Next Generation Beacons Next Generation Beacons 2008 Beacon Manufacturers Workshop 2008 Beacon Manufacturers Workshop San Diego, CA San Diego, CA Dann Dann Karlson Karlson , NOAA , NOAA SARSAT Program Specialist SARSAT Program Specialist

Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Next Generation BeaconsNext Generation Beacons

2008 Beacon Manufacturers Workshop2008 Beacon Manufacturers WorkshopSan Diego, CASan Diego, CA

DannDann KarlsonKarlson, NOAA, NOAASARSAT Program SpecialistSARSAT Program Specialist

Page 2: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Next Generation Beacons Next Generation Beacons ––An IntroductionAn Introduction

The development of DASS and other MidThe development of DASS and other Mid--Earth Earth Orbiting Search & Rescue (MEOSAR) systems Orbiting Search & Rescue (MEOSAR) systems (i.e. Galileo, GLONASS, (i.e. Galileo, GLONASS, BeidouBeidou, etc.) , etc.) ––which are which are all currently in their development stages all currently in their development stages ––provides the SARSAT community a unique provides the SARSAT community a unique opportunity to reinvent the wheel...opportunity to reinvent the wheel...

Page 3: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Next Generation Beacons Next Generation Beacons ––An IntroductionAn Introduction

Page 4: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Next Generation Beacons Next Generation Beacons ––An IntroductionAn Introduction

0

100

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

LEOGPSIIIBGPSIIIC

Potential Gap

United States (DASS)

Page 5: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

•• With over 25 years of experience as our With over 25 years of experience as our guide, what should the future 406 MHz guide, what should the future 406 MHz beacon segment look like?beacon segment look like?

•• How can/should we improve upon current How can/should we improve upon current generation 406 MHz beacons?generation 406 MHz beacons?

•• What do SAR responders need out of a What do SAR responders need out of a distress beacon?distress beacon?

•• Where are current 406 MHz beacons Where are current 406 MHz beacons deficient?deficient?

•• Have requirements changed?Have requirements changed?

Next Generation Beacons Next Generation Beacons ––An IntroductionAn Introduction

Page 6: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Defining the RequirementsDefining the Requirements

•• Identify the interested parties for the future systemIdentify the interested parties for the future system–– Beacon owners & user groups (for Beacon owners & user groups (for ELTsELTs, , EPIRBsEPIRBs, , PLBsPLBs, etc.), etc.)–– System operators (System operators (MCCsMCCs & & LUTsLUTs))–– Beacon manufacturersBeacon manufacturers–– System users (SAR responders, IMO/ICAO, etc.)System users (SAR responders, IMO/ICAO, etc.)

•• Solicit input from these interested partiesSolicit input from these interested parties–– Identify the limitations of the current system & beacon technoloIdentify the limitations of the current system & beacon technologygy–– Document the desired features of the future systemDocument the desired features of the future system–– Participate in national & intParticipate in national & int’’l Work Groupsl Work Groups

•• Identify assumptions & constraintsIdentify assumptions & constraints–– MEOSAR ground system by 2011 with space segment by 2017(ish)MEOSAR ground system by 2011 with space segment by 2017(ish)–– Will next generation beacons need to work with GOES?Will next generation beacons need to work with GOES?–– Will the system need to follow the current CWill the system need to follow the current C--S Frequency Mgmt Plan?S Frequency Mgmt Plan?–– What are/will be the international (i.e. CWhat are/will be the international (i.e. C--S) and national (i.e. S) and national (i.e.

RTCM/RTCA) requirementsRTCM/RTCA) requirements……

Page 7: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Defining the RequirementsDefining the Requirements

Step 1: Gather a captive audience of Step 1: Gather a captive audience of industry professionalsindustry professionals……

Page 8: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Defining the RequirementsDefining the Requirements

The real Step 1:The real Step 1: LetLet’’s outline current problems & s outline current problems & limitations limitations (from (from YOURYOUR perspective) perspective) ::

•• ReliabilityReliability: Are 406 MHz beacons failing or under: Are 406 MHz beacons failing or under--performing performing out in the field? Consider maritime and aviation scenarios and out in the field? Consider maritime and aviation scenarios and their operating environmentstheir operating environments……

•• AccuracyAccuracy: are 406MHz beacons accurate enough?: are 406MHz beacons accurate enough?

•• TimelinessTimeliness: is information provided quick enough?: is information provided quick enough?

•• Beacon identificationBeacon identification: do beacons provide enough info?: do beacons provide enough info?

•• False alertsFalse alerts: a no: a no--brainer?brainer?

•• Ancillary features (e.g. returnAncillary features (e.g. return--link)link): are these useful? : are these useful?

