Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
3430391900
Standing Height Table
Seated Height Table
Pour des instructions en francias, appelar le 800-822-7653Para instrucciones en enspanol, llame al 800-822-7653
Harvest Metal TableInstallation Instructions
03/22/2019
3430391900Page 2 of 14
Harvest Metal Table Installation Packet
#12 x 1” Wood Screw 5/16” - 18 X 7/8” Button head screw
black
#8 x 1/2” Wafer headscrew
1/4”-20 X 3/4” Truss head machine screw
5/16” Glide
3/4” wide galvanized steelLoop clamp
Plastic clip
Drill
No. 2 Phillips head screwdriver bit
No. 3 Phillips head screwdriver bit
Extra long Phillips head screwdriver bit
#2 Magnetic tip hex drive drill
1/4” driver
3/16” Hex Head Bit
Hardware - Total Quantities Shown
x32x40
x40
x2
x32
x4
x9
x9
x100
#10 x 1 Hex head Self drilling screw
Standing Height Tables1/4” - 20 x 3/4” Truss Head Screw - Bag #1
#12 - 8 Pan Head Screw - Bag #2
#10 - 16 x 1” Hex Head Self Drilling - Bag #3
#8 x 1/2” Wafer Head Screw - Bag #4
5/16” - 18 x 7/8” Button Head Screw -Bag #5
#10 x 7/8” Hex Head Screw
Seated Height Tables1/4” - 20 x 3/4” Truss Head Screw - Bag #1
#12 - 8 Pan Head Screw - Bag #2
#10 - 16 x 1” Hex Head Self Drilling - Bag #3
#8 x 1/2” Wafer Head Screw - Bag #4
#10 x 7/8” Hex Head Screw
#10 X 1-1/2” Philipswafer head
Hardware Bags
Tools
x40
#10 x 7/8”Hex Head Screw
Page 3 of 14 3430391900
Harvest Metal Table Installation PacketBuild Staging1. Protect worksurface by clearing the build area of any debris that can cause damage.
2. Place worksurafce upside down (as shown) on packing blankets or equivalent to protect upward facing show surface during the installation process.
3. Open up hardware pack and lay out the numbered bags within.
Build table with undersidefacing up.
Protect show surface and edges of the top
SCALE 0.500
SCALE 1.000
Note - Legs and corner brackets are left and right hand specific.
1. Attach corner brace to leg with (2) 1/4”-20 X 3/4” machine screws.
2. Align leg bracket with worksurface pilot holes. Start by installing (1) #12X1” wood screw into pilot hole #1. Verify that leg reveal is square with worksurface, make adjustments if needed. Install remaining 2 wood screws into pilot holes.
3. Repeat steps for all legs.
x8
x12
Leg Assembly
MachineScrews
Corner Brace
Pilot Holes
Hardware:
Leg RevealBoth Sides
3430391900Page 4 of 14
Harvest Metal Table Installation PacketStaging Electrical 1. Place all electrical components as shown below. Allow wiring to run through cord slots prior to center support channel being installed.
2. Power will run down one leg. Place cord/conduit through cord slots closest to preferred leg with plug/conduit hanging on the corner brace.
Cord Slots Electrical Boxes
1. Align center support channel across the length of the table shown in Illistration 1.
2. Install (3) #8-18X1/2” PHL Wafer screws through the corner brace into the support channel. Each channel is connected on both ends.
CenterSupport Channels
Corner Brace
Wafer screws
x12
Center Support Channels
Hardware:
Page 5 of 14 3430391900
Harvest Metal Table Installation Packet
1. Finish Installing leg assembly with (7) #12x1” wood screws into the workurface
2. Repeat for all legs.
x28
Hardware:
Note: Electrical must be moved aside to access all screw holes
Leg Assembly continued...
x8
Hardware:
Anti-Bow Brackets
CenterSupport Channel
Anti-BowBracket
6”
1. Mount anti-bow bracket into cavity of center support channels, and 6” away from each end.
2. Fasten each bracket to worksurface with (1) #12 x 1” wood screw. Repeat on both sides.
3. Mount remaining anti-bow brackets evenly across each support channel and attach to surface.
3430391900Page 6 of 14
Harvest Metal Table Installation Packet
SCALE 0.700
SCALE 0.550
Wood screwlocations
4. Align electrical module into the corner electrical bracket as shown. 5. Install (4) #12X1” wood screws to fully secure the corner unit.
6. Repeat for all legs.
1. With electrical box slid towards Center Support Channel, attach corner electrical bracket with (1) #12x1” wood screw into the front location circled below.
2. Slide electrical box forward and install (2) #12x1” remaining rear wood screws.
3. Repeat for all legs.
SCALE 0.550
Front Screw
SCALE 0.500
Corner electrical bracket
Electrical Box slid forward
Corner electrical bracket
x28
Hardware:
Corner Electrical
SlideBack
RearScrews
Page 7 of 14 3430391900
Harvest Metal Table Installation Packet
1. Align center electrical shroud with pilot holes in the center of the table. Attach using (2) #12 x 1” wood screws as shown below.
