In preparation of potential federal and state legislation supporting school construction, the Department of Education collected facility information from schools. SAU District School Q # (see Tab 1) Question Answer 1 Contoocook Valley Antrim Elementary School Q.14a a. Roofs ||||| 1 Contoocook Valley Antrim Elementary School Q.14b b. Lighting Systems ||||| 1 Contoocook Valley Antrim Elementary School Q.14c c. Windows ||||| 1 Contoocook Valley Antrim Elementary School Q.14d d. Ceilings ||||| 1 Contoocook Valley Antrim Elementary School Q.14e e. Plumbing ||||| 1 Contoocook Valley Antrim Elementary School Q.14f f. Heating Systems ||||| 1 Contoocook Valley Antrim Elementary School Q.14g g. Ventilation Systems ||||| 1 Contoocook Valley Antrim Elementary School Q.14h h. Conditioning Systems ||||| 3 Berlin Berlin Elementary School Q.01 Approximate year of the original construction date 1925 3 Berlin Berlin Elementary School Q.02 Excluding maintenance costs, identify the year of the last major addition or renovation project that was completed (with costs greater than $500,000). 0 3 Berlin Berlin Elementary School Q.03 Gross Square footage (including portables) 23000 3 Berlin Berlin Elementary School Q.04 Are student bus loading areas segregated from other vehicular traffic and pedestrian walkways? No 3 Berlin Berlin Elementary School Q.05 How many parking spaces does the facility have? 8 3 Berlin Berlin Elementary School Q.06 Does your building have a basement? No 3 Berlin Berlin Elementary School Q.07 How many portable classrooms are in use? 0 3 Berlin Berlin Elementary School Q.08 Not including portable classrooms, how many temporary classrooms are in use (e.g., the auditorium stage set up as a classroom, art on a cart, etc.)? 0 3 Berlin Berlin Elementary School Q.10 Does the building support technology requirements associated with academic standards and provide necessary space for technology instruction? Yes 3 Berlin Berlin Elementary School Q.11 Does the school facility have a separate room designated as a library/resource/media center in support of academic standards? Yes 3 Berlin Berlin Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No 3 Berlin Berlin Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes 3 Berlin Berlin Elementary School Q.14a a. Roofs |||||+ 3 Berlin Berlin Elementary School Q.14b b. Lighting Systems |||||+ 3 Berlin Berlin Elementary School Q.14c c. Windows |||||+ 3 Berlin Berlin Elementary School Q.14d d. Ceilings |||||+ 3 Berlin Berlin Elementary School Q.14e e. Plumbing |||||+ 3 Berlin Berlin Elementary School Q.14f f. Heating Systems |||||+ 3 Berlin Berlin Elementary School Q.14g g. Ventilation Systems |||||+ 3 Berlin Berlin Elementary School Q.14h h. Conditioning Systems NA||||| 3 Berlin Berlin Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat 3 Berlin Berlin Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick 3 Berlin Berlin Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|concrete 3 Berlin Berlin Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes 3 Berlin Berlin Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam 3 Berlin Berlin Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil 3 Berlin Berlin Elementary School Q.21 Is your building a CHP's or LEED certified? No 3 Berlin Berlin Elementary School Q.22 Have you had energy audits of all your school facilities? Yes 3 Berlin Berlin Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes 3 Berlin Berlin Elementary School Q.23 Do you have an energy performance contract in place? No 3 Berlin Berlin Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2 3 Berlin Berlin Elementary School Q.25 What is the R-Value of the roof? 22 3 Berlin Berlin Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No 3 Berlin Berlin Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos 3 Berlin Berlin Elementary School Q.28 Do you have a facility maintenance plan? No 3 Berlin Berlin Elementary School Q.29 What is your maintenance budget? 320658 2018-2019 School Facility Survey Results New Hampshire Department of Education Bureau of School Safety and Facility Management 101 Pleasant Street, Concord, NH 03301-3852 Telephone: (603) 271-2037 Page 1 of 238

New Hampshire Department of Education Bureau of School

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Hampshire Department of Education Bureau of School

In preparation of potential federal and state legislation supporting school construction, the Department of Education collected facility information from schools.

SAU District SchoolQ #

(see Tab 1) Question Answer

1 Contoocook Valley Antrim Elementary School Q.14a a. Roofs |||||

1 Contoocook Valley Antrim Elementary School Q.14b b. Lighting Systems |||||

1 Contoocook Valley Antrim Elementary School Q.14c c. Windows |||||

1 Contoocook Valley Antrim Elementary School Q.14d d. Ceilings |||||

1 Contoocook Valley Antrim Elementary School Q.14e e. Plumbing |||||

1 Contoocook Valley Antrim Elementary School Q.14f f. Heating Systems |||||

1 Contoocook Valley Antrim Elementary School Q.14g g. Ventilation Systems |||||

1 Contoocook Valley Antrim Elementary School Q.14h h. Conditioning Systems |||||

3 Berlin Berlin Elementary School Q.01 Approximate year of the original construction date 1925

3 Berlin Berlin Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

3 Berlin Berlin Elementary School Q.03 Gross Square footage (including portables) 23000

3 Berlin Berlin Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

3 Berlin Berlin Elementary School Q.05 How many parking spaces does the facility have? 8

3 Berlin Berlin Elementary School Q.06 Does your building have a basement? No

3 Berlin Berlin Elementary School Q.07 How many portable classrooms are in use? 0

3 Berlin Berlin Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

3 Berlin Berlin Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

3 Berlin Berlin Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

3 Berlin Berlin Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

3 Berlin Berlin Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

3 Berlin Berlin Elementary School Q.14a a. Roofs |||||+

3 Berlin Berlin Elementary School Q.14b b. Lighting Systems |||||+

3 Berlin Berlin Elementary School Q.14c c. Windows |||||+

3 Berlin Berlin Elementary School Q.14d d. Ceilings |||||+

3 Berlin Berlin Elementary School Q.14e e. Plumbing |||||+

3 Berlin Berlin Elementary School Q.14f f. Heating Systems |||||+

3 Berlin Berlin Elementary School Q.14g g. Ventilation Systems |||||+

3 Berlin Berlin Elementary School Q.14h h. Conditioning Systems NA|||||

3 Berlin Berlin Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

3 Berlin Berlin Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

3 Berlin Berlin Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|concrete

3 Berlin Berlin Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

3 Berlin Berlin Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

3 Berlin Berlin Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

3 Berlin Berlin Elementary School Q.21 Is your building a CHP's or LEED certified? No

3 Berlin Berlin Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

3 Berlin Berlin Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

3 Berlin Berlin Elementary School Q.23 Do you have an energy performance contract in place? No

3 Berlin Berlin Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

3 Berlin Berlin Elementary School Q.25 What is the R-Value of the roof? 22

3 Berlin Berlin Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

3 Berlin Berlin Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

3 Berlin Berlin Elementary School Q.28 Do you have a facility maintenance plan? No

3 Berlin Berlin Elementary School Q.29 What is your maintenance budget? 320658

2018-2019 School Facility Survey Results

New Hampshire Department of Education

Bureau of School Safety and Facility Management

101 Pleasant Street, Concord, NH 03301-3852

Telephone: (603) 271-2037

Page 1 of 238

Page 2: New Hampshire Department of Education Bureau of School

3 Berlin Berlin Elementary School Q.30 What is your operational budget? 1661379.44

3 Berlin Berlin Elementary School Q.31 What is your capital construction budget? 35000

3 Berlin Berlin Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?76871

3 Berlin Berlin Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

3 Berlin Berlin Elementary School Q.34 Do you have a maintenance contract in place? No

3 Berlin Berlin Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

3 Berlin Berlin Middle School Q.01 Approximate year of the original construction date 1928

3 Berlin Berlin Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

3 Berlin Berlin Middle School Q.03 Gross Square footage (including portables) 38000

3 Berlin Berlin Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

3 Berlin Berlin Middle School Q.05 How many parking spaces does the facility have? 17

3 Berlin Berlin Middle School Q.06 Does your building have a basement? Yes

3 Berlin Berlin Middle School Q.07 How many portable classrooms are in use? 0

3 Berlin Berlin Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

3 Berlin Berlin Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

3 Berlin Berlin Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

3 Berlin Berlin Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

3 Berlin Berlin Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

3 Berlin Berlin Middle School Q.14a a. Roofs |||||+

3 Berlin Berlin Middle School Q.14b b. Lighting Systems |||||+

3 Berlin Berlin Middle School Q.14c c. Windows |||||+

3 Berlin Berlin Middle School Q.14d d. Ceilings |||||+

3 Berlin Berlin Middle School Q.14e e. Plumbing |||||+

3 Berlin Berlin Middle School Q.14f f. Heating Systems |||||+

3 Berlin Berlin Middle School Q.14g g. Ventilation Systems |||||+

3 Berlin Berlin Middle School Q.14h h. Conditioning Systems NA|||||

3 Berlin Berlin Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

3 Berlin Berlin Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

3 Berlin Berlin Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Other|concrete

3 Berlin Berlin Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

3 Berlin Berlin Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

3 Berlin Berlin Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

3 Berlin Berlin Middle School Q.21 Is your building a CHP's or LEED certified? No

3 Berlin Berlin Middle School Q.22 Have you had energy audits of all your school facilities? Yes

3 Berlin Berlin Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

3 Berlin Berlin Middle School Q.23 Do you have an energy performance contract in place? No

3 Berlin Berlin Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

3 Berlin Berlin Middle School Q.25 What is the R-Value of the roof? 22

3 Berlin Berlin Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

3 Berlin Berlin Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

3 Berlin Berlin Middle School Q.28 Do you have a facility maintenance plan? No

3 Berlin Berlin Middle School Q.29 What is your maintenance budget? 402004

3 Berlin Berlin Middle School Q.30 What is your operational budget? 2659215.53

3 Berlin Berlin Middle School Q.31 What is your capital construction budget? 36000

3 Berlin Berlin Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?83277

3 Berlin Berlin Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

3 Berlin Berlin Middle School Q.34 Do you have a maintenance contract in place? No

Page 2 of 238

Page 3: New Hampshire Department of Education Bureau of School

3 Berlin Berlin Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

3 Berlin Berlin Senior High School Q.01 Approximate year of the original construction date 1972

3 Berlin Berlin Senior High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

3 Berlin Berlin Senior High School Q.03 Gross Square footage (including portables) 75000

3 Berlin Berlin Senior High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

3 Berlin Berlin Senior High School Q.05 How many parking spaces does the facility have? 193

3 Berlin Berlin Senior High School Q.06 Does your building have a basement? No

3 Berlin Berlin Senior High School Q.07 How many portable classrooms are in use? 0

3 Berlin Berlin Senior High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

3 Berlin Berlin Senior High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

3 Berlin Berlin Senior High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

3 Berlin Berlin Senior High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

3 Berlin Berlin Senior High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

3 Berlin Berlin Senior High School Q.14a a. Roofs |||||+

3 Berlin Berlin Senior High School Q.14b b. Lighting Systems |||||+

3 Berlin Berlin Senior High School Q.14c c. Windows |||||+

3 Berlin Berlin Senior High School Q.14d d. Ceilings |||||+

3 Berlin Berlin Senior High School Q.14e e. Plumbing |||||+

3 Berlin Berlin Senior High School Q.14f f. Heating Systems |||||+

3 Berlin Berlin Senior High School Q.14g g. Ventilation Systems |||||+

3 Berlin Berlin Senior High School Q.14h h. Conditioning Systems NA|||||

3 Berlin Berlin Senior High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

3 Berlin Berlin Senior High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

3 Berlin Berlin Senior High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

3 Berlin Berlin Senior High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

3 Berlin Berlin Senior High School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

3 Berlin Berlin Senior High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

3 Berlin Berlin Senior High School Q.21 Is your building a CHP's or LEED certified? No

3 Berlin Berlin Senior High School Q.22 Have you had energy audits of all your school facilities? Yes

3 Berlin Berlin Senior High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

3 Berlin Berlin Senior High School Q.23 Do you have an energy performance contract in place? No

3 Berlin Berlin Senior High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

3 Berlin Berlin Senior High School Q.25 What is the R-Value of the roof? 22

3 Berlin Berlin Senior High School Q.26 Do you have carbon monoxide detector(s) in your building? No

3 Berlin Berlin Senior High School Q.27 Do you have a presence of: (click all that apply) Asbestos

3 Berlin Berlin Senior High School Q.28 Do you have a facility maintenance plan? No

3 Berlin Berlin Senior High School Q.29 What is your maintenance budget? 624238

3 Berlin Berlin Senior High School Q.30 What is your operational budget? 4926763.22

3 Berlin Berlin Senior High School Q.31 What is your capital construction budget? 250000

3 Berlin Berlin Senior High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?175038

3 Berlin Berlin Senior High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?30

3 Berlin Berlin Senior High School Q.34 Do you have a maintenance contract in place? No

3 Berlin Berlin Senior High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

3 Berlin Brown Elementary School Q.01 Approximate year of the original construction date 1913

3 Berlin Brown Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1956

3 Berlin Brown Elementary School Q.03 Gross Square footage (including portables) 13000

3 Berlin Brown Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

3 Berlin Brown Elementary School Q.05 How many parking spaces does the facility have? 26

Page 3 of 238

Page 4: New Hampshire Department of Education Bureau of School

3 Berlin Brown Elementary School Q.07 How many portable classrooms are in use? 0

3 Berlin Brown Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

3 Berlin Brown Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)|Support Space|Storage

3 Berlin Brown Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

3 Berlin Brown Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

3 Berlin Brown Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

3 Berlin Brown Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

3 Berlin Brown Elementary School Q.14a a. Roofs |||||+

3 Berlin Brown Elementary School Q.14b b. Lighting Systems |||||+

3 Berlin Brown Elementary School Q.14c c. Windows |||||+

3 Berlin Brown Elementary School Q.14d d. Ceilings |||||+

3 Berlin Brown Elementary School Q.14e e. Plumbing |||||+

3 Berlin Brown Elementary School Q.14f f. Heating Systems |||||+

3 Berlin Brown Elementary School Q.14g g. Ventilation Systems |||||+

3 Berlin Brown Elementary School Q.14h h. Conditioning Systems |||||+

3 Berlin Brown Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

3 Berlin Brown Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

3 Berlin Brown Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

3 Berlin Brown Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

3 Berlin Brown Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

3 Berlin Brown Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

3 Berlin Brown Elementary School Q.21 Is your building a CHP's or LEED certified? No

3 Berlin Brown Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

3 Berlin Brown Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

3 Berlin Brown Elementary School Q.23 Do you have an energy performance contract in place? No

3 Berlin Brown Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

3 Berlin Brown Elementary School Q.25 What is the R-Value of the roof? 22

3 Berlin Brown Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

3 Berlin Brown Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

3 Berlin Brown Elementary School Q.28 Do you have a facility maintenance plan? No

3 Berlin Brown Elementary School Q.29 What is your maintenance budget? 280157

3 Berlin Brown Elementary School Q.30 What is your operational budget? 1906107.66

3 Berlin Brown Elementary School Q.31 What is your capital construction budget? 0

3 Berlin Brown Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?40970

3 Berlin Brown Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

3 Berlin Brown Elementary School Q.34 Do you have a maintenance contract in place? No

3 Berlin Brown Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

4 Newfound Area Bridgewater-Hebron Village School Q.01 Approximate year of the original construction date 1998

4 Newfound Area Bridgewater-Hebron Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

4 Newfound Area Bridgewater-Hebron Village School Q.03 Gross Square footage (including portables) 33000

4 Newfound Area Bridgewater-Hebron Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area Bridgewater-Hebron Village School Q.05 How many parking spaces does the facility have? 100

4 Newfound Area Bridgewater-Hebron Village School Q.06 Does your building have a basement? No

4 Newfound Area Bridgewater-Hebron Village School Q.07 How many portable classrooms are in use? 0

4 Newfound Area Bridgewater-Hebron Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area Bridgewater-Hebron Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area Bridgewater-Hebron Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

4 Newfound Area Bridgewater-Hebron Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

4 Newfound Area Bridgewater-Hebron Village School Q.14a a. Roofs 1998|1998|1998|||

Page 4 of 238

Page 5: New Hampshire Department of Education Bureau of School

4 Newfound Area Bridgewater-Hebron Village School Q.14b b. Lighting Systems 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14c c. Windows 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14d d. Ceilings 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14e e. Plumbing 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14f f. Heating Systems 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14g g. Ventilation Systems 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.14h h. Conditioning Systems 1998|1998|1998|||

4 Newfound Area Bridgewater-Hebron Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

4 Newfound Area Bridgewater-Hebron Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

4 Newfound Area Bridgewater-Hebron Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

4 Newfound Area Bridgewater-Hebron Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

4 Newfound Area Bridgewater-Hebron Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area Bridgewater-Hebron Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

4 Newfound Area Bridgewater-Hebron Village School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area Bridgewater-Hebron Village School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area Bridgewater-Hebron Village School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

4 Newfound Area Bridgewater-Hebron Village School Q.23 Do you have an energy performance contract in place? No

4 Newfound Area Bridgewater-Hebron Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 4

4 Newfound Area Bridgewater-Hebron Village School Q.25 What is the R-Value of the roof? 38

4 Newfound Area Bridgewater-Hebron Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

4 Newfound Area Bridgewater-Hebron Village School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area Bridgewater-Hebron Village School Q.29 What is your maintenance budget? 1607861

4 Newfound Area Bridgewater-Hebron Village School Q.30 What is your operational budget? 23562106

4 Newfound Area Bridgewater-Hebron Village School Q.31 What is your capital construction budget? 693259

4 Newfound Area Bridgewater-Hebron Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?28

4 Newfound Area Bridgewater-Hebron Village School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area Bridgewater-Hebron Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

4 Newfound Area Bristol Elementary School Q.01 Approximate year of the original construction date 1923

4 Newfound Area Bristol Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1960

4 Newfound Area Bristol Elementary School Q.03 Gross Square footage (including portables) 23908

4 Newfound Area Bristol Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area Bristol Elementary School Q.05 How many parking spaces does the facility have? 5060

4 Newfound Area Bristol Elementary School Q.06 Does your building have a basement? Yes

4 Newfound Area Bristol Elementary School Q.07 How many portable classrooms are in use? 0

4 Newfound Area Bristol Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area Bristol Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

4 Newfound Area Bristol Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area Bristol Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

4 Newfound Area Bristol Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

4 Newfound Area Bristol Elementary School Q.14a a. Roofs 1980|1980|1980|||

4 Newfound Area Bristol Elementary School Q.14b b. Lighting Systems 1980|1980|1980|||

4 Newfound Area Bristol Elementary School Q.14c c. Windows 1960|1960|2019|||

4 Newfound Area Bristol Elementary School Q.14d d. Ceilings 1960|1960|1960|||

4 Newfound Area Bristol Elementary School Q.14e e. Plumbing 1960|1960|1960|||

4 Newfound Area Bristol Elementary School Q.14f f. Heating Systems 1960|1960|1960|||

4 Newfound Area Bristol Elementary School Q.14g g. Ventilation Systems 1960|1960|1960|||

4 Newfound Area Bristol Elementary School Q.14h h. Conditioning Systems |||||

4 Newfound Area Bristol Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

4 Newfound Area Bristol Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

Page 5 of 238

Page 6: New Hampshire Department of Education Bureau of School

4 Newfound Area Bristol Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

4 Newfound Area Bristol Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

4 Newfound Area Bristol Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area Bristol Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

4 Newfound Area Bristol Elementary School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area Bristol Elementary School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area Bristol Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

4 Newfound Area Bristol Elementary School Q.23 Do you have an energy performance contract in place? No

4 Newfound Area Bristol Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

4 Newfound Area Bristol Elementary School Q.25 What is the R-Value of the roof? 38

4 Newfound Area Bristol Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

4 Newfound Area Bristol Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

4 Newfound Area Bristol Elementary School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area Bristol Elementary School Q.29 What is your maintenance budget? 1607861

4 Newfound Area Bristol Elementary School Q.30 What is your operational budget? 23562106

4 Newfound Area Bristol Elementary School Q.31 What is your capital construction budget? 693259

4 Newfound Area Bristol Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?38

4 Newfound Area Bristol Elementary School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area Bristol Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

4 Newfound Area Danbury Elementary School Q.01 Approximate year of the original construction date 1961

4 Newfound Area Danbury Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1961

4 Newfound Area Danbury Elementary School Q.03 Gross Square footage (including portables) 7366

4 Newfound Area Danbury Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area Danbury Elementary School Q.05 How many parking spaces does the facility have? 2530

4 Newfound Area Danbury Elementary School Q.06 Does your building have a basement? No

4 Newfound Area Danbury Elementary School Q.07 How many portable classrooms are in use? 0

4 Newfound Area Danbury Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area Danbury Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

4 Newfound Area Danbury Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area Danbury Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

4 Newfound Area Danbury Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

4 Newfound Area Danbury Elementary School Q.14a a. Roofs 1961|1961|1961|||

4 Newfound Area Danbury Elementary School Q.14b b. Lighting Systems 1961|1961|1961|||

4 Newfound Area Danbury Elementary School Q.14c c. Windows 1961|1961|1961|||

4 Newfound Area Danbury Elementary School Q.14d d. Ceilings 1985|1985|1985|||

4 Newfound Area Danbury Elementary School Q.14e e. Plumbing 1961|1961|1961|||

4 Newfound Area Danbury Elementary School Q.14f f. Heating Systems 1985|1985|1985|||

4 Newfound Area Danbury Elementary School Q.14g g. Ventilation Systems 1985|1985|1985|||

4 Newfound Area Danbury Elementary School Q.14h h. Conditioning Systems 2017|||||

4 Newfound Area Danbury Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

4 Newfound Area Danbury Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

4 Newfound Area Danbury Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

4 Newfound Area Danbury Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

4 Newfound Area Danbury Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area Danbury Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

4 Newfound Area Danbury Elementary School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area Danbury Elementary School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area Danbury Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

4 Newfound Area Danbury Elementary School Q.23 Do you have an energy performance contract in place? No

Page 6 of 238

Page 7: New Hampshire Department of Education Bureau of School

4 Newfound Area Danbury Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

4 Newfound Area Danbury Elementary School Q.25 What is the R-Value of the roof? 38

4 Newfound Area Danbury Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

4 Newfound Area Danbury Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

4 Newfound Area Danbury Elementary School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area Danbury Elementary School Q.29 What is your maintenance budget? 1607861

4 Newfound Area Danbury Elementary School Q.30 What is your operational budget? 23562106

4 Newfound Area Danbury Elementary School Q.31 What is your capital construction budget? 693259

4 Newfound Area Danbury Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

4 Newfound Area Danbury Elementary School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area Danbury Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

4 Newfound Area New Hampton Community School Q.01 Approximate year of the original construction date 1950

4 Newfound Area New Hampton Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1950

4 Newfound Area New Hampton Community School Q.03 Gross Square footage (including portables) 12881

4 Newfound Area New Hampton Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area New Hampton Community School Q.05 How many parking spaces does the facility have? 3040

4 Newfound Area New Hampton Community School Q.06 Does your building have a basement? No

4 Newfound Area New Hampton Community School Q.07 How many portable classrooms are in use? 0

4 Newfound Area New Hampton Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area New Hampton Community School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Other|The Little Red School house holds Music

and Art classes and is separate from tehmain

4 Newfound Area New Hampton Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

4 Newfound Area New Hampton Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area New Hampton Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

4 Newfound Area New Hampton Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

4 Newfound Area New Hampton Community School Q.14a a. Roofs 1987|2017|1980|||

4 Newfound Area New Hampton Community School Q.14b b. Lighting Systems 1980|1980|1980|||

4 Newfound Area New Hampton Community School Q.14c c. Windows 1950|1950|1950|||

4 Newfound Area New Hampton Community School Q.14d d. Ceilings 1950|1950|1950|||

4 Newfound Area New Hampton Community School Q.14e e. Plumbing 1950|1950|1950|||

4 Newfound Area New Hampton Community School Q.14f f. Heating Systems 1950|1950|1950|||

4 Newfound Area New Hampton Community School Q.14g g. Ventilation Systems 1950|||||

4 Newfound Area New Hampton Community School Q.14h h. Conditioning Systems |||||

4 Newfound Area New Hampton Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

4 Newfound Area New Hampton Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

4 Newfound Area New Hampton Community School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

4 Newfound Area New Hampton Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

4 Newfound Area New Hampton Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area New Hampton Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

4 Newfound Area New Hampton Community School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area New Hampton Community School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area New Hampton Community School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

4 Newfound Area New Hampton Community School Q.23 Do you have an energy performance contract in place? No

4 Newfound Area New Hampton Community School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

4 Newfound Area New Hampton Community School Q.25 What is the R-Value of the roof? 38

4 Newfound Area New Hampton Community School Q.26 Do you have carbon monoxide detector(s) in your building? No

4 Newfound Area New Hampton Community School Q.27 Do you have a presence of: (click all that apply) Asbestos

4 Newfound Area New Hampton Community School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area New Hampton Community School Q.29 What is your maintenance budget? 1607861

4 Newfound Area New Hampton Community School Q.30 What is your operational budget? 23562106

Page 7 of 238

Page 8: New Hampshire Department of Education Bureau of School

4 Newfound Area New Hampton Community School Q.31 What is your capital construction budget? 693259

4 Newfound Area New Hampton Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?17

4 Newfound Area New Hampton Community School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area New Hampton Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

4 Newfound Area Newfound Memorial Middle School Q.01 Approximate year of the original construction date 1947

4 Newfound Area Newfound Memorial Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1965

4 Newfound Area Newfound Memorial Middle School Q.03 Gross Square footage (including portables) 39715

4 Newfound Area Newfound Memorial Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area Newfound Memorial Middle School Q.05 How many parking spaces does the facility have? 4050

4 Newfound Area Newfound Memorial Middle School Q.06 Does your building have a basement? Yes

4 Newfound Area Newfound Memorial Middle School Q.07 How many portable classrooms are in use? 0

4 Newfound Area Newfound Memorial Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area Newfound Memorial Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

4 Newfound Area Newfound Memorial Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area Newfound Memorial Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

4 Newfound Area Newfound Memorial Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

4 Newfound Area Newfound Memorial Middle School Q.14a a. Roofs 1985|1985||||

4 Newfound Area Newfound Memorial Middle School Q.14b b. Lighting Systems 1960|1960||||

4 Newfound Area Newfound Memorial Middle School Q.14c c. Windows 1947|1947||||

4 Newfound Area Newfound Memorial Middle School Q.14d d. Ceilings 1947|1947||||

4 Newfound Area Newfound Memorial Middle School Q.14e e. Plumbing 1947|1947||||

4 Newfound Area Newfound Memorial Middle School Q.14f f. Heating Systems 1947|1947||||

4 Newfound Area Newfound Memorial Middle School Q.14g g. Ventilation Systems 1947|1947||||

4 Newfound Area Newfound Memorial Middle School Q.14h h. Conditioning Systems |||||

4 Newfound Area Newfound Memorial Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

4 Newfound Area Newfound Memorial Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

4 Newfound Area Newfound Memorial Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

4 Newfound Area Newfound Memorial Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area Newfound Memorial Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

4 Newfound Area Newfound Memorial Middle School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area Newfound Memorial Middle School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area Newfound Memorial Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

4 Newfound Area Newfound Memorial Middle School Q.23 Do you have an energy performance contract in place? No

4 Newfound Area Newfound Memorial Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

4 Newfound Area Newfound Memorial Middle School Q.25 What is the R-Value of the roof? 38

4 Newfound Area Newfound Memorial Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

4 Newfound Area Newfound Memorial Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

4 Newfound Area Newfound Memorial Middle School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area Newfound Memorial Middle School Q.29 What is your maintenance budget? 1607861

4 Newfound Area Newfound Memorial Middle School Q.30 What is your operational budget? 23562106

4 Newfound Area Newfound Memorial Middle School Q.31 What is your capital construction budget? 693259

4 Newfound Area Newfound Memorial Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?54

4 Newfound Area Newfound Memorial Middle School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area Newfound Regional High School Q.01 Approximate year of the original construction date 1989

4 Newfound Area Newfound Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

4 Newfound Area Newfound Regional High School Q.03 Gross Square footage (including portables) 90043

4 Newfound Area Newfound Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

4 Newfound Area Newfound Regional High School Q.05 How many parking spaces does the facility have? 160

4 Newfound Area Newfound Regional High School Q.06 Does your building have a basement? No

Page 8 of 238

Page 9: New Hampshire Department of Education Bureau of School

4 Newfound Area Newfound Regional High School Q.07 How many portable classrooms are in use? 0

4 Newfound Area Newfound Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

4 Newfound Area Newfound Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

4 Newfound Area Newfound Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

4 Newfound Area Newfound Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

4 Newfound Area Newfound Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

4 Newfound Area Newfound Regional High School Q.14a a. Roofs 2018|2018|2018|||

4 Newfound Area Newfound Regional High School Q.14b b. Lighting Systems 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14c c. Windows 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14d d. Ceilings 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14e e. Plumbing 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14f f. Heating Systems 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14g g. Ventilation Systems 1989|1989|1989|||

4 Newfound Area Newfound Regional High School Q.14h h. Conditioning Systems 1989|||||

4 Newfound Area Newfound Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

4 Newfound Area Newfound Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

4 Newfound Area Newfound Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

4 Newfound Area Newfound Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

4 Newfound Area Newfound Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

4 Newfound Area Newfound Regional High School Q.21 Is your building a CHP's or LEED certified? No

4 Newfound Area Newfound Regional High School Q.22 Have you had energy audits of all your school facilities? No

4 Newfound Area Newfound Regional High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

4 Newfound Area Newfound Regional High School Q.23 Do you have an energy performance contract in place? No

4 Newfound Area Newfound Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

4 Newfound Area Newfound Regional High School Q.25 What is the R-Value of the roof? 40

4 Newfound Area Newfound Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

4 Newfound Area Newfound Regional High School Q.28 Do you have a facility maintenance plan? No

4 Newfound Area Newfound Regional High School Q.29 What is your maintenance budget? 1607861

4 Newfound Area Newfound Regional High School Q.30 What is your operational budget? 23562106

4 Newfound Area Newfound Regional High School Q.31 What is your capital construction budget? 693259

4 Newfound Area Newfound Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?70

4 Newfound Area Newfound Regional High School Q.34 Do you have a maintenance contract in place? No

4 Newfound Area Newfound Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

5 Oyster River Coop Mast Way School Q.01 Approximate year of the original construction date 1960

5 Oyster River Coop Mast Way School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

5 Oyster River Coop Mast Way School Q.03 Gross Square footage (including portables) 49700

5 Oyster River Coop Mast Way School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

5 Oyster River Coop Mast Way School Q.05 How many parking spaces does the facility have? 87

5 Oyster River Coop Mast Way School Q.06 Does your building have a basement? No

5 Oyster River Coop Mast Way School Q.07 How many portable classrooms are in use? 0

5 Oyster River Coop Mast Way School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

5 Oyster River Coop Mast Way School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

5 Oyster River Coop Mast Way School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

5 Oyster River Coop Mast Way School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

5 Oyster River Coop Mast Way School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

5 Oyster River Coop Mast Way School Q.14a a. Roofs1960,1967,1994,2018|2000|2004|2008/9|2016|2

017

5 Oyster River Coop Mast Way School Q.14b b. Lighting Systems 1960|2012|2018|||

5 Oyster River Coop Mast Way School Q.14c c. Windows 1960|1994|2018|||

5 Oyster River Coop Mast Way School Q.14d d. Ceilings 1960|1994|2018|||

Page 9 of 238

Page 10: New Hampshire Department of Education Bureau of School

5 Oyster River Coop Mast Way School Q.14e e. Plumbing 1960|1994||||

5 Oyster River Coop Mast Way School Q.14f f. Heating Systems 1960|1994|2012|2016||

5 Oyster River Coop Mast Way School Q.14g g. Ventilation Systems 1994|2018|2019|||

5 Oyster River Coop Mast Way School Q.14h h. Conditioning Systems 2019|||||

5 Oyster River Coop Mast Way School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

5 Oyster River Coop Mast Way School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Some EIFS, concrete fiber board

5 Oyster River Coop Mast Way School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

5 Oyster River Coop Mast Way School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

5 Oyster River Coop Mast Way School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

5 Oyster River Coop Mast Way School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

5 Oyster River Coop Mast Way School Q.21 Is your building a CHP's or LEED certified? No

5 Oyster River Coop Mast Way School Q.22 Have you had energy audits of all your school facilities? Yes

5 Oyster River Coop Mast Way School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

5 Oyster River Coop Mast Way School Q.23 Do you have an energy performance contract in place? Yes

5 Oyster River Coop Mast Way School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

5 Oyster River Coop Mast Way School Q.25 What is the R-Value of the roof? 20

5 Oyster River Coop Mast Way School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

5 Oyster River Coop Mast Way School Q.28 Do you have a facility maintenance plan? Yes

5 Oyster River Coop Mast Way School Q.29 What is your maintenance budget? 57652

5 Oyster River Coop Mast Way School Q.30 What is your operational budget? 378217

5 Oyster River Coop Mast Way School Q.31 What is your capital construction budget? 180411

5 Oyster River Coop Mast Way School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?68202

5 Oyster River Coop Mast Way School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

5 Oyster River Coop Mast Way School Q.34 Do you have a maintenance contract in place? Yes

5 Oyster River Coop Mast Way School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

5 Oyster River Coop Moharimet School Q.01 Approximate year of the original construction date 1988

5 Oyster River Coop Moharimet School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

5 Oyster River Coop Moharimet School Q.03 Gross Square footage (including portables) 45480

5 Oyster River Coop Moharimet School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

5 Oyster River Coop Moharimet School Q.05 How many parking spaces does the facility have? 64

5 Oyster River Coop Moharimet School Q.06 Does your building have a basement? No

5 Oyster River Coop Moharimet School Q.07 How many portable classrooms are in use? 0

5 Oyster River Coop Moharimet School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

5 Oyster River Coop Moharimet School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

5 Oyster River Coop Moharimet School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

5 Oyster River Coop Moharimet School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

5 Oyster River Coop Moharimet School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

5 Oyster River Coop Moharimet School Q.14a a. Roofs 1988|2007|2014|2015||

5 Oyster River Coop Moharimet School Q.14b b. Lighting Systems 1988|2018||||

5 Oyster River Coop Moharimet School Q.14c c. Windows 1988|2018||||

5 Oyster River Coop Moharimet School Q.14d d. Ceilings 1988|2010||||

5 Oyster River Coop Moharimet School Q.14e e. Plumbing 1988|||||

5 Oyster River Coop Moharimet School Q.14f f. Heating Systems 1988|2017||||

5 Oyster River Coop Moharimet School Q.14g g. Ventilation Systems 1988|||||

5 Oyster River Coop Moharimet School Q.14h h. Conditioning Systems 1988|||||

5 Oyster River Coop Moharimet School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

5 Oyster River Coop Moharimet School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|EIFS

5 Oyster River Coop Moharimet School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

5 Oyster River Coop Moharimet School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

Page 10 of 238

Page 11: New Hampshire Department of Education Bureau of School

5 Oyster River Coop Moharimet School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

5 Oyster River Coop Moharimet School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

5 Oyster River Coop Moharimet School Q.21 Is your building a CHP's or LEED certified? No

5 Oyster River Coop Moharimet School Q.22 Have you had energy audits of all your school facilities? Yes

5 Oyster River Coop Moharimet School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

5 Oyster River Coop Moharimet School Q.23 Do you have an energy performance contract in place? Yes

5 Oyster River Coop Moharimet School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

5 Oyster River Coop Moharimet School Q.25 What is the R-Value of the roof? 20

5 Oyster River Coop Moharimet School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

5 Oyster River Coop Moharimet School Q.28 Do you have a facility maintenance plan? Yes

5 Oyster River Coop Moharimet School Q.29 What is your maintenance budget? 52756

5 Oyster River Coop Moharimet School Q.30 What is your operational budget? 346102

5 Oyster River Coop Moharimet School Q.31 What is your capital construction budget? 165092

5 Oyster River Coop Moharimet School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?68899

5 Oyster River Coop Moharimet School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

5 Oyster River Coop Moharimet School Q.34 Do you have a maintenance contract in place? Yes

5 Oyster River Coop Moharimet School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

5 Oyster River Coop Oyster River High School Q.01 Approximate year of the original construction date 1963

5 Oyster River Coop Oyster River High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

5 Oyster River Coop Oyster River High School Q.03 Gross Square footage (including portables) 198000

5 Oyster River Coop Oyster River High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

5 Oyster River Coop Oyster River High School Q.05 How many parking spaces does the facility have? 355

5 Oyster River Coop Oyster River High School Q.06 Does your building have a basement? No

5 Oyster River Coop Oyster River High School Q.07 How many portable classrooms are in use? 0

5 Oyster River Coop Oyster River High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

5 Oyster River Coop Oyster River High School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

5 Oyster River Coop Oyster River High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

5 Oyster River Coop Oyster River High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

5 Oyster River Coop Oyster River High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

5 Oyster River Coop Oyster River High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

5 Oyster River Coop Oyster River High School Q.14a a. Roofs 2005|||||

5 Oyster River Coop Oyster River High School Q.14b b. Lighting Systems 2005|2018||||

5 Oyster River Coop Oyster River High School Q.14c c. Windows 2005|||||

5 Oyster River Coop Oyster River High School Q.14d d. Ceilings 2005|||||

5 Oyster River Coop Oyster River High School Q.14e e. Plumbing 2005|||||

5 Oyster River Coop Oyster River High School Q.14f f. Heating Systems 2005|||||

5 Oyster River Coop Oyster River High School Q.14g g. Ventilation Systems 2005|||||

5 Oyster River Coop Oyster River High School Q.14h h. Conditioning Systems 2005|||||

5 Oyster River Coop Oyster River High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

5 Oyster River Coop Oyster River High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

5 Oyster River Coop Oyster River High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

5 Oyster River Coop Oyster River High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

5 Oyster River Coop Oyster River High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

5 Oyster River Coop Oyster River High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

5 Oyster River Coop Oyster River High School Q.21 Is your building a CHP's or LEED certified? No

5 Oyster River Coop Oyster River High School Q.22 Have you had energy audits of all your school facilities? Yes

5 Oyster River Coop Oyster River High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

5 Oyster River Coop Oyster River High School Q.23 Do you have an energy performance contract in place? Yes

5 Oyster River Coop Oyster River High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

Page 11 of 238

Page 12: New Hampshire Department of Education Bureau of School

5 Oyster River Coop Oyster River High School Q.25 What is the R-Value of the roof? 20

5 Oyster River Coop Oyster River High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

5 Oyster River Coop Oyster River High School Q.28 Do you have a facility maintenance plan? Yes

5 Oyster River Coop Oyster River High School Q.29 What is your maintenance budget? 229680

5 Oyster River Coop Oyster River High School Q.30 What is your operational budget? 1506780

5 Oyster River Coop Oyster River High School Q.31 What is your capital construction budget? 718740

5 Oyster River Coop Oyster River High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?305339

5 Oyster River Coop Oyster River High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

5 Oyster River Coop Oyster River High School Q.34 Do you have a maintenance contract in place? Yes

5 Oyster River Coop Oyster River High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

5 Oyster River Coop Oyster River Middle School Q.01 Approximate year of the original construction date 1963

5 Oyster River Coop Oyster River Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

5 Oyster River Coop Oyster River Middle School Q.03 Gross Square footage (including portables) 106966

5 Oyster River Coop Oyster River Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

5 Oyster River Coop Oyster River Middle School Q.05 How many parking spaces does the facility have? 135

5 Oyster River Coop Oyster River Middle School Q.06 Does your building have a basement? No

5 Oyster River Coop Oyster River Middle School Q.07 How many portable classrooms are in use? 0

5 Oyster River Coop Oyster River Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

5 Oyster River Coop Oyster River Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

5 Oyster River Coop Oyster River Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

5 Oyster River Coop Oyster River Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

5 Oyster River Coop Oyster River Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? No

5 Oyster River Coop Oyster River Middle School Q.14a a. Roofs 1935-95|2000|2002|2004|2005|2006

5 Oyster River Coop Oyster River Middle School Q.14b b. Lighting Systems ?|2012||||

5 Oyster River Coop Oyster River Middle School Q.14c c. Windows Original|1985||||

5 Oyster River Coop Oyster River Middle School Q.14d d. Ceilings Original|1985||||

5 Oyster River Coop Oyster River Middle School Q.14e e. Plumbing 1935-85|1985||||

5 Oyster River Coop Oyster River Middle School Q.14f f. Heating Systems 1935|1985|2006|2014|2016|

5 Oyster River Coop Oyster River Middle School Q.14g g. Ventilation Systems 1985|2014||||

5 Oyster River Coop Oyster River Middle School Q.14h h. Conditioning Systems 1985|||||

5 Oyster River Coop Oyster River Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

5 Oyster River Coop Oyster River Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

5 Oyster River Coop Oyster River Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

5 Oyster River Coop Oyster River Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

5 Oyster River Coop Oyster River Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

5 Oyster River Coop Oyster River Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

5 Oyster River Coop Oyster River Middle School Q.21 Is your building a CHP's or LEED certified? No

5 Oyster River Coop Oyster River Middle School Q.22 Have you had energy audits of all your school facilities? Yes

5 Oyster River Coop Oyster River Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

5 Oyster River Coop Oyster River Middle School Q.23 Do you have an energy performance contract in place? Yes

5 Oyster River Coop Oyster River Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

5 Oyster River Coop Oyster River Middle School Q.25 What is the R-Value of the roof? 20

5 Oyster River Coop Oyster River Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

5 Oyster River Coop Oyster River Middle School Q.27 Do you have a presence of: (click all that apply) Lead in Water

5 Oyster River Coop Oyster River Middle School Q.28 Do you have a facility maintenance plan? Yes

5 Oyster River Coop Oyster River Middle School Q.29 What is your maintenance budget? 124080

5 Oyster River Coop Oyster River Middle School Q.30 What is your operational budget? 814011

5 Oyster River Coop Oyster River Middle School Q.31 What is your capital construction budget? 388286

5 Oyster River Coop Oyster River Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?108129

Page 12 of 238

Page 13: New Hampshire Department of Education Bureau of School

5 Oyster River Coop Oyster River Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

5 Oyster River Coop Oyster River Middle School Q.34 Do you have a maintenance contract in place? Yes

5 Oyster River Coop Oyster River Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

5 Oyster River Coop Oyster River Middle School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Build new middle school

