1
LOCAL AUTHORITY APPROVAL: WATERPROOFING GENERAL NOTES: 1. 250 micron damp proof membrane [DPM] is to be laid under all surface beds. 2. 375 micron damp proof course [DPC] at base of all walls, at slab level, and under all window cills in accordance with SANS 10400 K, SANS 248, 298 and 952. External walls to have stepped DPC, one course below all window openings. 3. Foundation walls to have ʻbrickforceʼ, or equal approved by dws : sa every 3 rd course and walls every 4 th course. 4. All roof trusses to be fixed using hoop iron built into 6 courses of brickwork. 5. Neoprene closer to suit profile at ridge cap, flashing and eaves of roof. 6. All concrete roofs to be covered with ʻDerbigum SP4ʼ, or equal approved by dws : sa waterproofing membrane fully sealed to deck through torch-on fusion, side laps 75mm and end laps 100mm. Turn-ups and turndowns similarly fused to primed surfaces. Waterproofing to be turned up sidewalls and over fillets as required. Finish with 2 coats aluminium bitumous paint. Membrane to be installed by a ʻDerbigumʼ approved applicator and strictly according to manufacturers detail and specification. A 10-year guarantee is to be seeded to dws : sa. 7. All showers, where not tiled, are to be sealed with ʻeverbondʼ or equal approved by dws : sa, applied to manufacturers specification before application of top coats. Where the walls are already damp, first apply ʻevercure EM22ʼ or equal approved by dws : sa, to manufacturerʼs specification. 8. All showers to have ʻCoproxʼ, or equal approved by dws : sa cementitious waterproofing system applied to slab, dressed up shower tray sides and into outlet. System to be applied by specialist sub-contractor and strictly according to manufacturers detail and specification. 9. External brickwork walls are to be 220mm. The outer face of the inner skin to be bagged and waterproofed with ʻBrixealʼ, or equal approved by dws : sa. Ties, ʻbrickforceʼ, or equal approved by dws : sa and reinforcement around openings all to be according to structural engineerʼs detail and specification. 10. All recesses in brickwork housing rain water pipes [RWP] is to be waterproofed to dws : saʼs approval. DRAINAGE & PLUMBING GENERAL NOTES: 1. The design and installation of drainage and plumbing is to comply with SANS 10400 P, SANS 10252-2, SANS 1200 and any requirements of the local authority. It is the responsibility of the plumbing contractor to ensure compliance therewith. 2. The municipal sewer connection point is to be exposed prior to commencing any drainage installation, and the level is to be verified. Any discrepancies or proposed alterations are to be reported to dws : sa prior to commencing work. 3. The sewer sections shown indicate the design intention only and are to be verified by the plumbing contractor and any discrepancies or proposed alterations are to be reported to dws : sa prior to commencing work. 4. The storm water drainage is to be to engineerʼs detail. 5. Sanitary fixtures to be provided in compliance with the machinery and occupational safety act 6 of 1983 or the latest amendment and the SANS 10400 [National Building Regulations]. 6. Water supply is to comply with SANS 10400 W. 7. Mains water supply pipe to building to be HDPE or LDPE as necessary to SANS 10400. External drinking water supply pipe to be 25mm HDPE. All internal pipe work [hot and cold water] to be 22mm [unless otherwise stated] copper and lagged. All pipe work required to external showers and basins routed underground to be polycop 15mm. All in accordance with Model Preambles for Trades. 8. Internal water pressure to be provided at 400KPa [taps and mixers have a maximum operating pressure of 500KPa | 5 bar]. 9. Hot and cold water is required to all washing facilities, unless otherwise specified. 