D0A068 252 NEW JERSEY DEPT OF ENVIRONME~NTAL PROTECTIONE TRENTONi F/6 13/13NATION4AL DAM SAFETY PROGRAM. CAMPBELLS POND DAM EMJOO1Yl. RANW-ETCrJ))jAN 80 R MCDERMOTT DACOG1..YG-C-0011UNCLASSIFIEO

I.

III'/I ll'lI

Page 2: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

111~11.2__1 1112..

u1111 1 '* ' 1111 2 -HH.

11111 1.25 1.4 jl1.6

MICROCOPY RESOLUTION TESI CHART

NATIONAL BURIAU Sif ANARDS 19 1 A

L... . .. .... ... - S- " i --

Page 3: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

RAHWAY RIVER BASINWEST BRANCH RAHWAY RIVER

ESSEX COUNTYNEW JERSEY

CAMPBELLS POND DAM1q NJ 00517

00o) PHASE 1 INSPECTION REPORT0 ATIONAL DAM SAFETY PROGRAM

emsL.............. ..................... i'.' : L. i ::. .LL4

DEPARTMENT OF THE ARMYPhiladelphia DistrictCorps of Engineers

Philadelphia Pennsylva niaORIGINAL CONTAINS COLOR PLATES: ALLREPRODUCTIONS WILL BE IN BLACK AND WH

JANUARY 1980

Silui Lt ID. 8'21 020

Page 4: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECURITY CLASSIFICATION OF THIS PAGE (Wtan Dom EntreEo I C.;t

REPORT DOCUMENTATION PAGE CMLTGFR1RSPORT NUMBER2 GOVT ACCESSION NO. 3. REIINS AAO NUMBER

NJO0517 A -4,

4. TITLE (And Subt~t) 5~ TYEOEPORT 010 COVERED

Campbells Pond Dam (NJP51),"~.~~~ ~.p ING ORG REPQ!T OUMBER

~ :' e V Cs e>'AW6-79-C-

to. PRO RAN ELEMENT. PROJECT. TASKAREA & WORK UNIT NUMMERS

StorcI Engineering220 R~gedale Ave.F1W'cham Park, N.J. 07932

11. C NTROLLING OPFI £ AMI AND ADORE Protection / ng

pproe f War plcRease;s tbuinuiitd

14. MOITRINGAGNNCTANEME 0. GeADREee* affeeedi twoe Cm.*1 f fl em 18. ECRTYLS.(fOetp"

US. AUPyEEnAer OTstrcPiaepi

CstoriHgfie, Vi2ii 22151.t ncasife

mAppoen frpbcrlae; diamrbelti ond Dalmiew ere

V1s7 a DInspectIO ioAEMNT (Spf 0 Iniways Mt W

Thpis reotibe rlt tiof l Technical Infoti ation aStoe dasadcucy

Theaispeto a vlai Nathena Dam Safet PrcribdbahmNtoa a

I s p e c I n p e c t i o P u l cpai2 - l. l w a e c n clyn e s i a iosn c u e v s a

inspection, review of available design and construction records, and preliminarystructural and hydraulic and hydrologic calculations, as applicable, Aassessment of the dam's general condition is Included in the report.

SEGIJATV CLASSIF'ICATION Oft THIS PAGE(m e.g~td

Page 5: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

HOT ICE

THIS DOCUMENT HAS BEEN REPRODUCEDFROM THE BEST COPY FURNISHED US BYTHE SPONSORING AGENCY. ALTHOUGH ITIS RECOGNIZED THAT CERTAIN PORTIONSARE ILLEGIBLE. 17 1S BEING RELEASEDIN THE INTEREST OF MAKING AVAILABLEAS MUCH INFORMATION AS POSSIBLE.

Page 6: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

DEPARTMENT OF THE ARMYPHILADELPHIA DISTRICT. CORPS OF ENGINEERS

CUSTOM HOUSE-2 D & CHESTNUT STREETS

PHILADELPHIA. PENNSYLVANIA 19106

IN6PLT NKFCR TO

NAPEN-N

Honorable Brendan T. Byrne 1980Governor of New JerseyTrenton, New Jersey 08621

Dear Governor Byrne:

1aclosed is the Phase I Inspection Report for Campbells Pond Dam in EssexCeunty, New Jersey which has been prepared under authorization of the DamInspection Act, Public Law 92-367. A brief assessment of the dam's condition.is gi-fn in the front of the report.

"Based on visual inspection, available records, calculations and past'operational performance, Campbells Pond Dam, initially listed as a high.hazard potential structure, but reduced to a significant hazard potentialstructure as a result of this inspection, is judged to be in poor overallcondition. The dam's spillway is considered inadequate because a flowequivalent to 85 percent of the Spillway Design Flood - SDF - would cause thedam -to be overtopped. (The SDF, in this instance, is one half of theProbable Maximum Flood). To ensure adequacy of the structure, the followingactions, as a minimum, are recommended:

&. The spillway's adequacy should be determined by a qualifiedprolessional consultant engaged by the owner using more sophisticatedmetwods, procedures, and studies within six months from the date of approvalof this report. Within three months of the consultant's findings, remedialueasures to ensure spillway adequacy should be initiated.

'. Within six months from date of approval of this report, the followingenineering studies and analyses should be initiated:

(1) If it exists, the outlet works should be investigated andrestored to a functional condition. If no outlet works exists, an adequatelow level lake drain should be designed and installed.

(2) The masonry portion of the dam should be thoroughly inspected bya professional consultant engaged by the owner. The dam should be inspectedwith the lake drawn down and with the lake filled. Based on the inspections,

9.

Page 7: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

?IAP N-NHonorable Brendan T. Byrne

together with any necessary subsoil, seepage and structural investigations,remedial measures to correct the leakage and other possible causes ofdistress should be determined then implemented.

c. Within six months from the date of approval of this report, thefollowing remedial action should be completed:

(1) All trees and bushes on the embankment should be removed.

(2) Debris in the downstream channel should be removed.

d. The owner should develop written operating procedures and a periodicmaintenance plan to ensure the safety of the dam within one year from thedate of approval of this report.

e. The owner should develop an emergency action plan outlining actionsto be taken by the operator to minimize the downstream effects of anemergency and establish a flood warning system for the downstream communitieswithin six months from the date of approval of this report.

A copy of the report is being furnished to Mr. Dirk C. Hofman, New JerseyDepartment of Environmental Protection, the designated State Office contactfor this program. Within five days of the date of this letter, a copy willalso be sent to Congressman Minish of the Eleventh District. Under theprovision of the Freedom of Information Act, the inspection report will besubject to release by this office, upon request, five days after the date ofthis letter.

Additional copies of this report may be obtained from the National TechnicalInformation Services (NTIS), Springfield, Virginia 22161 at a reasonablecost. Please allow four to six weeks from the date of this letter for NTISto have copies of the report available.

2 Accesion Por

N TIG GRA&IDDC TABUnamouncedJustification

tvr i ,-1h 1 CS

K__a_ ad/o"Dist opeclal

Page 8: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

NAPEN-NHodorable Brendan T. Byrne

An important aspect of the Dam Safety Program will be the implementation ofthe recommendations made as a result of the inspection. We accordinglyrequest that we be advised of proposed actions taken by the State toimplement our recommendations.

Sincerely,

1 Inci AMES G. TONAs stated Colonel, Corps of Engineers

/ District Engineer

Copies furnished:Mr. Dirk C. Hofman, P.E., Deputy DirectorDivision of Water ResourcesN.J. Dept. of Environmental ProtectionP.O. Box CN029Trenton, NJ 08625

Mr. John O'Dowd, Acting ChiefBureau of Flood Plain ManagementDivision of Water ResourcesN.J. Dept. of Environmental ProtectionP.O. Box CN029Trenton, NJ 08625

( 4

Page 9: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

CAMPBELLS POND DAM (NJO0517)

CORPS OF ENGINEERS ASSESSMENT OF GENERAL CONDITIONS

This dam was inspected on 15 November and 23 November 1979 by StorchIngineers under contract to the State of New Jersey. The State, underagreement with the U.S. Army Engineer District, Philadelphia, had thisinspection performed in accordance with the National Dam Inspection Act,Tublie Law 92-367.

Campbells Pond Dam, initially listed as a high hazard potential structure,but reduced to a significant hazard potential structure as a result of thistippeetion, is judged to be in poor overall condition. The dam's spillway isconsidered inadequate because a flow equivalent to 85 percent of the SpillwayDesign Flood - SDF - would cause the dam to be overtopped. (The SDF, in thisinstonce, is one half of the Probable Maximum Flood). To ensure adequacy ofthe structure, the following actions, as a minimum, are recommended:

a. The spillway's adequacy should be determined by a qualifiedprofessional consultant engaged by the owner using more sophisticated0thods, procedures, and studies within six months from the date of approvalof this report. Within three months of the consultant's findings, remedialmavures to %nsure spillway adequacy should be initiated.

b. Within six months from date of approval of this report, the followingengineering studies and analyses should be initiated:

(1) If it exists, the outlet works should be investigated andTestored to a functional condition. If no outlet works exists, an adequatelow level lake drain should be designed and installed.

(2) The masonry portion of the dam should be thoroughly inspected bya professional consultant engaged by the owner. The dam should be inspectedwith the lake drawn down and with the lake filled. Based on the inspections,together with any necessary subsoil, seepage and structural investigations,remedial measures to correct the leakage and other possible causes ofdistrets shottid be determined then implemented.

ce Witbhn six months from the date of approval of this report, thefollowing remedial action should be completed:

(1) Al trees and bushes on the embankment should be removed.

(2) Debris in the downstream channel should be removed.

d. The owner should develop written operating procedures and a periodicmaintenance plan to ensure the safety of the dam within one year from thedate of approval of this report.

q,

- r

Page 10: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

e. The owner should develop an emergency action plan outlining actionsto be taken by the operator to minimize the downstream effects of anemergency and establish a flood warning system for the downstream communitieswithin six months from the date of approval of this report.

APPROVED:AMES G. TON

Colonel, Corps of EngineersDistrict Engineer

DATE:

20'

2

Page 11: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHASE I REPORT

NATIONAL DAM SAFETY PROGRAM

Name of Darn: Campbells Pond Dam, NJO0517

State Located: New Jersey

County Located: EssexUrainage Basin: Rahway River

Stream : West Branch Rahway RiverLUates of Inspection: November 15, 1979

November 23, 1979

Assessment of General Condition of Dam

based on visual inspection, past operational performance and Phase I

engineering analyses, Campbells Pond Dam is assessed as being in poor

overall condition.

based on investigations of the downstream flood plain made in connection

with this report, it is recommended that the hazard potential classification

be downgraded from high to significant hazard.

Hydraulic and hydrologic analyses indicate that the spillway is inadequate.

Discharge capacity of the spillway is not sufficient to pass the designated

spillway design flood (SDF) without an overtopping of the dam. (The

SDF for Campbells Pond Dam is equal to one-half the probable maximum

flood.) The spillway is capable of passing approximately 4I2 percent of

the probable maximum flood or 84I percent of the SDF. Therefore, the

owner should engage a professional engineer experienced in the design

and construction of dams In the near future to perform accurate hydraulic

and hydrologic analyses relating to spillway capacity. Based on the

findings of the analyses, the need for and type of remedial measures

should be determined and then implemented.

Page 12: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

Extensive leakage and other indications of possible distress in the dam

were observed. Therefore, the masonry portion of the dam should be

thoroughly inspected in the near future by a professional engineer

experienced in the design and construction of dams. The dam shouldUe inspected with the lake drawn down and also with the lake tilled.

Based on the inspections, together with any necessary subsoil,* seepage

and structural investigations, remedial measures to correct the leakage

and other possible causes of distress should be determined and then

implemented.

In addition, it is recommended that the following remedial measures be

undertaken by the owner in the near future:

1) If it exists, the outlet works should be investigated andrestored to a functional condition. If no outlet works exists,

an adequate low level lake drain should be designed andinstalled.

2) All adverse vegetation on the embankments should beremoved.

3) Debris in the downstream channel should be removed.

The owner of the dam should initiate, in the near future, a program ofperiodic inspection and maintenance, the complete records of which to

be kept on file and made available to the public. A visual inspection of

the dam and appurtenances by a professional engineer experienced in

the design and construction of dams should be made annually andreported on a standardized check-list form. Repairs should be made as

required and the following maintenance should be performed annually:

remove trees and brush from the embankments, fill and sod any eroded

surfaces of the embankments and clear the downstream channel. After

the outlet works have been made operative or Installed, at least once

Page 13: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

Extensive leakage and other indications of possible distress in the damwere observed. Therefore, the masonry portion of the dam should be

thoroughly inspected in the near future by a professional engineerexperienced in the design and construction of dams. The dam should

be inspected with the lake drawn down and also with the lake filled.Based on the inspections, together with any necessary subsoil, seepage

and structural investigations, remedial measures to correct the leakage

and other possible causes of distress should be determined and then

implemented.

In addition, it is recommended that the following remedial measures be

undertaken by the owner in the near future:

1) If it exists, the outlet works should be investigated and

restored to a functional condition. If no outlet works exists,

an adequate low level lake drain should be designed and

installed.

2) All adverse vegetation on the embankments should be removed.

3) Debris in the downstream channel should be removed.

In the near future, the owner of the dam should develop written operatingprocedures and a periodic maintenance plan to insure the safety of the

dam.

Richard' J. McDermott, P.E.

/Joh E.Gribbin, P.E.

Page 14: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

-

II

Page 15: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

TABLE OF CONTENTS

Page

ASSESSMENT OF GENERAL CONDITION OF DAM i

UVERVIEW PHOTO

TABLE OF CONTENTS iv

PREFACE vi

SELTIUN 1 - PROJECT INFORMATION

1.1 General

1.2 Description of Project

1.3 Pertinent Data

SECTION 2 - ENGINEERING DATA 8

2.1 Design

2.2 Construction

2.3 Operation

2.4 Evaluation

SECTION 3 - VISUAL INSPECTION 10

3.1 Findings

SECTIUN 4 - OPERATIONAL PROCEDURES 14

4.1 Procedures

4.2 Maintenance of Dam

4.3 Maintenance of Operating Facilities

4.4 Description of Warning System

4.5 Evaluation

IV

Page 16: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

TABLE OF CONTENTS (cont.)

Page

SECTION 5 - HYDRAULIC/ HYDROLOGIC 165.1 Evaluation of Features

SECTION 6 -STRUCTURAL STABILITY 186.1 Evaluation of Structural Stability

SECTION 7 - ASSESSMENT AND RECOMMENDATIONS 207.1 Dam Assessment

7.2 Recommendations

PLATES

I KEY MAP

2 VICINITY MAP

3 SOIL MAP

4i GENERAL PLAN

5 SECTIONS

6 PHOTO LOCATION PLAN

APPENDICES

1 Check List - Visual InspectionCheck List - Engineering Data

2- Photographs

3 Engineering Data4 Hydraulic/ Hydrologic Computations

5 Bibliography

Page 17: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PREFACE

This report is prepared under guidance contained in the Recommended

tuidelines for Safety Inspection of Dams, for Phase I Investigations.

Copies of these gjuidelines may be obtained from the Office of Chief of

Lngineers, Washington. D.C. 30214. The purpose of a Phase I Investi-

gation is to identify expeditiously those dams which may pose hazards

to human life or property. The assessment of the general condition of

the clam is based upon available data and visual inspections. Detailed

investigation, and analyses involving topographic mapping, subsurface

investigations, testing, and detailed computational evaluations are beyond

the scope of a Phase I investigation; however, the investigation is

intendled to identify any need for such studies.

In reviewing this report, it should be- realized that the reported condition

of the dam is based on observations of field conditions at the time of

inspection along with data available to the inspection team. It is important

to note that the condition of dam depends on numerous and constantly

changing internal and external conditions, and is evolutionary in nature.

It would be incorrect to assume that the present condition of the dam

will continue to represent the condition of the dam at some point in the

future. Only through continued care and inspection can there be any

chance that the unsafe conditions be detected.

Phase I inspections are not intended to provide detailed hydrologic and

hydraulic analyses. In accordance with the established Guidelines, the

Spillway Test flood is based on the estimated "Probable Maximum Flood"

for the region (greatest reasonably possible storm runoff), or fractions

thereof. The test flood provides a measure of relative spillway capacity

ana serves as an aid In determining the need for more detailed hydrologicand hydraulic studies, considering the size of the dam, Its general

condition and the downstream damage potential.

AV

Page 18: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHASE I INSPECTION REPORT

NATIONAL DAM SAFETY PROGRAM

CAMPBELLS POND DAM, I.D. NJ00517

SECTION 1: PROJECT INFORMATION

I General

a. Authority

Public Law 92-367, August 8, 1972 authorized the Secretary

of the Army, through the Corps of Engineers, to initiate a

National Program of Dam Inspection throughout the United

States. The Division of Water Resources of the New Jersey

Department of Environmental Protection (NJ DEP) in cooperation

with the Philadelphia District of the Corps of Engineers has

been assigned the responsibility of supervising the inspection

of dams within the State of New Jersey. Storch Engineers

has been retained by the NJDEP to inspect and report on a

selected group of these dams. The NJDEP is under agreement

with the Philadelphia District of the Corps of Engineers.

b. Purpose of Inspection

The visual inspections of Campbells Pond Dam were made on

November 15 and November 23, 1979. The purpose of the

inspections was to make a general assessment of the structural

Integrity and operational adequacy of the dam structure and

its appurtenances.

Page 19: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

1 .2 Description of Project

a. Description of Dam and Appurtenances

Campbells Pond Dam consists of a stone masonry free overflowspillway with earth embankments abutting each end. Reportedly,the dam does not include a low level outlet works. Threecast iron pipes penetrating the spillway are reportedly associatedwith water supply to the City of Orange. Two of these areabandoned while one may be currently in use.

A timber and steel bridge spans the entire length of thespillway and is supported by masonry abutments and piers.

At the junction between spillway and earth embankments,masonry training walls extend upstream and downstream fromthe spillway. Upstream from the spillway the training wallsare located along a portion of the upstream faces of theembankments.

The spillway which is oriented approximately east/west has anoverall length of 140 feet and a crest length of 124 feet. Theoverall length of the dam, Including spillway and embankmentsis 300 feet. The hydraulic height of the dam Is 18.5 feetwhile the structural height is estimated to be 22 feet.

b. Location

Campbells Pond Dam is located in the South Mountain ReservationIn the Township of Milburn, Essex County, New Jersey.Constructed across the West Branch of the Rahway River, thedam Impounds Campbells Pond. Principal access to the dam Isby Brookside Drive which Is a paved road located along thelake and downstream channel.

27 7777: -

Page 20: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

C. Size and Hazard Classification

Size and Hazard Classification criteria presented in "Recommended

Guidelines for Safety Inspection of Dams," published by the

U.S. Army Corps of Engineers are as follows:

SIZE CLASSIFICATION

Impoundment

Storage (Ac-ft) Height (Ft.)

Small < 1000 and 50 < 40 and 2!25

Intermediate 1000 and < 50,000 40 and < 100

Large 50o,000 2 100

HAZARD POTENTIAL CLASSIFICATION

Category Loss of Life Economic Loss;

(Extent of Development) (Extent of Development)

Low None expected (no per- Minimal (Undeveloped to

manent structures for to occasional structures

human habitation or agriculture)

Significant Few (No urban develop- Appreciable (Notable

ments and no more than agriculture, industry

a small number of or structures)

inhabitable structures

High More than a small Excessive (Extensive

number community. Industry or

agriculture)

(7

Page 21: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

The following data relating to size and downstream hazard for

Campbells Pond Dam have been obtained for this Phase Iassessment:

Storage: 62 acre-feet

Height: 18.5 feet

Potential Loss of Life:

Heavily used road (Brookside Drive) is locatedalong the bank of the downstream channel for a

distance of approximately 2500 feet. Failure of dam

could possibly cause loss'of life.

Potential Economic Loss:

A road bridge and an urban area of Millburn is

located about 2700 feet downstream from the dam.

A masonry dam impounding Diamond Mill Pond islocated about 1700 feet downstream from the dam.

Therefore, Campbells Pond Dam is classified as "Small" size

and "Significant" hazard potential.

d. Ownership

Campbells Pond Dam Is owned and maintained by the City ofOrange, 29 North Day Street, Orange, N.J. 07050

e. Purpose of Dam

The purpose of the dam Is the Impoundment of a recharge

basin for nearby wells used for water supply for the City of

( Orange.

Page 22: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

f. Design and Construction History

Campbells Pond Dam reportedly was originally constructedabout 1899 in conjunction with a pump house located on theeast bank of Campbells Pond. The purpose of the dam, at

that time, was the impoundment of a reservoir for directwater supply to the City of Orange. Use of the pump housefor water supply has since been discontinued.

g. Normal Operational Procedures

The dam and appurtenances are maintained by the OrangeCity Water Department. There is no fixed schedule of main-tenance; repairs are made as the need arises.

Due to the lack of an outlet works, the lake is not lowered asa normal operational procedure. However, the lake reportedlynormally becomes dry during the summer months at which time

silt is removed from its bed.

1.3 Pertinent Data

a. Drainage Area 6.4 square miles

b. Discharge at Damsite

Maximum flood at damslte UnknownOutlet works at normal pool elevation No known outletSpillway capacity at top of dam

(Elev. 218.5S) 3748 c.f.s.

( S

Page 23: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

c. Elevation (Feet above MSL)

Top of Dam Varies: 218.5 to 222.0

Maximum pool-design surcharge 219.1

Normal pool 214.0

Spillway crest 214.0

Stream bed at centerline of dam 200.0

Maximum tailwater 206.0

d. Reservoir

Length of maximum pool 1,300 feet

Length of normal pool 1,100 feet

e. Storage (Acre-feet)

Spillway Crest 21 acre-feet

Design Surcharge 70 acre-feet

Top of dam (Elev. 218.5) 62 acre-feet

f. Reservoir Surface (Acres)

Spillway Crest 4.6 acres

Top of dam (Elev. 218.5) 15 acres

Maximum Pool -design surcharge 16 acres

9. Dam

Type Masonry/ Earthfill

Length 300 feet

Height 18.5 feet

( 6

Page 24: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

{Side Slopes

Embankments - Upstream 2 horiz. to 1 vert.

- Downstream 3 horiz. to 1 vert.

Masonry - Upstream 1 horiz. to 3 vert.

- Downstream 1 horiz. to 12 vert.

Zoning Unknown

Impervious core Unknown

Cutoff Unknown

Grout curtain Unknown

h. Diversion and Regulating Tunnel N.A.

i. Spillway

Type Uncontrolled masonry weir

Length of weir 124 feet

Crest elevation 21q.0Gates N.A.

Upstream channel N.A.

Downstream channel Natural stream

j. Regulating outlets

None known.

(7

Page 25: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 2: ENGINEERING DATA

2.1 Design

No calculations, reports nor plans pertaining to the design of thedam are available.

2.2 Construction

No data nor reports pertaining to the construction of the dam are

available.

2.3 Operation

No records of operation and maintenance of the darn subsequent to

construction are available. Records of lake level monitoring are

available. Reports of inspections made by the State of New Jerseyin 1928 and 1929 are contained in the files of the NJDEP. According

to the reports, several leaks were present in the masonry portion

of the dam. The leaks were assessed as being of a nature that

did not threaten the structural integrity of the dam. Suggestions

for remedial measures were withheld pending further investigations.

2.'4 Evaluation

a. Availability

Available engineering information is limited to that which is on

file at the City Engineer's office, City of Orange and at the

NJDEP. The City of Orange file contains copies of lake levelgaging records and maps showing the layout of the pump

house and water main distribution. The NJDEP file contains

correspondence and inspection reports.

Page 26: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

b. Adequacy

Available engineering data pertaining to Campbells Pond Dam

is not adequate to be of significant assistance to the performance

of a Phase I evaluation. A list of absent information isincluded in paragraph 7.1.b.

C. Validity

The validity of engineering data cannot be assessed due to

the absence of data.

( 9

Page 27: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 3: VISUAL INSPECTION

3,.1 Findings

a. General

The inspections of Campbells Pond Dam took place on

November 15 and 23, 1979 by members of the staff of Storch

Engineers. A copy of the visual inspection check list is

contained in Appendix 1. The following procedures were

employed for the inspection:

1) The embankments of the dam, appurtenant structures

and adjacent areas were examined.

2) Areas of suspected seepage were noted and located.

3) The embankment and appurtenant structures were

measured and key elevations determined with the

use of a surveyor's level.

4I) The embankment, appurtenant structures and adjacent

areas were photographed.

b. Spillway

The grouted masonry overflow portion of the dam comprises

the spillway. The downstream face of the spillway is generally

aligned straight with some displacement of stones at the toe

near its center. Also, some stones at the toe have been

dislodged. Extensive patching and pointing of the stones on

the downstream face is evident. The spillway apron which

appeared to be composed of stone masonry overlaid with

concrete, was observed to be in deteriorated condition. A

timber strip which Is located on the downstream face at the

crest has a small section broken away near the center.

( 10

Page 28: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

Extensive leakage was noted discharging from the downstream

face. The leaks were numerous and extended across the

entire length of the spillway. The leaks, which were dischargingas jet flow under pressure, varied in diameter from approximately

1/4 inch to 2 inches. The estimated total quantity, with lake

level at the spillway crest, is 150 gallons/minute. At the time

of the first inspection, November 15, 1979, the lake level was

at the spillway crest but was approximately 2 feet below the

spillway crest at the time of the second inspection, November

23, 1979. It is assumed that most of the water lost from the

lake during the time between inspections discharged through

the dam as leakage. At the time of the second inspection,

when the lake level was approximately 2 feet below the spillway

crest, the leakage was observed to be considerably less in

quantity than the leakage observed when the lake level was at

the spillway crest.

Orange deposits were noted among the rocks approximately 15

feet downstream from the dam. It was not determined whether

these were due to leakage through the dam or seepage under

the darn.

The stone masonry training walls at either end of the spillway

appeared to be structurally stable and in generally satisfactory

condition with patching and pointing of the stones noted.

C. Embankments

Both emnbankments are generally grass covered with a pavedroadway located along the crest. Also, brush and tree growth

was observed on both embankments.

Page 29: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

The upstream face of the east embankment consists of a

continuation of the east training wall of the spillway. The

upstream face of the west embankment consists, in part, of a

continuation of the west training wall.

Both embankments appeared to be outwardly structurally

stable with no evidence of distress observed. Also, no

significant erosion nor seepage was observed.

ci. Bridge

The timber roadway, steel beams and chain link fence appeared

to be in satisfactory condition. The stone masonry piers

upon which the bridge rests appeared to be structurally

sound with extensive patching and pointing noted.

e. Reservoir Area

Campbells Pond is bordered by woods along its east bank and

by a paved road along its west bank. A brick pump house is

located on the east bank of the lake approximately 300 feet

from the dam.

f. Downstream Channel .

The spillway discharges directly into the West Branch of the

Rahway River which is a well defined stream with a bottom of

cobbles and boulders. Approximately 1700 feet from the dam

the stream widens into Diamond Mill Pond which has a surface

area of approximately 3 acres and is impounded by a masonry

and earth dam approximately 12 feet high.

12

Page 30: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

A paved road (Brookside Drive) is located along the channel

and varies in height above the stream bed from 4 feet to 8

feet. Approximately 2700 feet from the dam, the channel

passes under Glen Avenue and into an urban area of Millburn.

Buildings near the channel lie approximately 7 feet to 8 feet

above the stream bed.

Extensive debris including large pieces of broken concrete

was observed in the downstream channel in the immediate

vicinity of the dam. Also, a few apparent well casings were

observed in and adjacent to the channel immediately downstream

from the dam. A small abandoned well pump house was noted

adjacent to the channel in the vicinity of the dam.

13

Page 31: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 4: OPERATIONAL PROCEDURES

4.1 Procedures

The level of water in Campbells Pond is regulated naturally bydischarge over the masonry spillway portion of the dam. Inaddition, the lake water level apparently drops during dry weatherdue to leakage in the dam. Reportedly, the lake becomes dryduring, the summer season almost every year.

4.2 Maintenance of the Dam

Reportedly, there is no program of regular maintenance of the dam

and appurtenant structures. Maintenance is performed on an "as

needed" basis by the City of Orange Water Department which also

conducts an annual inspection of the bridge.

Recent maintenance reportedly includes a cleaning of the downstream

area of the dam and a patching, by concrete, of the downstream

face of the spillway about 3 years ago. In addition, the lake bed

reportedly is dredged each summer that it becomes dry.

4.3 Maintenance of Operating Facilities

The recording lake level gage located in the abandoned pump

house is maintained in operating condition on an "as needed"

basis.

14.41 Description of Warning System

Reportedly, no formal warning system Is In use at the presenttime. However, surveillance is maintained by the City of OrangeWater Department on a daily basis.

( I14

----------------------------------------.-. -7-

Page 32: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

4.5 Evaluation of Operational Adequacy

The apparent absence of a functioning outlet works contributes to

a poor operational adequacy of the dam.

Maintenance documentation is poor and the maintenance program for

the dam appears to be insufficient in the following areas:

1. Trees and brush on embankments.

2. Section of timber strip at crest of spillway broken away.

3. Extensive leaking of masonry portion of dam (spillway).

ij. Extensive debris in immediate downstream area of dam.

5. Stones dislodged and displaced from downstream face of

spillway.

Page 33: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 5: HYDRAULIC/HYDROLOGIC

5.1 Evaluation of Features

a. Design Data

The quantity of storm water runoff that the spillway should

be able to pass without an overtopping of the dam is based

on the size and hazard classification of the dam. This runoff,

called the Spillway Design Flood (SDF), is described in terms

of frequency or probable maximum flood (PMF) depending on

the extent of the dam's size and potential hazard. According

to the "Recommended Guidelines for Safety Inspection of

Dam," published by the U.S. Army Corps of Engineers, the

SDF for Campbells Pond Dam falls in a range of 100-year

frequency to 1/2 PMF. In this case the high end of the

range, 112 PMF, is chosen because of the hazard potential

caused by the road downstream from the dam.

The SDF hydrograph for Campbells Pond was computed by

use of the HEC-1-DB computer program using Clark's Method

employing parameters supplied by the Corps of Engineers.