5 Oyster River Coop Oyster River Middle School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 48

5 Oyster River Coop Oyster River Middle School Q.35c c. If yes, provide estimated year of construction. 2020

6 Claremont Bluff School Q.01 Approximate year of the original construction date 1939

6 Claremont Bluff School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

6 Claremont Bluff School Q.03 Gross Square footage (including portables) 32581

6 Claremont Bluff School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

6 Claremont Bluff School Q.05 How many parking spaces does the facility have? 56

6 Claremont Bluff School Q.06 Does your building have a basement? No

6 Claremont Bluff School Q.07 How many portable classrooms are in use? 0

6 Claremont Bluff School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Bluff School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Bluff School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Bluff School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Bluff School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Claremont Bluff School Q.14a a. Roofs 2019|||||

6 Claremont Bluff School Q.14b b. Lighting Systems 1996|||||

6 Claremont Bluff School Q.14c c. Windows 1996|||||

6 Claremont Bluff School Q.14d d. Ceilings 1996|||||

6 Claremont Bluff School Q.14e e. Plumbing |||||

6 Claremont Bluff School Q.14f f. Heating Systems 1996|||||

6 Claremont Bluff School Q.14g g. Ventilation Systems 1996|||||

6 Claremont Bluff School Q.14h h. Conditioning Systems 1996|||||

6 Claremont Bluff School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

6 Claremont Bluff School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

6 Claremont Bluff School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

6 Claremont Bluff School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Bluff School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Steam

6 Claremont Bluff School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

6 Claremont Bluff School Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Bluff School Q.22 Have you had energy audits of all your school facilities? Yes

6 Claremont Bluff School Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Bluff School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

6 Claremont Bluff School Q.25 What is the R-Value of the roof? 38

6 Claremont Bluff School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Bluff School Q.27 Do you have a presence of: (click all that apply) Asbestos

6 Claremont Bluff School Q.28 Do you have a facility maintenance plan? No

6 Claremont Bluff School Q.29 What is your maintenance budget? 175000

6 Claremont Bluff School Q.31 What is your capital construction budget? 0

6 Claremont Bluff School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?46500

6 Claremont Bluff School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3120

6 Claremont Bluff School Q.34 Do you have a maintenance contract in place? No

6 Claremont Bluff School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Claremont Claremont Middle School Q.01 Approximate year of the original construction date 1958

6 Claremont Claremont Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

6 Claremont Claremont Middle School Q.03 Gross Square footage (including portables) 69624

Page 13 of 238

Page 14: New Hampshire Department of Education Bureau of School

6 Claremont Claremont Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

6 Claremont Claremont Middle School Q.05 How many parking spaces does the facility have? 112

6 Claremont Claremont Middle School Q.06 Does your building have a basement? No

6 Claremont Claremont Middle School Q.07 How many portable classrooms are in use? 0

6 Claremont Claremont Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Claremont Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Claremont Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Claremont Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Claremont Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? No

6 Claremont Claremont Middle School Q.14a a. Roofs 2018|||||

6 Claremont Claremont Middle School Q.14b b. Lighting Systems 1996|||||

6 Claremont Claremont Middle School Q.14c c. Windows 2015|||||

6 Claremont Claremont Middle School Q.14d d. Ceilings 1996|||||

6 Claremont Claremont Middle School Q.14e e. Plumbing 1996|||||

6 Claremont Claremont Middle School Q.14f f. Heating Systems 1996|||||

6 Claremont Claremont Middle School Q.14g g. Ventilation Systems 1996|||||

6 Claremont Claremont Middle School Q.14h h. Conditioning Systems 1996|||||

6 Claremont Claremont Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

6 Claremont Claremont Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

6 Claremont Claremont Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

6 Claremont Claremont Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Claremont Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

6 Claremont Claremont Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

6 Claremont Claremont Middle School Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Claremont Middle School Q.22 Have you had energy audits of all your school facilities? Yes

6 Claremont Claremont Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

6 Claremont Claremont Middle School Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Claremont Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Claremont Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

6 Claremont Claremont Middle School Q.28 Do you have a facility maintenance plan? No

6 Claremont Claremont Middle School Q.29 What is your maintenance budget? 138000

6 Claremont Claremont Middle School Q.30 What is your operational budget? 448000

6 Claremont Claremont Middle School Q.31 What is your capital construction budget? 0

6 Claremont Claremont Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?94000

6 Claremont Claremont Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6240

6 Claremont Claremont Middle School Q.34 Do you have a maintenance contract in place? No

6 Claremont Claremont Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Claremont Claremont Preschool Center Q.01 Approximate year of the original construction date 1992

6 Claremont Claremont Preschool Center Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1992

6 Claremont Claremont Preschool Center Q.03 Gross Square footage (including portables) 56000

6 Claremont Claremont Preschool Center Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

6 Claremont Claremont Preschool Center Q.05 How many parking spaces does the facility have? 62

6 Claremont Claremont Preschool Center Q.07 How many portable classrooms are in use? 0

6 Claremont Claremont Preschool Center Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Claremont Preschool Center Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Claremont Preschool Center Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Claremont Preschool Center Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Claremont Preschool Center Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Claremont Claremont Preschool Center Q.14a a. Roofs 2016|||||

Page 14 of 238

Page 15: New Hampshire Department of Education Bureau of School

6 Claremont Claremont Preschool Center Q.14b b. Lighting Systems 1992|||||

6 Claremont Claremont Preschool Center Q.14c c. Windows |||||

6 Claremont Claremont Preschool Center Q.14d d. Ceilings |||||

6 Claremont Claremont Preschool Center Q.14e e. Plumbing |||||

6 Claremont Claremont Preschool Center Q.14f f. Heating Systems 1992|||||

6 Claremont Claremont Preschool Center Q.14g g. Ventilation Systems 1992|||||

6 Claremont Claremont Preschool Center Q.14h h. Conditioning Systems 1992|||||

6 Claremont Claremont Preschool Center Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

6 Claremont Claremont Preschool Center Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

6 Claremont Claremont Preschool Center Q.17 What type of studding is used at your school facility? (click all that apply) Wood

6 Claremont Claremont Preschool Center Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Claremont Preschool Center Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

6 Claremont Claremont Preschool Center Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

6 Claremont Claremont Preschool Center Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Claremont Preschool Center Q.22 Have you had energy audits of all your school facilities? Yes

6 Claremont Claremont Preschool Center Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

6 Claremont Claremont Preschool Center Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Claremont Preschool Center Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

6 Claremont Claremont Preschool Center Q.25 What is the R-Value of the roof? 24

6 Claremont Claremont Preschool Center Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Claremont Preschool Center Q.28 Do you have a facility maintenance plan? No

6 Claremont Claremont Preschool Center Q.29 What is your maintenance budget? 32500

6 Claremont Claremont Preschool Center Q.30 What is your operational budget? 201684

6 Claremont Claremont Preschool Center Q.31 What is your capital construction budget? 0

6 Claremont Claremont Preschool Center Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?69500

6 Claremont Claremont Preschool Center Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3120

6 Claremont Claremont Preschool Center Q.34 Do you have a maintenance contract in place? No

6 Claremont Claremont Preschool Center Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Claremont Disnard Elementary School Q.01 Approximate year of the original construction date 1958

6 Claremont Disnard Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

6 Claremont Disnard Elementary School Q.03 Gross Square footage (including portables) 41827

6 Claremont Disnard Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

6 Claremont Disnard Elementary School Q.05 How many parking spaces does the facility have? 66

6 Claremont Disnard Elementary School Q.06 Does your building have a basement? No

6 Claremont Disnard Elementary School Q.07 How many portable classrooms are in use? 0

6 Claremont Disnard Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Disnard Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|

6 Claremont Disnard Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Disnard Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Disnard Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Disnard Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Claremont Disnard Elementary School Q.14a a. Roofs 2016|||||

6 Claremont Disnard Elementary School Q.14b b. Lighting Systems 1996|||||

6 Claremont Disnard Elementary School Q.14c c. Windows 1996|||||

6 Claremont Disnard Elementary School Q.14d d. Ceilings 1996|||||

6 Claremont Disnard Elementary School Q.14e e. Plumbing 1996|||||

6 Claremont Disnard Elementary School Q.14f f. Heating Systems 1996|||||

6 Claremont Disnard Elementary School Q.14g g. Ventilation Systems 1996|||||

6 Claremont Disnard Elementary School Q.14h h. Conditioning Systems 1996|||||

Page 15 of 238

Page 16: New Hampshire Department of Education Bureau of School

6 Claremont Disnard Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

6 Claremont Disnard Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

6 Claremont Disnard Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

6 Claremont Disnard Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Disnard Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

6 Claremont Disnard Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

6 Claremont Disnard Elementary School Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Disnard Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

6 Claremont Disnard Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

6 Claremont Disnard Elementary School Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Disnard Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

6 Claremont Disnard Elementary School Q.25 What is the R-Value of the roof? 38

6 Claremont Disnard Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Disnard Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

6 Claremont Disnard Elementary School Q.28 Do you have a facility maintenance plan? No

6 Claremont Disnard Elementary School Q.29 What is your maintenance budget? 252000

6 Claremont Disnard Elementary School Q.30 What is your operational budget? 0

6 Claremont Disnard Elementary School Q.31 What is your capital construction budget? 0

6 Claremont Disnard Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?55250

6 Claremont Disnard Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

6 Claremont Disnard Elementary School Q.34 Do you have a maintenance contract in place? No

6 Claremont Disnard Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Claremont Maple Avenue School Q.01 Approximate year of the original construction date 1952

6 Claremont Maple Avenue School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

6 Claremont Maple Avenue School Q.03 Gross Square footage (including portables) 45922

6 Claremont Maple Avenue School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

6 Claremont Maple Avenue School Q.05 How many parking spaces does the facility have? 106

6 Claremont Maple Avenue School Q.07 How many portable classrooms are in use? 0

6 Claremont Maple Avenue School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Maple Avenue School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Maple Avenue School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Maple Avenue School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Maple Avenue School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Claremont Maple Avenue School Q.14a a. Roofs 2017|||||

6 Claremont Maple Avenue School Q.14b b. Lighting Systems 1996|||||

6 Claremont Maple Avenue School Q.14c c. Windows 1996|||||

6 Claremont Maple Avenue School Q.14d d. Ceilings 1996|||||

6 Claremont Maple Avenue School Q.14e e. Plumbing 1996|||||

6 Claremont Maple Avenue School Q.14f f. Heating Systems 1996|||||

6 Claremont Maple Avenue School Q.14g g. Ventilation Systems 1996|2017||||

6 Claremont Maple Avenue School Q.14h h. Conditioning Systems 1996|||||

6 Claremont Maple Avenue School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

6 Claremont Maple Avenue School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

6 Claremont Maple Avenue School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

6 Claremont Maple Avenue School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Maple Avenue School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

6 Claremont Maple Avenue School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

6 Claremont Maple Avenue School Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Maple Avenue School Q.22 Have you had energy audits of all your school facilities? Yes

Page 16 of 238

Page 17: New Hampshire Department of Education Bureau of School

6 Claremont Maple Avenue School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

6 Claremont Maple Avenue School Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Maple Avenue School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

6 Claremont Maple Avenue School Q.25 What is the R-Value of the roof? 38

6 Claremont Maple Avenue School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Maple Avenue School Q.27 Do you have a presence of: (click all that apply) Asbestos

6 Claremont Maple Avenue School Q.28 Do you have a facility maintenance plan? No

6 Claremont Maple Avenue School Q.29 What is your maintenance budget? 36200

6 Claremont Maple Avenue School Q.30 What is your operational budget? 239900

6 Claremont Maple Avenue School Q.31 What is your capital construction budget? 0

6 Claremont Maple Avenue School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?57700

6 Claremont Maple Avenue School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

6 Claremont Maple Avenue School Q.34 Do you have a maintenance contract in place? No

6 Claremont Maple Avenue School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Claremont Stevens High School Q.01 Approximate year of the original construction date 1915

6 Claremont Stevens High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2014

6 Claremont Stevens High School Q.03 Gross Square footage (including portables) 145000

6 Claremont Stevens High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

6 Claremont Stevens High School Q.05 How many parking spaces does the facility have? 138

6 Claremont Stevens High School Q.06 Does your building have a basement? Yes

6 Claremont Stevens High School Q.07 How many portable classrooms are in use? 0

6 Claremont Stevens High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Claremont Stevens High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Claremont Stevens High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Claremont Stevens High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Claremont Stevens High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Claremont Stevens High School Q.14a a. Roofs 2014|||||

6 Claremont Stevens High School Q.14b b. Lighting Systems 2014|||||

6 Claremont Stevens High School Q.14c c. Windows 2014|||||

6 Claremont Stevens High School Q.14d d. Ceilings 2014|||||

6 Claremont Stevens High School Q.14e e. Plumbing |||||

6 Claremont Stevens High School Q.14f f. Heating Systems 2014|||||

6 Claremont Stevens High School Q.14g g. Ventilation Systems 2014|||||

6 Claremont Stevens High School Q.14h h. Conditioning Systems 2014|||||

6 Claremont Stevens High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

6 Claremont Stevens High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

6 Claremont Stevens High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

6 Claremont Stevens High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

6 Claremont Stevens High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

6 Claremont Stevens High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

6 Claremont Stevens High School Q.21 Is your building a CHP's or LEED certified? No

6 Claremont Stevens High School Q.22 Have you had energy audits of all your school facilities? Yes

6 Claremont Stevens High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

6 Claremont Stevens High School Q.23 Do you have an energy performance contract in place? Yes

6 Claremont Stevens High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

6 Claremont Stevens High School Q.25 What is the R-Value of the roof? 24

6 Claremont Stevens High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Claremont Stevens High School Q.27 Do you have a presence of: (click all that apply) Asbestos

6 Claremont Stevens High School Q.28 Do you have a facility maintenance plan? No

Page 17 of 238

Page 18: New Hampshire Department of Education Bureau of School

6 Claremont Stevens High School Q.29 What is your maintenance budget? 43000

6 Claremont Stevens High School Q.30 What is your operational budget? 494100

6 Claremont Stevens High School Q.31 What is your capital construction budget? 0

6 Claremont Stevens High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?122000

6 Claremont Stevens High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8320

6 Claremont Stevens High School Q.34 Do you have a maintenance contract in place? No

6 Claremont Stevens High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

6 Unity Unity Elementary School Q.01 Approximate year of the original construction date 2014

6 Unity Unity Elementary School Q.03 Gross Square footage (including portables) 34000

6 Unity Unity Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

6 Unity Unity Elementary School Q.05 How many parking spaces does the facility have? 35

6 Unity Unity Elementary School Q.06 Does your building have a basement? Yes

6 Unity Unity Elementary School Q.07 How many portable classrooms are in use? 0

6 Unity Unity Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

6 Unity Unity Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

6 Unity Unity Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

6 Unity Unity Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

6 Unity Unity Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

6 Unity Unity Elementary School Q.14a a. Roofs ||||2014|

6 Unity Unity Elementary School Q.14b b. Lighting Systems ||||2014|

6 Unity Unity Elementary School Q.14c c. Windows ||||2014|

6 Unity Unity Elementary School Q.14d d. Ceilings ||||2014|

6 Unity Unity Elementary School Q.14e e. Plumbing ||||2014|

6 Unity Unity Elementary School Q.14f f. Heating Systems ||||2014|

6 Unity Unity Elementary School Q.14g g. Ventilation Systems ||||2014|

6 Unity Unity Elementary School Q.14h h. Conditioning Systems ||||2014|

6 Unity Unity Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

6 Unity Unity Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal

6 Unity Unity Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

6 Unity Unity Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

6 Unity Unity Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

6 Unity Unity Elementary School Q.21 Is your building a CHP's or LEED certified? No

6 Unity Unity Elementary School Q.22 Have you had energy audits of all your school facilities? No

6 Unity Unity Elementary School Q.23 Do you have an energy performance contract in place? No

6 Unity Unity Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 35

6 Unity Unity Elementary School Q.25 What is the R-Value of the roof? 35

6 Unity Unity Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

6 Unity Unity Elementary School Q.28 Do you have a facility maintenance plan? Yes

6 Unity Unity Elementary School Q.29 What is your maintenance budget? 152757

6 Unity Unity Elementary School Q.30 What is your operational budget? 3643108

6 Unity Unity Elementary School Q.31 What is your capital construction budget? 30051

6 Unity Unity Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?44544

6 Unity Unity Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?60

6 Unity Unity Elementary School Q.34 Do you have a maintenance contract in place? No

6 Unity Unity Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.01 Approximate year of the original construction date 2001

7 ColebrookColebrook Academy and Elementary

School (E)Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

7 ColebrookColebrook Academy and Elementary

School (E)Q.03 Gross Square footage (including portables) 79869

7 ColebrookColebrook Academy and Elementary

School (E)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

Page 18 of 238

Page 19: New Hampshire Department of Education Bureau of School

7 ColebrookColebrook Academy and Elementary

School (E)Q.06 Does your building have a basement? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.07 How many portable classrooms are in use? 0

7 ColebrookColebrook Academy and Elementary

School (E)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

7 ColebrookColebrook Academy and Elementary

School (E)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

7 ColebrookColebrook Academy and Elementary

School (E)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

7 ColebrookColebrook Academy and Elementary

School (E)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

7 ColebrookColebrook Academy and Elementary

School (E)Q.14a a. Roofs |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14b b. Lighting Systems |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14c c. Windows |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14d d. Ceilings |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14e e. Plumbing |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14f f. Heating Systems |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14g g. Ventilation Systems |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.14h h. Conditioning Systems |||||

7 ColebrookColebrook Academy and Elementary

School (E)Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

7 ColebrookColebrook Academy and Elementary

School (E)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Brick and Cement Block

7 ColebrookColebrook Academy and Elementary

School (E)Q.17 What type of studding is used at your school facility? (click all that apply) Steel

7 ColebrookColebrook Academy and Elementary

School (E)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

7 ColebrookColebrook Academy and Elementary

School (E)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

7 ColebrookColebrook Academy and Elementary

School (E)Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

7 ColebrookColebrook Academy and Elementary

School (E)Q.21 Is your building a CHP's or LEED certified? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.22 Have you had energy audits of all your school facilities? Yes

7 ColebrookColebrook Academy and Elementary

School (E)Q.23 Do you have an energy performance contract in place? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.27 Do you have a presence of: (click all that apply) Asbestos

7 ColebrookColebrook Academy and Elementary

School (E)Q.28 Do you have a facility maintenance plan? Yes

7 ColebrookColebrook Academy and Elementary

School (E)Q.29 What is your maintenance budget? 125000

7 ColebrookColebrook Academy and Elementary

School (E)Q.30 What is your operational budget? 6558950

7 ColebrookColebrook Academy and Elementary

School (E)Q.31 What is your capital construction budget? 277000

7 ColebrookColebrook Academy and Elementary

School (E)Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?170000

7 ColebrookColebrook Academy and Elementary

School (E)Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?45

7 ColebrookColebrook Academy and Elementary

School (E)Q.34 Do you have a maintenance contract in place? No

7 ColebrookColebrook Academy and Elementary

School (E)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

7 Pittsburg Pittsburg School (Elem) Q.01 Approximate year of the original construction date 1900

7 Pittsburg Pittsburg School (Elem) Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

7 Pittsburg Pittsburg School (Elem) Q.03 Gross Square footage (including portables) 49000

7 Pittsburg Pittsburg School (Elem) Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

7 Pittsburg Pittsburg School (Elem) Q.06 Does your building have a basement? Yes

7 Pittsburg Pittsburg School (Elem) Q.07 How many portable classrooms are in use? 0

7 Pittsburg Pittsburg School (Elem) Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

7 Pittsburg Pittsburg School (Elem) Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

7 Pittsburg Pittsburg School (Elem) Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

7 Pittsburg Pittsburg School (Elem) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

7 Pittsburg Pittsburg School (Elem) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

7 Pittsburg Pittsburg School (Elem) Q.14a a. Roofs |||||

7 Pittsburg Pittsburg School (Elem) Q.14b b. Lighting Systems |||||

7 Pittsburg Pittsburg School (Elem) Q.14c c. Windows |||||

7 Pittsburg Pittsburg School (Elem) Q.14d d. Ceilings |||||

7 Pittsburg Pittsburg School (Elem) Q.14e e. Plumbing |||||

Page 19 of 238

Page 20: New Hampshire Department of Education Bureau of School

7 Pittsburg Pittsburg School (Elem) Q.14f f. Heating Systems |||||

7 Pittsburg Pittsburg School (Elem) Q.14g g. Ventilation Systems |||||

7 Pittsburg Pittsburg School (Elem) Q.14h h. Conditioning Systems |||||

7 Pittsburg Pittsburg School (Elem) Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

7 Pittsburg Pittsburg School (Elem) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

7 Pittsburg Pittsburg School (Elem) Q.17 What type of studding is used at your school facility? (click all that apply) Steel

7 Pittsburg Pittsburg School (Elem) Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

7 Pittsburg Pittsburg School (Elem) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

7 Pittsburg Pittsburg School (Elem) Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

7 Pittsburg Pittsburg School (Elem) Q.21 Is your building a CHP's or LEED certified? No

7 Pittsburg Pittsburg School (Elem) Q.22 Have you had energy audits of all your school facilities? Yes

7 Pittsburg Pittsburg School (Elem) Q.23 Do you have an energy performance contract in place? No

7 Pittsburg Pittsburg School (Elem) Q.27 Do you have a presence of: (click all that apply) Asbestos

7 Pittsburg Pittsburg School (Elem) Q.28 Do you have a facility maintenance plan? Yes

7 Pittsburg Pittsburg School (Elem) Q.31 What is your capital construction budget? 0

7 Pittsburg Pittsburg School (Elem) Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20

7 Pittsburg Pittsburg School (Elem) Q.34 Do you have a maintenance contract in place? No

7 Pittsburg Pittsburg School (Elem) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

7 Stewartstown Stewartstown Community School Q.01 Approximate year of the original construction date 1998

7 Stewartstown Stewartstown Community School Q.03 Gross Square footage (including portables) 13000

7 Stewartstown Stewartstown Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

7 Stewartstown Stewartstown Community School Q.05 How many parking spaces does the facility have? 60

7 Stewartstown Stewartstown Community School Q.06 Does your building have a basement? No

7 Stewartstown Stewartstown Community School Q.07 How many portable classrooms are in use? 0

7 Stewartstown Stewartstown Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

7 Stewartstown Stewartstown Community School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)|Support Space

7 Stewartstown Stewartstown Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

7 Stewartstown Stewartstown Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

7 Stewartstown Stewartstown Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

7 Stewartstown Stewartstown Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

7 Stewartstown Stewartstown Community School Q.14a a. Roofs |||||

7 Stewartstown Stewartstown Community School Q.14b b. Lighting Systems |||||

7 Stewartstown Stewartstown Community School Q.14c c. Windows |||||

7 Stewartstown Stewartstown Community School Q.14d d. Ceilings |||||

7 Stewartstown Stewartstown Community School Q.14e e. Plumbing |||||

7 Stewartstown Stewartstown Community School Q.14f f. Heating Systems |||||

7 Stewartstown Stewartstown Community School Q.14g g. Ventilation Systems |||||

7 Stewartstown Stewartstown Community School Q.14h h. Conditioning Systems |||||

7 Stewartstown Stewartstown Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

7 Stewartstown Stewartstown Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal

7 Stewartstown Stewartstown Community School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

7 Stewartstown Stewartstown Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

7 Stewartstown Stewartstown Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

7 Stewartstown Stewartstown Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

7 Stewartstown Stewartstown Community School Q.21 Is your building a CHP's or LEED certified? No

7 Stewartstown Stewartstown Community School Q.22 Have you had energy audits of all your school facilities? Yes

7 Stewartstown Stewartstown Community School Q.23 Do you have an energy performance contract in place? No

7 Stewartstown Stewartstown Community School Q.26 Do you have carbon monoxide detector(s) in your building? No

7 Stewartstown Stewartstown Community School Q.28 Do you have a facility maintenance plan? Yes

Page 20 of 238

Page 21: New Hampshire Department of Education Bureau of School

7 Stewartstown Stewartstown Community School Q.29 What is your maintenance budget? 31875

7 Stewartstown Stewartstown Community School Q.30 What is your operational budget? 2662497

7 Stewartstown Stewartstown Community School Q.31 What is your capital construction budget? 0

7 Stewartstown Stewartstown Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?27425

7 Stewartstown Stewartstown Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

7 Stewartstown Stewartstown Community School Q.34 Do you have a maintenance contract in place? Yes

7 Stewartstown Stewartstown Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Abbot-Downing School Q.01 Approximate year of the original construction date 2012

8 Concord Abbot-Downing School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

8 Concord Abbot-Downing School Q.03 Gross Square footage (including portables) 73446

8 Concord Abbot-Downing School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Abbot-Downing School Q.05 How many parking spaces does the facility have? 200

8 Concord Abbot-Downing School Q.06 Does your building have a basement? No

8 Concord Abbot-Downing School Q.07 How many portable classrooms are in use? 0

8 Concord Abbot-Downing School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

8 Concord Abbot-Downing School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Abbot-Downing School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Abbot-Downing School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Abbot-Downing School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Abbot-Downing School Q.14a a. Roofs 2012|||||

8 Concord Abbot-Downing School Q.14b b. Lighting Systems 2012|||||

8 Concord Abbot-Downing School Q.14c c. Windows 2012|||||

8 Concord Abbot-Downing School Q.14d d. Ceilings 2012|||||

8 Concord Abbot-Downing School Q.14e e. Plumbing 2012|||||

8 Concord Abbot-Downing School Q.14f f. Heating Systems 2017|||||

8 Concord Abbot-Downing School Q.14g g. Ventilation Systems 2012|||||

8 Concord Abbot-Downing School Q.14h h. Conditioning Systems 2012|||||

8 Concord Abbot-Downing School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

8 Concord Abbot-Downing School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

8 Concord Abbot-Downing School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

8 Concord Abbot-Downing School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

8 Concord Abbot-Downing School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Abbot-Downing School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Abbot-Downing School Q.21 Is your building a CHP's or LEED certified? Yes

8 Concord Abbot-Downing School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Abbot-Downing School Q.23 Do you have an energy performance contract in place? No

8 Concord Abbot-Downing School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

8 Concord Abbot-Downing School Q.25 What is the R-Value of the roof? 25

8 Concord Abbot-Downing School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Abbot-Downing School Q.27 Do you have a presence of: (click all that apply) Other|none noted

8 Concord Abbot-Downing School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Abbot-Downing School Q.29 What is your maintenance budget? 20000

8 Concord Abbot-Downing School Q.30 What is your operational budget? 8000000

8 Concord Abbot-Downing School Q.31 What is your capital construction budget? 250000

8 Concord Abbot-Downing School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Abbot-Downing School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

8 Concord Abbot-Downing School Q.34 Do you have a maintenance contract in place? No

8 Concord Abbot-Downing School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Beaver Meadow School Q.01 Approximate year of the original construction date 1986

Page 21 of 238

Page 22: New Hampshire Department of Education Bureau of School

8 Concord Beaver Meadow School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1887

8 Concord Beaver Meadow School Q.03 Gross Square footage (including portables) 66000

8 Concord Beaver Meadow School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Beaver Meadow School Q.05 How many parking spaces does the facility have? 150

8 Concord Beaver Meadow School Q.06 Does your building have a basement? Yes

8 Concord Beaver Meadow School Q.07 How many portable classrooms are in use? 0

8 Concord Beaver Meadow School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?4

8 Concord Beaver Meadow School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Small Group|Support Space

8 Concord Beaver Meadow School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Beaver Meadow School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Beaver Meadow School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Beaver Meadow School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Beaver Meadow School Q.14a a. Roofs 2010|2013||||

8 Concord Beaver Meadow School Q.14b b. Lighting Systems 1987|||||

8 Concord Beaver Meadow School Q.14c c. Windows 1987|||||

8 Concord Beaver Meadow School Q.14d d. Ceilings 1987|||||

8 Concord Beaver Meadow School Q.14e e. Plumbing 1987|2011||||

8 Concord Beaver Meadow School Q.14f f. Heating Systems 1987|2008||||

8 Concord Beaver Meadow School Q.14g g. Ventilation Systems 1987|||||

8 Concord Beaver Meadow School Q.14h h. Conditioning Systems 1987|||||

8 Concord Beaver Meadow School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

8 Concord Beaver Meadow School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

8 Concord Beaver Meadow School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

8 Concord Beaver Meadow School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Beaver Meadow School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Beaver Meadow School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Beaver Meadow School Q.21 Is your building a CHP's or LEED certified? No

8 Concord Beaver Meadow School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Beaver Meadow School Q.23 Do you have an energy performance contract in place? No

8 Concord Beaver Meadow School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

8 Concord Beaver Meadow School Q.25 What is the R-Value of the roof? 15

8 Concord Beaver Meadow School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Beaver Meadow School Q.27 Do you have a presence of: (click all that apply) Mold/Mildew

8 Concord Beaver Meadow School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Beaver Meadow School Q.29 What is your maintenance budget? 20000

8 Concord Beaver Meadow School Q.30 What is your operational budget? 8000000

8 Concord Beaver Meadow School Q.31 What is your capital construction budget? 250000

8 Concord Beaver Meadow School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Beaver Meadow School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

8 Concord Beaver Meadow School Q.34 Do you have a maintenance contract in place? No

8 Concord Beaver Meadow School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Broken Ground School Q.01 Approximate year of the original construction date 1973

8 Concord Broken Ground School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1988

8 Concord Broken Ground School Q.03 Gross Square footage (including portables) 64000

8 Concord Broken Ground School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Broken Ground School Q.05 How many parking spaces does the facility have? 200

8 Concord Broken Ground School Q.06 Does your building have a basement? No

8 Concord Broken Ground School Q.07 How many portable classrooms are in use? 0

8 Concord Broken Ground School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

Page 22 of 238

Page 23: New Hampshire Department of Education Bureau of School

8 Concord Broken Ground School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Small Group

8 Concord Broken Ground School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Broken Ground School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Broken Ground School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Broken Ground School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Broken Ground School Q.14a a. Roofs 1973|1996|2018|2019||

8 Concord Broken Ground School Q.14b b. Lighting Systems 1987|1990||||

8 Concord Broken Ground School Q.14c c. Windows 1973|||||

8 Concord Broken Ground School Q.14d d. Ceilings 1973|||||

8 Concord Broken Ground School Q.14e e. Plumbing 1973|1988||||

8 Concord Broken Ground School Q.14f f. Heating Systems 1973|1990|2012|||

8 Concord Broken Ground School Q.14g g. Ventilation Systems 1973|1988||||

8 Concord Broken Ground School Q.14h h. Conditioning Systems 1973|||||

8 Concord Broken Ground School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

8 Concord Broken Ground School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

8 Concord Broken Ground School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

8 Concord Broken Ground School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Broken Ground School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Broken Ground School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Broken Ground School Q.21 Is your building a CHP's or LEED certified? No

8 Concord Broken Ground School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Broken Ground School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

8 Concord Broken Ground School Q.23 Do you have an energy performance contract in place? No

8 Concord Broken Ground School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

8 Concord Broken Ground School Q.25 What is the R-Value of the roof? 15

8 Concord Broken Ground School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Broken Ground School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Broken Ground School Q.29 What is your maintenance budget? 20000

8 Concord Broken Ground School Q.30 What is your operational budget? 8000000

8 Concord Broken Ground School Q.31 What is your capital construction budget? 250000

8 Concord Broken Ground School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Broken Ground School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

8 Concord Broken Ground School Q.34 Do you have a maintenance contract in place? No

8 Concord Broken Ground School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Christa McAuliffe School Q.01 Approximate year of the original construction date 2012

8 Concord Christa McAuliffe School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

8 Concord Christa McAuliffe School Q.03 Gross Square footage (including portables) 71485

8 Concord Christa McAuliffe School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Christa McAuliffe School Q.05 How many parking spaces does the facility have? 50

8 Concord Christa McAuliffe School Q.06 Does your building have a basement? No

8 Concord Christa McAuliffe School Q.07 How many portable classrooms are in use? 0

8 Concord Christa McAuliffe School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

8 Concord Christa McAuliffe School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Small Group|Support Space

8 Concord Christa McAuliffe School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Christa McAuliffe School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Christa McAuliffe School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Christa McAuliffe School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Christa McAuliffe School Q.14a a. Roofs 2012|||||

8 Concord Christa McAuliffe School Q.14b b. Lighting Systems 2012|||||

Page 23 of 238

Page 24: New Hampshire Department of Education Bureau of School

8 Concord Christa McAuliffe School Q.14c c. Windows 2012|||||

8 Concord Christa McAuliffe School Q.14d d. Ceilings 2012|||||

8 Concord Christa McAuliffe School Q.14e e. Plumbing 2012|||||

8 Concord Christa McAuliffe School Q.14f f. Heating Systems 2017|||||

8 Concord Christa McAuliffe School Q.14g g. Ventilation Systems 2012|||||

8 Concord Christa McAuliffe School Q.14h h. Conditioning Systems 2012|||||

8 Concord Christa McAuliffe School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

8 Concord Christa McAuliffe School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

8 Concord Christa McAuliffe School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

8 Concord Christa McAuliffe School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Christa McAuliffe School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Christa McAuliffe School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Christa McAuliffe School Q.21 Is your building a CHP's or LEED certified? Yes

8 Concord Christa McAuliffe School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Christa McAuliffe School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

8 Concord Christa McAuliffe School Q.23 Do you have an energy performance contract in place? No

8 Concord Christa McAuliffe School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

8 Concord Christa McAuliffe School Q.25 What is the R-Value of the roof? 25

8 Concord Christa McAuliffe School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Christa McAuliffe School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Christa McAuliffe School Q.29 What is your maintenance budget? 20000

8 Concord Christa McAuliffe School Q.30 What is your operational budget? 8000000

8 Concord Christa McAuliffe School Q.31 What is your capital construction budget? 250000

8 Concord Christa McAuliffe School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Christa McAuliffe School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

8 Concord Christa McAuliffe School Q.34 Do you have a maintenance contract in place? No

8 Concord Christa McAuliffe School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Concord High School Q.01 Approximate year of the original construction date 1929

8 Concord Concord High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

8 Concord Concord High School Q.03 Gross Square footage (including portables) 535000

8 Concord Concord High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Concord High School Q.05 How many parking spaces does the facility have? 200

8 Concord Concord High School Q.06 Does your building have a basement? Yes

8 Concord Concord High School Q.07 How many portable classrooms are in use? 0

8 Concord Concord High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?8

8 Concord Concord High School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education

8 Concord Concord High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Concord High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Concord High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Concord High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Concord High School Q.14a a. Roofs 1929|1994|1997|2008|2013|2018

8 Concord Concord High School Q.14b b. Lighting Systems 1994|||||

8 Concord Concord High School Q.14c c. Windows 1994|||||

8 Concord Concord High School Q.14d d. Ceilings 1994|||||

8 Concord Concord High School Q.14e e. Plumbing 1994|||||

8 Concord Concord High School Q.14f f. Heating Systems 2017|||||

8 Concord Concord High School Q.14g g. Ventilation Systems 1994|||||

8 Concord Concord High School Q.14h h. Conditioning Systems 1994|||||

8 Concord Concord High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

Page 24 of 238

Page 25: New Hampshire Department of Education Bureau of School

8 Concord Concord High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

8 Concord Concord High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

8 Concord Concord High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Concord High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Concord High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Concord High School Q.21 Is your building a CHP's or LEED certified? No

8 Concord Concord High School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Concord High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

8 Concord Concord High School Q.23 Do you have an energy performance contract in place? No

8 Concord Concord High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

8 Concord Concord High School Q.25 What is the R-Value of the roof? 15

8 Concord Concord High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Concord High School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Concord High School Q.29 What is your maintenance budget? 20000

8 Concord Concord High School Q.30 What is your operational budget? 8000000

8 Concord Concord High School Q.31 What is your capital construction budget? 250000

8 Concord Concord High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Concord High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?104

8 Concord Concord High School Q.34 Do you have a maintenance contract in place? No

8 Concord Concord High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

8 Concord Concord High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition")New roofs (7) total Optimax Polyurethane

Modified

8 Concord Concord High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2300000

8 Concord Concord High School Q.35c c. If yes, provide estimated year of construction. 2019

8 Concord Mill Brook School Q.01 Approximate year of the original construction date 2012

8 Concord Mill Brook School Q.03 Gross Square footage (including portables) 64580

8 Concord Mill Brook School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Mill Brook School Q.05 How many parking spaces does the facility have? 200

8 Concord Mill Brook School Q.06 Does your building have a basement? No

8 Concord Mill Brook School Q.07 How many portable classrooms are in use? 0

8 Concord Mill Brook School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

8 Concord Mill Brook School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Small Group|Support Space

8 Concord Mill Brook School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

8 Concord Mill Brook School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Mill Brook School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

8 Concord Mill Brook School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Mill Brook School Q.14a a. Roofs 2012|||||

8 Concord Mill Brook School Q.14b b. Lighting Systems 2012|||||

8 Concord Mill Brook School Q.14c c. Windows 2012|||||

8 Concord Mill Brook School Q.14d d. Ceilings 2012|||||

8 Concord Mill Brook School Q.14e e. Plumbing 2012|||||

8 Concord Mill Brook School Q.14f f. Heating Systems 2012|||||

8 Concord Mill Brook School Q.14g g. Ventilation Systems 2012|||||

8 Concord Mill Brook School Q.14h h. Conditioning Systems 2012|||||

8 Concord Mill Brook School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

8 Concord Mill Brook School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal|Other|Block, metal

8 Concord Mill Brook School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

8 Concord Mill Brook School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Mill Brook School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Mill Brook School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

Page 25 of 238

Page 26: New Hampshire Department of Education Bureau of School

8 Concord Mill Brook School Q.21 Is your building a CHP's or LEED certified? Yes

8 Concord Mill Brook School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Mill Brook School Q.23 Do you have an energy performance contract in place? No

8 Concord Mill Brook School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

8 Concord Mill Brook School Q.25 What is the R-Value of the roof? 25

8 Concord Mill Brook School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Mill Brook School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Mill Brook School Q.29 What is your maintenance budget? 20000

8 Concord Mill Brook School Q.30 What is your operational budget? 8000000

8 Concord Mill Brook School Q.31 What is your capital construction budget? 250000

8 Concord Mill Brook School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Mill Brook School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

8 Concord Mill Brook School Q.34 Do you have a maintenance contract in place? No

8 Concord Mill Brook School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

8 Concord Rundlett Middle School Q.01 Approximate year of the original construction date 1957

8 Concord Rundlett Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

8 Concord Rundlett Middle School Q.03 Gross Square footage (including portables) 186000

8 Concord Rundlett Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

8 Concord Rundlett Middle School Q.05 How many parking spaces does the facility have? 150

8 Concord Rundlett Middle School Q.06 Does your building have a basement? Yes

8 Concord Rundlett Middle School Q.07 How many portable classrooms are in use? 0

8 Concord Rundlett Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?5

8 Concord Rundlett Middle School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education

8 Concord Rundlett Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

8 Concord Rundlett Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

8 Concord Rundlett Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

8 Concord Rundlett Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

8 Concord Rundlett Middle School Q.14a a. Roofs 1957|1989|1993|1997||

8 Concord Rundlett Middle School Q.14b b. Lighting Systems 1957|1990||||

8 Concord Rundlett Middle School Q.14c c. Windows 1957|1991||||

8 Concord Rundlett Middle School Q.14d d. Ceilings 1957|1991||||

8 Concord Rundlett Middle School Q.14e e. Plumbing 1957|||||

8 Concord Rundlett Middle School Q.14f f. Heating Systems 2017||x|||

8 Concord Rundlett Middle School Q.14g g. Ventilation Systems 1957|1990|2010|||

8 Concord Rundlett Middle School Q.14h h. Conditioning Systems 1990|||||

8 Concord Rundlett Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

8 Concord Rundlett Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

8 Concord Rundlett Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

8 Concord Rundlett Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

8 Concord Rundlett Middle School Q.21 Is your building a CHP's or LEED certified? No

8 Concord Rundlett Middle School Q.22 Have you had energy audits of all your school facilities? Yes

8 Concord Rundlett Middle School Q.23 Do you have an energy performance contract in place? No

8 Concord Rundlett Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 0

8 Concord Rundlett Middle School Q.25 What is the R-Value of the roof? 10

8 Concord Rundlett Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

8 Concord Rundlett Middle School Q.27 Do you have a presence of: (click all that apply)Mold/Mildew|Asbestos|Lead Paint|PCBs|Vapor

