

ing

num

ber o

f you

ng p

rofe

ssio

nals

and

scie

ntis

ts in

the

rele

vant

ar

eas.

DO

E sh

ould

incl

ude

this

pro

gram

in it

s bud

get a

t the

le

vels

aut

horiz

ed b

y th

e En

ergy

Pol

icy

Act

of 2

005.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-6

-1-2

• I

NL.

It is

ess

entia

l to

prov

ide

reas

onab

le a

nd p

redi

ctab

le

fund

ing

to su

ppor

t the

PSO

resp

onsi

bilit

y fo

r site

con

ditio

n an

d ca

paci

ty b

uild

ing.

DO

E sh

ould

cre

ate

a st

rate

gic

plan

bas

ed o

n co

ncep

ts la

id o

ut in

Cha

pter

6 (s

ee T

able

6-2

) to

esta

blis

h th

e ta

rget

fund

ing

leve

l for

the

Idah

o Fa

cilit

ies M

anag

emen

t ac

coun

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-6

-2

Prog

ram

Ove

rsig

ht

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10

.1-6

-2-1

R

ecom

men

datio

n. A

s a c

ount

erba

lanc

e to

the

shor

t-ter

m n

atur

e of

the

fede

ral b

udge

t pro

cess

, NE

shou

ld a

dopt

an

over

sigh

t pr

oces

s for

eva

luat

ing

the

adeq

uacy

of p

rogr

am p

lans

, ev

alua

ting

prog

ress

aga

inst

thes

e pl

ans a

nd a

djus

ting

reso

urce

al

loca

tions

as p

lann

ed d

ecis

ion

poin

ts a

re re

ache

d.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S Su

mm

ary

10.2

The

Gen

erat

ion

IV a

nd N

ucle

ar H

ydro

gen

Initi

ativ

e Pr

ogra

ms

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-1

NEX

T-G

EN

ERA

TIO

N N

UC

LE

AR

PLA

NT

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10.2

-1-1

Prog

ram

Des

crip

tion

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 50

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-1

-1-1

Th

e N

GN

P pr

ogra

m is

aut

horiz

ed u

nder

EPA

ct05

at t

otal

fu

ndin

g of

$1.

25 b

illio

n fo

r Pha

se I,

whi

ch e

xten

ds to

201

1.

Dur

ing

this

pha

se, f

unda

men

tal R

&D

wou

ld b

e ca

rrie

d ou

t for

th

e as

soci

ated

tech

nolo

gies

and

com

pone

nts.

This

incl

udes

the

reac

tor a

nd it

s fue

l, th

e en

ergy

con

vers

ion

syst

em, m

ater

ials

, and

hy

drog

en g

ener

atio

n te

chno

logi

es. I

n ad

ditio

n, c

erta

in

fund

amen

tal d

ecis

ions

are

to b

e m

ade,

incl

udin

g se

lect

ion

of th

e m

issi

on o

f the

NG

NP

(eff

icie

nt e

lect

ricity

pro

duct

ion,

pro

cess

he

at, h

ydro

gen

gene

ratio

n, o

r a c

ombi

natio

n of

thes

e) a

nd th

e sp

ecifi

c hy

drog

en g

ener

atio

n te

chno

logy

. EPA

ct05

als

o di

scus

ses P

hase

II, w

hich

ext

ends

from

201

2 to

202

1 an

d w

here

in a

det

aile

d de

sign

shou

ld b

e co

mpe

titiv

ely

deve

lope

d, a

lic

ense

shou

ld b

e ob

tain

ed fr

om th

e U

.S. N

ucle

ar R

egul

ator

y C

omm

issi

on (U

SNR

C),

and

the

plan

t sho

uld

be c

onst

ruct

ed a

nd

com

mis

sion

ed.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10

.2-1

-1-2

A

ccor

ding

to E

PAct

05, t

he p

rogr

am w

ill b

e ba

sed

on th

e R

&D

ac

tiviti

es o

f the

Gen

erat

ion

IV p

rogr

am, t

he Id

aho

Nat

iona

l La

bora

tory

(IN

L) w

ill b

e th

e le

ad n

atio

nal l

abor

ator

y, a

nd th

e N

GN

P de

mon

stra

tion

will

be

site

d at

INL.

INL

is c

harg

ed to

or

gani

ze a

con

sorti

um o

f ind

ustri

al p

artn

ers t

o co

st-s

hare

the

proj

ect.

The

NG

NP

proj

ect i

s to

max

imiz

e te

chni

cal e

xcha

nge

and

trans

fer f

rom

oth

er re

leva

nt so

urce

s, in

clud

ing

othe

r in

dust

ries a

nd in

tern

atio

nal G

ener

atio

n IV

par

tner

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-1-2

HT

R/N

GN

P T

echn

olog

y C

halle

nges

and

Dev

elop

men

t Nee

ds

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-1

-2-

1-2

Fu

els D

evel

opm

ent a

nd R

equi

rem

ents

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10.2

-1-

2-1-

4

Plan

t Ope

ratio

ns

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 51

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10.2

-1-

2-1-

5

Safe

ty a

nd L

icen

sing

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10

.2-1

-2-1

-5-1

Th

ere

shal

l be

a di

scus

sion

with

the

USN

RC

on

the

key

aspe

cts

of sa

fety

and

lice

nsin

g th

at sh

ould

be

addr

esse

d if

the

NG

NP

is

depl

oyed

in th

e 20

17 to

202

1 tim

e fr

ame.

It is

kno

wn

that

U

SNR

C st

aff h

as a

lread

y be

gun

to d

evel

op a

tech

nolo

gy-n

eutra

l lic

ensi

ng fr

amew

ork

that

the

NG

NP

proj

ect c

an u

se a

s ini

tial

guid

ance

(SEC

Y-0

5-01

30).

How

ever

, thi

s sta

ff d

ocum

ent h

as

not y

et b

een

adop

ted

by th

e U

SNR

C b

ut is

still

bei

ng re

view

ed

by th

e st

aff a

nd th

e A

dvis

ory

Com

mitt

ee o

n R

eact

or S

afeg

uard

s. EP

Act

05 re

quire

s tha

t DO

E an

d U

SNR

C d

evel

op a

join

t ap

proa

ch to

lice

nsin

g N

GN

P by

Aug

ust 2

008.

Thi

s act

ivity

is

curr

ently

und

er w

ay w

ith in

puts

from

the

Phas

e 1

NG

NP

prog

ram

. The

DO

E-U

SNR

C d

iscu

ssio

ns re

late

d to

NG

NP

licen

sing

are

focu

sed

on d

efin

ing

the

appr

oach

that

will

be

used

. It

is p

ossi

ble

the

tech

nolo

gy-n

eutra

l app

roac

h w

ill b

e us

ed, b

ut it

is

not

cle

ar if

that

app

roac

h w

ould

be

read

y in

tim

e fo

r the

en

gine

erin

g ph

ase

of th

e N

GN

P. In

add

ition

, the

PB

MR

is

curr

ently

in p

re-a

pplic

atio

n re

view

for d

esig

n ce

rtific

atio

n by

th

e U

SNR

C. T

he is

sues

bei

ng a

ddre

ssed

are

gen

eric

to H

TR

licen

sing

, and

this

eff

ort w

ill p

rovi

de a

tang

ible

foru

m in

whi

ch

to m

ake

prog

ress

on

a lic

ensi

ng st

rate

gy fo

r NG

NP.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-1-

2-1-

6

Fuel

Cyc

le a

nd W

aste

Tec

hnol

ogy

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-1

-3

N

GN

P Ev

alua

tion

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 52

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-1

-3-1

-1

The

prog

ram

is d

esig

ned

to d

evel

op a

n ad

vanc

ed n

ew re

acto

r th

at c

an p

rovi

de p

roce

ss h

eat a

nd/o

r ele

ctric

ity. T

he

coge

nera

tion

func

tion

appe

ars t

o be

a c

ompl

icat

ion

sinc

e el

ectri

city

mig

ht b

e ge

nera

ted

mor

e ec

onom

ical

ly b

y ad

vanc

ed

LWR

s. H

owev

er, n

o ot

her n

ucle

ar te

chno

logy

can

gen

erat

e th

e hi

gh te

mpe

ratu

res n

eede

d fo

r the

bro

ad ra

nge

of p

roce

ss h

eat

appl

icat

ions

dis

cuss

ed. I

t has

bee

n re

com

men

ded

by N

ERA

C

that

this

dua

l mis

sion

be

reco

nsid

ered

and

not

be

acce

pted

w

ithou

t fur

ther

ana

lysi

s. It

was

felt

that

the

dual

mis

sion

wou

ld

driv

e th

e de

sign

, inc

reas

e th

e co

st o

f the

pro

gram

, and

ext

end

the

sche

dule

. It i

s im

porta

nt to

mai

ntai

n fle

xibi

lity

in th

e si

zing

of

the

NG

NP

reac

tor t

o fa

cilit

ate

obta

inin

g th

e ne

eded

in

tern

atio

nal c

olla

bora

tion

or c

o-fu

ndin

g by

end

use

rs.

Furth

erm

ore,

whi

le a

dua

l-pur

pose

mis

sion

wou

ld n

ot b

e ne

cess

ary

for f

utur

e co

mm

erci

al p

lant

s, it

coul

d se

rve

as a

n en

gine

erin

g-sc

ale

heat

exc

hang

er fo

r the

NG

NP

plan

t to

dem

onst

rate

the

viab

ility

of c

oupl

ing

of a

nuc

lear

pla

nt w

ith a

hy

drog

en p

rodu

ctio

n pl

ant.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10

.2-1

-3-4

-1

The

budg

et fo

r NG

NP

curr

ently

requ

este

d by

DO

E is

not

ad

equa

te to

mee

t the

pre

ferr

ed sc

hedu

le: T

o re

med

y th

is st

ate

of

affa

irs, a

sign

ifica

nt ra

mp-

up o

f rou

ghly

$10

0 m

illio

n pe

r yea

r w

ould

be

requ

ired

with

in 1

or 2

yea

rs. T

he b

udge

t for

FY

200

8 sh

ould

be

at le

ast $

60 m

illio

n if

the

prog

ram

is to

be

laun

ched

on

a tr

ajec

tory

that

will

mee

t the

201

7 op

erat

ions

dat

e. D

OE’

s no

tiona

l bud

get p

roje

ctio

n fo

r the

nex

t 6 y

ears

is o

nly

abou

t 20

perc

ent o

f wha

t is r

equi

red

to m

eet t

he st

ated

sche

dule

. The

bu

dget

s for

NH

I are

als

o pr

obab

ly n

ot a

dequ

ate

if th

is p

refe

rred

sc

hedu

le is

to b

e m

aint

aine

d. F

inal

ly, i

t is i

mpe

rativ

e th

at p

rivat

e se

ctor

fund

ing

be b

roug

ht in

to th

e pr

ogra

m to

supp

lem

ent t

he

requ

ired

rese

arch

, dev

elop

men

t, an

d de

mon

stra

tion.

The

te

chno

logy

par

tner

s mus

t be

sele

cted

and

end

use

rs m

ust b

e co

nvin

ced

to jo

in th

e pu

blic

/priv

ate

partn

ersh

ip a

t sig

nific

ant

leve

ls.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 53

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-1

-3-5

-1

Sinc

e th

e lo

ng-te

rm p

erfo

rman

ce g

oals

are

not

fully

est

ablis

hed-

for e

xam

ple,

the

final

tem

pera

ture

des

ign

for t

he V

HTR

is n

ot

defin

ed-it

is n

ot p

ossi

ble

to ju

dge

the

NG

NP’

s pro

gram

on

this

cr

iterio

n ye

t. Th

e ac

tual

NG

NP

prog

ram

rem

ains

in a

n ea

rly

form

ativ

e st

age.

Thi

s crit

erio

n sh

ould

be

held

in a

beya

nce

until

m

ore

prog

ress

is m

ade

on th

e pr

ogra

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-2

N

UC

LE

AR

HY

DR

OG

EN

INIT

IAT

IVE

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-2

-1

N

ucle

ar H

ydro

gen

Prod

uctio

n

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10.2

-2-3

Nuc

lear

Hyd

roge

n In

itiat

ive

Eva

luat

ion

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-2-3

-1-1

M

uch

of th

e cu

rren

t NH

I R&

D is

uni

vers

ity b

ased

, whi

ch is

ap

prop

riate

for m

any

aspe

cts o

f the

cur

rent

labo

rato

ry-s

cale

R

&D

. How

ever

, as i

nteg

rate

d ex

perim

ents

are

star

ted,

an

incr

easi

ng fr

actio

n of

the

prog

ram

supp

ort w

ill n

eed

to b

e di

rect

ed to

the

natio

nal l

abor

ator

ies a

nd in

dust

rial p

artic

ipan

ts in

th

e pr

ogra

m. M

ore

atte

ntio

n to

indu

stria

l-sca

le im

plic

atio

ns o

f th

e te

chno

logy

is n

eede

d, st

artin

g w

ith st

udyi

ng th

e im

plic

atio

ns

of o

pera

ting

cond

ition

s for

cos

t, re

liabi

lity,

and

safe

ty.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 54

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-2

-3-3

Th

e N

HI p

rogr

am is

eva

luat

ed u

sing

the

Gen

erat

ion

IV p

rogr

am

perf

orm

ance

mea

sure

s. Fo

r the

NH

I pro

gram

, the

eco

nom

ics

and

the

safe

ty a

nd re

liabi

lity

crite

ria a

re th

e m

ost i

mpo

rtant

. H

owev

er, s

peci

fic m

etric

s for

eva

luat

ing

perf

orm

ance

hav

e no

t be

en e

stab

lishe

d. T

he c

omm

ittee

reco

mm

ends

that

the

NH

I pr

ogra

m se

lect

spec

ific

econ

omic

met

rics t

hat c

an b

e lin

ked

to

the

cost

of h

ydro

gen

prod

uced

by

com

petin

g te

chno

logi

es, s

uch

as n

atur

al g

as st

eam

refo

rmin

g. It

is re

ason

able

that

unt

il m

ater

ials

and

fabr

icat

ion

met

hods

hav

e be

en id

entif

ied

for a

ll of

th

e m

ajor

syst

em c

ompo

nent

s, a

grea

t dea

l of u

ncer

tain

ty w

ill

surr

ound

thes

e ev

alua

tions

. The

des

ign

info

rmat

ion

will

bec

ome

avai

labl

e on

ce d

ecis

ions

hav

e be

en m

ade

befo

re e

nter

ing

the

pilo

t-sca

le d

emon

stra

tion

phas

e in

201

1. T

hese

dec

isio

ns sh

ould

be

bas

ed o

n th

e po

tent

ial t

o m

eet s

peci

fic e

cono

mic

crit

eria

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-3

O

TH

ER

GE

NE

RA

TIO

N IV

RE

AC

TO

R N

UC

LE

AR

E

NE

RG

Y S

YST

EM

S

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10.2

-3-1

Oth

er G

ener

atio

n IV

Sys

tem

Pro

gram

Des

crip

tions

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10

.2-3

-1-1

C

ross

cutti

ng R

&D

can

ben

efit

mor

e th

an o

ne re

acto

r con

cept

. Im

porta

nt fu

ndam

enta

l inf

orm

atio

n is

nee

ded

in th

e fo

llow

ing

cros

scut

ting

area

s:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-3-1

-1-1

• D

ata

to v

alid

ate

the

mod

els f

or th

e ef

fect

s of i

rrad

iatio

n on

m

ater

ials

cha

ract

eris

tics s

ince

the

expe

cted

serv

ice

time

for

nucl

ear p

ower

pla

nts h

as e

ffec

tivel

y be

com

e at

leas

t 60

year

s an

d co

uld

soon

be

as m

uch

as 8

0 ye

ars.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-3-1

-1-2

• D

ata

on th

e be

havi

or o

f UO

2 an

d no

nfer

tile

(neu

troni

cally

in

ert)

actin

ide-

bear

ing

fuel

s ope

ratin

g at

hig

h te

mpe

ratu

res f

or

long

tim

es. F

or e

xam

ple,

cer

ia, m

agne

sia,

and

zirc

onia

cou

ld b

e us

ed in

the

Gen

erat

ion

IV re

acto

rs to

hos

t the

act

inid

e fu

el.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 55

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-3

-1-1

-3

• Inf

orm

atio

n on

adv

ance

d en

ergy

con

vers

ion

syst

ems,

incl

udin

g eq

uipm

ent t

hat i

nter

face

s bet

wee

n th

e co

olan

t and

the

turb

ine

wor

king

flui

ds in

adv

ance

d cy

cles

, suc

h as

the

supe

rcrit

ical

CO

2 po

wer

cyc

le.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-3-1

-1-4

• I

nfor

mat

ion

on th

e ap

plic

atio

n of

tech

nolo

gy-n

eutra

l ap

proa

ches

to re

acto

r lic

ensi

ng a

nd a

dvan

ces i

n th

e re

gula

tory

sy

stem

to in

clud

e pe

rfor

man

ce-b

ased

crit

eria

for m

onito

ring.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-4

FIN

DIN

GS

AN

D R

ECO

MM

EN

DA

TIO

NS

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s 10

.2-4

-1

N

ext-

Gen

erat

ion

Nuc

lear

Pla

nt

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-4

A sc

hedu

le th

at c

oord

inat

es th

e re

quire

d el

emen

ts fo

r pub

lic-

priv

ate

partn

ersh

ip, d

esig

n ev

olut

ion,

def

ined

regu

lato

ry

appr

oach

, and

R&

D re

sults

shou

ld b

e ar

ticul

ated

to e

nhan

ce th

e po

tent

ial f

or p

rogr

am su

cces

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-5

DO

E sh

ould

dec

ide

whe

ther

to p

ursu

e a

diff

eren

t dem

onst

ratio

n pl

ant (

perh

aps a

smal

ler o

ne w

ith le

ss to

tal e

nerg

y ou

tput

or a

pl

ant w

ith fe

wer

hyd

roge

n pr

oduc

tion

optio

ns o

r a m

ore

basi

c te

chno

logy

app

roac

h fo

r the

VH

TR) w

ith a

smal

ler c

ontri

butio

n fr

om in

dust

ry.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10

.2-4

-1-6

In

ass

essi

ng N

GN

P co

ncep

tual

des

igns

, NE

shou

ld fa

vor d

esig

n ap

proa

ches

that

can

ach

ieve

a v

arie

ty o

f obj

ectiv

es a

t an

acce

ptab

le te

chni

cal r

isk-

for e

xam

ple,

hyd

roge

n pr

oduc

tion,

ot

her h

igh-

tem

pera

ture

pro

cess

hea

t pro

duct

s, en

ablin

g de

ep-

burn

act

inid

e m

anag

emen

t, an

d im

prov

ing

econ

omic

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10

.2-4

-1-7

N

E sh

ould

size

the

NG

NP

reac

tor s

yste

m to

faci

litat

e te

chno

logy

dem

onst

ratio

n fo

r fut

ure

com

mer

cial

uni

ts, i

nclu

ding

sa

fety

. Con

sist

ent w

ith re

sour

ces a

vaila

ble,

NE

shou

ld a

dopt

an

appr

opria

te p

ower

leve

l to

dem

onst

rate

com

pone

nts a

nd

func

tiona

lity

of p

ract

ical

sign

ifica

nce

to c

omm

erci

al si

ze.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 56

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-4

-1-8

B

ecau

se o

f the

ver

y hi

gh te

mpe

ratu

res a

nd se

vere

mat

eria

l pe

rfor

man

ce re

quire

men

ts fo

r the

rmo

chem

ical

wat

er sp

littin

g,

NE

shou

ld m

aint

ain

the

flexi

bilit

y to

firs

t ope

rate

the

NG

NP

usin

g hi

gh-te

mpe

ratu

re st

eam

ele

ctro

lysi

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-9

DO

E sh

ould

focu

s on

the

follo

win

g N

GN

P te

chno

logi

es th

at

requ

ire si

gnifi

cant

dev

elop

men

t and

ens

ure

that

suff

icie

nt fu

nds

are

avai

labl

e to

adv

ance

thes

e te

chno

logi

es w

heth

er o

r not

in

dust

ry m

atch

ing

fund

s are

ava

ilabl

e:

