The Port of Hastings Naturally Deep & Positioned for Growth IAC Submission - 15 October 2020

New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

The Port of HastingsNaturally Deep & Positioned for Growth

IAC Submission - 15 October 2020

Page 2: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

For more than 50 years, the Port of Hastings has operated as a commercial port serving domestic and international shipping movements that include:• import and export of crude oil, • LPG, ULP, general cargo, • project cargo, ship to ship transfer,• visiting cruise vessels,• pipe laying operations and the lay-up (safe harbour in between

projects) /repair of oil rigs/floating platforms.

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 2

Page 3: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 3

Hastings

LOCATION

Page 4: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COM

The Victorian Government established the Port of Hastings Development Authority (PoHDA) on 1 January 2012.

PoHDA is responsible for the direct management of the operations of the Port of Hastings.

The channels in Western Port and harbor control are controlled by the Victorian Regional Channels Authority.

Consistent with Government strategy and Ministerial Direction dated 27 May 2015, PoHDA pursues bulk and non-container related business and works with proponents who are seeking to use and/or develop facilities at the Port.

BACKGROUND

Page 5: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COM

PoHDA has statutory responsibilities described in the Marine Safety Act 2010, in relation to the maintenance and provision of port infrastructure. Ship safety in port waters during approach and at berth is the responsibility of the Victorian Regional Channels Authority (VRCA) and Harbour Master (employed by VRCA) through statutory responsibilities to Transport Safety Victoria (TSV).

PoHDA has the following plans in place to assist with the management of port related risks:

• Port Safety and Environmental Management Plan;

• ‘Whole of Port’ Emergency Management Plan; and

• Maritime Security Plan.

The Port has a long industrial history, operating harmoniously with the community and sensitive environment with no major environmental or safety incidents.

PORT REGULATION

Page 6: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 6

PORT REGULATION

Overview of PoHDA’s Health, Safety and Environment Management System framework

Page 7: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 7

The Port of Hastings was created in the 1960s due to the its deep water channel and extensive adjacent industrial land suitable for development (Long island point precinct illustrated in photograph).

Page 8: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 8

SITE CONTEXT

MarineTraffic.com

Page 9: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 9

The declared port waters outlined are in purple

The dotted line outlines shipping channel extents

BlueScope

Long Island Pt

Crib Pt

Stony Pt

Pilot Boarding Ground

FOUR ESTABLISHED PORT PRECINCTS

`

Page 10: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

STONY POINT JETTY AND WORKS DEPOT

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 10

Established 1975 to support the port operations and development

Stony Point

Page 11: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT LIQUID BERTHS 1, 2 AND PROJECT BERTH 3

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 11

Established 1965 to support the adjacent BP refinery

Crib Point

Page 12: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

LONG ISLAND POINT BULK LIQUID BERTH

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 12

Established 1969 to support the adjacent Esso refinery

Long Island Point

Page 13: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

BLUESCOPE BERTHS

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 13

Established 1972 to serve the adjacent steelworks

BlueScope

Page 14: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

STRATEGIC AND PLANNING CONTEXT

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 14

The land surrounding the Port of Hastings has been reserved for port related uses since the late 1960s.

Western Port was identified for the establishment of largescale process industries that require a deep water port and extensive land adjacent.

Large areas of land have been zoned Special Use Zone 1 to facilitate uses that derive benefit from being located near a port.

There is approximately 320 hectares of Special Use and Port Zoned land at Crib Point and over 3,200 hectares of similarly zoned land north of Hastings

For contrast the Port of Melbourne occupies approximately 500 hectares.

Page 15: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT ZONING

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 15

The purpose of Port zone is to provide for uses which derive direct benefit from co-establishing with a commercial port and to provide for the ongoing use and development of Victoria’s commercial trading ports in accordance with the relevant port development strategy prepared pursuant to the Port Management Act 1995.

Page 16: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 16

Section 91K of the Port Management Act 1995 sets out the requirement for port authorities to prepare a port development strategy every 5 years.

Following approval from the Minister for Ports, the Hon. Melissa Horne, the Port of Hastings 2018 Port Development Strategy (PDS) was released on 31 May 2019.

Developed in consultation with port users and the broader port community, the PDS provides a comprehensive overview of the current status of the Port of Hastings.

The PDS considers the role the Port can play in meeting the logistics needs of the State given its transport links, land availability, and existing and potential port infrastructure.

PORT DEVELOPMENT STRATEGY

Page 17: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 17

The PDS identifies Crib Point for development opportunities with a focus on “bulk liquids and gases with pipeline connections to major storage and distribution outlets”.

The PDS also states that Crib Point “is strategically important based on its exceptional deep water that can cater for large vessels, accessibility, recognising it is an old refinery site and the need for continual maintenance of buffer zones to the Crib Point community which is important in planning for the precinct.”

