NEXUS Capabilities
and Experience Deepwater, Shallow Water and Topsides
This document presents an overview of Nexus Deepwater Engineering Inc., its
capabilities, experience and global offices that are providing world class
engineering services in the area of Subsea and Topsides Production Systems
2012
Created by Nexus Global Marketing Team
Nexus Deepwater Engineering Inc.,
10/12/2012
2 REVISION OCTOBER 2012
CAPABILITIES AND EXPERIENCE
- SUBSEA DEEPWATER
- SUBSEA SHALLOW WATER
- PIPELINES / FLOWLINES
- PLATFORM STRUCTURAL
SUBSEA PRODUCTION SYSTEMS
3 REVISION OCTOBER 2012
Table of Contents
1 INTRODUCTION....................................................................................................................... 4
2 OVERVIEW ................................................................................................................................. 5
3 SUBSEA PRODUCTION SYSTEM PROJECT LIST / CAPABILITIES .................... 6
4 PROJECT PROFILES ............................................................................................................ 11
5 NEXUS OFFICES / CONTACT INFORMATION ........................................................... 18
4 REVISION OCTOBER 2012
1 INTRODUCTION
Nexus Deepwater Engineering Inc. (NEXUS) is a Houston Based engineering company
that has the most innovative independent subsea deepwater / shallow-water
engineering and management consultancy, with a team that brings over 30 years of
experience. Our global team capacity and offices are as following:
The Houston office has been operating since 2008 at 908 Town & Country Blvd
Suite 120, Houston Texas.
The Kuala Lumpur office has been operating since 2009 at Menara Citibank, Level
36, 165 Jalan Ampang KL. We have also opened our new engineering office on
Level 9-1 in Wisma UOAII, Jalan Pinang 50450 KL. The office is located near the
Petronas Twin Towers.
The Perth office was opened in the city center located in the AMP Tower close to
Woodside.
The Vietnam office also opened its doors on 1st October, 2012 in Ho Chi Minh
City’s main business district.
In 2008 NEXUS was formed by the joining of Oceanus S.A., NG Solutions and Rabia
Enterprises (Pvt Ltd) to provide a consolidated Subsea engineering (shallow and
deepwater), floating systems and construction management services. We are backed up
by a full suite of unique in-house specialist software, our comprehensive subsea and
topside capabilities include expertise in Project Management, Project Engineering, pre-
FEED, FEED, Bid Evaluation, Project Execution, Vessel Selection, Pre-Commissioning,
Installation Workover Control Systems, Rig Surveys and Onshore/Offshore Testing
Support.
Flow Assurance is an integral part of FEED study, where steady-state and transient state
for single-phase or multi-phase flow plays a critical role. Well fluid conditions are a key
driver for selection of materials, production control system, system hardware selection
and topside process system design.
5 REVISION OCTOBER 2012
2 OVERVIEW
NEXUS is a solution provider in the upstream subsea field development. It has achieved
its success through technical and commercial integrity. Our highly qualified Senior
Management and Engineering Professionals have provided quality and expertise in
executing an array of major international projects.
NEXUS has taken client projects from Concept through Design, Execution, Installation
and Safely into Production in accordance with the specifications, industry standards and
regulations.
NEXUS Subsea Professionals have proven track record of developing and completing
complex projects. The team has experience in managing multi-facet projects with a
decade or more experience in Engineering, Project Management, Manufacturing and
Offshore Installations of Subsea Production Systems.
Our team consists of Engineers that have worked on world class subsea projects:
Kanowit KAKG (Shallow Water)
Talisman Hoi Mai (Shallow Water)
Murphy Serendah-Patricia (Shallow Water)
Shell F-14/F-29 (Shallow Water)
Shell Gumusut-Kakap (Deepwater)
Chevron Jack & St.Malo (Deepwater)
Petrobras Cascade & Chinook (Ultra-Deepwater / Walker Ridge)
PDVSA Marsical Sucre (Shallow Water)
Chevron Agbami (Deepwater)
BP Thunderhorse (Deepwater)
BP Atlantis (Deepwater)
Kings Peak (Deepwater)
Canyon Express (Deepwater)
6 REVISION OCTOBER 2012
3 SUBSEA PRODUCTION SYSTEM PROJECT LIST / CAPABILITIES
PROJECT
NAME/LOCATION CLIENT PROJECT HIGHLIGHTS STATUS
Kanowit KAKG-A pre-
commissioning,
commissioning and
start-up
PCSB/PETRA/J
PK
Provision of Hook-up and Commissioning work for
KASS Project at KAKG-A Platform. Nexus was
involved in writing the topside subsea production
control system pre-commission, commissioning
and black-start up procedures. Furthermore,
Nexus was selected to lead the platform teams in
the pre-commissioning phase.
