26
Nathaniel West BFA Architecture LEED Green Associate

New Portfolio_test7

Embed Size (px)

Citation preview

Nathaniel WestBFA Architecture

LEED Green Associate

Awards and Recognition

Skills

3rd Place Recipient 2016 ASHRAEISBD Competition

Autodesk

Adobe

Microsoft

Autocad

Revit

3DS Max

InDesign

Photoshop

Illustrator

Premiere

Word

Excell

Powerpoint

Nathaniel West(865)[email protected]/in/westnathaniel

Education

Experience

B.F.A. Architecture, Class of 2016Savannah College of Art and DesignSavannah, GAGraduated Cum Laude

A.A.S. Civil Engineer Tech., Class of 2012Pellissippi State Community CollegeKnoxville, TN

LEED Green Associate 2015Dean’s List at SCAD 2012-2016Navy & Marine Corps Achievement Medal 2011

Builder Second Class Petty Officer U.S. Navy ReservesKnoxville, TN 37920June 2007- June 2014

- Deployed to Iraq 2009- Provided construction support for the Armed Forces-Plan of the Month Coordinator

Working Sm.

ASHRAE

Jacksonville

1-9

10-17

18-23

Design Considerations

-quality lighting -storage of materials/ equipment -clean-up -work area and relaxation area

LIGHT STUDIOSUsers: Artists who’s work is dependent on quality lighting

Painting Fashion Illustration

2

Working Sm.

2' - 6 "7' - 4 "

17' - 10"

10' - 0"4' - 0"

1' - 9" 3' - 5" 1' - 11" 2' - 1" 2' - 0" 1' - 11" 1' - 9"3' - 0"

2' - 10" 2' - 10"6' - 0"

Floor Joist24” O.C., Typ.

6' - 0"

4' -

0"

3' - 3"

3' - 6"

Floor Plan Floor joist Plan

CONSTRUCTION DRAWINGS

Working Sm.

3

2' - 6 "7' - 4 "

17' - 10"

10' - 0"4' - 0"

1' - 9" 3' - 5" 1' - 11" 2' - 1" 2' - 0" 1' - 11" 1' - 9"3' - 0"

2' - 10" 2' - 10"6' - 0"

CONSTRUCTION DRAWINGS

Working Sm.

4

DRAFTING STUDIOS

Design Considerations -Quality lighting -Storage -Computer station -Drafting station -Flat work area -Pin-up space

Users: Artists who work primarily on the computer and by hand.

Graphic Design Animation Architecture Interior Design

Working Sm.

5

5' -

4"

3' - 0"

3' - 0"

9' - 9"

3' -

6"

2' - 6"

8' -

0"

3' - 2"

2' -

6"2'

- 0"

1' -

11"

3' - 5"

3' - 0”

0' - 10"

4' -

4 3/

4"

3' - 1"

15' -

0"

2' -

1"4'

- 4

3/4"

Floor Plan

3’ -0”4’ -11”

3’ -0”3’ -1”

1’-0”

8’ - 0”

6’ - 3”

1’ - 0”

2’ - 9”

1’ - 0”

1’ - 0”

Roof Plan

CONSTRUCTION DRAWINGS

Working Sm.

6

Handle

Work Station

2’ -1

0”3’

- 6”

4’ -

4”

Section

Working Sm.

7

Drafting Table

Computer Station

10’ - 8”

3’ - 3-7/8”

2’ - 1”

shelf 3

shelf 2

shelf 1

2’ 1

2’ - 4”2’ 6”

10” 10”

3’ - 2”

Working Sm.

8

Working Sm.

SIP Panel

Cedar Shakes

CLT Panel

MATERIALITY

9

Municipal Government BuildingHuaibeizhuanjcun, Beijing, China

ASHRAE

Site Plan

11

ASHRAE

Given the fact that China’s and especially Beijing’s air quality is unhealthy. Indoor air quality becomes am important issue. Indoor air quality is affected by both outdoor and indoor pollutants. Some of the strategies of improving indoor air quality are: operable windows, vegetation, walk off matts, and the filters used in the HVAC system. Operable windows can be used to completely flush out the build-ing on days that the outside air quality is decent. Vegetation both on the roof and around the site will help filter the air. The leaves will trap the pollutants which will then be washed off during storms. Walk off matts reduce the amount of debris that is tracked into the building from peoples shoes. The walk off matts will have to be cleaned regularly. The building will be using a fan coil system for its HVAC. Each fan coil unit will have it’s own filter built in. In addition to this though, there will be a couple of fresh air intake ducts that service the fan coil units that are not able to be placed against an exterior wall. These fresh air intake ducts will have their own set of filters.

Indoor Air Quality

Operable Windows

Vegetation Filtration

12

ASHRAE

HVAC System The building will utilize a hybrid system to heat and cool the interior spac-es. The first system is a hybrid GHP (Ground Heat Pump) system. The GHP will exchange heat with the pond located on site. The second system is a closed water loop fan coil. The heated or cooled water from the GHP will circulate throughout the building and to the individual fan coil units. Each fan coil unit then will heat or cool the rooms. The third system is a fresh air intake system. It will have its own set of ducting and filters. This system is implemented because Beijing and its surroundings are highly polluted.

T

T

T

13

ASHRAE

SupplyReturnSprinkler

Pump

Thermostat

Diverter Valve

T

T

T

T

Plate Heat Exchanger

Fresh Air Inlet

Geothermal Unit

Boiler

Pond used as Heat source/ sink

HVAC Zoning & Plan Diagrams

14

ASHRAE

T

T

T

T

T

T

T

T

T

TT

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

First Floor HVAC Plan

15

ASHRAE

Structural Systems

16

ASHRAE

17

Jacksonville Science Musuem

Jacksonville

DATUM STUDIES 19

Site Studies

Jacksonville

CMU Lintel

Store Front Windows

Spill Over

Sand

# 57 Gravel

#2 Gravel

Drain to on-site cistern

Rain Water Collection

20

Jacksonville4” Steel Stud

Brick Veneer

Cap

Steel Plate

Flashing

Split Tail Anchor1-1/2” W Limestone Facade1” Air Gap2” Rigid Insulation

Reinforced CMU BlockThrough Wall Flashing#6 Rebar

1/2” Expansio Joint

1/2” Expansio Joint

Concrete Slab

Metal Decking

Bar Joist

Angle Iron

1/2” Gyp. BoardTrimFinish FloorSub-Floor

Ground Slab

Vapor Barrier

Gravel Base

Hat Channel

Typ. Wall Section

2

21

Jacksonville

Post Cap2 x 6Potting SoilGravel-drainagePlastic Liner2 x 44 x 4 Wood PostPaverLoose-laid Retention Tee

Railing CapFlashingAdjustable Wall TiesWeep Holes

Engineered Soil

Filter Fabric

Reservoir Layer

Moisture Retention Layer

Aeration Layer

Thermal Insulation

Drainage Layer

Protection Course

Thermoplastic Waterproofing Membrane

Green Roof & Urban Farm

22

Jacksonville

23