Upload
pitt87
View
214
Download
0
Embed Size (px)
Citation preview
8/3/2019 New Minutes of Meetings
1/11
MINUTES OF MEETINGS (MOM)
Meeting No : 1 Date : 12 January 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin RamliMuhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Conformation of previous
meeting
Meeting for the firsttime
Get to know each otherof the group members
1. Khidir
2. Ghazali3. Shafiq
4. Khairuddin
5. Zikri
2 Matter arisingEach group members present
their designs:-
1. Hovercraft2. Stretcher3. Lalang extractor
1.Khidir(Hovercraft 1)
2. Ghazali(Stretcher)
3. Shafiq(Hovercraft 2)
4. Khairuddin (Lalang
Extractor)
5. Zikri(Hovercraft 3)
3 Current matterSelect the most appropriatedesign for the project:- Lalang
Extractor has been selected due
to its;1. Manufacture ability2. Cost3. Environmental
By group members
Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
2/11
MINUTES OF MEETINGS (MOM)
Meeting No : 2 Date : 24 January 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 1 of 12
January was unanimously
confirmed
2 Matters ArisingDiscuss about the selecteddesign chosen last week TheLalang Extractor by focus on
comparing the selected designwith other designs.
Khairuddin statedthat Lalang
Extractor is simpler
than hovercraft andstretcher, it also
have fewer parts to
be manufacture.
Khidir stated thatLalang Extractor is a
green technology
because most of theparts can be recycle,
also the design does
not need high capital
to be manufacture
3 Current MattersSummarize all the criteria why
the Lalang Extractor picked.
Ghazali make a
summary on the
selected design
Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
3/11
MINUTES OF MEETINGS (MOM)
Meeting No : 3 Date : 2 Feb 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 2 of
24th
January was
unanimously confirmed
2 Matters ArisingDesign refinement for theproduct in Design 1.
Khairuddin wasresponsible to do the
design refinement and
preparing the blueprintfrom the Design 1.
3 Current MattersAcquiring suitable materials
for the Lalang Extractor
-Khairuddin acquired
the lawn mower blade
from the hardwareshop.
-All team membershave found all suitable
material in the Faculty
of MechanicalEngineering machine
workshop which is mildsteel hollow bar, plates
and solid rods.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
4/11
MINUTES OF MEETINGS (MOM)
Meeting No : 4 Date : 9th
February
2011
Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 3 of 2
nd
February was unanimously
confirmed2 Matters Arising
Fabrication of the handle bar.
The handle bar consist of two
component (component 1:hollow bar 65cm x 2.5cm x
2.5cm),(component 2: hollow
bar 24cm x 2.5cm x 2.5cm)
Handle bar was
fabricated by
Shafiq by cuttingthe hollow bar by
using hand saw and
bending the bar
according to thedesign angle.
3 Current Matters
Fabricating the mainframe. Themainframe consist of 2
components (component 1:hollow bar 47cm x 2.5cm x 2.5
cm), (component 2 : 40cm x
2.5cm x2.5cm)
Zikri, Khidir andGhazali cut the
hollow bar to theappropriate
dimension and do
some grinding onthe surface.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Ghazali Ramli Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
5/11
MINUTES OF MEETINGS (MOM)
Meeting No : 5 Date : 26th
February
2011
Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin RamliMuhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 3 of 9
th
February was unanimouslyconfirmed
2 Matters Arising-Fabrication of the chassis.
The chassis consist of three
component (components 1:hollow bar 30cm x 2.5cm x
2.5cm x 2 pieces), (component
2: hollow bar 34cm x 2.5cm x
2.5cm x 3 pieces) andcomponent 3 : hollow bar
26.5cm x 2.5cm x 2.5cm)
Hollow bars were cut
by Zikri and khidir by
using power saw andGhazali continued to
drill a hole for 8mm
diameter on the chassis.
3 Current MattersJoining of the chassiscomponents
The chassis componentswere welded together
by Shafiq andKhairuddin by using
MIG welding.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Ghazali Ramli Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
6/11
MINUTES OF MEETINGS (MOM)
Meeting No : 6 Date : 14th
March 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu BakarMohd Khairuddin Bin Zaidy
Muhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 5 of
26th
February was unanimously
confirmed
2 Matters ArisingFabricating the blades. Theblades has two components
(components 1 : solid bar 10cm
x 2.5cm x 0.5 cm x 6 pieces)and (component 2 : solid plate
34cm x 5cm x 0.5 cm)
Solid plate was cut byShafiq and Zikri by
using power saw and
was grinded to have theappropriate shape
according to the design
of blade and both blades
components was warewelded together by using
MIG welding.