Instrusions

8 Concord Rundlett Middle School Q.28 Do you have a facility maintenance plan? Yes

8 Concord Rundlett Middle School Q.29 What is your maintenance budget? 20000

8 Concord Rundlett Middle School Q.30 What is your operational budget? 8000000

Page 26 of 238

Page 27: New Hampshire Department of Education Bureau of School

8 Concord Rundlett Middle School Q.31 What is your capital construction budget? 250000

8 Concord Rundlett Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?25000

8 Concord Rundlett Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

8 Concord Rundlett Middle School Q.34 Do you have a maintenance contract in place? No

8 Concord Rundlett Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

8 Concord Rundlett Middle School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Build a new middle school. Planning in process

8 Concord Rundlett Middle School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 85000000

8 Concord Rundlett Middle School Q.35c c. If yes, provide estimated year of construction. 2023

9 Bartlett Josiah Bartlett Elementary School Q.01 Approximate year of the original construction date 1938

9 Bartlett Josiah Bartlett Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1990

9 Bartlett Josiah Bartlett Elementary School Q.03 Gross Square footage (including portables) 49000

9 Bartlett Josiah Bartlett Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

9 Bartlett Josiah Bartlett Elementary School Q.05 How many parking spaces does the facility have? 70

9 Bartlett Josiah Bartlett Elementary School Q.06 Does your building have a basement? No

9 Bartlett Josiah Bartlett Elementary School Q.07 How many portable classrooms are in use? 0

9 Bartlett Josiah Bartlett Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

9 Bartlett Josiah Bartlett Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

9 Bartlett Josiah Bartlett Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

9 Bartlett Josiah Bartlett Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

9 Bartlett Josiah Bartlett Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

9 Bartlett Josiah Bartlett Elementary School Q.14a a. Roofs |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14b b. Lighting Systems |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14c c. Windows |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14d d. Ceilings |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14e e. Plumbing |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14f f. Heating Systems |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14g g. Ventilation Systems |||||x

9 Bartlett Josiah Bartlett Elementary School Q.14h h. Conditioning Systems |||||x

9 Bartlett Josiah Bartlett Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

9 Bartlett Josiah Bartlett Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Wood

9 Bartlett Josiah Bartlett Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

9 Bartlett Josiah Bartlett Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

9 Bartlett Josiah Bartlett Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

9 Bartlett Josiah Bartlett Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

9 Bartlett Josiah Bartlett Elementary School Q.21 Is your building a CHP's or LEED certified? No

9 Bartlett Josiah Bartlett Elementary School Q.22 Have you had energy audits of all your school facilities? No

9 Bartlett Josiah Bartlett Elementary School Q.23 Do you have an energy performance contract in place? No

9 Bartlett Josiah Bartlett Elementary School Q.25 What is the R-Value of the roof? 36

9 Bartlett Josiah Bartlett Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

9 Bartlett Josiah Bartlett Elementary School Q.28 Do you have a facility maintenance plan? Yes

9 Bartlett Josiah Bartlett Elementary School Q.29 What is your maintenance budget? 203000

9 Bartlett Josiah Bartlett Elementary School Q.30 What is your operational budget? 8000000.00

9 Bartlett Josiah Bartlett Elementary School Q.31 What is your capital construction budget? 0

9 Bartlett Josiah Bartlett Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

9 Bartlett Josiah Bartlett Elementary School Q.34 Do you have a maintenance contract in place? No

9 Bartlett Josiah Bartlett Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

9 Conway Conway Elementary School Q.01 Approximate year of the original construction date 1954

9 Conway Conway Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

9 Conway Conway Elementary School Q.03 Gross Square footage (including portables) 45000

Page 27 of 238

Page 28: New Hampshire Department of Education Bureau of School

9 Conway Conway Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

9 Conway Conway Elementary School Q.05 How many parking spaces does the facility have? 100

9 Conway Conway Elementary School Q.06 Does your building have a basement? No

9 Conway Conway Elementary School Q.07 How many portable classrooms are in use? 1

9 Conway Conway Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

9 Conway Conway Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

9 Conway Conway Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

9 Conway Conway Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

9 Conway Conway Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

9 Conway Conway Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

9 Conway Conway Elementary School Q.14a a. Roofs |||||

9 Conway Conway Elementary School Q.14b b. Lighting Systems |||||

9 Conway Conway Elementary School Q.14c c. Windows |||||

9 Conway Conway Elementary School Q.14d d. Ceilings |||||

9 Conway Conway Elementary School Q.14e e. Plumbing |||||

9 Conway Conway Elementary School Q.14f f. Heating Systems |||||

9 Conway Conway Elementary School Q.14g g. Ventilation Systems |||||

9 Conway Conway Elementary School Q.14h h. Conditioning Systems |||||

9 Conway Conway Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

9 Conway Conway Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood|Other|Cement Plank

9 Conway Conway Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

9 Conway Conway Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

9 Conway Conway Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

9 Conway Conway Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

9 Conway Conway Elementary School Q.21 Is your building a CHP's or LEED certified? No

9 Conway Conway Elementary School Q.22 Have you had energy audits of all your school facilities? No

9 Conway Conway Elementary School Q.23 Do you have an energy performance contract in place? No

9 Conway Conway Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

9 Conway Conway Elementary School Q.28 Do you have a facility maintenance plan? Yes

9 Conway Conway Elementary School Q.29 What is your maintenance budget? 350000

9 Conway Conway Elementary School Q.30 What is your operational budget? 2500000

9 Conway Conway Elementary School Q.31 What is your capital construction budget? 0

9 Conway Conway Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?75000

9 Conway Conway Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?100

9 Conway Conway Elementary School Q.34 Do you have a maintenance contract in place? Yes

9 Conway Conway Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

9 Conway Kennett High School Q.01 Approximate year of the original construction date 2007

9 Conway Kennett High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

9 Conway Kennett High School Q.03 Gross Square footage (including portables) 220000

9 Conway Kennett High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

9 Conway Kennett High School Q.05 How many parking spaces does the facility have? 250

9 Conway Kennett High School Q.06 Does your building have a basement? No

9 Conway Kennett High School Q.07 How many portable classrooms are in use? 0

9 Conway Kennett High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

9 Conway Kennett High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

9 Conway Kennett High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

9 Conway Kennett High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

9 Conway Kennett High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

9 Conway Kennett High School Q.14a a. Roofs |||||

Page 28 of 238

Page 29: New Hampshire Department of Education Bureau of School

9 Conway Kennett High School Q.14b b. Lighting Systems |||||

9 Conway Kennett High School Q.14c c. Windows |||||

9 Conway Kennett High School Q.14d d. Ceilings |||||

9 Conway Kennett High School Q.14e e. Plumbing |||||

9 Conway Kennett High School Q.14f f. Heating Systems |||||

9 Conway Kennett High School Q.14g g. Ventilation Systems |||||

9 Conway Kennett High School Q.14h h. Conditioning Systems |||||

9 Conway Kennett High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

9 Conway Kennett High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Other|cement planking

9 Conway Kennett High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

9 Conway Kennett High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

9 Conway Kennett High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

9 Conway Kennett High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

9 Conway Kennett High School Q.21 Is your building a CHP's or LEED certified? No

9 Conway Kennett High School Q.22 Have you had energy audits of all your school facilities? No

9 Conway Kennett High School Q.23 Do you have an energy performance contract in place? No

9 Conway Kennett High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

9 Conway Kennett High School Q.25 What is the R-Value of the roof? 28

9 Conway Kennett High School Q.26 Do you have carbon monoxide detector(s) in your building? No

9 Conway Kennett High School Q.28 Do you have a facility maintenance plan? Yes

9 Conway Kennett High School Q.29 What is your maintenance budget? 1397811

9 Conway Kennett High School Q.30 What is your operational budget? 865772

9 Conway Kennett High School Q.31 What is your capital construction budget? 0

9 Conway Kennett High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?370000

9 Conway Kennett High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8

9 Conway Kennett High School Q.34 Do you have a maintenance contract in place? Yes

9 Conway Kennett High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

9 Conway Pine Tree Elementary School Q.01 Approximate year of the original construction date 1990

9 Conway Pine Tree Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

9 Conway Pine Tree Elementary School Q.03 Gross Square footage (including portables) 45000

9 Conway Pine Tree Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

9 Conway Pine Tree Elementary School Q.05 How many parking spaces does the facility have? 75

9 Conway Pine Tree Elementary School Q.06 Does your building have a basement? No

9 Conway Pine Tree Elementary School Q.07 How many portable classrooms are in use? 0

9 Conway Pine Tree Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

9 Conway Pine Tree Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

9 Conway Pine Tree Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

9 Conway Pine Tree Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

9 Conway Pine Tree Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

9 Conway Pine Tree Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

9 Conway Pine Tree Elementary School Q.14a a. Roofs |||||

9 Conway Pine Tree Elementary School Q.14b b. Lighting Systems |||||

9 Conway Pine Tree Elementary School Q.14c c. Windows |||||

9 Conway Pine Tree Elementary School Q.14d d. Ceilings |||||

9 Conway Pine Tree Elementary School Q.14e e. Plumbing |||||

9 Conway Pine Tree Elementary School Q.14f f. Heating Systems |||||

9 Conway Pine Tree Elementary School Q.14g g. Ventilation Systems |||||

9 Conway Pine Tree Elementary School Q.14h h. Conditioning Systems |||||

9 Conway Pine Tree Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

Page 29 of 238

Page 30: New Hampshire Department of Education Bureau of School

9 Conway Pine Tree Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

9 Conway Pine Tree Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

9 Conway Pine Tree Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

9 Conway Pine Tree Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

9 Conway Pine Tree Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

9 Conway Pine Tree Elementary School Q.21 Is your building a CHP's or LEED certified? No

9 Conway Pine Tree Elementary School Q.22 Have you had energy audits of all your school facilities? No

9 Conway Pine Tree Elementary School Q.23 Do you have an energy performance contract in place? No

9 Conway Pine Tree Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

9 Conway Pine Tree Elementary School Q.25 What is the R-Value of the roof? 24

9 Conway Pine Tree Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

9 Conway Pine Tree Elementary School Q.28 Do you have a facility maintenance plan? Yes

9 Conway Pine Tree Elementary School Q.29 What is your maintenance budget? 132922

9 Conway Pine Tree Elementary School Q.30 What is your operational budget? 2576097

9 Conway Pine Tree Elementary School Q.31 What is your capital construction budget? 0

9 Conway Pine Tree Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?39700

9 Conway Pine Tree Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

9 Conway Pine Tree Elementary School Q.34 Do you have a maintenance contract in place? Yes

9 Conway Pine Tree Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

9 Jackson Jackson Grammar School Q.01 Approximate year of the original construction date 18601989

9 Jackson Jackson Grammar School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2009

9 Jackson Jackson Grammar School Q.03 Gross Square footage (including portables) 5500

9 Jackson Jackson Grammar School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

9 Jackson Jackson Grammar School Q.05 How many parking spaces does the facility have? 15

9 Jackson Jackson Grammar School Q.06 Does your building have a basement? Yes

9 Jackson Jackson Grammar School Q.07 How many portable classrooms are in use? 0

9 Jackson Jackson Grammar School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

9 Jackson Jackson Grammar School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

9 Jackson Jackson Grammar School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

9 Jackson Jackson Grammar School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

9 Jackson Jackson Grammar School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

9 Jackson Jackson Grammar School Q.14a a. Roofs 2010|2009||||

9 Jackson Jackson Grammar School Q.14b b. Lighting Systems 2010|2015||||

9 Jackson Jackson Grammar School Q.14c c. Windows 2010|||||

9 Jackson Jackson Grammar School Q.14d d. Ceilings 2009|1989|1861|||

9 Jackson Jackson Grammar School Q.14e e. Plumbing 2010|||||

9 Jackson Jackson Grammar School Q.14f f. Heating Systems 2015|||||

9 Jackson Jackson Grammar School Q.14g g. Ventilation Systems 2010|||||

9 Jackson Jackson Grammar School Q.14h h. Conditioning Systems NA|||||

9 Jackson Jackson Grammar School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

9 Jackson Jackson Grammar School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

9 Jackson Jackson Grammar School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

9 Jackson Jackson Grammar School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

9 Jackson Jackson Grammar School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

9 Jackson Jackson Grammar School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

9 Jackson Jackson Grammar School Q.21 Is your building a CHP's or LEED certified? No

9 Jackson Jackson Grammar School Q.22 Have you had energy audits of all your school facilities? Yes

9 Jackson Jackson Grammar School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

9 Jackson Jackson Grammar School Q.23 Do you have an energy performance contract in place? No

Page 30 of 238

Page 31: New Hampshire Department of Education Bureau of School

9 Jackson Jackson Grammar School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

9 Jackson Jackson Grammar School Q.25 What is the R-Value of the roof? 30

9 Jackson Jackson Grammar School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

9 Jackson Jackson Grammar School Q.28 Do you have a facility maintenance plan? Yes

9 Jackson Jackson Grammar School Q.29 What is your maintenance budget? 145147.00

9 Jackson Jackson Grammar School Q.30 What is your operational budget? 37851.00

9 Jackson Jackson Grammar School Q.31 What is your capital construction budget? 0

9 Jackson Jackson Grammar School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?30611

9 Jackson Jackson Grammar School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?175

9 Jackson Jackson Grammar School Q.34 Do you have a maintenance contract in place? No

9 Jackson Jackson Grammar School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative Derry Early Education Program Q.01 Approximate year of the original construction date 1952

10 Derry Cooperative Derry Early Education Program Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

10 Derry Cooperative Derry Early Education Program Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative Derry Early Education Program Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative Derry Early Education Program Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative Derry Early Education Program Q.14a a. Roofs |||||

10 Derry Cooperative Derry Early Education Program Q.14b b. Lighting Systems 2017|||||

10 Derry Cooperative Derry Early Education Program Q.14c c. Windows |||||

10 Derry Cooperative Derry Early Education Program Q.14d d. Ceilings |||||

10 Derry Cooperative Derry Early Education Program Q.14e e. Plumbing |||||

10 Derry Cooperative Derry Early Education Program Q.14f f. Heating Systems 2015|||||

10 Derry Cooperative Derry Early Education Program Q.14g g. Ventilation Systems 2018|||||

10 Derry Cooperative Derry Early Education Program Q.14h h. Conditioning Systems |||||

10 Derry Cooperative Derry Early Education Program Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

10 Derry Cooperative Derry Early Education Program Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative Derry Early Education Program Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative Derry Early Education Program Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative Derry Early Education Program Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative Derry Early Education Program Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

10 Derry Cooperative Derry Early Education Program Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative Derry Early Education Program Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative Derry Early Education Program Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

10 Derry Cooperative Derry Early Education Program Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative Derry Early Education Program Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative Derry Early Education Program Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative Derry Early Education Program Q.34 Do you have a maintenance contract in place? Yes

10 Derry Cooperative Derry Early Education Program Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative Derry Village School Q.01 Approximate year of the original construction date 1967

10 Derry Cooperative Derry Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

10 Derry Cooperative Derry Village School Q.03 Gross Square footage (including portables) 61788

10 Derry Cooperative Derry Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative Derry Village School Q.05 How many parking spaces does the facility have? 65

10 Derry Cooperative Derry Village School Q.06 Does your building have a basement? No

10 Derry Cooperative Derry Village School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative Derry Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative Derry Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry Cooperative Derry Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative Derry Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

Page 31 of 238

Page 32: New Hampshire Department of Education Bureau of School

10 Derry Cooperative Derry Village School Q.14a a. Roofs 1967|2000||||

10 Derry Cooperative Derry Village School Q.14b b. Lighting Systems 1967|2000|2017|||

10 Derry Cooperative Derry Village School Q.14c c. Windows 1967|2000||||

10 Derry Cooperative Derry Village School Q.14d d. Ceilings 1967|2000||||

10 Derry Cooperative Derry Village School Q.14e e. Plumbing 1967|2000||||

10 Derry Cooperative Derry Village School Q.14f f. Heating Systems 1967|2000|2019|||

10 Derry Cooperative Derry Village School Q.14g g. Ventilation Systems 1967|2000||||

10 Derry Cooperative Derry Village School Q.14h h. Conditioning Systems |||||

10 Derry Cooperative Derry Village School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

10 Derry Cooperative Derry Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative Derry Village School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative Derry Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative Derry Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative Derry Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

10 Derry Cooperative Derry Village School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative Derry Village School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative Derry Village School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative Derry Village School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative Derry Village School Q.27 Do you have a presence of: (click all that apply) Asbestos

10 Derry Cooperative Derry Village School Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative Derry Village School Q.29 What is your maintenance budget? 504953

10 Derry Cooperative Derry Village School Q.30 What is your operational budget? 5173734

10 Derry Cooperative Derry Village School Q.31 What is your capital construction budget? 0

10 Derry Cooperative Derry Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?101945

10 Derry Cooperative Derry Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?45

10 Derry Cooperative Derry Village School Q.34 Do you have a maintenance contract in place? No

10 Derry Cooperative Derry Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.01 Approximate year of the original construction date 1986

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.03 Gross Square footage (including portables) 58874

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.05 How many parking spaces does the facility have? 85

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.06 Does your building have a basement? No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.07 How many portable classrooms are in use? 0

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14a a. Roofs 1986|||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14b b. Lighting Systems 1986|2017||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14c c. Windows 1986|||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14d d. Ceilings 1986|||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14e e. Plumbing 1986|||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14f f. Heating Systems 1986|2018||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14g g. Ventilation Systems 1986|2018||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.14h h. Conditioning Systems 1986|2018||||

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.15 What types of roofs are on your school facility? (click all that apply) Flat

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

Page 32 of 238

Page 33: New Hampshire Department of Education Bureau of School

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.21 Is your building a CHP's or LEED certified? No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.22 Have you had energy audits of all your school facilities? Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.23 Do you have an energy performance contract in place? Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.27 Do you have a presence of: (click all that apply) Lead in Water

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.28 Do you have a facility maintenance plan? Yes

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.29 What is your maintenance budget? 534689

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.30 What is your operational budget? 4476597

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.31 What is your capital construction budget? 0

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100656

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?45

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.34 Do you have a maintenance contract in place? No

10 Derry CooperativeEast Derry Memorial Elementary

SchoolQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative Ernest P. Barka Elementary School Q.01 Approximate year of the original construction date 2005

10 Derry Cooperative Ernest P. Barka Elementary School Q.03 Gross Square footage (including portables) 93809

10 Derry Cooperative Ernest P. Barka Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative Ernest P. Barka Elementary School Q.05 How many parking spaces does the facility have? 116

10 Derry Cooperative Ernest P. Barka Elementary School Q.06 Does your building have a basement? No

10 Derry Cooperative Ernest P. Barka Elementary School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative Ernest P. Barka Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative Ernest P. Barka Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative Ernest P. Barka Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.14a a. Roofs 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14b b. Lighting Systems 2005|2018||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14c c. Windows 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14d d. Ceilings 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14e e. Plumbing 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14f f. Heating Systems 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14g g. Ventilation Systems 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.14h h. Conditioning Systems 2005|||||

10 Derry Cooperative Ernest P. Barka Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

10 Derry Cooperative Ernest P. Barka Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative Ernest P. Barka Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative Ernest P. Barka Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative Ernest P. Barka Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative Ernest P. Barka Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

10 Derry Cooperative Ernest P. Barka Elementary School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative Ernest P. Barka Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative Ernest P. Barka Elementary School Q.29 What is your maintenance budget? 624967

10 Derry Cooperative Ernest P. Barka Elementary School Q.30 What is your operational budget? 7161330

10 Derry Cooperative Ernest P. Barka Elementary School Q.31 What is your capital construction budget? 0

10 Derry Cooperative Ernest P. Barka Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?196327

10 Derry Cooperative Ernest P. Barka Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?55

Page 33 of 238

Page 34: New Hampshire Department of Education Bureau of School

10 Derry Cooperative Ernest P. Barka Elementary School Q.34 Do you have a maintenance contract in place? No

10 Derry Cooperative Ernest P. Barka Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.01 Approximate year of the original construction date 1952

10 Derry Cooperative Gilbert H. Hood Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

10 Derry Cooperative Gilbert H. Hood Middle School Q.03 Gross Square footage (including portables) 168919

10 Derry Cooperative Gilbert H. Hood Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative Gilbert H. Hood Middle School Q.05 How many parking spaces does the facility have? 182

10 Derry Cooperative Gilbert H. Hood Middle School Q.06 Does your building have a basement? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative Gilbert H. Hood Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative Gilbert H. Hood Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry Cooperative Gilbert H. Hood Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.14a a. Roofs 1952|1971|2005|||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14b b. Lighting Systems 1952|1971|2005|2017||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14c c. Windows 1952|1971|2005|||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14d d. Ceilings 1952|1971|2005|||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14e e. Plumbing 1952|1971|2005|||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14f f. Heating Systems 1952|1971|2005|2015||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14g g. Ventilation Systems 1952|1971|2005|2018||

10 Derry Cooperative Gilbert H. Hood Middle School Q.14h h. Conditioning Systems 0|||||

10 Derry Cooperative Gilbert H. Hood Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

10 Derry Cooperative Gilbert H. Hood Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative Gilbert H. Hood Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative Gilbert H. Hood Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative Gilbert H. Hood Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative Gilbert H. Hood Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

10 Derry Cooperative Gilbert H. Hood Middle School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative Gilbert H. Hood Middle School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative Gilbert H. Hood Middle School Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative Gilbert H. Hood Middle School Q.29 What is your maintenance budget? 709842

10 Derry Cooperative Gilbert H. Hood Middle School Q.30 What is your operational budget? 7655595

10 Derry Cooperative Gilbert H. Hood Middle School Q.31 What is your capital construction budget? 0

10 Derry Cooperative Gilbert H. Hood Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?193336

10 Derry Cooperative Gilbert H. Hood Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?65

10 Derry Cooperative Gilbert H. Hood Middle School Q.34 Do you have a maintenance contract in place? Yes

10 Derry Cooperative Gilbert H. Hood Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative Gilbert H. Hood Middle School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 0

10 Derry Cooperative Gilbert H. Hood Middle School Q.35c c. If yes, provide estimated year of construction. 0

10 Derry Cooperative Grinnell School Q.01 Approximate year of the original construction date 1950

10 Derry Cooperative Grinnell School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

10 Derry Cooperative Grinnell School Q.03 Gross Square footage (including portables) 80047

10 Derry Cooperative Grinnell School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative Grinnell School Q.05 How many parking spaces does the facility have? 90

10 Derry Cooperative Grinnell School Q.06 Does your building have a basement? Yes

10 Derry Cooperative Grinnell School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative Grinnell School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative Grinnell School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 34 of 238

Page 35: New Hampshire Department of Education Bureau of School

10 Derry Cooperative Grinnell School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative Grinnell School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

10 Derry Cooperative Grinnell School Q.14a a. Roofs 1950|2008||||

10 Derry Cooperative Grinnell School Q.14b b. Lighting Systems 1950|2008|2017|||

10 Derry Cooperative Grinnell School Q.14c c. Windows 1950|2008||||

10 Derry Cooperative Grinnell School Q.14d d. Ceilings 1950|2008||||

10 Derry Cooperative Grinnell School Q.14e e. Plumbing 1950|2008||||

10 Derry Cooperative Grinnell School Q.14f f. Heating Systems 1950|2008|2017|||

10 Derry Cooperative Grinnell School Q.14g g. Ventilation Systems 1950|2008|2018|||

10 Derry Cooperative Grinnell School Q.14h h. Conditioning Systems 0|||||

10 Derry Cooperative Grinnell School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

10 Derry Cooperative Grinnell School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative Grinnell School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative Grinnell School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative Grinnell School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative Grinnell School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

10 Derry Cooperative Grinnell School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative Grinnell School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative Grinnell School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative Grinnell School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative Grinnell School Q.27 Do you have a presence of: (click all that apply) Asbestos

10 Derry Cooperative Grinnell School Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative Grinnell School Q.29 What is your maintenance budget? 493362

10 Derry Cooperative Grinnell School Q.30 What is your operational budget? 4090965

10 Derry Cooperative Grinnell School Q.31 What is your capital construction budget? 0

10 Derry Cooperative Grinnell School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?74911

10 Derry Cooperative Grinnell School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?45

10 Derry Cooperative Grinnell School Q.34 Do you have a maintenance contract in place? No

10 Derry Cooperative Grinnell School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative South Range Elementary School Q.01 Approximate year of the original construction date 1966

10 Derry Cooperative South Range Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

10 Derry Cooperative South Range Elementary School Q.03 Gross Square footage (including portables) 52307

10 Derry Cooperative South Range Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

10 Derry Cooperative South Range Elementary School Q.05 How many parking spaces does the facility have? 65

10 Derry Cooperative South Range Elementary School Q.06 Does your building have a basement? No

10 Derry Cooperative South Range Elementary School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative South Range Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative South Range Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

10 Derry Cooperative South Range Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry Cooperative South Range Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative South Range Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

10 Derry Cooperative South Range Elementary School Q.14a a. Roofs 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14b b. Lighting Systems 1966|2000|2017|||

10 Derry Cooperative South Range Elementary School Q.14c c. Windows 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14d d. Ceilings 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14e e. Plumbing 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14f f. Heating Systems 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14g g. Ventilation Systems 1966|2000||||

10 Derry Cooperative South Range Elementary School Q.14h h. Conditioning Systems 1966|2000||||

Page 35 of 238

Page 36: New Hampshire Department of Education Bureau of School

10 Derry Cooperative South Range Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

10 Derry Cooperative South Range Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

10 Derry Cooperative South Range Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative South Range Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative South Range Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

10 Derry Cooperative South Range Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

10 Derry Cooperative South Range Elementary School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative South Range Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative South Range Elementary School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative South Range Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative South Range Elementary School Q.28 Do you have a facility maintenance plan? No

10 Derry Cooperative South Range Elementary School Q.29 What is your maintenance budget? 478434

10 Derry Cooperative South Range Elementary School Q.30 What is your operational budget? 4582202

10 Derry Cooperative South Range Elementary School Q.31 What is your capital construction budget? 0

10 Derry Cooperative South Range Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?101562

10 Derry Cooperative South Range Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

10 Derry Cooperative South Range Elementary School Q.34 Do you have a maintenance contract in place? No

10 Derry Cooperative South Range Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

10 Derry Cooperative West Running Brook Middle School Q.01 Approximate year of the original construction date 1995

10 Derry Cooperative West Running Brook Middle School Q.03 Gross Square footage (including portables) 112037

10 Derry Cooperative West Running Brook Middle School Q.05 How many parking spaces does the facility have? 138

10 Derry Cooperative West Running Brook Middle School Q.06 Does your building have a basement? No

10 Derry Cooperative West Running Brook Middle School Q.07 How many portable classrooms are in use? 0

10 Derry Cooperative West Running Brook Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

10 Derry Cooperative West Running Brook Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

10 Derry Cooperative West Running Brook Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

10 Derry Cooperative West Running Brook Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

10 Derry Cooperative West Running Brook Middle School Q.14a a. Roofs 1995|||||

10 Derry Cooperative West Running Brook Middle School Q.14b b. Lighting Systems 1995|2017||||

10 Derry Cooperative West Running Brook Middle School Q.14c c. Windows 1995|||||

10 Derry Cooperative West Running Brook Middle School Q.14d d. Ceilings 1995|||||

10 Derry Cooperative West Running Brook Middle School Q.14e e. Plumbing 1995|||||

10 Derry Cooperative West Running Brook Middle School Q.14f f. Heating Systems 1995|2017||||

10 Derry Cooperative West Running Brook Middle School Q.14g g. Ventilation Systems 1995|2017||||

10 Derry Cooperative West Running Brook Middle School Q.14h h. Conditioning Systems 1995|||||

10 Derry Cooperative West Running Brook Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

10 Derry Cooperative West Running Brook Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

10 Derry Cooperative West Running Brook Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

10 Derry Cooperative West Running Brook Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

10 Derry Cooperative West Running Brook Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

10 Derry Cooperative West Running Brook Middle School Q.21 Is your building a CHP's or LEED certified? No

10 Derry Cooperative West Running Brook Middle School Q.22 Have you had energy audits of all your school facilities? Yes

10 Derry Cooperative West Running Brook Middle School Q.23 Do you have an energy performance contract in place? Yes

10 Derry Cooperative West Running Brook Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

10 Derry Cooperative West Running Brook Middle School Q.28 Do you have a facility maintenance plan? Yes

10 Derry Cooperative West Running Brook Middle School Q.29 What is your maintenance budget? 555597

10 Derry Cooperative West Running Brook Middle School Q.30 What is your operational budget? 6262325

10 Derry Cooperative West Running Brook Middle School Q.31 What is your capital construction budget? 0

10 Derry Cooperative West Running Brook Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?135897

Page 36 of 238

Page 37: New Hampshire Department of Education Bureau of School

10 Derry Cooperative West Running Brook Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

10 Derry Cooperative West Running Brook Middle School Q.34 Do you have a maintenance contract in place? No

10 Derry Cooperative West Running Brook Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

11 Dover Woodman Park School Q.01 Approximate year of the original construction date 1950

11 Dover Woodman Park School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

11 Dover Woodman Park School Q.03 Gross Square footage (including portables) 642619

11 Dover Woodman Park School Q.06 Does your building have a basement? No

11 Dover Woodman Park School Q.07 How many portable classrooms are in use? 0

11 Dover Woodman Park School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

11 Dover Woodman Park School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

11 Dover Woodman Park School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

11 Dover Woodman Park School Q.14a a. Roofs |||||

11 Dover Woodman Park School Q.14b b. Lighting Systems |||||

11 Dover Woodman Park School Q.14c c. Windows |||||

11 Dover Woodman Park School Q.14d d. Ceilings |||||

11 Dover Woodman Park School Q.14e e. Plumbing |||||

11 Dover Woodman Park School Q.14f f. Heating Systems |||||

11 Dover Woodman Park School Q.14g g. Ventilation Systems |||||

11 Dover Woodman Park School Q.14h h. Conditioning Systems |||||

11 Dover Woodman Park School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

11 Dover Woodman Park School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Wood

11 Dover Woodman Park School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

11 Dover Woodman Park School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

11 Dover Woodman Park School Q.21 Is your building a CHP's or LEED certified? No

11 Dover Woodman Park School Q.28 Do you have a facility maintenance plan? Yes

11 Dover Woodman Park School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?16

11 Dover Woodman Park School Q.34 Do you have a maintenance contract in place? Yes

11 Dover Woodman Park School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

12 Londonderry Londonderry Middle School Q.01 Approximate year of the original construction date 1982

12 Londonderry Londonderry Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

12 Londonderry Londonderry Middle School Q.03 Gross Square footage (including portables) 158900

12 Londonderry Londonderry Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry Londonderry Middle School Q.05 How many parking spaces does the facility have? 214

12 Londonderry Londonderry Middle School Q.06 Does your building have a basement? No

12 Londonderry Londonderry Middle School Q.07 How many portable classrooms are in use? 0

12 Londonderry Londonderry Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry Londonderry Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry Londonderry Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry Londonderry Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

12 Londonderry Londonderry Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry Londonderry Middle School Q.14a a. Roofs 2002|2003|2004|2005|2013|

12 Londonderry Londonderry Middle School Q.14b b. Lighting Systems 2000|2018||||

12 Londonderry Londonderry Middle School Q.14c c. Windows 1997|2003|2012|||

12 Londonderry Londonderry Middle School Q.14d d. Ceilings 1982|1997||||

12 Londonderry Londonderry Middle School Q.14e e. Plumbing 1982|1997||||

12 Londonderry Londonderry Middle School Q.14f f. Heating Systems 1982|1997|2006|||

12 Londonderry Londonderry Middle School Q.14g g. Ventilation Systems 1982|1997|2000|||

12 Londonderry Londonderry Middle School Q.14h h. Conditioning Systems 1982|1997|2010|||

12 Londonderry Londonderry Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

Page 37 of 238

Page 38: New Hampshire Department of Education Bureau of School

12 Londonderry Londonderry Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

12 Londonderry Londonderry Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

12 Londonderry Londonderry Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

12 Londonderry Londonderry Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry Londonderry Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

12 Londonderry Londonderry Middle School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry Londonderry Middle School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry Londonderry Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry Londonderry Middle School Q.23 Do you have an energy performance contract in place? No

12 Londonderry Londonderry Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry Londonderry Middle School Q.25 What is the R-Value of the roof? 25

12 Londonderry Londonderry Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

12 Londonderry Londonderry Middle School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry Londonderry Middle School Q.29 What is your maintenance budget? 58100

12 Londonderry Londonderry Middle School Q.30 What is your operational budget? 263400

12 Londonderry Londonderry Middle School Q.31 What is your capital construction budget? 220000

12 Londonderry Londonderry Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?141100

12 Londonderry Londonderry Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

12 Londonderry Londonderry Middle School Q.34 Do you have a maintenance contract in place? Yes

12 Londonderry Londonderry Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry Londonderry Middle School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Core renovations / addition- library, kitchen. caf

12 Londonderry Londonderry Middle School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 6

12 Londonderry Londonderry Middle School Q.35c c. If yes, provide estimated year of construction. 2024

12 Londonderry Londonderry Senior High School Q.01 Approximate year of the original construction date 1971

12 Londonderry Londonderry Senior High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

12 Londonderry Londonderry Senior High School Q.03 Gross Square footage (including portables) 287250

12 Londonderry Londonderry Senior High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry Londonderry Senior High School Q.05 How many parking spaces does the facility have? 387

12 Londonderry Londonderry Senior High School Q.06 Does your building have a basement? Yes

12 Londonderry Londonderry Senior High School Q.07 How many portable classrooms are in use? 0

12 Londonderry Londonderry Senior High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry Londonderry Senior High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry Londonderry Senior High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry Londonderry Senior High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

12 Londonderry Londonderry Senior High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry Londonderry Senior High School Q.14a a. Roofs 2004|2011|2013|2017|2015|2012

12 Londonderry Londonderry Senior High School Q.14b b. Lighting Systems 2000|2018||||

12 Londonderry Londonderry Senior High School Q.14c c. Windows 2001|2003||||

12 Londonderry Londonderry Senior High School Q.14d d. Ceilings 1971|1997|2003|||

12 Londonderry Londonderry Senior High School Q.14e e. Plumbing 1971|1974|1975|1978|1997|2003

12 Londonderry Londonderry Senior High School Q.14f f. Heating Systems 1991|||||

12 Londonderry Londonderry Senior High School Q.14g g. Ventilation Systems 1971|1996|1997|2003|2012|

12 Londonderry Londonderry Senior High School Q.14h h. Conditioning Systems 1996|2003|2012|2018||

12 Londonderry Londonderry Senior High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

12 Londonderry Londonderry Senior High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

12 Londonderry Londonderry Senior High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

12 Londonderry Londonderry Senior High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

12 Londonderry Londonderry Senior High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry Londonderry Senior High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Solar

Page 38 of 238

Page 39: New Hampshire Department of Education Bureau of School

12 Londonderry Londonderry Senior High School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry Londonderry Senior High School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry Londonderry Senior High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry Londonderry Senior High School Q.23 Do you have an energy performance contract in place? No

12 Londonderry Londonderry Senior High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry Londonderry Senior High School Q.25 What is the R-Value of the roof? 25

12 Londonderry Londonderry Senior High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

12 Londonderry Londonderry Senior High School Q.27 Do you have a presence of: (click all that apply) Asbestos

12 Londonderry Londonderry Senior High School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry Londonderry Senior High School Q.29 What is your maintenance budget? 168500

12 Londonderry Londonderry Senior High School Q.30 What is your operational budget? 380000

12 Londonderry Londonderry Senior High School Q.31 What is your capital construction budget? 323000

12 Londonderry Londonderry Senior High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?351800

12 Londonderry Londonderry Senior High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

12 Londonderry Londonderry Senior High School Q.34 Do you have a maintenance contract in place? Yes

12 Londonderry Londonderry Senior High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry Londonderry Senior High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Renovations; addition; auditorium

12 Londonderry Londonderry Senior High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 10

12 Londonderry Londonderry Senior High School Q.35c c. If yes, provide estimated year of construction. 2024

12 Londonderry Matthew Thornton Elementary School Q.01 Approximate year of the original construction date 1949

12 Londonderry Matthew Thornton Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1985

12 Londonderry Matthew Thornton Elementary School Q.03 Gross Square footage (including portables) 74535

12 Londonderry Matthew Thornton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry Matthew Thornton Elementary School Q.05 How many parking spaces does the facility have? 151

12 Londonderry Matthew Thornton Elementary School Q.06 Does your building have a basement? No

12 Londonderry Matthew Thornton Elementary School Q.07 How many portable classrooms are in use? 0

12 Londonderry Matthew Thornton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry Matthew Thornton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry Matthew Thornton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry Matthew Thornton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

12 Londonderry Matthew Thornton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry Matthew Thornton Elementary School Q.14a a. Roofs 2000|2001|2002|2006|2011|

12 Londonderry Matthew Thornton Elementary School Q.14b b. Lighting Systems 2000|||||

12 Londonderry Matthew Thornton Elementary School Q.14c c. Windows 2010|2011|2012|||

12 Londonderry Matthew Thornton Elementary School Q.14d d. Ceilings 1985|||||

12 Londonderry Matthew Thornton Elementary School Q.14e e. Plumbing 1949|1963|1985|||

12 Londonderry Matthew Thornton Elementary School Q.14f f. Heating Systems 1999|2004||||

12 Londonderry Matthew Thornton Elementary School Q.14g g. Ventilation Systems 1985|2004|2012|||

12 Londonderry Matthew Thornton Elementary School Q.14h h. Conditioning Systems 1985|2004|2012|2016||

12 Londonderry Matthew Thornton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

12 Londonderry Matthew Thornton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

12 Londonderry Matthew Thornton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

12 Londonderry Matthew Thornton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

12 Londonderry Matthew Thornton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry Matthew Thornton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

12 Londonderry Matthew Thornton Elementary School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry Matthew Thornton Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry Matthew Thornton Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry Matthew Thornton Elementary School Q.23 Do you have an energy performance contract in place? No

Page 39 of 238

Page 40: New Hampshire Department of Education Bureau of School

12 Londonderry Matthew Thornton Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry Matthew Thornton Elementary School Q.25 What is the R-Value of the roof? 25

12 Londonderry Matthew Thornton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

12 Londonderry Matthew Thornton Elementary School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry Matthew Thornton Elementary School Q.29 What is your maintenance budget? 34000

12 Londonderry Matthew Thornton Elementary School Q.30 What is your operational budget? 118900

12 Londonderry Matthew Thornton Elementary School Q.31 What is your capital construction budget? 126000

12 Londonderry Matthew Thornton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?77000

12 Londonderry Matthew Thornton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

12 Londonderry Matthew Thornton Elementary School Q.34 Do you have a maintenance contract in place? Yes

12 Londonderry Matthew Thornton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry Matthew Thornton Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Core renovations / classroom expansion

12 Londonderry Matthew Thornton Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

12 Londonderry Matthew Thornton Elementary School Q.35c c. If yes, provide estimated year of construction. 2026

12 Londonderry Moose Hill School Q.01 Approximate year of the original construction date 2001

12 Londonderry Moose Hill School Q.03 Gross Square footage (including portables) 37500

12 Londonderry Moose Hill School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry Moose Hill School Q.05 How many parking spaces does the facility have? 146

12 Londonderry Moose Hill School Q.06 Does your building have a basement? No

12 Londonderry Moose Hill School Q.07 How many portable classrooms are in use? 2

12 Londonderry Moose Hill School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry Moose Hill School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

12 Londonderry Moose Hill School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry Moose Hill School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry Moose Hill School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

12 Londonderry Moose Hill School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry Moose Hill School Q.14a a. Roofs 2001|2016||||

12 Londonderry Moose Hill School Q.14b b. Lighting Systems 2001|||||

12 Londonderry Moose Hill School Q.14c c. Windows 2001|||||

12 Londonderry Moose Hill School Q.14d d. Ceilings 2001|||||

12 Londonderry Moose Hill School Q.14e e. Plumbing 2001|2018||||

12 Londonderry Moose Hill School Q.14f f. Heating Systems 2001|2004||||

12 Londonderry Moose Hill School Q.14g g. Ventilation Systems 2001|2004||||

12 Londonderry Moose Hill School Q.14h h. Conditioning Systems 2001|2004|2008|||

12 Londonderry Moose Hill School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

12 Londonderry Moose Hill School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

12 Londonderry Moose Hill School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

12 Londonderry Moose Hill School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

12 Londonderry Moose Hill School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry Moose Hill School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

12 Londonderry Moose Hill School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry Moose Hill School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry Moose Hill School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry Moose Hill School Q.23 Do you have an energy performance contract in place? No

12 Londonderry Moose Hill School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry Moose Hill School Q.25 What is the R-Value of the roof? 25

12 Londonderry Moose Hill School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

12 Londonderry Moose Hill School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry Moose Hill School Q.29 What is your maintenance budget? 22700

Page 40 of 238

Page 41: New Hampshire Department of Education Bureau of School

12 Londonderry Moose Hill School Q.30 What is your operational budget? 98000

12 Londonderry Moose Hill School Q.31 What is your capital construction budget? 31000

12 Londonderry Moose Hill School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?37800

12 Londonderry Moose Hill School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

12 Londonderry Moose Hill School Q.34 Do you have a maintenance contract in place? Yes

12 Londonderry Moose Hill School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry Moose Hill School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") classroom expansion; gym; caf

12 Londonderry Moose Hill School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 10

12 Londonderry Moose Hill School Q.35c c. If yes, provide estimated year of construction. 2022

12 Londonderry North Londonderry Elementary School Q.01 Approximate year of the original construction date 1967

12 Londonderry North Londonderry Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

12 Londonderry North Londonderry Elementary School Q.03 Gross Square footage (including portables) 61052

12 Londonderry North Londonderry Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry North Londonderry Elementary School Q.05 How many parking spaces does the facility have? 127

12 Londonderry North Londonderry Elementary School Q.06 Does your building have a basement? No

12 Londonderry North Londonderry Elementary School Q.07 How many portable classrooms are in use? 0

12 Londonderry North Londonderry Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry North Londonderry Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry North Londonderry Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry North Londonderry Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

12 Londonderry North Londonderry Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry North Londonderry Elementary School Q.14a a. Roofs 2002|2003|2006|2007|2012|

12 Londonderry North Londonderry Elementary School Q.14b b. Lighting Systems 2000|2006||||

12 Londonderry North Londonderry Elementary School Q.14c c. Windows 1997|2001|2006|||

12 Londonderry North Londonderry Elementary School Q.14d d. Ceilings 1990|2006||||

12 Londonderry North Londonderry Elementary School Q.14e e. Plumbing 1967|1997|2006|||

12 Londonderry North Londonderry Elementary School Q.14f f. Heating Systems 2006|||||

12 Londonderry North Londonderry Elementary School Q.14g g. Ventilation Systems 1967|1997|2006|||

12 Londonderry North Londonderry Elementary School Q.14h h. Conditioning Systems 1995|2003|2006|||

12 Londonderry North Londonderry Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

12 Londonderry North Londonderry Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

12 Londonderry North Londonderry Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

12 Londonderry North Londonderry Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

12 Londonderry North Londonderry Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry North Londonderry Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

12 Londonderry North Londonderry Elementary School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry North Londonderry Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry North Londonderry Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry North Londonderry Elementary School Q.23 Do you have an energy performance contract in place? No

12 Londonderry North Londonderry Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry North Londonderry Elementary School Q.25 What is the R-Value of the roof? 25

12 Londonderry North Londonderry Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

12 Londonderry North Londonderry Elementary School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry North Londonderry Elementary School Q.29 What is your maintenance budget? 26800

12 Londonderry North Londonderry Elementary School Q.30 What is your operational budget? 118200

12 Londonderry North Londonderry Elementary School Q.31 What is your capital construction budget? 31000

12 Londonderry North Londonderry Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?69000

12 Londonderry North Londonderry Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

12 Londonderry North Londonderry Elementary School Q.34 Do you have a maintenance contract in place? Yes

Page 41 of 238

Page 42: New Hampshire Department of Education Bureau of School

12 Londonderry North Londonderry Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry North Londonderry Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Core renovations / classroom expansion

12 Londonderry North Londonderry Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

12 Londonderry North Londonderry Elementary School Q.35c c. If yes, provide estimated year of construction. 2026

12 Londonderry South Londonderry Elementary School Q.01 Approximate year of the original construction date 1978

12 Londonderry South Londonderry Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

12 Londonderry South Londonderry Elementary School Q.03 Gross Square footage (including portables) 65545

12 Londonderry South Londonderry Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

12 Londonderry South Londonderry Elementary School Q.05 How many parking spaces does the facility have? 154

12 Londonderry South Londonderry Elementary School Q.06 Does your building have a basement? No

12 Londonderry South Londonderry Elementary School Q.07 How many portable classrooms are in use? 0

12 Londonderry South Londonderry Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

12 Londonderry South Londonderry Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

12 Londonderry South Londonderry Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

12 Londonderry South Londonderry Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

12 Londonderry South Londonderry Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

12 Londonderry South Londonderry Elementary School Q.14a a. Roofs 2003|2004|2008|2018||

12 Londonderry South Londonderry Elementary School Q.14b b. Lighting Systems 2000|2004|2008|||

12 Londonderry South Londonderry Elementary School Q.14c c. Windows 2004|2008||||

12 Londonderry South Londonderry Elementary School Q.14d d. Ceilings 2004|2008||||

12 Londonderry South Londonderry Elementary School Q.14e e. Plumbing 1978|1997|2008|||

12 Londonderry South Londonderry Elementary School Q.14f f. Heating Systems 2008|||||

12 Londonderry South Londonderry Elementary School Q.14g g. Ventilation Systems 1978|1997|2004|2008||

12 Londonderry South Londonderry Elementary School Q.14h h. Conditioning Systems 1978|2002|2005|2008|2018|

12 Londonderry South Londonderry Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

12 Londonderry South Londonderry Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

12 Londonderry South Londonderry Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

12 Londonderry South Londonderry Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

12 Londonderry South Londonderry Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

12 Londonderry South Londonderry Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

12 Londonderry South Londonderry Elementary School Q.21 Is your building a CHP's or LEED certified? No

12 Londonderry South Londonderry Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

12 Londonderry South Londonderry Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

12 Londonderry South Londonderry Elementary School Q.23 Do you have an energy performance contract in place? No

12 Londonderry South Londonderry Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

12 Londonderry South Londonderry Elementary School Q.25 What is the R-Value of the roof? 25

12 Londonderry South Londonderry Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

12 Londonderry South Londonderry Elementary School Q.28 Do you have a facility maintenance plan? Yes

12 Londonderry South Londonderry Elementary School Q.29 What is your maintenance budget? 31300

12 Londonderry South Londonderry Elementary School Q.30 What is your operational budget? 106200

12 Londonderry South Londonderry Elementary School Q.31 What is your capital construction budget? 87000

12 Londonderry South Londonderry Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?102700

12 Londonderry South Londonderry Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

12 Londonderry South Londonderry Elementary School Q.34 Do you have a maintenance contract in place? Yes

12 Londonderry South Londonderry Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

12 Londonderry South Londonderry Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Core renovations / classroom expansion

12 Londonderry South Londonderry Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

12 Londonderry South Londonderry Elementary School Q.35c c. If yes, provide estimated year of construction. 2026

13 Freedom Freedom Elementary School Q.01 Approximate year of the original construction date 1983

Page 42 of 238

Page 43: New Hampshire Department of Education Bureau of School

13 Freedom Freedom Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

13 Freedom Freedom Elementary School Q.03 Gross Square footage (including portables) 21000

13 Freedom Freedom Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

13 Freedom Freedom Elementary School Q.05 How many parking spaces does the facility have? 20

13 Freedom Freedom Elementary School Q.06 Does your building have a basement? No

13 Freedom Freedom Elementary School Q.07 How many portable classrooms are in use? 0

13 Freedom Freedom Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

13 Freedom Freedom Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

13 Freedom Freedom Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

13 Freedom Freedom Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

13 Freedom Freedom Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

13 Freedom Freedom Elementary School Q.14a a. Roofs 2018|2017|2000|1989|1983|

13 Freedom Freedom Elementary School Q.14b b. Lighting Systems 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14c c. Windows 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14d d. Ceilings 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14e e. Plumbing 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14f f. Heating Systems 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14g g. Ventilation Systems 2000|1989|1983|||

13 Freedom Freedom Elementary School Q.14h h. Conditioning Systems 2019|2000||||

13 Freedom Freedom Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

13 Freedom Freedom Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

13 Freedom Freedom Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

13 Freedom Freedom Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

13 Freedom Freedom Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

13 Freedom Freedom Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

13 Freedom Freedom Elementary School Q.21 Is your building a CHP's or LEED certified? Yes

13 Freedom Freedom Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

13 Freedom Freedom Elementary School Q.23 Do you have an energy performance contract in place? No

13 Freedom Freedom Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

13 Freedom Freedom Elementary School Q.27 Do you have a presence of: (click all that apply) Lead in Water

13 Freedom Freedom Elementary School Q.28 Do you have a facility maintenance plan? Yes

13 Freedom Freedom Elementary School Q.29 What is your maintenance budget? 169549.04

13 Freedom Freedom Elementary School Q.30 What is your operational budget? 3751143.88

13 Freedom Freedom Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2080

13 Freedom Freedom Elementary School Q.34 Do you have a maintenance contract in place? No

13 Freedom Freedom Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

13 Madison Madison Elementary School Q.01 Approximate year of the original construction date 1924

13 Madison Madison Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

13 Madison Madison Elementary School Q.03 Gross Square footage (including portables) 35000

13 Madison Madison Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

13 Madison Madison Elementary School Q.05 How many parking spaces does the facility have? 48

13 Madison Madison Elementary School Q.06 Does your building have a basement? No

13 Madison Madison Elementary School Q.07 How many portable classrooms are in use? 0

13 Madison Madison Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

13 Madison Madison Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

13 Madison Madison Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

13 Madison Madison Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

13 Madison Madison Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

13 Madison Madison Elementary School Q.14a a. Roofs 3|||||

Page 43 of 238

Page 44: New Hampshire Department of Education Bureau of School

13 Madison Madison Elementary School Q.14b b. Lighting Systems all|||||

13 Madison Madison Elementary School Q.14c c. Windows |||||

13 Madison Madison Elementary School Q.14d d. Ceilings |||||

13 Madison Madison Elementary School Q.14e e. Plumbing |||||

13 Madison Madison Elementary School Q.14f f. Heating Systems |||||

13 Madison Madison Elementary School Q.14g g. Ventilation Systems |||||

13 Madison Madison Elementary School Q.14h h. Conditioning Systems |||||

13 Madison Madison Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

13 Madison Madison Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

13 Madison Madison Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

13 Madison Madison Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

13 Madison Madison Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

13 Madison Madison Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

13 Madison Madison Elementary School Q.21 Is your building a CHP's or LEED certified? No

13 Madison Madison Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

13 Madison Madison Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

13 Madison Madison Elementary School Q.23 Do you have an energy performance contract in place? No

13 Madison Madison Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

13 Madison Madison Elementary School Q.28 Do you have a facility maintenance plan? Yes

13 Madison Madison Elementary School Q.29 What is your maintenance budget? 45000

13 Madison Madison Elementary School Q.30 What is your operational budget? 6792133

13 Madison Madison Elementary School Q.31 What is your capital construction budget? 0

13 Madison Madison Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?60000

13 Madison Madison Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

13 Madison Madison Elementary School Q.34 Do you have a maintenance contract in place? No

13 Madison Madison Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

15 Auburn Auburn Village School Q.01 Approximate year of the original construction date 19401988

15 Auburn Auburn Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1988

15 Auburn Auburn Village School Q.03 Gross Square footage (including portables) 76413

15 Auburn Auburn Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

15 Auburn Auburn Village School Q.05 How many parking spaces does the facility have? 112

15 Auburn Auburn Village School Q.06 Does your building have a basement? No

15 Auburn Auburn Village School Q.07 How many portable classrooms are in use? 6

15 Auburn Auburn Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?3

15 Auburn Auburn Village School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

15 Auburn Auburn Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

15 Auburn Auburn Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

15 Auburn Auburn Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

15 Auburn Auburn Village School Q.13 Are all instructional and service areas within the facility ADA compliant? No

15 Auburn Auburn Village School Q.14a a. Roofs |||||x

15 Auburn Auburn Village School Q.14b b. Lighting Systems |||||x

15 Auburn Auburn Village School Q.14c c. Windows |||||x

15 Auburn Auburn Village School Q.14d d. Ceilings |||||x

15 Auburn Auburn Village School Q.14e e. Plumbing |||||x

15 Auburn Auburn Village School Q.14f f. Heating Systems ||||x|

15 Auburn Auburn Village School Q.14g g. Ventilation Systems |||||x

15 Auburn Auburn Village School Q.14h h. Conditioning Systems |||||x

15 Auburn Auburn Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

15 Auburn Auburn Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

Page 44 of 238

Page 45: New Hampshire Department of Education Bureau of School

15 Auburn Auburn Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

15 Auburn Auburn Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply)LED|Fluorescent tubes|Other|Minimal HPS

Exterior

15 Auburn Auburn Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

15 Auburn Auburn Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

15 Auburn Auburn Village School Q.21 Is your building a CHP's or LEED certified? No

15 Auburn Auburn Village School Q.22 Have you had energy audits of all your school facilities? Yes

15 Auburn Auburn Village School Q.23 Do you have an energy performance contract in place? No

15 Auburn Auburn Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1930

15 Auburn Auburn Village School Q.25 What is the R-Value of the roof? 1930

15 Auburn Auburn Village School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

15 Auburn Auburn Village School Q.27 Do you have a presence of: (click all that apply) Asbestos

15 Auburn Auburn Village School Q.28 Do you have a facility maintenance plan? Yes

15 Auburn Auburn Village School Q.29 What is your maintenance budget? 183542

15 Auburn Auburn Village School Q.30 What is your operational budget? 286142

15 Auburn Auburn Village School Q.31 What is your capital construction budget? 67600

15 Auburn Auburn Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?102700

15 Auburn Auburn Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2080

15 Auburn Auburn Village School Q.34 Do you have a maintenance contract in place? Yes

15 Auburn Auburn Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

15 Auburn Auburn Village School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Building Addition/Renovation underway

15 Auburn Auburn Village School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 14

15 Auburn Auburn Village School Q.35c c. If yes, provide estimated year of construction. 2019

15 Candia Henry W. Moore School Q.01 Approximate year of the original construction date 1936

15 Candia Henry W. Moore School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

15 Candia Henry W. Moore School Q.03 Gross Square footage (including portables) 45000

15 Candia Henry W. Moore School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

15 Candia Henry W. Moore School Q.05 How many parking spaces does the facility have? 81

15 Candia Henry W. Moore School Q.06 Does your building have a basement? Yes

15 Candia Henry W. Moore School Q.07 How many portable classrooms are in use? 0

15 Candia Henry W. Moore School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

15 Candia Henry W. Moore School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

15 Candia Henry W. Moore School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

15 Candia Henry W. Moore School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

15 Candia Henry W. Moore School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

15 Candia Henry W. Moore School Q.14a a. Roofs 2019|2017||||

15 Candia Henry W. Moore School Q.14b b. Lighting Systems |||||

15 Candia Henry W. Moore School Q.14c c. Windows 2019|||||

15 Candia Henry W. Moore School Q.14d d. Ceilings |||||

15 Candia Henry W. Moore School Q.14e e. Plumbing |||||

15 Candia Henry W. Moore School Q.14f f. Heating Systems 2011|||||

15 Candia Henry W. Moore School Q.14g g. Ventilation Systems |||||

15 Candia Henry W. Moore School Q.14h h. Conditioning Systems 2014|||||

15 Candia Henry W. Moore School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

15 Candia Henry W. Moore School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

15 Candia Henry W. Moore School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

15 Candia Henry W. Moore School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

15 Candia Henry W. Moore School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

15 Candia Henry W. Moore School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

15 Candia Henry W. Moore School Q.21 Is your building a CHP's or LEED certified? No

Page 45 of 238

Page 46: New Hampshire Department of Education Bureau of School

15 Candia Henry W. Moore School Q.22 Have you had energy audits of all your school facilities? Yes

15 Candia Henry W. Moore School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

15 Candia Henry W. Moore School Q.23 Do you have an energy performance contract in place? No

15 Candia Henry W. Moore School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

15 Candia Henry W. Moore School Q.25 What is the R-Value of the roof? 6

15 Candia Henry W. Moore School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

15 Candia Henry W. Moore School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

15 Candia Henry W. Moore School Q.28 Do you have a facility maintenance plan? Yes

15 Candia Henry W. Moore School Q.29 What is your maintenance budget? 510210

15 Candia Henry W. Moore School Q.30 What is your operational budget? 8653229

15 Candia Henry W. Moore School Q.31 What is your capital construction budget? 0

15 Candia Henry W. Moore School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?80000

15 Candia Henry W. Moore School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

15 Candia Henry W. Moore School Q.34 Do you have a maintenance contract in place? No

15 Candia Henry W. Moore School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

15 Hooksett David R. Cawley Middle School Q.01 Approximate year of the original construction date 2004

15 Hooksett David R. Cawley Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

15 Hooksett David R. Cawley Middle School Q.03 Gross Square footage (including portables) 13900

15 Hooksett David R. Cawley Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

15 Hooksett David R. Cawley Middle School Q.05 How many parking spaces does the facility have? 324

15 Hooksett David R. Cawley Middle School Q.06 Does your building have a basement? No

15 Hooksett David R. Cawley Middle School Q.07 How many portable classrooms are in use? 0

15 Hooksett David R. Cawley Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

15 Hooksett David R. Cawley Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

15 Hooksett David R. Cawley Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

15 Hooksett David R. Cawley Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

15 Hooksett David R. Cawley Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

15 Hooksett David R. Cawley Middle School Q.14a a. Roofs 2004|||||

15 Hooksett David R. Cawley Middle School Q.14b b. Lighting Systems 2004|||||

15 Hooksett David R. Cawley Middle School Q.14c c. Windows 2004|||||

15 Hooksett David R. Cawley Middle School Q.14d d. Ceilings 2004|||||

15 Hooksett David R. Cawley Middle School Q.14e e. Plumbing 2004|||||

15 Hooksett David R. Cawley Middle School Q.14f f. Heating Systems 2004|||||

15 Hooksett David R. Cawley Middle School Q.14g g. Ventilation Systems 2004|||||

15 Hooksett David R. Cawley Middle School Q.14h h. Conditioning Systems 2004|||||

15 Hooksett David R. Cawley Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

15 Hooksett David R. Cawley Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

15 Hooksett David R. Cawley Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

15 Hooksett David R. Cawley Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

15 Hooksett David R. Cawley Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

15 Hooksett David R. Cawley Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

15 Hooksett David R. Cawley Middle School Q.21 Is your building a CHP's or LEED certified? No

15 Hooksett David R. Cawley Middle School Q.22 Have you had energy audits of all your school facilities? No

15 Hooksett David R. Cawley Middle School Q.23 Do you have an energy performance contract in place? No

15 Hooksett David R. Cawley Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 8

15 Hooksett David R. Cawley Middle School Q.25 What is the R-Value of the roof? 10

15 Hooksett David R. Cawley Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

15 Hooksett David R. Cawley Middle School Q.28 Do you have a facility maintenance plan? Yes

15 Hooksett David R. Cawley Middle School Q.29 What is your maintenance budget? 603747.00

Page 46 of 238

Page 47: New Hampshire Department of Education Bureau of School

15 Hooksett David R. Cawley Middle School Q.30 What is your operational budget? 33000784.00

15 Hooksett David R. Cawley Middle School Q.31 What is your capital construction budget? 0

15 Hooksett David R. Cawley Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?170000.00

15 Hooksett David R. Cawley Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?220

15 Hooksett David R. Cawley Middle School Q.34 Do you have a maintenance contract in place? Yes

15 Hooksett David R. Cawley Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

15 Hooksett Hooksett Memorial School Q.01 Approximate year of the original construction date 1962

15 Hooksett Hooksett Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

15 Hooksett Hooksett Memorial School Q.03 Gross Square footage (including portables) 81000

15 Hooksett Hooksett Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

15 Hooksett Hooksett Memorial School Q.05 How many parking spaces does the facility have? 127

15 Hooksett Hooksett Memorial School Q.06 Does your building have a basement? No

15 Hooksett Hooksett Memorial School Q.07 How many portable classrooms are in use? 0

15 Hooksett Hooksett Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

15 Hooksett Hooksett Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

15 Hooksett Hooksett Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

15 Hooksett Hooksett Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

15 Hooksett Hooksett Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

15 Hooksett Hooksett Memorial School Q.14a a. Roofs 2005|||||

15 Hooksett Hooksett Memorial School Q.14b b. Lighting Systems 2016|||||

15 Hooksett Hooksett Memorial School Q.14c c. Windows 2005|||||

15 Hooksett Hooksett Memorial School Q.14d d. Ceilings 2005|||||

15 Hooksett Hooksett Memorial School Q.14e e. Plumbing 2005|||||

15 Hooksett Hooksett Memorial School Q.14f f. Heating Systems 2005|||||

15 Hooksett Hooksett Memorial School Q.14g g. Ventilation Systems 2005|||||

15 Hooksett Hooksett Memorial School Q.14h h. Conditioning Systems 2005|||||

15 Hooksett Hooksett Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

15 Hooksett Hooksett Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Stucco

15 Hooksett Hooksett Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

15 Hooksett Hooksett Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

15 Hooksett Hooksett Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

15 Hooksett Hooksett Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

15 Hooksett Hooksett Memorial School Q.21 Is your building a CHP's or LEED certified? No

15 Hooksett Hooksett Memorial School Q.22 Have you had energy audits of all your school facilities? No

15 Hooksett Hooksett Memorial School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

15 Hooksett Hooksett Memorial School Q.23 Do you have an energy performance contract in place? No

15 Hooksett Hooksett Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 8

15 Hooksett Hooksett Memorial School Q.25 What is the R-Value of the roof? 10

15 Hooksett Hooksett Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? No

15 Hooksett Hooksett Memorial School Q.28 Do you have a facility maintenance plan? Yes

15 Hooksett Hooksett Memorial School Q.29 What is your maintenance budget? 90000

15 Hooksett Hooksett Memorial School Q.30 What is your operational budget? 100000

15 Hooksett Hooksett Memorial School Q.31 What is your capital construction budget? 0

15 Hooksett Hooksett Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?120000

15 Hooksett Hooksett Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1750

15 Hooksett Hooksett Memorial School Q.34 Do you have a maintenance contract in place? Yes

15 Hooksett Hooksett Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

16 East Kingston East Kingston Elementary School Q.01 Approximate year of the original construction date 1977

16 East Kingston East Kingston Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

Page 47 of 238

Page 48: New Hampshire Department of Education Bureau of School

16 East Kingston East Kingston Elementary School Q.03 Gross Square footage (including portables) 15200

16 East Kingston East Kingston Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

16 East Kingston East Kingston Elementary School Q.05 How many parking spaces does the facility have? 61

16 East Kingston East Kingston Elementary School Q.06 Does your building have a basement? No

16 East Kingston East Kingston Elementary School Q.07 How many portable classrooms are in use? 0

16 East Kingston East Kingston Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

16 East Kingston East Kingston Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

16 East Kingston East Kingston Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

16 East Kingston East Kingston Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

16 East Kingston East Kingston Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

16 East Kingston East Kingston Elementary School Q.14a a. Roofs 2019|2013|2012|1988||

16 East Kingston East Kingston Elementary School Q.14b b. Lighting Systems 2019|2018||||

16 East Kingston East Kingston Elementary School Q.14c c. Windows 2012|1999|1988|||

16 East Kingston East Kingston Elementary School Q.14d d. Ceilings |||||

16 East Kingston East Kingston Elementary School Q.14e e. Plumbing 1999|1988|1977|||

16 East Kingston East Kingston Elementary School Q.14f f. Heating Systems 2018|1999||||

16 East Kingston East Kingston Elementary School Q.14g g. Ventilation Systems 1999|1988|1977|||

16 East Kingston East Kingston Elementary School Q.14h h. Conditioning Systems 2015|2012||||

16 East Kingston East Kingston Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

16 East Kingston East Kingston Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

16 East Kingston East Kingston Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

16 East Kingston East Kingston Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

16 East Kingston East Kingston Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

16 East Kingston East Kingston Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Solar

16 East Kingston East Kingston Elementary School Q.21 Is your building a CHP's or LEED certified? No

16 East Kingston East Kingston Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

16 East Kingston East Kingston Elementary School Q.23 Do you have an energy performance contract in place? No

16 East Kingston East Kingston Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

16 East Kingston East Kingston Elementary School Q.25 What is the R-Value of the roof? 65

16 East Kingston East Kingston Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

16 East Kingston East Kingston Elementary School Q.28 Do you have a facility maintenance plan? Yes

16 East Kingston East Kingston Elementary School Q.29 What is your maintenance budget? 80000

16 East Kingston East Kingston Elementary School Q.30 What is your operational budget? 102925

16 East Kingston East Kingston Elementary School Q.31 What is your capital construction budget? 0

16 East Kingston East Kingston Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?35000

16 East Kingston East Kingston Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?60

16 East Kingston East Kingston Elementary School Q.34 Do you have a maintenance contract in place? No

16 East Kingston East Kingston Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

16 Kensington Kensington Elementary School Q.01 Approximate year of the original construction date 1952

16 Kensington Kensington Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

16 Kensington Kensington Elementary School Q.03 Gross Square footage (including portables) 31000

16 Kensington Kensington Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

16 Kensington Kensington Elementary School Q.05 How many parking spaces does the facility have? 70

16 Kensington Kensington Elementary School Q.06 Does your building have a basement? No

16 Kensington Kensington Elementary School Q.07 How many portable classrooms are in use? 0

16 Kensington Kensington Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

16 Kensington Kensington Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

16 Kensington Kensington Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

16 Kensington Kensington Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

Page 48 of 238

Page 49: New Hampshire Department of Education Bureau of School

16 Kensington Kensington Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

16 Kensington Kensington Elementary School Q.14a a. Roofs 2003|2016|2018|||

16 Kensington Kensington Elementary School Q.14b b. Lighting Systems 2018|||||

16 Kensington Kensington Elementary School Q.14c c. Windows 2003|2010|2017|2018|2019|

16 Kensington Kensington Elementary School Q.14d d. Ceilings 1952|1987|1989|2003||

16 Kensington Kensington Elementary School Q.14e e. Plumbing 1952|1987|1989|1995|2003|

16 Kensington Kensington Elementary School Q.14f f. Heating Systems 1987|1989|2003|||

16 Kensington Kensington Elementary School Q.14g g. Ventilation Systems 2003|||||

16 Kensington Kensington Elementary School Q.14h h. Conditioning Systems 2003|||||

16 Kensington Kensington Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

16 Kensington Kensington Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

16 Kensington Kensington Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|concrete block

16 Kensington Kensington Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

16 Kensington Kensington Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

16 Kensington Kensington Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

16 Kensington Kensington Elementary School Q.21 Is your building a CHP's or LEED certified? No

16 Kensington Kensington Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

16 Kensington Kensington Elementary School Q.23 Do you have an energy performance contract in place? No

16 Kensington Kensington Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

16 Kensington Kensington Elementary School Q.25 What is the R-Value of the roof? 9

16 Kensington Kensington Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

16 Kensington Kensington Elementary School Q.28 Do you have a facility maintenance plan? Yes

16 Kensington Kensington Elementary School Q.29 What is your maintenance budget? 279486

16 Kensington Kensington Elementary School Q.30 What is your operational budget? 2928471

16 Kensington Kensington Elementary School Q.31 What is your capital construction budget? 0

16 Kensington Kensington Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?45500

16 Kensington Kensington Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

16 Kensington Kensington Elementary School Q.34 Do you have a maintenance contract in place? No

16 Kensington Kensington Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

16 Newfields Newfields Elementary School Q.01 Approximate year of the original construction date 1907

16 Newfields Newfields Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

16 Newfields Newfields Elementary School Q.03 Gross Square footage (including portables) 21000

16 Newfields Newfields Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

16 Newfields Newfields Elementary School Q.05 How many parking spaces does the facility have? 38

16 Newfields Newfields Elementary School Q.06 Does your building have a basement? Yes

16 Newfields Newfields Elementary School Q.07 How many portable classrooms are in use? 0

16 Newfields Newfields Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

16 Newfields Newfields Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

16 Newfields Newfields Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

16 Newfields Newfields Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

16 Newfields Newfields Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

16 Newfields Newfields Elementary School Q.14a a. Roofs 2001|||||

16 Newfields Newfields Elementary School Q.14b b. Lighting Systems 2011|||||

16 Newfields Newfields Elementary School Q.14c c. Windows 2001|1996|1907|||

16 Newfields Newfields Elementary School Q.14d d. Ceilings 2001|1907||||

16 Newfields Newfields Elementary School Q.14e e. Plumbing 2001|||||

16 Newfields Newfields Elementary School Q.14f f. Heating Systems 2001|2001||||

16 Newfields Newfields Elementary School Q.14g g. Ventilation Systems 2001|||||

16 Newfields Newfields Elementary School Q.14h h. Conditioning Systems -|||||

Page 49 of 238

Page 50: New Hampshire Department of Education Bureau of School

16 Newfields Newfields Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

16 Newfields Newfields Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

16 Newfields Newfields Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

16 Newfields Newfields Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

16 Newfields Newfields Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

16 Newfields Newfields Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

16 Newfields Newfields Elementary School Q.21 Is your building a CHP's or LEED certified? No

16 Newfields Newfields Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

16 Newfields Newfields Elementary School Q.23 Do you have an energy performance contract in place? No

16 Newfields Newfields Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

16 Newfields Newfields Elementary School Q.28 Do you have a facility maintenance plan? Yes

16 Newfields Newfields Elementary School Q.29 What is your maintenance budget? 178710

16 Newfields Newfields Elementary School Q.30 What is your operational budget? 239739

16 Newfields Newfields Elementary School Q.31 What is your capital construction budget? 0

16 Newfields Newfields Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?50000

16 Newfields Newfields Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?60

16 Newfields Newfields Elementary School Q.34 Do you have a maintenance contract in place? Yes

16 Newfields Newfields Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

16 Stratham Stratham Memorial School Q.01 Approximate year of the original construction date 1989

16 Stratham Stratham Memorial School Q.03 Gross Square footage (including portables) 71540

16 Stratham Stratham Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

16 Stratham Stratham Memorial School Q.05 How many parking spaces does the facility have? 250

16 Stratham Stratham Memorial School Q.06 Does your building have a basement? No

16 Stratham Stratham Memorial School Q.07 How many portable classrooms are in use? 1

16 Stratham Stratham Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

16 Stratham Stratham Memorial School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

16 Stratham Stratham Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

16 Stratham Stratham Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

16 Stratham Stratham Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

16 Stratham Stratham Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

16 Stratham Stratham Memorial School Q.14a a. Roofs 2012|||||

16 Stratham Stratham Memorial School Q.14b b. Lighting Systems 2006|||||

16 Stratham Stratham Memorial School Q.14c c. Windows 1989|||||

16 Stratham Stratham Memorial School Q.14d d. Ceilings 1989|||||

16 Stratham Stratham Memorial School Q.14e e. Plumbing 1989|||||

16 Stratham Stratham Memorial School Q.14f f. Heating Systems 1989|||||

16 Stratham Stratham Memorial School Q.14g g. Ventilation Systems 1989|||||

16 Stratham Stratham Memorial School Q.14h h. Conditioning Systems 1989|||||

16 Stratham Stratham Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

16 Stratham Stratham Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

16 Stratham Stratham Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

16 Stratham Stratham Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

16 Stratham Stratham Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

16 Stratham Stratham Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

16 Stratham Stratham Memorial School Q.21 Is your building a CHP's or LEED certified? No

16 Stratham Stratham Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

16 Stratham Stratham Memorial School Q.23 Do you have an energy performance contract in place? No

16 Stratham Stratham Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? No

16 Stratham Stratham Memorial School Q.28 Do you have a facility maintenance plan? No

Page 50 of 238

Page 51: New Hampshire Department of Education Bureau of School

16 Stratham Stratham Memorial School Q.29 What is your maintenance budget? 319542

16 Stratham Stratham Memorial School Q.30 What is your operational budget? 490545

16 Stratham Stratham Memorial School Q.31 What is your capital construction budget? 0

16 Stratham Stratham Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?148500

16 Stratham Stratham Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

16 Stratham Stratham Memorial School Q.34 Do you have a maintenance contract in place? No

16 Stratham Stratham Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

19 Goffstown Bartlett Elementary School Q.01 Approximate year of the original construction date 1922

19 Goffstown Bartlett Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

19 Goffstown Bartlett Elementary School Q.03 Gross Square footage (including portables) 30000

19 Goffstown Bartlett Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

19 Goffstown Bartlett Elementary School Q.05 How many parking spaces does the facility have? 43

19 Goffstown Bartlett Elementary School Q.06 Does your building have a basement? Yes

19 Goffstown Bartlett Elementary School Q.07 How many portable classrooms are in use? 3

19 Goffstown Bartlett Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?5

19 Goffstown Bartlett Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

19 Goffstown Bartlett Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

19 Goffstown Bartlett Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

19 Goffstown Bartlett Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

19 Goffstown Bartlett Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 Goffstown Bartlett Elementary School Q.14a a. Roofs 1922|1963|1990|2011||

19 Goffstown Bartlett Elementary School Q.14b b. Lighting Systems 1922|1963|1990|200||

19 Goffstown Bartlett Elementary School Q.14c c. Windows 1922|1963|1990|||

19 Goffstown Bartlett Elementary School Q.14d d. Ceilings 1922|1963|1990|||

19 Goffstown Bartlett Elementary School Q.14e e. Plumbing 1922|1963|2000|||

19 Goffstown Bartlett Elementary School Q.14f f. Heating Systems 1922|1963|2000|||

19 Goffstown Bartlett Elementary School Q.14g g. Ventilation Systems 1922|1963|1990|2000||

19 Goffstown Bartlett Elementary School Q.14h h. Conditioning Systems 1922|1963|1990|2000||

19 Goffstown Bartlett Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 Goffstown Bartlett Elementary School Q.17 What type of studding is used at your school facility? (click all that apply)Steel|Wood|Other|Viynl siding on Modulars

Units

19 Goffstown Bartlett Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

19 Goffstown Bartlett Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 Goffstown Bartlett Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

19 Goffstown Bartlett Elementary School Q.21 Is your building a CHP's or LEED certified? No

19 Goffstown Bartlett Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

19 Goffstown Bartlett Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 Goffstown Bartlett Elementary School Q.23 Do you have an energy performance contract in place? No

19 Goffstown Bartlett Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

19 Goffstown Bartlett Elementary School Q.25 What is the R-Value of the roof? 40

19 Goffstown Bartlett Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 Goffstown Bartlett Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

19 Goffstown Bartlett Elementary School Q.28 Do you have a facility maintenance plan? Yes

19 Goffstown Bartlett Elementary School Q.29 What is your maintenance budget? 68567

19 Goffstown Bartlett Elementary School Q.30 What is your operational budget? 306539

19 Goffstown Bartlett Elementary School Q.31 What is your capital construction budget? 200000

19 Goffstown Bartlett Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?30248

19 Goffstown Bartlett Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

19 Goffstown Bartlett Elementary School Q.34 Do you have a maintenance contract in place? Yes

19 Goffstown Bartlett Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

Page 51 of 238

Page 52: New Hampshire Department of Education Bureau of School

19 Goffstown Glen Lake School Q.01 Approximate year of the original construction date 2006

19 Goffstown Glen Lake School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

19 Goffstown Glen Lake School Q.03 Gross Square footage (including portables) 17500

19 Goffstown Glen Lake School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

19 Goffstown Glen Lake School Q.05 How many parking spaces does the facility have? 50

19 Goffstown Glen Lake School Q.06 Does your building have a basement? No

19 Goffstown Glen Lake School Q.07 How many portable classrooms are in use? 0

19 Goffstown Glen Lake School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?6

19 Goffstown Glen Lake School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

19 Goffstown Glen Lake School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

19 Goffstown Glen Lake School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

19 Goffstown Glen Lake School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 Goffstown Glen Lake School Q.14a a. Roofs 2006|||||

19 Goffstown Glen Lake School Q.14b b. Lighting Systems 2006|||||

19 Goffstown Glen Lake School Q.14c c. Windows 2006|||||

19 Goffstown Glen Lake School Q.14d d. Ceilings 2006|||||

19 Goffstown Glen Lake School Q.14e e. Plumbing 2006|||||

19 Goffstown Glen Lake School Q.14f f. Heating Systems 2006|||||

19 Goffstown Glen Lake School Q.14g g. Ventilation Systems 2006|||||

19 Goffstown Glen Lake School Q.14h h. Conditioning Systems 2006|||||

19 Goffstown Glen Lake School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 Goffstown Glen Lake School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

19 Goffstown Glen Lake School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

19 Goffstown Glen Lake School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

19 Goffstown Glen Lake School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 Goffstown Glen Lake School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

19 Goffstown Glen Lake School Q.21 Is your building a CHP's or LEED certified? No

19 Goffstown Glen Lake School Q.22 Have you had energy audits of all your school facilities? Yes

19 Goffstown Glen Lake School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 Goffstown Glen Lake School Q.23 Do you have an energy performance contract in place? No

19 Goffstown Glen Lake School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

19 Goffstown Glen Lake School Q.25 What is the R-Value of the roof? 40

19 Goffstown Glen Lake School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 Goffstown Glen Lake School Q.28 Do you have a facility maintenance plan? Yes

19 Goffstown Glen Lake School Q.29 What is your maintenance budget? 44720

19 Goffstown Glen Lake School Q.30 What is your operational budget? 156332

19 Goffstown Glen Lake School Q.31 What is your capital construction budget? 200000

19 Goffstown Glen Lake School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?19875

19 Goffstown Glen Lake School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

19 Goffstown Glen Lake School Q.34 Do you have a maintenance contract in place? Yes

19 Goffstown Glen Lake School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

19 Goffstown Glen Lake School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Addition to building due to enrollment

19 Goffstown Glen Lake School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 21

19 Goffstown Glen Lake School Q.35c c. If yes, provide estimated year of construction. 2025

19 Goffstown Goffstown High School Q.01 Approximate year of the original construction date 1956

19 Goffstown Goffstown High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

19 Goffstown Goffstown High School Q.03 Gross Square footage (including portables) 181124

19 Goffstown Goffstown High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

19 Goffstown Goffstown High School Q.05 How many parking spaces does the facility have? 359

Page 52 of 238

Page 53: New Hampshire Department of Education Bureau of School

19 Goffstown Goffstown High School Q.06 Does your building have a basement? No

19 Goffstown Goffstown High School Q.07 How many portable classrooms are in use? 0

19 Goffstown Goffstown High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

19 Goffstown Goffstown High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

19 Goffstown Goffstown High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

19 Goffstown Goffstown High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 Goffstown Goffstown High School Q.14a a. Roofs 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14b b. Lighting Systems 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14c c. Windows 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14d d. Ceilings 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14e e. Plumbing 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14f f. Heating Systems 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14g g. Ventilation Systems 1956|1973|2001|||

19 Goffstown Goffstown High School Q.14h h. Conditioning Systems 1956|1973|2001|||

19 Goffstown Goffstown High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 Goffstown Goffstown High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

19 Goffstown Goffstown High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

19 Goffstown Goffstown High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

19 Goffstown Goffstown High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 Goffstown Goffstown High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

19 Goffstown Goffstown High School Q.21 Is your building a CHP's or LEED certified? No

19 Goffstown Goffstown High School Q.22 Have you had energy audits of all your school facilities? Yes

19 Goffstown Goffstown High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 Goffstown Goffstown High School Q.23 Do you have an energy performance contract in place? No

19 Goffstown Goffstown High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

19 Goffstown Goffstown High School Q.25 What is the R-Value of the roof? 40

19 Goffstown Goffstown High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 Goffstown Goffstown High School Q.27 Do you have a presence of: (click all that apply) Asbestos

19 Goffstown Goffstown High School Q.28 Do you have a facility maintenance plan? Yes

19 Goffstown Goffstown High School Q.29 What is your maintenance budget? 636260

19 Goffstown Goffstown High School Q.30 What is your operational budget? 1821820

19 Goffstown Goffstown High School Q.31 What is your capital construction budget? 200000

19 Goffstown Goffstown High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?307251

19 Goffstown Goffstown High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8

19 Goffstown Goffstown High School Q.34 Do you have a maintenance contract in place? Yes

19 Goffstown Goffstown High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

19 Goffstown Goffstown High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") New Buiding

19 Goffstown Goffstown High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 80

19 Goffstown Goffstown High School Q.35c c. If yes, provide estimated year of construction. 2028

19 Goffstown Maple Avenue School Q.01 Approximate year of the original construction date 1956

19 Goffstown Maple Avenue School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

19 Goffstown Maple Avenue School Q.03 Gross Square footage (including portables) 67438

19 Goffstown Maple Avenue School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

19 Goffstown Maple Avenue School Q.05 How many parking spaces does the facility have? 67

19 Goffstown Maple Avenue School Q.06 Does your building have a basement? Yes

19 Goffstown Maple Avenue School Q.07 How many portable classrooms are in use? 6

19 Goffstown Maple Avenue School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?7

19 Goffstown Maple Avenue School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom|Support Space

19 Goffstown Maple Avenue School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

Page 53 of 238

Page 54: New Hampshire Department of Education Bureau of School

19 Goffstown Maple Avenue School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

19 Goffstown Maple Avenue School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

19 Goffstown Maple Avenue School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 Goffstown Maple Avenue School Q.14a a. Roofs 1956|1961|1980|2018|2018|2018

19 Goffstown Maple Avenue School Q.14b b. Lighting Systems 1956|1961|1980|2000||

19 Goffstown Maple Avenue School Q.14c c. Windows 1956|1961|1980|||

19 Goffstown Maple Avenue School Q.14d d. Ceilings 1956|1961|1980|||

19 Goffstown Maple Avenue School Q.14e e. Plumbing 1956|1961|1980|||

19 Goffstown Maple Avenue School Q.14f f. Heating Systems 1956|1961|1980|2000||

19 Goffstown Maple Avenue School Q.14g g. Ventilation Systems 1956|1961|1980|2000||

19 Goffstown Maple Avenue School Q.14h h. Conditioning Systems 1956|1961|1980|2000||

19 Goffstown Maple Avenue School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 Goffstown Maple Avenue School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

19 Goffstown Maple Avenue School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

19 Goffstown Maple Avenue School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

19 Goffstown Maple Avenue School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 Goffstown Maple Avenue School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

19 Goffstown Maple Avenue School Q.21 Is your building a CHP's or LEED certified? No

19 Goffstown Maple Avenue School Q.22 Have you had energy audits of all your school facilities? Yes

19 Goffstown Maple Avenue School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 Goffstown Maple Avenue School Q.23 Do you have an energy performance contract in place? No

