    MINUTES OF MEETINGS (MOM)

    Meeting No : 1 Date : 12 January 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin RamliMuhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Conformation of previous

    meeting

    Meeting for the firsttime

    Get to know each otherof the group members

    1. Khidir

    2. Ghazali3. Shafiq

    4. Khairuddin

    5. Zikri

    2 Matter arisingEach group members present

    their designs:-

    1. Hovercraft2. Stretcher3. Lalang extractor

    1.Khidir(Hovercraft 1)

    2. Ghazali(Stretcher)

    3. Shafiq(Hovercraft 2)

    4. Khairuddin (Lalang

    Extractor)

    5. Zikri(Hovercraft 3)

    3 Current matterSelect the most appropriatedesign for the project:- Lalang

    Extractor has been selected due

    to its;1. Manufacture ability2. Cost3. Environmental

    By group members

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    2/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 2 Date : 24 January 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 1 of 12

    January was unanimously

    confirmed

    2 Matters ArisingDiscuss about the selecteddesign chosen last week TheLalang Extractor by focus on

    comparing the selected designwith other designs.

    Khairuddin statedthat Lalang

    Extractor is simpler

    than hovercraft andstretcher, it also

    have fewer parts to

    be manufacture.

    Khidir stated thatLalang Extractor is a

    green technology

    because most of theparts can be recycle,

    also the design does

    not need high capital

    to be manufacture

    3 Current MattersSummarize all the criteria why

    the Lalang Extractor picked.

    Ghazali make a

    summary on the

    selected design

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    3/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 3 Date : 2 Feb 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 2 of

    24th

    January was

    unanimously confirmed

    2 Matters ArisingDesign refinement for theproduct in Design 1.

    Khairuddin wasresponsible to do the

    design refinement and

    preparing the blueprintfrom the Design 1.

    3 Current MattersAcquiring suitable materials

    for the Lalang Extractor

    -Khairuddin acquired

    the lawn mower blade

    from the hardwareshop.

    -All team membershave found all suitable

    material in the Faculty

    of MechanicalEngineering machine

    workshop which is mildsteel hollow bar, plates

    and solid rods.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    4/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 4 Date : 9th

    February

    2011

    Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 3 of 2

    nd

    February was unanimously

    confirmed2 Matters Arising

    Fabrication of the handle bar.

    The handle bar consist of two

    component (component 1:hollow bar 65cm x 2.5cm x

    2.5cm),(component 2: hollow

    bar 24cm x 2.5cm x 2.5cm)

    Handle bar was

    fabricated by

    Shafiq by cuttingthe hollow bar by

    using hand saw and

    bending the bar

    according to thedesign angle.

    3 Current Matters

    Fabricating the mainframe. Themainframe consist of 2

    components (component 1:hollow bar 47cm x 2.5cm x 2.5

    cm), (component 2 : 40cm x

    2.5cm x2.5cm)

    Zikri, Khidir andGhazali cut the

    hollow bar to theappropriate

    dimension and do

    some grinding onthe surface.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Ghazali Ramli Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    5/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 5 Date : 26th

    February

    2011

    Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin RamliMuhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 3 of 9

    th

    February was unanimouslyconfirmed

    2 Matters Arising-Fabrication of the chassis.

    The chassis consist of three

    component (components 1:hollow bar 30cm x 2.5cm x

    2.5cm x 2 pieces), (component

    2: hollow bar 34cm x 2.5cm x

    2.5cm x 3 pieces) andcomponent 3 : hollow bar

    26.5cm x 2.5cm x 2.5cm)

    Hollow bars were cut

    by Zikri and khidir by

    using power saw andGhazali continued to

    drill a hole for 8mm

    diameter on the chassis.

    3 Current MattersJoining of the chassiscomponents

    The chassis componentswere welded together

    by Shafiq andKhairuddin by using

    MIG welding.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Ghazali Ramli Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    6/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 6 Date : 14th

    March 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy

    Muhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 5 of

    26th

    February was unanimously

    confirmed

    2 Matters ArisingFabricating the blades. Theblades has two components

    (components 1 : solid bar 10cm

    x 2.5cm x 0.5 cm x 6 pieces)and (component 2 : solid plate

    34cm x 5cm x 0.5 cm)

    Solid plate was cut byShafiq and Zikri by

    using power saw and

    was grinded to have theappropriate shape

    according to the design

    of blade and both blades

    components was warewelded together by using

    MIG welding.

