Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
New in Vers ion 2015
Logarithmic time scales expand parts of the date
range, making it possible to zoom in on years or
months.
A new nickname feature makes updating from many
Microsoft Project, Project Server or XML schedules
easier.
Link to an active Microsoft Project schedule. Populate
columns or tasks from Project ad-hoc.
DataGraphs improved with the addition of a new
“points” DataGraphs, ideal for “hi-low” graphs. Also,
easily paste dates and values from Excel.
Attach date range curtains to individual task rows.
Build a larger toolbox with up to 32 rows of customi-
zable symbols and bars.
Up to 11 vertical levels per task row makes it easier
to build and maintain dense schedules.
Click and drag to reposition symbol notes.
Create a mini schedule for PowerPoint by copying
select rows, complete with date headings.
New schedule log helps keep track of all Milestones
schedules opened and more.
Much more!
Easier mult i - f i le re fresh f rom
Microsoft Project.
2019 2020 2021 2022 2023 2024 20252 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
Project IMS (Integrated Master Schedule)Project IMS (Integrated Master Schedule)
Key Milestone 1 Key Milestone 2 Key Milestone 3 Key Milestone 4 Key Milestone 5 Key Milestone 6 Key Milestone 7
KM KM KM
IM 1
IM 2
IM 3 IM 4
IM 7
IM 6
IM 5
IM 9
IM 8
IM 10
IM 11
IM 13
IM 14
KM KM KM
“Logari thmic” t ime scales
New bars and symbols
Points DataGraph
11 leve ls on each task row
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Many multi-year schedules have a great deal of detail within a handful of years. In this case, it might be a good idea to expand the detailed portion of the schedule and shrink the future (or past) parts of the schedule which aren’t of immediate interest. In prior versions of Milestones Professional, this type of a “logarithmic” heading was accomplished via custom headings but a number of issues arose.
2015 offers a new “Logarithmic View” which makes highlighting certain years a breeze!
Expand key date ranges with “Logari thmic” View
Choose to expand years….
Or, choose to expand just a few months:
2019 2020 2021 2022 2023 2024 2025 20262 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
Project IMS (Integrated Master Schedule)Project IMS (Integrated Master Schedule)
Key Milestone 1Key Milestone 2Key Milestone 3Key Milestone 4 Key Milestone 5 Key Milestone 6 Key Milestone 7
KM KM KM
IM 1
IM 2
IM 3 IM 4
IM 7
IM 6
IM 5
IM 9
IM 8
IM 10
IM 11
IM 13
IM 14
KM KM KM
2019 2020 2021 2022 2023 2024 20252 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
Project IMS (Integrated Master Schedule)Project IMS (Integrated Master Schedule)
Key Milestone 1 Key Milestone 2 Key Milestone 3 Key Milestone 4 Key Milestone 5 Key Milestone 6 Key Milestone 7
KM KM KM
IM 1
IM 2
IM 3 IM 4
IM 7
IM 6
IM 5
IM 9
IM 8
IM 10
IM 11
IM 13
IM 14
KM KM KM
Schedule presentat ion enhancements 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Color individual parts of custom date ranges
MISSION SCHEDULE1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Pre-Phase A Phase A Phase B Phase C Phase D
Major Project Phase A Major Project Phase B Major Project Phase C
Task
Key MilestonesKM1
KM2
KM3 KM4 KM5
KDP B
KM6 KM6
KDP C
CDR
SRR
KDP D
MOR MORMOR Launch
KDP E
Schedule presentat ion enhancements
Task row curtains
Curtains offer a way to shade any date range on a schedule. Curtains might be used to
shade a critical project time span, a holiday season, every other month, or any other
time period. Each curtain appears for a set date range or repeat for a designated period,
at specified intervals. The schedule can have as many curtains as needed. Now, cur-
tains can be shown on specified tasks only.
Eleven (11) leve ls on each task row
It’s now possible to have 11 vertical levels on each task row. This allows for excellent control of symbol position, espe-cially in tight spaces.
2015
Individual sections (date ranges) of custom headings can be colored.
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Copy select task rows to make “mini schedules” for presentat ion
2014 2015 2016 2017
A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M
Summary Current Plan Milestone
Basic Gantt Chart Example 2
Phase 1
PHASE 2
SPACECRAFTENGINEERING
PLANNING
ANALYSIS
INTEGRATION
INTEGRATION
REQUIREMENTS
ANALYSIS
System Engineering Complete
SPACECRAFT ENGINEERING
COMMAND AND CONTROL
ATTITUDE CONTROL
Now, select just a few task rows to paste into another application. Choose whether or not to include the date heading.
Now, individual links on the schedule can be customized with unique colors and line pat-terns. This greatly extends the range of possible vertical connectors on a schedule.
Set color + pattern for indiv idual vert ica l l inks
Schedule presentat ion enhancements 2015
If just a few task rows from a schedule are needed for presentation or for inclusion in a document, just select the tasks and copy them to the clipboard. Optionally, include the date headings.
Administrative DivisionJanuary 2014
Sun Mon Tue Wed Thu Fri Sat
313029 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1
2 3 4 5 6 7 8
Staff meeting
Staff meeting
Staff meeting
Design review
Design review Design review
Research review
Dept meeting
Resourcereview
Resourcereview
Dept meeting
Dept meeting
Boardmeeting
Monthly reportreview
Monthly report
Color days in the ca lendar view
Calendars are easier to read as individual days can be colored.
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Now, in addition to many other date format options in Mile-stones, it’s possible to change the date format for individual symbols on a schedule.
Symbol date format
In addition to setting the outline color in the toolbox, now it
can be changed for individual symbols on the schedule.