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-10

• Adv

ance

d m

ater

ials

for i

n-re

acto

r ope

ratio

n at

tem

pera

ture

s ab

ove

900º

C.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-11

• Fue

l par

ticle

s tha

t can

with

stan

d hi

gh b

urn-

up a

nd a

dver

se

trans

ient

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10

.2-4

-1-1

2 • T

he h

eat t

rans

port

syst

em fo

r pro

cess

hea

t app

licat

ions

, sp

ecifi

cally

to im

prov

e its

eff

icie

ncy

and

relia

bilit

y.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-1

-13

• Was

te m

anag

emen

t tec

hnol

ogie

s rel

ated

to c

omm

erci

al

depl

oym

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-2

N

ucle

ar H

ydro

gen

Initi

ativ

e

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

10

.2-4

-2-1

N

HI i

s wel

l for

mul

ated

to id

entif

y an

d de

velo

p w

orka

ble

tech

nolo

gies

, but

the

sche

dule

s and

bud

gets

nee

d to

be

adju

sted

to

ass

ure

appr

opria

te c

oupl

ing

to th

e la

rger

NG

NP

prog

ram

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 57

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

10

.2-4

-2-3

D

OE

shou

ld e

xpan

d N

HI p

rogr

am in

tera

ctio

ns w

ith in

dust

rial

and

inte

rnat

iona

l res

earc

h or

gani

zatio

ns e

xper

ienc

ed in

che

mic

al

proc

esse

s and

ope

ratin

g te

mpe

ratu

res s

imila

r to

thos

e in

ther

mo

chem

ical

wat

er sp

littin

g. N

E sh

ould

als

o br

oade

n th

e hy

drog

en

prod

uctio

n sy

stem

per

form

ance

met

rics b

eyon

d ec

onom

ics-

for

exam

ple,

it c

ould

use

the

Gen

erat

ion

IV p

erfo

rman

ce m

etric

s of

econ

omic

s, sa

fety

, and

sust

aina

bilit

y.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10

.2-4

-3

Oth

er G

ener

atio

n IV

Nuc

lear

Ene

rgy

Syst

em P

rogr

ams

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-3

-1

With

in th

e G

ener

atio

n IV

pro

gram

, NE

shou

ld m

odes

tly a

nd

reas

onab

ly su

ppor

t lon

g-te

rm b

ase

tech

nolo

gy o

ptio

ns o

ther

than

th

e V

HTR

and

the

SFR

, par

ticul

arly

for a

ctin

ide

man

agem

ent,

usin

g th

erm

al a

nd fa

st re

acto

rs a

nd a

ppro

pria

te fu

els.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-3

-2

Thou

gh N

E cu

rren

tly fo

cuse

s on

the

VH

TR fo

r pro

cess

hea

t and

th

e SF

R fo

r adv

ance

d fu

el c

ycle

s, it

shou

ld a

sses

s the

cos

t-be

nefit

of a

sing

le re

acto

r sys

tem

des

ign

to m

eet b

oth

need

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

NA

S 3.

The

Gen

erat

ion

IV a

nd N

ucle

ar

Hyd

roge

n In

itiat

ive

Prog

ram

s

10.2

-4-3

-3

Fund

ing

for N

GN

P an

d N

HI s

houl

d be

incr

ease

d if

the

sche

dule

is

to b

e ac

cele

rate

d to

attr

act m

ore

indu

stria

l sup

port.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

N

AS

3. T

he G

ener

atio

n IV

and

Nuc

lear

H

ydro

gen

Initi

ativ

e Pr

ogra

ms

2

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

B

uild

ings

and

Str

uctu

res

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

B

uild

ings

and

St

ruct

ures

2.

1

Ope

ratio

nal R

equi

rem

ents

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

2.

1-3

The

NG

NP

shal

l dem

onst

rate

a m

inim

um 1

8-m

onth

refu

elin

g in

terv

al c

apab

ility

(if a

pplic

able

). 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 58

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1-4

The

NG

NP

shal

l im

plem

ent t

he te

chno

logi

es im

porta

nt to

ac

hiev

ing

the

func

tiona

l per

form

ance

and

des

ign

requ

irem

ents

de

term

ined

thro

ugh

clos

e co

llabo

ratio

n w

ith c

omm

erci

al

indu

stry

end

-use

rs.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.1

NG

NP

Mis

sion

N

eed

2.

1-5

The

NG

NP

shal

l de

mon

stra

te th

e ba

sis f

or c

omm

erci

aliz

atio

n of

the

nucl

ear s

yste

m, a

hea

t tra

nsfe

r/tra

nspo

rt sy

stem

, a

hydr

ogen

pro

duct

ion

proc

ess,

and

a po

wer

con

vers

ion

conc

ept.

An

esse

ntia

l par

t of t

he h

ydro

gen

oper

atio

ns w

ill b

e de

mon

stra

ting

that

the

requ

isite

relia

bilit

y an

d ca

paci

ty fa

ctor

ca

n be

ach

ieve

d ov

er a

n ex

tend

ed p

erio

d of

ope

ratio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.1

NG

NP

Mis

sion

N

eed

2.

1-6a

N

GN

P nu

clea

r hea

t sou

rce

shal

l be

base

d on

the

HTG

R c

once

pt

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

2.1-

6b

The

NG

NP

nucl

ear h

eat s

ourc

e sh

all u

tiliz

e pa

ssiv

e sa

fety

fe

atur

es to

coo

l the

cor

e fr

om fu

ll po

wer

to sa

fe sh

utdo

wn

cond

ition

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

2.1-

7a

The

NG

NP

shal

l pro

duce

hig

h-ef

ficie

ncy

elec

trici

ty a

nd

gene

rate

hyd

roge

n on

a sc

ale

that

sets

a fo

unda

tion

for f

utur

e co

mm

erci

al d

eplo

ymen

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

2.

1-7b

N

GN

P sh

all g

ener

ate

hydr

ogen

on

a sc

ale

that

sets

a fo

unda

tion

for f

utur

e co

mm

erci

al d

eplo

ymen

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

2.1

NG

NP

Proj

ect

Req

uire

men

ts a

t Pr

e-C

once

ptua

l D

esig

n

2.1-

8 N

GN

P sh

all i

nclu

de p

rovi

sion

s for

futu

re te

stin

g.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 59

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1-9a

Th

e N

GN

P sh

all e

nabl

e de

mon

stra

tion

of e

nerg

y pr

oduc

ts

utili

zing

its n

ucle

ar h

eat s

ourc

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

2.

1-9b

Th

e N

GN

P sh

all e

nabl

e de

mon

stra

tion

of e

nerg

y pr

oces

ses

utili

zing

its n

ucle

ar h

eat s

ourc

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

1 N

GN

P Pr

ojec

t R

equi

rem

ents

at

Pre-

Con

cept

ual

Des

ign

2.

1-10

Th

e N

GN

P sh

all l

imit

norm

al m

aint

enan

ce e

xpos

ure

of n

o m

ore

than

50

pers

on-R

EM/y

ear p

er m

odul

e in

a re

fuel

ing

year

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

SA

G

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

M

eetin

g A

gree

men

ts

Oct

ober

22,

200

8 M

eetin

g M

inut

es

2.

1-11

Th

e N

GN

P sh

all

have

an

avai

labi

lity

fact

or o

f gre

ater

than

or

equa

l to

90%

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

2.2

HTG

R

Fund

amen

tal

Req

uire

men

ts

2.

1-12

Th

e N

GN

P sh

all h

ave

a pl

ant d

esig

n lif

etim

e of

60

year

s (c

alen

dar)

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

2.2

HTG

R

Fund

amen

tal

Req

uire

men

ts

2.

1-14

Th

e N

GN

P re

acto

r gas

out

let t

empe

ratu

re sh

all b

e in

the

rang

e of

750

°C to

800

°C

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SAG

M

eetin

g A

gree

men

ts

Oct

ober

22,

200

8 M

eetin

g M

inut

es

3

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

3.

1

Rea

ctor

Sys

tem

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

3.1-

2 Th

e N

GN

P co

re sh

all u

se fo

rced

circ

ulat

ion

heliu

m a

s the

hea

t tra

nspo

rt flu

id.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1 R

eact

or

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 60

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

1-3a

Th

e N

GN

P no

n-re

plac

eabl

e st

ruct

ural

mat

eria

ls in

con

tact

with

he

lium

shal

l res

ist e

rosi

on d

urin

g pl

ant c

ycle

life

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

3.1-

3b

The

NG

NP

non-

repl

acea

ble

stru

ctur

al m

ater

ials

in c

onta

ct w

ith

heliu

m sh

all r

esis

t ero

sion

dur

ing

plan

t cyc

le li

fe.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1 R

eact

or

Syst

em

4

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

4.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

5

R

eact

or T

ype

Bou

ndin

g C

ondi

tion

4.1

Rea

ctor

Typ

e

5.1

B

ound

ing

Con

ditio

n - 0

01

Bou

ndin

g C

ondi

tion

4.1.

1 B

ound

ing

Con

ditio

n - 0

01

6

Rea

ctor

Des

ign

Pow

er L

evel

B

ound

ing

Con

ditio

n 4.

2 R

eact

or D

esig

n Po

wer

Lev

el

6.1

B

ound

ing

Con

ditio

n - 0

02

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02

6.

1-1

The

NG

NP

shal

l be

capa

ble

of o

pera

tion

at p

ower

leve

ls u

p to

60

0 M

wt,

depe

ndin

g on

the

core

des

ign,

and

cor

e po

wer

de

nsiti

es th

at w

ill d

emon

stra

te th

e te

chni

cal a

nd e

cono

mic

fe

asib

ility

of c

omm

erci

al H

TGR

s with

a p

assi

ve sa

fety

bas

is

such

that

max

imum

fuel

tem

pera

ture

s und

er n

orm

al a

nd

abno

rmal

con

ditio

ns a

re a

ccep

tabl

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02

6.

1-3-

1 Th

e pe

ak ti

me

aver

aged

fuel

tem

pera

ture

doe

s not

exc

eed

1250

°C u

nder

nor

mal

ope

ratin

g co

nditi

ons.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02

6.

1-3-

2 Th

e pe

ak fu

el te

mpe

ratu

re sh

all n

ot e

xcee

d 16

00°C

und

er

acci

dent

con

ditio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02

6.

1-4

In a

dditi

on, t

he c

ore

desi

gn sh

all r

esul

t in

a se

lf-co

nsis

tent

set o

f op

erat

ing

para

met

ers (

e.g.

, pow

er d

ensi

ty, c

ore

delta

T) a

nd

mat

eria

l cho

ices

(e.g

., fu

el, g

raph

ite, c

ore

barr

el, r

eact

or v

esse

l) th

at d

emon

stra

te a

dequ

ate

safe

ty m

argi

n w

hen

unce

rtain

ties i

n op

erat

ing

para

met

ers a

nd in

the

asso

ciat

ed c

alcu

latio

n m

etho

ds

(typi

cally

at 9

5% c

onfid

ence

) are

exp

licitl

y ac

coun

ted.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 61

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

6.

1-5

Fina

l des

ign

wor

k is

requ

ired

to v

erify

that

the

calc

ulat

ed fu

el

tem

pera

ture

s mee

t the

spec

ified

rang

es u

nder

all

cond

ition

s afte

r ap

prop

riate

ly a

ccou

ntin

g fo

r unc

erta

intie

s in

the

calc

ulat

ions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02,

Sum

mar

y of

Bas

es

6.

1-6

The

desi

gn o

f the

nuc

lear

isla

nd fo

r the

nuc

lear

syst

em se

lect

ed

for N

GN

P ne

eds t

o be

com

plet

ed a

long

with

the

rese

arch

and

de

velo

pmen

t (R

&D

) sup

porti

ng th

e qu

alifi

catio

n of

fuel

, gr

aphi

te, m

ater

ials

, and

met

hods

requ

ired

to su

ppor

t the

lic

ensi

ng b

asis

of t

he p

lant

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02,

Sum

mar

y of

Bas

es

6.

1-7

Add

ition

al w

ork

is re

quire

d to

dev

elop

the

char

acte

ristic

s of t

he

nucl

ear s

yste

m w

ith a

low

er p

ower

ratin

g (e

.g.,

one

half

the

max

imum

pow

er d

esig

n) in

con

junc

tion

with

an

eval

uatio

n of

de

sign

and

any

add

ition

al R

&D

that

wou

ld b

e re

quire

d to

in

clud

e or

evo

lve

certi

ficat

ion

of th

is lo

wer

-pow

er d

esig

n un

der

that

for t

he h

ighe

r-po

wer

des

ign.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02,

Sum

mar

y of

Bas

es

6.

1-9

Cle

arly

iden

tify

the

low

er-p

ower

des

ign

requ

irem

ents

in fu

rther

ev

alua

tions

with

the

priv

ate

sect

or a

nd th

roug

h ev

alua

tion

of

othe

r fac

tors

(e.g

., av

aila

bilit

y of

com

pone

nts,

trans

porta

tion

of

larg

e ve

ssel

s and

com

pone

nts,

pote

ntia

l for

mas

s pro

duct

ion,

lic

ensi

ng)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02,

Sum

mar

y of

Bas

es

6.

1-10

Th

e lo

wer

-pow

er d

esig

ns b

y th

e ve

ndor

s sha

ll be

dev

elop

ed

thro

ugh

scal

ing,

whe

re p

ossib

le, o

f the

cur

rent

des

igns

to m

eet

the

priv

ate

sect

or n

eeds

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.2.

1 B

ound

ing

Con

ditio

n - 0

02,

Sum

mar

y of

Bas

es

7

Rea

ctor

Gas

Out

let T

empe

ratu

re

Bou

ndin

g C

ondi

tion

4.3

Rea

ctor

Gas

O

utle

t Tem

pera

ture

7.

1

Bou

ndin

g C

ondi

tion

- 003

B

ound

ing

Con

ditio

n 4.

3.1

Bou

ndin

g C

ondi

tion

- 003

7.1-

1 Th

e re

acto

r isl

and

shal

l be

desi

gned

for o

pera

tion

at th

e hi

ghes

t te

mpe

ratu

re a

chie

vabl

e fo

r the

reac

tor c

ore

desi

gn (i

.e.,

pebb

le

bed,

the

pris

mat

ic c

ores

) and

the

max

imum

pow

er le

vel (

see

spec

ific

fuel

tem

pera

ture

requ

irem

ents

abo

ve).

950

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.3.

1 B

ound

ing

Con

ditio

n - 0

03

7.

1-2

NG

NP

shal

l be

capa

ble

of o

pera

ting

at lo

wer

pow

er a

nd

tem

pera

ture

to a

ccom

mod

ate

a pe

riod

of p

lant

ope

ratio

n be

low

de

sign

con

ditio

ns.

950

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.3.

1 B

ound

ing

Con

ditio

n - 0

03

8

Rea

ctor

Gas

Inle

t Tem

pera

ture

B

ound

ing

Con

ditio

n 4.

4 R

eact

or G

as

Inle

t Tem

pera

ture

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 62

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

8.1

B

ound

ing

Con

ditio

n - 0

04

Bou

ndin

g C

ondi

tion

4.4.

1 B

ound

ing

Con

ditio

n - 0

04

8.

1-1

The

reac

tor g

as in

let t

empe

ratu

re sh

all b

e co

mpa

tible

with

the

max

imum

reac

tor p

ower

, gas

out

let t

empe

ratu

re, a

nd re

quire

d ga

s flo

w ra

te to

ach

ieve

acc

epta

ble

fuel

ope

ratin

g te

mpe

ratu

res

(see

des

ign

limits

abo

ve) a

nd m

ater

ial c

hoic

es, p

artic

ular

ly th

e R

PV.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.4.

1 B

ound

ing

Con

ditio

n - 0

04

9

Con

tain

men

t

B

ound

ing

Con

ditio

n 4.

11 C

onta

inm

ent

9.1

B

ound

ing

Con

ditio

n - 0

15

Bou

ndin

g C

ondi

tion

4.11

.1 B

ound

ing

Con

ditio

n - 0

15

9.

1-1

NG

NP

shal

l inc

lude

reac

tor a

nd re

acto

r bui

ldin

g co

ntai

nmen

t fe

atur

es th

at, i

n co

mbi

natio

n w

ith th

e ot

her m

echa

nism

s for

ra

dion

uclid

e co

ntai

nmen

t (e.

g., f

issi

on p

rodu

ct re

tent

ion

capa

bilit

ies o

f the

fuel

) and

tran

spor

t, (e

.g.,

entra

inm

ent,

plat

e ou

t), re

sult

in c

alcu

late

d do

se ra

tes a

t the

EA

B th

at m

eet t

he

crite

ria e

stab

lishe

d ab

ove

(see

Pub

lic a

nd W

orke

r Exp

osur

e Li

mits

) for

nor

mal

ope

ratio

n, a

bnor

mal

con

ditio

ns, a

nd a

ccid

ent

cond

ition

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.11

.1 B

ound

ing

Con

ditio

n - 0

15

10

L

icen

sing

B

ound

ing

Con

ditio

n 4.

12 L

icen

sing

10.1

Bou

ndin

g C

ondi

tion

- 016

B

ound

ing

Con

ditio

n 4.

12.1

Bou

ndin

g C

ondi

tion

- 016

11

Ris

k M

anag

emen

t

B

ound

ing

Con

ditio

n 4.

13 R

isk

Man

agem

ent

11.1

Bou

ndin

g C

ondi

tion

- 017

B

ound

ing

Con

ditio

n 4.

13.1

Bou

ndin

g C

ondi

tion

- 017

12

Com

pone

nt T

est F

acili

ty

Bou

ndin

g C

ondi

tion

4.14

Com

pone

nt

Test

Fac

ility

12

.1

B

ound

ing

Con

ditio

n - 0

18

Bou

ndin

g C

ondi

tion

4.14

.1 B

ound

ing

Con

ditio

n - 0

18

12

.1-1

A

CTF

shal

l be

prov

ided

as p

art o

f the

infr

astru

ctur

e su

ppor

ting

HTG

R te

chno

logi

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.14

.1 B

ound

ing

Con

ditio

n - 0

18

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 63

of10

4

Obj

ect

#R

equi

rem

ent

IDSt

akeh

olde

r R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

12

.1-2

Th

e fa

cilit

y sh

all b

e ca

pabl

e of

com

plet

ing

proo

f-of

-pe

rfor

man

ce te

stin

g of

maj

or H

TGR

and

NG

NP

com

pone

nts a

t en

gine

erin

g or

full

scal

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.14

.1 B

ound

ing

Con

ditio

n - 0

18

Form 412.09 (Rev. 10)

Idaho National Laboratory

NGNP SYSTEM REQUIREMENTS MANUAL

Identifier: Revision: Effective Date:

INL/EXT-07-12999 3 09/10/09 Page: 65 of 104

Appendix B

NGNP Functional, Operational, andTechnical Requirements

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 66

of10

4

App

endi

x B

N

GN

P Fu

nctio

nal,

Ope

ratio

nal,

and

Tech

nica

l Req

uire

men

ts

B-1

. N

ucle

ar H

eat S

uppl

y R

equi

rem

ents

B

-1.1

R

eact

or P

ress

ure

Vess

el

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Pre

ssur

e V

esse

l Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

Bui

ldin

gs

and

Stru

ctur

es

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

2.1

Su

rvei

llanc

e an

d In

-Ser

vice

Insp

ectio

n re

quir

emen

ts

SRM

Rev

2

4.1.