    3 Current Matters1.0 Joining of handle bar and

    the main frame.

    2.0 Preparing the design report.

    Shafiq and Khairuddin

    do some welding for thehandle bar and the main

    frame components by

    using MIG welding.

    Khidir and Ghazalifocusing on completing

    the Morphological Chart

    and the Gantt chart.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    7/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 7 Date : 22th

    March 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 6 of

    24th

    March was unanimously

    confirmed

    2 Matters ArisingFabricating the blade holder.(Dimension 15.3 cm x 4.8cm x

    0.6cm x 2 pieces)

    Solid plate was cut byGhazali by usingpower saw and was

    grinded.

    3 Current Matters-Fabricating the brackets.

    (Dimension 5cm x 6.7 cm x 4pieces)

    -Joining of main frame to theblade holder.

    The brackets was

    fabricated by Ghazaliby cutting plates to

    the appropriate

    dimentsion and then

    Khairuddin and Zikri

    continued to do thehole for diameter of

    8mm by using handdrill.

    The blade was weldedby Shafiq and

    Khairuddin to the

    main frame by using

    MIG welding.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Ghazali Ramli Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    8/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 8 Date : 30th

    March 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 6 of

    25th

    March was unanimously

    confirmed

    2 Matters Arising- Fabricating the footstepbeam. (Dimension : 13cm x

    8cm x 2.5cm)

    -Fabricating the blade

    attachments. (Dimension :15cm x 2.5cm x 0.5 cm)

    Solid bar was cut byZikri to the appropriate

    dimension by using

    power saw and wasgrind.

    Solid bar was cut by

    Khidir to theappropriate dimension

    by using power saw and

    was grind.

    3 Current MattersJoining of the blade

    components.

    All the blade

    components including

    the blades, bladeholder, blade

    attachments and

    footstep beam was

    welded by Khairuddinand Shafiq by using

    MIG welding.Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    9/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 9 Date : 8th

    April 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 7 of

    30th

    March was unanimously

    confirmed

    2 Matters ArisingAcquiring the Rear wheels Rear wheels were

    acquired by Khairuddin

    from hardware shop.

    3 Current Matters-Fabrication of the wheels

    axle consist of solid rod (15cm x 2cm with 2.4

    diameter)

    -Joining of the wheels axle to

    the main frame

    -Fabrication of the bladecover:

    (Dimension 30cm x 5cm)

    Solid rod was cut by

    Zikri and by usingpower saw and Ghazali

    drill a hole of 8mm

    diameter for the wheels

    stopper.

    Shafiq weld by wheels

    axle and the main frameby using MIG welding.

    Blade cover wasfabricated by

    Khairuddin by using

    rubber tube and

    aluminum plates.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Khidir Abdullah Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    10/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 10 Date : 12nd

    April 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 8 of 8th

    April was unanimously

    confirmed.

    2 Matters ArisingAcquiring the spray can. Khidir and Zikri

    acquired the sprays

    can from hardware

    shop

    3 Current MattersPainting all the parts. All parts were paint

    by Khairuddin and

    Shafiq.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Ghazali Ramli Dato Mohammed Dahalan

    Date: Date:

  • 8/3/2019 New Minutes of Meetings

    11/11

    MINUTES OF MEETINGS (MOM)

    Meeting No : 11 Date : 15th

    April 2011 Group : EMD7M2A/F

    Attendance : Muhammad Khidir Bin Abdullah

    (GROUP F) Muhammad Ghazali Bin Ramli

    Muhammad Shafiq Bin Abu Bakar

    Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin

    No. ISSUES/ITEMS ACTION DUE DATE REMARKS

    1 Confirmation of previous

    minutesMinutes of Meeting No 9 of

    12nd

    April was unanimously

    confirmed.2 Matters Arising

    Product testing All parts were

    assembled by the

    team members andthe functionality of

    the product was

    tested and seems to

    successfullyoperate.

    3 Current Matters

    Preparing the slide show forthe final presentation.

    -Ghazali andKhidir focusing on

    preparing the slidesshow

    -Khairuddin

    focusing oncompleting the

    simulation of the

    product.

    Prepared by, Checked by,

    _____________________ _____________________

    Muhammad Ghazali Ramli Dato Mohammed Dahalan

    Date: Date: