Upload
nathaniel-west
View
10
Download
0
Embed Size (px)
Citation preview
Awards and Recognition
Skills
3rd Place Recipient 2016 ASHRAEISBD Competition
Autodesk
Adobe
Microsoft
Autocad
Revit
3DS Max
InDesign
Photoshop
Illustrator
Premiere
Word
Excell
Powerpoint
Nathaniel West(865)[email protected]/in/westnathaniel
Education
Experience
B.F.A. Architecture, Class of 2016Savannah College of Art and DesignSavannah, GAGraduated Cum Laude
A.A.S. Civil Engineer Tech., Class of 2012Pellissippi State Community CollegeKnoxville, TN
LEED Green Associate 2015Dean’s List at SCAD 2012-2016Navy & Marine Corps Achievement Medal 2011
Builder Second Class Petty Officer U.S. Navy ReservesKnoxville, TN 37920June 2007- June 2014
- Deployed to Iraq 2009- Provided construction support for the Armed Forces-Plan of the Month Coordinator
Design Considerations
-quality lighting -storage of materials/ equipment -clean-up -work area and relaxation area
LIGHT STUDIOSUsers: Artists who’s work is dependent on quality lighting
Painting Fashion Illustration
2
Working Sm.
2' - 6 "7' - 4 "
17' - 10"
10' - 0"4' - 0"
1' - 9" 3' - 5" 1' - 11" 2' - 1" 2' - 0" 1' - 11" 1' - 9"3' - 0"
2' - 10" 2' - 10"6' - 0"
Floor Joist24” O.C., Typ.
6' - 0"
4' -
0"
3' - 3"
3' - 6"
Floor Plan Floor joist Plan
CONSTRUCTION DRAWINGS
Working Sm.
3
2' - 6 "7' - 4 "
17' - 10"
10' - 0"4' - 0"
1' - 9" 3' - 5" 1' - 11" 2' - 1" 2' - 0" 1' - 11" 1' - 9"3' - 0"
2' - 10" 2' - 10"6' - 0"
CONSTRUCTION DRAWINGS
Working Sm.
4
DRAFTING STUDIOS
Design Considerations -Quality lighting -Storage -Computer station -Drafting station -Flat work area -Pin-up space
Users: Artists who work primarily on the computer and by hand.
Graphic Design Animation Architecture Interior Design
Working Sm.
5
5' -
4"
3' - 0"
3' - 0"
9' - 9"
3' -
6"
2' - 6"
8' -
0"
3' - 2"
2' -
6"2'
- 0"
1' -
11"
3' - 5"
3' - 0”
0' - 10"
4' -
4 3/
4"
3' - 1"
15' -
0"
2' -
1"4'
- 4
3/4"
Floor Plan
3’ -0”4’ -11”
3’ -0”3’ -1”
1’-0”
8’ - 0”
6’ - 3”
1’ - 0”
2’ - 9”
1’ - 0”
1’ - 0”
Roof Plan
CONSTRUCTION DRAWINGS
Working Sm.
6
Drafting Table
Computer Station
10’ - 8”
3’ - 3-7/8”
2’ - 1”
shelf 3
shelf 2
shelf 1
2’ 1
”
2’ - 4”2’ 6”
10” 10”
3’ - 2”
Working Sm.
8
ASHRAE
Given the fact that China’s and especially Beijing’s air quality is unhealthy. Indoor air quality becomes am important issue. Indoor air quality is affected by both outdoor and indoor pollutants. Some of the strategies of improving indoor air quality are: operable windows, vegetation, walk off matts, and the filters used in the HVAC system. Operable windows can be used to completely flush out the build-ing on days that the outside air quality is decent. Vegetation both on the roof and around the site will help filter the air. The leaves will trap the pollutants which will then be washed off during storms. Walk off matts reduce the amount of debris that is tracked into the building from peoples shoes. The walk off matts will have to be cleaned regularly. The building will be using a fan coil system for its HVAC. Each fan coil unit will have it’s own filter built in. In addition to this though, there will be a couple of fresh air intake ducts that service the fan coil units that are not able to be placed against an exterior wall. These fresh air intake ducts will have their own set of filters.
Indoor Air Quality
Operable Windows
Vegetation Filtration
12
ASHRAE
HVAC System The building will utilize a hybrid system to heat and cool the interior spac-es. The first system is a hybrid GHP (Ground Heat Pump) system. The GHP will exchange heat with the pond located on site. The second system is a closed water loop fan coil. The heated or cooled water from the GHP will circulate throughout the building and to the individual fan coil units. Each fan coil unit then will heat or cool the rooms. The third system is a fresh air intake system. It will have its own set of ducting and filters. This system is implemented because Beijing and its surroundings are highly polluted.
T
T
T
13
ASHRAE
SupplyReturnSprinkler
Pump
Thermostat
Diverter Valve
T
T
T
T
Plate Heat Exchanger
Fresh Air Inlet
Geothermal Unit
Boiler
Pond used as Heat source/ sink
HVAC Zoning & Plan Diagrams
14
Jacksonville
CMU Lintel
Store Front Windows
Spill Over
Sand
# 57 Gravel
#2 Gravel
Drain to on-site cistern
Rain Water Collection
20
Jacksonville4” Steel Stud
Brick Veneer
Cap
Steel Plate
Flashing
Split Tail Anchor1-1/2” W Limestone Facade1” Air Gap2” Rigid Insulation
Reinforced CMU BlockThrough Wall Flashing#6 Rebar
1/2” Expansio Joint
1/2” Expansio Joint
Concrete Slab
Metal Decking
Bar Joist
Angle Iron
1/2” Gyp. BoardTrimFinish FloorSub-Floor
Ground Slab
Vapor Barrier
Gravel Base
Hat Channel
Typ. Wall Section
2
21
Jacksonville
Post Cap2 x 6Potting SoilGravel-drainagePlastic Liner2 x 44 x 4 Wood PostPaverLoose-laid Retention Tee
Railing CapFlashingAdjustable Wall TiesWeep Holes
Engineered Soil
Filter Fabric
Reservoir Layer
Moisture Retention Layer
Aeration Layer
Thermal Insulation
Drainage Layer
Protection Course
Thermoplastic Waterproofing Membrane
Green Roof & Urban Farm
22