6 Su

rvei

llanc

e an

d In

-Ser

vice

In

spec

tion

requ

irem

ents

2.1-

1 Th

e N

GN

P de

sign

shal

l pro

vide

acc

ess t

o th

e pr

imar

y an

d se

cond

ary

loop

pre

ssur

e bo

unda

ry to

per

mit

In-S

ervi

ce

Insp

ectio

n a

s req

uire

d by

app

ropr

iate

sect

ions

of t

he A

mer

ican

So

ciet

y of

Mec

hani

cal E

ngin

eers

(ASM

E) B

oile

r and

Pre

ssur

e V

esse

l (B

&PV

) Cod

e.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

6 Su

rvei

llanc

e an

d In

-Ser

vice

In

spec

tion

requ

irem

ents

2.2

V

esse

l Sys

tem

Fun

ctio

n an

d D

esig

n

SRM

Rev

2

2.2-

2 Th

e du

ratio

n of

mai

nten

ance

shal

l be

min

imiz

ed.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2 V

esse

l Sy

stem

2.2-

2 Th

e du

ratio

n of

, In-

Serv

ice

shal

l be

min

imiz

ed.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2 V

esse

l Sy

stem

2.2-

2 Th

e du

ratio

n of

repa

ir/re

plac

emen

t ope

ratio

ns o

f the

ves

sel

syst

em sh

all b

e m

inim

ized

. 95

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2

Ves

sel

Syst

em

2.

2-3

All

parts

of t

he v

esse

l sys

tem

shal

l be

desi

gned

for a

n op

erat

ing

dura

tion

of 6

0 ye

ars.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2 V

esse

l Sy

stem

2.2-

4 Li

fetim

e of

isol

atio

n va

lves

, pip

ing

and

cros

s-ve

ssel

s (w

here

ap

plic

able

) of t

he v

esse

l sys

tem

shal

l be

optim

ized

acc

ordi

ng to

th

e in

vest

men

t cos

t and

repl

acem

ent d

urat

ion.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2 V

esse

l Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 67

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Pre

ssur

e V

esse

l Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

2-5

The

vess

el sy

stem

shal

l be

desi

gned

for d

esig

n ba

sis d

uty-

cycl

e ev

ents

. 95

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2

Ves

sel

Syst

em

3

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

3.

1

Ves

sel S

yste

m

SRM

Rev

2

4.3.

2 V

esse

l Sy

stem

3.

1.1

R

eact

or V

esse

l

SR

M R

ev 2

4.

3.2.

1 R

eact

or

Ves

sel

3.

1.1-

3 D

urin

g no

rmal

ope

ratio

n, th

e re

acto

r ves

sel s

hall

mai

ntai

n its

op

erat

ing

tem

pera

ture

thro

ugh

a th

erm

al b

alan

ce b

etw

een

the

core

hea

t flu

x, c

ore

inle

t hel

ium

flow

, and

the

reac

tor c

avity

co

olin

g sy

stem

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.1

Rea

ctor

V

esse

l

3.

1.1-

4 Th

e re

acto

r ves

sel s

hall

mai

ntai

n th

e pr

imar

y pr

essu

re b

ound

ary

inte

grity

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

1 R

eact

or

Ves

sel

3.

1.1-

5 Th

e op

erat

ing

cond

ition

s sha

ll be

con

side

red

acco

rdin

g to

the

follo

win

g st

atem

ents

: 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

1 R

eact

or

Ves

sel

3.

1.1-

5-1

In n

orm

al o

pera

tion,

cre

ep e

ffec

ts o

n th

e re

acto

r ves

sel s

hall

be

avoi

ded

(neg

ligib

le c

reep

). 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

1 R

eact

or

Ves

sel

3.

1.1-

5-2

No

leak

age

shal

l res

ult f

rom

Ant

icip

ated

Ope

ratin

g O

ccur

renc

es

(AO

O).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.1

Rea

ctor

V

esse

l

3.1.

1-5-

3 Fo

r AO

Os a

nd D

BA

s, th

e re

acto

r ves

sel s

hall

not p

reve

nt

rest

artin

g of

the

plan

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

1 R

eact

or

Ves

sel

3.1.

1.1

V

esse

l Sys

tem

SRM

Rev

1

4.3.

2 V

esse

l Sy

stem

3.1.

1.1-

1

The

vess

el sy

stem

shal

l con

tain

and

supp

ort t

he c

ompo

nent

s of

the

reac

tor c

ore,

reac

tor i

nter

nal s

uppo

rts a

nd st

ruct

ures

, and

the

nucl

ear h

eat t

rans

port

com

pone

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

2 V

esse

l Sy

stem

3.

1.2

C

ross

Ves

sels

(whe

re a

pplie

d)

SRM

Rev

2

3.1.

2-2

The

cros

s ves

sels

shal

l mai

ntai

n th

e pr

imar

y pr

essu

re b

ound

ary

inte

grity

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

2 C

ross

V

esse

ls (w

here

ap

plie

d)

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 68

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Pre

ssur

e V

esse

l Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3.

1.2-

3 Th

e cr

oss v

esse

ls sh

all p

rovi

de th

e pr

imar

y he

at tr

ansp

ort p

ath

to/fr

om th

e re

acto

r ves

sel a

nd IH

X v

esse

ls, o

r ste

am g

ener

ator

ve

ssel

s, as

app

licab

le.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.2

Cro

ss

Ves

sels

(whe

re

appl

ied)

3.

1.3

IH

X V

esse

ls (w

here

app

lied)

SR

M R

ev 2

3.

1.3-

1 Th

e fu

nctio

n of

the

IHX

ves

sel s

hall

be to

supp

ort t

he IH

X

mod

ules

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

3 IH

X

Ves

sels

(whe

re

appl

ied)

3.1.

3-2

The

IHX

ves

sels

shal

l mai

ntai

n th

e pr

imar

y pr

essu

re b

ound

ary

inte

grity

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

3 IH

X

Ves

sels

(whe

re

appl

ied)

3.

1.4

V

esse

l Sup

port

s

SR

M R

ev 2

3.

1.4-

1 Th

e IH

X v

esse

l sup

ports

shal

l sup

port

the

verti

cal l

oad.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

4 V

esse

l Su

ppor

ts

3.

1.4-

2 Th

e IH

X v

esse

l sup

ports

shal

l inc

lude

key

ing

for l

ater

al

supp

ort.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.4

Ves

sel

Supp

orts

3.1.

4-3

The

IHX

ves

sel s

uppo

rts sh

all a

ccom

mod

ate

ther

mal

exp

ansi

on.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.4

Ves

sel

Supp

orts

3.1.

4-4

The

IHX

ves

sel s

uppo

rts sh

all a

ccom

mod

ate

duty

-cyc

le e

vent

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

4 V

esse

l Su

ppor

ts

3.

1.4-

5 Th

e IH

X v

esse

l sup

ports

shal

l with

stan

d co

uple

d vi

brat

ion

from

th

e ci

rcul

ator

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

4 V

esse

l Su

ppor

ts

3.

1.4-

6 Th

e re

acto

r ves

sel s

hall

prov

ide

core

supp

ort a

nd m

aint

ain

its

rela

tive

posi

tion

to th

e co

ntro

l rod

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.2.

1 R

eact

or

Ves

sel

3.

1.4-

7 Th

e re

acto

r ves

sel s

hall

prov

ide

deca

y he

at a

nd re

sidu

al h

eat

rem

oval

by

radi

al c

ondu

ctio

n du

ring

loss

-of-

forc

ed c

ircul

atio

n ev

ents

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.2.

1 R

eact

or

Ves

sel

3.1.

5

Pres

sure

Rel

ief S

yste

m

SRM

Rev

2

3.1.

5-2

In c

ase

of p

rimar

y ov

erpr

essu

re, t

he sa

fety

val

ves s

hall

open

to

elim

inat

e th

e ov

erpr

essu

re a

nd re

clos

e on

ce th

e ov

erpr

essu

re

cond

ition

term

inat

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.5

Pres

sure

R

elie

f Sys

tem

3.

1.5-

3 Th

e pr

essu

re re

lief s

yste

m sh

all p

rovi

de th

e pr

imar

y co

olan

t lo

op’s

ove

rpre

ssur

e pr

otec

tion

as re

quire

d by

ASM

E pr

essu

re

relie

f cod

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

2.5

Pres

sure

R

elie

f Sys

tem

4

Pr

imar

y Sy

stem

Pre

ssur

e V

esse

ls

Bou

ndin

g C

ondi

tion

4.6

Prim

ary

Syst

em

Pres

sure

Ves

sels

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 69

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Pre

ssur

e V

esse

l Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

4.1

B

ound

ing

Con

ditio

n - 0

08

Bou

ndin

g C

ondi

tion

4.6.

1 B

ound

ing

Con

ditio

n - 0

08

4.

1-1

The

nucl

ear h

eat s

uppl

y sy

stem

, whi

ch in

clud

es th

e he

at

trans

fer/t

rans

port

syst

em, s

hall

be d

esig

ned

to m

inim

ize

sche

dule

risk

for t

he p

rimar

y pr

essu

re v

esse

ls a

t ful

l des

ign

pow

er le

vel a

nd in

let a

nd o

utle

t tem

pera

ture

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.6.

1 B

ound

ing

Con

ditio

n - 0

08

4.

1-2

In th

is re

gard

, the

des

ign

of th

e pr

imar

y pr

essu

re v

esse

ls,

incl

udin

g th

e R

PV, s

hall

inco

rpor

ate

stan

dard

LW

R R

PV

mat

eria

l (e.

g., S

A 5

08/5

33).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.6.

1 B

ound

ing

Con

ditio

n - 0

08

4.

1-3

A p

aral

lel e

ffor

t sha

ll be

con

tinue

d by

the

NG

NP

Proj

ect i

n co

llabo

ratio

n w

ith th

e ap

prop

riate

reac

tor v

endo

rs to

dev

elop

th

e m

odifi

ed 9

Cr (

Gra

de 9

1) m

ater

ial a

s a v

iabl

e al

tern

ativ

e to

th

e SA

508

/533

mat

eria

l.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.6.

1 B

ound

ing

Con

ditio

n - 0

08

4.

1-4

If re

quire

d, u

se o

f act

ive

cool

ing

or o

ther

mea

sure

s sha

ll be

id

entif

ied

and

the

desi

gn d

evel

oped

as n

eces

sary

to m

eet t

his

requ

irem

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.6.

1 B

ound

ing

Con

ditio

n - 0

08

4.

1-5

The

reac

tor s

yste

m sh

all b

e de

sign

ed to

pro

vide

pas

sive

resi

dual

he

at re

mov

al u

nder

con

ditio

ns o

f los

s of f

orce

d co

olin

g an

d lo

ss

of c

oola

nt.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1 R

eact

or

Syst

em

4.

1-6

The

reac

tor s

yste

m sh

all b

e de

sign

ed su

ch th

at th

e re

acto

r cor

e is

mai

ntai

ned

in a

coo

labl

e ge

omet

ry u

nder

all

norm

al

oper

atin

g, a

bnor

mal

ope

ratin

g, a

nd p

ostu

late

d de

sign

bas

is a

nd

beyo

nd d

esig

n ba

sis a

ccid

ent c

ondi

tions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

4.1-

7 Th

e re

acto

r sys

tem

shal

l be

desi

gned

for a

n op

erat

iona

l life

time

of 6

0 ye

ars (

cale

ndar

). Ex

clud

ing

thos

e po

rtion

s of t

he sy

stem

th

at c

an b

e re

plac

ed.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1 R

eact

or

Syst

em

4.

1-8

The

core

shal

l use

forc

ed c

ircul

atio

n he

lium

as t

he h

eat

trans

port

fluid

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

4.1-

9 N

on-r

epla

ceab

le st

ruct

ural

mat

eria

ls in

con

tact

with

hel

ium

sh

all r

esis

t cor

rosi

on a

nd e

rosi

on d

urin

g pl

ant l

ife a

s to

avoi

d fa

ilure

and

or n

eed

for r

epla

cem

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1 R

eact

or

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 70

of10

4 B

-1.2

R

eact

or V

esse

l Int

erna

ls

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Ves

sel I

nter

nals

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

2.

1

Rea

ctor

Sys

tem

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

2.

1.1

R

eact

or In

tern

als

SRM

Rev

2

4.3.

1.2

Rea

ctor

In

tern

als

2.

1.1-

1 Th

e re

acto

r int

erna

ls sh

all b

e de

sign

ed to

pro

perly

con

trol

bypa

ss fl

ows.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.2

Rea

ctor

In

tern

als

2.

1.1-

2 Th

e re

acto

r int

erna

ls sh

all b

e de

sign

ed to

tran

spor

t res

idua

l de

cay

heat

from

the

reac

tor c

ore

to th

e re

acto

r ves

sel.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.2

Rea

ctor

In

tern

als

2.

1.1-

3 Th

e re

acto

r int

erna

ls sh

all b

e de

sign

ed to

cha

nnel

prim

ary

cool

ant t

o an

d fr

om th

e re

acto

r cor

e fo

r tra

nsfe

r of h

eat t

o th

e Pr

imar

y H

eat T

rans

port

Syst

em (P

HTS

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.2

Rea

ctor

In

tern

als

2.

1.1-

4 Th

e re

acto

r int

erna

ls sh

all b

e de

sign

ed to

pro

vide

radi

olog

ical

sh

ield

ing

to li

mit

neut

ron

fluen

ce to

the

reac

tor v

esse

l. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1.

2 R

eact

or

Inte

rnal

s

2.1.

1-5

The

reac

tor i

nter

nals

shal

l be

desi

gned

to li

mit

gam

ma

radi

atio

n ex

posu

re to

the

plan

t per

sonn

el a

nd e

quip

men

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1.

2 R

eact

or

Inte

rnal

s

2.1.

1-6

The

reac

tor i

nter

nals

shal

l be

desi

gned

to li

mit

dam

age

to p

lant

co

mpo

nent

s dur

ing

cond

uctio

n co

oldo

wn

even

ts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.2

Rea

ctor

In

tern

als

2.

1.1-

7 Th

e re

acto

r int

erna

ls sh

all m

aint

ain

reac

tor c

ore

geom

etry

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.1.

2 R

eact

or

Inte

rnal

s

2.1.

1-8

The

reac

tor i

nter

nals

shal

l pro

vide

hea

t tra

nsfe

r dur

ing

cond

uctio

n co

oldo

wn.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.1.

2 R

eact

or

Inte

rnal

s

2.1.

1-9

The

reac

tor i

nter

nals

shal

l con

serv

e ne

utro

ns in

the

reac

tor c

ore

and

prov

ide

shie

ldin

g.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

1.2

Rea

ctor

In

tern

als

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 71

of10

4 B

-1.3

R

eact

or C

ore

and

Cor

e St

ruct

ures

O

bjec

t #

Req

uire

men

t ID

Req

uire

men

ts fo

r C

ore

and

Cor

e St

ruct

ures

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

1

Not

e: It

ems a

ppea

ring

in b

rack

ets (

[ ]) r

epre

sent

ap

prox

imat

ions

and

/or

unde

fined

val

ues.

2

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

2.

1

Rea

ctor

Sys

tem

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

2.

1.1

R

eact

or C

ore

950

C

750

C

SR

M R

ev 2

4.

3.1.

1 R

eact

or

Cor

e

2.1.

1-1

The

deca

y he

at re

mov

al sh

all b

e po

ssib

le b

y pa

ssiv

e he

at

trans

fer m

eans

(con

duct

ion

and

radi

atio

n) fr

om th

e fu

el to

the

reac

tor i

nter

nals

with

out r

each

ing

unac

cept

able

fuel

te

mpe

ratu

res d

urin

g al

l DB

A c

ondi

tions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

2 Th

e co

re sh

all u

tiliz

e th

erm

al sp

ectru

m n

eutro

ns fo

r fis

sion

re

actio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

3 Th

e co

re sh

all b

e m

oder

ated

with

gra

phite

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1.

1 R

eact

or

Cor

e

2.1.

1-4

The

activ

e co

re h

eigh

t sha

ll en

sure

the

axia

l sta

bilit

y of

the

neut

ron

flux

and

prec

lude

the

risk

of x

enon

osc

illat

ions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1.

1 R

eact

or

Cor

e

2.1.

1-5

Ref

eren

ce fu

el sh

all b

e LE

U-b

ased

(UC

O o

r UO

2) w

ith a

n en

richm

ent l

imite

d to

<20

.0%

(in

mas

s) a

nd w

ith a

pea

k bu

rn-u

p lim

ited

to 2

0% fi

ssio

ns p

er in

itial

met

al io

n (F

IMA

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

7 Th

e co

re b

ypas

s flo

w sh

all b

e m

aint

aine

d w

ithin

an

acce

ptab

le

rang

e [T

BD

], to

ens

ure

fuel

tem

pera

ture

s in

norm

al a

nd

acci

dent

al c

ondi

tions

are

mai

ntai

ned

with

in [T

BD

] lim

its

(exi

sten

ce o

f a m

inim

um a

mou

nt o

f byp

ass i

n la

tera

l ref

lect

or).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

8 Th

e re

activ

ity te

mpe

ratu

re c

oeff

icie

nt sh

all b

e su

ffic

ient

ly

nega

tive

to sh

utdo

wn

the

nucl

ear c

hain

reac

tion

befo

re a

n un

acce

ptab

le fu

el te

mpe

ratu

re is

reac

hed,

and

mai

ntai

n th

e co

re

in a

safe

stat

e fo

r a ti

me

offe

ring

the

certa

inty

to re

liabl

y in

trodu

ce a

bsor

ber e

lem

ents

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

9 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e re

acto

r cor

e:

Gen

erat

e he

at.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.1

Rea

ctor

C

ore

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 72

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cor

e an

d C

ore

Stru

ctur

es

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

1.1-

10

The

reac

tor c

ore

shal

l gen

erat

e he

at.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

1.1

Rea

ctor

C

ore

2.

1.1-

11

The

reac

tor c

ore

shal

l tra

nsfe

r hea

t to

cool

ant a

nd/o

r rea

ctor

in

tern

als.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

1.1

Rea

ctor

C

ore

B-1

.4

Nuc

lear

Inst

rum

enta

tion

Cur

rent

ly, n

o re

quire

men

ts e

xist

.

B-1

.5

Fuel

Ele

men

ts

Obj

ect

#R

equi

rem

ents

ID

Req

uire

men

ts fo

r Fu

el E

lem

ents

N

ote:

Item

s app

earin

g in

bra

cket

s ([ ]

) rep

rese

nt

appr

oxim

atio

ns a

nd/o

r und

efin

ed v

alue

s. Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

Bui

ldin

gs

and

Stru

ctur

es

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

2.1

O

pera

tiona

l Req

uire

men

ts

SRM

Rev

2

4.1.