Hydrologic computations and computer output are contained in

Appendix 4. The calculated SDF peak inflow for Campbells

Pond Dam is 4529 c.f.s.

Discharge capacity for the spillway was computed by considering

free discharge over the masonry portion of the dam. Hydraulic

computations are contained in Appendix 4.

The elevation of the crest of dam varies from 218.5 to 222.0

For purposes of computer input, the top of dam was taken as

222.0. However, for overtopping analysis, the top of dam

was assumed to be 218.5.

16

Page 34: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

A routing of the SDF through Campbells Pond resulted in anovertopping of the dam by a depth of 0.6 feet. The overtoppingwould occur at the west end of the dam which has the lowestelevation (218.5) of any point on the dam. Accordingly, thesubject spillway is assessed as being inadequate in accordancewith criteria developed by the U.S. Army Corps of Engineers.

b. Experience Data

Reportedly, the dam has not been overtopped due to highlake water level. However, the roadway downstream from the

dam reportedly is occasionally inundated during periods ofheavy precipitation.

C. Visual Observations

No evidence was found at the time of inspection that wouldindicate that the dam had been overtopped.

d. Overtopping Potential

As indicated in paragraph 5.1.a., a storm of magnitudeequivalent to the SDF would cause overtopping of the dam bya height of 0.6 feet above the top of the dam. The spillwayis capable of passing approximately 42% of the PMF or 84% ofthe SDIF with lake level equal to the top of the dam (elev.218.5).

( 17

Page 35: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 6: STRUCTURAL STABILITY

6.1 Evaluation of Structural Stability

a. Visual Observations

The embankments appeared, at the time of inspection to be

outwardly stable. However, the masonry portion of the dam

appeared marginally stable because of its numerous leaks and

slight displacement at the toe and the presence of possible

seepage containing orange deposits downstream from the toe.

An accurate determination of the severity of the observed

indications of possible distress cannot be made without furtherinvestigation beyond the scope of a Phase I inspection.

b. Generalized Soils Description

The generalized soil description of the dam site consists of

alluvial soil composed of stratified materials deposited by

streams overlying glacial terminal moraine. The moraine

consists of silt, sandy silt and silty sand with varying amounts

of gravel and small amounts of clay deposited at the outer

edge of the ice sheet during the Wisconsin stage of continental

glaciation. The glacial terminal moraine overlies "Newark"

basalt bedrock.

C. Design and Construction Data

Analysis of structural stability and construction data for the

embankment and spillway structure are not available.

(i

Page 36: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

d. Operating Records

No operating records are available for the dam. Reports ofinspections made by the State of New Jersey in 1928 and 1929

are contained in the files of the NJDEP. According to thereports, several leaks were present in the masonry portion of

the dam. The leaks were assessed as being of a nature that

did not threaten the structural integrity of the dam. Suggestionsfor remedial measures were withheld pending further investigations.

e. Post Construction Changes

No records of any post construction changes are available.

f. Seismic Stability

Campbells Pond Dam is located in Seismic Zone 1 as defined in"Recommended Guideline for Safety Inspection of Dams,"

which is a zone of very low seismic activity. Experienceindicates that dams in Seismic Zone 1 will have adequate

stability under seismic loading conditions if stable understatic loading conditions. Campbells Pond Dam appeared at

the time of inspection to be outwardly stable.

( 19

Page 37: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SECTION 7: ASSESSMENT AND RECOMMENDATIONS

7.1 Dam Assessment

a. Safety

Based on hydraulic and hydrologic analyses outlined in

Section 5 and Appendix 4, the spillway of Campbells Pond

Dam is assessed as being inadequate.

The masonry portion of the dam exhibits. extensive leakage

and other indications of possible distress. The condition of

the dam indicates that it could become unstable if corrective

measures are not implemented.

b. Adequacy of Information

information sources for this study include: 1) field inspections,

2) USGS quadrangle, 3) aerial topography, 4) aerial photography

5) inspection reports in NJDEP file and 6) consultation with

representatives of the City of Orange. The information

outlined is sufficient to allow a Phase I assessment as outlined

in "Recommended Guidelines for Safety Inspection of Dams."

Some of the absent data are as follows:

1. Soils Report

2. Plans of the dam3. Structural Design Report

4. Hydraulic Design Report

20

Page 38: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

C. Necessity for Additional Data/Evaluation

Additional data and evaluation is considered necessary in

order to assess the structural integrity of the dam.

7.2 Recommendations

a. Remedial Measures

Based on hydraulic and hydrologic analyses outlined in

paragraph 5.1.a., the spillway is assessed as being inadequate.

It is therefore recommended that a professional engineer

experienced in the design and construction of dams be engaged

in the near future to perform more accurate hydraulic and

hydrologic analyses relating to spillway capacity. Based on

the findings of these analyses, the need for and type of

mitigating measures should be determined and then implemented.

In addition, it is recommended that the following remedial

measures be undertaken by the owner in the near future.

1) If it exists, the outlet works should be investigated and

restored to a functional condition. If no outlet works

exists, an adequate low level lake drain should be designed

and installed.

2) The masonry portion of the dam' should be thoroughly

Inspected by a professional engineer experienced in the

design and construction of dams. The dam should be

Inspected with the lake drawn down and with the lake

filled. Based on the Inspections, together with any

necessary subsoil, seepage and structural Investigations,

remedial measures to correct the leakage and other

possible causes of distress should be determined and

( then implemented.21

Page 39: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

3) All adverse vegetation on the embankments should be

removed.

4) Debris in the downstream channel should be removed.

b. Maintenance

In the near future, the owner of the dam should develop

written operating procedures and a periodic maintenance plan

to insure the safety of the dam.

( 22

Page 40: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

9

(

PLATES

(S

Page 41: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

EPLATE I

PLORAM ARK NE JEREY EY AE

DINOFWTRRSUSCAMPBELL POND DAM MRE

TRENTON, NEWoEE

Page 42: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

/ I *27J

**~:.~~ , *- * * .*.

W 7 ~ ' ~ "'TT'r

h ~

- I T-1

,, "A1

// ',

/ /()~ ,~\V ~ // ,/ ' I/I ~'**/du

~ ~~' \ *~ '0 AW"'TRe~m -

ShornoniMtU f' R

'fL~&- A ~/z Bm Golf K

~I~MPELL PND DA7

__ ~ ~ L~ '~ ~~( SM

7 '00,Guth Muntais-- 2

74%

V __&___I -hd~ -, )X qW 54'

SCALE IN MILES PLATE 2

STORCN ENGINEERS INSPECTION AND EVALUATION OF DAMSFLORHAM PARK, NEW JIERSEY VICINITY MAP

DIVISION OF WATER RESOURCESCAPELONDMN.J.DEPT.OF ENVIR. PROTECTION I 0. N .J.00517 SCALE: AS SHOWN

TRENTON, NEW JERSEY DT:NV,17

Page 43: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

AU

Ia .. C

GN GA 46000

a AAR*%~~~

Z- 10i15.

/CM L PON AM

-CM Z-. XJ

Legend

AR Recent alluvium composed of stratified materials deposited bystreams.

GMM-24 Glacial Terminal moraine. Silt, sandy silt and silty sand withvarying amounts of gravel and small amounts of clay depositedat the outer edge of the ice sheet during the Wisconsin stageof continental glaciation.

lb Triassic igneous rocks identified as "Newark" basalt andcommnonly called trap rock.

NOTE: Information taken from Rutgers University Soil Survey ofNew Jersey, Report No. 2, Essex County, and Geologic Mapof New Jersey prepared by Lewis and Kuimmel. - P-T

STORCH ENGINEERS INSPECTION AND EVALUATION OF DAMSFLORH4AM PARK, NEW JERSEY SOIL MAP

DIVSION OF WATER RESOURCES CAMPBELL POND DAMNAL.DEPT.OF ENVIR.PROTECTION -I.D. NJ00517 SCALE. NONE

TRENTON, NEW JERSEYfDAENV 197

Page 44: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

/ 4 A'5~f ' ,'6,4/

Zm AC7-7 k-77t- I -

Page 45: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

/ 5

IW

2 624/Z 270A

n /

0/ 4

FLRA AKNJRE I TRNTN NEERE

I.0 D. N.J 00,7=CL:NTT CL

/AE " 199/

SPLATE 4

STORCH ENGINEERS |N.J. DEPT. OF ENVIR. PROTECTIONFLORHAM PARK, NEW JERSEYi TRENTON, NEW JERSEY

INSPECTION AND EVALUATION OF DAMS

GENERAL PLANCAMPBELLS POND DAM

I.0I..001 CL NTT CL) ~ ~ ~ ~ ~ ~ ~ _____________. ,;-.. _ DATE:........ EC. , 1979 .......

Page 46: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

C5 7e0f- 7,,~~r

DAM SECTION

Page 47: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

SPILLWAY SECTION

PLATE 5

STOICHENGNEES DVSONyo OF WATER RESOURICESSTOAH ENINEE 9 t. DEPT. OF ENVIR. PROTECTION

FLORHGAM PARK, NEW JERME TRENTON, NEW JERSE"

INSPECTION AND EVALUATION OF DAMS

SECTI ONSCAMPBELLS POND DAM

I1.0 N.J.0051? S9CALE: NOT TO SCALEt ~I DATE. DEC. ,19?9

Page 48: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

4 \102A~?

Page 49: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

/

0 /

* 1)9 /

PLATE 6STORC ENGIEERS DIVISION OF WATER RESOURCES

)TRHENIER N.J. DEPT. OF EW~R. PROTECTIONFLORHAM PARK, NEW JERSEY TRENTON, NEW JERSEY

{ INSPECTION AND EVALUATION OF DAMS

V PHOTO LOCATION PLANCAMPBELLS POND DAM

I.-0 - D. N.J 00 1 SCL NO OC L

DAT - DE .17

Page 50: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

APPENDIX I

Check List - Visual InspectionCheck List - Engineering Data

Page 51: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

00

-~4-z0

0

4-) 004

00

to 0

44.

CXC

0

a) a

-, (D 4)

'UC

CLI

4-) 9-

0 41 4-.

4.) -0CL CLo

In1 T) C - ~~JU,* 6LJ

4#-IA4 0 £

ac C L.