19 Goffstown Maple Avenue School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

19 Goffstown Maple Avenue School Q.25 What is the R-Value of the roof? 38

19 Goffstown Maple Avenue School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 Goffstown Maple Avenue School Q.27 Do you have a presence of: (click all that apply) Asbestos

19 Goffstown Maple Avenue School Q.28 Do you have a facility maintenance plan? Yes

19 Goffstown Maple Avenue School Q.29 What is your maintenance budget? 90150

19 Goffstown Maple Avenue School Q.30 What is your operational budget? 434309

19 Goffstown Maple Avenue School Q.31 What is your capital construction budget? 200000

19 Goffstown Maple Avenue School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?29875

19 Goffstown Maple Avenue School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

19 Goffstown Maple Avenue School Q.34 Do you have a maintenance contract in place? Yes

19 Goffstown Maple Avenue School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

19 Goffstown Maple Avenue School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Addition to building due to enrollment

19 Goffstown Maple Avenue School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 9

19 Goffstown Maple Avenue School Q.35c c. If yes, provide estimated year of construction. 2025

19 Goffstown Mountain View Middle School Q.01 Approximate year of the original construction date 1991

19 Goffstown Mountain View Middle School Q.03 Gross Square footage (including portables) 121657

19 Goffstown Mountain View Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

19 Goffstown Mountain View Middle School Q.05 How many parking spaces does the facility have? 161

19 Goffstown Mountain View Middle School Q.06 Does your building have a basement? Yes

19 Goffstown Mountain View Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

19 Goffstown Mountain View Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

19 Goffstown Mountain View Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

19 Goffstown Mountain View Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 Goffstown Mountain View Middle School Q.14a a. Roofs 1991|2010||||

19 Goffstown Mountain View Middle School Q.14b b. Lighting Systems 1991|2000||||

19 Goffstown Mountain View Middle School Q.14c c. Windows 1991|||||

19 Goffstown Mountain View Middle School Q.14d d. Ceilings 1991|||||

Page 54 of 238

Page 55: New Hampshire Department of Education Bureau of School

19 Goffstown Mountain View Middle School Q.14e e. Plumbing 1991|||||

19 Goffstown Mountain View Middle School Q.14f f. Heating Systems 1991|2010||||

19 Goffstown Mountain View Middle School Q.14g g. Ventilation Systems 1991|2010||||

19 Goffstown Mountain View Middle School Q.14h h. Conditioning Systems 1991|2010||||

19 Goffstown Mountain View Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 Goffstown Mountain View Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

19 Goffstown Mountain View Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

19 Goffstown Mountain View Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

19 Goffstown Mountain View Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 Goffstown Mountain View Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

19 Goffstown Mountain View Middle School Q.21 Is your building a CHP's or LEED certified? No

19 Goffstown Mountain View Middle School Q.22 Have you had energy audits of all your school facilities? Yes

19 Goffstown Mountain View Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 Goffstown Mountain View Middle School Q.23 Do you have an energy performance contract in place? No

19 Goffstown Mountain View Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

19 Goffstown Mountain View Middle School Q.25 What is the R-Value of the roof? 40

19 Goffstown Mountain View Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 Goffstown Mountain View Middle School Q.28 Do you have a facility maintenance plan? Yes

19 Goffstown Mountain View Middle School Q.29 What is your maintenance budget? 144087

19 Goffstown Mountain View Middle School Q.30 What is your operational budget? 965228

19 Goffstown Mountain View Middle School Q.31 What is your capital construction budget? 200000

19 Goffstown Mountain View Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?192228

19 Goffstown Mountain View Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

19 Goffstown Mountain View Middle School Q.34 Do you have a maintenance contract in place? Yes

19 Goffstown Mountain View Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

19 New Boston New Boston Central School Q.01 Approximate year of the original construction date 1954

19 New Boston New Boston Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

19 New Boston New Boston Central School Q.03 Gross Square footage (including portables) 60000

19 New Boston New Boston Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

19 New Boston New Boston Central School Q.05 How many parking spaces does the facility have? 164

19 New Boston New Boston Central School Q.06 Does your building have a basement? No

19 New Boston New Boston Central School Q.07 How many portable classrooms are in use? 2

19 New Boston New Boston Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?4

19 New Boston New Boston Central School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

19 New Boston New Boston Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

19 New Boston New Boston Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

19 New Boston New Boston Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

19 New Boston New Boston Central School Q.14a a. Roofs 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14b b. Lighting Systems 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14c c. Windows 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14d d. Ceilings 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14e e. Plumbing 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14f f. Heating Systems 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14g g. Ventilation Systems 1954|1970|1990|2000||

19 New Boston New Boston Central School Q.14h h. Conditioning Systems 1954|1670|1990|2000||

19 New Boston New Boston Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

19 New Boston New Boston Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

19 New Boston New Boston Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

19 New Boston New Boston Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

Page 55 of 238

Page 56: New Hampshire Department of Education Bureau of School

19 New Boston New Boston Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

19 New Boston New Boston Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

19 New Boston New Boston Central School Q.21 Is your building a CHP's or LEED certified? No

19 New Boston New Boston Central School Q.22 Have you had energy audits of all your school facilities? Yes

19 New Boston New Boston Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

19 New Boston New Boston Central School Q.23 Do you have an energy performance contract in place? No

19 New Boston New Boston Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

19 New Boston New Boston Central School Q.25 What is the R-Value of the roof? 40

19 New Boston New Boston Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

19 New Boston New Boston Central School Q.27 Do you have a presence of: (click all that apply) Asbestos

19 New Boston New Boston Central School Q.28 Do you have a facility maintenance plan? Yes

19 New Boston New Boston Central School Q.29 What is your maintenance budget? 73941

19 New Boston New Boston Central School Q.30 What is your operational budget? 458287

19 New Boston New Boston Central School Q.31 What is your capital construction budget? 150000

19 New Boston New Boston Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?94983

19 New Boston New Boston Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

19 New Boston New Boston Central School Q.34 Do you have a maintenance contract in place? Yes

19 New Boston New Boston Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

19 New Boston New Boston Central School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") School expansion

19 New Boston New Boston Central School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 3

19 New Boston New Boston Central School Q.35c c. If yes, provide estimated year of construction. 2025

20 Errol Errol Consolidated Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

20 Errol Errol Consolidated Elementary School Q.05 How many parking spaces does the facility have? 5

20 Errol Errol Consolidated Elementary School Q.06 Does your building have a basement? No

20 Errol Errol Consolidated Elementary School Q.07 How many portable classrooms are in use? 0

20 Errol Errol Consolidated Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

20 Errol Errol Consolidated Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

20 Errol Errol Consolidated Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

20 Errol Errol Consolidated Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

20 Errol Errol Consolidated Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

20 Errol Errol Consolidated Elementary School Q.14a a. Roofs |||||

20 Errol Errol Consolidated Elementary School Q.14b b. Lighting Systems |||||

20 Errol Errol Consolidated Elementary School Q.14c c. Windows |||||

20 Errol Errol Consolidated Elementary School Q.14d d. Ceilings |||||

20 Errol Errol Consolidated Elementary School Q.14e e. Plumbing |||||

20 Errol Errol Consolidated Elementary School Q.14f f. Heating Systems |||||

20 Errol Errol Consolidated Elementary School Q.14g g. Ventilation Systems |||||

20 Errol Errol Consolidated Elementary School Q.14h h. Conditioning Systems |||||

20 Errol Errol Consolidated Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat|Other|Metal roof

20 Errol Errol Consolidated Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

20 Errol Errol Consolidated Elementary School Q.22 Have you had energy audits of all your school facilities? No

20 Errol Errol Consolidated Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

20 Errol Errol Consolidated Elementary School Q.23 Do you have an energy performance contract in place? No

20 Errol Errol Consolidated Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

20 Errol Errol Consolidated Elementary School Q.28 Do you have a facility maintenance plan? Yes

20 Errol Errol Consolidated Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.01 Approximate year of the original construction date 1956

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.03 Gross Square footage (including portables) 32000

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

Page 56 of 238

Page 57: New Hampshire Department of Education Bureau of School

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.05 How many parking spaces does the facility have? 54

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.06 Does your building have a basement? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.07 How many portable classrooms are in use? 0

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14a a. Roofs 2008|||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14b b. Lighting Systems 2008|2012|2006|1994||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14c c. Windows 2009|||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14d d. Ceilings |||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14e e. Plumbing |||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14f f. Heating Systems 1998|2014||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14g g. Ventilation Systems |||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.14h h. Conditioning Systems |||||

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes|Other|incandescent lights

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.21 Is your building a CHP's or LEED certified? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.22 Have you had energy audits of all your school facilities? Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.23 Do you have an energy performance contract in place? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1749

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.25 What is the R-Value of the roof? 37

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.28 Do you have a facility maintenance plan? Yes

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.29 What is your maintenance budget? 13700.00

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.30 What is your operational budget? 106159.00

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.31 What is your capital construction budget? 47110.00

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?59500.00

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3744

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.34 Do you have a maintenance contract in place? No

20Gorham Randolph

Shelburne CooperativeEdward Fenn School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.01 Approximate year of the original construction date 1924

20Gorham Randolph

Shelburne CooperativeGorham High School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

20Gorham Randolph

Shelburne CooperativeGorham High School Q.03 Gross Square footage (including portables) 64000

20Gorham Randolph

Shelburne CooperativeGorham High School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.05 How many parking spaces does the facility have? 112

20Gorham Randolph

Shelburne CooperativeGorham High School Q.06 Does your building have a basement? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.07 How many portable classrooms are in use? 0

20Gorham Randolph

Shelburne CooperativeGorham High School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

20Gorham Randolph

Shelburne CooperativeGorham High School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14a a. Roofs 2008|||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14b b. Lighting Systems 1924|1958|1969|1992|2008|

Page 57 of 238

Page 58: New Hampshire Department of Education Bureau of School

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14c c. Windows 1924|1997|2008|2010|2011|2012

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14d d. Ceilings |||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14e e. Plumbing |||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14f f. Heating Systems 1994|||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14g g. Ventilation Systems 2008|||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.14h h. Conditioning Systems |||||

20Gorham Randolph

Shelburne CooperativeGorham High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

20Gorham Randolph

Shelburne CooperativeGorham High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Wood

20Gorham Randolph

Shelburne CooperativeGorham High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

20Gorham Randolph

Shelburne CooperativeGorham High School Q.18 What type of lighting systems are used in your school facility? (click all that apply)

LED|Fluorescent tubes|Other|incandescent -

bathroom and closet

20Gorham Randolph

Shelburne CooperativeGorham High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

20Gorham Randolph

Shelburne CooperativeGorham High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

20Gorham Randolph

Shelburne CooperativeGorham High School Q.21 Is your building a CHP's or LEED certified? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.22 Have you had energy audits of all your school facilities? Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.23 Do you have an energy performance contract in place? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 17491279

20Gorham Randolph

Shelburne CooperativeGorham High School Q.25 What is the R-Value of the roof? 37

20Gorham Randolph

Shelburne CooperativeGorham High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.27 Do you have a presence of: (click all that apply) Asbestos

20Gorham Randolph

Shelburne CooperativeGorham High School Q.28 Do you have a facility maintenance plan? Yes

20Gorham Randolph

Shelburne CooperativeGorham High School Q.29 What is your maintenance budget? 12790.00

20Gorham Randolph

Shelburne CooperativeGorham High School Q.30 What is your operational budget? 146332.

20Gorham Randolph

Shelburne CooperativeGorham High School Q.31 What is your capital construction budget? 45801.00

20Gorham Randolph

Shelburne CooperativeGorham High School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?63300.00

20Gorham Randolph

Shelburne CooperativeGorham High School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3640

20Gorham Randolph

Shelburne CooperativeGorham High School Q.34 Do you have a maintenance contract in place? No

20Gorham Randolph

Shelburne CooperativeGorham High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.01 Approximate year of the original construction date 1924

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.03 Gross Square footage (including portables) 64000

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.05 How many parking spaces does the facility have? 112

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.06 Does your building have a basement? No

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.07 How many portable classrooms are in use? 0

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14a a. Roofs 2008|||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14b b. Lighting Systems 1924|1959|1969|1992|2008|

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14c c. Windows 1924|1997|2008|2010|2011|2012

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14d d. Ceilings |||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14e e. Plumbing |||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14f f. Heating Systems |||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14g g. Ventilation Systems |||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.14h h. Conditioning Systems |||||

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Wood

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

Page 58 of 238

Page 59: New Hampshire Department of Education Bureau of School

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply)

LED|Fluorescent tubes|Other|ancandescent-1924

bath and closet

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.21 Is your building a CHP's or LEED certified? No

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.22 Have you had energy audits of all your school facilities? Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.23 Do you have an energy performance contract in place? No

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1749

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.25 What is the R-Value of the roof? 37

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.28 Do you have a facility maintenance plan? Yes

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.29 What is your maintenance budget? 104410.

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.30 What is your operational budget? 120959.

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.31 What is your capital construction budget? 37950.00

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?51700.00

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3016

20Gorham Randolph

Shelburne CooperativeGorham Middle School Q.34 Do you have a maintenance contract in place? No

20 Milan Milan Village Elementary School Q.01 Approximate year of the original construction date 1950

20 Milan Milan Village Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

20 Milan Milan Village Elementary School Q.03 Gross Square footage (including portables) 19740

20 Milan Milan Village Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

20 Milan Milan Village Elementary School Q.05 How many parking spaces does the facility have? 45

20 Milan Milan Village Elementary School Q.06 Does your building have a basement? Yes

20 Milan Milan Village Elementary School Q.07 How many portable classrooms are in use? 0

20 Milan Milan Village Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

20 Milan Milan Village Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|None

20 Milan Milan Village Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

20 Milan Milan Village Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

20 Milan Milan Village Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

20 Milan Milan Village Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

20 Milan Milan Village Elementary School Q.14a a. Roofs 1|||||

20 Milan Milan Village Elementary School Q.14b b. Lighting Systems 17|||||

20 Milan Milan Village Elementary School Q.14c c. Windows 17|||||

20 Milan Milan Village Elementary School Q.14d d. Ceilings 17|||||

20 Milan Milan Village Elementary School Q.14e e. Plumbing 17|||||

20 Milan Milan Village Elementary School Q.14f f. Heating Systems 35|||||

20 Milan Milan Village Elementary School Q.14g g. Ventilation Systems 17|||||

20 Milan Milan Village Elementary School Q.14h h. Conditioning Systems 17|||||

20 Milan Milan Village Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

20 Milan Milan Village Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood|Other|Vinyl

20 Milan Milan Village Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

20 Milan Milan Village Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

20 Milan Milan Village Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

20 Milan Milan Village Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

20 Milan Milan Village Elementary School Q.21 Is your building a CHP's or LEED certified? No

20 Milan Milan Village Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

20 Milan Milan Village Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

20 Milan Milan Village Elementary School Q.23 Do you have an energy performance contract in place? No

20 Milan Milan Village Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

Page 59 of 238

Page 60: New Hampshire Department of Education Bureau of School

20 Milan Milan Village Elementary School Q.25 What is the R-Value of the roof? 21

20 Milan Milan Village Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

20 Milan Milan Village Elementary School Q.27 Do you have a presence of: (click all that apply) Other|None

20 Milan Milan Village Elementary School Q.28 Do you have a facility maintenance plan? Yes

20 Milan Milan Village Elementary School Q.29 What is your maintenance budget? 212716

20 Milan Milan Village Elementary School Q.30 What is your operational budget? 3453597

20 Milan Milan Village Elementary School Q.31 What is your capital construction budget? 30000

20 Milan Milan Village Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?66100

20 Milan Milan Village Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

20 Milan Milan Village Elementary School Q.34 Do you have a maintenance contract in place? No

20 Milan Milan Village Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

21 Seabrook Seabrook Elementary School Q.01 Approximate year of the original construction date 1945

21 Seabrook Seabrook Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

21 Seabrook Seabrook Elementary School Q.03 Gross Square footage (including portables) 114000

21 Seabrook Seabrook Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

21 Seabrook Seabrook Elementary School Q.05 How many parking spaces does the facility have? 198

21 Seabrook Seabrook Elementary School Q.06 Does your building have a basement? No

21 Seabrook Seabrook Elementary School Q.07 How many portable classrooms are in use? 1

21 Seabrook Seabrook Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

21 Seabrook Seabrook Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Support Space

21 Seabrook Seabrook Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

21 Seabrook Seabrook Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

21 Seabrook Seabrook Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

21 Seabrook Seabrook Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

21 Seabrook Seabrook Elementary School Q.14a a. Roofs 1990|2002|2007|2009|2014|2019

21 Seabrook Seabrook Elementary School Q.14b b. Lighting Systems 2000|||||

21 Seabrook Seabrook Elementary School Q.14c c. Windows 1980|1994|2018|||

21 Seabrook Seabrook Elementary School Q.14d d. Ceilings 1980|1994||||

21 Seabrook Seabrook Elementary School Q.14e e. Plumbing 1954|1956|1964|1972|1986|1995

21 Seabrook Seabrook Elementary School Q.14f f. Heating Systems 1980|2017||||

21 Seabrook Seabrook Elementary School Q.14g g. Ventilation Systems 1945|1986|1994|2000||

21 Seabrook Seabrook Elementary School Q.14h h. Conditioning Systems 1980|||||

21 Seabrook Seabrook Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

21 Seabrook Seabrook Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

21 Seabrook Seabrook Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

21 Seabrook Seabrook Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

21 Seabrook Seabrook Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

21 Seabrook Seabrook Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

21 Seabrook Seabrook Elementary School Q.21 Is your building a CHP's or LEED certified? No

21 Seabrook Seabrook Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

21 Seabrook Seabrook Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

21 Seabrook Seabrook Elementary School Q.23 Do you have an energy performance contract in place? Yes

21 Seabrook Seabrook Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

21 Seabrook Seabrook Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

21 Seabrook Seabrook Elementary School Q.28 Do you have a facility maintenance plan? Yes

21 Seabrook Seabrook Elementary School Q.29 What is your maintenance budget? 829000

21 Seabrook Seabrook Elementary School Q.30 What is your operational budget? 14633871

21 Seabrook Seabrook Elementary School Q.31 What is your capital construction budget? 113000

21 Seabrook Seabrook Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?168000

Page 60 of 238

Page 61: New Hampshire Department of Education Bureau of School

21 Seabrook Seabrook Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?208880

21 Seabrook Seabrook Elementary School Q.34 Do you have a maintenance contract in place? No

21 Seabrook Seabrook Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

23 Bath Bath Village School Q.01 Approximate year of the original construction date 1904

23 Bath Bath Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

23 Bath Bath Village School Q.03 Gross Square footage (including portables) 21000

23 Bath Bath Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

23 Bath Bath Village School Q.05 How many parking spaces does the facility have? 20

23 Bath Bath Village School Q.06 Does your building have a basement? Yes

23 Bath Bath Village School Q.07 How many portable classrooms are in use? 0

23 Bath Bath Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

23 Bath Bath Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

23 Bath Bath Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

23 Bath Bath Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

23 Bath Bath Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

23 Bath Bath Village School Q.14a a. Roofs 1989|||||

23 Bath Bath Village School Q.14b b. Lighting Systems 1989|||||

23 Bath Bath Village School Q.14c c. Windows 1989|||||

23 Bath Bath Village School Q.14d d. Ceilings 1989|||||

23 Bath Bath Village School Q.14e e. Plumbing 1989|||||

23 Bath Bath Village School Q.14f f. Heating Systems 1989|||||

23 Bath Bath Village School Q.14g g. Ventilation Systems 1989|||||

23 Bath Bath Village School Q.14h h. Conditioning Systems 1989|||||

23 Bath Bath Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

23 Bath Bath Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

23 Bath Bath Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

23 Bath Bath Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

23 Bath Bath Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

23 Bath Bath Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

23 Bath Bath Village School Q.21 Is your building a CHP's or LEED certified? No

23 Bath Bath Village School Q.22 Have you had energy audits of all your school facilities? Yes

23 Bath Bath Village School Q.23 Do you have an energy performance contract in place? No

23 Bath Bath Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

23 Bath Bath Village School Q.25 What is the R-Value of the roof? 20

23 Bath Bath Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

23 Bath Bath Village School Q.28 Do you have a facility maintenance plan? Yes

23 Bath Bath Village School Q.29 What is your maintenance budget? 135896.08

23 Bath Bath Village School Q.30 What is your operational budget? 2413966.75

23 Bath Bath Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?36409.34

23 Bath Bath Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

23 Bath Bath Village School Q.34 Do you have a maintenance contract in place? No

23 Bath Bath Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.01 Approximate year of the original construction date 1991

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.03 Gross Square footage (including portables) 62000

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.05 How many parking spaces does the facility have? 150

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.07 How many portable classrooms are in use? 0

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

Page 61 of 238

Page 62: New Hampshire Department of Education Bureau of School

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14a a. Roofs 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14b b. Lighting Systems 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14c c. Windows 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14d d. Ceilings 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14e e. Plumbing 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14f f. Heating Systems 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14g g. Ventilation Systems 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.14h h. Conditioning Systems 1991|||||

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.22 Have you had energy audits of all your school facilities? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.23 Do you have an energy performance contract in place? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.25 What is the R-Value of the roof? 20

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.28 Do you have a facility maintenance plan? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.29 What is your maintenance budget? 306135.25

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.30 What is your operational budget? 4555053.43

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?74468.97

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?110

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.34 Do you have a maintenance contract in place? Yes

23 Haverhill Cooperative Haverhill Cooperative Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

23 Haverhill Cooperative Woodsville Elementary School Q.01 Approximate year of the original construction date 1958

23 Haverhill Cooperative Woodsville Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1991

23 Haverhill Cooperative Woodsville Elementary School Q.03 Gross Square footage (including portables) 27200

23 Haverhill Cooperative Woodsville Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

23 Haverhill Cooperative Woodsville Elementary School Q.05 How many parking spaces does the facility have? 80

23 Haverhill Cooperative Woodsville Elementary School Q.06 Does your building have a basement? No

23 Haverhill Cooperative Woodsville Elementary School Q.07 How many portable classrooms are in use? 0

23 Haverhill Cooperative Woodsville Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

23 Haverhill Cooperative Woodsville Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

23 Haverhill Cooperative Woodsville Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

23 Haverhill Cooperative Woodsville Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.14a a. Roofs 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14b b. Lighting Systems 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14c c. Windows 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14d d. Ceilings 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14e e. Plumbing 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14f f. Heating Systems 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14g g. Ventilation Systems 1991|||||

23 Haverhill Cooperative Woodsville Elementary School Q.14h h. Conditioning Systems 1991|||||

Page 62 of 238

Page 63: New Hampshire Department of Education Bureau of School

23 Haverhill Cooperative Woodsville Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

23 Haverhill Cooperative Woodsville Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

23 Haverhill Cooperative Woodsville Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

23 Haverhill Cooperative Woodsville Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

23 Haverhill Cooperative Woodsville Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

23 Haverhill Cooperative Woodsville Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

23 Haverhill Cooperative Woodsville Elementary School Q.21 Is your building a CHP's or LEED certified? No

23 Haverhill Cooperative Woodsville Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.23 Do you have an energy performance contract in place? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

23 Haverhill Cooperative Woodsville Elementary School Q.25 What is the R-Value of the roof? 20

23 Haverhill Cooperative Woodsville Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

23 Haverhill Cooperative Woodsville Elementary School Q.28 Do you have a facility maintenance plan? Yes

23 Haverhill Cooperative Woodsville Elementary School Q.29 What is your maintenance budget? 215702.98

23 Haverhill Cooperative Woodsville Elementary School Q.30 What is your operational budget? 3063058.55

23 Haverhill Cooperative Woodsville Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?56423.16

23 Haverhill Cooperative Woodsville Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?175

23 Haverhill Cooperative Woodsville Elementary School Q.34 Do you have a maintenance contract in place? No

23 Haverhill Cooperative Woodsville Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

23 Haverhill Cooperative Woodsville High School Q.01 Approximate year of the original construction date 1911

23 Haverhill Cooperative Woodsville High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

23 Haverhill Cooperative Woodsville High School Q.03 Gross Square footage (including portables) 67000

23 Haverhill Cooperative Woodsville High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

23 Haverhill Cooperative Woodsville High School Q.05 How many parking spaces does the facility have? 150

23 Haverhill Cooperative Woodsville High School Q.06 Does your building have a basement? Yes

23 Haverhill Cooperative Woodsville High School Q.07 How many portable classrooms are in use? 0

23 Haverhill Cooperative Woodsville High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

23 Haverhill Cooperative Woodsville High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

23 Haverhill Cooperative Woodsville High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

23 Haverhill Cooperative Woodsville High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

23 Haverhill Cooperative Woodsville High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

23 Haverhill Cooperative Woodsville High School Q.14a a. Roofs 2015|2018|2018|2019||

23 Haverhill Cooperative Woodsville High School Q.14b b. Lighting Systems 1969|1991|2018|2019||

23 Haverhill Cooperative Woodsville High School Q.14c c. Windows 1969|1991|2019|||

23 Haverhill Cooperative Woodsville High School Q.14d d. Ceilings 1969|1991|2019|||

23 Haverhill Cooperative Woodsville High School Q.14e e. Plumbing 1969|1991|2018|2019||

23 Haverhill Cooperative Woodsville High School Q.14f f. Heating Systems 1969|1991|2018|2019||

23 Haverhill Cooperative Woodsville High School Q.14g g. Ventilation Systems 1969|1991|2019|||

23 Haverhill Cooperative Woodsville High School Q.14h h. Conditioning Systems 1969|1991|2019|||

23 Haverhill Cooperative Woodsville High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

23 Haverhill Cooperative Woodsville High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

23 Haverhill Cooperative Woodsville High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

23 Haverhill Cooperative Woodsville High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

23 Haverhill Cooperative Woodsville High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Steam

23 Haverhill Cooperative Woodsville High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

23 Haverhill Cooperative Woodsville High School Q.21 Is your building a CHP's or LEED certified? No

23 Haverhill Cooperative Woodsville High School Q.22 Have you had energy audits of all your school facilities? Yes

23 Haverhill Cooperative Woodsville High School Q.23 Do you have an energy performance contract in place? Yes

Page 63 of 238

Page 64: New Hampshire Department of Education Bureau of School

23 Haverhill Cooperative Woodsville High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

23 Haverhill Cooperative Woodsville High School Q.25 What is the R-Value of the roof? 20

23 Haverhill Cooperative Woodsville High School Q.26 Do you have carbon monoxide detector(s) in your building? No

23 Haverhill Cooperative Woodsville High School Q.28 Do you have a facility maintenance plan? Yes

23 Haverhill Cooperative Woodsville High School Q.29 What is your maintenance budget? 458625.74

23 Haverhill Cooperative Woodsville High School Q.30 What is your operational budget? 4939710.88

23 Haverhill Cooperative Woodsville High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?97126.87

23 Haverhill Cooperative Woodsville High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?110

23 Haverhill Cooperative Woodsville High School Q.34 Do you have a maintenance contract in place? Yes

23 Haverhill Cooperative Woodsville High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

23 Haverhill Cooperative Woodsville High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") addition/renovation

23 Haverhill Cooperative Woodsville High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 6

23 Haverhill Cooperative Woodsville High School Q.35c c. If yes, provide estimated year of construction. 2019

23 Piermont Piermont Village School Q.01 Approximate year of the original construction date 1904

23 Piermont Piermont Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1991

23 Piermont Piermont Village School Q.03 Gross Square footage (including portables) 21000

23 Piermont Piermont Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

23 Piermont Piermont Village School Q.05 How many parking spaces does the facility have? 30

23 Piermont Piermont Village School Q.06 Does your building have a basement? No

23 Piermont Piermont Village School Q.07 How many portable classrooms are in use? 0

23 Piermont Piermont Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

23 Piermont Piermont Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

23 Piermont Piermont Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

23 Piermont Piermont Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

23 Piermont Piermont Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

23 Piermont Piermont Village School Q.14a a. Roofs 1991|||||

23 Piermont Piermont Village School Q.14b b. Lighting Systems 1991|2018||||

23 Piermont Piermont Village School Q.14c c. Windows 1991|||||

23 Piermont Piermont Village School Q.14d d. Ceilings 1991|||||

23 Piermont Piermont Village School Q.14e e. Plumbing 1991|||||

23 Piermont Piermont Village School Q.14f f. Heating Systems 1991|||||

23 Piermont Piermont Village School Q.14g g. Ventilation Systems 1991|||||

23 Piermont Piermont Village School Q.14h h. Conditioning Systems 1991|||||

23 Piermont Piermont Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

23 Piermont Piermont Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

23 Piermont Piermont Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

23 Piermont Piermont Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

23 Piermont Piermont Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

23 Piermont Piermont Village School Q.21 Is your building a CHP's or LEED certified? No

23 Piermont Piermont Village School Q.22 Have you had energy audits of all your school facilities? Yes

23 Piermont Piermont Village School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

23 Piermont Piermont Village School Q.23 Do you have an energy performance contract in place? No

23 Piermont Piermont Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

23 Piermont Piermont Village School Q.25 What is the R-Value of the roof? 20

23 Piermont Piermont Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

23 Piermont Piermont Village School Q.28 Do you have a facility maintenance plan? Yes

23 Piermont Piermont Village School Q.29 What is your maintenance budget? 130740.84

23 Piermont Piermont Village School Q.30 What is your operational budget? 2016697.50

23 Piermont Piermont Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?21066.08

Page 64 of 238

Page 65: New Hampshire Department of Education Bureau of School

23 Piermont Piermont Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

23 Piermont Piermont Village School Q.34 Do you have a maintenance contract in place? Yes

24 Henniker Henniker Community School Q.01 Approximate year of the original construction date 1930

24 Henniker Henniker Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

24 Henniker Henniker Community School Q.03 Gross Square footage (including portables) 90000

24 Henniker Henniker Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

24 Henniker Henniker Community School Q.05 How many parking spaces does the facility have? 68

24 Henniker Henniker Community School Q.06 Does your building have a basement? No

24 Henniker Henniker Community School Q.07 How many portable classrooms are in use? 0

24 Henniker Henniker Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

24 Henniker Henniker Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

24 Henniker Henniker Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

24 Henniker Henniker Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

24 Henniker Henniker Community School Q.14a a. Roofs 1930|1950|1996|2013||

24 Henniker Henniker Community School Q.14b b. Lighting Systems 1930|1950|1996|2015||

24 Henniker Henniker Community School Q.14c c. Windows 1930|1950|1996|2018||

24 Henniker Henniker Community School Q.14d d. Ceilings 1930|1950|1996|||

24 Henniker Henniker Community School Q.14e e. Plumbing 1930|1950|1996|||

24 Henniker Henniker Community School Q.14f f. Heating Systems 1930|1950|1996|2015||

24 Henniker Henniker Community School Q.14g g. Ventilation Systems |||||

24 Henniker Henniker Community School Q.14h h. Conditioning Systems |||||

24 Henniker Henniker Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

24 Henniker Henniker Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

24 Henniker Henniker Community School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

24 Henniker Henniker Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

24 Henniker Henniker Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

24 Henniker Henniker Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

24 Henniker Henniker Community School Q.21 Is your building a CHP's or LEED certified? No

24 Henniker Henniker Community School Q.22 Have you had energy audits of all your school facilities? Yes

24 Henniker Henniker Community School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

24 Henniker Henniker Community School Q.23 Do you have an energy performance contract in place? No

24 Henniker Henniker Community School Q.25 What is the R-Value of the roof? 38

24 Henniker Henniker Community School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

24 Henniker Henniker Community School Q.28 Do you have a facility maintenance plan? No

24 Henniker Henniker Community School Q.29 What is your maintenance budget? 772847

24 Henniker Henniker Community School Q.30 What is your operational budget? 7766108

24 Henniker Henniker Community School Q.31 What is your capital construction budget? 0

24 Henniker Henniker Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?107588

24 Henniker Henniker Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?180

24 Henniker Henniker Community School Q.34 Do you have a maintenance contract in place? No

24 Henniker Henniker Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

24 John Stark Regional John Stark Regional High School Q.01 Approximate year of the original construction date 1987

24 John Stark Regional John Stark Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

24 John Stark Regional John Stark Regional High School Q.03 Gross Square footage (including portables) 134000

24 John Stark Regional John Stark Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

24 John Stark Regional John Stark Regional High School Q.05 How many parking spaces does the facility have? 230

24 John Stark Regional John Stark Regional High School Q.06 Does your building have a basement? No

24 John Stark Regional John Stark Regional High School Q.07 How many portable classrooms are in use? 0

24 John Stark Regional John Stark Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 65 of 238

Page 66: New Hampshire Department of Education Bureau of School

24 John Stark Regional John Stark Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

24 John Stark Regional John Stark Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

24 John Stark Regional John Stark Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

24 John Stark Regional John Stark Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

24 John Stark Regional John Stark Regional High School Q.14a a. Roofs 2001|||||

24 John Stark Regional John Stark Regional High School Q.14b b. Lighting Systems 2018|||||

24 John Stark Regional John Stark Regional High School Q.14c c. Windows 2001|||||

24 John Stark Regional John Stark Regional High School Q.14d d. Ceilings 2001|||||

24 John Stark Regional John Stark Regional High School Q.14e e. Plumbing 2018|||||

24 John Stark Regional John Stark Regional High School Q.14f f. Heating Systems 2019|||||

24 John Stark Regional John Stark Regional High School Q.14g g. Ventilation Systems 2019|||||

24 John Stark Regional John Stark Regional High School Q.14h h. Conditioning Systems 2019|||||

24 John Stark Regional John Stark Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

24 John Stark Regional John Stark Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

24 John Stark Regional John Stark Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

24 John Stark Regional John Stark Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

24 John Stark Regional John Stark Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

24 John Stark Regional John Stark Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

24 John Stark Regional John Stark Regional High School Q.21 Is your building a CHP's or LEED certified? Yes

24 John Stark Regional John Stark Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

24 John Stark Regional John Stark Regional High School Q.23 Do you have an energy performance contract in place? Yes

24 John Stark Regional John Stark Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 45

24 John Stark Regional John Stark Regional High School Q.25 What is the R-Value of the roof? 40

24 John Stark Regional John Stark Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

24 John Stark Regional John Stark Regional High School Q.28 Do you have a facility maintenance plan? Yes

24 John Stark Regional John Stark Regional High School Q.29 What is your maintenance budget? 1311451

24 John Stark Regional John Stark Regional High School Q.30 What is your operational budget? 13102433.

24 John Stark Regional John Stark Regional High School Q.31 What is your capital construction budget? 0

24 John Stark Regional John Stark Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?246899

24 John Stark Regional John Stark Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?360

24 John Stark Regional John Stark Regional High School Q.34 Do you have a maintenance contract in place? Yes

24 John Stark Regional John Stark Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

24 John Stark Regional John Stark Regional High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Roof Replacement

24 John Stark Regional John Stark Regional High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 1.5

24 John Stark Regional John Stark Regional High School Q.35c c. If yes, provide estimated year of construction. 2025

24 Stoddard James Faulkner Elementary School Q.01 Approximate year of the original construction date 1979

24 Stoddard James Faulkner Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

24 Stoddard James Faulkner Elementary School Q.03 Gross Square footage (including portables) 11880

24 Stoddard James Faulkner Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

24 Stoddard James Faulkner Elementary School Q.05 How many parking spaces does the facility have? 40

24 Stoddard James Faulkner Elementary School Q.06 Does your building have a basement? No

24 Stoddard James Faulkner Elementary School Q.07 How many portable classrooms are in use? 1

24 Stoddard James Faulkner Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

24 Stoddard James Faulkner Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Support Space

24 Stoddard James Faulkner Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

24 Stoddard James Faulkner Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

24 Stoddard James Faulkner Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

24 Stoddard James Faulkner Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

24 Stoddard James Faulkner Elementary School Q.14a a. Roofs 1979|1988|1998|2014||

Page 66 of 238

Page 67: New Hampshire Department of Education Bureau of School

24 Stoddard James Faulkner Elementary School Q.14b b. Lighting Systems 1979|2016||||

24 Stoddard James Faulkner Elementary School Q.14c c. Windows 1979|1988|1998|2014||

24 Stoddard James Faulkner Elementary School Q.14d d. Ceilings 1979|1988|1998|2014||

24 Stoddard James Faulkner Elementary School Q.14e e. Plumbing 1979|1988|1998|2014||

24 Stoddard James Faulkner Elementary School Q.14f f. Heating Systems 1979|2014||||

24 Stoddard James Faulkner Elementary School Q.14g g. Ventilation Systems 1979|2988|1998|2014||

24 Stoddard James Faulkner Elementary School Q.14h h. Conditioning Systems |||||

24 Stoddard James Faulkner Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

24 Stoddard James Faulkner Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Other|Vinyl

24 Stoddard James Faulkner Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

24 Stoddard James Faulkner Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

24 Stoddard James Faulkner Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

24 Stoddard James Faulkner Elementary School Q.21 Is your building a CHP's or LEED certified? No

24 Stoddard James Faulkner Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

24 Stoddard James Faulkner Elementary School Q.23 Do you have an energy performance contract in place? No

24 Stoddard James Faulkner Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

24 Stoddard James Faulkner Elementary School Q.29 What is your maintenance budget? 139818

24 Stoddard James Faulkner Elementary School Q.30 What is your operational budget? 2845684

24 Stoddard James Faulkner Elementary School Q.31 What is your capital construction budget? 0

24 Stoddard James Faulkner Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?33175

24 Stoddard James Faulkner Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

24 Stoddard James Faulkner Elementary School Q.34 Do you have a maintenance contract in place? No

24 Stoddard James Faulkner Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

24 Weare Center Woods School Q.01 Approximate year of the original construction date 1990

24 Weare Center Woods School Q.03 Gross Square footage (including portables) 67000

24 Weare Center Woods School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

24 Weare Center Woods School Q.05 How many parking spaces does the facility have? 120

24 Weare Center Woods School Q.07 How many portable classrooms are in use? 0

24 Weare Center Woods School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

24 Weare Center Woods School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

24 Weare Center Woods School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

24 Weare Center Woods School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

24 Weare Center Woods School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

24 Weare Center Woods School Q.14a a. Roofs 2011|||||

24 Weare Center Woods School Q.14b b. Lighting Systems 2019|||||

24 Weare Center Woods School Q.14c c. Windows 2001|||||

24 Weare Center Woods School Q.14d d. Ceilings 1990|||||

24 Weare Center Woods School Q.14e e. Plumbing 2019|||||

24 Weare Center Woods School Q.14f f. Heating Systems 2019|||||

24 Weare Center Woods School Q.14g g. Ventilation Systems 2019|||||

24 Weare Center Woods School Q.14h h. Conditioning Systems 2019|||||

24 Weare Center Woods School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

24 Weare Center Woods School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

24 Weare Center Woods School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

24 Weare Center Woods School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

24 Weare Center Woods School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

24 Weare Center Woods School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

24 Weare Center Woods School Q.21 Is your building a CHP's or LEED certified? No

24 Weare Center Woods School Q.22 Have you had energy audits of all your school facilities? Yes

Page 67 of 238

Page 68: New Hampshire Department of Education Bureau of School

24 Weare Center Woods School Q.23 Do you have an energy performance contract in place? Yes

24 Weare Center Woods School Q.24 What is the R-Value of the exterior walls, windows, and doors? 45

24 Weare Center Woods School Q.25 What is the R-Value of the roof? 40

24 Weare Center Woods School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

24 Weare Center Woods School Q.28 Do you have a facility maintenance plan? Yes

24 Weare Center Woods School Q.29 What is your maintenance budget? 501673

24 Weare Center Woods School Q.30 What is your operational budget? 7715882

24 Weare Center Woods School Q.31 What is your capital construction budget? 0

24 Weare Center Woods School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?60134

24 Weare Center Woods School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?80

24 Weare Center Woods School Q.34 Do you have a maintenance contract in place? Yes

24 Weare Center Woods School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

24 Weare Weare Middle School Q.01 Approximate year of the original construction date 2006

24 Weare Weare Middle School Q.03 Gross Square footage (including portables) 134000

24 Weare Weare Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

24 Weare Weare Middle School Q.05 How many parking spaces does the facility have? 187

24 Weare Weare Middle School Q.06 Does your building have a basement? No

24 Weare Weare Middle School Q.07 How many portable classrooms are in use? 0

24 Weare Weare Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

24 Weare Weare Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

24 Weare Weare Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

24 Weare Weare Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

24 Weare Weare Middle School Q.14a a. Roofs 2006|||||

24 Weare Weare Middle School Q.14b b. Lighting Systems 2006|2015|2019|||

24 Weare Weare Middle School Q.14c c. Windows 2006|||||

24 Weare Weare Middle School Q.14d d. Ceilings 2006|||||

24 Weare Weare Middle School Q.14e e. Plumbing 2006|||||

24 Weare Weare Middle School Q.14f f. Heating Systems 2006|||||

24 Weare Weare Middle School Q.14g g. Ventilation Systems 2006|||||

24 Weare Weare Middle School Q.14h h. Conditioning Systems 2006|||||

24 Weare Weare Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

24 Weare Weare Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

24 Weare Weare Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

24 Weare Weare Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

24 Weare Weare Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

24 Weare Weare Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

24 Weare Weare Middle School Q.21 Is your building a CHP's or LEED certified? No

24 Weare Weare Middle School Q.22 Have you had energy audits of all your school facilities? Yes

24 Weare Weare Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

24 Weare Weare Middle School Q.23 Do you have an energy performance contract in place? Yes

24 Weare Weare Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 38

24 Weare Weare Middle School Q.25 What is the R-Value of the roof? 38

24 Weare Weare Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

24 Weare Weare Middle School Q.29 What is your maintenance budget? 718066

24 Weare Weare Middle School Q.30 What is your operational budget? 7423093

24 Weare Weare Middle School Q.31 What is your capital construction budget? 0

24 Weare Weare Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?199149

24 Weare Weare Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?260

24 Weare Weare Middle School Q.34 Do you have a maintenance contract in place? No

Page 68 of 238

Page 69: New Hampshire Department of Education Bureau of School

24 Weare Weare Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford Bedford High School Q.01 Approximate year of the original construction date 2007

25 Bedford Bedford High School Q.03 Gross Square footage (including portables) 226000

25 Bedford Bedford High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford Bedford High School Q.05 How many parking spaces does the facility have? 729

25 Bedford Bedford High School Q.06 Does your building have a basement? No

25 Bedford Bedford High School Q.07 How many portable classrooms are in use? 0

25 Bedford Bedford High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

25 Bedford Bedford High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford Bedford High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

25 Bedford Bedford High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford Bedford High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

25 Bedford Bedford High School Q.14a a. Roofs |||||

25 Bedford Bedford High School Q.14b b. Lighting Systems |||||

25 Bedford Bedford High School Q.14c c. Windows |||||

25 Bedford Bedford High School Q.14d d. Ceilings |||||

25 Bedford Bedford High School Q.14e e. Plumbing |||||

25 Bedford Bedford High School Q.14f f. Heating Systems |||||

25 Bedford Bedford High School Q.14g g. Ventilation Systems |||||

25 Bedford Bedford High School Q.14h h. Conditioning Systems |||||

25 Bedford Bedford High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford Bedford High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

25 Bedford Bedford High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford Bedford High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

25 Bedford Bedford High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford Bedford High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

25 Bedford Bedford High School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford Bedford High School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford Bedford High School Q.23 Do you have an energy performance contract in place? No

25 Bedford Bedford High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford Bedford High School Q.25 What is the R-Value of the roof? 25

25 Bedford Bedford High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford Bedford High School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford Bedford High School Q.29 What is your maintenance budget? 500729

25 Bedford Bedford High School Q.30 What is your operational budget? 1316670

25 Bedford Bedford High School Q.31 What is your capital construction budget? 1342765

25 Bedford Bedford High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?405275

25 Bedford Bedford High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?340

25 Bedford Bedford High School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford Bedford High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford McKelvie Intermediate School Q.01 Approximate year of the original construction date 1964

25 Bedford McKelvie Intermediate School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1987

25 Bedford McKelvie Intermediate School Q.03 Gross Square footage (including portables) 110700

25 Bedford McKelvie Intermediate School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford McKelvie Intermediate School Q.05 How many parking spaces does the facility have? 164

25 Bedford McKelvie Intermediate School Q.06 Does your building have a basement? No

25 Bedford McKelvie Intermediate School Q.07 How many portable classrooms are in use? 0

25 Bedford McKelvie Intermediate School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford McKelvie Intermediate School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 69 of 238

Page 70: New Hampshire Department of Education Bureau of School

25 Bedford McKelvie Intermediate School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford McKelvie Intermediate School Q.13 Are all instructional and service areas within the facility ADA compliant? No

25 Bedford McKelvie Intermediate School Q.14a a. Roofs |||||

25 Bedford McKelvie Intermediate School Q.14b b. Lighting Systems |||||

25 Bedford McKelvie Intermediate School Q.14c c. Windows |||||

25 Bedford McKelvie Intermediate School Q.14d d. Ceilings |||||

25 Bedford McKelvie Intermediate School Q.14e e. Plumbing |||||

25 Bedford McKelvie Intermediate School Q.14f f. Heating Systems |||||

25 Bedford McKelvie Intermediate School Q.14g g. Ventilation Systems |||||

25 Bedford McKelvie Intermediate School Q.14h h. Conditioning Systems |||||

25 Bedford McKelvie Intermediate School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford McKelvie Intermediate School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Other|vinyl siding

25 Bedford McKelvie Intermediate School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford McKelvie Intermediate School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

25 Bedford McKelvie Intermediate School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford McKelvie Intermediate School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

25 Bedford McKelvie Intermediate School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford McKelvie Intermediate School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford McKelvie Intermediate School Q.23 Do you have an energy performance contract in place? No

25 Bedford McKelvie Intermediate School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford McKelvie Intermediate School Q.25 What is the R-Value of the roof? 25

25 Bedford McKelvie Intermediate School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford McKelvie Intermediate School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford McKelvie Intermediate School Q.29 What is your maintenance budget? 500729

25 Bedford McKelvie Intermediate School Q.30 What is your operational budget? 1316670

25 Bedford McKelvie Intermediate School Q.31 What is your capital construction budget? 1342765

25 Bedford McKelvie Intermediate School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?133717

25 Bedford McKelvie Intermediate School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?240

25 Bedford McKelvie Intermediate School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford McKelvie Intermediate School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford Memorial School Q.01 Approximate year of the original construction date 1955

25 Bedford Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

25 Bedford Memorial School Q.03 Gross Square footage (including portables) 62400

25 Bedford Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford Memorial School Q.05 How many parking spaces does the facility have? 93

25 Bedford Memorial School Q.06 Does your building have a basement? No

25 Bedford Memorial School Q.07 How many portable classrooms are in use? 0

25 Bedford Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

25 Bedford Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? No

25 Bedford Memorial School Q.14a a. Roofs |||||

25 Bedford Memorial School Q.14b b. Lighting Systems |||||

25 Bedford Memorial School Q.14c c. Windows |||||

25 Bedford Memorial School Q.14d d. Ceilings |||||

25 Bedford Memorial School Q.14e e. Plumbing |||||

25 Bedford Memorial School Q.14f f. Heating Systems |||||

25 Bedford Memorial School Q.14g g. Ventilation Systems |||||

25 Bedford Memorial School Q.14h h. Conditioning Systems |||||

Page 70 of 238

Page 71: New Hampshire Department of Education Bureau of School

25 Bedford Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

25 Bedford Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

25 Bedford Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

25 Bedford Memorial School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford Memorial School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

25 Bedford Memorial School Q.23 Do you have an energy performance contract in place? No

25 Bedford Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford Memorial School Q.25 What is the R-Value of the roof? 25

25 Bedford Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford Memorial School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford Memorial School Q.29 What is your maintenance budget? 500729

25 Bedford Memorial School Q.30 What is your operational budget? 1316670

25 Bedford Memorial School Q.31 What is your capital construction budget? 1342765

25 Bedford Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?93102

25 Bedford Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?140

25 Bedford Memorial School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford Peter Woodbury School Q.01 Approximate year of the original construction date 1972

25 Bedford Peter Woodbury School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

25 Bedford Peter Woodbury School Q.03 Gross Square footage (including portables) 58720

25 Bedford Peter Woodbury School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford Peter Woodbury School Q.05 How many parking spaces does the facility have? 123

25 Bedford Peter Woodbury School Q.06 Does your building have a basement? No

25 Bedford Peter Woodbury School Q.07 How many portable classrooms are in use? 0

25 Bedford Peter Woodbury School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford Peter Woodbury School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

25 Bedford Peter Woodbury School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford Peter Woodbury School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

25 Bedford Peter Woodbury School Q.14a a. Roofs |||||

25 Bedford Peter Woodbury School Q.14b b. Lighting Systems |||||

25 Bedford Peter Woodbury School Q.14c c. Windows |||||

25 Bedford Peter Woodbury School Q.14d d. Ceilings |||||

25 Bedford Peter Woodbury School Q.14e e. Plumbing |||||

25 Bedford Peter Woodbury School Q.14f f. Heating Systems |||||

25 Bedford Peter Woodbury School Q.14g g. Ventilation Systems |||||

25 Bedford Peter Woodbury School Q.14h h. Conditioning Systems |||||

25 Bedford Peter Woodbury School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford Peter Woodbury School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

25 Bedford Peter Woodbury School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford Peter Woodbury School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

25 Bedford Peter Woodbury School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford Peter Woodbury School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

25 Bedford Peter Woodbury School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford Peter Woodbury School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford Peter Woodbury School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

Page 71 of 238

Page 72: New Hampshire Department of Education Bureau of School

25 Bedford Peter Woodbury School Q.23 Do you have an energy performance contract in place? No

25 Bedford Peter Woodbury School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford Peter Woodbury School Q.25 What is the R-Value of the roof? 25

25 Bedford Peter Woodbury School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford Peter Woodbury School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford Peter Woodbury School Q.29 What is your maintenance budget? 500729

25 Bedford Peter Woodbury School Q.30 What is your operational budget? 1316670

25 Bedford Peter Woodbury School Q.31 What is your capital construction budget? 1342765

25 Bedford Peter Woodbury School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?76868

25 Bedford Peter Woodbury School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?140

25 Bedford Peter Woodbury School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford Peter Woodbury School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford Riddle Brook School Q.01 Approximate year of the original construction date 1999

25 Bedford Riddle Brook School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

25 Bedford Riddle Brook School Q.03 Gross Square footage (including portables) 80000

25 Bedford Riddle Brook School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford Riddle Brook School Q.05 How many parking spaces does the facility have? 98

25 Bedford Riddle Brook School Q.06 Does your building have a basement? No

25 Bedford Riddle Brook School Q.07 How many portable classrooms are in use? 0

25 Bedford Riddle Brook School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford Riddle Brook School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

25 Bedford Riddle Brook School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford Riddle Brook School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

25 Bedford Riddle Brook School Q.14a a. Roofs |||||

25 Bedford Riddle Brook School Q.14b b. Lighting Systems |||||

25 Bedford Riddle Brook School Q.14c c. Windows |||||

25 Bedford Riddle Brook School Q.14d d. Ceilings |||||

25 Bedford Riddle Brook School Q.14e e. Plumbing |||||

25 Bedford Riddle Brook School Q.14f f. Heating Systems |||||

25 Bedford Riddle Brook School Q.14g g. Ventilation Systems |||||

25 Bedford Riddle Brook School Q.14h h. Conditioning Systems |||||

25 Bedford Riddle Brook School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford Riddle Brook School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

25 Bedford Riddle Brook School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford Riddle Brook School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

25 Bedford Riddle Brook School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford Riddle Brook School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

25 Bedford Riddle Brook School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford Riddle Brook School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford Riddle Brook School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

25 Bedford Riddle Brook School Q.23 Do you have an energy performance contract in place? No

25 Bedford Riddle Brook School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford Riddle Brook School Q.25 What is the R-Value of the roof? 25

25 Bedford Riddle Brook School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford Riddle Brook School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford Riddle Brook School Q.29 What is your maintenance budget? 500729

25 Bedford Riddle Brook School Q.30 What is your operational budget? 1316670

25 Bedford Riddle Brook School Q.31 What is your capital construction budget? 1342765

25 Bedford Riddle Brook School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?134872

Page 72 of 238

Page 73: New Hampshire Department of Education Bureau of School

25 Bedford Riddle Brook School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?180

25 Bedford Riddle Brook School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford Riddle Brook School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

25 Bedford Ross A. Lurgio Middle School Q.01 Approximate year of the original construction date 2007

25 Bedford Ross A. Lurgio Middle School Q.03 Gross Square footage (including portables) 110000

25 Bedford Ross A. Lurgio Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

25 Bedford Ross A. Lurgio Middle School Q.05 How many parking spaces does the facility have? 729

25 Bedford Ross A. Lurgio Middle School Q.06 Does your building have a basement? No

25 Bedford Ross A. Lurgio Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

25 Bedford Ross A. Lurgio Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

25 Bedford Ross A. Lurgio Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

25 Bedford Ross A. Lurgio Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

25 Bedford Ross A. Lurgio Middle School Q.14a a. Roofs |||||

25 Bedford Ross A. Lurgio Middle School Q.14b b. Lighting Systems |||||

25 Bedford Ross A. Lurgio Middle School Q.14c c. Windows |||||

25 Bedford Ross A. Lurgio Middle School Q.14d d. Ceilings |||||

25 Bedford Ross A. Lurgio Middle School Q.14e e. Plumbing |||||

25 Bedford Ross A. Lurgio Middle School Q.14f f. Heating Systems |||||

25 Bedford Ross A. Lurgio Middle School Q.14g g. Ventilation Systems |||||

25 Bedford Ross A. Lurgio Middle School Q.14h h. Conditioning Systems |||||

25 Bedford Ross A. Lurgio Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

25 Bedford Ross A. Lurgio Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

25 Bedford Ross A. Lurgio Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

25 Bedford Ross A. Lurgio Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

25 Bedford Ross A. Lurgio Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

25 Bedford Ross A. Lurgio Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

25 Bedford Ross A. Lurgio Middle School Q.21 Is your building a CHP's or LEED certified? No

25 Bedford Ross A. Lurgio Middle School Q.22 Have you had energy audits of all your school facilities? Yes

25 Bedford Ross A. Lurgio Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

25 Bedford Ross A. Lurgio Middle School Q.23 Do you have an energy performance contract in place? No

25 Bedford Ross A. Lurgio Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 14

25 Bedford Ross A. Lurgio Middle School Q.25 What is the R-Value of the roof? 25

25 Bedford Ross A. Lurgio Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

25 Bedford Ross A. Lurgio Middle School Q.28 Do you have a facility maintenance plan? Yes

25 Bedford Ross A. Lurgio Middle School Q.29 What is your maintenance budget? 500729

25 Bedford Ross A. Lurgio Middle School Q.30 What is your operational budget? 1316670

25 Bedford Ross A. Lurgio Middle School Q.31 What is your capital construction budget? 1342765

25 Bedford Ross A. Lurgio Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?405275

25 Bedford Ross A. Lurgio Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?240

25 Bedford Ross A. Lurgio Middle School Q.34 Do you have a maintenance contract in place? Yes

25 Bedford Ross A. Lurgio Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 Merrimack James Mastricola Elementary School Q.01 Approximate year of the original construction date 1961

26 Merrimack James Mastricola Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

26 Merrimack James Mastricola Elementary School Q.03 Gross Square footage (including portables) 85634

26 Merrimack James Mastricola Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 Merrimack James Mastricola Elementary School Q.05 How many parking spaces does the facility have? 87

26 Merrimack James Mastricola Elementary School Q.06 Does your building have a basement? No

26 Merrimack James Mastricola Elementary School Q.07 How many portable classrooms are in use? 0

26 Merrimack James Mastricola Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 73 of 238

Page 74: New Hampshire Department of Education Bureau of School

26 Merrimack James Mastricola Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 Merrimack James Mastricola Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 Merrimack James Mastricola Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

26 Merrimack James Mastricola Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 Merrimack James Mastricola Elementary School Q.14a a. Roofs |||||1

26 Merrimack James Mastricola Elementary School Q.14b b. Lighting Systems |||||1

26 Merrimack James Mastricola Elementary School Q.14c c. Windows |||||1

26 Merrimack James Mastricola Elementary School Q.14d d. Ceilings |||||1

26 Merrimack James Mastricola Elementary School Q.14e e. Plumbing |||||1

26 Merrimack James Mastricola Elementary School Q.14f f. Heating Systems |||||1

26 Merrimack James Mastricola Elementary School Q.14g g. Ventilation Systems |||||1

26 Merrimack James Mastricola Elementary School Q.14h h. Conditioning Systems |||||1

26 Merrimack James Mastricola Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

26 Merrimack James Mastricola Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 Merrimack James Mastricola Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

26 Merrimack James Mastricola Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

26 Merrimack James Mastricola Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

26 Merrimack James Mastricola Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

26 Merrimack James Mastricola Elementary School Q.21 Is your building a CHP's or LEED certified? No

26 Merrimack James Mastricola Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

26 Merrimack James Mastricola Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 Merrimack James Mastricola Elementary School Q.23 Do you have an energy performance contract in place? Yes

26 Merrimack James Mastricola Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 Merrimack James Mastricola Elementary School Q.25 What is the R-Value of the roof? 30

26 Merrimack James Mastricola Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

26 Merrimack James Mastricola Elementary School Q.28 Do you have a facility maintenance plan? Yes

26 Merrimack James Mastricola Elementary School Q.29 What is your maintenance budget? 3525467

26 Merrimack James Mastricola Elementary School Q.30 What is your operational budget? 79234477

26 Merrimack James Mastricola Elementary School Q.31 What is your capital construction budget? 875000

26 Merrimack James Mastricola Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?85765

26 Merrimack James Mastricola Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8000

26 Merrimack James Mastricola Elementary School Q.34 Do you have a maintenance contract in place? Yes

26 Merrimack James Mastricola Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.01 Approximate year of the original construction date 1949

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.03 Gross Square footage (including portables) 123635

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.05 How many parking spaces does the facility have? 140

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.06 Does your building have a basement? No

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.07 How many portable classrooms are in use? 0

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14a a. Roofs |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14b b. Lighting Systems |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14c c. Windows |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14d d. Ceilings |||||1

Page 74 of 238

Page 75: New Hampshire Department of Education Bureau of School

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14e e. Plumbing |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14f f. Heating Systems |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14g g. Ventilation Systems |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.14h h. Conditioning Systems |||||1

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.15 What types of roofs are on your school facility? (click all that apply) Flat

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.17 What type of studding is used at your school facility? (click all that apply) Steel

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.21 Is your building a CHP's or LEED certified? No

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.22 Have you had energy audits of all your school facilities? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.23 Do you have an energy performance contract in place? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.25 What is the R-Value of the roof? 30

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.26 Do you have carbon monoxide detector(s) in your building? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.28 Do you have a facility maintenance plan? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.29 What is your maintenance budget? 3525467

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.30 What is your operational budget? 79234477

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.31 What is your capital construction budget? 875000

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?145891

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?12000

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.34 Do you have a maintenance contract in place? Yes

26 MerrimackJames Mastricola Upper Elementary

SchoolQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 Merrimack Merrimack High School Q.01 Approximate year of the original construction date 1965

26 Merrimack Merrimack High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2016

26 Merrimack Merrimack High School Q.03 Gross Square footage (including portables) 213800

26 Merrimack Merrimack High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 Merrimack Merrimack High School Q.05 How many parking spaces does the facility have? 600

26 Merrimack Merrimack High School Q.06 Does your building have a basement? Yes

26 Merrimack Merrimack High School Q.07 How many portable classrooms are in use? 0

26 Merrimack Merrimack High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

26 Merrimack Merrimack High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 Merrimack Merrimack High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 Merrimack Merrimack High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

26 Merrimack Merrimack High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 Merrimack Merrimack High School Q.14a a. Roofs |||||1

26 Merrimack Merrimack High School Q.14b b. Lighting Systems |||||1

26 Merrimack Merrimack High School Q.14c c. Windows |||||1

26 Merrimack Merrimack High School Q.14d d. Ceilings |||||1

26 Merrimack Merrimack High School Q.14e e. Plumbing |||||1

26 Merrimack Merrimack High School Q.14f f. Heating Systems |||||1

26 Merrimack Merrimack High School Q.14g g. Ventilation Systems |||||1

26 Merrimack Merrimack High School Q.14h h. Conditioning Systems |||||1

26 Merrimack Merrimack High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

26 Merrimack Merrimack High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 Merrimack Merrimack High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

26 Merrimack Merrimack High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

Page 75 of 238

Page 76: New Hampshire Department of Education Bureau of School

26 Merrimack Merrimack High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

26 Merrimack Merrimack High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

26 Merrimack Merrimack High School Q.21 Is your building a CHP's or LEED certified? No

26 Merrimack Merrimack High School Q.22 Have you had energy audits of all your school facilities? Yes

26 Merrimack Merrimack High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 Merrimack Merrimack High School Q.23 Do you have an energy performance contract in place? Yes

26 Merrimack Merrimack High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 Merrimack Merrimack High School Q.25 What is the R-Value of the roof? 30

26 Merrimack Merrimack High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

26 Merrimack Merrimack High School Q.28 Do you have a facility maintenance plan? Yes

26 Merrimack Merrimack High School Q.29 What is your maintenance budget? 3525467

26 Merrimack Merrimack High School Q.30 What is your operational budget? 79234477

26 Merrimack Merrimack High School Q.31 What is your capital construction budget? 875000

26 Merrimack Merrimack High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?145891

26 Merrimack Merrimack High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20000

26 Merrimack Merrimack High School Q.34 Do you have a maintenance contract in place? Yes

26 Merrimack Merrimack High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 Merrimack Merrimack Middle School Q.01 Approximate year of the original construction date 2004

26 Merrimack Merrimack Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

26 Merrimack Merrimack Middle School Q.03 Gross Square footage (including portables) 120000

26 Merrimack Merrimack Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 Merrimack Merrimack Middle School Q.05 How many parking spaces does the facility have? 145

26 Merrimack Merrimack Middle School Q.06 Does your building have a basement? No

26 Merrimack Merrimack Middle School Q.07 How many portable classrooms are in use? 0

26 Merrimack Merrimack Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

26 Merrimack Merrimack Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 Merrimack Merrimack Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 Merrimack Merrimack Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

26 Merrimack Merrimack Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 Merrimack Merrimack Middle School Q.14a a. Roofs |||1||

26 Merrimack Merrimack Middle School Q.14b b. Lighting Systems |||||1

26 Merrimack Merrimack Middle School Q.14c c. Windows |||||1

26 Merrimack Merrimack Middle School Q.14d d. Ceilings |||||1

26 Merrimack Merrimack Middle School Q.14e e. Plumbing |||||1

26 Merrimack Merrimack Middle School Q.14f f. Heating Systems |||||1

26 Merrimack Merrimack Middle School Q.14g g. Ventilation Systems |||||1

26 Merrimack Merrimack Middle School Q.14h h. Conditioning Systems |||||1

26 Merrimack Merrimack Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

26 Merrimack Merrimack Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 Merrimack Merrimack Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

26 Merrimack Merrimack Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

26 Merrimack Merrimack Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

26 Merrimack Merrimack Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

26 Merrimack Merrimack Middle School Q.21 Is your building a CHP's or LEED certified? No

26 Merrimack Merrimack Middle School Q.22 Have you had energy audits of all your school facilities? Yes

26 Merrimack Merrimack Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 Merrimack Merrimack Middle School Q.23 Do you have an energy performance contract in place? Yes

26 Merrimack Merrimack Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 Merrimack Merrimack Middle School Q.25 What is the R-Value of the roof? 30

Page 76 of 238

Page 77: New Hampshire Department of Education Bureau of School

26 Merrimack Merrimack Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

26 Merrimack Merrimack Middle School Q.28 Do you have a facility maintenance plan? Yes

26 Merrimack Merrimack Middle School Q.29 What is your maintenance budget? 3525467

26 Merrimack Merrimack Middle School Q.30 What is your operational budget? 79234477

26 Merrimack Merrimack Middle School Q.31 What is your capital construction budget? 875000

26 Merrimack Merrimack Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?278719

26 Merrimack Merrimack Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10000

26 Merrimack Merrimack Middle School Q.34 Do you have a maintenance contract in place? Yes

26 Merrimack Merrimack Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 Merrimack Reeds Ferry School Q.01 Approximate year of the original construction date 1968

26 Merrimack Reeds Ferry School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

26 Merrimack Reeds Ferry School Q.03 Gross Square footage (including portables) 67203

26 Merrimack Reeds Ferry School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 Merrimack Reeds Ferry School Q.05 How many parking spaces does the facility have? 87

26 Merrimack Reeds Ferry School Q.06 Does your building have a basement? No

26 Merrimack Reeds Ferry School Q.07 How many portable classrooms are in use? 0

26 Merrimack Reeds Ferry School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

26 Merrimack Reeds Ferry School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 Merrimack Reeds Ferry School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 Merrimack Reeds Ferry School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

26 Merrimack Reeds Ferry School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 Merrimack Reeds Ferry School Q.14a a. Roofs |||||1

26 Merrimack Reeds Ferry School Q.14b b. Lighting Systems |||||1

26 Merrimack Reeds Ferry School Q.14c c. Windows |||||1

26 Merrimack Reeds Ferry School Q.14d d. Ceilings |||||1

26 Merrimack Reeds Ferry School Q.14e e. Plumbing |||||1

26 Merrimack Reeds Ferry School Q.14f f. Heating Systems |||||1

26 Merrimack Reeds Ferry School Q.14g g. Ventilation Systems |||||1

26 Merrimack Reeds Ferry School Q.14h h. Conditioning Systems |||||1

26 Merrimack Reeds Ferry School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

26 Merrimack Reeds Ferry School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 Merrimack Reeds Ferry School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

26 Merrimack Reeds Ferry School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

26 Merrimack Reeds Ferry School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

26 Merrimack Reeds Ferry School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

26 Merrimack Reeds Ferry School Q.21 Is your building a CHP's or LEED certified? No

26 Merrimack Reeds Ferry School Q.22 Have you had energy audits of all your school facilities? Yes

26 Merrimack Reeds Ferry School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 Merrimack Reeds Ferry School Q.23 Do you have an energy performance contract in place? Yes

26 Merrimack Reeds Ferry School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 Merrimack Reeds Ferry School Q.25 What is the R-Value of the roof? 30

26 Merrimack Reeds Ferry School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

26 Merrimack Reeds Ferry School Q.28 Do you have a facility maintenance plan? Yes

26 Merrimack Reeds Ferry School Q.29 What is your maintenance budget? 3525467

26 Merrimack Reeds Ferry School Q.30 What is your operational budget? 79234477

26 Merrimack Reeds Ferry School Q.31 What is your capital construction budget? 875000

26 Merrimack Reeds Ferry School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?95253

26 Merrimack Reeds Ferry School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8000

26 Merrimack Reeds Ferry School Q.34 Do you have a maintenance contract in place? Yes

Page 77 of 238

Page 78: New Hampshire Department of Education Bureau of School

26 Merrimack Reeds Ferry School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

26 Merrimack Thorntons Ferry School Q.01 Approximate year of the original construction date 1968

26 Merrimack Thorntons Ferry School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

26 Merrimack Thorntons Ferry School Q.03 Gross Square footage (including portables) 67203

26 Merrimack Thorntons Ferry School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

26 Merrimack Thorntons Ferry School Q.05 How many parking spaces does the facility have? 100

26 Merrimack Thorntons Ferry School Q.06 Does your building have a basement? No

26 Merrimack Thorntons Ferry School Q.07 How many portable classrooms are in use? 0

26 Merrimack Thorntons Ferry School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

26 Merrimack Thorntons Ferry School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

26 Merrimack Thorntons Ferry School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

26 Merrimack Thorntons Ferry School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

26 Merrimack Thorntons Ferry School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

26 Merrimack Thorntons Ferry School Q.14a a. Roofs |||||1

26 Merrimack Thorntons Ferry School Q.14b b. Lighting Systems |||||1

26 Merrimack Thorntons Ferry School Q.14c c. Windows |||||1

26 Merrimack Thorntons Ferry School Q.14d d. Ceilings |||||1

26 Merrimack Thorntons Ferry School Q.14e e. Plumbing |||||1

26 Merrimack Thorntons Ferry School Q.14f f. Heating Systems |||||1

26 Merrimack Thorntons Ferry School Q.14g g. Ventilation Systems |||||1

26 Merrimack Thorntons Ferry School Q.14h h. Conditioning Systems |||||1

26 Merrimack Thorntons Ferry School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

26 Merrimack Thorntons Ferry School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

26 Merrimack Thorntons Ferry School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

26 Merrimack Thorntons Ferry School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

26 Merrimack Thorntons Ferry School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

26 Merrimack Thorntons Ferry School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

26 Merrimack Thorntons Ferry School Q.21 Is your building a CHP's or LEED certified? No

26 Merrimack Thorntons Ferry School Q.22 Have you had energy audits of all your school facilities? Yes

26 Merrimack Thorntons Ferry School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

26 Merrimack Thorntons Ferry School Q.23 Do you have an energy performance contract in place? Yes

26 Merrimack Thorntons Ferry School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

26 Merrimack Thorntons Ferry School Q.25 What is the R-Value of the roof? 30

26 Merrimack Thorntons Ferry School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

26 Merrimack Thorntons Ferry School Q.28 Do you have a facility maintenance plan? Yes

26 Merrimack Thorntons Ferry School Q.29 What is your maintenance budget? 3525467

26 Merrimack Thorntons Ferry School Q.30 What is your operational budget? 79234477

26 Merrimack Thorntons Ferry School Q.31 What is your capital construction budget? 875000

26 Merrimack Thorntons Ferry School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?85765

26 Merrimack Thorntons Ferry School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8000

26 Merrimack Thorntons Ferry School Q.34 Do you have a maintenance contract in place? Yes

26 Merrimack Thorntons Ferry School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

27 Litchfield Campbell High School Q.01 Approximate year of the original construction date 2000

27 Litchfield Campbell High School Q.03 Gross Square footage (including portables) 116980

27 Litchfield Campbell High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

27 Litchfield Campbell High School Q.05 How many parking spaces does the facility have? 237

27 Litchfield Campbell High School Q.06 Does your building have a basement? No

27 Litchfield Campbell High School Q.07 How many portable classrooms are in use? 0

27 Litchfield Campbell High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 78 of 238

Page 79: New Hampshire Department of Education Bureau of School

27 Litchfield Campbell High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

27 Litchfield Campbell High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

27 Litchfield Campbell High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

27 Litchfield Campbell High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

27 Litchfield Campbell High School Q.14a a. Roofs |||||

27 Litchfield Campbell High School Q.14b b. Lighting Systems |||||

27 Litchfield Campbell High School Q.14c c. Windows |||||

27 Litchfield Campbell High School Q.14d d. Ceilings |||||

27 Litchfield Campbell High School Q.14e e. Plumbing |||||

27 Litchfield Campbell High School Q.14f f. Heating Systems |||||

27 Litchfield Campbell High School Q.14g g. Ventilation Systems |||||

27 Litchfield Campbell High School Q.14h h. Conditioning Systems |||||

27 Litchfield Campbell High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

27 Litchfield Campbell High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

27 Litchfield Campbell High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

27 Litchfield Campbell High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

27 Litchfield Campbell High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

27 Litchfield Campbell High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

27 Litchfield Campbell High School Q.21 Is your building a CHP's or LEED certified? Yes

27 Litchfield Campbell High School Q.22 Have you had energy audits of all your school facilities? No

27 Litchfield Campbell High School Q.23 Do you have an energy performance contract in place? No

27 Litchfield Campbell High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

27 Litchfield Campbell High School Q.25 What is the R-Value of the roof? 19

27 Litchfield Campbell High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

27 Litchfield Campbell High School Q.27 Do you have a presence of: (click all that apply) Radon in Air

27 Litchfield Campbell High School Q.28 Do you have a facility maintenance plan? Yes

27 Litchfield Campbell High School Q.29 What is your maintenance budget? 2069557

27 Litchfield Campbell High School Q.30 What is your operational budget? 23166855

27 Litchfield Campbell High School Q.31 What is your capital construction budget? 0

27 Litchfield Campbell High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?164825

27 Litchfield Campbell High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

27 Litchfield Campbell High School Q.34 Do you have a maintenance contract in place? No

27 Litchfield Campbell High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

27 Litchfield Griffin Memorial School Q.01 Approximate year of the original construction date 1930

27 Litchfield Griffin Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1978

27 Litchfield Griffin Memorial School Q.03 Gross Square footage (including portables) 63008

27 Litchfield Griffin Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

27 Litchfield Griffin Memorial School Q.05 How many parking spaces does the facility have? 98

27 Litchfield Griffin Memorial School Q.06 Does your building have a basement? No

27 Litchfield Griffin Memorial School Q.07 How many portable classrooms are in use? 2

27 Litchfield Griffin Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

27 Litchfield Griffin Memorial School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

27 Litchfield Griffin Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

27 Litchfield Griffin Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

27 Litchfield Griffin Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

27 Litchfield Griffin Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

27 Litchfield Griffin Memorial School Q.14a a. Roofs |||||

27 Litchfield Griffin Memorial School Q.14b b. Lighting Systems |||||

27 Litchfield Griffin Memorial School Q.14c c. Windows |||||

Page 79 of 238

Page 80: New Hampshire Department of Education Bureau of School

27 Litchfield Griffin Memorial School Q.14d d. Ceilings |||||

27 Litchfield Griffin Memorial School Q.14e e. Plumbing |||||

27 Litchfield Griffin Memorial School Q.14f f. Heating Systems |||||

27 Litchfield Griffin Memorial School Q.14g g. Ventilation Systems |||||

27 Litchfield Griffin Memorial School Q.14h h. Conditioning Systems |||||

27 Litchfield Griffin Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

27 Litchfield Griffin Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

27 Litchfield Griffin Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

27 Litchfield Griffin Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

27 Litchfield Griffin Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

27 Litchfield Griffin Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

27 Litchfield Griffin Memorial School Q.21 Is your building a CHP's or LEED certified? Yes

27 Litchfield Griffin Memorial School Q.22 Have you had energy audits of all your school facilities? No

27 Litchfield Griffin Memorial School Q.23 Do you have an energy performance contract in place? No

27 Litchfield Griffin Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

27 Litchfield Griffin Memorial School Q.25 What is the R-Value of the roof? 19

27 Litchfield Griffin Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

27 Litchfield Griffin Memorial School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

27 Litchfield Griffin Memorial School Q.28 Do you have a facility maintenance plan? Yes

27 Litchfield Griffin Memorial School Q.29 What is your maintenance budget? 2069557

27 Litchfield Griffin Memorial School Q.30 What is your operational budget? 23166855

27 Litchfield Griffin Memorial School Q.31 What is your capital construction budget? 0

27 Litchfield Griffin Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?114543

27 Litchfield Griffin Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

27 Litchfield Griffin Memorial School Q.34 Do you have a maintenance contract in place? No

27 Litchfield Griffin Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

27 Litchfield Litchfield Middle School Q.01 Approximate year of the original construction date 1988

27 Litchfield Litchfield Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

27 Litchfield Litchfield Middle School Q.03 Gross Square footage (including portables) 71568

27 Litchfield Litchfield Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

27 Litchfield Litchfield Middle School Q.05 How many parking spaces does the facility have? 88

27 Litchfield Litchfield Middle School Q.06 Does your building have a basement? No

27 Litchfield Litchfield Middle School Q.07 How many portable classrooms are in use? 2

27 Litchfield Litchfield Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

27 Litchfield Litchfield Middle School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

27 Litchfield Litchfield Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

27 Litchfield Litchfield Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

27 Litchfield Litchfield Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

27 Litchfield Litchfield Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

27 Litchfield Litchfield Middle School Q.14a a. Roofs 2005|||||

27 Litchfield Litchfield Middle School Q.14b b. Lighting Systems 2010|||||

27 Litchfield Litchfield Middle School Q.14c c. Windows |||||

27 Litchfield Litchfield Middle School Q.14d d. Ceilings |||||

27 Litchfield Litchfield Middle School Q.14e e. Plumbing |||||

27 Litchfield Litchfield Middle School Q.14f f. Heating Systems |||||

27 Litchfield Litchfield Middle School Q.14g g. Ventilation Systems |||||

27 Litchfield Litchfield Middle School Q.14h h. Conditioning Systems |||||

27 Litchfield Litchfield Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

27 Litchfield Litchfield Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

Page 80 of 238

Page 81: New Hampshire Department of Education Bureau of School

27 Litchfield Litchfield Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

27 Litchfield Litchfield Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

27 Litchfield Litchfield Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

27 Litchfield Litchfield Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

27 Litchfield Litchfield Middle School Q.21 Is your building a CHP's or LEED certified? Yes

27 Litchfield Litchfield Middle School Q.22 Have you had energy audits of all your school facilities? No

27 Litchfield Litchfield Middle School Q.23 Do you have an energy performance contract in place? No

27 Litchfield Litchfield Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

27 Litchfield Litchfield Middle School Q.25 What is the R-Value of the roof? 19

27 Litchfield Litchfield Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

27 Litchfield Litchfield Middle School Q.28 Do you have a facility maintenance plan? Yes

27 Litchfield Litchfield Middle School Q.29 What is your maintenance budget? 2069557

27 Litchfield Litchfield Middle School Q.30 What is your operational budget? 23166855

27 Litchfield Litchfield Middle School Q.31 What is your capital construction budget? 0

27 Litchfield Litchfield Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?104821

27 Litchfield Litchfield Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

27 Litchfield Litchfield Middle School Q.34 Do you have a maintenance contract in place? No

27 Litchfield Litchfield Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

28 Pelham Pelham Elementary School Q.01 Approximate year of the original construction date 2001

28 Pelham Pelham Elementary School Q.03 Gross Square footage (including portables) 127296

28 Pelham Pelham Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

28 Pelham Pelham Elementary School Q.05 How many parking spaces does the facility have? 216

28 Pelham Pelham Elementary School Q.06 Does your building have a basement? No

28 Pelham Pelham Elementary School Q.07 How many portable classrooms are in use? 3

28 Pelham Pelham Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

28 Pelham Pelham Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Other|Half the building is

SAU28 admin.