3 Current Matters1.0 Joining of handle bar and
the main frame.
2.0 Preparing the design report.
Shafiq and Khairuddin
do some welding for thehandle bar and the main
frame components by
using MIG welding.
Khidir and Ghazalifocusing on completing
the Morphological Chart
and the Gantt chart.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
7/11
MINUTES OF MEETINGS (MOM)
Meeting No : 7 Date : 22th
March 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 6 of
24th
March was unanimously
confirmed
2 Matters ArisingFabricating the blade holder.(Dimension 15.3 cm x 4.8cm x
0.6cm x 2 pieces)
Solid plate was cut byGhazali by usingpower saw and was
grinded.
3 Current Matters-Fabricating the brackets.
(Dimension 5cm x 6.7 cm x 4pieces)
-Joining of main frame to theblade holder.
The brackets was
fabricated by Ghazaliby cutting plates to
the appropriate
dimentsion and then
Khairuddin and Zikri
continued to do thehole for diameter of
8mm by using handdrill.
The blade was weldedby Shafiq and
Khairuddin to the
main frame by using
MIG welding.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Ghazali Ramli Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
8/11
MINUTES OF MEETINGS (MOM)
Meeting No : 8 Date : 30th
March 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 6 of
25th
March was unanimously
confirmed
2 Matters Arising- Fabricating the footstepbeam. (Dimension : 13cm x
8cm x 2.5cm)
-Fabricating the blade
attachments. (Dimension :15cm x 2.5cm x 0.5 cm)
Solid bar was cut byZikri to the appropriate
dimension by using
power saw and wasgrind.
Solid bar was cut by
Khidir to theappropriate dimension
by using power saw and
was grind.
3 Current MattersJoining of the blade
components.
All the blade
components including
the blades, bladeholder, blade
attachments and
footstep beam was
welded by Khairuddinand Shafiq by using
MIG welding.Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
9/11
MINUTES OF MEETINGS (MOM)
Meeting No : 9 Date : 8th
April 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 7 of
30th
March was unanimously
confirmed
2 Matters ArisingAcquiring the Rear wheels Rear wheels were
acquired by Khairuddin
from hardware shop.
3 Current Matters-Fabrication of the wheels
axle consist of solid rod (15cm x 2cm with 2.4
diameter)
-Joining of the wheels axle to
the main frame
-Fabrication of the bladecover:
(Dimension 30cm x 5cm)
Solid rod was cut by
Zikri and by usingpower saw and Ghazali
drill a hole of 8mm
diameter for the wheels
stopper.
Shafiq weld by wheels
axle and the main frameby using MIG welding.
Blade cover wasfabricated by
Khairuddin by using
rubber tube and
aluminum plates.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Khidir Abdullah Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
10/11
MINUTES OF MEETINGS (MOM)
Meeting No : 10 Date : 12nd
April 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 8 of 8th
April was unanimously
confirmed.
2 Matters ArisingAcquiring the spray can. Khidir and Zikri
acquired the sprays
can from hardware
shop
3 Current MattersPainting all the parts. All parts were paint
by Khairuddin and
Shafiq.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Ghazali Ramli Dato Mohammed Dahalan
Date: Date:
8/3/2019 New Minutes of Meetings
11/11
MINUTES OF MEETINGS (MOM)
Meeting No : 11 Date : 15th
April 2011 Group : EMD7M2A/F
Attendance : Muhammad Khidir Bin Abdullah
(GROUP F) Muhammad Ghazali Bin Ramli
Muhammad Shafiq Bin Abu Bakar
Mohd Khairuddin Bin ZaidyMuhamad Zikri Bin Shamsudin
No. ISSUES/ITEMS ACTION DUE DATE REMARKS
1 Confirmation of previous
minutesMinutes of Meeting No 9 of
12nd
April was unanimously
confirmed.2 Matters Arising
Product testing All parts were
assembled by the
team members andthe functionality of
the product was
tested and seems to
successfullyoperate.
3 Current Matters
Preparing the slide show forthe final presentation.
-Ghazali andKhidir focusing on
preparing the slidesshow
-Khairuddin
focusing oncompleting the
simulation of the
product.
Prepared by, Checked by,
_____________________ _____________________
Muhammad Ghazali Ramli Dato Mohammed Dahalan
Date: Date: