13
New Paradigms & Experimental Facilities http://cordis.europa.eu/fp7/ict/fire FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007 Dr. Max Lemke Deputy Head of Unit DG INFSO-F4 New Paradigms and Experimental Facilities

New Paradigms & Experimental Facilities FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Embed Size (px)

Citation preview

Page 1: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

New Paradigms & Experimental Facilities

http://cordis.europa.eu/fp7/ict/fire http://cordis.europa.eu/fp7/ict/fire

FP7 – ICT Call 2 Objective ICT-2007.1.6

NCP Info DayBrussels 23 May 2007

Dr. Max LemkeDeputy Head of Unit

DG INFSO-F4New Paradigms and Experimental Facilities

FP7 – ICT Call 2 Objective ICT-2007.1.6

NCP Info DayBrussels 23 May 2007

Dr. Max LemkeDeputy Head of Unit

DG INFSO-F4New Paradigms and Experimental Facilities

Page 2: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Limits of the current Internet architecture Limits of the current Internet architecture and of the IP protocoland of the IP protocol

Internet has grown to unexpected reach– 1 billion users– Tb/s links– Broadband to home– E-europe– Internet telephony, TV, …

Problems have as well– Spam– Viruses– Service attacks– Complexity of management– Adding new devices: cars, mobile phones, sensor networks…– Mchine-to-machine communication

patches

patches

patches

patches

patches

patchespatchespatches

patchespatches

patches

patches

Page 3: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Different perspectives for Different perspectives for the Future Internetthe Future Internet

Industrial– backward compatibility / standards– security for supporting commercial services and applications

Academic/Technological– aiming at clear improvements– clean slate approach to overcome intrinsic limitations

Political– redesigning the internet involves a huge social responsibility

• cannot be based solely on technological or commercial constraints – how to preserve openness, fairness, social role of the Internet

• Striking the right balance between security and privacy• was internet open and democratic by design or by accident?

– do not throw the baby out with the bath water!

– European competitiveness on future internet

Industrial– backward compatibility / standards– security for supporting commercial services and applications

Academic/Technological– aiming at clear improvements– clean slate approach to overcome intrinsic limitations

Political– redesigning the internet involves a huge social responsibility

• cannot be based solely on technological or commercial constraints – how to preserve openness, fairness, social role of the Internet

• Striking the right balance between security and privacy• was internet open and democratic by design or by accident?

– do not throw the baby out with the bath water!

– European competitiveness on future internet

Page 4: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Experimentally-driven long-term research related to the Future Internet

Interconnected testbeds

Part of Challenge 1 – complementary e.g. to “Technologies and systems architectures for the Future Internet”, part of Objective “The network of the Future” (Call 1)

To bootstrap and prepare the European FIRE Future Internet Research and Experimentation Initiative

Call 2 - Budget: 40 M€ - planned opening June, closure October 2007

http://cordis.europa.eu/fp7/ict/fire

Objective ICT-2007.1.6Objective ICT-2007.1.6New Paradigms and Experimental FacilitiesNew Paradigms and Experimental Facilities

Advanced networking approaches

Interconnected testbeds

Page 5: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Workprogramme text: Workprogramme text: NEW PARADIGMS AND EXPERIMENTAL FACILITIESNEW PARADIGMS AND EXPERIMENTAL FACILITIES

Target Outcome Advanced networking approaches to architectures and

protocols– to cope with the increased scale, resilience, complexity,

mobility, security and transparency of the Future Internet– coupled with their validation in large scale testing environments

based on a combination of physical and 'virtual' infrastructures Interconnected testbeds addressing:

– novel distributed and reconfigurable protocol architectures; – novel distributed network and service architectures,

infrastructures and software platforms; – advanced embedded or overlay security, trust and identity

management architectures and technologies– system-level testbeds for providing trusted access to e-services

with users requiring no administration and security skills Coordination and Support Actions

Page 6: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Workprogramme text: Workprogramme text: NEW PARADIGMS AND EXPERIMENTAL FACILITIESNEW PARADIGMS AND EXPERIMENTAL FACILITIES

Impact– Strengthened EU position in Future Internet

Developments– Wider take-up of RTD on networks and services facilitated

by comprehensive validation– Global consensus towards standards and strengthened

international co-operation through interconnected testbeds and interconnection capabilities offered to third countries

– Higher confidence in the secure use of the internet Indicative Budget Distribution

– CP 36 M€: IPs min 12 M€, STREPs min 15 M€– NoE 3M€– CSA 1M€

Page 7: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

The FIRE Initiative The FIRE Initiative Future Internet Research and ExperimentationFuture Internet Research and Experimentation

Experimentally-driven long-term research

– on new paradigms and networking approaches for the future internet

– open to fresh bottom-up ideas, no backwards-compatibility constraints

– complementing the running FET SAC projects

– multidisciplinary

Building a sustainable, dynamic, large-scale experimentation facility

– Supporting both medium and long term research on networks and services

– Gradually built by federating existing and new testbeds

• PANLAB, ONELAB ideas for federation

• Research Networking Testbeds, SAC testbeds

• Open to relevant testbeds from EU, EUREKA, national, regional projects

– For use by European industry and academia

FIRE is a long term initiative: Call 2 is just a first step – more calls planned in FP7

Definition of a European identity based on EU needs and strengths

Exploiting the GEANT pan-European Gigabit research network

Collaboration with FIND/GENI (US) and related initiatives in the Far East

Experimentally-driven long-term research

– on new paradigms and networking approaches for the future internet

– open to fresh bottom-up ideas, no backwards-compatibility constraints

– complementing the running FET SAC projects

– multidisciplinary

Building a sustainable, dynamic, large-scale experimentation facility

– Supporting both medium and long term research on networks and services

– Gradually built by federating existing and new testbeds

• PANLAB, ONELAB ideas for federation

• Research Networking Testbeds, SAC testbeds

• Open to relevant testbeds from EU, EUREKA, national, regional projects

– For use by European industry and academia

FIRE is a long term initiative: Call 2 is just a first step – more calls planned in FP7

Definition of a European identity based on EU needs and strengths

Exploiting the GEANT pan-European Gigabit research network

Collaboration with FIND/GENI (US) and related initiatives in the Far East

Page 8: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

FIRE baseline: starting from FP6 researchFIRE baseline: starting from FP6 research

Long-term research in communications and networking under Future and Emerging Technologies:

– Situated Autonomic Communications projects:• ANA, BIONETS, CASCADAS, HAGGLE

– other future internet related projects• CATNETS, COOPCOM, EVERGROW, NET-REFOUND

Research Infrastructure Testbeds– Onelab STREP to widen Planetlab and create an autonomous

Planetlab Europe – PANLAB SSA preparing the federation of testbeds– Testbeds related to QoS, new routing, convergence of services,

IPv6, mobility and multihoming, etc.

Long-term research in communications and networking under Future and Emerging Technologies:

– Situated Autonomic Communications projects:• ANA, BIONETS, CASCADAS, HAGGLE

– other future internet related projects• CATNETS, COOPCOM, EVERGROW, NET-REFOUND

Research Infrastructure Testbeds– Onelab STREP to widen Planetlab and create an autonomous

Planetlab Europe – PANLAB SSA preparing the federation of testbeds– Testbeds related to QoS, new routing, convergence of services,

IPv6, mobility and multihoming, etc.

Page 9: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

New Architectures

Situated Services

BIONETSBIONETSAutonomic service evolution

HAGGLEHAGGLEOpportunistic networking (cross-layer)

Common research issues:Security, resilience, self-* (organisation,

evolution,healing, …) interaction of new

paradigms with society

ANAANABeyond

IPself-org.

Autonomic communication elements

CASCADASCASCADAS

Baseline: Baseline: SAC projects in FP6-FETSAC projects in FP6-FET2006 – 2009, ~ 30 M€2006 – 2009, ~ 30 M€

Baseline: Baseline: SAC projects in FP6-FETSAC projects in FP6-FET2006 – 2009, ~ 30 M€2006 – 2009, ~ 30 M€

Page 10: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Baseline: Testbeds in FP6Baseline: Testbeds in FP6(2006 – 2009, ~ 30M€)(2006 – 2009, ~ 30M€)

Federation of Testbeds

New Routing

QoS in multi-domain IP nets

Measurements,Tomography

Convergence Servicesover IP: IMS

QoS Policies in IP networks

IPv6 Mobilityand Multihoming

IST

RI

Page 11: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

FIRE strategyFIRE strategylo

ng

-ter

m

FP6

pre

-co

mm

erc

ial

or

em

erg

ing

te

ch

no

log

ies

dis

rup

tiv

e t

ec

hn

olo

gie

s,

sy

ste

ms

, a

rch

ite

ctu

res

PANLAB

ONELABTo be

defined

take

-up

WP 2007-08

pre

-co

mm

erc

ial

se

rvic

es

,& p

rod

uc

ts

FP7

CIPCapacities

StudyCORELABS

WPs 2009-10, 2011/12

FIREFIRE

Objective 1.6“New Paradigms& Experimental

Facilities”Call 240M

Page 12: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

FIRE Preparatory Group ReportFIRE Preparatory Group Report

to be issued in early June activities identified as needed to bootstrap FIRE

– Experimentally driven long term research on future internet

– Framework / umbrella / organisation for federation of testbeds

– Pilots of interconnected testbeds• demonstrating the added value of federation/interconnection

• system-level testbeds

• testing and benchmarking methodologies

to be issued in early June activities identified as needed to bootstrap FIRE

– Experimentally driven long term research on future internet

– Framework / umbrella / organisation for federation of testbeds

– Pilots of interconnected testbeds• demonstrating the added value of federation/interconnection

• system-level testbeds

• testing and benchmarking methodologies

Page 13: New Paradigms & Experimental Facilities  FP7 – ICT Call 2 Objective ICT-2007.1.6 NCP Info Day Brussels 23 May 2007

Objective ICT-2007.1.6 Objective ICT-2007.1.6 New Paradigms and Experimental FacilitiesNew Paradigms and Experimental Facilities

Contact– Unit INFSO - F4 New Infrastructure Paradigms and

Experimental Facilities– Per Blixt (HoU)– Max Lemke (DHoU)– Fabrizio Sestini

Info Day– 14 June 2007, Brussels– [email protected]

Website– http://cordis.europa.eu/fp7/ict/fire

Contact– Unit INFSO - F4 New Infrastructure Paradigms and

Experimental Facilities– Per Blixt (HoU)– Max Lemke (DHoU)– Fabrizio Sestini

Info Day– 14 June 2007, Brussels– [email protected]

Website– http://cordis.europa.eu/fp7/ict/fire