28 Pelham Pelham Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

28 Pelham Pelham Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

28 Pelham Pelham Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

28 Pelham Pelham Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

28 Pelham Pelham Elementary School Q.14a a. Roofs 2018|||||

28 Pelham Pelham Elementary School Q.14b b. Lighting Systems 2019|||||

28 Pelham Pelham Elementary School Q.14c c. Windows 2002|||||

28 Pelham Pelham Elementary School Q.14d d. Ceilings 2002|||||

28 Pelham Pelham Elementary School Q.14e e. Plumbing 2002|||||

28 Pelham Pelham Elementary School Q.14f f. Heating Systems 2019|||||

28 Pelham Pelham Elementary School Q.14g g. Ventilation Systems 2002|||||

28 Pelham Pelham Elementary School Q.14h h. Conditioning Systems 2002|||||

28 Pelham Pelham Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

28 Pelham Pelham Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

28 Pelham Pelham Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

28 Pelham Pelham Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

28 Pelham Pelham Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

28 Pelham Pelham Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

28 Pelham Pelham Elementary School Q.21 Is your building a CHP's or LEED certified? No

28 Pelham Pelham Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

28 Pelham Pelham Elementary School Q.23 Do you have an energy performance contract in place? Yes

28 Pelham Pelham Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

28 Pelham Pelham Elementary School Q.25 What is the R-Value of the roof? 13

Page 81 of 238

Page 82: New Hampshire Department of Education Bureau of School

28 Pelham Pelham Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

28 Pelham Pelham Elementary School Q.27 Do you have a presence of: (click all that apply) Other|None of the above.

28 Pelham Pelham Elementary School Q.28 Do you have a facility maintenance plan? Yes

28 Pelham Pelham Elementary School Q.29 What is your maintenance budget? 2725000.00

28 Pelham Pelham Elementary School Q.30 What is your operational budget? 649425.00

28 Pelham Pelham Elementary School Q.31 What is your capital construction budget? 0

28 Pelham Pelham Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?199520.00

28 Pelham Pelham Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?50

28 Pelham Pelham Elementary School Q.34 Do you have a maintenance contract in place? Yes

28 Pelham Pelham Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

28 Pelham Pelham High School Q.01 Approximate year of the original construction date 1975

28 Pelham Pelham High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2016

28 Pelham Pelham High School Q.03 Gross Square footage (including portables) 134050

28 Pelham Pelham High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

28 Pelham Pelham High School Q.05 How many parking spaces does the facility have? 300

28 Pelham Pelham High School Q.06 Does your building have a basement? No

28 Pelham Pelham High School Q.07 How many portable classrooms are in use? 1

28 Pelham Pelham High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

28 Pelham Pelham High School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Support Space

28 Pelham Pelham High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

28 Pelham Pelham High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

28 Pelham Pelham High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

28 Pelham Pelham High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

28 Pelham Pelham High School Q.14a a. Roofs 2018|||||

28 Pelham Pelham High School Q.14b b. Lighting Systems 2018|||||

28 Pelham Pelham High School Q.14c c. Windows 2018|||||

28 Pelham Pelham High School Q.14d d. Ceilings 2018|||||

28 Pelham Pelham High School Q.14e e. Plumbing 2018|||||

28 Pelham Pelham High School Q.14f f. Heating Systems 2018|||||

28 Pelham Pelham High School Q.14g g. Ventilation Systems 2018|||||

28 Pelham Pelham High School Q.14h h. Conditioning Systems 2018|||||

28 Pelham Pelham High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

28 Pelham Pelham High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

28 Pelham Pelham High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

28 Pelham Pelham High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

28 Pelham Pelham High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

28 Pelham Pelham High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

28 Pelham Pelham High School Q.21 Is your building a CHP's or LEED certified? No

28 Pelham Pelham High School Q.22 Have you had energy audits of all your school facilities? Yes

28 Pelham Pelham High School Q.23 Do you have an energy performance contract in place? Yes

28 Pelham Pelham High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

28 Pelham Pelham High School Q.25 What is the R-Value of the roof? 13

28 Pelham Pelham High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

28 Pelham Pelham High School Q.27 Do you have a presence of: (click all that apply) Other|None of the above

28 Pelham Pelham High School Q.28 Do you have a facility maintenance plan? Yes

28 Pelham Pelham High School Q.29 What is your maintenance budget? 36308.00

28 Pelham Pelham High School Q.30 What is your operational budget? 730565.00

28 Pelham Pelham High School Q.31 What is your capital construction budget? 0

28 Pelham Pelham High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?302538.00

Page 82 of 238

Page 83: New Hampshire Department of Education Bureau of School

28 Pelham Pelham High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?50

28 Pelham Pelham High School Q.34 Do you have a maintenance contract in place? Yes

28 Pelham Pelham High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

28 Pelham Pelham Memorial School Q.01 Approximate year of the original construction date 1965

28 Pelham Pelham Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1984

28 Pelham Pelham Memorial School Q.03 Gross Square footage (including portables) 59927

28 Pelham Pelham Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

28 Pelham Pelham Memorial School Q.05 How many parking spaces does the facility have? 80

28 Pelham Pelham Memorial School Q.06 Does your building have a basement? Yes

28 Pelham Pelham Memorial School Q.07 How many portable classrooms are in use? 2

28 Pelham Pelham Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

28 Pelham Pelham Memorial School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom|Special (music, art, etc)

28 Pelham Pelham Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

28 Pelham Pelham Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

28 Pelham Pelham Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

28 Pelham Pelham Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

28 Pelham Pelham Memorial School Q.14a a. Roofs 15yrs|||||

28 Pelham Pelham Memorial School Q.14b b. Lighting Systems 1990's|||||

28 Pelham Pelham Memorial School Q.14c c. Windows 1990's|||||

28 Pelham Pelham Memorial School Q.14d d. Ceilings 1964|||||

28 Pelham Pelham Memorial School Q.14e e. Plumbing 2016|||||

28 Pelham Pelham Memorial School Q.14f f. Heating Systems 2019|||||

28 Pelham Pelham Memorial School Q.14g g. Ventilation Systems 2008|||||

28 Pelham Pelham Memorial School Q.14h h. Conditioning Systems N/A|||||

28 Pelham Pelham Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

28 Pelham Pelham Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

28 Pelham Pelham Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

28 Pelham Pelham Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

28 Pelham Pelham Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

28 Pelham Pelham Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

28 Pelham Pelham Memorial School Q.21 Is your building a CHP's or LEED certified? No

28 Pelham Pelham Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

28 Pelham Pelham Memorial School Q.23 Do you have an energy performance contract in place? Yes

28 Pelham Pelham Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

28 Pelham Pelham Memorial School Q.25 What is the R-Value of the roof? 10

28 Pelham Pelham Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

28 Pelham Pelham Memorial School Q.27 Do you have a presence of: (click all that apply) Other|None of the above.

28 Pelham Pelham Memorial School Q.28 Do you have a facility maintenance plan? Yes

28 Pelham Pelham Memorial School Q.29 What is your maintenance budget? 20000.00

28 Pelham Pelham Memorial School Q.30 What is your operational budget? 346979.00

28 Pelham Pelham Memorial School Q.31 What is your capital construction budget? 0

28 Pelham Pelham Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?111594.00

28 Pelham Pelham Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

28 Pelham Pelham Memorial School Q.34 Do you have a maintenance contract in place? No

28 Pelham Pelham Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

28 Pelham Pelham Memorial School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Possible additon/renovation

28 Pelham Pelham Memorial School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 30.

28 Pelham Pelham Memorial School Q.35c c. If yes, provide estimated year of construction. 2021

29 Chesterfield Chesterfield Central School Q.01 Approximate year of the original construction date 1951

Page 83 of 238

Page 84: New Hampshire Department of Education Bureau of School

29 Chesterfield Chesterfield Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

29 Chesterfield Chesterfield Central School Q.03 Gross Square footage (including portables) 50000

29 Chesterfield Chesterfield Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Chesterfield Chesterfield Central School Q.05 How many parking spaces does the facility have? 20

29 Chesterfield Chesterfield Central School Q.06 Does your building have a basement? No

29 Chesterfield Chesterfield Central School Q.07 How many portable classrooms are in use? 0

29 Chesterfield Chesterfield Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Chesterfield Chesterfield Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Chesterfield Chesterfield Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Chesterfield Chesterfield Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

29 Chesterfield Chesterfield Central School Q.13 Are all instructional and service areas within the facility ADA compliant? No

29 Chesterfield Chesterfield Central School Q.14a a. Roofs x|x|x|||x

29 Chesterfield Chesterfield Central School Q.14b b. Lighting Systems |||||n/a

29 Chesterfield Chesterfield Central School Q.14c c. Windows |||||n/a

29 Chesterfield Chesterfield Central School Q.14d d. Ceilings |||||n/a

29 Chesterfield Chesterfield Central School Q.14e e. Plumbing |||||9+

29 Chesterfield Chesterfield Central School Q.14f f. Heating Systems |||||9+

29 Chesterfield Chesterfield Central School Q.14g g. Ventilation Systems |||x||

29 Chesterfield Chesterfield Central School Q.14h h. Conditioning Systems |||||n/a

29 Chesterfield Chesterfield Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Chesterfield Chesterfield Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

29 Chesterfield Chesterfield Central School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

29 Chesterfield Chesterfield Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

29 Chesterfield Chesterfield Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Chesterfield Chesterfield Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

29 Chesterfield Chesterfield Central School Q.21 Is your building a CHP's or LEED certified? No

29 Chesterfield Chesterfield Central School Q.22 Have you had energy audits of all your school facilities? No

29 Chesterfield Chesterfield Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

29 Chesterfield Chesterfield Central School Q.23 Do you have an energy performance contract in place? No

29 Chesterfield Chesterfield Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

29 Chesterfield Chesterfield Central School Q.25 What is the R-Value of the roof? 50

29 Chesterfield Chesterfield Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Chesterfield Chesterfield Central School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Chesterfield Chesterfield Central School Q.28 Do you have a facility maintenance plan? Yes

29 Chesterfield Chesterfield Central School Q.29 What is your maintenance budget? 412488

29 Chesterfield Chesterfield Central School Q.30 What is your operational budget? 8460773

29 Chesterfield Chesterfield Central School Q.31 What is your capital construction budget? 0

29 Chesterfield Chesterfield Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?74000

29 Chesterfield Chesterfield Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

29 Chesterfield Chesterfield Central School Q.34 Do you have a maintenance contract in place? No

29 Chesterfield Chesterfield Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Harrisville Wells Memorial School Q.01 Approximate year of the original construction date 1952

29 Harrisville Wells Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1991

29 Harrisville Wells Memorial School Q.03 Gross Square footage (including portables) 16345

29 Harrisville Wells Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Harrisville Wells Memorial School Q.05 How many parking spaces does the facility have? 24

29 Harrisville Wells Memorial School Q.06 Does your building have a basement? No

29 Harrisville Wells Memorial School Q.07 How many portable classrooms are in use? 0

29 Harrisville Wells Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 84 of 238

Page 85: New Hampshire Department of Education Bureau of School

29 Harrisville Wells Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Harrisville Wells Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Harrisville Wells Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Harrisville Wells Memorial School Q.14a a. Roofs ||x|x||

29 Harrisville Wells Memorial School Q.14b b. Lighting Systems |x|x|||

29 Harrisville Wells Memorial School Q.14c c. Windows |||||n/a

29 Harrisville Wells Memorial School Q.14d d. Ceilings |||||n/a

29 Harrisville Wells Memorial School Q.14e e. Plumbing ||x|||

29 Harrisville Wells Memorial School Q.14f f. Heating Systems |||||9+

29 Harrisville Wells Memorial School Q.14g g. Ventilation Systems |||||9+

29 Harrisville Wells Memorial School Q.14h h. Conditioning Systems |||||n/a

29 Harrisville Wells Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Harrisville Wells Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

29 Harrisville Wells Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Harrisville Wells Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Harrisville Wells Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Harrisville Wells Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

29 Harrisville Wells Memorial School Q.21 Is your building a CHP's or LEED certified? No

29 Harrisville Wells Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

29 Harrisville Wells Memorial School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

29 Harrisville Wells Memorial School Q.23 Do you have an energy performance contract in place? No

29 Harrisville Wells Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 11

29 Harrisville Wells Memorial School Q.25 What is the R-Value of the roof? 35

29 Harrisville Wells Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Harrisville Wells Memorial School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Harrisville Wells Memorial School Q.28 Do you have a facility maintenance plan? No

29 Harrisville Wells Memorial School Q.29 What is your maintenance budget? 195544

29 Harrisville Wells Memorial School Q.30 What is your operational budget? 2005002

29 Harrisville Wells Memorial School Q.31 What is your capital construction budget? 0

29 Harrisville Wells Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?31500

29 Harrisville Wells Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

29 Harrisville Wells Memorial School Q.34 Do you have a maintenance contract in place? No

29 Harrisville Wells Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Keene Franklin Elementary School Q.01 Approximate year of the original construction date 1906

29 Keene Franklin Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

29 Keene Franklin Elementary School Q.03 Gross Square footage (including portables) 43000

29 Keene Franklin Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Franklin Elementary School Q.05 How many parking spaces does the facility have? 55

29 Keene Franklin Elementary School Q.06 Does your building have a basement? Yes

29 Keene Franklin Elementary School Q.07 How many portable classrooms are in use? 0

29 Keene Franklin Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

29 Keene Franklin Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

29 Keene Franklin Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Franklin Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Franklin Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Franklin Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

29 Keene Franklin Elementary School Q.14a a. Roofs 2018|1990||||

29 Keene Franklin Elementary School Q.14b b. Lighting Systems 2018|1987||||

29 Keene Franklin Elementary School Q.14c c. Windows 1987|1968|1957|||

Page 85 of 238

Page 86: New Hampshire Department of Education Bureau of School

29 Keene Franklin Elementary School Q.14d d. Ceilings 2018|1987||||

29 Keene Franklin Elementary School Q.14e e. Plumbing 2018|1987|1968|||

29 Keene Franklin Elementary School Q.14f f. Heating Systems 2018|||||

29 Keene Franklin Elementary School Q.14g g. Ventilation Systems 2018|1987||||

29 Keene Franklin Elementary School Q.14h h. Conditioning Systems |||||

29 Keene Franklin Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Keene Franklin Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

29 Keene Franklin Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Keene Franklin Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Keene Franklin Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Keene Franklin Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

29 Keene Franklin Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Franklin Elementary School Q.22 Have you had energy audits of all your school facilities? No

29 Keene Franklin Elementary School Q.23 Do you have an energy performance contract in place? Yes

29 Keene Franklin Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

29 Keene Franklin Elementary School Q.25 What is the R-Value of the roof? 50

29 Keene Franklin Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Keene Franklin Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Keene Franklin Elementary School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Franklin Elementary School Q.29 What is your maintenance budget? 384455

29 Keene Franklin Elementary School Q.30 What is your operational budget? 3282441

29 Keene Franklin Elementary School Q.31 What is your capital construction budget? 1728941

29 Keene Franklin Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?73346

29 Keene Franklin Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6437

29 Keene Franklin Elementary School Q.34 Do you have a maintenance contract in place? No

29 Keene Franklin Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

29 Keene Franklin Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Franklin Life Safety and Renovations Phase 2 & 3

29 Keene Franklin Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

29 Keene Franklin Elementary School Q.35c c. If yes, provide estimated year of construction. 2019

29 Keene Fuller Elementary School Q.01 Approximate year of the original construction date 1936

29 Keene Fuller Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2015

29 Keene Fuller Elementary School Q.03 Gross Square footage (including portables) 51405

29 Keene Fuller Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Fuller Elementary School Q.05 How many parking spaces does the facility have? 115

29 Keene Fuller Elementary School Q.06 Does your building have a basement? Yes

29 Keene Fuller Elementary School Q.07 How many portable classrooms are in use? 0

29 Keene Fuller Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Fuller Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Fuller Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Fuller Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Fuller Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

29 Keene Fuller Elementary School Q.14a a. Roofs 2017|2010|1989|||

29 Keene Fuller Elementary School Q.14b b. Lighting Systems 2015|2000||||

29 Keene Fuller Elementary School Q.14c c. Windows 1989|||||

29 Keene Fuller Elementary School Q.14d d. Ceilings 2015|1989||||

29 Keene Fuller Elementary School Q.14e e. Plumbing 2015|1989|1971|1962|1936|

29 Keene Fuller Elementary School Q.14f f. Heating Systems 2015|||||

29 Keene Fuller Elementary School Q.14g g. Ventilation Systems 2015|1989||||

29 Keene Fuller Elementary School Q.14h h. Conditioning Systems |||||

Page 86 of 238

Page 87: New Hampshire Department of Education Bureau of School

29 Keene Fuller Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Keene Fuller Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

29 Keene Fuller Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Keene Fuller Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Keene Fuller Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Keene Fuller Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

29 Keene Fuller Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Fuller Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

29 Keene Fuller Elementary School Q.23 Do you have an energy performance contract in place? Yes

29 Keene Fuller Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Fuller Elementary School Q.25 What is the R-Value of the roof? 20

29 Keene Fuller Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Keene Fuller Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Keene Fuller Elementary School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Fuller Elementary School Q.29 What is your maintenance budget? 384455

29 Keene Fuller Elementary School Q.30 What is your operational budget? 4095668

29 Keene Fuller Elementary School Q.31 What is your capital construction budget? 0

29 Keene Fuller Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?63456

29 Keene Fuller Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6437

29 Keene Fuller Elementary School Q.34 Do you have a maintenance contract in place? No

29 Keene Fuller Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

29 Keene Fuller Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Fuller Phase 2

29 Keene Fuller Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

29 Keene Fuller Elementary School Q.35c c. If yes, provide estimated year of construction. 2021

29 Keene Jonathan Daniels School Q.01 Approximate year of the original construction date 1968

29 Keene Jonathan Daniels School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1970

29 Keene Jonathan Daniels School Q.03 Gross Square footage (including portables) 34700

29 Keene Jonathan Daniels School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Jonathan Daniels School Q.05 How many parking spaces does the facility have? 74

29 Keene Jonathan Daniels School Q.06 Does your building have a basement? No

29 Keene Jonathan Daniels School Q.07 How many portable classrooms are in use? 0

29 Keene Jonathan Daniels School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Jonathan Daniels School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Jonathan Daniels School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Jonathan Daniels School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Jonathan Daniels School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Keene Jonathan Daniels School Q.14a a. Roofs 2008|||||

29 Keene Jonathan Daniels School Q.14b b. Lighting Systems 2000|||||

29 Keene Jonathan Daniels School Q.14c c. Windows 1970|1968||||

29 Keene Jonathan Daniels School Q.14d d. Ceilings 1970|||||

29 Keene Jonathan Daniels School Q.14e e. Plumbing 2010|1970|1968|||

29 Keene Jonathan Daniels School Q.14f f. Heating Systems 2010|||||

29 Keene Jonathan Daniels School Q.14g g. Ventilation Systems 1968|||||

29 Keene Jonathan Daniels School Q.14h h. Conditioning Systems |||||

29 Keene Jonathan Daniels School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

29 Keene Jonathan Daniels School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Wood

29 Keene Jonathan Daniels School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Keene Jonathan Daniels School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

29 Keene Jonathan Daniels School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

Page 87 of 238

Page 88: New Hampshire Department of Education Bureau of School

29 Keene Jonathan Daniels School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric|Wood Chip/Pellet

29 Keene Jonathan Daniels School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Jonathan Daniels School Q.22 Have you had energy audits of all your school facilities? Yes

29 Keene Jonathan Daniels School Q.23 Do you have an energy performance contract in place? No

29 Keene Jonathan Daniels School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Jonathan Daniels School Q.25 What is the R-Value of the roof? 20

29 Keene Jonathan Daniels School Q.26 Do you have carbon monoxide detector(s) in your building? No

29 Keene Jonathan Daniels School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Keene Jonathan Daniels School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Jonathan Daniels School Q.29 What is your maintenance budget? 384455

29 Keene Jonathan Daniels School Q.30 What is your operational budget? 1452638

29 Keene Jonathan Daniels School Q.31 What is your capital construction budget? 5000

29 Keene Jonathan Daniels School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?38560

29 Keene Jonathan Daniels School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5397

29 Keene Jonathan Daniels School Q.34 Do you have a maintenance contract in place? No

29 Keene Jonathan Daniels School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Keene Keene High School Q.01 Approximate year of the original construction date 1952

29 Keene Keene High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

29 Keene Keene High School Q.03 Gross Square footage (including portables) 342562

29 Keene Keene High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Keene High School Q.06 Does your building have a basement? Yes

29 Keene Keene High School Q.07 How many portable classrooms are in use? 0

29 Keene Keene High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Keene High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Keene High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Keene High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Keene High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Keene Keene High School Q.14a a. Roofs 2017|2010|2002|1999||

29 Keene Keene High School Q.14b b. Lighting Systems 2018|2011|1999|2002||

29 Keene Keene High School Q.14c c. Windows 1976|1972|1999|||

29 Keene Keene High School Q.14d d. Ceilings 2002|1999||||

29 Keene Keene High School Q.14e e. Plumbing 1952|1969|1965|1976|1999|2002

29 Keene Keene High School Q.14f f. Heating Systems 2011|||||

29 Keene Keene High School Q.14g g. Ventilation Systems 2018|2012|1989|||

29 Keene Keene High School Q.14h h. Conditioning Systems |||||

29 Keene Keene High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Keene Keene High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

29 Keene Keene High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood|Other|Block Wall

29 Keene Keene High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Keene Keene High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Keene Keene High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

29 Keene Keene High School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Keene High School Q.22 Have you had energy audits of all your school facilities? No

29 Keene Keene High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

29 Keene Keene High School Q.23 Do you have an energy performance contract in place? No

29 Keene Keene High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Keene High School Q.25 What is the R-Value of the roof? 20

29 Keene Keene High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Keene Keene High School Q.27 Do you have a presence of: (click all that apply) Asbestos

Page 88 of 238

Page 89: New Hampshire Department of Education Bureau of School

29 Keene Keene High School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Keene High School Q.29 What is your maintenance budget? 2233996

29 Keene Keene High School Q.30 What is your operational budget? 14834058

29 Keene Keene High School Q.31 What is your capital construction budget? 787500

29 Keene Keene High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?496661

29 Keene Keene High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?32861

29 Keene Keene High School Q.34 Do you have a maintenance contract in place? Yes

29 Keene Keene High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

29 Keene Keene High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") High School Boy's Locker Room

29 Keene Keene High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

29 Keene Keene High School Q.35c c. If yes, provide estimated year of construction. 2024

29 Keene Keene Middle School Q.01 Approximate year of the original construction date 2010

29 Keene Keene Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2010

29 Keene Keene Middle School Q.03 Gross Square footage (including portables) 163975

29 Keene Keene Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Keene Middle School Q.05 How many parking spaces does the facility have? 279

29 Keene Keene Middle School Q.06 Does your building have a basement? No

29 Keene Keene Middle School Q.07 How many portable classrooms are in use? 0

29 Keene Keene Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Keene Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Keene Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Keene Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Keene Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Keene Keene Middle School Q.14a a. Roofs 2010|||||

29 Keene Keene Middle School Q.14b b. Lighting Systems 2010|||||

29 Keene Keene Middle School Q.14c c. Windows 2010|||||

29 Keene Keene Middle School Q.14d d. Ceilings 2010|||||

29 Keene Keene Middle School Q.14e e. Plumbing 2010|||||

29 Keene Keene Middle School Q.14f f. Heating Systems 2010|||||

29 Keene Keene Middle School Q.14g g. Ventilation Systems 2010|||||

29 Keene Keene Middle School Q.14h h. Conditioning Systems 2010|||||

29 Keene Keene Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Keene Keene Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

29 Keene Keene Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Block walls

29 Keene Keene Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Keene Keene Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Keene Keene Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet

29 Keene Keene Middle School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Keene Middle School Q.22 Have you had energy audits of all your school facilities? No

29 Keene Keene Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

29 Keene Keene Middle School Q.23 Do you have an energy performance contract in place? No

29 Keene Keene Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Keene Middle School Q.25 What is the R-Value of the roof? 20

29 Keene Keene Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Keene Keene Middle School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Keene Middle School Q.29 What is your maintenance budget? 1039068

29 Keene Keene Middle School Q.30 What is your operational budget? 7832091

29 Keene Keene Middle School Q.31 What is your capital construction budget? 0

29 Keene Keene Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?193793

Page 89 of 238

Page 90: New Hampshire Department of Education Bureau of School

29 Keene Keene Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?17115

29 Keene Keene Middle School Q.34 Do you have a maintenance contract in place? No

29 Keene Keene Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Keene Symonds Elementary School Q.01 Approximate year of the original construction date 1928

29 Keene Symonds Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

29 Keene Symonds Elementary School Q.03 Gross Square footage (including portables) 49000

29 Keene Symonds Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Symonds Elementary School Q.05 How many parking spaces does the facility have? 85

29 Keene Symonds Elementary School Q.06 Does your building have a basement? Yes

29 Keene Symonds Elementary School Q.07 How many portable classrooms are in use? 0

29 Keene Symonds Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Symonds Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Symonds Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Symonds Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Symonds Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Keene Symonds Elementary School Q.14a a. Roofs 2017|2000||||

29 Keene Symonds Elementary School Q.14b b. Lighting Systems 2017|2016||||

29 Keene Symonds Elementary School Q.14c c. Windows 1987|1973|1957|1951|1928|

29 Keene Symonds Elementary School Q.14d d. Ceilings 2017|2016||||

29 Keene Symonds Elementary School Q.14e e. Plumbing 2017|2016|1987|1973|1957|1928

29 Keene Symonds Elementary School Q.14f f. Heating Systems 2016|||||

29 Keene Symonds Elementary School Q.14g g. Ventilation Systems 2017|2016||||

29 Keene Symonds Elementary School Q.14h h. Conditioning Systems 2016|||||

29 Keene Symonds Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

29 Keene Symonds Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Wood

29 Keene Symonds Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Keene Symonds Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

29 Keene Symonds Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Keene Symonds Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

29 Keene Symonds Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Symonds Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

29 Keene Symonds Elementary School Q.23 Do you have an energy performance contract in place? No

29 Keene Symonds Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Symonds Elementary School Q.25 What is the R-Value of the roof? 20

29 Keene Symonds Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Keene Symonds Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Keene Symonds Elementary School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Symonds Elementary School Q.29 What is your maintenance budget? 384455

29 Keene Symonds Elementary School Q.30 What is your operational budget? 4234009

29 Keene Symonds Elementary School Q.31 What is your capital construction budget? 5000

29 Keene Symonds Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?53128

29 Keene Symonds Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6437

29 Keene Symonds Elementary School Q.34 Do you have a maintenance contract in place? No

29 Keene Symonds Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Keene Wheelock Elementary School Q.01 Approximate year of the original construction date 1885

29 Keene Wheelock Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1979

29 Keene Wheelock Elementary School Q.03 Gross Square footage (including portables) 43700

29 Keene Wheelock Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

29 Keene Wheelock Elementary School Q.05 How many parking spaces does the facility have? 44

Page 90 of 238

Page 91: New Hampshire Department of Education Bureau of School

29 Keene Wheelock Elementary School Q.06 Does your building have a basement? Yes

29 Keene Wheelock Elementary School Q.07 How many portable classrooms are in use? 0

29 Keene Wheelock Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Keene Wheelock Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Keene Wheelock Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Keene Wheelock Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Keene Wheelock Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Keene Wheelock Elementary School Q.14a a. Roofs 1985|1995||||

29 Keene Wheelock Elementary School Q.14b b. Lighting Systems 1990|||||

29 Keene Wheelock Elementary School Q.14c c. Windows 1987|1979||||

29 Keene Wheelock Elementary School Q.14d d. Ceilings 1987|||||

29 Keene Wheelock Elementary School Q.14e e. Plumbing 1979|1952||||

29 Keene Wheelock Elementary School Q.14f f. Heating Systems 1995|||||

29 Keene Wheelock Elementary School Q.14g g. Ventilation Systems 1987|1979||||

29 Keene Wheelock Elementary School Q.14h h. Conditioning Systems |||||

29 Keene Wheelock Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

29 Keene Wheelock Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

29 Keene Wheelock Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Keene Wheelock Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

29 Keene Wheelock Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

29 Keene Wheelock Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

29 Keene Wheelock Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Keene Wheelock Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

29 Keene Wheelock Elementary School Q.23 Do you have an energy performance contract in place? No

29 Keene Wheelock Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

29 Keene Wheelock Elementary School Q.25 What is the R-Value of the roof? 20

29 Keene Wheelock Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

29 Keene Wheelock Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Keene Wheelock Elementary School Q.28 Do you have a facility maintenance plan? Yes

29 Keene Wheelock Elementary School Q.29 What is your maintenance budget? 384455

29 Keene Wheelock Elementary School Q.30 What is your operational budget? 2474414

29 Keene Wheelock Elementary School Q.31 What is your capital construction budget? 0

29 Keene Wheelock Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?67743

29 Keene Wheelock Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6437

29 Keene Wheelock Elementary School Q.34 Do you have a maintenance contract in place? No

29 Keene Wheelock Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

29 Keene Wheelock Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Wheelock Life Safety and HVAC

29 Keene Wheelock Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

29 Keene Wheelock Elementary School Q.35c c. If yes, provide estimated year of construction. 2023

29 Marlborough Marlborough Elementary School Q.01 Approximate year of the original construction date 2010

29 Marlborough Marlborough Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

29 Marlborough Marlborough Elementary School Q.03 Gross Square footage (including portables) 52000

29 Marlborough Marlborough Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

29 Marlborough Marlborough Elementary School Q.05 How many parking spaces does the facility have? 64

29 Marlborough Marlborough Elementary School Q.06 Does your building have a basement? No

29 Marlborough Marlborough Elementary School Q.07 How many portable classrooms are in use? 0

29 Marlborough Marlborough Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Marlborough Marlborough Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Marlborough Marlborough Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 91 of 238

Page 92: New Hampshire Department of Education Bureau of School

29 Marlborough Marlborough Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Marlborough Marlborough Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Marlborough Marlborough Elementary School Q.14a a. Roofs |||||9+

29 Marlborough Marlborough Elementary School Q.14b b. Lighting Systems |||||9+

29 Marlborough Marlborough Elementary School Q.14c c. Windows |||||9+

29 Marlborough Marlborough Elementary School Q.14d d. Ceilings |||||9+

29 Marlborough Marlborough Elementary School Q.14e e. Plumbing |||||9+

29 Marlborough Marlborough Elementary School Q.14f f. Heating Systems |||||9+

29 Marlborough Marlborough Elementary School Q.14g g. Ventilation Systems |||||9+

29 Marlborough Marlborough Elementary School Q.14h h. Conditioning Systems |||||9+

29 Marlborough Marlborough Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

29 Marlborough Marlborough Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

29 Marlborough Marlborough Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

29 Marlborough Marlborough Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

29 Marlborough Marlborough Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

29 Marlborough Marlborough Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

29 Marlborough Marlborough Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Marlborough Marlborough Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

29 Marlborough Marlborough Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

29 Marlborough Marlborough Elementary School Q.23 Do you have an energy performance contract in place? No

29 Marlborough Marlborough Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Marlborough Marlborough Elementary School Q.28 Do you have a facility maintenance plan? Yes

29 Marlborough Marlborough Elementary School Q.29 What is your maintenance budget? 55000

29 Marlborough Marlborough Elementary School Q.30 What is your operational budget? 6038560

29 Marlborough Marlborough Elementary School Q.31 What is your capital construction budget? 0

29 Marlborough Marlborough Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?91000

29 Marlborough Marlborough Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?30

29 Marlborough Marlborough Elementary School Q.34 Do you have a maintenance contract in place? No

29 Marlborough Marlborough Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Marlow John D. Perkins Academy Q.01 Approximate year of the original construction date 1973

29 Marlow John D. Perkins Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

29 Marlow John D. Perkins Academy Q.05 How many parking spaces does the facility have? 10

29 Marlow John D. Perkins Academy Q.07 How many portable classrooms are in use? 0

29 Marlow John D. Perkins Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Marlow John D. Perkins Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Marlow John D. Perkins Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Marlow John D. Perkins Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Marlow John D. Perkins Academy Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Marlow John D. Perkins Academy Q.14a a. Roofs |||||9+

29 Marlow John D. Perkins Academy Q.14b b. Lighting Systems |||||9+

29 Marlow John D. Perkins Academy Q.14c c. Windows |||||9+

29 Marlow John D. Perkins Academy Q.14d d. Ceilings |||||9+

29 Marlow John D. Perkins Academy Q.14e e. Plumbing |||||9+

29 Marlow John D. Perkins Academy Q.14f f. Heating Systems |||||9+

29 Marlow John D. Perkins Academy Q.14g g. Ventilation Systems |||||9+

29 Marlow John D. Perkins Academy Q.14h h. Conditioning Systems |||||n/a

29 Marlow John D. Perkins Academy Q.15 What types of roofs are on your school facility? (click all that apply) Flat

29 Marlow John D. Perkins Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

29 Marlow John D. Perkins Academy Q.17 What type of studding is used at your school facility? (click all that apply) Wood

Page 92 of 238

Page 93: New Hampshire Department of Education Bureau of School

29 Marlow John D. Perkins Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

29 Marlow John D. Perkins Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Marlow John D. Perkins Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

29 Marlow John D. Perkins Academy Q.21 Is your building a CHP's or LEED certified? No

29 Marlow John D. Perkins Academy Q.22 Have you had energy audits of all your school facilities? No

29 Marlow John D. Perkins Academy Q.23 Do you have an energy performance contract in place? No

29 Marlow John D. Perkins Academy Q.26 Do you have carbon monoxide detector(s) in your building? No

29 Marlow John D. Perkins Academy Q.27 Do you have a presence of: (click all that apply) Asbestos

29 Marlow John D. Perkins Academy Q.28 Do you have a facility maintenance plan? No

29 Marlow John D. Perkins Academy Q.29 What is your maintenance budget? 56884

29 Marlow John D. Perkins Academy Q.30 What is your operational budget? 2080138

29 Marlow John D. Perkins Academy Q.31 What is your capital construction budget? 0

29 Marlow John D. Perkins Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?14807

29 Marlow John D. Perkins Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20

29 Marlow John D. Perkins Academy Q.34 Do you have a maintenance contract in place? No

29 Marlow John D. Perkins Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Nelson Nelson Elementary School Q.01 Approximate year of the original construction date 1893

29 Nelson Nelson Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

29 Nelson Nelson Elementary School Q.03 Gross Square footage (including portables) 7000

29 Nelson Nelson Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

29 Nelson Nelson Elementary School Q.05 How many parking spaces does the facility have? 22

29 Nelson Nelson Elementary School Q.06 Does your building have a basement? No

29 Nelson Nelson Elementary School Q.07 How many portable classrooms are in use? 0

29 Nelson Nelson Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

29 Nelson Nelson Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Nelson Nelson Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

29 Nelson Nelson Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

29 Nelson Nelson Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Nelson Nelson Elementary School Q.14a a. Roofs |||||8 - 9

29 Nelson Nelson Elementary School Q.14b b. Lighting Systems |||||8+

29 Nelson Nelson Elementary School Q.14c c. Windows ||x|||

29 Nelson Nelson Elementary School Q.14d d. Ceilings |||||8+

29 Nelson Nelson Elementary School Q.14e e. Plumbing |||||+

29 Nelson Nelson Elementary School Q.14f f. Heating Systems |||||x

29 Nelson Nelson Elementary School Q.14g g. Ventilation Systems |||||8+

29 Nelson Nelson Elementary School Q.14h h. Conditioning Systems |||||n/a

29 Nelson Nelson Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

29 Nelson Nelson Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal|Wood

29 Nelson Nelson Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Nelson Nelson Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Nelson Nelson Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

29 Nelson Nelson Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

29 Nelson Nelson Elementary School Q.21 Is your building a CHP's or LEED certified? No

29 Nelson Nelson Elementary School Q.22 Have you had energy audits of all your school facilities? No

29 Nelson Nelson Elementary School Q.23 Do you have an energy performance contract in place? No

29 Nelson Nelson Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

29 Nelson Nelson Elementary School Q.28 Do you have a facility maintenance plan? No

29 Nelson Nelson Elementary School Q.29 What is your maintenance budget? 89000

29 Nelson Nelson Elementary School Q.30 What is your operational budget? 2043655

Page 93 of 238

Page 94: New Hampshire Department of Education Bureau of School

29 Nelson Nelson Elementary School Q.31 What is your capital construction budget? 0

29 Nelson Nelson Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?15000

29 Nelson Nelson Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

29 Nelson Nelson Elementary School Q.34 Do you have a maintenance contract in place? No

29 Nelson Nelson Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

29 Westmoreland Westmoreland School Q.01 Approximate year of the original construction date 1960

29 Westmoreland Westmoreland School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

29 Westmoreland Westmoreland School Q.03 Gross Square footage (including portables) 25081

29 Westmoreland Westmoreland School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

29 Westmoreland Westmoreland School Q.05 How many parking spaces does the facility have? 30

29 Westmoreland Westmoreland School Q.06 Does your building have a basement? No

29 Westmoreland Westmoreland School Q.07 How many portable classrooms are in use? 0

29 Westmoreland Westmoreland School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

29 Westmoreland Westmoreland School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Small Group

29 Westmoreland Westmoreland School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

29 Westmoreland Westmoreland School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

29 Westmoreland Westmoreland School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

29 Westmoreland Westmoreland School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

29 Westmoreland Westmoreland School Q.14a a. Roofs |x||||

29 Westmoreland Westmoreland School Q.14b b. Lighting Systems |||||9+

29 Westmoreland Westmoreland School Q.14c c. Windows |||||9+

29 Westmoreland Westmoreland School Q.14d d. Ceilings |||||9+

29 Westmoreland Westmoreland School Q.14e e. Plumbing |||||9+

29 Westmoreland Westmoreland School Q.14f f. Heating Systems |||x||

29 Westmoreland Westmoreland School Q.14g g. Ventilation Systems |||x||

29 Westmoreland Westmoreland School Q.14h h. Conditioning Systems |||||n/a

29 Westmoreland Westmoreland School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

29 Westmoreland Westmoreland School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

29 Westmoreland Westmoreland School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

29 Westmoreland Westmoreland School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

29 Westmoreland Westmoreland School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

29 Westmoreland Westmoreland School Q.21 Is your building a CHP's or LEED certified? No

29 Westmoreland Westmoreland School Q.22 Have you had energy audits of all your school facilities? Yes

29 Westmoreland Westmoreland School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

29 Westmoreland Westmoreland School Q.23 Do you have an energy performance contract in place? No

29 Westmoreland Westmoreland School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

29 Westmoreland Westmoreland School Q.25 What is the R-Value of the roof? 40

29 Westmoreland Westmoreland School Q.26 Do you have carbon monoxide detector(s) in your building? No

29 Westmoreland Westmoreland School Q.28 Do you have a facility maintenance plan? Yes

29 Westmoreland Westmoreland School Q.29 What is your maintenance budget? 30000

29 Westmoreland Westmoreland School Q.30 What is your operational budget? 3879000

29 Westmoreland Westmoreland School Q.31 What is your capital construction budget? 0

29 Westmoreland Westmoreland School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?40000

29 Westmoreland Westmoreland School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?175

29 Westmoreland Westmoreland School Q.34 Do you have a maintenance contract in place? No

29 Westmoreland Westmoreland School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

30 Laconia Elm Street School Q.01 Approximate year of the original construction date 1960

30 Laconia Elm Street School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

30 Laconia Elm Street School Q.03 Gross Square footage (including portables) 32000

Page 94 of 238

Page 95: New Hampshire Department of Education Bureau of School

30 Laconia Elm Street School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

30 Laconia Elm Street School Q.06 Does your building have a basement? No

30 Laconia Elm Street School Q.07 How many portable classrooms are in use? 0

30 Laconia Elm Street School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

30 Laconia Elm Street School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

30 Laconia Elm Street School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

30 Laconia Elm Street School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

30 Laconia Elm Street School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

30 Laconia Elm Street School Q.14a a. Roofs 18|||||

30 Laconia Elm Street School Q.14b b. Lighting Systems 18|||||

30 Laconia Elm Street School Q.14c c. Windows 18|||||

30 Laconia Elm Street School Q.14d d. Ceilings 18|||||

30 Laconia Elm Street School Q.14e e. Plumbing 18|||||

30 Laconia Elm Street School Q.14f f. Heating Systems 18|||||

30 Laconia Elm Street School Q.14g g. Ventilation Systems |||||

30 Laconia Elm Street School Q.14h h. Conditioning Systems 18|||||

30 Laconia Elm Street School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

30 Laconia Elm Street School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

30 Laconia Elm Street School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

30 Laconia Elm Street School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

30 Laconia Elm Street School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

30 Laconia Elm Street School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

30 Laconia Elm Street School Q.21 Is your building a CHP's or LEED certified? No

30 Laconia Elm Street School Q.22 Have you had energy audits of all your school facilities? Yes

30 Laconia Elm Street School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

30 Laconia Elm Street School Q.23 Do you have an energy performance contract in place? Yes

30 Laconia Elm Street School Q.24 What is the R-Value of the exterior walls, windows, and doors? 36

30 Laconia Elm Street School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

30 Laconia Elm Street School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

31 Newmarket Newmarket Elementary School Q.01 Approximate year of the original construction date 1987

31 Newmarket Newmarket Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

31 Newmarket Newmarket Elementary School Q.03 Gross Square footage (including portables) 83000

31 Newmarket Newmarket Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

31 Newmarket Newmarket Elementary School Q.05 How many parking spaces does the facility have? 100

31 Newmarket Newmarket Elementary School Q.06 Does your building have a basement? No

31 Newmarket Newmarket Elementary School Q.07 How many portable classrooms are in use? 0

31 Newmarket Newmarket Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

31 Newmarket Newmarket Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

31 Newmarket Newmarket Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

31 Newmarket Newmarket Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

31 Newmarket Newmarket Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

31 Newmarket Newmarket Elementary School Q.14a a. Roofs 2025|||||

31 Newmarket Newmarket Elementary School Q.14b b. Lighting Systems 2019|||||

31 Newmarket Newmarket Elementary School Q.14c c. Windows |||||2030

31 Newmarket Newmarket Elementary School Q.14d d. Ceilings 2019|||||

31 Newmarket Newmarket Elementary School Q.14e e. Plumbing 2019|||||

31 Newmarket Newmarket Elementary School Q.14f f. Heating Systems 2018|||||

31 Newmarket Newmarket Elementary School Q.14g g. Ventilation Systems 2019|||||

31 Newmarket Newmarket Elementary School Q.14h h. Conditioning Systems 2019|||||

Page 95 of 238

Page 96: New Hampshire Department of Education Bureau of School

31 Newmarket Newmarket Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

31 Newmarket Newmarket Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

31 Newmarket Newmarket Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

31 Newmarket Newmarket Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

31 Newmarket Newmarket Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

31 Newmarket Newmarket Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

31 Newmarket Newmarket Elementary School Q.21 Is your building a CHP's or LEED certified? No

31 Newmarket Newmarket Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

31 Newmarket Newmarket Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

31 Newmarket Newmarket Elementary School Q.23 Do you have an energy performance contract in place? Yes

31 Newmarket Newmarket Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 10

31 Newmarket Newmarket Elementary School Q.25 What is the R-Value of the roof? 24

31 Newmarket Newmarket Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

31 Newmarket Newmarket Elementary School Q.28 Do you have a facility maintenance plan? Yes

31 Newmarket Newmarket Elementary School Q.29 What is your maintenance budget? 250000

31 Newmarket Newmarket Elementary School Q.30 What is your operational budget? 365000

31 Newmarket Newmarket Elementary School Q.31 What is your capital construction budget? 125000

31 Newmarket Newmarket Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?4

31 Newmarket Newmarket Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

31 Newmarket Newmarket Elementary School Q.34 Do you have a maintenance contract in place? Yes

31 Newmarket Newmarket Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

31 Newmarket Newmarket Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") major renovation and addition to the schools

31 Newmarket Newmarket Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 11

31 Newmarket Newmarket Elementary School Q.35c c. If yes, provide estimated year of construction. 20182019

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.01 Approximate year of the original construction date 1925

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.03 Gross Square footage (including portables) 150000

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.05 How many parking spaces does the facility have? 120

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.06 Does your building have a basement? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.07 How many portable classrooms are in use? 0

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14a a. Roofs 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14b b. Lighting Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14c c. Windows 2030|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14d d. Ceilings 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14e e. Plumbing 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14f f. Heating Systems 2018|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14g g. Ventilation Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.14h h. Conditioning Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

Page 96 of 238

Page 97: New Hampshire Department of Education Bureau of School

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.21 Is your building a CHP's or LEED certified? No

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.22 Have you had energy audits of all your school facilities? No

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.23 Do you have an energy performance contract in place? No

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.24 What is the R-Value of the exterior walls, windows, and doors? 10

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.25 What is the R-Value of the roof? 24

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.27 Do you have a presence of: (click all that apply) Asbestos

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.28 Do you have a facility maintenance plan? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.29 What is your maintenance budget? 250000

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.30 What is your operational budget? 365000

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.31 What is your capital construction budget? 125000

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?5

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.34 Do you have a maintenance contract in place? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.35a a. If yes, provide a short description. (e.g., "High School Addition") major renovation and addition to the schools

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 24

31 Newmarket Newmarket Jr.-Sr. High (Elem) Q.35c c. If yes, provide estimated year of construction. 2018

31 Newmarket Newmarket Jr.-Sr. High School Q.01 Approximate year of the original construction date 1902

31 Newmarket Newmarket Jr.-Sr. High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

31 Newmarket Newmarket Jr.-Sr. High School Q.03 Gross Square footage (including portables) 5000

31 Newmarket Newmarket Jr.-Sr. High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

31 Newmarket Newmarket Jr.-Sr. High School Q.05 How many parking spaces does the facility have? 25

31 Newmarket Newmarket Jr.-Sr. High School Q.06 Does your building have a basement? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.07 How many portable classrooms are in use? 0