Outl ine color
Override the symbol mark and mark color for symbols that are al-
ready on the schedule. Add a mark or remove the mark if it is al-
ready there.
Symbol mark
Now, set a color overrided in the toolbox in addition to individual symbol overrides.
Text and date co lor
New bar types and symbol types
Schedule presentat ion enhancements 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
In addition to Bar and Line graphs, it’s now possible to show a “points” DataGraph. Pick any toolbox symbol to represent the points in the DataGraph.
Dow Jones August-Sept 2014
August September
1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29
HIGH
LOW
16,000.00
16,500.00
17,000.00
17,500.00HIGH
LOW
Page 1 of 2 10/11/2014
Task
Dow Jones August-Sept 2014
August September
1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29
HIGH
LOW
FY2014 FY2015
II III IV I II III IV
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
PRODUCTION COST $500 $2,000 $3,500 $1,575 $4,300 $2,000 $400 $455 $3,000 $2,444 $3,333 $2,200 $3,500 $1,000 $4,125 $3,300 $2,200 $1,100 $3,455 $3,100 $4,200
$0
$900
$1,800
$2,700
$3,600
$4,500PRODUCTION COST
Page 1 of 1
Task
Phase 1
Phase 2
Phase 2
Phase 4
FY2014 FY2015
II III IV I II III IV
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
24 20
30 2
18 31 22 10
18 2
When using a points DataGraph, pairs of ValueSets can be linked in order to represent a “Hi/Low” set of values. In this example, which overlays a points DataGraph with a line DataGraph, the High value points represent Maximum Hours. The low value points represent Minimum Hours.
In the example below, the daily high and low values for the Dow Jones Industrial Average are shown:
Additional ValueSet and DataGraph enhancements:
It’s now easier to paste a range of values along with dates from a spreadsheet or table.
Improved scrolling when editing values.
DataGraph and ValueSet Enhancements 2015
“Points” DataGraph
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Easi ly update (“refresh”) from mult iple Project schedules
FILE 1
FILE 2
FILE 3
Now, update one Milestones schedule from multiple Microsoft Project schedules using file nickname references.
Build a “refresh file list” for a presentation schedule. Add all of your Microsoft Pro-
ject schedules to the list and assign a nickname to each schedule. Then, on the master
schedule, reference the Project Unique ID along with the nickname.
Link to act ive MS Project task enhanced for ad -hoc schedule addi t ions
In pr ior vers ions , the Link to Active MS Project Task fea ture s imply tagged the columns of a row with the
Projec t task’s Unique ID.
Now, this fea ture a l lows ad -hoc a ddi tion of symbology.
Working wi th Microsoft Pro ject 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Populate columns on the f ly
Forget to br ing a Pro ject f ie ld into a Miles tones
Profess ional schedule? Now, when a Micr osof t
Projec t column is added to the schedule , i t ’ s pos -
s ible to popula te the column using the ac tive Mi -
crosoft Pr o jec t s chedule .
Create/Edi t symbol tag:
Symbol tags can be crea ted or changed wi th the
Create/Edi t symbol tag dia log box.
Improved refresh report :
Now, when a schedule is upda ted (refreshed) from one or more Microsof t Projec t s chedules , the refresh
repor t wil l (optional ly) provide a l i s t of exceptions. For example, i f a symbol i t tagged, but dur ing the
refresh process no ma tch was found in Microsof t Project , an exception wil l be noted .
Working wi th Microsoft Pro ject 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Percent F i l l for Indiv idual Bars
Symbols or symbols and horizon-
tal bars can have a percent fill
override applied. This override
overrides any other factors such
as status date.
Remove all baseline symbols from a schedule
Remove all status symbols from a schedule
Delete al l status and base l ine Symbols
A symbol shape drop down was added to the Symbol Op-tions dialog for each symbol in the Toolbox to allow a differ-ent symbol shape if after the status date.
After status symbol overr ide
Specify that all summary bars get filled to the current date, thus ignoring any status symbols or computed percent completes.
Summary Bars Fi l l to Current Date
Status & % Complete 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
The on-screen toolbox can be as small or as big as required.
On-screen qual i ty improved with anti -al iasing
Turn on anti-aliasing to enhance the display of symbols, lines, boxes, and other objects.
Anti-aliasing Off Anti-aliasing On
Have a certain bar type that is perfect for your needs but is needed in several colors? Set it up once.
Then replicate it and change only the color on other rows.
Copy Toolbox Row
Larger toolbox
Manage lines, boxes and cir-cles. With this option find missing drawing elements, delete them, bring them to the top or place them on all pages.
Manage drawing elements
Moving symbol notes has gotten easier. Just click the note and drag the mouse.
Easy c l ick and drag symbol note posi t ioning
Improved Usabi l i ty 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Default symbol tag
Set a default symbol tag in the Toolbox. Use this feature in conjunction with Date from Symbol
Automation Tag SmartColumn. Turn on Overlay Tags option to see the tagged symbols’ tag.
Open Schedule Note
Now, a note can be displayed whenever a schedule is opened. This can be useful if a schedule is shared with others and they
need to know something about the schedule when they open it. For example: “This schedule has links to important project docu-
ments.” or “Please do not make any changes to this schedule.”
Force vertical links to be on top of bars and symbols.
Show vert ical l inks on top
Show on Top Off Show on Top On
More! 2015
Milestones Professional 2015 New Features © KIDASA Software, Inc. October 2014 www.kidasa.com
Log f i le helps you keep track of schedule f i les used
More! 2015
Personal ize the text co lor on the too lbar