●Safety Instrumented System integraEon
between MCS and Subsea ESD/PSD
●Master Control StaEon powering and start-up
●Electrical Power Unit power-up and start-up
●Chemical InjecEon Unit start-up and
commissioning
●Hydraulic Power Unit start-up and testing
●Topside Umbilical TerminaEon Unit (TUTU)
testing
Ongoing
Kanowit KAKG-A pre-
commissioning,
commissioning and
start-up
PCSB/PETRA/J
PK
Nexus was selected by Petronas and PETRA to
provide a hydraulic flushing unit that is being used
on the platform for flushing control lines to
maintain NAS Class 6 level cleanliness
Ongoing
Structural Design and
SACS analysis Project
AXON/AmerCa
ble (USA)
Detail Structural design based on a workable
structural configuration in place with the
telescopic crane as part of the cage. The
incorporation of the crane shall be up to the top
pedestal. The design of structural support for the
cage system will be included (structural integrity
of the cantilever deck will not be considered as
part of the design scope).
Ongoing
Pressure Vessel
Engineering Design
Review Project
Shell (USA)/
Metarock
Nexus was selected by Shell to provide its
Professional Engineering Licensing in evaluating
the design of eighteen (18) pressure vessels. A
comprehensive calculation package was created
and Stamped for each vessel. ASME VII was used
as a criterion for comparison.
Completed 2012
Subsea Training PCSB/JPK
Nexus was selected by Petronas (PCSB) to provide
training on:
●Level 2, Subsea Front End Engineering (FEED)
training
●Level 2, Subsea Umbilical and Subsea
Distribution System training
Nexus created presentation material, animations,
Ongoing
7 REVISION OCTOBER 2012
workshop, assessment exam and trainer's manual
for each module
Patricia Water
Injection System Murphy
JP Kenny Malaysia was awarded the Patricia and
Serendah Pipeline and Subsea Pre-FEED study for
a Water Injection System. Based on Patricia Gas
Production draw-down by 2013, Murphy would
like a feasibility study that would introduce two
Water Injection Wells that would allow for
increased production. Processed water is pumped
from 13km to the Water Injectors; whereas, the
control system is located 1km away on the
Patricia Platform. The subsea control system
(MCS, EPU, TUTA, Umbilical, SUTA and Flying
Leads) ranges from simple direct hydraulics to
complex MUX systems. Nexus has been engaged
in developing a report that will examine an array
of field architectures, using proven technologies.
The Cost Analysis is to ensure that CAPEX and
OPEX are optimized and if a system is selected,
the well economics is favorable.
Completed 2011
F14-F29 Conceptual
Design Shell
JP Kenny Malaysia was requested by SSB Shell
Sarawak through Aker Solutions to conduct a
number of Conceptual pre-FEED studies for its F29
Subsea Well. Nexus was contracted to provide the
following:
● Subsea ProducEon Control System Philosophy
(MCS, HPU, and EPU)
● Subsea Shutdown and Startup Philosophy
●Subsea Interface Matrix Development
● Conduct subsea system HAZOP
● Develop Umbilical and Hydraulic Flying Lead
Installation Scope of Work
●Extensive interfacing with Topsides Process,
Structural, Piping, Mechanical, Instrumentation
and Electrical disciplines.
●Line Diagrams and drawings were provided for
interfacing with IPS and Process Shutdowns
- Process Shutdown Review and interface review
- Shell TA review and pigging philosophy review
Completed 2011
8 REVISION OCTOBER 2012
Subsea Control
System Pre-
commissioning
Woodside
JP Kenny Malaysia was requested by Woodside
Australia to provide pre-commissioning Subsea
Control System Test Leadership at Keppel
Shipyard Singapore. Nexus was contracted to play
a lead role in representing Woodside to
successfully pre-commission the MCS, EPU, HPU
and ESD system; including testing of Control
System Lines on the OKHA FPSO. An extensive
testing program was reviewed, with daily
readiness reviews, interfacing with SBM and
implementation of control system.
Completed 2011
Liwan Umbilical
System CNOOC
Technip Malaysia was contracted by COOEC to
perform the conceptual and detailed engineering
for the Liwan 3-1, Block 29/26 Field Development.
