Tennessee River NEYLAND DRIVE JOAN CRONAN WAY KUB Kuwahee Wastewater Treatment Plant KUB Kuwahee Wastewater Treatment Plant KUB Kuwahee Wastewater Treatment Plant Neyland Drive Lane Shifts Both Eastbound Lanes of Traffic Maintained via Shift to Center Turn Lane No lefthand turns from Eastbound Lane Westbound Traffic Maintains Normal Flow NEYLAND GREENWAY NEYLAND GREENWAY NEYLAND GREENWAY NEYLAND GREENWAY NEYLAND GREENWAY Intermittent Neyland Greenway Closures through Feb. 2021 Boat Dock Access for Emergency Vehicles Only through Feb. 2021 Eastbound KUB Plant Traffic Use Joan Cronan Way Neyland Drive & Greenway Traffic Impacts Kuwahee Wastewater Treatment Plant Project Construction: January 2019 – February 2021

Neyland Drive & Greenway Traffic Impacts Kuwahee ...Treatment Plant Neyland Drive Lane Shifts Both Eastbound Lanes of Traffic Maintained via Shift to Center Turn Lane No lefthand turns

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Neyland Drive & Greenway Traffic Impacts Kuwahee ...Treatment Plant Neyland Drive Lane Shifts Both Eastbound Lanes of Traffic Maintained via Shift to Center Turn Lane No lefthand turns

Tennessee RiverNEYLAND DRIVE

JOAN CRONAN WAY

KUB Kuwahee WastewaterTreatment Plant

KUB Kuwahee WastewaterTreatment Plant

KUB Kuwahee WastewaterTreatment Plant

Neyland DriveLane Shifts

BothEastbound Lanes

of Traffic Maintained via Shiftto CenterTurn Lane

No lefthandturns fromEastbound

Lane

WestboundTraffic

MaintainsNormal Flow

NEYLAND GREENWAY

NEYLAND GREENWAY

NEYLAND GREENWAY

NEYLAND GREENWAY

NEYL

AND

GREE

NWAY

IntermittentNeyland

GreenwayClosuresthrough

Feb. 2021

Boat DockAccess

forEmergency

VehiclesOnly

throughFeb. 2021

EastboundKUB PlantTraffic Use

Joan CronanWay

Neyland Drive & GreenwayTraffic Impacts

Kuwahee Wastewater TreatmentPlant Project

Construction: January 2019 – February 2021