•• What else???What else???

Page 9: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Defining the RequirementsDefining the Requirements

Step 2:Step 2: LetLet’’s outline the requirements:s outline the requirements:

•• ReliabilityReliability: do we need beacons to be 100% reliable, 100% of : do we need beacons to be 100% reliable, 100% of the time? If so, consider the implicationsthe time? If so, consider the implications……

•• AccuracyAccuracy: How accurate do we need beacons to be?: How accurate do we need beacons to be?

•• TimelinessTimeliness: How quickly do SAR responders need positional : How quickly do SAR responders need positional information?information?

•• Beacon identificationBeacon identification: Should more info be programmed into a : Should more info be programmed into a beacon instead of relying upon owner/userbeacon instead of relying upon owner/user--provided data? provided data? Can/should we expand data beyond current bit limit?Can/should we expand data beyond current bit limit?

•• False alertsFalse alerts: What is the false: What is the false--alert threshold? None!?! Is this alert threshold? None!?! Is this realistic? What about training & testing??realistic? What about training & testing??

Page 10: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Defining the RequirementsDefining the Requirements

Step 2:Step 2: LetLet’’s outline the SAR requirements:s outline the SAR requirements:

•• Operational & technical requirementsOperational & technical requirements: are current operational : are current operational and technical requirements sufficient? If not, what are the and technical requirements sufficient? If not, what are the SAR requirements?? SAR requirements??

•• AncillaryAncillary--featuresfeatures::–– 121.5 homer: is this necessary esp. once MEOSAR is operational?121.5 homer: is this necessary esp. once MEOSAR is operational?–– What about other types of homers: AISWhat about other types of homers: AIS--SART, etc.SART, etc.–– ReturnReturn--linklink–– Other Other commscomms featuresfeatures–– Should other features like SVDRShould other features like SVDR--EPIRBsEPIRBs continue?continue?

•• What else???What else???

Page 11: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

The Way AheadThe Way Ahead……

•• Your inputs will be documented and carried forwardYour inputs will be documented and carried forward……–– InternationallyInternationally

•• SARSAT will collect input from all userSARSAT will collect input from all user--communitiescommunities•• A Task Group will be established:A Task Group will be established:

Will focus on what is possible with the future MEOSAR Will focus on what is possible with the future MEOSAR systemsystemAddress what impacts will be on the current systemAddress what impacts will be on the current system

•• Will be reported back thru IMO/ICAO/ITUWill be reported back thru IMO/ICAO/ITU•• Presumably, RTCM and RTCA requirements will have to updatedPresumably, RTCM and RTCA requirements will have to updated•• Need to ensure that new requirements and new technology is Need to ensure that new requirements and new technology is

understood by userunderstood by user--communitiescommunities

Page 12: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

•• Initial draft requirements should be submitted by Oct. 2008 Initial draft requirements should be submitted by Oct. 2008 (C(C--S Open Council)S Open Council)

•• CospasCospas--SarsatSarsat should commence developing Next should commence developing Next Generation Beacon requirements in 2009Generation Beacon requirements in 2009--2010.2010.

•• CospasCospas--SarsatSarsat should commence testing during DASS D&E should commence testing during DASS D&E Phase (2011Phase (2011--2013)2013)

•• CospasCospas--SarsatSarsat should begin endorsing and integrating should begin endorsing and integrating NGBsNGBsinto Cinto C--S standards by 2013S standards by 2013--2014(ish) to enable Type2014(ish) to enable Type--Approval and Production to begin by 2015Approval and Production to begin by 2015--2016(ish) 2016(ish) timeframe with units in the market and in the field by 2017.timeframe with units in the market and in the field by 2017.

•• DASS should (GodDASS should (God--willing) begin flying in 2017.willing) begin flying in 2017.

The Way AheadThe Way Ahead……

Page 13: Next Generation Beacons 08 attachments/NOAA Next... · 2008. 6. 3. · Next Generation Beacons – An Introduction The development of DASS and other Mid-Earth Orbiting Search & Rescue

Thank You!Thank You!

DannDann KarlsonKarlsonSARSAT Program SpecialistSARSAT Program Specialist

Email: Email: [email protected]@noaa.govWeb: Web: www.sarsat.noaa.govwww.sarsat.noaa.gov

Phone: 301Phone: 301--817817--38963896Mobile: 443Mobile: 443--995995--42314231Fax:Fax: 301301--817817--39043904

SARSAT Program OfficeSARSAT Program OfficeNOAANOAA--NSOF, Suite 1419NSOF, Suite 14194231 Suitland Rd.4231 Suitland Rd.Suitland, MD 20746Suitland, MD 20746