PORT DEVELOPMENT STRATEGY

Port Development Strategy Pg. 62

Page 18: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 18

The PDS key recommendations include:• Retention of all port zoned land at Crib Point

to preserve port development options.• Investigating the use of some port zoned land

located north of Hastings for general industry.• Development of critical transport links

including: Western Port Highway; East/west connections to Peninsula

Link; and Road connections to Gippsland.

PORT DEVELOPMENT STRATEGY

Port Development Strategy Pg. 26

Page 19: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 19

Deep Water:

Natural deep water channel• To Crib Point 14.2m• To Long Island Pt 14.2m• To BlueScope 9.0m• Approximately 2.7m of additional depth on the average high tide.

Depth alongside berths• Crib Point 1 15.7m• Long Island Pt 15.7m• BlueScope 12.0m

Project Berth• Crib Point 2 12.7m (13.0m for project)

CHANNEL AND BERTH DEPTHS

BlueScope

Long Island Pt

Crib Pt

Stony Pt

Page 20: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 20

2.7m tidal range within Western Port

CHANNEL PROFILE

Page 21: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CHANNEL LOCATION MAP

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 21

Fairway buoy

Sandy Point

Page 22: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 22

CONNECTIONS – ROAD AND RAIL

Page 23: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 23

CONNECTIONS - PIPELINES

BlueScope

Long Island Pt

Crib Pt

Page 24: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 24

Around 100 – 140 vessels, ranging in size up to 125,000 displacement tonnes, enter and leave the Port of Hastings most years. The Port of Hastings has significant latent capacity and has accommodated over 700 vessels in previous years.

WESTERN PORT SHIP NUMBERSIAC Direction 7A

0

20

40

60

80

100

120

140

160

FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20

Western Port Commercial Vessel Visits

Anchorage BlueScope Long Island Point Crib Point Stony Point

Movement of vessels based at Western Port are not included

Page 25: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 25

SHIPPING PROJECTIONS

Port Development Strategy Pg. 35

Forecast Volume Predictions

IAC Direction 7B

Page 26: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 26

SHIPPING PROJECTIONS

Excludes non-cargo Stony Point and Anchorage Vessels

IAC Direction 7B

Page 27: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

SHIP SIZE FORECASTS

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 27

Based on trade forecasts the potential ship fleet likely to call at the Port of Hastings are indicated in the table below.

Trade Description DWT LOA Beam (width) Draft

Liquid bulk – Fuel LR2 115,000 250m 44m 15m

Liquid Bulk – LPG Large 79,000 290m 49m 12m

Liquid Bulk – LNG Large 80,000 300m 43m 12m

Dry Bulk Panamax 75,000 225m 32m 13m

Multi Purpose Large 37,000 180m 30m 11m

DWT Deadweight Tonnage LR2 Long Range 2 Product Tanker LOA Length Overall LPG Liquefied petroleum gas LNG Liquefied Natural Gas

IAC Direction 7B

Page 28: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 28

BlueScope

BLUESCOPE

Page 29: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 29

The BlueScope berth are owned and operated by BlueScope for the import and export of steel products.

BLUESCOPE STEEL WHARVES

Page 30: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 30

Typical vessel179.99 x 30m Hebe Harmony

The average time vessels are alongside BlueScope Jetty is 53.9 hours

VESSEL SIZES AT BLUESCOPEIAC Direction 7A

Page 31: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 31

Long Island Pt

LONG ISLAND POINT

Page 32: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 32

Esso’s Long Island Point facility is used to export LPG and Crude Oil. The Port is the southern terminal for several pipelines carrying gas and oil to coastal markets, and through the Western Port Altona Geelong Pipeline to the Exxon and Viva refineries in Melbourne and Geelong.

LONG ISLAND POINT

Page 33: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 33

250 x 44m Signal Cheetah 99 x 17.4m JS Jaguar

• The average time vessels are alongside Long Island Point Jetty is 36.6 hours

• Maximum vessel length is 300m• Maximum vessel displacement is

125,000 tonnes

TYPICAL VESSEL SIZES AT LONG ISLAND POINTIAC Direction 7A

Page 34: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 34

Stony Point

STONY POINT

Page 35: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 35

The Stony Point precinct hosts smaller commercial vessels servicing shipping in the Port. Harbour control and PoHDA’s maintenance depot is also located at Stony Point that includes oil pollution response equipment.

STONY POINT

Page 36: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 36

Cowes Anchorage

ANCHORAGES

Rhyll Anchorage

Flinders Anchorage

Stony Point Anchorage

IAC Direction 7C

BlueScope Anchorage

Page 37: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 37

290m x 40m Golden Princess

• Vessels may be at anchorage from a day to months at a time.

• Vessels may be anchored at a variety of locations within port water depending on their characteristics and needs.