10. Hot water reticulation to be sized | designed to ensure that hot water is available within half a minute of turning the tap. All hot and cold water supply pipes to be a minimum of 100mm apart. Hot and cold water supply to be balanced and pressure tested before closing up. 11. Accessible hot and cold water isolation valves to each ablution cluster. 12. All geysers to have a multiblock pressure reducing valve, access for adjusting and maintenance, and visibility to check for system leaks. The pressure-reducing valve must be within 15m of the hot water cylinders for balancing of hot and cold water. Installation, temperature pressure emergency safety valve and draincock, overflow tray and overflow pipe to exterior installation in strict accordance with the manufacturers instructions. 13. Soil pipes are to be a minimum of 110mm uPVC, waste pipes are to be a minimum of 50mm uPVC. Pipes laid below buildings, roads or parking areas to be heavy duty uPVC. 14. Wastewater branch drains over 6m long to comply with SANS 10400 PP18.4c. 15. Inspection eyes to all bends and junctions in drains and marked with covers at ground level. 16. Rodding eyes are to comply with SANS 10400 PP21 17. Invert level at head of drain to be a min of 450mm below ground level. 18. Head of drains to have 110mm stack vent pipe [SVP]. 19. Pipe work is to be at a minimum gradient of 1:60. 20. Drains under building to be encased in concrete. 21. All waste fittings to have rodding eye seal traps. 22. All overflow gulleys to be exposed. 23. All gulley surrounds to be 75mm above finished ground level. 24. All fitting locations must be installed strictly in accordance with layout drawings. Contractor to ensure that plumbers and other tradesman follow the detailed drawings carefully when installing any bathware / sanitaryware. The supplier is to be consulted for detailed installation requirements for all fittings. 25. All plumbing and water supply pipes are to be concealed in walls. No pipe work to be exposed on external surfaces of visible walls and connection to equipment to be neat and non-visible. Position of pipe work to be agreed with dws : sa. 26. All pipe work to be coordinated with other services. Queries or concerns are to be recorded with dws : sa before installation. FIRE NOTES: 1. The contractor is responsible for fire water supply complying with SANS 10400 W [mechanical eng?]. 2. All fire protection installation to comply with SANS 10400 T and relevant specific building classifications. 3. Fire escape stairs to be minimum of 1100mm, all in compliance with SANS 10400 TT23. 4. Fire equipment signage required in terms of SANS 10400 TT29 & TT32 and displayed to dws : sa specification. All equipment is to be stainless steel if within 15km of the coast or subject to degrading chemical exposure. 5. Water supply to fire hose reels [FHR] to be minimum 25mm and in compliance with SANS 10400 TT33. 6. 30m FHRʼs to comply with SANS 543 and SANS 10400 TT34. 7. Portable fire extinguishers to comply with SANS 10400 TT37. 8. Structural stability to comply with SANS 10400 TT7. 9. Materials to comply with SANS 10177. designworkshop : sa 94 florida road l durban | 4001 | south africa +27 [0]31 303 5191 l t +27 [0]31 303 5198 l f [email protected] l e job no. series family rev. stage zone scale date checked drawn reg no. rate no. ARCHITECT : Mark Horner CLIENT : Clifton School 6831 FOR : CLIFTON SCHOOL CLIFTON SCHOOL PHASE 1 ALTERATION PROPOSED NEW 2 LEVEL BASEMENT PARKING AND UPGRADED DROP-OFF AREA COPYRIGHT: In accordance with the relevant clauses of the Copyright Act (Act 98 of 1978) relating to assignment, all documents prepared by designworkshop : sa in connection with the project remain the property and copyright of designworkshop : sa , subject to their use by the client for the particular project to which this document relates, and the client shall not be entitled, either directly or indirectly, to make use of the document(s) for any additional or similar works or publish the same except with the prior consent from designworkshop : sa . GENERAL NOTES: 1. Mechanical lighting and ventilation to internalised WC's and habitable rooms in compliance with SANS 10400 Part O. 2. 