16
New Product Development Module GAP OSM's NPD ( New Product Development) module ensures a smooth Design & Development Activity which is based on APQP and simultaneously prepares all the required PPAP documentation. It creates and saves all the documents required for Verification, Validation, Process and Product Monitoring. It also results in a smooth transition from Development to Production. It keeps a tab on the Product Cost and the Time frame. 1 /16

New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

New Product Development ModuleGAP OSM's NPD ( New Product Development) module ensures a smooth Design & Development Activity which is based on APQP and simultaneously prepares all the required PPAP documentation.It creates and saves all the documents required for Verification, Validation, Process and Product Monitoring. It also results in a smooth transition from Development to Production.

It keeps a tab on the Product Cost and the Time frame.

1/16

Page 2: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

The various Activities covered under NPD module are shown below:-

• Project Initiation

• Projects Listing

• Working on Individual Product

• Function Identification & Study / Quality Function Deployment (QFD)

• Quality Function Deployment (QFD)

• Design Validation Plan (DVP)

• Performance Testing Sheet

• Product Costing Sheet

• Part List with details

• Development Status Review

• Defining the Process Stations with Required Inputs

• Process Flow Chart

• Process FMEA Work Sheet & Print Out

• Special Characteristics Matrix

• Inspection Sheet for Layout

• PDI Sheet ( Pre Despatch Inspection )

• Checking Aids List

• Skills Required and Available Plan

• Skills Development Plan

• Child Part Detailing

• Child Part Raw material details

• Child Part Processing Details

• Child Part Finishing details

• Child Part Control Plans

• Part Submission Warrant

• PPAP Documents

2/16

Page 3: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Project Initiation

Projects Listing

3/16

Page 4: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Working on Individual Product

Function Identification & Study / Quality Function Deployment (QFD)

4/16

Page 5: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Quality Function Deployment (QFD)

Design Validation Plan (DVP)

5/16

Page 6: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Performance Testing Sheet

Product Costing Sheet

6/16

Page 7: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Part List with details

Development Status Review

7/16

Page 8: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Defining the Process Stations with Required Inputs

Process Flow Chart

8/16

Page 9: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Process FMEA Work Sheet

Process FMEA Print Out

9/16

Page 10: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Special Characteristics Matrix

Inspection Sheet for Layout and PDI ( Pre Despatch Inspection )

10/16

Page 11: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Layout Inspection Sheet

PDI Sheet

11/16

Page 12: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Checking Aids List

Skills Required and Available Plan

12/16

Page 13: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Skills Development Plan

Child Part Detailing

13/16

Page 14: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Child Part Raw material details

Child Part Processing Details

Child Part Finishing details

14/16

Page 15: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

Child Part Control Plans

Part Submission Warrant

15/16

Page 16: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition

PPAP Documents

Gilard Application Programmers LLPC-132, Phase VIII,

Industrial Area, Mohali,PUNJAB INDIA

www.gaposm.com

[email protected]

0172-5020510 +91-9888111773

16/16