Nextef Status of h igh gradient experiment. May 13-15, 2008 2 nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK. Nextef progress Establishing power generation and transport in 2007. - PowerPoint PPT Presentation
Citation preview
Nextef Status of high gradient experiment
May 13-15, 20082nd Collaboration meeting on X-band Accelerator Structure
Design and Test Program
T. Higo, KEK
Nextef progressEstablishing power generation and transport in 2007
080513-15 22nd collaboration meeting on X-band
Nextef inside shield roommost basic components are now in line.
080513-15 32nd collaboration meeting on X-band
Nextef planning5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
2008 2009
Establish system with KX03
T18_VG2.4_Disk #2
TD18_VG2.4_Quad
TD18_VG2.4_Disk
T18_VG2.4_Disk #3
T18_VG2.4_Disk #4
?????
C-band test at same place
2008/5/13-15 42nd collaboration meeting on X-band
What are needed for Nextef
• Enough power, 55MW, 300ns at accelerator structure, CLIC_VG1, for 100MV/m
• Square RF pulse with variable width• Operation and each RF pulse analysis at 50Hz• Stable operation with BRD < 1BD/hr at most• Proper control program based on the well-
defined processing protocol• Identification of breakdowns, distinguishing
either at structure or outside080513-15 2nd collaboration meeting on X-band 5
Nextef Nominal RF power line
080513-15 2nd collaboration meeting on X-band 6
Two klystrons
ACC Structure
Low loss waveguide
2-klystrons 120MW, 300nsklystron—3dB 2.3m3dB— LLWG 1.5mLLWG 5mLLWG—ACC Str 5.0mWR90 flanges ~36sets*7mm SUS
Loss Kly.Str. ~23%Delay ~ 50ns
S+N
ACC-IN
Shape rise and fall and flat top 2mV / 89mV
= ±0.4mW / 11mW = ±4%
Base line jitter or actual?
S+N
S+N
ACC-IN
ACC-Refl
S+N_refl
Refl_load
Refl_load
Nextef operation without structure RF shape at 50MW, 300ns, 50Hz
080513-15 72nd collaboration meeting on X-band
Refl. From load
Nextef recent typical operation
Blue ~ ACC-IN[MW], Pink = Load Vacuum, Green = Combiner vacuum
Rarely but sometimes vacuum jump near combiner 3dB, with big reflection to klystrons
Stable operation at 50MW level
Load vacuum jump with reflection from load
080513-15 82nd collaboration meeting on X-band
Readiness of components• Nextef: Refer to Matsumoto’s talk• Klystrons are tested at 60MW for 300nsec pulse,
which makes the combined power of 120MW. • 3dB hybrid or WR90 waveguide components are
sometimes arcing at 50MW level now. This needs to be conditioned out or identified to distinguish from the events due to accelerator structure.
• Loads are subject to damage due to high pulse energy operation. Proper loads are to be used for the loads downstream of accelerator structure.
080513-15 2nd collaboration meeting on X-band 9
Nextef: Nominal observables along waveguideSLAC 3dB
ACC structure
Lounine Load(based on SLAC design)
Ohtsuka Load
Guard window TE01-type
IP 30l/s
WR90
DC made by BINP
080513-15 102nd collaboration meeting on X-band
F & Rs
T
VAC
Ra
Beam-line setup
080513-15 2nd collaboration meeting on X-band 11
GVGVPM PMAM
Sl i t
FC
EH
MC
E
E
I P
Louni nel oad
Otsukal oad
DC
I P
I P
I PH
H
GW
DC
VAC
I nsulVAC
I PDC H
H
Vari an I P
187
KX03
H H
HE H
425
FC
I P
Load
Vari anI P
Q-mass
WC WCFC
FC
Rack
VAC DC1260
Nextef Beam l i ne and wavegui de conf i gurati on
5000
3000
500500
500
230
Nextef: observables along beam axis
080513-15 2nd collaboration meeting on X-band 12
GVGVPM PMAM
Sl i t
FC
E
E
I P
Louni nel oad
Otsukal oad
DC
I PH
VAC
I nsulVAC
I PDC H
H
Vari an I P
187
KX03 425
FC
I P
Load
Vari anI P
Q-mass
WC WCFC
FC
VAC DC
230
FCFCFCQmass
PM PMAM
GVGVACC str
Preparation status of sensors• RF pulse: crystals
– Combined, ACC-input are being monitored as feed RF power.– F, Rs, Ra and T will be detected with crystals. Each pulse will be analyzed with 7000 series Tektro
oscillo. Oscilloscope data taking is under development at KT-1.
• VAC : cold cathord gauges– CCG monitors are working at various places of WR90 and two points of beam line
• Dark currents: Faraday cups, analyzer magnet and profile monitors– DC current measurement wit FC is our typical.– Transient response of FC is yet to be confirmed.– AM should work without problem.– The response of profile monitor is not checked after many years idling.
• Acoustic sensors– Sensors are those from SLAC and used at XTF.– VME modules are under preparation for operation.
• Photomultiplier and scintillator– A few lead-shielded sets are prepared.
• Q-mass – Operation should be checked.
080513-15 2nd collaboration meeting on X-band 13
Various detection tools are to be integrated into Nextef control system
System control PCPython, Linux
DPO7054(1GHz, every pulse)
VME Acoustic (SLAC)
Mod. PLC
Acc PLC
CCG
RF crystal
Various signal
CT
FCAM
Data storageKEKB Inj. control
DL7480(500MHz)
History 4MW/ch
Modulator
KlystronLLRF
FPGA (100MHz)
S/H & DC Amp
Discri
Acoustic
INTLK Safety
Etc.
X-ray
Etc. Etc.
Etc.
X-ray
Now b
eing
prep
ared
Pictures are
recorded now.
Digital data should
be recorded.
Buy for Nextef?
TDS3034B (300MHz)TDS3054B (500MHz)
Nextef to be done for breakdown detection system
• Tektro 7054 pulse-to-pulse analysis– Take experience at KT-1– Establish the threshold and other parameters
• RF pulse at all points– Identify the breakdown position in Nextef system– Digital data taking and analysis as needed.
• VME modules– Restart operation program similar to XTF– Use as positioning of arc in the system or in the structure.
• FC, AM, PM, PMT, Q-mass operations– Basic performance should be confirmed. With actual signal or with other
source?
• Red-marked items should be from the beginning of CLIC_VG1 test.2008/5/13-15 152nd collaboration meeting on X-band
Conclusion • Nextef power rating is now ~50MW, 300ns, 50Hz level with
less than 1BD/hr.
• We need to establish the detection system in May with KX03.– In breakdown detection and analysis at the input power level of
50MW or more.
• We want to start CLIC_VG1 before summer shutdown of KEKB. – Some incompleteness of the system should be tolerated, as long as
essential features, such as power evaluation, processing protocol and identification of breakdown, are confirmed.
• We try to operate the Nextef as effectively as possible within the KEK regulation. – Hopefully run during shutdown but we admit it not easily be realized.
080513-15 162nd collaboration meeting on X-band