25 L/S per bathroom of mechanical ventilation 3. min 160 lux atrificial lighting to the bathrooms where required 4. The contractor is responsible for the glazing being executed in strict conformance with glass manufacturerʼs recommendations & all in accordance with the National Building Regulations Part N, SANS 10137,SANS 1263-1 & AAAMSA Selection Guide for Safety Glazing Materials. A certificate of compliance is to be issued to dws : sa on completion of the work. 340_Clifton Phase 1_01 [mms.designworkshop.co.za] | 5:06 PM | 2013/05/02 340 M 01 GN 502 Ground Floor Plan North A A footings to demolishe New Subsoil Drain Storm water concrete channel in basement. Alpha channel with Mentis grid Storm water concrete channel in basement. Alpha channel with Mentus grid Fin drain New subsoil drain 1 2 3 4 5 6 7 8 9 10 11 12 13 B B C C E E 16 x 166 = 2 650 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 400 4 150 4 150 3 550 3 850 3 850 7 700 3 850 3 850 7 700 4 150 2 800 4 900 6 700 6 700 2 900 2 900 3 200 3 250 3 250 2 885 5 990 4 800 5 600 4 900 4 900 5 600 4 900 4 900 5 600 4 800 47 600 OVERALL 2 900 2 900 3 400 3 300 2 900 2 900 3 200 3 250 3 375 1 500 1 720 110 3 500 23 100 2 615 2 500 2 585 2 600 2 500 2 600 2 600 2 500 2 600 2 600 4 850 2 156 1 844 6 000 2 400 4 150 4 150 3 550 3 850 3 850 7 700 3 850 3 850 7 700 4 150 EQ EQ EQ EQ EQ EQ EQ EQ EQ 700 13 350 1 250 2 650 3 800 3 900 3 800 3 900 3 800 3 900 1 450 4 736 580 9 885 1 640 26 395 4 100 2 356 1 844 536 264 1 500 5 090 110 780 870 1 191 110 3 890 800 700 430 345 1 385 750 686 1 300 139 220 28 649 250 600 300 900 300 200 2 370 33 905 250 2 100 150 540 110 11 325 300 27 605 300 6 470 110 540 150 47 600 9 675 1 560 220 1 524 220 1 526 230 500 570 230 3 000 bb bb 1 316,98 m 2 FFL +45, 300 FFL +45, 300 FFL +45, 600 FFL +45, 600 FFL +45, 300 FFL +45, 300 FFL +45, 600 FFL +45, 300 FFL +45, 600 FFL +45, 185 FFL +45, 300 FFL +45, 300 FFL +45, 470 FFL +45, 600 FFL +45, 670 FFL +45, 385 FFL +45, 300 FFL +45, 600 FFL +45, 600 FFL +45, 300 FFL +45, 650 paving finish to fall 46,320 asphalt 500x250 RC columns to eng detail painted 500x250 RC columns to eng detail painted power floated screed landscaping to specialist 500x250 RC columns to eng detail, painted FFL 50,630 power floated screed Existing sewer to be temporarily re- routed prior to commencement of any construction as per eng specification. 500x250 RC columns to eng detail painted Temporary sewer main laid to falls on existing surface to eng specification. Existing 100 Ø stm water line to be upgraded to 300 Ø uPVC class 34 as per eng spec. 250mm thick RC slab cast to fall to eng detail Line to show ridge line Line to show ridge line line of edge of roof slab above Finish: paving with 100mm wide painted line only to demarcate parking to walkway. Finish: pavers 700 x3900 o/a opening to floor slab RE IE 03 STORAGE A: 3,37 m 2 Grano Screed 01 NEW PROPOSED LAMBERT RD PARKING A: 1 154,27 m 2 Power floated slab 04 STAIR A: 38,27 m 2 Power floated slab 05 STAIR A: 8,96 m 2 Power floated slab NEW SECURITY BOH NEW FOYER 08 FIRE LOBBY A: 6,33 m 2 Grano Screed 110 x 220 x 900mm steel bollards to arch detail EX SUTCLIFF H SURFACE BED F F G G H H J J K K L L M M 1 1 2 2 3 3 4 4 5 5 7 7 8 8 9 9 10 10 11 11 6 6 aa aa BOUNDARY LINE 01 02 03 04 05 06 07 20 21 22 25 24 23 26 27 28 30 29 31 32 33 34 35 36 37 ENTRANCE EXISTING 7,5m building line