2 O

pera

tiona

l R

equi

rem

ents

2.1-

1 Th

e N

GN

P sh

all b

e de

sign

ed to

use

low

enr

iche

d ur

aniu

m

(LEU

) TR

ISO

-coa

ted

parti

cle

fuel

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

3

Req

uire

men

ts A

pplic

able

to F

uel

3-

3 Th

e fu

el p

erfo

rman

ce sh

all a

llow

for a

sour

ce te

rm c

alcu

latio

n ca

pabl

e of

obt

aini

ng a

n N

RC

lice

nse

with

an

excl

usio

n zo

ne o

f no

mor

e th

an 4

00 m

eter

s (ap

prox

imat

ely)

for t

he d

esig

n po

wer

le

vel.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.2

Req

uire

men

ts

App

licab

le to

Fue

l

3-

4 Th

e fu

el sh

all m

eet f

ollo

win

g re

quire

men

t: A

s-m

anuf

actu

red

Qua

lity

Req

uire

men

ts, a

t a 9

5% c

onfid

ence

leve

l: H

eavy

met

al

cont

amin

atio

n: �

2 ×

10 -5

(Pris

mat

ic B

lock

); �6

.0 ×

10

-5

(Peb

ble

Bed

)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.2

Req

uire

men

ts

App

licab

le to

Fue

l

3-

5 Th

e fu

el sh

all m

eet

the

follo

win

g re

quire

men

t: A

s-m

anuf

actu

red

Qua

lity

Req

uire

men

ts, a

t a 9

5% c

onfid

ence

leve

l: Si

C D

efec

t Fra

ctio

n: �

1 ×

10 -4

(Pris

mat

ic B

lock

); �6

.0 ×

10

-5

(Peb

ble

Bed

)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.2

Req

uire

men

ts

App

licab

le to

Fue

l

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 73

of10

4

Obj

ect

#R

equi

rem

ents

ID

Req

uire

men

ts fo

r Fu

el E

lem

ents

N

ote:

Item

s app

earin

g in

bra

cket

s ([ ]

) rep

rese

nt

appr

oxim

atio

ns a

nd/o

r und

efin

ed v

alue

s. Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3-

6 Th

e fu

el sh

all m

eet

the

follo

win

g re

quire

men

t: In

-ser

vice

Fue

l Pe

rfor

man

ces R

equi

rem

ents

, at a

95%

con

fiden

ce le

vel:

Fuel

fa

ilure

dur

ing

norm

al o

pera

tions

: �2

× 1

0 -4

(Pris

mat

ic B

lock

); �4

.6 ×

10

-5 (P

ebbl

e B

ed)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.2

Req

uire

men

ts

App

licab

le to

Fue

l

3-

7 Th

e fu

el sh

all m

eet t

he fo

llow

ing

requ

irem

ent:

In-s

ervi

ce F

uel

Perf

orm

ance

s Req

uire

men

ts, a

t a 9

5% c

onfid

ence

leve

l: In

crem

enta

l fue

l fai

lure

s dur

ing

acci

dent

con

ditio

ns:

�6.0

× 1

0 -

4 (P

rism

atic

Blo

ck);

�5.0

× 1

0 -4

(Peb

ble

Bed

)

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.2

Req

uire

men

ts

App

licab

le to

Fue

l

B-1

.6

Res

erve

Shu

tdow

n Sy

stem

No

requ

irem

ents

cur

rent

ly.

B-1

.7

Rea

ctiv

ity C

ontr

ol S

yste

m

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctiv

ity C

ontr

ol S

yste

m

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

2.

1

Rea

ctor

Sys

tem

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

2.

1-1

The

reac

tor s

yste

m sh

all g

ener

ate

heat

and

tran

sfer

it to

the

prim

ary

cool

ant.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

1 R

eact

or

Syst

em

2.1-

2 Th

e re

acto

r sys

tem

shal

l mai

ntai

n re

acto

r shu

tdow

n.95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.1

Rea

ctor

Sy

stem

2.

1.1

N

eutr

on C

ontr

ol E

lem

ents

SR

M R

ev 2

4.

3.1.

3 N

eutro

n C

ontro

l Ele

men

ts

2.

1.1-

1 Th

e ne

utro

n co

ntro

l ele

men

ts sh

all b

e de

sign

ed to

pro

vide

su

ffic

ient

neg

ativ

e re

activ

ity to

shut

dow

n th

e re

acto

r and

m

aint

ain

it in

subc

ritic

al c

ondi

tion

for a

ny st

ate

whi

le

com

pens

atin

g fo

r the

wor

st p

ositi

ve re

activ

ity in

serti

on.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

1.3

Neu

tron

Con

trol E

lem

ents

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 74

of10

4

2.1.

1-2

The

neut

ron

cont

rol e

lem

ents

shal

l con

trol t

he n

ucle

ar c

hain

re

actio

n in

the

reac

tor c

ore

by a

bsor

bing

neu

trons

in a

ny

oper

atio

nal m

ode.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

1.3

Neu

tron

Con

trol E

lem

ents

2.2

N

HS

Prot

ectio

n Sy

stem

SR

M R

ev 2

4.

3.4

NH

S Pr

otec

tion

Syst

em

2.

2-1

The

prot

ectio

n sy

stem

shal

l im

plem

ent t

he re

leva

nt m

onito

ring,

an

alys

is, a

nd a

ctua

tion

func

tions

nec

essa

ry to

reac

h th

e co

ntro

lled

stat

e in

cas

e of

abn

orm

al e

vent

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

4 N

HS

Prot

ectio

n Sy

stem

2.3

N

HS

Con

trol

Roo

m a

nd O

pera

tor

Inte

rfac

e Sy

stem

SR

M R

ev 2

4.

3.6

NH

S C

ontro

l R

oom

and

Ope

rato

r In

terf

ace

Syst

em

2.

3-1

The

NG

NP

faci

lity

desi

gn sh

all p

erm

it th

e op

erat

ors t

o ta

ke

cont

rol o

f the

reac

tor a

nd su

ppor

t pro

cess

es fr

om w

ithin

a si

ngle

in

tegr

ated

con

trol r

oom

usi

ng th

e m

anua

l mod

e at

any

tim

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

6 N

HS

Con

trol

Roo

m a

nd O

pera

tor

Inte

rfac

e Sy

stem

B-1

.8

Cor

e C

ondi

tioni

ng S

yste

m (S

hutd

own

Coo

ling)

O

bjec

t #

Req

uire

men

t ID

Req

uire

men

ts fo

r C

ore

Con

ditio

ning

Sys

tem

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

2.

1

Rea

ctor

Sup

port

Sys

tem

s

SR

M R

ev 2

4.

3.3

Rea

ctor

Su

ppor

t Sys

tem

s 2.

1.1

Sh

utdo

wn

Coo

ling

Syst

em

SRM

Rev

2

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.1.

1-9

The

Shut

dow

n C

oolin

g Sy

stem

(SC

S) sh

all l

imit

the

ingr

ess o

f po

tent

ial c

onta

min

ants

into

the

prim

ary

heliu

m c

ircui

t fro

m

com

pone

nts o

f the

SC

S ex

tern

al to

the

prim

ary

HPB

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

10

The

Shut

dow

n C

oolin

g Sy

stem

(SC

S) sh

all r

etai

n he

lium

and

ra

dion

uclid

es w

ithin

the

parts

of t

he S

CS

com

pris

ing

the

prim

ary

Hel

ium

Pre

ssur

e B

ound

ary

(HPB

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 75

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cor

e C

ondi

tioni

ng S

yste

m

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

1.1-

11

The

Shut

dow

n C

oolin

g Sy

stem

shal

l tra

nspo

rt co

re re

sidu

al a

nd

deca

y he

at fr

om th

e re

acto

r sys

tem

to th

e en

viro

nmen

t whe

n th

e re

acto

r sys

tem

is sh

utdo

wn

and

the

PHTS

is n

ot o

pera

tiona

l.

The

heliu

m p

rimar

y co

olan

t may

be

pres

suriz

ed o

r de

pres

suriz

ed.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

12

The

Shut

dow

n C

oolin

g Sy

stem

shal

l tra

nspo

rt co

re re

sidu

al a

nd

deca

y he

at fr

om th

e re

acto

r sys

tem

to th

e en

viro

nmen

t whe

n th

e he

lium

prim

ary

cool

ant i

s dep

ress

uriz

ed d

urin

g re

acto

r cor

e re

fuel

ing

oper

atio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

13

The

Shut

dow

n C

oolin

g Sy

stem

shal

l tra

nspo

rt co

re re

sidu

al a

nd

deca

y he

at fr

om th

e re

acto

r sys

tem

to th

e en

viro

nmen

t whe

n th

e he

lium

prim

ary

cool

ant i

s dep

ress

uriz

ed d

urin

g sc

hedu

led

mai

nten

ance

of c

ore,

ves

sel,

and

inte

rnal

com

pone

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

14

The

Shut

dow

n C

oolin

g Sy

stem

shal

l tra

nspo

rt co

re re

sidu

al a

nd

deca

y he

at fr

om th

e re

acto

r sys

tem

to th

e en

viro

nmen

t whe

n th

e he

lium

prim

ary

cool

ant i

s dep

ress

uriz

ed d

urin

g ce

rtain

pot

entia

l un

sche

dule

d m

aint

enan

ce o

r rep

air a

ctiv

ities

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

15

The

Shut

dow

n C

oolin

g Sy

stem

shal

l sup

port

cool

ing

of th

e IH

X, a

s nee

ded,

and

pot

entia

lly fo

r oth

er c

ompo

nent

s whe

n th

e PH

TS is

not

ope

ratin

g.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

2.

1.1-

16

The

Shut

dow

n C

oolin

g Sy

stem

shal

l lim

it co

re b

ypas

s flo

w

thro

ugh

its c

ompo

nent

s dur

ing

PHTS

ope

ratio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.1

Shut

dow

n C

oolin

g Sy

stem

B-1

.9

Rea

ctor

Cav

ity C

oolin

g Sy

stem

O

bjec

t #

Req

uire

men

t ID

Req

uire

men

ts fo

r R

eact

or C

avity

Coo

ling

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to N

ucle

ar H

eat S

ourc

e

SR

M R

ev 2

4.

3 R

equi

rem

ents

A

pplic

able

to

Nuc

lear

Hea

t So

urce

2.

1

Rea

ctor

Sys

tem

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

2.1-

1 Th

e re

acto

r sys

tem

shal

l be

desi

gned

to p

rovi

de p

assi

ve re

sidu

al

heat

rem

oval

und

er c

ondi

tions

of l

oss o

f coo

ling.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.1

Rea

ctor

Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 76

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Cav

ity C

oolin

g Sy

stem

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.2

R

eact

or S

uppo

rt S

yste

ms

SRM

Rev

2

4.3.

3 R

eact

or

Supp

ort S

yste

m

2.2.

1

Rea

ctor

Cav

ity C

oolin

g Sy

stem

SR

M R

ev 2

4.

3.3.

2 R

eact

or

Cav

ity C

oolin

g Sy

stem

2.2.

1-3

The

Rea

ctor

Cav

ity C

oolin

g Sy

stem

(RC

CS)

shal

l ope

rate

co

ntin

uous

ly a

nd m

aint

ain

reac

tor c

avity

con

cret

e te

mpe

ratu

res

to le

ss th

an [9

0ºC

] dur

ing

norm

al o

pera

tions

and

less

than

[1

50ºC

] for

off

-nor

mal

eve

nts (

shor

t ter

m).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

4 Th

e R

CC

S sh

all b

e de

sign

ed to

ope

rate

thro

ugh

the

utili

ty/u

ser

duty

-cyc

le e

vent

s for

the

num

ber o

f cyc

les s

peci

fied

[TB

D] p

lus

thos

e ev

ents

and

eve

nt c

ombi

natio

ns d

eter

min

ed to

be

requ

ired

by p

lant

tran

sient

ana

lysi

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

5 In

acce

ssib

le p

arts

of t

he R

CC

S sh

all b

e de

sign

ed fo

r an

oper

atin

g lif

e of

60

year

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.3.

2 R

eact

or

Cav

ity C

oolin

g Sy

stem

2.2.

1-6

The

need

for a

cces

s to

indi

vidu

al c

ompo

nent

s dur

ing

norm

al

plan

t ope

ratio

n an

d un

der a

ccid

ent c

ondi

tions

shal

l be

cons

ider

ed in

dev

elop

ing

build

ing

and

com

pone

nt a

rran

gem

ents

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

8 Th

e R

CC

S sh

all a

ccom

mod

ate

cont

inuo

us o

pera

tion

at a

ny

pow

er le

vel u

p to

100

% o

f rat

ed p

ower

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.3.

2 R

eact

or

Cav

ity C

oolin

g Sy

stem

2.2.

1-9

The

RC

CS

shal

l inc

orpo

rate

feat

ures

requ

ired

to im

plem

ent o

n-lin

e su

rvei

llanc

e an

d pe

rfor

man

ce m

onito

ring.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.3.

2 R

eact

or

Cav

ity C

oolin

g Sy

stem

2.2.

1-10

Th

e R

CC

S sh

all i

ncor

pora

te th

ose

feat

ures

requ

ired

to

acco

mpl

ish

ISI a

ctiv

ities

with

in th

e tim

e an

d sc

hedu

ling

cons

train

ts im

pose

d by

the

allo

tted

desi

gn p

lann

ed o

utag

e tim

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

11

The

RC

CS

shal

l be

requ

ired

to o

pera

te c

ontin

uous

ly in

all

plan

t st

ates

, inc

ludi

ng sh

utdo

wn

follo

win

g lo

ss o

f for

ced

reac

tor

cool

ing

by th

e PH

TS a

nd S

CS

with

sim

ulta

neou

s los

s of

pum

ped

circ

ulat

ion

of R

CC

S co

olin

g w

ater

and

an

SSE.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 77

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Rea

ctor

Cav

ity C

oolin

g Sy

stem

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

2.1-

12

The

RC

CS

shal

l ope

rate

con

tinuo

usly

in a

ll pl

ant s

tate

s, in

clud

ing

shut

dow

n fo

llow

ing

loss

of f

orce

d re

acto

r coo

ling

by

the

PHTS

and

SC

S w

ith si

mul

tane

ous l

oss o

f pum

ped

circ

ulat

ion

of R

CC

S co

olin

g w

ater

, whe

re a

pplic

able

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

13

All

com

pone

nts a

nd p

ipin

g of

the

RC

CS

shal

l mee

t se

ism

ic

load

s req

uire

men

ts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

14

All

com

pone

nts a

nd p

ipin

g in

side

the

reac

tor b

uild

ing,

incl

udin

g th

e co

nnec

tions

for e

mer

genc

y w

ater

supp

ly (f

ire b

rigad

e), s

hall

be d

esig

ned

agai

nst e

xter

nal e

vent

s (e.

g., a

ircra

ft cr

ash

or

pres

sure

wav

es).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

15

The

Rea

ctor

Cav

ity C

oolin

g Sy

stem

shal

l pro

tect

the

reac

tor

cavi

ty c

oncr

ete

stru

ctur

e, in

clud

ing

the

supp

ort s

truct

ures

of t

he

reac

tor p

ress

ure

vess

el, f

rom

ove

rhea

ting

durin

g al

l mod

es o

f op

erat

ion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.

2.1-

16

The

Rea

ctor

Cav

ity C

oolin

g Sy

stem

shal

l pro

vide

an

alte

rnat

e m

eans

of r

eact

or c

ore

heat

rem

oval

from

the

reac

tor s

yste

m to

th

e en

viro

nmen

t whe

n ne

ither

the

PHTS

nor

the

SCS

is

avai

labl

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.2

Rea

ctor

C

avity

Coo

ling

Syst

em

2.2.

2

Nuc

lear

Isla

nd C

oolin

g Sy

stem

SR

M R

ev 2

4.

3.3.

5 N

ucle

ar

Isla

nd C

oolin

g Sy

stem

2.2.

2-3

The

nucl

ear i

slan

d co

olin

g sy

stem

shal

l ser

ve th

e ne

eds o

f the

re

acto

r and

its a

ssoc

iate

d co

mpo

nent

s at a

ll tim

es u

nder

full-

pow

er o

pera

ting

cond

ition

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.5

Nuc

lear

Is

land

Coo

ling

Syst

em

2.

2.2-

4 Sy

stem

mak

eup

shal

l be

prov

ided

from

the

plan

t Wat

er S

uppl

y Tr

eatm

ent S

yste

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.5

Nuc

lear

Is

land

Coo

ling

Syst

em

2.

2.2-

5a

Red

unda

nt c

ompo

nent

s sha

ll be

pro

vide

d fo

r the

nuc

lear

isla

nd

cool

ing

syst

em, a

s nee

ded,

to su

ppor

t con

tinuo

us o

pera

tion

of

the

reac

tor..

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.5

Nuc

lear

Is

land

Coo

ling

Syst

em

2.

2.2-

5b

Red

unda

nt c

ompo

nent

s sha

ll be

pro

vide

d fo

r the

nuc

lear

isla

nd

cool

ing

syst

em, a

s nee

ded,

to p

rovi

de fo

r on-

line

mai

nten

ance

of

the

cool

ing

syst

em c

ompo

nent

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.5

Nuc

lear

Is

land

Coo

ling

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 78

of10

4 B

-1.1

0 G

ener

al

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Nuc

lear

Hea

t Sup

ply

Syst

em -

Gen

eral

Req

uire

men

ts

2.1

R

equi

rem

ents

App

licab

le to

Nuc

lear

Hea

t Sup

ply

2.1-

1 Th

e N

ucle

ar H

eat S

uppl

y Sy

stem

shal

l be

desi

gn c

ertif

ied

for a

br

oad

rang

e of

app

licat

ions

and

site

s. N

ote

that

the

Nuc

lear

Hea

t Su

pply

Sys

tem

incl

udes

the

nucl

ear i

slan

d (e

.g.,

the

reac

tor,

prim

ary

cool

ant s

yste

m, a

nd su

ppor

ting

syst

ems)

and

the

heat

tra

nsfe

r/tra

nspo

rt sy

stem

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

2.

1-2

The

NH

SS sh

all b

e lic

ense

d in

depe

nden

t of t

he a

pplic

atio

n. In

th

is re

gard

the

licen

sing

bou

ndar

y an

d in

terf

ace

requ

irem

ents

sh

all b

e de

fined

for t

he re

fere

nce

conf

igur

atio

ns (e

.g.,

trans

ient

s, fe

ed a

nd g

as re

turn

che

mis

try.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

2.

1-5

App

licab

le to

bro

ad ra

nge

of c

ogen

erat

ion

appl

icat

ions

su

pply

ing,

sing

ly o

r in

com

bina

tion,

ele

ctric

ity, s

team

, and

hot

ga

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

2.1-

6 R

eact

or g

as o

utle

t tem

pera

ture

in th

e ra

nge

of 7

50 to

800

°C.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

2.1-

7 C

apab

le o

f com

plet

ing

desi

gn, l

icen

sing

, con

stru

ctio

n, a

nd

star

tup

test

ing

for i

nitia

l ope

ratio

n by

202

1.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.2.

2 H

TGR

Fu

ndam

enta

l R

equi

rem

ents

2.1-

8 C

apab

le o

f fol

low

ing

proc

ess l

oad

varia

tions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

2.2

HTG

R

Fund

amen

tal

Req

uire

men

ts

2.

1-9

The

NG

NP

desi

gn w

ill b

e ap

plic

able

to a

bro

ad ra

nge

of

coge

nera

tion

appl

icat

ions

supp

lyin

g, si

ngly

or i

n co

mbi

natio

n,

elec

trici

ty, s

team

, and

hot

gas

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

1 Sy

stem

C

onfig

urat

ion

and

Esse

ntia

l Fea

ture

s R

equi

rem

ents

2.1-

10

For t

he N

GN

P (F

OA

K),

the

desi

gned

reac

tor g

as o

utle

t te

mpe

ratu

re sh

all b

e in

the

rang

e of

750

to 8

00°C

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.1

Syst

em

Con

figur

atio

n an

d Es

sent

ial F

eatu

res

Req

uire

men

ts

2.

