NEW YORK STATE DEPARTMENT OF
TRANSPORTATIONRegion 1Bundled Bridges
Design-Build Project (PIN 1BOW.0C, D900028)
Saratoga, Warren, and Washington Counties
Request for Qualifications
Informational Summary
Region 1Bundled BridgesDesign-Build Project (PIN 1BOW.0C,
D900028)
Project Overview Quality Control & Quality Assurance
Procurement
Peter RussellAttn: Region 1 Bundled Bridges, Project
ProcurementOffice of Contracts Management
New York State Department of Transportation50 Wolf Road, 6th Floor
Albany, New York [email protected]
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028)Procurement Contact
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028)
Project Overview General Location Goals General Scope of Work Utilities
Quality Control & Quality Assurance Procurement
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
Saratoga County Route 9 over the Kayaderosseras Creek Route 9N over the Kayaderosseras Creek
Warren County Route 28 over the Hudson River
Washington County Route 4 over the Glens Falls Feeder Canal Route 196 over the Glens Falls Feeder
Canal
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
US Route 9 over the Kayaderosseras Creek
RM 9 1509 1157BIN 1-00564-1
SH 611; Malta – SaratogaTown of Malta, Saratoga County
Length - 108 ft.
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
NYS Route 9N over the Kayaderosseras Creek
RM 9N 1501 2068BIN 1-00669-0
SH 340; Saratoga - CorinthTown of Greenfield, Saratoga County
Length - 24 ft.
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
NYS Route 28 over the Hudson RiverRM 28 1710 1163
BIN 1-02037-0SH 8485; Glen - Wevertown
Town of Thruman, Warren CountyLength - 360 ft.
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
US Route 4 over the Feeder CanalRM 4 1802 1134BIN 4-00108-0
SH 1080; Main StreetVillage of Hudson Falls,
Washington CountyLength - 33 ft.
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) General Location
NYS Route 196 over the Glens Falls Feeder Canal
RM 196 1801 1004BIN 4-03980-0
SH 9312Village of Hudson Falls,
Washington CountyLength - 34 ft.
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Goals
Replace five Bridges in Region 1 Ensure coordination with all utility owners, third
parties and any adjacent construction projects Ensure a long-service life for all Project
elements to satisfy long term preservation goals Ensure the safety of the travelling public Maximize the benefit of the public investment in
the Project and provide the best value to the Department
Deliver the Project safely, on schedule & within budget
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
General Scope of Work
Construct five new bridges with new foundations in Saratoga, Warren, and Washington Counties, including… Removal of existing substructures and
superstructures Necessary approach roadway reconstruction
Specific traffic requirements/constraints at each bridge site to be presented in RFP Minimize traffic impacts
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
General Scope of Work (Continued)
Design and construct updated drainage systems for each site
Fabrication and installation of new guide rail and bridge rail
Coordination with and/or preservation of existing utilities
Remediation and disposal of any asbestos containing materials
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
General Scope of Work (Continued)
Water Quality protection Comply with existing environmental
constraints Threatened and endangered species Wetlands NYSDEC in-stream work date restrictions Date restrictions for tree removal (Northern Long-ear
Bat, Indiana Bat) Invasive plant species control and emerald ash borer
requirements Erosion and Sediment Control and SPDES
Ensure coordination with all utility owners
Existing utilities at each site will be detailed in the Draft RFP
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Utility Coordination – Existing Utilities
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Utility Coordination - Relocation and/or Preservation of Existing Utilities
Department to provide Two-party (Department and Utility) Preliminary Utility Work Agreement(s) in RFP, including approximate timeframes
Three Way Coordination – DB, Utility, & State DB Team responsible for holding utility
coordination meetings DB Team responsible to meet and coordinate
with utility(ies) and Department, and negotiate Three-party (Department, Utility, and DB Team) Final Utility Work Agreements, including final locations and agreed upon timeframes
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) Agenda
Project Overview Quality Control & Quality Assurance Procurement