EXISTING BOUNDARY LINE LAMBERT ROAD EXIT line of basement below line of parking basement below painted parking line with bollards line of non mountable precast concrete curb line of existing curb to be retained & re-instated where required NEW TRAFFIC ISLAND storm water road hump to eng. detail storm water road hump to eng. detail 1 2 3 4 5 6 fire door sliding gate to detail sliding gate to detail PUBLIC WALKWAY INTERNAL PRIVATE WALKWAY NEW TRAFFIC ISLAND TO ALLIGN WITH EX ISLAND access control access control 10 11 12 13 14 15 16 17 18 PROPOSED ATTENUATION TANK to engineers specification NATURAL VENT RISER smoke exhoust & ventilation to eng. detail STAIR 1 to SUTCLIFFE hall 19 treads @ 355mm, 18 risers @ 140mm PROPOSED 2m building line store below 19 screen to full floor soffit height to detail NEW PROPOSED GRADE R DROP-OFF ZONE NEW PEDESTRIAN CROSSING AND SPEED HUMP TO ALIGN WITH MAIN ENTRANCE EX STUBBS HOUSE to municipal services upgraded SWP line - 160mm dia UPVC @ 1:100 fall, to engineers detail MH 250x500 up stand beam with s/s balustrade to 1m H to NBR regulations, to architects details upgraded SWP line - 160mm dia UPVC @ 1:100 fall excavation & backfill to eng detail 250mm RC wall to eng detail waterproofing to specialist's detail waterproofing to specialist's detail 250x500 up stand beam with s/s balustrade to 1m H to NBR regulations ex MH 250mm RC RW to eng detail bagged & painted finish 500mm thk continious piling to eng detail painted parking line with bollards up from basement parking RAMP 2 @ 1:8 new sump new sump new sump new sump new sump motorbike bay motorbike bay motorbike bay 08 09 upgraded SW 150mm dia UPVC @ 1:100 fall, to engineers detail upgraded H 2 O Pipe, to engineers detail EX GR 1& 2 ABOVE 250mm RC RW wall to eng detail 110mm thk brick wall bagged & painted finish in front of 250x500 up stand beam with s/s balustrade to 1m H to NBR regulations, to architects details 500mm thk continious piling to eng detail 250mm RC RW wall to eng detail 110mm thk brick wall bagged & painted finish in front of STAIR 3 to GR R @ 1st floor level 14 treads @ 300mm + platform 16 risers @ 166mm STAIR 1 fire escape from basement 14 treads @ 300mm + platform 16 risers @ 163mm down to basement parking RAMP 1 @ 1:8 escape door in screen escape from basement 14 treads @ 300mm + platform 16 risers @ 163mm fire door AN D30 MH 2 MH MH vent UP DOWN 110 x 220 x 900mm steel bollards, to architects detail PARKING BAYS: 37 NOTE: All parking bay dimensions & access rd in accordance to NBR slab to fall 1:100 painted parking line with bollards fire door paving FFL to fall 1:100 to match internal floor slab Storage for fire equipment specialist to confirm G 05 AD G 06 AE G 07 AF FHR and two 9kg fire extinguishers @ 1800 AFFL to Column FHR and two 9kg fire extinguishers @ 1800 AFFL to Column 600mm wide air vent to RW, to detail along full length 600mm wide air vent to RW, to detail along full length Steel screen to full floor to ceiling height to detail slab to fall 1:100 110mm thk brick wall bagged & painted finish in front of vent vent vent vent concrete pavers & tree rings to match existing 400x400 concrete tree rings Row of new large trees to landscape architects detail motorized gate motorized gate AN D31 AN D38 Soil poisoning to comply with SANS 10400-F Soil poisoning to comply with SANS 10400-F Soil poisoning to comply with SANS 10400-F INTERNAL PRIVATE WALKWAY line of slab above new RC retaining wall double volume wall of basement to municipal connection ex sewer line D32 AQ AM D35 FIRE ESCAPE D34 AM new traffic island to line up with ex traffic island boundary wall to tie in with neighbour's fence. tbc PROPOSED 3m BUILDING LINE EXISTING 3m building line EX SUTCLIFF HAL 12 12 GROUND FLOOR PLAN 1:100 1:100 SN 13|04|16 CS 00 North

