NEWLANDS HIGHWALL FAILURE OCT 2015 2014 EVENT TIMELINE 17-390 File A Page 1 of 10 Published on DNRME Disclosure Log RTI Act 2009

NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

NEWLANDS HIGHWALL FAILURE OCT 2015

2014 EVENT TIMELINE 

17-390 File A Page 1 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 2: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

2014Jul Aug Sep

Risk Assessment for intro of Highwall mining completed 

25/9/2014

Risk Assessment for Strata Failure completed 

8/7/2014

17-390 File A Page 2 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 3: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

NEWLANDS HIGHWALL FAILUREOCT 2015

2015 EVENT TIMELINE 

17-390 File A Page 3 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 4: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

2015Jun Jul Aug Sep Oct

RISK ASSESSMENT ‐ HW MINING BANROCK B PIT 

14/9/2015

PTM RAMP B BANROCK PANEL 2 ENTRIES 1‐10

24/9/2015

INCIDENT DATE 

16/10/2015

SITE INSPECTION 

27/10/2015

GLENCORE COAL GEOTECH DESIGN REPORT 

29/6/2015

PTM RAMP B BANROCK PANEL 1 ENTRIES 1‐10

16/9/2015

PTM RAMP B BANROCK PANEL 3 ENTRIES 1‐10

1/10/2015

SITE INSPECTION 

26/10/2015

17-390 File A Page 4 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 5: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Radar continues to indicate deformation across the highwall. Three zones in particular should still be classified as most likely failure locations

17-390 File A Page 5 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 6: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Area inbye of stacker and cone of coal considered a red hazard with no entry at the moment

Green area compromising the stacker and the cone of coal is considered a green area for the removal of the coal and stacker

Amber area immediately north of the stacker of to the small loader is considered an amber risk with risk assessment and spotter required for entry

Area north of the small loader is considered a high risk area due to deformation continued to be monitored from the radar. This area would be considered an amber risk zone one a bund has been dozed in place in a systematic manner and once the three red hotspots on the radar have indicated a reduced deformation and once the second radar has been implemented in the north. The method of bunding would be determined through risk assessment.

17-390 File A Page 6 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 7: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Release17-390 File A Page 7 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 8: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Release17-390 File A Page 8 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 9: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Release17-390 File A Page 9 of 10

Publis

hed o

n DNRME D

isclos

ure Lo

g

RTI Act

2009

Page 10: NEWLANDS HIGHWALL FAILURE OCT 2015 2009 · 2019-03-19 · Jul Aug Sep 2014 Risk Assessment for intro of Highwall mining completed 25/9/2014 Risk Assessment for Strata Failure completed

Release17-390 File A Page 10 of 10