1-11

Th

e N

HSS

shal

l be

capa

ble

of c

ontro

lling

the

trans

port

of

radi

onuc

lides

to th

e en

d pr

oduc

ts a

t lev

els b

elow

the

conc

entra

tion

or e

xpos

ure

requ

irem

ents

for t

he p

rodu

ct (e

.g.,

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SAG

M

eetin

g A

gree

men

ts

Oct

ober

22,

200

8

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 79

of10

4

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

tritiu

m in

stea

m, g

as, h

ydro

gen)

[Ini

tial a

ccep

tabl

e tri

tium

leve

ls

will

be

set a

t a T

BD

frac

tion

of th

e EP

A li

mits

for d

rinki

ng

wat

er a

nd a

ir]

2.

1-12

Th

e N

ucle

ar H

eat S

uppl

y Sy

stem

(NH

SS) s

hall

be d

esig

n ce

rtifie

d fo

r a b

road

rang

e of

app

licat

ions

and

site

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SA

G

Mee

ting

Agr

eem

ents

O

ctob

er 2

2, 2

008

2.

1-13

Th

e N

HSS

shal

l be

licen

sed

inde

pend

ent o

f the

app

licat

ion.

In

this

rega

rd th

e lic

ensi

ng b

ound

ary

and

inte

rfac

e re

quire

men

ts

shal

l be

defin

ed fo

r the

refe

renc

e co

nfig

urat

ions

, (e.

g.,

trans

ient

s, fe

ed a

nd g

as re

turn

che

mis

try).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SAG

M

eetin

g A

gree

men

ts

Oct

ober

22,

200

8

2.

1-14

Th

e N

HSS

des

igns

shal

l be

appl

icab

le, o

n ec

onom

ic,

avai

labi

lity

and

relia

bilit

y ba

ses,

to a

bro

ad ra

nge

of c

o-ge

nera

tion

appl

icat

ions

supp

lyin

g, si

ngly

or i

n co

mbi

natio

n,

elec

trici

ty, s

team

, and

hot

gas

(hel

ium

).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SAG

M

eetin

g A

gree

men

ts

Oct

ober

22,

200

8

2.2

Sy

stem

Con

figur

atio

n an

d E

ssen

tials

Feat

ures

R

equi

rem

ents

The

NG

NP

nucl

ear h

eat s

ourc

e (N

HS)

shal

l use

the

HTG

R

conc

ept.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

1 Sy

stem

C

onfig

urat

ion

and

Esse

ntia

l Fea

ture

s R

equi

rem

ents

2.2-

1 Th

e N

GN

P N

HS

shal

l dem

onst

rate

com

mer

cial

via

bilit

y of

the

HTG

R.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

1 Sy

stem

C

onfig

urat

ion

and

Esse

ntia

l Fea

ture

s R

equi

rem

ents

2.2-

2 Th

e N

GN

P N

HS

shal

l be

desi

gned

such

that

it c

an b

e de

sign

ce

rtifie

d fo

r a b

road

rang

e of

app

licat

ions

and

site

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.1

Syst

em

Con

figur

atio

n an

d Es

sent

ial F

eatu

res

Req

uire

men

ts

2.3

2.2-

3O

pera

tiona

l Req

uire

men

ts

2.3-

1 Th

e N

GN

P N

HS

shal

l hav

e an

ope

ratio

nal l

ifetim

e of

60

year

s (c

alen

dar)

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

2.

3-4

The

NG

NP

shal

l be

desi

gned

to o

pera

te d

urin

g lo

ss o

f hyd

roge

n pr

oduc

tion

and

stab

ilize

in th

e el

ectri

city

gen

erat

ion

phas

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.1.

2 O

pera

tiona

l R

equi

rem

ents

2.3-

5 Th

e N

GN

P pl

ant s

hall

be c

apab

le o

f fol

low

ing

proc

ess l

oad

varia

tions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 80

of10

4

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

3-7

The

NG

NP

shal

l dem

onst

rate

a m

inim

um 1

8-m

onth

refu

elin

g in

terv

al c

apab

ility

(if a

pplic

able

). 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.2

Ope

ratio

nal

Req

uire

men

ts

2.

3-8

The

NG

NP

shal

l be

desi

gned

to o

pera

te fo

llow

ing

loss

of a

se

cond

ary

heat

pro

cess

, suc

h as

hyd

roge

n pr

oduc

tion,

and

st

abili

ze in

the

elec

trici

ty g

ener

atio

n ph

ase.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

2 O

pera

tiona

l R

equi

rem

ents

2.4

Su

rvei

llanc

e an

d In

-Ser

vice

Insp

ectio

n R

equi

rem

ents

2.4-

1 Th

e N

GN

P de

sign

shal

l pro

vide

acc

ess t

o th

e pr

imar

y an

d se

cond

ary,

if a

pplic

able

, loo

p pr

essu

re b

ound

ary

to p

erm

it IS

I as

requ

ired

by a

ppro

pria

te se

ctio

ns o

f the

Am

eric

an S

ocie

ty o

f M

echa

nica

l Eng

inee

rs (A

SME)

Boi

ler a

nd P

ress

ure

Ves

sel

(B&

PV) C

ode,

min

imiz

ing

the

need

for r

eque

sts f

or C

ode

relie

f du

e to

acc

essi

bilit

y co

nstra

ints

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

6 Su

rvei

llanc

e an

d In

-Ser

vice

In

spec

tion

Req

uire

men

ts

B-2

. H

eat T

rans

port

Sys

tem

Req

uire

men

ts

B-2

.1

Circ

ulat

ors

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cir

cula

tors

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

2.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

2.

1-1

The

Prim

ary

Hea

t Tra

nspo

rt Sy

stem

shal

l tra

nsfe

r hea

t fro

m th

e re

acto

r cor

e to

the

seco

ndar

y ci

rcui

t.95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

4.1

Prim

ary

Hea

t Tr

ansp

ort S

yste

m

2.1.

1

Mai

n H

eliu

m C

ircu

lato

r (M

HC

)

SR

M R

ev 2

4.

4.1.

1 M

ain

Hel

ium

Circ

ulat

or

2.

1.1-

2 Th

e M

HC

shal

l be

driv

en b

y el

ectri

cal m

otor

s cap

able

of r

ated

an

d va

riabl

e sp

eeds

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

4.1.

1 M

ain

Hel

ium

Circ

ulat

or

2.

1.1-

4 B

earin

g de

sign

shal

l pre

clud

e co

ntam

inan

t (e.

g., l

ubric

atin

g pr

oduc

t) in

gres

s in

the

prim

ary

circ

uit.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.1

Mai

n H

eliu

m C

ircul

ator

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 81

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cir

cula

tors

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1.1-

5 Th

erm

al in

sula

tion

shal

l be

requ

ired

to p

rote

ct th

e in

tern

al

com

pone

nts b

y re

duci

ng h

eat m

igra

tion

due

to p

rimar

y sy

stem

te

mpe

ratu

res.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.1

Mai

n H

eliu

m C

ircul

ator

2.

1.1-

6 Th

e M

HC

shal

l be

desi

gned

with

a m

inim

um li

fetim

e of

10

year

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

4.1.

1 M

ain

Hel

ium

Circ

ulat

or

2.

1.1-

7 Th

e M

HC

shal

l be

desi

gned

with

hyd

raul

ic c

hara

cter

istic

s as

stab

le a

s pos

sibl

e ov

er th

e re

quire

d sp

eed

rang

e w

ithou

t di

stin

ctiv

e re

vers

al p

oint

s and

with

out p

rono

unce

d pe

aks.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.1

Mai

n H

eliu

m C

ircul

ator

2.

1.1-

8 Th

e M

HC

shal

l mai

ntai

n pr

imar

y pr

essu

re b

ound

ary

inte

grity

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

4.1.

1 M

ain

Hel

ium

Circ

ulat

or

2.

1.1-

9 Th

e M

ain

Hel

ium

Circ

ulat

or sh

all c

ontro

l the

flow

of h

eliu

m to

m

atch

the

heat

gen

erat

ion

of th

e re

acto

r cor

e w

ith th

e he

at

rem

oval

of t

he P

HTS

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.4.

1.1

Mai

n H

eliu

m C

ircul

ator

3

Hel

ium

Cir

cula

tors

B

ound

ing

Con

ditio

n 4.

8 H

eliu

m

Circ

ulat

ors

3.1

B

ound

ing

Con

ditio

n - 0

12

Bou

ndin

g C

ondi

tion

4.8.

1 B

ound

ing

Con

ditio

n - 0

12

3.

1-1

The

abili

ty to

ope

rate

mul

tiple

circ

ulat

ors i

n pa

ralle

l sha

ll be

ev

alua

ted

and

test

ed a

s an

alte

rnat

ive

to in

stal

latio

n of

a si

ngle

hi

gh-p

ower

des

ign

that

requ

ires s

igni

fican

t dev

elop

men

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.8.

1 B

ound

ing

Con

ditio

n - 0

12

3.

1-2

Dev

elop

men

t of h

igh-

pow

er d

esig

ns th

at a

re re

quire

d fo

r ap

plic

atio

n in

the

seco

ndar

y lo

op sh

all b

e co

ntin

ued.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

B

ound

ing

Con

ditio

n 4.

8.1

Bou

ndin

g C

ondi

tion

- 012

B-2

.2

Inte

rmed

iate

Hea

t Exc

hang

ers

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Inte

rmed

iate

Hea

t Exc

hang

ers

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

4

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

4.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

4.

1.1

In

term

edia

te H

eat E

xcha

nger

(IH

X)

SRM

Rev

2

4.4.

1.3

Inte

rmed

iate

Hea

t Ex

chan

ger (

IHX

)

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 82

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Inte

rmed

iate

Hea

t Exc

hang

ers

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

5

Inte

rmed

iate

Hea

t Exc

hang

er D

esig

n

B

ound

ing

Con

ditio

n 4.

7 In

term

edia

te

Hea

t Exc

hang

er

Des

ign

5.1

G

ener

al

Bou

ndin

g C

ondi

tion

4.7.

1 G

ener

al

5.2

B

ound

ing

Con

ditio

n - 0

09

Bou

ndin

g C

ondi

tion

4.7.

2 B

ound

ing

Con

ditio

n - 0

09

B-2

.3

Cro

ss V

esse

l Pip

ing

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cro

ss V

esse

l Pip

ing

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

2.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

2.

1.1

H

ot D

uct A

ssem

bly

(HD

A) (

whe

re a

pplie

d)

SRM

Rev

2

4.4.

1.2

Hot

Duc

t A

ssem

bly

(whe

re

appl

ied)

2.1.

1-2

Rad

ial k

eys s

hall

prov

ide

a ra

dial

supp

ort d

urin

g op

erat

ing

and

seis

mic

con

ditio

ns.

950

C75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

4.1.

2 H

ot D

uct

Ass

embl

y (w

here

ap

plie

d)

2.

1.1-

3 Th

e H

DA

shal

l pro

vide

hel

ium

leak

tigh

tnes

s at e

ach

end

(with

C

ore

supp

ort s

truct

ure

and

IHX

). 95

0 C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.2

Hot

Duc

t A

ssem

bly

(whe

re

appl

ied)

2.1.

1-4

The

Hot

Duc

t Ass

embl

y (w

here

app

lied)

shal

l cha

nnel

hig

h-te

mpe

ratu

re h

eliu

m fr

om th

e re

acto

r cor

e ou

tlet p

lenu

m to

the

IHX

inle

t.

950

C75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

4.1.

2 H

ot D

uct

Ass

embl

y (w

here

ap

plie

d)

3.1.

1

Cro

ss V

esse

ls (w

here

app

lied)

4.3.

2.2

Cro

ss

Ves

sels

(whe

re

appl

ied)

3.1.

1-1

The

cros

s ves

sels

shal

l mai

ntai

n th

e pr

imar

y pr

essu

re b

ound

ary

inte

grity

. 95

0 C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

2.2

Cro

ss

Ves

sels

(whe

re

appl

ied)

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 83

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Cro

ss V

esse

l Pip

ing

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.1-

2 Th

e cr

oss v

esse

ls sh

all p

rovi

de th

e pr

imar

y he

at tr

ansp

ort p

ath

to/fr

om th

e re

acto

r ves

sel a

nd IH

X v

esse

ls.

950

C75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.2.

2 C

ross

V

esse

ls (w

here

ap

plie

d)

4

Inte

rmed

iate

Hea

t Exc

hang

er D

esig

n

B

ound

ing

Con

ditio

n 4.

7 In

term

edia

te

Hea

t Exc

hang

er

Des

ign

4-1

The

Inte

rmed

iate

Hea

t Exc

hang

er (I

HX

) sha

ll tra

nsfe

r hea

t fro

m

the

prim

ary

loop

to th

e se

cond

ary

loop

dur

ing

spec

ified

nor

mal

op

erat

ing

cond

ition

s and

cer

tain

abn

orm

al a

nd a

ccid

ent

cond

ition

s.

950

C75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

4.1.

3 In

term

edia

te H

eat

Exch

ange

r (IH

X)

4-2

The

Inte

rmed

iate

Hea

t Exc

hang

er (I

HX

) sha

ll se

para

te th

e pr

imar

y lo

op fr

om th

e se

cond

ary

loop

dur

ing

all n

orm

al a

nd

abno

rmal

con

ditio

ns a

nd d

urin

g ac

cide

nt c

ondi

tions

for a

sp

ecifi

ed ti

me.

950

C75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

4.1.

3 In

term

edia

te H

eat

Exch

ange

r (IH

X)

4.1

B

ound

ing

Con

ditio

n - 0

10

Bou

ndin

g C

ondi

tion

4.7.

3 B

ound

ing

Con

ditio

n - 0

10

4.

1-1

Mat

eria

ls b

eing

eva

luat

ed fo

r the

NG

NP

heat

tran

sfer

/tran

spor

t sy

stem

shal

l be

capa

ble

of su

stai

ned

oper

atio

n (i.

e., 1

0 ef

fect

ive

full-

pow

er y

ears

of o

pera

tion

or lo

nger

) at t

he u

pper

bou

nds o

f th

e re

acto

r gas

out

let a

nd in

let t

empe

ratu

res.

950

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.7.

3 B

ound

ing

Con

ditio

n - 0

10

4.

1-2

R&

D sh

all b

e co

nduc

ted

to su

ppor

t dev

elop

men

t and

cod

ifica

tion

of th

ese

mat

eria

ls fo

r use

in N

GN

P an

d fu

ture

HTG

R c

omm

erci

al

appl

icat

ions

.

950

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.7.

3 B

ound

ing

Con

ditio

n - 0

10

4.2

B

ound

ing

Con

ditio

n - 0

11

Bou

ndin

g C

ondi

tion

4.7.

4 B

ound

ing

Con

ditio

n - 0

11

4.

2-1

At l

east

two

prim

ary

loop

s sha

ll be

pro

vide

d: a

full

pow

er lo

op(s

) fo

r the

PC

S an

d a

smal

ler l

oop

(e.g

., up

to 6

0 M

wt)

for t

he

hydr

ogen

pla

nt.

950

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.7.

4 B

ound

ing

Con

ditio

n - 0

11

B-2

.4

Mix

ing

Cha

mbe

r

No

requ

irem

ents

cur

rent

ly.

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 84

of10

4 B

-2.5

H

igh

Tem

pera

ture

Val

ves

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hig

h T

empe

ratu

re V

alve

s Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

2.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

2.

1.1

Se

cond

ary

Gas

Isol

atio

n V

alve

s

SR

M R

ev 2

4.

4.1.

4 Se

cond

ary

Gas

Isol

atio

n V

alve

s

2.1.

1-2

The

seco

ndar

y ga

s iso

latio

n va

lves

shal

l acc

omm

odat

e a

pres

sure

diff

eren

tial o

f [5-

9 M

Pa].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.4

Seco

ndar

y G

as Is

olat

ion

Val

ves

2.

1.1-

3 Th

e se

cond

ary

gas i

sola

tion

valv

es sh

all m

aint

ain

prim

ary

pres

sure

bou

ndar

y in

tegr

ity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.4

Seco

ndar

y G

as Is

olat

ion

Val

ves

2.

1.1-

4 Th

e se

cond

ary

gas i

sola

tion

valv

es sh

all h

ave

a m

axim

um

leak

age

rate

whe

n sh

ut o

f [TB

D].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.4.

1.4

Seco

ndar

y G

as Is

olat

ion

Val

ves (

whe

re

appl

ied)

2.

2

Seco

ndar

y H

eat T

rans

port

Sys

tem

SR

M R

ev 1

4.

4.2

Seco

ndar

y H

eat T

rans

port

Syst

em

2.

2-1

The

Seco

ndar

y H

eat T

rans

port

Syst

em sh

all p

rovi

de h

ot h

eliu

m

to th

e hy

drog

en p

rodu

ctio

n pl

ant a

nd re

ceiv

es th

e ci

rcul

atin

g he

lium

at a

low

er te

mpe

ratu

re fr

om th

e hy

drog

en p

rodu

ctio

n pl

ant.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.4.

2 Se

cond

ary

Hea

t Tra

nspo

rt Sy

stem

2.

2-2

The

Seco

ndar

y H

eat T

rans

port

Syst

em sh

all p

rovi

de h

ot h

eliu

m

to th

e PC

S an

d re

ceiv

ed th

e ci

rcul

atin

g he

lium

at a

low

er

tem

pera

ture

from

the

PCS.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.4.

2 Se

cond

ary

Hea

t Tra

nspo

rt Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 85

of10

4 B

-2.6

G

ener

al

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

for

Hea

t Tra

nspo

rt S

yste

m

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to H

eat T

rans

port

Sys

tem

SR

M R

ev 2

4.

4 R

equi

rem

ents

A

pplic

able

to H

eat

Tran

spor

t Sys

tem

2.

1

Prim

ary

Hea

t Tra

nspo

rt S

yste

m

SRM

Rev

2

4.4.

1 Pr

imar

y H

eat

Tran

spor

t Sys

tem

B-3

. H

ydro

gen

Prod

uctio

n Sy

stem

Req

uire

men

ts

B-3

.1

Hyd

roge

n Pr

oduc

tion

Syst

em

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to H

ydro

gen

Prod

uctio

n Pl

ant

SRM

Rev

2

4.6

Req

uire

men

ts

App

licab

le to

H

ydro

gen

Prod

uctio

n Pl

ant

2.1

H

ydro

gen

Prod

uctio

n Pl

ant P

aram

eter

s and

Per

form

ance

SR

M R

ev 2

4.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t Pa

ram

eter

s and

Pe

rfor

man

ce

2.

1-1

The

hydr

ogen

pro

duct

ion

plan

t sha

ll re

ceiv

e pr

oces

s hel

ium

at

tem

pera

ture

s up

to [9

00°C

] and

util

ize

heat

at a

rate

of u

p to

[60

MW

th] i

n th

e pr

oduc

tion

of h

ydro

gen.

950

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.6.

1 H

ydro

gen

Prod

uctio

n Pl

ant

Para

met

ers a

nd

Perf

orm

ance

2.1-

2 Th

e hy

drog

en p

rodu

ctio

n pl

ant s

hall

rece

ive

proc

ess h

eliu

m a

t te

mpe

ratu

res u

p to

800

°C a

nd u

tiliz

e he

at a

t a ra

te o

f up

to

[TB

D M

Wth

] in

the

prod

uctio

n of

hyd

roge

n.