ANCHORAGESIAC Direction 7C

Page 38: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 38

Crib Point

CRIB POINT

Page 39: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 39

The Crib Point Jetty facility was constructed in 1965 in association with the construction of the adjacent BP Refinery. The refinery at Crib Point was established after BP Australia purchased a large amount of land adjoining Western Port in 1963. The refinery closed down in 1986, around 20 years after its construction.

Page 40: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 40

Today, the Crib Point Jetty is a key piece of state owned infrastructure. Berth 1 is used for the importation of unleaded petrol and diesel, critical to Victoria's transportation needs.

05

101520253035

Crib Point Vessel Visits

Crib Point

*Note. FY20 includes COVID-19 impacts

Page 41: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 41

Crib Point

CRIB POINT

United Terminal and storage tanks

Page 42: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY DIMENSIONS

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 42

IAC Direction 7E

Page 43: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 43

Typical vessel – 183m x 32.2m Elandra Sea

• The average time vessels are alongside Crib Point Jetty is 41 hours

• Maximum vessel length is 300m• Berth 1 maximum vessel

displacement is presently 100,000 tonnes

TYPICAL VESSEL SIZES AT CRIB POINTIAC Direction 7A

Page 44: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 44

From time-to-time Berth 3 is used for offshore oil and gas pipe spooling projects, that is only possible due to the unique advantage of having a large tract of clear land available adjacent to deep water access.

The Crib Point jetty is adjacent to 320 hectares of Special Use Zone 1 land and a smaller parcel of Port Zoned land.

Page 45: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

VESSEL BERTHING AT BERTH 1

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 45

MV Barramundi – 228m x 35m

Page 46: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

VESSEL BERTHING AT BERTH 1

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 46

Page 47: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 47

High tide

4.0m

Trunkway

Berth 2 Pierhead

IAC Direction 7E

Trunkway

Pierhead

Mooring dolphins & Catwalks

Page 48: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT JETTY RECENT AND PLANNED WORKS

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 48

BERTH 1

BERTH 2

Berth 3 – Completed 2018: Installation of new berthing dolphins & mooring pile to accommodate longer and deeper draft pipe spooling vessels Berth 1 – Investigating the installation of new berthing dolphin to accommodate Long Range (LR2) liquid tankers. Will increase the maximum vessel displacement (weight) allowed by 50%.PoHDA has on ongoing maintenance program for the jetty and its berths. Works are presently focussed on the repair and strengthening of steel piles.

IAC Direction 7D

Page 49: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

BERTH 3 UPGRADE PROJECT – COMPLETED 2018

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 49

Existing Berthing Dolphins

New Berthing Dolphins & mooring pile

BERTH 3

BERTH 1

Two new berthing dolphins and a mooring pile were constructed in 2018 to accommodate a pipe laying vessel (Seven Seas).These additional structures enables larger pipe spooling vessels with greater drafts to use Berth 3

IAC Direction 7D

Page 50: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

BERTH 3 UPGRADE PROJECT

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 50

New Berthing Dolphins

IAC Direction 7D

Page 51: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

BERTH 1 UPGRADE PROJECT

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 51

New Berthing Dolphin

Investigating a new berthing dolphin that will increase the weight of vessels that Berth 1 can accept.The allowable vessel size will increase from 100,000 displacement tonnes to 150,000 displacement tonnes.

BERTH 1

New Berthing Dolphin

IAC Direction 7D

186.44m

Page 52: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

CRIB POINT 2 UPGRADE WORKS

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 52

PoHDA is ready to commence remediation and upgrade works on Berth 2 at the southern end of the Crib Point Jetty. Berth 2 has not been utilised since the adjacent Refinery closed in 1986 and the upgrade works are required to enable the safe mooring of the FSRU and visiting LNG carriers.

IAC Direction 7D

EES Summary document July 20 Pg. 8

Page 53: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib

POSITIONED FOR GROWTH | PORTOFHASTINGS.COMPAGE 53

THE ADVANTAGES OF THE PORT OF HASTINGS INCLUDE:

• bulk trading for 50 years; a long history of industrial activity including as an export facility for the former adjacent refinery;

• existing deep water channel, for ships with drafts up to 15m;

• approximately 3,500 hectares of appropriately zoned land to support port development;

• proximity to State’s natural resources / business and industry networks;

• the Crib Point Jetty has exceptional physical attributes for port development, offering significant opportunity for expanding bulk trades utilising existing infrastructure;

• PoHDA’s focus is on liquid-bulk and break-bulk growth and the importation of LNG product fits with the current and future Government approved plans for the Port and Crib Point.

Page 54: New The Port of Hastings · 1 day ago · Port Development Strategy Pg. 26 . PAGE 19 POSITIONED FOR GROWTH | PORTOFHASTINGS.COM Deep Water: Natural deep water channel • To Crib