Page 52: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

0

ix E

0 EU> - 0)

r Q. La

#A 2 0 "o .

4-c 4.-n L

S.0- 1- 0&c =EU 4) 0

w ..0CL LW

0) L.do

En 4) 4Ja)

evI- to L

(A4. WE OL43 L00 WO0

UO - 4J c 04= p1 0 0.3

Ux Lc - UQ ArLi) 43-) 43 N oC t

ce wUL. a) EO

>L En L L 4- >4- - 3to 1

to L 3 4) LWLX 0 0.) 4-) 0 w be06 4-) r_ 0O4OUJ ~ 0W 4=0 0L. in

L3 -U 4n - uA 43-

o w ~EW c , A - 0L.~ 3 4- 4J UEUWWCL' M -3- 0 LL*E> uE L(A0 004- 4J 4

C3W306) a 3 0)L0. 4) 4- > 0w4

0.4IA 43 4 3 S L c LU.

3 )4A4 41. tua int-

GA4) U. .0 3:t 3L2 4J -. 4)E =0600 -

I'D in 2m4 WE 40-0-

* ~ EE~n n EUU4-'4)4LL.0 n04

Q 40 o4 4

>, L 03 4)'-U Wi

Lin4) *.-L43Cc

LI-J

I-i

Page 53: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

0

o 0-

LU 0

S-' 4-40 M

a))

0J 41

(U

OLL

UL - =

4- CO

U' LO. 0 -l

d) 3- CL(L 0

Q o44t 3: 4 0

.0r C &- to+Cto 4-

L) 0a-. U % r t oE

;I- OW) 0e

0 -0t 5 J4

a)t.c 0 00 to44o 4--0CA. r -4) 0x d)0 4) nE0 04)I

4> 0 0 03w 0.smU a- (Ut--

Ea. (A -) n - toLOcW ( 010 L .00

3.u c w Jc o 4

Li LU a 5-1 %- CLgo4- C-L 00L154- 4So a. 0 140 a0 = CL(U t

i0 w to CL o(A"

301 P1r-0

-a- P4- 01h 0100341 CL7 m--'4'

4)4. U0143 . 0EW 0

WEA 7.i #A~> -

Page 54: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

14J09

0)r

LaJ 0

oo u30 t

4--

Id. 0

Su- LA

0o4-

30

4-)u

'4-

W4.)

3

I- @m

= 4J 5-CD0 .0

coo

L&i >. 0o0c

LLn 06 (A

CO to

u0

393

.0 00. 0 @ @

4J 0 0n1

too 0. 0 00a- u ;m0

00. 0. C30

LLii

0. a0Iii 1U.

LLJ =7

Page 55: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

0

2mCI

L.

E0

3

gn

4A 4- €

%- d)to u.

Li. 00

..-

0 0

• . 4.-

I - 4,

Li..' 3 4. -").

to to

CA EU U

1.. $ ., .

S-e. A L

to ca, uf - 0

000

o a CoL LLL. =L

LAD x A

cc- a- C- cc

CDJ LAJO ul -

-~ e-,&JL

9 CI--I

1-) V) LiaJ

Page 56: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

Cl

~4J

L)J

C)

UU-o I

LiJ

ClE

w -c

o oCL

o

LL-J

-J-U, ~ - I I- (A

2 0A ZA L0cc

Page 57: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

2-

LL)

L.)

LUJ

00

CL

.0- &- 0L

4- C U (0. c. >) 0

:9CLI 0 S.-E

u0W

C) ) 4- 43> 0>U- 4- -l-

.4c S- 4-)0W01

a:0 tO 4J 4-1.0 r=0%-t

co 4.3 03U 0

41 0 a W

3E

4-' to cc S- 4J

u cn 0) W01~~c to -I )U4-

.- 3D Ch # d

0 +j I- CLS

0.) 5. M. up)COCL-

LA.

- LLJ

aLUL

LLLJ

I-J LIcc C

C- IUCi'-4o

Page 58: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

LAA

Ecm

ui1

. °

co w

01t

.

00

a,

4I

"0

0 90

!-J

CDP cc

LaE

.2 CL

Page 59: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

I-:

cn

L&J l0--•-. 3

4.)

o. .- CO 4

0 € *., 0

cc)

u U

o,. >.. C""O

1 - U--_

acm

0. -f,, U

r_ 0

'44-

,. o > ,. ,

L,,.- 0 00

0 m a 4." ) U

s- u = &L

"4' -"0 . -. 0

"0.

CDP go 0

0 0~ 0_4-LW 0 0

00 -Ike3c CL-- 50

00 4J0

to a 0 -'

>0 4J 4-

(00 0. r_

0 0u~0 44

r_.9 CLO

000

oo CL-a0 ~ 0 4 .0t

00

I-L(cI- U

0.aI. I cc

Page 60: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

C

ClU 0

oc >

LU 0

0

0x0 r

0- 0= to W

$- CL 2 +j

,a 4v 00 c0

4 U~- 02 s

4-b u C-1Lii a - g4.

CC IV-04- (a a t0)4 -4 S- 0 0IM) 4--b 0 ) 4j 4

E4 94 EU0xQ -

r0 o 0 -0)4-' S- 43- 00

oA w o)1 0L 0 4j > Q.C~

LL -o 0) -- LOC3 S.. CL 0 -

0 af 0 )0

0 0cr- 00 X 0

s - - w s- co 0

rV f 0 J 0 C0 0 0 m V 0 1-

go CA4J 4 0.001)- C 4-3

00

9*-0 0 Co00 - -. 00 0 o V(- 4- C 4JC

00 c 0:."" -0- Cc ~ -h -

0-4 CCL.J D'C3

Page 61: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

(A

4-0

CC

.9-.

Eui

41 0

o inLLJ "a

W0 0

~co m

2! LA r

0k Co

La *S

0 C 1 4.3

. 0 0 . 0u -

In~( -o e 3 L~

La .~77-77-77

Page 62: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

.0 ~.0.00

4.3 4.A 4-3 4.3 4J 4o 0 0 0 0 0z zc

LL.0D

>- In V

CA 31 1CAC4A 0 LL) -

uJ 9 V1- Intin~

-iZ0-0 S -

LaiO W c2 -

Lai.

Page 63: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

4-

64-

4-4CD 0

'4-

a,

In

C,

*10

LiiJCC

4-4

0ato

o ~4-

.0S-

-.1 C

C LA-02

EU U)

UE

CLU

EU a,0 EU

4A Cl

Page 64: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

APPENDIX 2

Photographs

Page 65: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHOTO 1MASONRY SPILLWAY AND BRIDGE

PHOTO 2TOP OF DAM -BRIDGE OVER SPILLWAY

CAM4PBELLS POND DAM15 NOVEMBER 1979

Page 66: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHOTO 3UPSTREAM FACE OF SPILLWAY

PHOTO 4DOWNSTREAM FACE OF SPILLWAY

CAMPBELLS POND DAM23 NOVEMBER 1979

Page 67: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHOTO 5 15 NOVEMBER 1979

LEAKS IN DOWNSTREAM FACE OF SPILLWAY

PHOTO 6 23 NOVEMBER 1979

DETERIORATION AT TOE OF DAM - STONES DISLODGED

(CAMPBELLS POND DAM

Page 68: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

Ie

PHOTO 7 15 NOVEMBER 1979

WATER TRANSMISSION PIPES PENETRATING TOE OF DAM

PHOTO 8 23 NOVEMBER 1979

MANHOLE UPSTREAM FROM DAM REPORTEDLY HOUSING WATER MAIN VALVE

(CNIPBELLS POND DAM

Page 69: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PHOTO 9 23 NOVEMBER 1979

ORANGE DEPOSITS IN SUSPECTED SEEPAGE

PHOTO 10 15 NOVEMBER 1979

DOWNSTREAM CHANNEL

CAMPBELLS POND DAM

Page 70: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

APPENDIX 3

Engineering Data

Page 71: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

CHECK LIST

HYDROLOGIC AND HYDRAULIC DATA

ENGINEERING DATA

DRAINAGE AREA CHARACTERISTICS: Urban and Wooded

ELEVATION TOP NORMAL POOL (STORAGE CAPACITY): 214.0 (21 acre-feet)

ELEVATION TOP FLOOD CONTROL POOL (STORAGE CAPACITY): N.A.

ELEVATION MAXIMUM DESIGN POOL: 219.1

ELEVATION TOP DAM: Varies: 218.5 to 222.0

SPILLWAY CREST: Straight Masonry Weir with Piers

a. Elevation 214.0

b. Type Irregular Section

c. Width 4 feet

d. Length 124 feet

e. Location Spillover Center of dam

f. Number and Type of Gates None

OUTLET WORKS: None

a. Type N.A.

b. Location N.A.

c. Entrance inverts N.A.

d. Exit inverts N.A.

e. Emergency draindown facilities: N.A.

HYDROMETEOROLOGICAL GAGES: Lake Water Level Gage

a. Type Recording

b. Location Abandoned Pump House

c. Records Orange City Engineer's File

MAXIMUM NON-DAMAGING DICHARGE:

(Lake stage qual to top of dam) 3748 c.f.s.(Elev. 218.5)

Page 72: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

APPENDIX 4

Hydraulic/ Hydrologic Computations

7 ......._._.-.

Page 73: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS SheL..... of <6

Project (20 It? p/i ei D2am~ -MadfeBy -±4-- Dae //-'2f 7'?

__________________________________Chkdy J6 Date IZ147.

2) schaffeaver- weg- w.'11 he Cc/c-ie~tee4

T#e eporisit/e,,-r Of19 y

usc'e e. 4..-." Ho4i ck a k?4//~hy ernter o. C' ~4

w~ ,~?1Cr /O~ve/ rise. ahov.'4 77-, brdeqe

d'se)a r -1./ c .l-dc-e solOl1

a,.4irqe t-el 0. 76~g'~e Asd)

~;o.577 7'

Page 74: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS ShetL. of 8

Project CO,p/ P0C, b)ie Made By "r Date /2-7

__________________________________Chkd By 16 Date________9

222.0 z 2/ .7 0

Lo&Ou P:'i*

-Flow ove-t- low pai;j-1 cu./ be e-,/Lc A e ed

broad cre te 4 W e- 1 JrPIUIa h

C~ 2L69

sm CSS

-r - ---- *-- -- 10W VV~e ---- ----- -- _____ -t Clei - -

Page 75: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCI- ENGINEERS sho...- 3 of 6.