Technip contracted NEXUS to develop a feasibility
study of Umbilical, Umbilical Installation and
possible utilization of Subsea System SSIV.
ISO13628-5 was used as a bench mark to provide
a customized report.
Completed 2010
PROD Tool Testing BP
JP Kenny Malaysia was requested by BP United
Kingdom to provide technical expertise to
support its new Seismic Tool Technology for the
Shendiz Caspian Project (AzSPU). Nexus was
screened and selected by BP to oversee the
qualification of its new PROD technology in
Brisbane Australia. Extensive seismic testing and
drilling tool functionalities were tested to ensure
product integrity and reliability.
Completed 2010
SSIV Control System
Design (TGT) Petro Vietnam
JP Kenny Malaysia was contracted by Petro
Vietnam to provide pipelines and subsea control
system FEED / detailed design engineering. TGT
Field Development required expertise that would
guide TGT, Hong Long JOC and Petro Vietnam with
a subsea controls solution. NEXUS team started
out by creating an Interface Management Tool to
identify technical and contractual gaps. Then the
team set out through a series of studies, detailed
reports, data sheets and vendor product reviews
to provide a topside-to-subsea SSIV control
system that was located on the Bumi Armada
FPSO.
Completed 2010
9 REVISION OCTOBER 2012
Gumusut-Kakap Shell
Gumusut-Kakap is a deepwater field located in
Sarawak Malaysian waters. JP Kenny Malaysia was
awarded the SIFOE contract by Shell Malaysia to
put an umbrella team that will pull in global
expertise to successfully deliver the project.
NEXUS was one of the global experts selected and
seconded to Shell. The scope of work was related
to Subsea Control System, Manifold System and
IWOCS/CWOR systems in a lead role. Well over
100 documents were reviewed and approved:
● FAT and EFAT TesEng of IWOCS HMI was
conducted in Norway Kongsberg
● EFAT tesEng of IWOCS and CWOR System
including the EDP / LRP breakaway system were
tested and approved (Johor Bahru Malaysia)
●ProducEon, WI and GI Manifold tesEng;
including control system testing was conducted
and approved in Lumut Malaysia
● HAZOP and HAZID's for IWOCS and Control
Systems were conducted in Shell's KL Deepwater
Office
Completed 2010
Festoon System BP
A new Festoon design was required by BP in the
Gulf of Mexico that would meet the stringent
standards - harsh Arctic environment. Nexus
provided the design verification package,
including a detailed design study that enabled EMI
to successfully quality, manufacture, test and
operate a Festoon System on the Parker Drilling
Rig.
Completed 2008
Hydraulic Power Unit
Development Chevron
Agbami was West Africa (Nigeria) deepwater
project. A total of four (4) Test Hydraulic Power
Units (THPU) were designed, manufactured and
tested in Houston Texas. The HPU manufacturer
experienced some challenges when DNV
discovered that some of the tubing "markings"
were hard to verify. Nexus conducted an onsite
investigation and provided its P.E.Stampings on a
calculation package. This design verification
document would serve to ensure that tubing
pressure integrity was per the 1:4 burst ratio.
Completed 2008
10 REVISION OCTOBER 2012
Pressure Vessel
Standardization Shell
Shell Geological Group in Houston Texas
implemented ASME pressure vessel codes by
releasing a new Shell DEP standard. Pressure
Vessels at Shell facilities for Soil Sampling were
closely examined and a complete design
verification package with detailed calculations
was provided; with P.E. Stampings. The package
was approved by Shell Netherlands and was
regarded a bench mark document.
COMPLETED 2005
11 REVISION OCTOBER 2012
4 PROJECT PROFILES
PETRONAS
Project: KANOWIT
Client: PETRA
Location: Kumang Cluster (Shallow Water)
Scope:
Pre-commissioning, Commissioning and Start-
up
Duration 8 Months (Ongoing)
Project Value USD 1/2 Million
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED Execute Commissioning
Scope of Work and Services
This project engaged our team in developing detailed procedures for pre-commissioning, commissioning and start-up of the KASS 1 and KASS 2 subsea wells for the Kanowit Project. The Subsea Production Control pre-commissioning involved the SIS, MCS, EPU, HPU, TUTU and CIU; including a post umbilical Hook-up procedure. Our team has been on the KAKG platform leading this project.