New Subsoil Drain

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Subsoil Drain

LOCAL AUTHORITY APPROVAL:

WATERPROOFING GENERAL NOTES:

1.! 250 micron damp proof membrane [DPM] is to be laid under all surfacebeds.

2.! 375 micron damp proof course [DPC] at base of all walls, at slab level, andunder all window cills in accordance with SANS 10400 K, SANS 248, 298and 952. External walls to have stepped DPC, one course below all windowopenings.

3.! Foundation walls to have ʻbrickforceʼ, or equal approved by dws : sa every3rd course and walls every 4th course.

4.! All roof trusses to be fixed using hoop iron built into 6 courses of brickwork.5.! Neoprene closer to suit profile at ridge cap, flashing and eaves of roof.6.! All concrete roofs to be covered with ʻDerbigum SP4ʼ, or equal approved by

dws : sa waterproofing membrane fully sealed to deck through torch-onfusion, side laps 75mm and end laps 100mm. Turn-ups and turndownssimilarly fused to primed surfaces. Waterproofing to be turned up sidewallsand over fillets as required. Finish with 2 coats aluminium bitumous paint.Membrane to be installed by a ʻDerbigumʼ approved applicator and strictlyaccording to manufacturers detail and specification. A 10-year guarantee isto be seeded to dws : sa.

7.! All showers, where not tiled, are to be sealed with ʻeverbondʼ or equalapproved by dws : sa, applied to manufacturers specification beforeapplication of top coats. Where the walls are already damp, first applyʻevercure EM22ʼ or equal approved by dws : sa, to manufacturerʼsspecification.

8.! All showers to have ʻCoproxʼ, or equal approved by dws : sa cementitiouswaterproofing system applied to slab, dressed up shower tray sides and intooutlet. System to be applied by specialist sub-contractor and strictlyaccording to manufacturers detail and specification.

9.! External brickwork walls are to be 220mm. The outer face of the inner skinto be bagged and waterproofed with ʻBrixealʼ, or equal approved by dws :sa. Ties, ʻbrickforceʼ, or equal approved by dws : sa and reinforcementaround openings all to be according to structural engineerʼs detail andspecification.

10.!All recesses in brickwork housing rain water pipes [RWP] is to bewaterproofed to dws : saʼs approval.

DRAINAGE & PLUMBING GENERAL NOTES:

1.! The design and installation of drainage and plumbing is to comply with SANS10400 P, SANS 10252-2, SANS 1200 and any requirements of the localauthority. It is the responsibility of the plumbing contractor to ensurecompliance therewith.

2.! The municipal sewer connection point is to be exposed prior to commencingany drainage installation, and the level is to be verified. Any discrepancies orproposed alterations are to be reported to dws : sa prior to commencingwork.

3.! The sewer sections shown indicate the design intention only and are to beverified by the plumbing contractor and any discrepancies or proposedalterations are to be reported to dws : sa prior to commencing work.

4.! The storm water drainage is to be to engineerʼs detail.5.! Sanitary fixtures to be provided in compliance with the machinery and

occupational safety act 6 of 1983 or the latest amendment and the SANS10400 [National Building Regulations].

6.! Water supply is to comply with SANS 10400 W.7.! Mains water supply pipe to building to be HDPE or LDPE as necessary to

SANS 10400. External drinking water supply pipe to be 25mm HDPE. Allinternal pipe work [hot and cold water] to be 22mm [unless otherwise stated]copper and lagged. All pipe work required to external showers and basinsrouted underground to be polycop 15mm. All in accordance with ModelPreambles for Trades.

8.! Internal water pressure to be provided at 400KPa [taps and mixers have amaximum operating pressure of 500KPa | 5 bar].

9.! Hot and cold water is required to all washing facilities, unless otherwisespecified.

10.!Hot water reticulation to be sized | designed to ensure that hot water isavailable within half a minute of turning the tap. All hot and cold water supplypipes to be a minimum of 100mm apart. Hot and cold water supply to bebalanced and pressure tested before closing up.

11.!Accessible hot and cold water isolation valves to each ablution cluster.12.!All geysers to have a multiblock pressure reducing valve, access for

adjusting and maintenance, and visibility to check for system leaks. Thepressure-reducing valve must be within 15m of the hot water cylinders forbalancing of hot and cold water. Installation, temperature pressureemergency safety valve and draincock, overflow tray and overflow pipe toexterior installation in strict accordance with the manufacturers instructions.

13.!Soil pipes are to be a minimum of 110mm uPVC, waste pipes are to be aminimum of 50mm uPVC. Pipes laid below buildings, roads or parking areasto be heavy duty uPVC.

14.!Wastewater branch drains over 6m long to comply with SANS 10400PP18.4c.

15.! Inspection eyes to all bends and junctions in drains and marked with coversat ground level.

16.!Rodding eyes are to comply with SANS 10400 PP2117.! Invert level at head of drain to be a min of 450mm below ground level.18.!Head of drains to have 110mm stack vent pipe [SVP].19.!Pipe work is to be at a minimum gradient of 1:60.20.!Drains under building to be encased in concrete.21.!All waste fittings to have rodding eye seal traps.22.!All overflow gulleys to be exposed.23.!All gulley surrounds to be 75mm above finished ground level.24.!All fitting locations must be installed strictly in accordance with layout

drawings. Contractor to ensure that plumbers and other tradesman followthe detailed drawings carefully when installing any bathware / sanitaryware.The supplier is to be consulted for detailed installation requirements for allfittings.