Project Csstbbells Roi T~ Made By Dat. 60~5

-ChicdBy /4Date -- 8

/Azt,4/ 1-dwTo /A

2/4, 9 00

31 .14z -342

271 -7748

22/ 45,13 C-8707,

z2.TZ 7zlC F14C

Page 76: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS sb..tf of _'g

Gp)6// - Made~ *'-.~

SI14. 02C1rc cr~

Z0 4

~~-0 eB 0tf

2-It 4473?

0 (go*& ~ ~ to o@1,

Page 77: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS SkheL.. f S ...4aPr~j~ CA~~ 'OLS~ T AAAMade By22'O Date 142LI79

CkdBy 1J6 DateZL/f~/7-9

P CE CI PrrA-nt-o (De. 'beIb,'4 OF 5JMA-tL bAAAS US 1, 19-7-1)

PROMUA& AA)iALiAA PPECIPMtAXlDt. 25.1 iAcWEFO~6HIOUR bUA-nom~ 10 So. A~el-Cr Ae-A

12. 109

t(*IL-AiATOIJ bATA

WeITiAt. iAjPiL1TPA-noMj 1. 0 aI~cIEs

COW1AAT lAFLR~7k 0-10 lk(*es /frue>

F(2M LL%% OUA04M&I-eS, IROs&Ue i oAa be, CLCbwu3L

bPAAJAL-- A42e-A 2 A C? uA A AO C MiCE S

AAI. CN/~dJpJ- JQf eSFftM US6S QUAbM0e6CE

1f0rAt cAjtjeL L GA67-rH (,I ~t

)004 LEA613.4.AI Muet ES EL4PVA"O'J

18-0/ LCP)(74 S2 MI(ES ccr~ 360

va 24 Ferr /m' -

Page 78: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS Shf 4 of -6rojci tA44PI36 L POA)b Th\AAA Mad. By)''. Dat. 12) 'lIP

-Chcd y 16 .Dafe /1/73

lAApret2xlOUs coocd 1ii:E 1

(ou L A-no& 1Tple&. F(?OxJ C rly op e- 01 o(Aa 6FA N us &S aC1AtQAP%36LE)

*POP'LJ(AT)OJJ 'ba--y (Z ) 2500 _____k

t0.992 - 0.019 t-06 i0)0 .11-7 b zo SEILP%(?3)

TIME~ 0P COAMJEA)W2ArsJ0J, 3 i

LMMP%6 CLAS PAfAMETe(2s SLp P LlEjIZV' TH-C CO(9PS 0;- EA.)IAj6MS

DA- (o.4 SAA

S'24 fT A41LC

T 8.2 9 C i.o q-o.os c 2.IS)7 (I/2q)O

lot~ -T (

Page 79: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS Ske.7 ofProject CAM P - E-L c DPJ )A MadeBy'-ODafe IZ1121-79

-Chcd By -/d Datezp

c~~A~e 1-te V of,LJ4 (PPOAA uAA1

S-TAbae (FT-r SWPAF~ MAgEA (Ac.)

200 0

21 q 4.:59

21o 35.181

~ter- I - b1Z~ T1l-06VAA L I Uict -64v&-LoP

ZTP- e CAPAOC I-Y PPom :UPC

APC-A C-LC-JArio&.

Page 80: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STORCH ENGINEERS shot 8 of8

ProjectCd/~)Cf 0 %~ Made By J6:Date g/77

______________________________________Chkd By - Dale _____

40

30 I

I1 .

WAM

/0.,PS ,0-0 - / 14r

Page 81: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

HEC-1-DB COMPUTATIONS

Page 82: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

c%. gp;

4.

o1 cJ c

In.

40 CD

2 - LL 4-1-- C3 - ecc % 4

ac 0a30 0 M a 4 %ox = 4= a- a - a: .- 4 0C

w A : 4107I'

- -CL P 1.-.- 0%P o- - i

I. MC C.: 00 0..44

L,J J;7 0

U- -j *4

-a-

4 0 *. z C 4 cm -r : 0 rv -4 a 0

'~ -4cc

tsIu-)- W E r 0% .4r Kf0 fl - 4 "O- 4 .

zzo U... X x

.30 tnLAm~. cuahE .NJO'

"- -~n m ~ 0~ v'. L .4o iff- 'a.

Page 83: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

4* 09

W.4.4

U3 W49 JO

4, if , XrnoCfind#V)0 if.4 -D a P

me , .1440 "',A

a. of if .4

C0 - 0 1- P.

9mw 0- L4 p-in W . :11 -ze c 4 3tl Wil 0 iO cc m W4 .19; . ~ I. P: I... U 0V9tj IL 4K. . 4[r.cc it 4 a : - 2 sza 4 1)

wf IL if ")c 4 0 0 e 4f 0 0 2 fl1.0 So AJ Efl * So_7 1- . . 0~ a~f n 0.

. *.10-c _ 4 a o z cc Co . n~ 0 3--W W . 4 * c *OK LIx "a - 4 0 W I Om~b mW i- UO 0f~

a . or0 of- CL CZ W cd 0 c 44 jo 9:1 a 0 - i 0 .ifI cc 62 ifZ 4 .4 a2

44P9 116 0~ =. fO 4 W 0

WJZ ~ ~ t 134* .. 0 fOW

EnKO .4 1.- 4 0 0 0 S04 '0 .0 cc iu O= 00 .)

42 K 4 4 0 61-.d t SIS0490 4 1 Lie GO*CS, if C aJN 1- .-. or P. 0.. Z~a.i .* 4 *

.9049 Si P 4 - inCm 1- 0.P.l--

in a) 409 do 30:i M * WIJ2

*~~e 4 2.JZ imw~U.

*5~e. it 2 0 c.OI 40 4 r_001lIm14.1 o4 f go0 X

-- t.wo 10- 06.4 0. vinC 0-.* IWL4I 0f 0 0 a, )*h1) -A w. t-4044 44: Km4 £

111C 4 4 0-041, LA 4* 0 -0 &S 4 4~o

4 0"04 %i44P. .2".0-0 d4*AD.IOMNC4..

0-0" 4111

two. to

a 44

Page 84: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

PMF HYDkOGRAPH

HO.DA HR."N PERIOD RAIN EXCS LOSS COMP a

, 1. 00.101 1 .02 o01 .01 1 2,1.11 :02 000 02 .1.01 .30 3 *02 0.00 *02 5.1.01 .40 4 .02 0.00 *02 5.

. 1.51 _. .50 5 .02 0.00 -02 501.01 1.00 6 .02 0.00 .02 4.1.01 1.10 7 .02 0.00 *02 4.1.01 1.20 8 02 0.00 *02 4.1.01 1.30 9 " .2 0.00 *02 3.1.01 1.40 1C *02 0.o0 .02 3.1.01 1.50 11 .02 O.CO .02 3.1.01 2.00 12 .02 0.00 .02 3.1,G1 2.10 13 .02 0.00 .02 301. l 2.20 14 .02 0.00 .02 2.1.01 2.30 15 .02 0.00 .02 2.1.01 2.40 16 .02 0.00 ,02 2.

- 2. I:[1 25 17 :C2 0.00 .02 2o1.C1 3.10 19 .02 0.00 %02 2.1.01 3.10 19 .02 0.00 .02 2.1.01 3.20 20 .02 0.00 .02 2.

-- 1.01 3.30 21 *02 0.00 .02 1.1.01 3.40 22 .02 0.00 .02 1.1.01 3.50 23 .02 0.00 .02 1.1.01 4.10 24 *02 0.00 .02 1.1.01 4.10 25 .02 0.00 .02 1.1.01 4.20 26 .02 0.00 .02 1.1.01 4.30 27 .02 0.00 *02 1.1*01 4.40 28 .02 0.00 .02 1,.01 4.50 29 .02 0.00 *02 1.

1.01 5.10 30 .02 0.010 .02 1.1.01 5.20 31 .02 0.00 .02 1.1.01 5.20 32 .02 0.00 .02 1.!1 o b*30 33 .02 0.00 :02 1.1.1 5.40 34 .02 0.00 *02 1.1.01 5.50 35 .02 0.00 .02 1.1.01 6.00 36 .02 0.00 .02 1.. :81 - 6: S 31 :R5 0:88:1 6 0 3 05 001.01 6.3S 39 .05 0.00 .05 Q.1.01 6.40 40 .05 0.00 .C5 0.:- -101 6o50 41 .05 0.00 005 0.- GI 700 42 .05 0.00 :C5 0.1,01 7*10 43 .05 .01 .04 0.101 7.20 44 .05 003 .02 1.2.01 7.30 45 .05 .03 .02 2.1.01 7.40 46 .05 .03 *02 4.1.01 7.50 47 .05 .03 .02 7.1.01 #.00 48 .05 .03 .02 11.- 01 solo 49 .05 :33 :02 17.•ol 8*20 50 .05 .13 *02 2 41.01 a.30 51 .05 003 .02 33.1.01 8.40 52 .05 .03 .02 44.1... 01 8.50 53 .05 .03 .02 56.1.01 9.00 54 .05 .03 .02 69.1.1 9.10 55 .05 .03 .02 84.1.01 9.20 56 .05 .05 .02 110.1.01 9.30 7 .05 .3 .02 117.1.01 9.40 58 005 .03 .02 135.o01 9.50 59 .05 003 .02 153.:01 10.00 bO .05 .03 .02 172.

1.01 1G30 63 .05 .03 002 229.j:01 16040 64 .05 .93 .02 247.

:01 105 5 .05 :S 8 64..os1 0.o:8] :81 .11 11,00 66 ,O53S 281.a.01 11.10 67 .05 .03 .02 298.

1.01 11.20 68 .05 .03 .02 314.

1:1 .05 .03 .02 359.1.01 12.00 72 .05 .73 .02 373.

. 02 409.Oct 30 7 .934 .33 ,02 436.

( ..