12 REVISION OCTOBER 2012
AXON
Project: Platform Festoon Cage System
Client: AXON
Location: TLP (GoM)
Scope: Detail Design
Duration 8 weeks
Project Value USD 200,000
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED
Detail
Design Operate
Scope of Work and Services
Detail Structural design based on a workable structural configuration. Design and Analysis of Festoon System structure on TLP using SACS. The structure has is being designed for dynamic loading resulting from land transportation, vessel transportation (using Noble Denton Criteria) and platform dynamics.
13 REVISION OCTOBER 2012
MURPHY OIL
Project: SERENDAH, PATRICIA, SOUTH ACIS (SPSA)
Client: Murphy Sarawak Oil Co Ltd (MURPHY)
Location: Blocks SK309 and SK311
Scope: Conceptual & Pre-FEED Design Study for Subsea Water Injection System
Duration 4 months
Project Value RM 1,200,000
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED Execute Operate
Scope of Work and Services
The scope of this preliminary design report is evaluate an array of subsea tie-back configurations for two (2) water injection Trees located within a 1km radius of PT-SA (Patricia Platform). The subsea control system (SCS) is to be located on the PT-SA platform, providing the required subsea electro-hydraulic controls. Moreover, 6-inch flow-line(s) approximately 13km long, shall supply treated water from WP-PA to the two PT-IA water injection wells. The following key drivers provide the net value (NV) in terms of CAPEX and OPEX: 1. Subsea Christmas Hardware 2. Subsea Control System. 3. Flow Lines. 4. Testing. 5. Installation, Hook-up and Commissioning.
14 REVISION OCTOBER 2012
SHELL F29
Project: F14 / F29
Client: Shell Sabah Oil, Malaysia
Location: F14 and F29 Fields
Scope: Conceptual & Pre-FEED Subsea Production Control System
Duration Ongoing
Project Value RM 900,000
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED Execute Operate
Scope of Work and Services
The scope of work was to develop conceptual/pre-FEED studies that would set the pace for developing a Subsea Production Control System for successfully operating F29 Well. The following conceptual studies were carried out: 1. Field Layout and Architecture 2. Subsea Control System Philosophy (MCS, EPU, HPU, TUTA) 3. Subsea Start-up and Shutdown Philosophy 4. Umbilical and Flying Lead Installation Scope of Work (Umbilical, SUTA) 5. Subsea Interface Management 6. Subsea Operability and HAZOP 7. Topsides to Subsea Interfacing
15 REVISION OCTOBER 2012
WOODSIDE
Project: CWLH Project
Client: Woodside Australia
Location: Cossack Wanaea Lambert Hermes Fields
Scope: Pre-commissioning of Subsea Production Control System
Duration 8-Weeks
Project Value RM 475,000
Phases 1 2 3 4 5
Conceptual
Pre-
FEED FEED Execute Commissioning
Scope of Work and Services
Subsea Production Control System pre-commissioning was carried out. The MCS, EPU, HPU, TUTA and ESD system were integrated to function along with the OKHA FPSO Distributed Control System (DCS) and IPS. An extensive testing program was implemented, with daily readiness reviews, continuous interfacing with SBM and rectification of all onsite hardware operational issues.
16 REVISION OCTOBER 2012
COOEC
Project: LIWAN 3-1
Client: COOEC
Location: Block 29/26
Scope: FEED Study
Duration 8-Weeks
Project Value RM 120,000
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED Execute Operate
Scope of Work and Services
This was a FEED study for the Liwan 3-1, Block 29/26 Shallow Field Development. Studies were conducted to understand the impact of SSIV and Subsea Umbilical System suitable for the life of the project.
17 REVISION OCTOBER 2012
SHELL
Project: GUMUSUT-KAKAP
Client: Shell Malaysia
Location: Deepwater Field
Scope: Execute Phase: SCS, IWOCS, Manifolds
Duration 2.5yrs
Project Value
USD
1,000,000
Phases 1 2 3 4 5
Conceptual Pre-FEED FEED Execute Operate
Scope of Work and Services
This was a challenging project that required training of Local Content, overview of various Subsea Vendors, Interface Management with Shell Malaysia and Shell USA to ensure that the FMC IWOCS, CWOR and Manifold Systems were manufactured and tested to Shell DEP's. A brand new HMI design was implemented for the IWOCS system that was extensively tested in Norway. The HPU was built in Stavenger Norway and the system tested in Johor Bahru. The manifolds were manufactured in Lumut Malaysia. All testing programs were lead by our team.