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) Quality Control (QC)
QC shall be the Design-Builder’s Responsibility Design-Builder shall be required to develop a QC Plan
covering both Design QC and Construction QC Design-Builder shall appoint a QC Manager responsible
for Project QC Design QC may be by the Designer in accordance with
the QC Plan Construction Inspection shall be by an Independent
Engineering Firm (Hired by the Design-Builder) Materials Testing shall be by an Independent Testing
Firm or Laboratory (Hired by the Design-Builder) The Materials Testing Firm shall report to the
Construction Inspection Firm
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C,
D900028) Quality Assurance (QA)
Design & Construction QA is Department’s Responsibility
The Department may perform QA on any of the Design-Builder’s Design and Construction Activities
The Department may utilize an independent Consultant to perform QA of the Design-Builder’s Designs
Department Staff will perform Construction QA RFQ Section 1.9 covers QA/QC RFP will describe in detail the Department’s QA
Role for the Project
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Agenda
Project Overview Quality Control & Quality Assurance Procurement
Schedule Contract Information SOQ Evaluation and Selection Additional Information and Website
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Procurement Schedule
Activity Due DateFinal RFQ Released December 4, 2014
Final Date for receipt of Proposer’s questions December 30, 2014
Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions January 5, 2015
SOQ Due Date January 13, 2015
Shortlisted DB Teams Announced (3 to 5 Teams) February, 2015
Draft RFP Issued February, 2015
Draft RFP Informational Meeting March, 2015
Final RFP to Shortlisted Firms March, 2015
Proposals Due May, 2015
Selection of Best Value Proposal June, 2015
Contract Award July, 2015
Notice to Proceed August, 2015
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Contract Information
Lump Sum Design-Build Contract Two Step Best Value Procurement Process Opportunity for ATC (Alternative Technical Concepts) submittal
and one-on-one meetings after Final RFP issuance Project Schedule
Total Duration 24 Months +/- There will be a Payment Schedule provided in the RFP Stipend Amount is provided in the RFQ Liquidated Damages may be imposed for missed milestones
and/or missed Project completion date DOT acquiring temporary easements for Route 196 site Construction Related Permits (i.e., Staging Area) by Design-
Builder
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
SOQ Evaluation and Selection
Pass/Fail Evaluation Factors Legal; Financial; Backlog Capacity; Vendor Responsibility; and
Quality Evaluation Factors Organization and Key Personnel (25%) Experience of the Firms (25%) Project Understanding (15%) Past Performance (30%) Compliance with SOQ Format and Organization (5%)
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Additional Information
Responses to Questions will be posted on the Project Web Site
Final date for receipt of Questions on RFQ Dec. 30, 2014
There will be a Buy America Clause There will be a DBE Participation Goal defined in the
RFP RFQ Section 1.10 covers Insurance & Bonding
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Additional Information (continued)
Reference Information which has been or will be posted on the Project Web Site: Final Design Reports for all sites As-Built Record Plans for all sites Bridge Inspection Reports for all sites Geotechnical Soil Boring Logs for all sites Asbestos Reports for all sites Survey Data for all sites Preliminary Design Microstation files for all sites Existing Right-of-Way/Highway Boundaries for all sites
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Additional Information (continued)
Reference Information which has been or will be posted on the Project Web Site: Fathometer Survey and Diving Inspection for the Route
28 site ROW acquisition maps for the Route 196 site
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Project Website & Questions
Link to Project Website:
https://www.dot.ny.gov/main/
business-center/designbuildproject16
Questions: During the RFQ stage, questions should be submitted in
writing to the Department’s designated contact, who is listed in the RFQ Appendix A, on slide 3 and the following slide.
Peter RussellAttn: Region 1 Bundled Bridges, Project
ProcurementOffice of Contracts ManagementNew York State Department of
Transportation50 Wolf Road, 6th Floor
Albany, New York [email protected]
Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028)
Procurement Contact