25.!All plumbing and water supply pipes are to be concealed in walls. No pipework to be exposed on external surfaces of visible walls and connection toequipment to be neat and non-visible. Position of pipe work to be agreedwith dws : sa.

26.!All pipe work to be coordinated with other services. Queries or concerns areto be recorded with dws : sa before installation.

FIRE NOTES:

1.! The contractor is responsible for fire water supply complying with SANS10400 W [mechanical eng?].

2.! All fire protection installation to comply with SANS 10400 T and relevantspecific building classifications.

3.! Fire escape stairs to be minimum of 1100mm, all in compliance with SANS10400 TT23.

4.! Fire equipment signage required in terms of SANS 10400 TT29 & TT32 anddisplayed to dws : sa specification. All equipment is to be stainless steel ifwithin 15km of the coast or subject to degrading chemical exposure.

5.! Water supply to fire hose reels [FHR] to be minimum 25mm and incompliance with SANS 10400 TT33.

6.! 30m FHRʼs to comply with SANS 543 and SANS 10400 TT34.7.! Portable fire extinguishers to comply with SANS 10400 TT37.8.! Structural stability to comply with SANS 10400 TT7.9.! Materials to comply with SANS 10177.

designworkshop : sa94 florida road l durban | 4001 | south africa

+27 [0]31 303 5191 l t+27 [0]31 303 5198 l f

[email protected] l e

job no. series family rev.stage zone

scaledatecheckeddrawn

reg no.rate no.

ARCHITECT : Mark HornerCLIENT : Clifton School

6831

FOR : CLIFTON SCHOOL

CLIFTON SCHOOL PHASE 1ALTERATIONPROPOSED NEW 2 LEVEL BASEMENT PARKINGAND UPGRADED DROP-OFF AREA

COPYRIGHT:

In accordance with the relevant clauses of the Copyright Act (Act 98 of 1978)relating to assignment, all documents prepared by designworkshop : sa inconnection with the project remain the property and copyright ofdesignworkshop : sa , subject to their use by the client for the particularproject to which this document relates, and the client shall not be entitled,either directly or indirectly, to make use of the document(s) for any additionalor similar works or publish the same except with the prior consent fromdesignworkshop : sa .

GENERAL NOTES:1.! Mechanical lighting and ventilation to internalised WC's and habitable

rooms in compliance with SANS 10400 Part O.2. 25 L/S per bathroom of mechanical ventilation3. min 160 lux atrificial lighting to the bathrooms where required4.! The contractor is responsible for the glazing being executed in strict

conformance with glass manufacturerʼs recommendations & all inaccordance with the National Building Regulations Part N, SANS10137,SANS 1263-1 & AAAMSA Selection Guide for Safety GlazingMaterials.

! A certificate of compliance is to be issued to dws : sa on completion of thework.

34

0_Cl

ifton

Pha

se 1

_01

[mm

s.de

signw

orks

hop.

co.z

a] |

5:06

PM

| 20

13/0

5/02

340 M 01 GN 502

Ground Floor Plan

North

A

A

Existing columns &footings to bedemolished to hallcanopy

New Subsoil DrainSt

orm

wat

er c

oncr

ete

chan

nel in

bas

emen

t. Al

pha

chan

nel w

ith M

entis

grid

Stor

m w

ater

con

cret

e ch

anne

l in b

asem

ent.