2. Mount center electrical box into shroud until fully seated. Attach module with (2) #8 x 1/2” Wafer head screws.
x4
Hardware:
x12
3. Place electrical cover plates between the center electrical box and shroud, keeping the back of the plates flush with center support channels.
4. Attach cover plates to electrical shroud with (4) #8 x 1/2” Wafer head screws
5. Repeat all steps for opposite side of table.
Center Electrical
Wafer HeadScrews
Electrical ShroudCenter
Electrical Box
ElectricalCover Plates
3430391900Page 8 of 14
Harvest Metal Table Installation PacketCenter Electrical Junction Box - Corded
Center Electrical Junction Box - Hardwired
1. Align junction box on the center of the worksurface, between the cord slots as shown below. Attach junction box with (2) #12 x 1” wood screws.
CenterCord Slots
x2
Hardware:
1. Align junction boxes in the center of the worksurface, as shown below. Attach to worksurface with (4) #12 X 1” wood screws.
Hardwired junctionboxes to be attachedby electrician.
x4
Hardware:
Page 9 of 14 3430391900
Harvest Metal Table Installation PacketExternal Stiffeners1. Place first stiffener along row of anti-bow brackets, with one end 2-5/8“ from the surface edge. Attach stiffener to surface with (2) #10 x 7/8 Hex head screws into outer-most holes of stiffener.
2. Place second stiffener along inside wall of fist stiffener, with end 2-5/8” from opposite surface edge than the first stiffener. Attach with (2) #10 x 7/8 Hex head screws into outer-most holes.
3. Finish installing external stiffeners with (16) #10 x 7/8 Hex head screws.
4. Repeat steps 1-3 for 2 remaining stiffeners on other half of worksurface.
x9
Hardware:
x9
5. Attach all cords/conduit to bottom of surface using (9) loop clamps and (9) #12 x 1” wood screws. Excess cords must be placed between external stiffeners.
x40
OutermostScrew
ExternalStiffener
ExcessCords
25/8
3430391900Page 10 of 14
Harvest Metal Table Installation PacketExternal Siffeners - 36” Wide VariantNote - The external stiffeners on 36” wide Harvest Tables differ from the standard mounting method.
Place largest stiffeners over top of Anti-bow Brackets. (Remove screws)
Place smallest stiffeners centered on the surface, 2 5/8” from each edge.
25/8
Page 11 of 14 3430391900
Harvest Metal Table Installation Packet
SCALE 0.500
SCALE 0.600
SCALE 0.520
SCALE 0.650
Shelves
1. Mount shelves into place over electrical and support channels. Route cord/conduit out of clearance notch of shelf next to chosen leg.
2. Align pilot holes in shelves with holes on the left and right hand corner electrical plates, as well as corner brace holes. Use (8) 1/4-20 x 3/4” zinc plated screws per shelf.
3. Attach shelf to center electrical with (4) 1/4-20 x 3/4” zinc plated screws per shelf.
1/4-20 x 3/4”zinc plated screws
Clearance Notch
#10 x 1-1/2”pan head screw
#10-16 x 1”Self-Drilling Screw
x24
x2
Hardware:
x36
Leave end screw out until next step
Shelves
4. Fasten center electrical to shelf using (1) #10 x 3/4” pan head screw per shelf.
5. Fasten shelves to support channels with #10-16 x 1” self-drilling screws. (Qty varies)
Corner Electrical Center Electrical
3430391900Page 12 of 14
Harvest Metal Table Installation Packet
1. Install leveling glides into threaded insert on each leg.
2. Attach foot rest to legs with (8) 5/16”-18 x 7/8” button head screws. Repeat for opposite end.
3. Place foot rail between foot rests and install (4) 5/16”-18 x 7/8” button head screws into each end. Repeat for remaining foot rail.
SCALE 0.500
Glide
1. Mount apron over shelves, install (2) #10 X 16 X 1” self-drilling screws into support channels.
2. Install (8) #8-18 x 1/2” PHL waferhead screws into shelves.
3. Repeat for opposite end.
x16
Hardware:
x4
5/16”-18 x 7/8”Button Head Screws
Foot Rail
Foot Rest
x32
Hardware:
SCALE 0.100
Reference view
x4
Apron
Aprons
SCALE 0.500
Foot Rest & Foot Rail (standing height only)
Foot Rest
Page 13 of 14 3430391900
Harvest Metal Table Installation Packet
1. Once fully assembled, lift and rotate the table to the upright position.
2. Check legs to make sure that they are perpendicular to the floor.
3. Level table.
Build view Stand view
WireManagement
Trough
1. Run cord/conduit from shelf through wire management trough.
2. Attach adhesive tape to trough on face shown below.
3. Adhere tape/trough directly to leg, keeping the outward facing surface flush with apron.
Top View
Apply adhesivetape to this surface
Flip Table Upright
*Important*Table should be rolled by at least two installers. Table should be lifted while flipping dueto the overall weight. Failure to adequately support table may result in damage to legs.
Wire Management Trough
This face to beflush with apron
3430391900Page 14 of 14
Harvest Metal Table Installation Packet
Final Assembled Table
Exploded View