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

1 H

ydro

gen

Prod

uctio

n Pl

ant

Para

met

ers a

nd

Perf

orm

ance

2.1-

3 Th

e hy

drog

en p

rodu

ctio

n pl

ant p

roce

ss e

ffic

ienc

y sh

all b

e no

le

ss th

an [4

0% h

ighe

r hea

ting

valu

e].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

1 H

ydro

gen

Prod

uctio

n Pl

ant

Para

met

ers a

nd

Perf

orm

ance

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 86

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.2

H

ydro

gen

Prod

uctio

n Pl

ant C

onfig

urat

ion

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

2 Th

e hy

drog

en p

rodu

ctio

n pl

ant s

hall

be p

hysi

cally

sepa

rate

d fr

om th

e re

mai

nder

of t

he N

GN

P co

nsis

tent

with

com

mer

cial

pl

ant e

cono

mic

and

risk

trad

eoff

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

3 Th

e in

terf

aces

bet

wee

n th

e hy

drog

en p

rodu

ctio

n pl

ant a

nd th

e re

mai

nder

of t

he N

GN

P sh

all b

e de

sign

ed to

ens

ure

that

failu

res

or u

pset

con

ditio

ns in

the

hydr

ogen

pro

duct

ion

plan

t do

not

resu

lt in

failu

res o

r adv

erse

impa

cts t

o th

e re

mai

nder

of t

he

NG

NP

faci

lity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.

2-4

The

inte

rfac

es b

etw

een

the

hydr

ogen

pro

duct

ion

plan

t and

the

rem

aind

er o

f the

NG

NP

shal

l be

desi

gned

to e

nsur

e th

at fa

ilure

s or

ups

et c

ondi

tions

in th

e N

GN

P fa

cilit

y do

not

resu

lt in

failu

res

or a

dver

se im

pact

s to

the

hydr

ogen

pro

duct

ion

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.

2-5

The

hydr

ogen

pro

duct

ion

plan

t sha

ll pr

ovid

e fo

r sto

rage

of

feed

stoc

k (e

.g.,

wat

er a

nd m

akeu

p ch

emic

als)

, as r

equi

red.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

6.2

Hyd

roge

n Pr

oduc

tion

Plan

t C

onfig

urat

ion

2.

2-6

The

hydr

ogen

pro

duct

ion

plan

t sha

ll in

clud

e al

l nec

essa

ry

pret

reat

men

t or c

ondi

tioni

ng o

f rea

dily

ava

ilabl

e ra

w m

ater

ials

ne

eded

for t

he sp

ecifi

c hy

drog

en p

roce

ss (e

.g.,

wat

er tr

eatm

ent).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

7 H

ydro

gen

prod

uced

in th

e hy

drog

en p

rodu

ctio

n pl

ant s

hall

be

mad

e av

aila

ble

for d

istri

butio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

9a

No

cent

ral s

tora

ge sh

all b

e in

clud

ed a

t the

hyd

roge

n pr

oduc

tion

plan

t oth

er th

an b

uffe

r sto

rage

, as r

equi

red

for e

ffic

ient

op

erat

ions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

9b

Stor

age

of h

ydro

gen

shal

l pro

vide

for p

ress

ure

relie

f, ve

ntin

g,

valv

ing,

inst

rum

enta

tion,

and

max

imum

allo

wab

le q

uant

ities

to

limit

post

ulat

ed c

onfla

grat

ion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

10

The

oxyg

en b

y-pr

oduc

t gas

shal

l hav

e pu

rity

leve

ls c

onsi

sten

t w

ith c

urre

nt in

dust

ry st

anda

rds f

or b

ulk

oxyg

en a

pplic

atio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 87

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

2-11

Th

e hy

drog

en d

eliv

ery

pres

sure

shal

l be

[TB

D M

Pa].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.2-

12

The

hydr

ogen

pro

duct

gas

shal

l hav

e pu

rity

leve

ls c

onsi

sten

t w

ith c

urre

nt in

dust

ry st

anda

rds f

or b

ulk

hydr

ogen

app

licat

ions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

6.2

Hyd

roge

n Pr

oduc

tion

Plan

t C

onfig

urat

ion

2.

2-13

Th

e in

terf

ace

syst

em b

etw

een

the

hydr

ogen

pro

duct

ion

plan

t an

d th

e re

mai

nder

of t

he N

GN

P sh

all b

e de

sign

ed to

ens

ure

that

tri

tium

mig

ratio

n in

to th

e hy

drog

en p

rodu

ctio

n pl

ant w

ill b

e lim

ited,

such

that

the

max

imum

am

ount

of t

ritiu

m re

leas

ed to

th

e hy

drog

en p

rodu

ctio

n pl

ant d

oes n

ot e

xcee

d [T

BD

] sta

ndar

ds.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.

2-15

Th

e to

tal c

once

ntra

tion

of ra

dioa

ctiv

e co

ntam

inan

ts in

the

hydr

ogen

pro

duct

gas

and

ass

ocia

ted

hydr

ogen

pro

duct

ion

syst

ems s

hall

be m

inim

ized

to e

nsur

e th

at p

ublic

dos

e lim

its d

o no

t exc

eed

NR

C re

gula

tory

lim

its.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.

2-15

Th

e to

tal c

once

ntra

tion

of ra

dioa

ctiv

e co

ntam

inan

ts in

the

hydr

ogen

pro

duct

gas

and

ass

ocia

ted

hydr

ogen

pro

duct

ion

syst

ems s

hall

be m

inim

ized

to e

nsur

e th

at w

orke

r dos

e lim

its d

o no

t exc

eed

NR

C re

gula

tory

lim

its.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

Con

figur

atio

n

2.3

H

ydro

gen

Prod

uctio

n Pl

ant W

aste

SR

M R

ev 2

4.

6.3

Hyd

roge

n Pr

oduc

tion

Plan

t W

aste

2.3-

2 Th

e hy

drog

en p

rodu

ctio

n pl

ant d

esig

n sh

all b

e su

ch th

at th

ere

is

a di

spos

al p

ath

for a

ll w

aste

. Haz

ardo

us w

aste

stre

ams i

dent

ified

in

40

CFR

261

.3 sh

all b

e di

spos

ed o

f acc

ordi

ngly

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

3 H

ydro

gen

Prod

uctio

n Pl

ant

Was

te

2.

3-3

A m

eans

of d

ispo

sing

(suc

h as

flar

ing)

of o

ut-o

f-sp

ecifi

catio

n hy

drog

en p

rodu

ct d

urin

g up

sets

or s

tartu

p/sh

utdo

wn

shal

l be

incl

uded

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

3 H

ydro

gen

Prod

uctio

n Pl

ant

Was

te

2.4

H

ydro

gen

Prod

uctio

n Pl

ant S

afet

y an

d L

icen

sing

SR

M R

ev 2

4.

6.4

Hyd

roge

n Pr

oduc

tion

Plan

t Sa

fety

and

Li

cens

ing

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 88

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

4-1

The

hydr

ogen

pro

duct

ion

faci

litie

s, in

clud

ing

the

conv

ersi

on,

stor

age,

and

dis

tribu

tion

syst

ems,

shal

l com

ply

with

the

requ

irem

ents

of 2

9 C

FR 1

910.

103,

Occ

upat

iona

l Saf

ety

and

Hea

lth S

tand

ards

, Sub

part

H -

Haz

ardo

us M

ater

ials

, Hyd

roge

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty a

nd

Lice

nsin

g

2.4-

2 In

the

even

t tha

t the

hyd

roge

n pr

oduc

tion

plan

t als

o pr

oduc

es

and

stor

es si

gnifi

cant

qua

ntiti

es o

f oxy

gen,

the

requ

irem

ents

of

29 C

FR 1

910.

104,

“O

xyge

n,”

shal

l app

ly.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty a

nd

Lice

nsin

g

2.4-

3a

The

oper

atio

n, o

f the

hyd

roge

n pr

oduc

tion

plan

t sha

ll co

mpl

y w

ith 2

9 C

FR 1

910.

119,

“Pr

oces

s Saf

ety

Man

agem

ent o

f Hig

hly

Haz

ardo

us C

hem

ical

s.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty a

nd

Lice

nsin

g

2.4-

3b

The

mai

nten

ance

of t

he h

ydro

gen

prod

uctio

n pl

ant s

hall

com

ply

with

29

CFR

191

0.11

9, “

Proc

ess S

afet

y M

anag

emen

t of H

ighl

y H

azar

dous

Che

mic

als.”

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty a

nd

Lice

nsin

g

2.4-

4 St

andb

y po

wer

to th

e hy

drog

en p

rodu

ctio

n fa

cilit

y ve

ntila

tion,

tre

atm

ent s

yste

ms,

tem

pera

ture

con

trols

, ala

rms,

dete

ctio

n sy

stem

s, an

d ot

her e

lect

roni

cally

ope

rate

d sy

stem

s sha

ll be

pr

ovid

ed in

acc

orda

nce

with

Nat

iona

l Fire

Pro

tect

ion

Ass

ocia

tion

(NFP

A) r

equi

rem

ents

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty

2.

4-5

Hea

t exc

hang

ers a

nd/o

r ste

am g

ener

ator

s sha

ll m

eet t

he

appl

icab

le p

ress

ure

vess

el re

quire

men

ts in

the

ASM

E B

&PV

C

ode.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty

2.

4-6a

H

PS P

ipin

g sy

stem

s sha

ll pr

even

t ele

ctro

stat

ic d

isch

arge

from

ac

oust

ical

ly in

duce

d fa

tigue

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

6.4

Hyd

roge

n Pr

oduc

tion

Plan

t Sa

fety

2.4-

6b

HPS

stor

age

syst

ems s

hall

prev

ent e

lect

rost

atic

dis

char

ge fr

om

acou

stic

ally

indu

ced

fatig

ue.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

4 H

ydro

gen

Prod

uctio

n Pl

ant

Safe

ty

2.

4-6c

H

PS P

ipin

g sy

stem

s sha

ll pr

even

t equ

ipm

ent f

ailu

res f

rom

hy

drog

en e

mbr

ittle

men

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

6.4

Hyd

roge

n Pr

oduc

tion

Plan

t Sa

fety

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 89

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

4-6d

H

PS st

orag

e sy

stem

s sha

ll pr

even

t equ

ipm

ent f

ailu

res f

rom

hy

drog

en e

mbr

ittle

men

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

6.4

Hyd

roge

n Pr

oduc

tion

Plan

t Sa

fety

2.

5

Hyd

roge

n Pr

oduc

tion

Plan

t Rel

iabi

lity

and

Ava

ilabi

lity

SRM

Rev

2

4.6.

5 H

ydro

gen

Prod

uctio

n Pl

ant

Rel

iabi

lity

and

Ava

ilabi

lity

2.5.

1

Cap

acity

Fac

tor

SRM

Rev

2

4.6.

5.1

Cap

acity

Fa

ctor

2.5.

1-1

Excl

udin

g N

GN

P m

issi

on-s

peci

fic o

utag

es fo

r ins

pect

ion

and

test

ing,

the

hydr

ogen

pro

duct

ion

plan

t des

ign

capa

city

fact

or fo

r hy

drog

en p

rodu

ctio

n av

erag

ed o

ver t

he p

lant

life

time

shal

l be

at

leas

t [TB

D %

] whe

n m

odel

ed w

ith e

quip

men

t mea

n tim

e to

fa

ilure

and

mea

n tim

e to

repa

ir da

ta fo

r the

sam

e or

sim

ilar

syst

ems a

nd/o

r com

pone

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

5.1

Cap

acity

Fa

ctor

2.5.

2

Plan

ned

Out

ages

SR

M R

ev 2

4.

6.5.

2 Pl

anne

d O

utag

es

2.

5.2-

1 Ex

clud

ing

NG

NP

mis

sion

-spe

cific

out

ages

for i

nspe

ctio

n an

d te

stin

g, th

e ca

paci

ty fa

ctor

loss

due

to h

ydro

gen

prod

uctio

n pl

ant p

lann

ed o

utag

es a

vera

ged

over

the

plan

t life

time

shal

l be

no g

reat

er th

an [T

BD

%],

incl

udin

g al

l pla

nned

insp

ectio

n an

d m

aint

enan

ce a

ctiv

ities

that

mus

t be

acco

mpl

ishe

d w

ith th

e hy

drog

en p

rodu

ctio

n pl

ant s

hutd

own.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

5.2

Plan

ned

Out

ages

2.5.

3

Hyd

roge

n Pr

oduc

tion

Plan

t Inv

estm

ent P

rote

ctio

n

SR

M R

ev 2

4.

6.5.

3 H

ydro

gen

Prod

uctio

n Pl

ant

Inve

stm

ent

Prot

ectio

n

2.5.

3-1

Excl

udin

g N

GN

P m

issi

on-s

peci

fic o

utag

es fo

r ins

pect

ion

and

test

ing,

the

calc

ulat

ed c

apac

ity fa

ctor

loss

due

to u

npla

nned

hy

drog

en p

rodu

ctio

n pl

ant o

utag

es a

vera

ged

over

the

lifet

ime

of

the

plan

t sha

ll no

t exc

eed

[TB

D. %

].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

5.3

Hyd

roge

n Pr

oduc

tion

Plan

t In

vest

men

t Pr

otec

tion

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 90

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.6

H

ydro

gen

Prod

uctio

n Pl

ant M

aint

enan

ce a

nd In

-Ser

vice

In

spec

tion

SRM

Rev

2

4.6.

6 H

ydro

gen

Prod

uctio

n Pl

ant

Mai

nten

ance

and

In

-Ser

vice

In

spec

tion

2.6.

1

Hyd

roge

n Pr

oduc

tion

Plan

t Mai

nten

ance

Req

uire

men

ts

SRM

Rev

2

4.6.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t M

aint

enan

ce

Req

uire

men

ts

2.

6.1-

1 Th

e hy

drog

en p

rodu

ctio

n pl

ant s

hall

be d

esig

ned

to a

llow

all

com

pone

nts t

o be

rem

oved

, rep

lace

d (if

nec

essa

ry),

and

rein

stal

led.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t M

aint

enan

ce

Req

uire

men

ts

2.

6.1-

2 Th

e hy

drog

en p

rodu

ctio

n pl

ant d

esig

n sh

all i

nclu

de p

rovi

sion

s fo

r mon

itorin

g eq

uipm

ent s

tatu

s, co

nfig

urat

ion,

and

pe

rfor

man

ce a

nd fo

r det

ectin

g an

d di

agno

sing

mal

func

tions

as a

ba

sis f

or p

redi

ctiv

e m

aint

enan

ce p

lans

and

dec

isio

n m

akin

g.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t M

aint

enan

ce

Req

uire

men

ts

2.

6.1-

3 Th

e hy

drog

en p

rodu

ctio

n pl

ant d

esig

n sh

all p

rovi

de st

orag

e fa

cilit

ies f

or a

n ad

equa

te a

mou

nt o

f spa

re p

arts

as d

eter

min

ed b

y a

prev

entiv

e m

aint

enan

ce a

nd fa

cilit

y av

aila

bilit

y pl

an.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t M

aint

enan

ce

Req

uire

men

ts

2.

6.1-

4 H

ydro

gen

dete

ctor

s, re

lief v

alve

s, al

arm

s, an

d is

olat

ion

valv

es

requ

ired

for s

afet

y w

ill b

e de

sign

ed fo

r per

iodi

c te

stin

g an

d ca

libra

tion.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

6.1

Hyd

roge

n Pr

oduc

tion

Plan

t M

aint

enan

ce

Req

uire

men

ts

2.6.

2

Hyd

roge

n Pr

oduc

tion

Plan

t In-

Serv

ice

Insp

ectio

n

SR

M R

ev 2

4.

6.6.

2 H

ydro

gen

Prod

uctio

n Pl

ant

In-S

ervi

ce

Insp

ectio

n

2.6.

2-2

The

hydr

ogen

pro

duct

ion

plan

t des

ign

shal

l pro

vide

acc

ess t

o th

e pr

essu

re b

ound

ary

to p

erm

it op

erat

iona

l ins

pect

ion

as

requ

ired

by a

ppro

pria

te se

ctio

ns o

f the

ASM

E B

&PV

Cod

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.6.

6.2

Hyd

roge

n Pr

oduc

tion

Plan

t O

pera

tiona

l In

spec

tion

3

Hyd

roge

n Pl

ant

Bou

ndin

g C

ondi

tion

4.10

Hyd

roge

n Pl

ant

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 91

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Hyd

roge

n Pr

oduc

tion

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.1

B

ound

ing

Con

ditio

n - 0

14

Bou

ndin

g C

ondi

tion

4.10

.1 B

ound

ing

Con

ditio

n - 0

14

3.

1-1

The

inte

rfac

e fo

r the

hyd

roge

n pl

ant s

hall

be v

ia a

sepa

rate

pa

ralle

l prim

ary

loop

with

an

IHX

des

igne

d to

acc

omm

odat

e th

e pr

oces

s with

the

high

est p

rodu

ctio

n m

odul

e en

ergy

requ

irem

ent

(exp

ecte

d to

be

in th

e 60

Mw

t ran

ge).

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.10

.1 B

ound

ing

Con

ditio

n - 0

14

3.

1-2

This

loop

shal

l be

desi

gned

to o

pera

te a

t tem

pera

ture

s up

to

950°

C a

t pow

er le

vels

from

5 M

wt t

o 60

MW

t. 95

0 C

Pe

bble

Bed

Pr

ism

atic

B

ound

ing

Con

ditio

n 4.

10.1

Bou

ndin

g C

ondi

tion

- 014

3.1-

3 Th

e he

at tr

ansf

er/ t

rans

port

syst

em su

pply

ing

thes

e pr

oces

ses

mus

t be

capa

ble

of a

turn

dow

n ra

tio o

f 10:

1 to

acc

omm

odat

e th

ese

varia

tions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.10

.1 B

ound

ing

Con

ditio

n - 0

14,

Sum

mar

y of

Bas

es

3.

1-4

The

inte

rfac

e be

twee

n N

GN

P an

d th

e hy

drog

en p

roce

ss m

ust b

e de

sign

ed to

acc

omm

odat

e th

e th

erm

o-ch

emic

al p

roce

sses

as

they

bec

ome

avai

labl

e fo

r dem

onst

ratio

n at

the

prod

uctio

n m

odul

e le

vel.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.10

.1 B

ound

ing

Con

ditio

n - 0

14,

Sum

mar

y of

Bas

es

B-4

. Po

wer

Con

vers

ion

Syst

em R

equi

rem

ents

B

-4.1

St

eam

Gen

erat

or

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Stea

m G

ener

ator

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to P

ower

Con

vers

ion

Syst

em

SRM

Rev

2

4.5

Req

uire

men

ts

App

licab

le to

Po

wer

Con

vers

ion

Syst

em

2-1

The

Pow

er C

onve

rsio

n Sy

stem

shal

l con

vert

ener

gy fr

om th

e PH

TS o

r ste

am g

ener

ator

, as a

pplic

able

, int

o el

ectri

city

for

dist

ribut

ion

on th

e co

mm

erci

al g

ird.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5

Req

uire

men

ts

App

licab

le to

Po

wer

Con

vers

ion

Syst

em

2.1

St

eam

Tur

bine

and

Gen

erat

or

SRM

Rev

2

4.5.

1 St

eam

Tu

rbin

e an

d G

ener

ator

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 92

of10

4

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Stea

m G

ener

ator

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

1-2

The

stea

m tu

rbin

e an

d ge

nera

tor s

hall

be d

esig

ned

for

supe

rhea

ted

stea

m a

t a p

ress

ure

of [T

BD

] and

tem

pera

ture

of

[TB

D] a

t the

turb

ine

thro

ttle.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5.