Alph

a ch

anne

l with

Men

tus

grid

Fin

drai

n

New subsoil drain

123456789

10

111213

B

B

C

C

E

E

16

x 16

6 =

2 65

0

1234567

8

910111213141516

D

D

123456789101112131415161718

2 400 4 150 4 150 3 550 3 850 3 850 7 700 3 850 3 850 7 700 4 150

2 80

04

900

6 70

06

700

2 90

02

900

3 20

03

250

3 25

02

885

5 99

0

4 800 5 600 4 900 4 900 5 600 4 900 4 900 5 600 4 800

47 600 OVERALL

2 90

02

900

3 40

03

300

2 90

02

900

3 20

03

250

3 37

5

1 50

0

1 720

110

3 50

0

23 100

2 615 2 500 2 585 2 600 2 500 2 600 2 600 2 500 2 600 2 600 4 850 2 156 1 844

6 000

2 400 4 150 4 150 3 550 3 850 3 850 7 700 3 850 3 850 7 700 4 150

EQ EQ EQ EQ EQ EQ EQ EQ EQ

700

13 350 1 250 2 650 3 800 3 900 3 800 3 900 3 800 3 900 1 450 4 736

580 9 885 1 640 26 395 4 100 2 356 1 844 536 264

1 50

05

090

110

780

870

1 19

111

0 3 890

800

700

430

345

1 38

575

068

61

300

139

220

28 6

4925

060

0300

900

300

200

2 37

033

905

250

2 10

0

150540

110 11 325 300 27 605 300 6 470 110540

150

47 600

9 675 1 560

220 1 524220

1 526230

500570

230

3 00

0

bbbb

1 316,98 m2

FFL +45, 300

FFL +45, 300 FFL +45, 600

FFL +45, 600

FFL +45, 300

FFL +45, 300

FFL +45, 600

FFL +45, 300 FFL +45, 600

FFL +45, 185

FFL +45, 300

FFL +45, 300

FFL +45, 470

FFL +45, 600

FFL +45, 670 FFL +45, 385

FFL +45, 300 FFL +45, 600

FFL +45, 600 FFL +45, 300

FFL +45, 650

FFL +45, 270

FFL +45, 350

paving finish to fall

46,320

asphalt

500x250 RC columns toeng detailpainted

500x250 RC columns toeng detailpainted

power floated screed

landscaping to specialist

500x250 RC columns toeng detail, painted

FFL 50,630

power floated screed

Existing sewer to be temporarily re-routed prior to commencement of anyconstruction as per eng specification.

500x250 RC columns toeng detailpainted

Temporary sewer main laid to falls onexisting surface to eng specification.

Existing 100 Ø stm water line to beupgraded to 300 Ø uPVC class 34 asper eng spec.

250mm thick RC slab cast to fall to eng detail

Line

to s

how

ridg

e lin

e

Line

to s

how

ridg

e lin

eline of edge of roof slab above

Finish: paving with 100mm wide painted line only to demarcate parking to walkway.