- ---- J, )mu mmm-- - - - - - - - I ll llI

Page 85: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

1.01 12.40 76 .34 .33 *02 472.1.01 12.50 77 .34 .33 .02 518.ltol 13.0 7b .34 .33 .02 574.1.01 13.10 79 .41 .39 .V2 642.1.01 13.20 80 .41 .39 .02 724... 01 13.30 81 .41 .39 .02 821.1:01 13.40 82 .41 .39 .02 933.1.01 13.50 83 .1 .39 .02 1060.10&1 14.C0 84 .41 .39 .02 1201.1.01 14.10 85 .1 :50 *02 1356.1.01 1%.20 86 .51 .50 :02 1524.1.01 14.30 87 .51 .50 .02 1706.1.;1 14.40 88 .51 .50 .02 1900.1:81 1450 89 :51 .50 :0j 2104:40 1.60 0 51 5 0 2318:lo01 15.10 91 .47 .45 .02 2536.1.01 15.20 92 .78 ,.7b .C2 2759.1.01 15.30 93 1.41 1.39 .02 2992.1 .1 15.40 94 3.52 3.0 .02 3256.1.01 15.50 95 1.02 1.00 .02 3967.1.91 16.00 96 .63 .61 .0? 3914.1. 01 16.10 97 .48 .46 .02 42E6.1.01 16.20 98 .48 .46 .02 4675.1.01 16.30 99 .48 .46 .02 5077.1.01 16.40 100 .48 .46 .02 5489.1:01 16.50 101 048 .46 .02 5908.1.01 17.00 1C2 .'8 .46 .02 6331.1.01 17.10 103 .38 .36 .02 6750.1.01 17.20 104 .38 .36 .02 715n.1.01 17.30 1 5 .38 .36 .02 7521.1:01 17.40 106 .38 .36 .02 7860.1.01 17.50 107 .38 .36 .02 P166.1.01 18.00 118 .38 036 .02 P437,

- - 1.01 18.10 1C9 .03 .01 .02 8670.1.01 18.20 110 .03 .1 :02 8857.1.01 18.30 111 :e3 .01 .02 8988.1.01 I.40 112 .03 .01 .02 9053.

... 1.01 18.50 113 .03 .01 .02 9058.1CI 19.00 114 03 .01 .02 9027.1.01 19.10 115 .03 .01 .02 8972.1.01 19.20 116 .03 .01 .02 P897.1.01 19.30 117 .03 :01 .02 880101.01 19.40 118 .03 .01 .02 8686.1.01 19.50 119 .03 .01 .02 8551.1.01 20.00 120 .03 .01 .02 8400.

•121 :3 :01 :02 825.

20.30 123 i03 .01 Cp 7875.1.C1 20.40 124 .03 .01 .02 7683.1 01 20.50 125 .03 .01 .02 7486.

21 0 126 .V3 .01 .02 7287.,010 21.. 127 :03 .01 .02 7088.

1.01 21.20 128 .03 .01 .02 689.. 1.01 21.30 129 .03 .01 : 671.01 21.40 130 .03 .01 2 6536.1.01 21.50 131 ,03 .0. .02 6345.1.01 22.00 132 .03 .0 ,02 6172.

- 0,1 22.10 133 .03 0 :02 6005*1.I 22.20 13 o 03 ,1 .02 5841*C03 .01 .02 5683..01 22.40 136 .03 .01 .02 5529.

: e50 137 .03 .1 :S2 5379.230 138 .03 .01 2 5234.

1.01 23.10 139 .03 .01 .02 5093.1 23.20 140 .03 .01 02 4956.142 .03 .0H4 142 :03 493.23:58 143 .03 .01 .02 4566.

. 09 144 .03 .01 4442.14: 0.00 :0. 0.2 4322.16 0000 o 0 0o0 42040.147 0.00 0.00 000 4090.J 148 0.00 0.00 0,0 399.. 0 . 0 . 7 o.1:1 1; 0 8:00 S 0:0 7640

Page 86: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

MO.DA HReM4 PERIOD RAIN EXCS LOSS COMP 01.02 1.10 151 0.00 0.00 0.00 3661.12 1.20 152 0.00 0.00 0.00 3560.1.02 1.30 153 0.00 0.00 0.00 3461.1.02 1.40 154 0.00 0.00 0.00 3364.1:02 1:5 155 0.0 0.0 0.00 3270.1.02 200 156 000 0.00 0.00 3178.1.02 2.10 157 0.00 0.00 0.0 3088.1.02 2.20 158 0.00 0.00 0.00 3VCB.1.02 2.30 159 0.00 0.00 0.00 2914.1.02 2.40 160 0.00 0 0.00 0.00 2P30.1.02 2.50 161 0.00 0.00 0.00 2748.1.02 3.00 162 0.00 0.00 0.00 2668.1.02 3.10 163 0.00 0 .00 0.00 2591.1.02 3.20 164 0.00 0.00 0.00 2515.1.02 3.30 165 0.00 0.00 0.00 2442.1.02 3.40 166 0.00 0.00 0.40 2371.1.02 3.59 167 0.00 00 .00 232.1.02 4. u0 168 f. 0 00 0.00 2234.1.02 4.10 169 0.00 0.10 0.o0 2169.1.02 4.20 170 0.00 0.00 0.0 2106.1.02 4.30 171 0.00 0.00 0.00 2044.102 4.41 112 No.0 O.o0 0.00 1984.1.02 4.50 113 0.00 0.00 0.00 1911.1.02 5.00 174 0.00 0.00 0.00 1*39.1:2 5.10 15 0:O0 0.00 0:00 1770:12 5.20 1 6 000 0 00 00.00 17C3.1*02 5.30 117 0.00 000 0.00 1638.1.02 5.40 178 0.00 0.00 0.00 1574.1.02 5.50 179 0.00 0.00 0.00 1509.

180 6.30 180 0.00 0.00 0.00 145.i 6 .11t 181 0.00 0.00 Deco 1384o1.02 6.20 182 0.00 0.00 0.00 1324.1.02 6.30 183 0.00 0.00 0.0s 266.2 6.40 184 0.00 00 0 0 1209.2 6.0 185 0.00 0.00 0.00 1149.1002 7.00 186 0.00 0.00 0.c 1091.1:82 7.10 191 0.00 0.00 00 182.2 7.020 192 0.00 0.00 0.00 979.1.02 7o30 189 0.00 0.00 0.00 925.1.02 7.20 190 0 .00 0.0 cc 873.1.02 7.5 191 0.00 0.00 0.00 825.1.02 8.00 192 0:00 0.0 0.00 250.1.02 g.20 193 0.00 0.00 0.00 61.02 ,2.0 19 0.00 00 0.00 67.8:38 195 *:80 .0 8:S9 429.

19 0 00 0,0 400*1.02 84 197 0.00 0.00 0.00 373.1.02 9.00 198 0.00 0.00 0.0 348.1.02 :10 199 0.00 0.00 0.00 325.1.02 920 200 0.00 0.00 0.00 331 10 2 9.30 201 0.00 0.0 0.00 200.1.o 904 202 0.00 Dec 0018S1.02 19:5 203 0.00 0.0 0:0 26.i.02 00 2C 0.00 0.00 0.00 233.1.02 100 205 0.00 0.00 0.00 212.1.2 11.20 21s 000 0.00 0.00 200.

:8 110 217 0:00 0:00 0.0 0 1

.02 12.20 0 0.00 0.00 0071.02 12.0 220 0.00 0.00 0.Co 17.

1.02 12.50 221 0.00 0.0 0.00 13.1[02 11.0 222 0.00 0.00 000 150( 1 :1 2 2:11 .2 211 8:88 S-00 0 ': t32I:02 ,210 213 a*0 0.00 0000 2301 212.20 219' 1*00 0.00 0.0 Ilse

... 82 12.3 0 2179 -0 0.00 00 3,0 2 12o20 229*0. O0 0.O0 0.00 p1,

1:02 2:0 2? S SO 0 :00 00,CO --- 71.12 12 50 221 00 0.0 0a 710|,21,0 222 0 00 0 ,00 6600 1 224 o.0 0.o #5:0213,30 225 0.09 0 0 0.00 540

Page 87: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

1.02 13.40 226 0.00 0.00 0.00 50..02 13.50 227 O.0O 0.00 0.00 47..02 14.00 228 0.00 0.00 9.00 44.1902 14.10 229 0.00 0.00 0.00 41.1e02 14.20 230 0.00 0.00 0.00 38.1.02 14.30 231 0.00 O.CO 0.00 35.

14.40 232 0.00 00 0.00 33:112 1450 233 0.00 0.00 0.00 31.1.02 15.00 234 0.00 0.00 0.00 29.1.02 15.10 235 0.09 0.00 0.00 271.02 15.20 236 0.00 0.00 0.00 25.1.02 15.30 237 0.00 0.00 0.00 23.1*02 15*40 234 0.00 0.00 0.00 22,1.02 15.50 239 0.00 0.00 0.00 20.1.02 16.00 240 0.00 000 00 19.1.02 16,10 241 0.00 0.00 0.00 18.1.02 16.20 242 0.00 0.00 O.CO 17.t:02 16.30 243 0.00 f0 0 : jS: -02 16.40 244 000 0.00 0.00 13.1,02 16.50 245 0.00 0.C0 0o.I0 1301*02 17.00 246 0.00 0.00 0.60 13.1.02 17.10 247 0.00 0.08 0.00 12.1.02 17.20 248 0.00 0.*0 0.0 11.1.02 17.30 249 0.00 0.00 0.00 J0.1.02 17.40 250 0.00 0.00 0.00 9.l: 17:5 251 0.00 0.00 C." 90

18.00 252 0.00 0.00 0.00 8:1*02 18e10 253 0.00 1.00 0.00 8.1.02 18.20 254 0.00 0.00 0.00 7.1.02 18.30 255 0.00 0.00 0.00 7..... ..1.02 18.40 256 0.00 0.00 0.00 f.1.02 18.50 257 0.00 0.00 0.00 6.1.02 19.00 258 000 000 0.00 5.1.02 19.10 259 0.00 0.00 0.00 5.1.C2 19.20 260 0.00 0.00 0.00 5.1.02 19.30 261 0.00 0.00 0.00 4.1.02 19.40 262 0.00 0.00 0.00 4.1.02 19.50 263 0.00 0.00 0.00 4.1:02 10,00 264 0.00 0.0 0.00 4.