1 St

eam

Tu

rbin

e an

d G

ener

ator

2.1-

3 Th

e st

eam

turb

ine

and

gene

rato

r sha

ll be

des

igne

d w

ith a

sing

le

shaf

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

5.1

Stea

m

Turb

ine

and

Gen

erat

or

2.

1-4

The

turb

ine

shal

l be

desi

gned

for m

ain

stea

m te

mpe

ratu

re

varia

tions

of u

p to

[TB

D].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5.

1 St

eam

Tu

rbin

e an

d G

ener

ator

2.1-

5 Th

e st

eam

turb

ine

gene

rato

r rat

ing

shal

l be

[TB

D].

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5.

1 St

eam

Tu

rbin

e an

d G

ener

ator

2.1-

6 Th

e St

eam

Tur

bine

and

Gen

erat

or sh

all p

rodu

ce e

lect

ricity

usi

ng

stea

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5.

1 St

eam

Tu

rbin

e an

d G

ener

ator

B-4

.2

Pow

er C

onve

rsio

n Sy

stem

Equ

ipm

ent f

or D

irect

Com

bine

d C

ycle

O

bjec

t #

Req

uire

men

t ID

Req

uire

men

ts fo

r PC

S Eq

uipm

ent f

or D

irec

t Com

bine

d C

ycle

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

3

Pow

er C

onve

rsio

n Sy

stem

B

ound

ing

Con

ditio

n 4.

9 Po

wer

C

onve

rsio

n Sy

stem

3.

1

Bou

ndin

g C

ondi

tion

- 013

B

ound

ing

Con

ditio

n 4.

9.1

Bou

ndin

g C

ondi

tion

- 013

3.1-

1 Th

e N

GN

P PC

S sh

all b

e an

indi

rect

sub-

criti

cal R

anki

ne c

ycle

(i.

e., t

he st

eam

gen

erat

or sh

all b

e in

stal

led

in th

e se

cond

ary

loop

su

pply

ing

a st

anda

rd st

eam

turb

ine

gene

rato

r) w

ith a

ratin

g eq

uiva

lent

to th

e nu

clea

r sys

tem

pow

er ra

ting.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.9.

1 B

ound

ing

Con

ditio

n - 0

13

3.

1-2

The

stea

m c

ondi

tions

and

con

figur

atio

n of

the

cycl

e sh

all b

e se

lect

ed to

resu

lt in

a n

et g

ener

atio

n ef

ficie

ncy

of a

t lea

st 4

2%;

bala

ncin

g co

st w

ith e

ffic

ienc

y an

d re

liabi

lity.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

Bou

ndin

g C

ondi

tion

4.9.

1 B

ound

ing

Con

ditio

n - 0

13

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 93

of10

4 B

-4.3

G

ener

al

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

for

Pow

er C

onve

rsio

n Sy

stem

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

1

Not

e: It

ems a

ppea

ring

in b

rack

ets (

[ ]) r

epre

sent

ap

prox

imat

ions

and

/or

unde

fined

val

ues.

2

Pow

er C

onve

rsio

n Sy

stem

- G

ener

al R

equi

rem

ents

2.

1

Req

uire

men

ts A

pplic

able

to P

ower

Con

vers

ion

Syst

em

2.

1-2

The

NG

NP

PCS

shal

l be

conn

ecte

d to

a lo

cal p

ublic

tra

nsm

issi

on li

ne fo

r ext

erna

l dis

tribu

tion

and

sale

of u

p to

[250

-30

0] M

We.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5

Req

uire

men

ts

App

licab

le to

Po

wer

Con

vers

ion

Syst

em

2.

1-3

The

NG

NP

PCS

shal

l pro

duce

ele

ctric

ity a

t nom

inal

60

Hz.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

5 R

equi

rem

ents

A

pplic

able

to

Pow

er C

onve

rsio

n Sy

stem

2.1-

4 Th

e N

GN

P PC

S sh

all b

e si

zed

to p

rodu

ce e

lect

ricity

at

com

mer

cial

scal

e us

ing

100%

of t

he N

GN

P th

erm

al e

nerg

y fr

om th

e re

acto

r.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5

Req

uire

men

ts

App

licab

le to

Po

wer

Con

vers

ion

Syst

em

2.

1-5

The

NG

NP

elec

trica

l out

put s

hall

be d

eliv

ered

to th

e op

erat

ing

utili

ty a

t the

low

-vol

tage

bus

hing

s of t

he m

ain

pow

er

trans

form

er.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.5

Req

uire

men

ts

App

licab

le to

Po

wer

Con

vers

ion

Syst

em

2.2

M

ain

Feed

-Wat

er S

yste

m

2.

2-1

The

Mai

n Fe

edw

ater

Sys

tem

shal

l del

iver

feed

wat

er to

the

stea

m g

ener

ator

at t

he sp

ecifi

ed te

mpe

ratu

re, p

ress

ure,

flow

rate

, an

d w

ater

che

mis

try.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5.

3 M

ain

Feed

wat

er S

yste

m

2.

2-2

The

Mai

n Fe

edw

ater

Sys

tem

shal

l pro

vide

stor

age

to

acco

mm

odat

e pr

oces

s flu

id su

rge

and

volu

me

fluct

uatio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5.

3 M

ain

Feed

wat

er S

yste

m

2.

2-3

The

Mai

n Fe

edw

ater

Sys

tem

shal

l pro

vide

isol

atio

n of

the

feed

wat

er to

pre

vent

wat

er in

flow

to a

faile

d st

eam

gen

erat

or.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5.

3 M

ain

Feed

wat

er S

yste

m

2.3

M

ain

Stea

m S

yste

m

2.

3-1

The

Mai

n St

eam

Sys

tem

shal

l con

vey

stea

m fr

om th

e st

eam

ge

nera

tor o

utle

t noz

zles

to th

e in

let n

ozzl

es o

f the

hig

h-pr

essu

re

turb

ines

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.5.

4 M

ain

Stea

m

Syst

em

2.4

M

ain

Con

dens

ate

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 94

of10

4

Obj

ect

#R

equi

rem

ent

IDG

ener

al R

equi

rem

ents

for

Pow

er C

onve

rsio

n Sy

stem

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2.

4-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

5.5

Mai

n C

onde

nsat

e Sy

stem

2.

5

PCS

Con

trol

and

Inst

rum

enta

tion

Syst

em

2.

5-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

5.6

PCS

Con

trol

and

Inst

rum

enta

tion

Syst

em

B-5

. B

alan

ce o

f Pla

nt R

equi

rem

ents

B

-5.1

Fu

el H

andl

ing

Syst

em

Obj

ect

#R

equi

rem

ents

ID

Req

uire

men

ts fo

r Fu

el H

andl

ing

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

Bui

ldin

gs

and

Stru

ctur

es

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

2.1

D

ecom

mis

sion

ing

Req

uire

men

ts

950

C

750

C

SR

M R

ev 2

4.

1.13

D

ecom

mis

sion

ing

Req

uire

men

ts

2.

1-1a

U

pon

com

plet

ion

of it

s use

ful l

ife, t

he N

GN

P nu

clea

r hea

t so

urce

shal

l be

put i

nto

a co

nditi

on o

f saf

e st

orag

e fo

r 10

year

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

14

Dec

omm

issi

onin

g R

equi

rem

ents

2.1-

1b

Afte

r the

safe

stor

age

perio

d of

10

year

s, th

e N

GN

P sh

all b

e

deco

mm

issi

oned

and

dis

man

tled

to a

llow

con

tinue

d us

e of

the

land

as a

pow

er p

lant

or i

ndus

trial

site

.

2.

1.1

The

desi

gn o

f the

NG

NP

shal

l inc

orpo

rate

feat

ures

con

sist

ent

with

dec

omm

issi

onin

g an

d de

cont

amin

atio

n be

st p

ract

ices

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.4

Envi

ronm

enta

l R

equi

rem

ents

3

R

equi

rem

ents

App

licab

le to

Nuc

lear

Hea

t Sou

rce

SRM

Rev

2

4.3

Req

uire

men

ts

App

licab

le to

N

ucle

ar H

eat

Sour

ce

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 95

of10

4

Obj

ect

#R

equi

rem

ents

ID

Req

uire

men

ts fo

r Fu

el H

andl

ing

Syst

em

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.1

R

eact

or S

uppo

rt S

yste

ms

SRM

Rev

2

4.3.

3 R

eact

or

Supp

ort S

yste

ms

3.1.

1

Fuel

Han

dlin

g Sy

stem

s

SR

M R

ev 2

4.

3.3.

3 Fu

el

Han

dlin

g Sy

stem

s

3.1.

1-8

For t

he p

rism

atic

reac

tor d

esig

n du

ring

reac

tor s

hutd

own,

the

Fuel

Han

dlin

g Sy

stem

(FH

S) sh

all r

ecei

ve n

ew a

nd ir

radi

ated

fu

el, r

efle

ctor

blo

cks,

and

othe

r cor

e el

emen

ts fr

om th

e sp

ent

fuel

stor

age

syst

em (S

FSS)

and

pla

ce th

em in

the

reac

tor v

esse

l, ph

ysic

ally

repl

acin

g an

d re

stac

king

the

core

.

950

C

750

C

Pris

mat

ic

SRM

Rev

2

4.3.

3.3

Fuel

H

andl

ing

Syst

ems

3.

1.1-

9 Fo

r the

peb

ble

bed

reac

tor d

esig

n, th

e FH

S sh

all b

e de

velo

ped

such

that

the

fuel

peb

bles

are

circ

ulat

ed th

roug

h th

e co

re to

af

fect

on-

line

plan

t ref

uelin

g.

950

C

750

C

Pebb

le B

ed

SRM

Rev

2

4.3.

3.3

Fuel

H

andl

ing

Syst

ems

3.

1.1-

10

The

FHS

shal

l pro

vide

shie

ldin

g to

pro

tect

wor

kers

from

ra

diat

ion

durin

g ce

rtain

fuel

han

dlin

g op

erat

ions

, as a

pplic

able

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.3.

3 Fu

el

Han

dlin

g Sy

stem

s

3.1.

1-11

Th

e FH

S sh

all l

imit

the

ingr

ess o

f pot

entia

l con

tam

inan

ts in

to

the

prim

ary

heliu

m c

ircui

t fro

m c

ompo

nent

s of t

he F

HS

exte

rnal

to

the

prim

ary

HPB

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.3

Fuel

H

andl

ing

Syst

ems

3.

1.1-

12

For t

he p

rism

atic

reac

tor d

esig

n, th

e FH

S sh

all b

e de

sign

ed to

ac

com

plis

h pl

ant r

efue

ling

with

in a

tim

e in

terv

al sp

ecifi

ed in

pl

anne

d ou

tage

allo

catio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.3

Fuel

H

andl

ing

Syst

ems

3.

1.1-

13

The

Fuel

Han

dlin

g Sy

stem

shal

l rem

ove

and

repl

ace

fuel

from

th

e re

acto

r cor

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.3.

3.3

Fuel

H

andl

ing

Syst

ems

3.

1.1-

14

The

Fuel

Han

dlin

g Sy

stem

shal

l pre

pare

new

fuel

for u

se in

the

reac

tor c

ore.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.3.

3 Fu

el

Han

dlin

g Sy

stem

s

3.1.

1-15

Th

e Fu

el H

andl

ing

Syst

em sh

all s

tore

spen

t fue

l. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.3.

3 Fu

el

Han

dlin

g Sy

stem

s 3.

1.2

Sp

ent F

uel C

oolin

g Sy

stem

SR

M R

ev 2

3.

1.2-

2 Th

e sp

ent f

uel c

oolin

g sy

stem

shal

l con

tinuo

usly

rem

ove

[TB

D

MW

t] of

hea

t abs

orbe

d by

the

cool

ing

wat

er a

t am

bien

t at

mos

pher

ic c

ondi

tions

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.4

Spen

t Fue

l C

oolin

g Sy

stem

3.

1.2-

3 Th

e sp

ent f

uel c

oolin

g sy

stem

shal

l be

desi

gned

to o

pera

te

cont

inuo

usly

whe

neve

r spe

nt fu

el is

loca

ted

in st

orag

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.4

Spen

t Fue

l C

oolin

g Sy

stem

3.1.

2-4

Wat

er q

ualit

y re

quire

men

ts sh

all b

e m

aint

aine

d at

all

times

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.3.

4 Sp

ent F

uel

Coo

ling

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 96

of10

4 B

-5.2

In

stru

men

tatio

n an

d C

ontr

ol

Obj

ect

#R

equi

rem

ent

IDR

equi

rem

ents

for

Inst

rum

enta

tion

and

Con

trol

Se

t R

eact

or T

ype

Sour

ce

Sour

ce S

ectio

n

2

Req

uire

men

ts A

pplic

able

to M

ultip

le S

yste

ms,

Bui

ldin

gs

and

Stru

ctur

es

SRM

Rev

2

4.1

Req

uire

men

ts

App

licab

le to

M

ultip

le S

yste

ms,

Bui

ldin

gs a

nd

Stru

ctur

es

2.1

In

stru

men

tatio

n an

d C

ontr

ol R

equi

rem

ents

SR

M R

ev 2

4.

1.5

Inst

rum

enta

tion

and

Con

trol

Req

uire

men

ts

2.

1-2

The

NG

NP

shal

l be

capa

ble

of b

eing

con

trolle

d fr

om a

sing

le

cont

rol r

oom

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.5

Inst

rum

enta

tion

and

Con

trol

Req

uire

men

ts

2.

1-3

The

mai

n co

ntro

l roo

m sh

all i

nclu

de c

ontro

ls fo

r the

PC

S an

d hi

gh-te

mpe

ratu

re h

eat t

rans

port

syst

em.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

5 In

stru

men

tatio

n an

d C

ontro

l R

equi

rem

ents

2.1-

4 Th

e N

GN

P de

sign

shal

l opt

imiz

e th

e hu

man

-mac

hine

inte

rfac

e ba

sed

on h

uman

fact

ors e

ngin

eerin

g pr

inci

ples

and

ope

ratin

g ex

perie

nce

to th

e ex

tent

pos

sibl

e w

ithou

t com

prom

isin

g pl

ant

safe

ty.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

5 In

stru

men

tatio

n an

d C

ontro

l R

equi

rem

ents

2.

2

Mai

nten

ance

Req

uire

men

ts

SRM

Rev

2

4.1.

8 M

aint

enan

ce

Req

uire

men

ts

2.

2-1

The

NG

NP

desi

gn sh

all i

nclu

de p

rovi

sion

s for

mon

itorin

g eq

uipm

ent s

tatu

s, co

nfig

urat

ion,

and

per

form

ance

and

for

dete

ctin

g an

d di

agno

sing

mal

func

tions

as a

bas

is fo

r pre

dict

ive

mai

nten

ance

pla

ns a

nd d

ecis

ion

mak

ing.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

8 M

aint

enan

ce

Req

uire

men

ts

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 97

of10

4 B

-5.3

G

ener

al

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2

Req

uire

men

ts A

pplic

able

to B

alan

ce o

f Pla

nt

SRM

Rev

2

2.

1

Coo

ling

Wat

er S

yste

ms

2.

1-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.1

Coo

ling

Wat

er S

yste

ms

2.2

L

iqui

d an

d G

as S

uppl

ies

2.

2-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.2

Liqu

id a

nd

Gas

Sup

plie

s 2.

3

Pipi

ng S

yste

ms

2.

3-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.3

Pipi

ng

Syst

ems

2.4

E

lect

rica

l Sys

tem

s

2.4-

1 Th

e El

ectri

cal S

yste

ms s

hall

deliv

er p

ower

gen

erat

ed b

y th

e pl

ant t

o th

e of

fsite

tran

smis

sion

net

wor

k.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4 El

ectri

cal

Syst

ems

2.

4-2

The

Elec

trica

l Sys

tem

s sha

ll ta

ke p

ower

from

the

off-

site

tra

nsm

issi

on n

etw

ork

for v

ario

us p

lant

ope

ratio

ns, i

nclu

ding

st

artu

p.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4 El

ectri

cal

Syst

ems

2.

4-3

The

Elec

trica

l Sys

tem

s sha

ll pr

ovid

e ba

ckup

pow

er to

sele

ct

auxi

liarie

s whe

n th

e pl

ant p

ower

uni

ts a

nd o

ff-s

ite p

ower

are

not

av

aila

ble.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4 El

ectri

cal

Syst

ems

2.4-

5.1

H

igh

Vol

tage

Pow

er S

yste

m

2.

4-5.

1-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.4.

1 H

igh

Vol

tage

Pow

er

Syst

em

2.4-

5.2

M

ediu

m V

olta

ge P

ower

Sys

tem

2.4-

5.2-

1 TB

D

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.7.

4.2

Med

ium

V

olta

ge P

ower

Sy

stem

2.

4-5.

3

Low

Vol

tage

Pow

er S

yste

m

2.

4-5.

3-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.4.

3 Lo

w

Vol

tage

Pow

er

Syst

em

2.4-

5.4

B

acku

p Po

wer

Sys

tem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 98

of10

4

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.4.

4 B

acku

p Po

wer

Sys

tem

2.

4-5.

5

Dir

ect C

urre

nt/U

nint

erru

ptib

le P

ower

Sup

ply

Syst

em

2.

4-5.

4-1

The

Dire

ct C

urre

nt (D

C)/U

nint

erru

ptib

le P

ower

Sup

ply

(UPS

) Sy

stem

shal

l pro

vide

a st

ored

ene

rgy

sour

ce fo

r the

all

plan

t DC

lo

ads.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4.5

DC

/UPS

Sy

stem

2.4-

5.6

G

roun

ding

Sys

tem

2.4-

5.6-

1 Th

e G

roun

ding

Sys

tem

shal

l pro

tect

per

sonn

el a

nd e

quip

men

t fr

om sy

stem

faul

ts a

nd li

ghtn

ing

strik

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4.6

Gro

undi

ng

Syst

em

2.

4-5.

6-2

The

Gro

undi

ng S

yste

m sh

all m

inim

ize

elec

trica

l noi

se in

sign

al

cabl

es.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4.6

Gro

undi

ng

Syst

em

2.4-

5.7

C

omm

unic

atio

n an

d L

ight

ing

2.4-

5.7-

1 C

omm

unic

atio

n an

d Li

ghtin

g sh

all p

rovi

de in

tra-p

lant

co

mm

unic

atio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4.7

Com

mun

icat

ion

and

Ligh

ting

2.

4-5.

7-2

Com

mun

icat

ion

and

Ligh

ting

shal

l pro

vide

inte

rnal

and

ext

erna

l lig

htin

g.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

4.7

Com

mun

icat

ion

and

Ligh

ting

2.5

Pl

ant C

ontr

ol R

oom

Sys

tem

2.5-

1 Th

e N

GN

P fa

cilit

y de

sign

shal

l per

mit

the

oper

ator

s to

take

co

ntro

l of t

he re

acto

r and

supp

ort p

roce

sses

from

with

in a

sing

le

inte

grat

ed c

ontro

l roo

m u

sing

the

man

ual m

ode

at a

ny ti

me.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

6 N

HS

Con

trol

Roo

m a

nd

Ope

rato

r Int

erfa

ce

Syst

em

2.

5-2

The

cont

rol r

oom

shal

l rem

ain

oper

able

and

cap

able

of

occu

patio

n du

ring

cred

ible

ext

erna

l eve

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

6 N

HS

Con

trol

Roo

m a

nd

Ope

rato

r Int

erfa

ce

Syst

em

2.

5-3

TBD

for a

dditi

onal

con

trol r

oom

and

ope

rato

r int

erfa

ce

requ

irem

ents

, suc

h as

hum

an fa

ctor

s, pr

otec

tion

in D

BA

s, et

c.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

6 N

HS

Con

trol

Roo

m a

nd

Ope

rato

r Int

erfa

ce

Syst

em

2.