Finish: pavers

700 x3900 o/a opening to floor slabNEWSWSUMP

REIE

IEIE

03STORAGE

A: 3,37 m2

Grano Screed

01NEW PROPOSED LAMBERT RD PARKING

A: 1 154,27 m2

Power floated slab

04STAIR

A: 38,27 m2

Power floated slab

05STAIRA: 8,96 m2

Power floated slab

4NEW SECURITY BOH

A: 8,81 m2

Grano screed

1NEW FOYER

A: 18,42 m2

Power floated slab

08FIRE LOBBY

A: 6,33 m2

Grano Screed

110 x 220 x 900mm steel bollards to arch detail

EX SUTCLIFF HALL

escape door in screen

new WC

new whb

CAD01 CB

D02

NEW 125

SURFACE BED

line of steel screen

F

F

G

G

H

H

J

J

K

K

L

L

M

M

1 1

2 2

3 3

4 4

5 5

7 7

8 8

9 9

10 10

11 11

6 6

aa aa

BO

UN

DA

RY L

INE

01

02

03

04

05

06

07

20

21

22

25

24

23

26

27

28

30

29

31

32

33

34

35

36

37

ENTRANCE

EXISTING 7,5m building line

EXISTING BOUNDARY LINE

LAMBERT ROAD

EXIT

line of basement belowline of parking basement below

painted parking line with bollards

line of non mountable precast concrete curb

line of existing curb to be retained & re-instated where required

NEW TRAFFIC ISLANDstorm water road hump

to eng. detailstorm water road hump

to eng. detail

1 2 3

4 5 6

fire door

sliding gate to detail sliding gate to detailPUBLIC WALKWAY

INTERNALPRIVATE WALKWAY

NEW TRAFFIC ISLAND TO ALLIGN WITH EX ISLAND

access control

access control

10 11 12 13 14 15 16 17 18

PROPOSED ATTENUATION TANK to engineers specification

NATURAL VENT RISER smoke exhoust & ventilation to eng. detail

STAIR 1 to SUTCLIFFE hall19 treads @ 355mm, 18 risers @ 140mm

PRO

POSE

D 2

m b

uild

ing

line

storebelow

19

screen to full floor soffit height to detail

NEW PROPOSED GRADE R DROP-OFF ZONE

NEW PEDESTRIANCROSSING AND SPEEDHUMP TO ALIGN WITH

MAIN ENTRANCE

EX STUBBS HOUSE

to municipal services

upgraded SWP line - 160mm dia UPVC @ 1:100 fall, to engineers detailMH

250x500 up stand beam with s/s balustrade to 1m H to NBR regulations, to architects details

upgr

aded

SW

P lin

e - 1

60m

m d

ia U

PV

C @

1:1

00 fa

ll

excavation & backfill to eng detail

250mm RC wall to eng detail

waterproofing to specialist's detailwaterproofing to specialist's detail

250x500 up stand beam withs/s balustrade to 1m H to NBR regulations

exMH

250mm RC RW to eng detail bagged & painted finish

500m

m th

k co

ntin

ious

pili

ng to

eng

det

ail

painted parking line with bollards

up from basement parking

RAMP 2 @ 1:8

newsump

newsump

newsump

newsump

newsump

motorbike bay

motorbike bay

motorbike bay

08

09

upgraded SW 150mm dia UPVC @ 1:100 fall, to engineers detail

upgraded H2O Pipe, to engineers detail

EX GR 1& 2 ABOVE

250m

m R

C R

W w

all t

o en

g de

tail

110m

m th

k br

ick

wal

l bag

ged

& p

aint

ed fi

nish

in fr

ont o

f

250x500 up stand beam with s/s balustrade to 1m H to NBR regulations, to architects details

500m

m th

k co

ntin

ious

pili

ng to

eng

det

ail

250m

m R

C R

W w

all t

o en

g de

tail

110m

m th

k br

ick

wal

l bag

ged

& p

aint

ed fi

nish

in fr

ont o

f

STAIR 3 to GR R @ 1st floor level14 treads @ 300mm + platform

16 risers @ 166mm

STAIR 1 fire escape from basement14 treads @ 300mm + platform16 risers @ 163mm

down to basement parking

RAMP 1 @ 1:8

escape door in screen

escape from basement14 treads @ 300mm +

platform16 risers @ 163mm

fire door

AND30

MH2

MH

MH

vent

UP

DOWN

110 x 220 x 900mm steel bollards, toarchitects detail

PARKING BAYS: 37NOTE: All parking bay dimensions & access rd

in accordance to NBR

slab to fall 1:100

painted parking line with bollards

fire door

paving FFL to fall 1:100 to match internal floor slab

Storage for fire equipmentspecialist to confirm

G 05AD

G 06AE G 07

AF

FHR and two 9kg fireextinguishers @ 1800 AFFL to

Column

FHR and two 9kg fireextinguishers @ 1800 AFFL to

Column

600mm wide air vent to RW, to detail along full length600mm wide air vent to RW, to detail along full length

Ste

el s

cree

n to

full

floor

to c

eilin

g he

ight

to d

etai

l

slab to fall 1:100

110m

m th

k br

ick

wal

l bag

ged

& p

aint

edfin

ish

in fr

ont o

f

ventventventvent

concrete pavers & tree rings to match existing 400x400 concrete tree ringsRow of new large trees to landscape architects detail

motorized gate

motorized gate

AND31

AND38

Soil poisoning to complywith SANS 10400-F

Soi

l poi

soni

ng to

com

ply

with

SA

NS

104

00-F

Soi

l poi

soni

ng to

com

ply

with

SA

NS

104

00-F

INTERNALPRIVATE WALKWAY

line of slab above

new

RC

reta

inin

g w

all

doub

le v

olum

e

wal

l of b

asem

ent

to municipal connection

ex sewer line

D32AQ

AMD35

FIRE ESCAPE

D34AM

new traffic island to line up with ex traffic island

boundary wall to tiein with neighbour'sfence. tbc

PROPOSED 3m BUILDING LINE

EXIS

TIN

G 3

m b

uild

ing

line

EX SUTCLIFF HALL

12 12

GROUND FLOOR PLAN1:100

1:100SN 13|04|16CS00

North