2 0.10 265 0.00.00 0.:0 3:1.02 20:20 266 0.00 0.00 0.00 3.

1.02 20 27 00:08 0 000 312 204 26 0.0 .00 8:0 3-

1.02 2050 269 0.00 0.00 0.00 3.1.02 21.00 274 0.00 0.00 0.00 2.N02| 21:1o 271 222 7 .oo .o00o 8:0.001002 21.50 273 0.00 0:00 0.00 2:1.02 21*40 274 000 0.00 0.00 2.02 21.50 275 0.00 0.00 0.00 2.02 22.0 276 0*0 0*0 01 291 2 22.10 277 0.00 00 0C0 10

1.02 23.20 278 0.00 0.00 0.00 1.

t: 22.S 223 273 00900 :284 0.00 0.00 0 a

23.40 285 0.00 0.00 0.0026 0.00.0 00I:~2.0 27 00 .00S 0.00 1: .....

1.02 22.0 281 0.00 0.00 0.001.02 .0 282 0.00 0.00 0.00 1.td2 1:10 23 0:0o0o g0 :

S.20 284 0.00 0.00 0.00 1..0 2 23930 285 0000 0.00 0.00 1.1:02 2o5o 2886 88 8:88 0 .00

1.03 .50 .00 0.00

4. 10 24 M 0 .0 U .00

.03 010 2: 0,00 1 0,00 De8o I:

1 3 0 297 00000

9ii :88 8 IS:80o 3 so 29 000 2600 cc1:o 294 i a

0100 08 ,001:41 298 O0 0 . 0 00

lei .1 R9 :88 1:11 01.:0 9

Page 88: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

C4 da

* @4

. .0 I

=*o .4 000.. 1

ow 'D4 Vma~ 0 9

P-ag'oIL= I 45 a 0 tj c

.J~~a44D. 4dP C1.8

Ar 01.. 1ONN 0 qc-C aW.O .4 asV)M 1.0

.4 F0 j aI

41 .0 2. 0ai.,c S. a.Ca-.

=40 KO@44-S * ~ -4 C a doo*e;. ow)4 00V~C41 dig) WC2 coya

-9 C4 ous 3cha a..we

Z. 4 0.4 4 C~ S *cc -ca -aK 0 .ocu -E CD, ~U) *ap,-. 0 0QC Z .Oh.4 ~ 1 4 0 4 .A 4

Mwl ~ ki C-4 CP %acy Cca MmP a 4- a

U2 Ca..0

a 4 *.sN z ftd 4

lo. .4

1 'Co old aC~~ -. ..

462-~ u Cd% ua.UU: to 1C Ire .

"W 4.) -W d10

GO #A 4- 001010Kb-K ~ 01 .All

Page 89: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

STATION DAN. PLAN to RATIO I

END-OF-PERIOD HYOROGRAPH ORDINATESOUTFLOW

2. 2. 2. 2. 292 o: . Is.

13. 1g 2. 29. 39.o3. 51. 59. o9. 71687. 96. 106. 115. 124. 132o 141. 149. 1S7 .172 179, 1870 1950 2050 220o 238. 261. 2892362. 4150 48b. 554. 626. 704. 789. 879. 9750 1075.1191. 1305. 1417. 1538o 1675. 1831. 2002. 2198. 2395. 25930279*. 29e8. 32080 3424. 36180 37960 3958. 4104. 4234. 4344.443 0 95. 4522 41521. 450*. 474. 4434. 4389. 43310 *262:41850 41c1. 4012. 3919. 3821. 3722. 3621. 3522. 3425. 3330.3239. 3150. 30700 2988. 2906. 2827. 2749. 267*. 2601. 2530.2461. 2395. 233G. 2266. 2204. 2144. 2085. 2029. 1978. 1924.1A71. 18190. 17680 1719. 167P* 1624o 1577o 1532. 14880 1445.14C30 1362. 13229 1283. 1246. 12090 1174. 1139. 1107. 10las1047. 1016. 983. 948. 912. 877. 84. 811. 778. 746.715. 684. 654. 625. 5960 566. 537o 508. 481. 540428. 401. 372. 317. 258o 225. 204. 188. 175. 163.152. 142. 132. 123. 115. 107. 100. 93. 87. I.76. 71. 66. 61. 57. 53. 50. i6. 43. 9.38. 35. 33. 31. 29. 27. 25. 230 22. 20.190 18. 16. 15. 14. 13. 12. 12. 11. 10.9. 90 s. 8. 7. 70 6. 6. 5. 55 .4. 4. 4. 30 3. 3 3.2 2. 2o 2. 2. 2. 2. 1. 1:10 1. !; I0 10 1. 1* 1: 11I1. 1. 1. o. 0. 0 0. o. . 00 00. 0. 0. 0. 0. 0. 0. 0. 0. 0.

ST3RAGE21. 21. 21. 21o 21o 21. 21. 21. 21. 21.21. 21. 21. 21. 21. 21. 21. 21.21. 21. 21. 21. 21. 21. 21. 21. 2 It21. 21. 21. 21. 21. 21. 21. 21. 21. 21021. 21. 21o 210 21. 21 21. 21o 21. 22.22. 22. 22. 22. : 1 22. 22. 22. 22. 22. 22.22 23. 23. 23. 23o 23. 23. 23. 23. 23.24. 24. 24 24o 24. 24 24. 25. 25. 26026. 27. 28. 28. 29. 30. 31. 31. 32. 34.35. 36. 37. 38. 39. AS * 3 45. 4. 49.51. 53. 550 58. 60. 63: 65. 66.669.. 70. 70. 6 0 69. o 69. 68. 68. 69:66. 65. 64. 63. 62. 61. 60. 59. 58. 57.56. 55. 54. 3: 52. 51. 50.47. 47. 46. *5 45. 4*1 . 440.41. 41. 40. 40o 3q, 39o 38. 380 37. 3737. 36. 36. 36. 5. 35. 35. 34. 34. 34.J3: 3: 33. 32o 3: 310 31: 31: 30: 3.290 29. 29. 28. 28 28. 28. .2?. 27o 26. 2fi. 2S0 24. 24o 24o 24. 13:23. 23. 23. 23. 230 23. 3 23. 22 22.220 22. 22. 22 2. 22 22. 2. 222. 22. 22. 22. 22. 22. 22. 22.22. 22. 22. 22. 22. 22. 22. 22. 22. 22.22. 22. 22. 22. 22: 21. 21. 21. 21. 71.

1 21. 21. 21. 21. :: 21: |I: II: -- ii:21. 21o 21. 21. 21o 21 21. 21. 21.21. 21. 21. 21. 21o 21. 21. 21. 21o 21.-216 21. -- 21 21. 21. 21. --- 21. 21 . 21. 21e

STAGE214.0 214.0 2140 21400 2140 214.0 21410 214.0 214.0 14.0214.0 214.0 2 4.0 210 .1400 414. :214.0 214.0 214.0 214.0 214.8 214.0 214.0 214.0 214. 4.02140o 214.0 214.0 214.0 21403 214.0 2140 0 214.0 4:214.0 814.: 2... 214. o 81: 1401 214.2 214.2110 214.2 1 214.3 214.1 1 21. 214.4 14.4214.4 214.5 214.5 214.5 214.5 214.6 214.6 214.? 2140T214.9 215.0 15o1 215*2 215.3 215.4 215.6 215.7 21505 21216.1 2162 218.3 216.5 21605 216.8 217.0 217 2703217.? 217.9 219.1 218.2 218.4 218.5 21896 217.1 218.8219.0 219.0 219.1 219.1 219.o 219.0 219.0 219.0 218.9 219219.8 218:7 218.7 218.6 218.5 218.4 1804 218.3 218.221.1 217. 2 2:7.:.4 211.3 It.: 27.2 7217.1 217.0 21..

117;9 19 IN - 17:1. 1169216.8 216.8 2167 2126.17 216.6 2 o16. 216.5 26 216.4 2 60216 216&3 216.2 212 2 16. 26 216.1 216.0 216. 1.215.8 215.8 215. 215.? 21591j~. 15.9 215.4 215.3 215o 215.2 215.6 215.6il215.0 i.4 21409 214.8 214.7 214.6 21405 214o 214.4 2(4:4214.4 214.4 21403 214.3 214.3 214.3 2143 214.2 214.2 214N214.0 214.2 2142 214.A 214.1 214. 114.1 4. 211 40421400 21*.0 214.0214.1 21 41.21.11

2.224.121., 1400 14.:1.214.0 214.0 214.0 .0 214o 214o 2 .o1::124.0 214.0 14.0 214.0 21*.! 214.0 214.0I . 211.0 211.S ll:.S .. ... ii:.0 Jj4.0. I:: II:: l :

Page 90: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

aw C~2 ociC3 c

CD *e. 000~cc-

L. " u4.-4 x

a ZCo 2or

I-0

IAJWOO 0 00

92:,-T I.-

CL

Z: 4c4 LL. r-Dn.

() 4 1.- .

(021:X le

Da7-I *0

1 C).4

4z -M- z- j D-P

W' 0 0000663. I r '

LU C 2C- Ir-"c3I. ON

0

Page 91: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

APPENDIX 5

Bibliography

Page 92: NEW JERSEY DEPT OF UNCLASSIFIEO I III'/ · 11111 1.25 1.4 jl1.6 microcopy resolution tesi chart national buriau sif anards 19 1 ... i --rahway river basin west branch rahway river

1. "Recommended Guidelines for Safety Inspection of Dams," Department

of the Army, Office of the Chief of Engineers, Washington, D.C. 20314.

2. Design of Small Dams, Second Edition, United States Department of

the Interior, Bureau of Reclamation, United States Government

Printing Office, Washington, D.C., 1973.

3. Holman, William W. and Jumikis, Alfreds R., Engineering Soil

Survey of New Jersey, Report No. 2, Essex County, Rutgers

University, New Brunswick, N.J., 1953.

4. "Geologic Map of New Jersey," prepared by J. Volney Lewis and

Henry B. Kummel, dated 1910 - 1912.

5. Safety of Small Dams, Proceedings of the Engineering Foundation

Conference, American Society of Civil Engineers, 1974.

6. King, Horace W4illiams and Brater, Ernest F., Handbook of Hydraulics,

Fifth Edition, McGraw-Hill Book Company, 1963.