5-4

The

Plan

t Con

trol R

oom

Sys

tem

shal

l pro

vide

an

inte

rfac

e be

twee

n pl

ant o

pera

tors

and

eac

h of

the

nece

ssar

y sy

stem

s w

ithin

the

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

5 Pl

ant C

ontro

l R

oom

Sys

tem

2.6

Pl

ant M

echa

nica

l Ser

vice

s Sys

tem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 99

of10

4

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

6-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.6

Plan

t M

echa

nica

l Se

rvic

es S

yste

m

2.7

Fi

re D

etec

tion

and

Supp

ress

ion

Syst

em

2.

7-1

The

Fire

Det

ectio

n an

d Su

ppre

ssio

n Sy

stem

shal

l rap

idly

det

ect

and

annu

ncia

te th

e pr

esen

ce a

nd lo

catio

n of

com

bust

ion

by-

prod

ucts

or t

he p

rese

nce

of fi

re w

ithin

the

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

7 Fi

re

Det

ectio

n an

d Su

ppre

ssio

n Sy

stem

2.7-

2 Th

e Fi

re D

etec

tion

and

Supp

ress

ion

Syst

em sh

all c

ontro

l and

ex

tingu

ish

fires

that

do

occu

r. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

7.7

Fire

D

etec

tion

and

Supp

ress

ion

Syst

em

2.

7-3

The

Fire

Det

ectio

n an

d Su

ppre

ssio

n Sy

stem

shal

l pro

vide

pr

otec

tion

for P

ASS

Cs s

uch

that

the

perf

orm

ance

of s

afet

y fu

nctio

ns a

re n

ot p

reve

nted

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.7.

7 Fi

re

Det

ectio

n an

d Su

ppre

ssio

n Sy

stem

2.

8

Com

mun

icat

ions

Sys

tem

2.8-

1 Th

e C

omm

unic

atio

ns S

yste

m sh

all p

rovi

de p

lant

to o

ff-s

ite

com

mun

icat

ions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

7.8

Com

mun

icat

ions

Sy

stem

2.

9

Safe

guar

ds a

nd S

ecur

ity S

yste

m

2.

9-1

The

Safe

guar

ds a

nd S

ecur

ity S

yste

m sh

all p

rovi

de p

hysi

cal

prot

ectio

n of

the

plan

t. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

7.9

Safe

guar

ds

and

Secu

rity

Syst

em

2.10

Plan

t I&

C a

nd P

rote

ctio

n

2.10

-1

TBD

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

7.10

Pla

nt I&

C

and

Prot

ectio

n 2.

11

N

GN

P Su

perv

isor

y an

d C

ontr

ol S

yste

m

2.

11-1

TB

D

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.7.

11 N

GN

P Su

perv

isor

y an

d C

ontro

l Sys

tem

2.

12

Si

te a

nd C

ivil

Wor

ks

2.

12-1

TB

D

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.7.

12 S

ite a

nd

Civ

il W

orks

2.

13

St

ruct

ural

Req

uire

men

ts

SRM

Rev

2

4.1.

3 St

ruct

ural

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 100

of1

04

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

Req

uire

men

ts

2.

13-5

C

an b

e co

lloca

ted

with

the

proc

ess;

Pro

tect

ive

Act

ion

Gui

delin

es li

mits

at s

ite b

ound

ary

of a

ppro

xim

atel

y 40

0 m

eter

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

3.

2.2

HTG

R

Fund

amen

tal

Req

uire

men

ts

2.

13-6

Th

e N

GN

P de

sign

will

be

such

that

the

HTG

R c

an b

e co

lloca

ted

with

the

proc

ess;

PA

G li

mits

met

at t

he si

te b

ound

ary

of

appr

oxim

atel

y 40

0 m

eter

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

1 Sy

stem

C

onfig

urat

ion

and

Esse

ntia

l Fea

ture

s R

equi

rem

ents

2.13

-7

NG

NP

PASS

Cs s

hall

be d

esig

ned

and

cons

truct

ed u

sing

and

de

mon

stra

ting

mod

ular

pla

nt c

onst

ruct

ion.

95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

1.3

Stru

ctur

al

Req

uire

men

ts

2.

13-8

Th

e N

GN

P sh

all b

e de

sign

ed fo

r a re

fere

nce

safe

shut

dow

n ea

rthqu

ake

(SSE

) hor

izon

tal p

eak

grou

nd a

ccel

erat

ion

(PG

A) o

f [0

.3g]

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

3 St

ruct

ural

R

equi

rem

ents

2.

13-9

Th

e N

GN

P sh

all b

e de

sign

ed su

ch th

at th

e m

inim

um le

vel a

t w

hich

a sh

utdo

wn

is re

quire

d to

eva

luat

e th

e co

nditi

on o

f the

pl

ant f

ollo

win

g an

ear

thqu

ake

shal

l be

[0.1

g] P

GA

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

3 St

ruct

ural

R

equi

rem

ents

2.

13-1

0 A

seis

mic

mar

gin

asse

ssm

ent s

hall

be p

erfo

rmed

to d

emon

stra

te

that

ther

e is

seis

mic

mar

gin

in th

e N

GN

P be

yond

the

desi

gn

leve

l SSE

. The

seis

mic

mar

gin

earth

quak

e us

ed in

the

seis

mic

m

argi

n as

sess

men

t pro

cess

shal

l be

the

NU

REG

/CR

-009

8 m

edia

n sh

ape

curv

e an

chor

ed to

a [0

.5g]

PG

A.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

3 St

ruct

ural

R

equi

rem

ents

2.

13-1

1 N

GN

P pl

ant e

xter

nal s

truct

ures

, im

porta

nt to

safe

ty, s

hall

be

desi

gned

and

con

stru

cted

with

con

side

ratio

n of

airc

raft

impa

cts,

as re

quire

d by

NR

C fi

nal r

ule

RIN

315

0-A

I19.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

3 St

ruct

ural

R

equi

rem

ents

2.14

Con

stru

ctio

n R

equi

rem

ents

SR

M R

ev 2

4.

1.12

Con

stru

ctio

n R

equi

rem

ents

2.14

-1

Adv

ance

d te

chni

ques

, suc

h as

the

use

of fa

ctor

y or

fiel

d-fa

bric

ated

and

ass

embl

ed m

odul

es c

onta

inin

g po

rtion

s of

syst

ems a

nd/o

r stru

ctur

es, s

hall

be u

tiliz

ed (a

s app

ropr

iate

) to

redu

ce e

rect

ion

cost

s and

sche

dule

risk

s and

to e

nhan

ce q

ualit

y co

ntro

l.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

12 C

onst

ruct

ion

Req

uire

men

ts

2.

14-2

Th

e de

sign

of b

uild

ings

and

equ

ipm

ent s

hall

faci

litat

e pl

ant

cons

truct

ion

and

the

inst

alla

tion,

repa

ir, a

nd re

plac

emen

t of

equi

pmen

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

12 C

onst

ruct

ion

Req

uire

men

ts

2.15

Safe

ty R

equi

rem

ents

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 101

of1

04

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

15-1

Th

e nu

clea

r sys

tem

safe

ty b

asis

shal

l not

dep

end

on a

ctiv

e co

olin

g sy

stem

s dur

ing

desi

gn b

asis

acc

iden

t (D

BA

) con

ditio

ns.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

9 Sa

fety

R

equi

rem

ents

2.

16

Ph

ysic

al P

rote

ctio

n of

Pla

nts a

nd M

ater

ials

Req

uire

men

ts

2.

16-1

Th

e de

sign

of N

GN

P sh

all p

osse

ss fe

atur

es to

elim

inat

e or

re

duce

the

pote

ntia

l the

ft of

nuc

lear

mat

eria

ls.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

2.16

-2

The

desi

gn o

f NG

NP

shal

l em

phas

ize

pass

ive

barr

iers

to

pote

ntia

l the

ft of

nuc

lear

mat

eria

ls.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

2.16

-3

The

desi

gn o

f the

NG

NP

shal

l inc

orpo

rate

des

ign

feat

ures

in

tend

ed to

pro

vide

phy

sica

l pro

tect

ion

agai

nst a

cts o

f sab

otag

e th

at c

ould

cre

ate

a ra

diol

ogic

al h

azar

d to

the

pers

onne

l or a

po

tent

ial r

adio

activ

e re

leas

e to

the

publ

ic a

nd th

e en

viro

nmen

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

2.

16-4

M

easu

res t

hat h

ave

been

des

igne

d in

to th

e N

GN

P fo

r saf

ety

purp

oses

shal

l be

take

n in

to a

ccou

nt, t

o th

e ex

tent

pra

ctic

able

; th

ese

safe

ty fe

atur

es sh

ould

be

desi

gned

and

loca

ted

with

in th

e N

GN

P in

a m

anne

r tha

t fac

ilita

tes s

abot

age

and

thef

t pro

tect

ion,

in

clud

ing

cons

ider

atio

n of

dam

age

cont

rol/r

ecov

ery

actio

ns

from

sabo

tage

atte

mpt

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

2.

16-5

Th

ere

shal

l be

conc

urre

nt c

onsi

dera

tion

of sa

fety

and

secu

rity,

w

hich

will

com

men

ce a

t the

beg

inni

ng o

f the

des

ign

proc

ess.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.1

Phy

sica

l Pr

otec

tion

of P

lant

s an

d M

ater

ials

2.16

-6

The

NG

NP

shal

l inc

orpo

rate

des

ign

feat

ures

faci

litat

ing

impl

emen

tatio

n of

mat

eria

l con

trol a

nd a

ccou

ntin

g pr

oced

ures

th

at a

re su

ffic

ient

to e

nabl

e th

e N

GN

P op

erat

ing

orga

niza

tion

to

acco

unt f

or th

e sp

ecia

l nuc

lear

mat

eria

l in

its p

osse

ssio

n.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

11.2

Mat

eria

l C

ontro

l and

A

ccou

ntin

g of

Sp

ecia

l Nuc

lear

M

ater

ial

2.

17

M

aint

enan

ce R

equi

rem

ents

2.17

-1

The

NG

NP

desi

gn sh

all i

nclu

de p

rovi

sion

s for

mon

itorin

g eq

uipm

ent s

tatu

s, co

nfig

urat

ion,

and

per

form

ance

and

for

dete

ctin

g an

d di

agno

sing

mal

func

tions

as a

bas

is fo

r pre

dict

ive

mai

nten

ance

pla

ns a

nd d

ecis

ion

mak

ing.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.1.

8 M

aint

enan

ce

Req

uire

men

ts

2.18

NH

S Pr

otec

tion

Syst

em

2.

18-1

Th

e N

HS

Prot

ectio

n Sy

stem

shal

l mai

ntai

n pl

ant p

aram

eter

s w

ithin

acc

epta

ble

limits

est

ablis

hed

for D

BA

s. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 1

4.

3.4

NH

S Pr

otec

tion

Syst

em

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 102

of1

04

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

2.

18-2

Th

e pr

otec

tion

syst

em sh

all i

mpl

emen

t the

rele

vant

mon

itorin

g,

anal

ysis

, and

act

uatio

n fu

nctio

ns n

eces

sary

to re

ach

the

cont

rolle

d st

ate

in c

ase

of a

bnor

mal

eve

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

4 N

HS

Prot

ectio

n Sy

stem

2.

18-3

Th

e pr

otec

tion

syst

em sh

all p

rovi

de re

dund

ant,

fail-

safe

pr

otec

tive

func

tions

. 95

0 C

75

0 C

Pe

bble

Bed

Pr

ism

atic

SR

M R

ev 2

4.

3.4

NH

S Pr

otec

tion

Syst

em

2.

18-4

Th

e pr

otec

tion

syst

em sh

all r

emai

n op

erab

le o

r fai

l-saf

e du

ring

cred

ible

ext

erna

l eve

nts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

4 N

HS

Prot

ectio

n Sy

stem

3

R

equi

rem

ents

App

licab

le to

Nuc

lear

Hea

t Sou

rce

SRM

Rev

2

4.3

Req

uire

men

ts

App

licab

le to

N

ucle

ar H

eat

Sour

ce

3.1

R

eact

or S

uppo

rt S

yste

ms

SRM

Rev

2

4.3.

3 R

eact

or

Supp

ort S

yste

ms

3.1.

1

Hel

ium

Ser

vice

Sys

tem

SR

M R

ev 2

4.

3.3.

6 H

eliu

m

Serv

ice

Syst

em

3.

1.1-

1 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e he

lium

serv

ice

syst

em: R

emov

e ch

emic

al a

nd p

artic

ulat

e co

ntam

inan

ts fr

om th

e pr

imar

y co

olan

t to

mai

ntai

n sp

ecifi

ed v

alue

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

3.

1.1-

2 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e he

lium

serv

ice

syst

em: S

uppl

y pu

rifie

d he

lium

to sy

stem

s fill

ed w

ith h

eliu

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

3.1.

1-3

The

follo

win

g is

a re

quire

d fu

nctio

n of

the

heliu

m se

rvic

e sy

stem

: Rem

ove

heliu

m fr

om th

e pr

imar

y sy

stem

and

the

heliu

m-f

illed

supp

ortin

g sy

stem

s and

stor

e in

a g

as st

ore

for

purif

ied

heliu

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

3.

1.1-

4 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e he

lium

serv

ice

syst

em: A

ccep

t hel

ium

from

hel

ium

-fill

ed a

uxili

ary

and

supp

ortin

g sy

stem

s dur

ing

depr

essu

rizat

ion

activ

ities

and

, po

ssib

ly, s

tore

radi

oact

ivel

y co

ntam

inat

ed h

eliu

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

3.

1.1-

5 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e he

lium

serv

ice

syst

em: E

vacu

ate

prim

ary

syst

ems a

nd h

eliu

m su

ppor

ting

syst

ems.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

3.

1.1-

6 Th

e fo

llow

ing

is a

requ

ired

func

tion

of th

e he

lium

serv

ice

syst

em: M

aint

ain

chem

ical

con

tam

inan

ts w

ithin

requ

ired

conc

entra

tion

band

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.6

Hel

ium

Se

rvic

e Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 103

of1

04

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.1-

7 Th

e Se

cond

ary

Hel

ium

Pur

ifica

tion

Syst

em sh

all p

roce

ss a

sm

all s

ide-

stre

am o

f hel

ium

from

the

Seco

ndar

y H

eat T

rans

port

Syst

em to

rem

ove

chem

ical

and

radi

oact

ive

impu

ritie

s.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.4.

2.1

Seco

ndar

y H

eliu

m

Purif

icat

ion

Syst

em

3.

1.1-

8 Th

e Se

cond

ary

Hel

ium

Pur

ifica

tion

Syst

em sh

all p

rovi

de fo

r tri

tium

rem

oval

as r

equi

red

to m

eet t

ritiu

m tr

ansp

ort l

imits

to

plan

t eff

luen

ts a

nd p

rodu

cts.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

1

4.4.

2.1

Seco

ndar

y H

eliu

m

Purif

icat

ion

Syst

em

3.1.

2

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-1

The

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em sh

all

prov

ide

for c

olle

ctin

g ra

dioa

ctiv

e (o

r pot

entia

lly ra

dioa

ctiv

e)

liqui

d an

d ga

seou

s was

tes,

incl

udin

g va

rious

form

s of s

olid

w

aste

gen

erat

ed w

ithin

the

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-1

The

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em sh

all

prov

ide

for s

torin

g ra

dioa

ctiv

e (o

r pot

entia

lly ra

dioa

ctiv

e) li

quid

an

d ga

seou

s was

tes,

incl

udin

g va

rious

form

s of s

olid

was

te

gene

rate

d w

ithin

the

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-1

The

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em sh

all

prov

ide

for p

roce

ssin

g, ra

dioa

ctiv

e (o

r pot

entia

lly ra

dioa

ctiv

e)

liqui

d an

d ga

seou

s was

tes,

incl

udin

g va

rious

form

s of s

olid

w

aste

gen

erat

ed w

ithin

the

plan

t.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-1

The

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em sh

all

prov

ide

for m

onito

ring

radi

oact

ive

(or p

oten

tially

radi

oact

ive)

liq

uid

and

gase

ous w

aste

s, in

clud

ing

vario

us fo

rms o

f sol

id

was

te g

ener

ated

with

in th

e pl

ant.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-2

The

Rad

ioac

tive

Was

te a

nd D

econ

tam

inat

ion

Syst

em sh

all

prov

ide

equi

pmen

t to

rem

ove

radi

oact

ive

surf

ace

cont

amin

atio

n fr

om c

ompo

nent

s, as

nec

essa

ry, t

o fa

cilit

ate

cont

rol a

nd

min

imiz

e m

igra

tion

of ra

dioa

ctiv

e co

ntam

inat

ion

and

to li

mit

pers

onne

l exp

osur

e to

radi

onuc

lides

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

Fo

rm 4

12.0

9 (R

ev. 1

0)

Id

aho

Nat

iona

l Lab

orat

ory

NG

NP

SYST

EM

RE

QU

IRE

ME

NT

S M

AN

UA

L

Iden

tifie

r: R

evis

ion:

Ef

fect

ive

Dat

e:

INL/

EXT-

07-1

2999

3 09

/10/

09

Page

: 104

of1

04

Obj

ect

#R

equi

rem

ents

ID

Gen

eral

Req

uire

men

ts fo

r B

alan

ce o

f Pla

nt

Set

Rea

ctor

Typ

e So

urce

So

urce

Sec

tion

3.

1.2-

3 Th

e ra

dioa

ctiv

e an

d po

tent

ially

radi

oact

ive

floor

and

equ

ipm

ent

liqui

d ru

noff

. was

te st

ream

s sha

ll be

rout

ed to

the

liqui

d ra

dioa

ctiv

e w

aste

subs

yste

m.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

3.

1.2-

4 Pr

ovis

ions

shal

l be

incl

uded

to re

duce

act

ivity

leve

ls c

onta

ined

in

liqu

id e

fflu

ent.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-5

Rad

ioac

tive

liqui

d w

aste

syst

em c

ompo

nent

s sha

ll be

redu

ndan

t to

pro

vide

for b

oth

syst

em re

liabi

lity

and

on-li

ne m

aint

enan

ce.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-6

The

gas w

aste

por

tion

of th

e ra

dioa

ctiv

e w

aste

syst

em sh

all h

ave

suff

icie

nt st

orag

e ca

paci

ty to

allo

w fo

r rad

ioac

tive

deca

y pr

ior t

o re

leas

e.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-7

Dec

onta

min

atio

n eq

uipm

ent s

hall

be sk

id m

ount

ed. E

ach

deco

ntam

inat

ion

skid

shal

l pro

vide

stea

m, w

ash

wat

er

(incl

udin

g de

terg

ent a

nd/o

r add

itive

s), r

inse

wat

er, d

ryin

g ai

r, an

d va

cuum

ing

serv

ice.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-8

Dec

onta

min

atio

n sy

stem

was

tes s

hall

be c

olle

cted

loca

lly a

nd

rout

ed to

the

appr

opria

te ra

dioa

ctiv

e w

aste

syst

ems.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem

3.1.

2-9

All

radi

oact

ive

was

tes g

ener

ated

with

in th

e fa

cilit

y sh

all b

e co

llect

ed, m

onito

red,

trea

ted,

and

pro

cess

ed o

nsite

prio

r to

ship

men

t off

site

.

950

C

750

C

Pebb

le B

ed

Pris

mat

ic

SRM

Rev

2

4.3.

3.7

Rad

ioac

tive

Was

te a

nd

Dec

onta

min

atio

n Sy

stem