31 Newmarket Newmarket Jr.-Sr. High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

31 Newmarket Newmarket Jr.-Sr. High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

31 Newmarket Newmarket Jr.-Sr. High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

31 Newmarket Newmarket Jr.-Sr. High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.14a a. Roofs 2005|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14b b. Lighting Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14c c. Windows 1996|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14d d. Ceilings 1996|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14e e. Plumbing 1985|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14f f. Heating Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14g g. Ventilation Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.14h h. Conditioning Systems 2019|||||

31 Newmarket Newmarket Jr.-Sr. High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

31 Newmarket Newmarket Jr.-Sr. High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

31 Newmarket Newmarket Jr.-Sr. High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|multi pass brick

31 Newmarket Newmarket Jr.-Sr. High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

31 Newmarket Newmarket Jr.-Sr. High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

31 Newmarket Newmarket Jr.-Sr. High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

31 Newmarket Newmarket Jr.-Sr. High School Q.21 Is your building a CHP's or LEED certified? No

31 Newmarket Newmarket Jr.-Sr. High School Q.22 Have you had energy audits of all your school facilities? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.23 Do you have an energy performance contract in place? Yes

Page 97 of 238

Page 98: New Hampshire Department of Education Bureau of School

31 Newmarket Newmarket Jr.-Sr. High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 12

31 Newmarket Newmarket Jr.-Sr. High School Q.25 What is the R-Value of the roof? 12

31 Newmarket Newmarket Jr.-Sr. High School Q.26 Do you have carbon monoxide detector(s) in your building? No

31 Newmarket Newmarket Jr.-Sr. High School Q.27 Do you have a presence of: (click all that apply) Other|Town Hall rental space

31 Newmarket Newmarket Jr.-Sr. High School Q.28 Do you have a facility maintenance plan? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.29 What is your maintenance budget? 5000

31 Newmarket Newmarket Jr.-Sr. High School Q.30 What is your operational budget? 15000

31 Newmarket Newmarket Jr.-Sr. High School Q.31 What is your capital construction budget? 0

31 Newmarket Newmarket Jr.-Sr. High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?3

31 Newmarket Newmarket Jr.-Sr. High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?0

31 Newmarket Newmarket Jr.-Sr. High School Q.34 Do you have a maintenance contract in place? Yes

31 Newmarket Newmarket Jr.-Sr. High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

32 Plainfield Plainfield Elementary School Q.01 Approximate year of the original construction date 1971

32 Plainfield Plainfield Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

32 Plainfield Plainfield Elementary School Q.03 Gross Square footage (including portables) 25000

32 Plainfield Plainfield Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

32 Plainfield Plainfield Elementary School Q.05 How many parking spaces does the facility have? 100

32 Plainfield Plainfield Elementary School Q.07 How many portable classrooms are in use? 0

32 Plainfield Plainfield Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

32 Plainfield Plainfield Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

32 Plainfield Plainfield Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

32 Plainfield Plainfield Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

32 Plainfield Plainfield Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

32 Plainfield Plainfield Elementary School Q.14a a. Roofs 1973?|1960?|1998|||

32 Plainfield Plainfield Elementary School Q.14b b. Lighting Systems 1973|1960|1998|||

32 Plainfield Plainfield Elementary School Q.14c c. Windows 1996|2013||||

32 Plainfield Plainfield Elementary School Q.14d d. Ceilings 1973|1960|1998|||

32 Plainfield Plainfield Elementary School Q.14e e. Plumbing 1973|1960|1998|||

32 Plainfield Plainfield Elementary School Q.14f f. Heating Systems 1973|2011|2013|||

32 Plainfield Plainfield Elementary School Q.14g g. Ventilation Systems 1973|2013||||

32 Plainfield Plainfield Elementary School Q.14h h. Conditioning Systems 2013|||||

32 Plainfield Plainfield Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

32 Plainfield Plainfield Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood|Other|concrete block

32 Plainfield Plainfield Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

32 Plainfield Plainfield Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

32 Plainfield Plainfield Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

32 Plainfield Plainfield Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Solar

32 Plainfield Plainfield Elementary School Q.21 Is your building a CHP's or LEED certified? No

32 Plainfield Plainfield Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

32 Plainfield Plainfield Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

32 Plainfield Plainfield Elementary School Q.23 Do you have an energy performance contract in place? No

32 Plainfield Plainfield Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 45

32 Plainfield Plainfield Elementary School Q.25 What is the R-Value of the roof? 45

32 Plainfield Plainfield Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

32 Plainfield Plainfield Elementary School Q.27 Do you have a presence of: (click all that apply)Vapor Instrusions|Other|water vapor through the

floor and drains

32 Plainfield Plainfield Elementary School Q.28 Do you have a facility maintenance plan? Yes

32 Plainfield Plainfield Elementary School Q.29 What is your maintenance budget? 31000

32 Plainfield Plainfield Elementary School Q.30 What is your operational budget? 316018

32 Plainfield Plainfield Elementary School Q.31 What is your capital construction budget? 0

Page 98 of 238

Page 99: New Hampshire Department of Education Bureau of School

32 Plainfield Plainfield Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?41000

32 Plainfield Plainfield Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

32 Plainfield Plainfield Elementary School Q.34 Do you have a maintenance contract in place? No

32 Plainfield Plainfield Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

32 Plainfield Plainfield Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Safety, security, Kitchen/cafe,stage, sau off ,gym

32 Plainfield Plainfield Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2.5

32 Plainfield Plainfield Elementary School Q.35c c. If yes, provide estimated year of construction. 202122

33 Raymond Iber Holmes Gove Middle School Q.01 Approximate year of the original construction date 2006

33 Raymond Iber Holmes Gove Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).20052006

33 Raymond Iber Holmes Gove Middle School Q.03 Gross Square footage (including portables) 105000

33 Raymond Iber Holmes Gove Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

33 Raymond Iber Holmes Gove Middle School Q.05 How many parking spaces does the facility have? 159

33 Raymond Iber Holmes Gove Middle School Q.06 Does your building have a basement? No

33 Raymond Iber Holmes Gove Middle School Q.07 How many portable classrooms are in use? 0

33 Raymond Iber Holmes Gove Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

33 Raymond Iber Holmes Gove Middle School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|none

33 Raymond Iber Holmes Gove Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

33 Raymond Iber Holmes Gove Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

33 Raymond Iber Holmes Gove Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

33 Raymond Iber Holmes Gove Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

33 Raymond Iber Holmes Gove Middle School Q.14a a. Roofs |||||x

33 Raymond Iber Holmes Gove Middle School Q.14b b. Lighting Systems |||||x

33 Raymond Iber Holmes Gove Middle School Q.14c c. Windows |||||x

33 Raymond Iber Holmes Gove Middle School Q.14d d. Ceilings |||||x

33 Raymond Iber Holmes Gove Middle School Q.14e e. Plumbing |||||x

33 Raymond Iber Holmes Gove Middle School Q.14f f. Heating Systems |||||x

33 Raymond Iber Holmes Gove Middle School Q.14g g. Ventilation Systems |||||x

33 Raymond Iber Holmes Gove Middle School Q.14h h. Conditioning Systems |||||x

33 Raymond Iber Holmes Gove Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

33 Raymond Iber Holmes Gove Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

33 Raymond Iber Holmes Gove Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

33 Raymond Iber Holmes Gove Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

33 Raymond Iber Holmes Gove Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

33 Raymond Iber Holmes Gove Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

33 Raymond Iber Holmes Gove Middle School Q.21 Is your building a CHP's or LEED certified? No

33 Raymond Iber Holmes Gove Middle School Q.22 Have you had energy audits of all your school facilities? Yes

33 Raymond Iber Holmes Gove Middle School Q.23 Do you have an energy performance contract in place? No

33 Raymond Iber Holmes Gove Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

33 Raymond Iber Holmes Gove Middle School Q.25 What is the R-Value of the roof? 23

33 Raymond Iber Holmes Gove Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

33 Raymond Iber Holmes Gove Middle School Q.27 Do you have a presence of: (click all that apply) Other|None

33 Raymond Iber Holmes Gove Middle School Q.28 Do you have a facility maintenance plan? Yes

33 Raymond Iber Holmes Gove Middle School Q.29 What is your maintenance budget? 676845

33 Raymond Iber Holmes Gove Middle School Q.30 What is your operational budget? 287369

33 Raymond Iber Holmes Gove Middle School Q.31 What is your capital construction budget? 0

33 Raymond Iber Holmes Gove Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?143760

33 Raymond Iber Holmes Gove Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?11960

33 Raymond Iber Holmes Gove Middle School Q.34 Do you have a maintenance contract in place? No

33 Raymond Iber Holmes Gove Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

Page 99 of 238

Page 100: New Hampshire Department of Education Bureau of School

33 Raymond Iber Holmes Gove Middle School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") None

33 Raymond Lamprey River Elementary School Q.01 Approximate year of the original construction date 1976

33 Raymond Lamprey River Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

33 Raymond Lamprey River Elementary School Q.03 Gross Square footage (including portables) 63184

33 Raymond Lamprey River Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

33 Raymond Lamprey River Elementary School Q.05 How many parking spaces does the facility have? 175

33 Raymond Lamprey River Elementary School Q.06 Does your building have a basement? No

33 Raymond Lamprey River Elementary School Q.07 How many portable classrooms are in use? 10

33 Raymond Lamprey River Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

33 Raymond Lamprey River Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Small

Group|Support Space

33 Raymond Lamprey River Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

33 Raymond Lamprey River Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

33 Raymond Lamprey River Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

33 Raymond Lamprey River Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

33 Raymond Lamprey River Elementary School Q.14a a. Roofs |||||x

33 Raymond Lamprey River Elementary School Q.14b b. Lighting Systems |||||x

33 Raymond Lamprey River Elementary School Q.14c c. Windows |||||x

33 Raymond Lamprey River Elementary School Q.14d d. Ceilings |||||x

33 Raymond Lamprey River Elementary School Q.14e e. Plumbing |||||x

33 Raymond Lamprey River Elementary School Q.14f f. Heating Systems |||||x

33 Raymond Lamprey River Elementary School Q.14g g. Ventilation Systems |||||x

33 Raymond Lamprey River Elementary School Q.14h h. Conditioning Systems |||||x

33 Raymond Lamprey River Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

33 Raymond Lamprey River Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

33 Raymond Lamprey River Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

33 Raymond Lamprey River Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

33 Raymond Lamprey River Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

33 Raymond Lamprey River Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

33 Raymond Lamprey River Elementary School Q.21 Is your building a CHP's or LEED certified? No

33 Raymond Lamprey River Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

33 Raymond Lamprey River Elementary School Q.23 Do you have an energy performance contract in place? No

33 Raymond Lamprey River Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

33 Raymond Lamprey River Elementary School Q.25 What is the R-Value of the roof? 19

33 Raymond Lamprey River Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

33 Raymond Lamprey River Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

33 Raymond Lamprey River Elementary School Q.28 Do you have a facility maintenance plan? Yes

33 Raymond Lamprey River Elementary School Q.29 What is your maintenance budget? 621967

33 Raymond Lamprey River Elementary School Q.30 What is your operational budget? 280758

33 Raymond Lamprey River Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?98699

33 Raymond Lamprey River Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?9360

33 Raymond Lamprey River Elementary School Q.34 Do you have a maintenance contract in place? No

33 Raymond Lamprey River Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

33 Raymond Raymond High School Q.01 Approximate year of the original construction date 1988

33 Raymond Raymond High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

33 Raymond Raymond High School Q.03 Gross Square footage (including portables) 106000

33 Raymond Raymond High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

33 Raymond Raymond High School Q.05 How many parking spaces does the facility have? 257

33 Raymond Raymond High School Q.06 Does your building have a basement? No

33 Raymond Raymond High School Q.07 How many portable classrooms are in use? 0

Page 100 of 238

Page 101: New Hampshire Department of Education Bureau of School

33 Raymond Raymond High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

33 Raymond Raymond High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

33 Raymond Raymond High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

33 Raymond Raymond High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

33 Raymond Raymond High School Q.14a a. Roofs |||||x

33 Raymond Raymond High School Q.14b b. Lighting Systems |||||x

33 Raymond Raymond High School Q.14c c. Windows |||||x

33 Raymond Raymond High School Q.14d d. Ceilings |||||x

33 Raymond Raymond High School Q.14e e. Plumbing |||||x

33 Raymond Raymond High School Q.14f f. Heating Systems |||||x

33 Raymond Raymond High School Q.14g g. Ventilation Systems |||||x

33 Raymond Raymond High School Q.14h h. Conditioning Systems |||||x

33 Raymond Raymond High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

33 Raymond Raymond High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

33 Raymond Raymond High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

33 Raymond Raymond High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

33 Raymond Raymond High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

33 Raymond Raymond High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

33 Raymond Raymond High School Q.21 Is your building a CHP's or LEED certified? No

33 Raymond Raymond High School Q.22 Have you had energy audits of all your school facilities? Yes

33 Raymond Raymond High School Q.23 Do you have an energy performance contract in place? No

33 Raymond Raymond High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

33 Raymond Raymond High School Q.25 What is the R-Value of the roof? 23

33 Raymond Raymond High School Q.26 Do you have carbon monoxide detector(s) in your building? No

33 Raymond Raymond High School Q.28 Do you have a facility maintenance plan? Yes

33 Raymond Raymond High School Q.29 What is your maintenance budget? 571518

33 Raymond Raymond High School Q.30 What is your operational budget? 239932

33 Raymond Raymond High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?103222

33 Raymond Raymond High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10400

33 Raymond Raymond High School Q.34 Do you have a maintenance contract in place? No

33 Raymond Raymond High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.01 Approximate year of the original construction date 1926

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.03 Gross Square footage (including portables) 95985

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.05 How many parking spaces does the facility have? 125

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.06 Does your building have a basement? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.07 How many portable classrooms are in use? 0

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14a a. Roofs |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14b b. Lighting Systems |x||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14c c. Windows |x||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14d d. Ceilings |x||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14e e. Plumbing |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14f f. Heating Systems ||x|||

Page 101 of 238

Page 102: New Hampshire Department of Education Bureau of School

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14g g. Ventilation Systems ||x|||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.14h h. Conditioning Systems ||x|||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Wood|Other|Vinyl Siding

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.21 Is your building a CHP's or LEED certified? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.23 Do you have an energy performance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 23

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.25 What is the R-Value of the roof? 30

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint|Lead in Water

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.28 Do you have a facility maintenance plan? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.29 What is your maintenance budget? 1977364

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.30 What is your operational budget? 1600000

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.31 What is your capital construction budget? 60000

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?125000

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.34 Do you have a maintenance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.01 Approximate year of the original construction date 1988

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.03 Gross Square footage (including portables) 71758

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.05 How many parking spaces does the facility have? 196

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.06 Does your building have a basement? No

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.07 How many portable classrooms are in use? 0

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14a a. Roofs |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14b b. Lighting Systems ||x|||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14c c. Windows |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14d d. Ceilings |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14e e. Plumbing |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14f f. Heating Systems ||x|||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14g g. Ventilation Systems |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.14h h. Conditioning Systems |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

Page 102 of 238

Page 103: New Hampshire Department of Education Bureau of School

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.21 Is your building a CHP's or LEED certified? No

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.22 Have you had energy audits of all your school facilities? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.23 Do you have an energy performance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 23

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.25 What is the R-Value of the roof? 20

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.26 Do you have carbon monoxide detector(s) in your building? No

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.28 Do you have a facility maintenance plan? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.29 What is your maintenance budget? 1977364

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.30 What is your operational budget? 1600000

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.31 What is your capital construction budget? 60000

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?120000

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.34 Do you have a maintenance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.01 Approximate year of the original construction date 2003

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.03 Gross Square footage (including portables) 63688

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.05 How many parking spaces does the facility have? 65

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.06 Does your building have a basement? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.07 How many portable classrooms are in use? 0

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14a a. Roofs |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14b b. Lighting Systems ||x|||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14c c. Windows |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14d d. Ceilings |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14e e. Plumbing |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14f f. Heating Systems |||x||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14g g. Ventilation Systems |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.14h h. Conditioning Systems |||||x

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.21 Is your building a CHP's or LEED certified? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.22 Have you had energy audits of all your school facilities? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.23 Do you have an energy performance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 23

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.25 What is the R-Value of the roof? 20

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.28 Do you have a facility maintenance plan? Yes

Page 103 of 238

Page 104: New Hampshire Department of Education Bureau of School

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.29 What is your maintenance budget? 1977364

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.30 What is your operational budget? 1600000

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.31 What is your capital construction budget? 60000

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100000

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.34 Do you have a maintenance contract in place? Yes

34Hillsboro-Deering

CooperativeHillsboro-Deering Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

34 Washington Washington Elementary School Q.01 Approximate year of the original construction date 1991

34 Washington Washington Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

34 Washington Washington Elementary School Q.03 Gross Square footage (including portables) 13788

34 Washington Washington Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

34 Washington Washington Elementary School Q.05 How many parking spaces does the facility have? 20

34 Washington Washington Elementary School Q.06 Does your building have a basement? No

34 Washington Washington Elementary School Q.07 How many portable classrooms are in use? 0

34 Washington Washington Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

34 Washington Washington Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

34 Washington Washington Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

34 Washington Washington Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

34 Washington Washington Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

34 Washington Washington Elementary School Q.14a a. Roofs |||||

34 Washington Washington Elementary School Q.14b b. Lighting Systems |||||

34 Washington Washington Elementary School Q.14c c. Windows |||||

34 Washington Washington Elementary School Q.14d d. Ceilings |||||

34 Washington Washington Elementary School Q.14e e. Plumbing |||||

34 Washington Washington Elementary School Q.14f f. Heating Systems 40000|||||

34 Washington Washington Elementary School Q.14g g. Ventilation Systems |||||

34 Washington Washington Elementary School Q.14h h. Conditioning Systems |||||

34 Washington Washington Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

34 Washington Washington Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Vinyl Siding

34 Washington Washington Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|concrete blocks, brick

34 Washington Washington Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

34 Washington Washington Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

34 Washington Washington Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

34 Washington Washington Elementary School Q.21 Is your building a CHP's or LEED certified? No

34 Washington Washington Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

34 Washington Washington Elementary School Q.23 Do you have an energy performance contract in place? No

34 Washington Washington Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

34 Washington Washington Elementary School Q.25 What is the R-Value of the roof? 30

34 Washington Washington Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

34 Washington Washington Elementary School Q.28 Do you have a facility maintenance plan? Yes

34 Washington Washington Elementary School Q.29 What is your maintenance budget? 145344

34 Washington Washington Elementary School Q.30 What is your operational budget? 2500265

34 Washington Washington Elementary School Q.31 What is your capital construction budget? 0

34 Washington Washington Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?132300

34 Washington Washington Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2080

34 Washington Washington Elementary School Q.34 Do you have a maintenance contract in place? Yes

34 Washington Washington Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

35 Bethlehem Bethlehem Elementary School Q.01 Approximate year of the original construction date 1931

35 Bethlehem Bethlehem Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

Page 104 of 238

Page 105: New Hampshire Department of Education Bureau of School

35 Bethlehem Bethlehem Elementary School Q.03 Gross Square footage (including portables) 32108

35 Bethlehem Bethlehem Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

35 Bethlehem Bethlehem Elementary School Q.05 How many parking spaces does the facility have? 50

35 Bethlehem Bethlehem Elementary School Q.06 Does your building have a basement? Yes

35 Bethlehem Bethlehem Elementary School Q.07 How many portable classrooms are in use? 0

35 Bethlehem Bethlehem Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?3

35 Bethlehem Bethlehem Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special Education|Special (music, art, etc)|Small

Group|Support Space

35 Bethlehem Bethlehem Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

35 Bethlehem Bethlehem Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

35 Bethlehem Bethlehem Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

35 Bethlehem Bethlehem Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

35 Bethlehem Bethlehem Elementary School Q.14a a. Roofs |||||X

35 Bethlehem Bethlehem Elementary School Q.14b b. Lighting Systems X|||||

35 Bethlehem Bethlehem Elementary School Q.14c c. Windows ||||X|

35 Bethlehem Bethlehem Elementary School Q.14d d. Ceilings |||||X

35 Bethlehem Bethlehem Elementary School Q.14e e. Plumbing |||||X

35 Bethlehem Bethlehem Elementary School Q.14f f. Heating Systems |||||X

35 Bethlehem Bethlehem Elementary School Q.14g g. Ventilation Systems |||||X

35 Bethlehem Bethlehem Elementary School Q.14h h. Conditioning Systems |||||X

35 Bethlehem Bethlehem Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

35 Bethlehem Bethlehem Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

35 Bethlehem Bethlehem Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

35 Bethlehem Bethlehem Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

35 Bethlehem Bethlehem Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

35 Bethlehem Bethlehem Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet

35 Bethlehem Bethlehem Elementary School Q.21 Is your building a CHP's or LEED certified? Yes

35 Bethlehem Bethlehem Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

35 Bethlehem Bethlehem Elementary School Q.23 Do you have an energy performance contract in place? Yes

35 Bethlehem Bethlehem Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

35 Bethlehem Bethlehem Elementary School Q.25 What is the R-Value of the roof? 20

35 Bethlehem Bethlehem Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

35 Bethlehem Bethlehem Elementary School Q.28 Do you have a facility maintenance plan? Yes

35 Bethlehem Bethlehem Elementary School Q.29 What is your maintenance budget? 209222

35 Bethlehem Bethlehem Elementary School Q.30 What is your operational budget? 3324963.00

35 Bethlehem Bethlehem Elementary School Q.31 What is your capital construction budget? 12000

35 Bethlehem Bethlehem Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?49000

35 Bethlehem Bethlehem Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?80

35 Bethlehem Bethlehem Elementary School Q.34 Do you have a maintenance contract in place? Yes

35 Bethlehem Bethlehem Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

35 Lafayette Regional Lafayette Regional School Q.01 Approximate year of the original construction date 1963

35 Lafayette Regional Lafayette Regional School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

35 Lafayette Regional Lafayette Regional School Q.03 Gross Square footage (including portables) 30000

35 Lafayette Regional Lafayette Regional School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

35 Lafayette Regional Lafayette Regional School Q.06 Does your building have a basement? No

35 Lafayette Regional Lafayette Regional School Q.07 How many portable classrooms are in use? 0

35 Lafayette Regional Lafayette Regional School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

35 Lafayette Regional Lafayette Regional School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

35 Lafayette Regional Lafayette Regional School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

35 Lafayette Regional Lafayette Regional School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

Page 105 of 238

Page 106: New Hampshire Department of Education Bureau of School

35 Lafayette Regional Lafayette Regional School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

35 Lafayette Regional Lafayette Regional School Q.14a a. Roofs |||||

35 Lafayette Regional Lafayette Regional School Q.14b b. Lighting Systems ||2016|||

35 Lafayette Regional Lafayette Regional School Q.14c c. Windows |||2015||

35 Lafayette Regional Lafayette Regional School Q.14d d. Ceilings |||||

35 Lafayette Regional Lafayette Regional School Q.14e e. Plumbing |||||

35 Lafayette Regional Lafayette Regional School Q.14f f. Heating Systems ||||2014|

35 Lafayette Regional Lafayette Regional School Q.14g g. Ventilation Systems |||||

35 Lafayette Regional Lafayette Regional School Q.14h h. Conditioning Systems |||||

35 Lafayette Regional Lafayette Regional School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

35 Lafayette Regional Lafayette Regional School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|aluminum siding

35 Lafayette Regional Lafayette Regional School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

35 Lafayette Regional Lafayette Regional School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

35 Lafayette Regional Lafayette Regional School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

35 Lafayette Regional Lafayette Regional School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

35 Lafayette Regional Lafayette Regional School Q.21 Is your building a CHP's or LEED certified? No

35 Lafayette Regional Lafayette Regional School Q.22 Have you had energy audits of all your school facilities? Yes

35 Lafayette Regional Lafayette Regional School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

35 Lafayette Regional Lafayette Regional School Q.23 Do you have an energy performance contract in place? No

35 Lafayette Regional Lafayette Regional School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

35 Lafayette Regional Lafayette Regional School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

35 Lafayette Regional Lafayette Regional School Q.27 Do you have a presence of: (click all that apply) Asbestos

35 Lafayette Regional Lafayette Regional School Q.28 Do you have a facility maintenance plan? Yes

35 Lafayette Regional Lafayette Regional School Q.29 What is your maintenance budget? 214203.

35 Lafayette Regional Lafayette Regional School Q.30 What is your operational budget? 2700000.

35 Lafayette Regional Lafayette Regional School Q.31 What is your capital construction budget? 00

35 Lafayette Regional Lafayette Regional School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?64300.

35 Lafayette Regional Lafayette Regional School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20

35 Lafayette Regional Lafayette Regional School Q.34 Do you have a maintenance contract in place? Yes

35 Lafayette Regional Lafayette Regional School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

35 Landaff Landaff Blue School Q.01 Approximate year of the original construction date 1858

35 Landaff Landaff Blue School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1990

35 Landaff Landaff Blue School Q.03 Gross Square footage (including portables) 5684

35 Landaff Landaff Blue School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

35 Landaff Landaff Blue School Q.05 How many parking spaces does the facility have? 2

35 Landaff Landaff Blue School Q.06 Does your building have a basement? No

35 Landaff Landaff Blue School Q.07 How many portable classrooms are in use? 2

35 Landaff Landaff Blue School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

35 Landaff Landaff Blue School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Special

(music, art, etc)|Small Group

35 Landaff Landaff Blue School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

35 Landaff Landaff Blue School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

35 Landaff Landaff Blue School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

35 Landaff Landaff Blue School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

35 Landaff Landaff Blue School Q.14a a. Roofs 1989|2009||||

35 Landaff Landaff Blue School Q.14b b. Lighting Systems 2018|||||

35 Landaff Landaff Blue School Q.14c c. Windows 1990|||||

35 Landaff Landaff Blue School Q.14d d. Ceilings 2009|||||

35 Landaff Landaff Blue School Q.14e e. Plumbing 1990|||||

35 Landaff Landaff Blue School Q.14f f. Heating Systems |||||

Page 106 of 238

Page 107: New Hampshire Department of Education Bureau of School

35 Landaff Landaff Blue School Q.14g g. Ventilation Systems |||||

35 Landaff Landaff Blue School Q.14h h. Conditioning Systems |||||

35 Landaff Landaff Blue School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

35 Landaff Landaff Blue School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal|Wood

35 Landaff Landaff Blue School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

35 Landaff Landaff Blue School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

35 Landaff Landaff Blue School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

35 Landaff Landaff Blue School Q.21 Is your building a CHP's or LEED certified? No

35 Landaff Landaff Blue School Q.22 Have you had energy audits of all your school facilities? Yes

35 Landaff Landaff Blue School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

35 Landaff Landaff Blue School Q.23 Do you have an energy performance contract in place? Yes

35 Landaff Landaff Blue School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

35 Landaff Landaff Blue School Q.25 What is the R-Value of the roof? 30

35 Landaff Landaff Blue School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

35 Landaff Landaff Blue School Q.28 Do you have a facility maintenance plan? Yes

35 Landaff Landaff Blue School Q.29 What is your maintenance budget? 14853

35 Landaff Landaff Blue School Q.30 What is your operational budget? 1015298.60

35 Landaff Landaff Blue School Q.31 What is your capital construction budget? 6551

35 Landaff Landaff Blue School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?8500

35 Landaff Landaff Blue School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?0

35 Landaff Landaff Blue School Q.34 Do you have a maintenance contract in place? No

35 Landaff Landaff Blue School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

35 Lisbon Regional Lisbon Regional School (Elem) Q.01 Approximate year of the original construction date 19591993

35 Lisbon Regional Lisbon Regional School (Elem) Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1993

35 Lisbon Regional Lisbon Regional School (Elem) Q.03 Gross Square footage (including portables) 47000

35 Lisbon Regional Lisbon Regional School (Elem) Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

35 Lisbon Regional Lisbon Regional School (Elem) Q.05 How many parking spaces does the facility have? 95

35 Lisbon Regional Lisbon Regional School (Elem) Q.06 Does your building have a basement? No

35 Lisbon Regional Lisbon Regional School (Elem) Q.07 How many portable classrooms are in use? 0

35 Lisbon Regional Lisbon Regional School (Elem) Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

35 Lisbon Regional Lisbon Regional School (Elem) Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

35 Lisbon Regional Lisbon Regional School (Elem) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.14a a. Roofs 2009|2014|2018|||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14b b. Lighting Systems 2017|||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14c c. Windows 1959|1993||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14d d. Ceilings 1959|1993||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14e e. Plumbing 1959|1993||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14f f. Heating Systems 1993|||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14g g. Ventilation Systems 1993|||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.14h h. Conditioning Systems 1993|||||

35 Lisbon Regional Lisbon Regional School (Elem) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

35 Lisbon Regional Lisbon Regional School (Elem) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal|Wood

35 Lisbon Regional Lisbon Regional School (Elem) Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

35 Lisbon Regional Lisbon Regional School (Elem) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

35 Lisbon Regional Lisbon Regional School (Elem) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

35 Lisbon Regional Lisbon Regional School (Elem) Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

35 Lisbon Regional Lisbon Regional School (Elem) Q.21 Is your building a CHP's or LEED certified? Yes

Page 107 of 238

Page 108: New Hampshire Department of Education Bureau of School

35 Lisbon Regional Lisbon Regional School (Elem) Q.22 Have you had energy audits of all your school facilities? Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.24 What is the R-Value of the exterior walls, windows, and doors? 6

35 Lisbon Regional Lisbon Regional School (Elem) Q.25 What is the R-Value of the roof? 16

35 Lisbon Regional Lisbon Regional School (Elem) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.27 Do you have a presence of: (click all that apply) Asbestos

35 Lisbon Regional Lisbon Regional School (Elem) Q.28 Do you have a facility maintenance plan? Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.29 What is your maintenance budget? 32000

35 Lisbon Regional Lisbon Regional School (Elem) Q.30 What is your operational budget? 57450

35 Lisbon Regional Lisbon Regional School (Elem) Q.31 What is your capital construction budget? 0

35 Lisbon Regional Lisbon Regional School (Elem) Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?94250

35 Lisbon Regional Lisbon Regional School (Elem) Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?35

35 Lisbon Regional Lisbon Regional School (Elem) Q.34 Do you have a maintenance contract in place? Yes

35 Lisbon Regional Lisbon Regional School (Elem) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

35 Profile Profile Senior High School Q.01 Approximate year of the original construction date 1976

35 Profile Profile Senior High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

35 Profile Profile Senior High School Q.03 Gross Square footage (including portables) 72606

35 Profile Profile Senior High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

35 Profile Profile Senior High School Q.05 How many parking spaces does the facility have? 149

35 Profile Profile Senior High School Q.06 Does your building have a basement? No

35 Profile Profile Senior High School Q.07 How many portable classrooms are in use? 0

35 Profile Profile Senior High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

35 Profile Profile Senior High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

35 Profile Profile Senior High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

35 Profile Profile Senior High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

35 Profile Profile Senior High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

35 Profile Profile Senior High School Q.14a a. Roofs 1994|2008||||

35 Profile Profile Senior High School Q.14b b. Lighting Systems 2016|2018||||

35 Profile Profile Senior High School Q.14c c. Windows 1994|2008||||

35 Profile Profile Senior High School Q.14d d. Ceilings 1994|2008||||

35 Profile Profile Senior High School Q.14e e. Plumbing 1994|2008||||

35 Profile Profile Senior High School Q.14f f. Heating Systems 2008|||||

35 Profile Profile Senior High School Q.14g g. Ventilation Systems 2008|||||

35 Profile Profile Senior High School Q.14h h. Conditioning Systems 2008|||||

35 Profile Profile Senior High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

35 Profile Profile Senior High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Cement Board

35 Profile Profile Senior High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

35 Profile Profile Senior High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

35 Profile Profile Senior High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

35 Profile Profile Senior High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

35 Profile Profile Senior High School Q.21 Is your building a CHP's or LEED certified? Yes

35 Profile Profile Senior High School Q.22 Have you had energy audits of all your school facilities? Yes

35 Profile Profile Senior High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

35 Profile Profile Senior High School Q.23 Do you have an energy performance contract in place? No

35 Profile Profile Senior High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 35

35 Profile Profile Senior High School Q.25 What is the R-Value of the roof? 35

35 Profile Profile Senior High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

35 Profile Profile Senior High School Q.28 Do you have a facility maintenance plan? Yes

35 Profile Profile Senior High School Q.29 What is your maintenance budget? 257655

35 Profile Profile Senior High School Q.30 What is your operational budget? 5935845

Page 108 of 238

Page 109: New Hampshire Department of Education Bureau of School

35 Profile Profile Senior High School Q.31 What is your capital construction budget? 0

35 Profile Profile Senior High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?117500

35 Profile Profile Senior High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?30

35 Profile Profile Senior High School Q.34 Do you have a maintenance contract in place? Yes

35 Profile Profile Senior High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

39 Amherst Amherst Middle School Q.01 Approximate year of the original construction date 1973

39 Amherst Amherst Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

39 Amherst Amherst Middle School Q.03 Gross Square footage (including portables) 112000

39 Amherst Amherst Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

39 Amherst Amherst Middle School Q.06 Does your building have a basement? No

39 Amherst Amherst Middle School Q.07 How many portable classrooms are in use? 0

39 Amherst Amherst Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

39 Amherst Amherst Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

39 Amherst Amherst Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

39 Amherst Amherst Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

39 Amherst Amherst Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

39 Amherst Amherst Middle School Q.14a a. Roofs 1973|1986|2002|2015||

39 Amherst Amherst Middle School Q.14b b. Lighting Systems 1973|2002|2015|||

39 Amherst Amherst Middle School Q.14c c. Windows 1973|2002||||

39 Amherst Amherst Middle School Q.14d d. Ceilings 1973|2002||||

39 Amherst Amherst Middle School Q.14e e. Plumbing 1973|2019||||

39 Amherst Amherst Middle School Q.14f f. Heating Systems 1973|2002|2012|||

39 Amherst Amherst Middle School Q.14g g. Ventilation Systems 1973|2002||||

39 Amherst Amherst Middle School Q.14h h. Conditioning Systems 1973|2002||||

39 Amherst Amherst Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

39 Amherst Amherst Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

39 Amherst Amherst Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

39 Amherst Amherst Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

39 Amherst Amherst Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

39 Amherst Amherst Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

39 Amherst Amherst Middle School Q.21 Is your building a CHP's or LEED certified? No

39 Amherst Amherst Middle School Q.22 Have you had energy audits of all your school facilities? No

39 Amherst Amherst Middle School Q.23 Do you have an energy performance contract in place? No

39 Amherst Amherst Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

39 Amherst Amherst Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

39 Amherst Amherst Middle School Q.28 Do you have a facility maintenance plan? Yes

39 Amherst Amherst Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

39 Amherst Amherst Middle School Q.34 Do you have a maintenance contract in place? No

39 Amherst Amherst Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

39 Amherst Clark-Wilkins School Q.01 Approximate year of the original construction date 1932

39 Amherst Clark-Wilkins School Q.03 Gross Square footage (including portables) 77342

39 Amherst Clark-Wilkins School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

39 Amherst Clark-Wilkins School Q.05 How many parking spaces does the facility have? 135

39 Amherst Clark-Wilkins School Q.06 Does your building have a basement? Yes

39 Amherst Clark-Wilkins School Q.07 How many portable classrooms are in use? 2

39 Amherst Clark-Wilkins School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

39 Amherst Clark-Wilkins School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

39 Amherst Clark-Wilkins School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

39 Amherst Clark-Wilkins School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 109 of 238

Page 110: New Hampshire Department of Education Bureau of School

39 Amherst Clark-Wilkins School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

39 Amherst Clark-Wilkins School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

39 Amherst Clark-Wilkins School Q.14a a. Roofs 1932|1967|2010|||

39 Amherst Clark-Wilkins School Q.14b b. Lighting Systems 1932|1967||||

39 Amherst Clark-Wilkins School Q.14c c. Windows 1932|1967|2012|||

39 Amherst Clark-Wilkins School Q.14d d. Ceilings 1932|1967||||

39 Amherst Clark-Wilkins School Q.14e e. Plumbing 1932|1967||||

39 Amherst Clark-Wilkins School Q.14f f. Heating Systems 1932|2012||||

39 Amherst Clark-Wilkins School Q.14g g. Ventilation Systems 1932|1967||||

39 Amherst Clark-Wilkins School Q.14h h. Conditioning Systems |||||

39 Amherst Clark-Wilkins School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

39 Amherst Clark-Wilkins School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

39 Amherst Clark-Wilkins School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

39 Amherst Clark-Wilkins School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

39 Amherst Clark-Wilkins School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

39 Amherst Clark-Wilkins School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

39 Amherst Clark-Wilkins School Q.21 Is your building a CHP's or LEED certified? No

39 Amherst Clark-Wilkins School Q.22 Have you had energy audits of all your school facilities? No

39 Amherst Clark-Wilkins School Q.23 Do you have an energy performance contract in place? No

39 Amherst Clark-Wilkins School Q.24 What is the R-Value of the exterior walls, windows, and doors? 0

39 Amherst Clark-Wilkins School Q.25 What is the R-Value of the roof? 0

39 Amherst Clark-Wilkins School Q.26 Do you have carbon monoxide detector(s) in your building? No

39 Amherst Clark-Wilkins School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

39 Amherst Clark-Wilkins School Q.28 Do you have a facility maintenance plan? Yes

39 Amherst Clark-Wilkins School Q.29 What is your maintenance budget? 139000

39 Amherst Clark-Wilkins School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?141000

39 Amherst Clark-Wilkins School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

39 Amherst Clark-Wilkins School Q.34 Do you have a maintenance contract in place? No

39 Amherst Clark-Wilkins School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

39 Mont Vernon Mont Vernon Village School Q.01 Approximate year of the original construction date 1970

39 Mont Vernon Mont Vernon Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

39 Mont Vernon Mont Vernon Village School Q.03 Gross Square footage (including portables) 37676

39 Mont Vernon Mont Vernon Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

39 Mont Vernon Mont Vernon Village School Q.05 How many parking spaces does the facility have? 53

39 Mont Vernon Mont Vernon Village School Q.06 Does your building have a basement? No

39 Mont Vernon Mont Vernon Village School Q.07 How many portable classrooms are in use? 0

39 Mont Vernon Mont Vernon Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

39 Mont Vernon Mont Vernon Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

39 Mont Vernon Mont Vernon Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

39 Mont Vernon Mont Vernon Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

39 Mont Vernon Mont Vernon Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

39 Mont Vernon Mont Vernon Village School Q.14a a. Roofs 1970|2006||||

39 Mont Vernon Mont Vernon Village School Q.14b b. Lighting Systems 1970|2019||||

39 Mont Vernon Mont Vernon Village School Q.14c c. Windows 1970|2018||||

39 Mont Vernon Mont Vernon Village School Q.14d d. Ceilings 1970|||||

39 Mont Vernon Mont Vernon Village School Q.14e e. Plumbing 1970|||||

39 Mont Vernon Mont Vernon Village School Q.14f f. Heating Systems 1970|1986||||

39 Mont Vernon Mont Vernon Village School Q.14g g. Ventilation Systems 1970|||||

39 Mont Vernon Mont Vernon Village School Q.14h h. Conditioning Systems |||||

Page 110 of 238

Page 111: New Hampshire Department of Education Bureau of School

39 Mont Vernon Mont Vernon Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

39 Mont Vernon Mont Vernon Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

39 Mont Vernon Mont Vernon Village School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

39 Mont Vernon Mont Vernon Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

39 Mont Vernon Mont Vernon Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

39 Mont Vernon Mont Vernon Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

39 Mont Vernon Mont Vernon Village School Q.21 Is your building a CHP's or LEED certified? No

39 Mont Vernon Mont Vernon Village School Q.22 Have you had energy audits of all your school facilities? No

39 Mont Vernon Mont Vernon Village School Q.23 Do you have an energy performance contract in place? No

39 Mont Vernon Mont Vernon Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

39 Mont Vernon Mont Vernon Village School Q.25 What is the R-Value of the roof? 50

39 Mont Vernon Mont Vernon Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

39 Mont Vernon Mont Vernon Village School Q.27 Do you have a presence of: (click all that apply) Asbestos

39 Mont Vernon Mont Vernon Village School Q.28 Do you have a facility maintenance plan? Yes

39 Mont Vernon Mont Vernon Village School Q.29 What is your maintenance budget? 245877

39 Mont Vernon Mont Vernon Village School Q.31 What is your capital construction budget? 0

39 Mont Vernon Mont Vernon Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?70000

39 Mont Vernon Mont Vernon Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

39 Mont Vernon Mont Vernon Village School Q.34 Do you have a maintenance contract in place? No

39 Mont Vernon Mont Vernon Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

39 Souhegan Cooperative Souhegan Coop High School Q.01 Approximate year of the original construction date 1992

39 Souhegan Cooperative Souhegan Coop High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

39 Souhegan Cooperative Souhegan Coop High School Q.03 Gross Square footage (including portables) 168556

39 Souhegan Cooperative Souhegan Coop High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

39 Souhegan Cooperative Souhegan Coop High School Q.05 How many parking spaces does the facility have? 432

39 Souhegan Cooperative Souhegan Coop High School Q.06 Does your building have a basement? Yes

39 Souhegan Cooperative Souhegan Coop High School Q.07 How many portable classrooms are in use? 0

39 Souhegan Cooperative Souhegan Coop High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

39 Souhegan Cooperative Souhegan Coop High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

39 Souhegan Cooperative Souhegan Coop High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

39 Souhegan Cooperative Souhegan Coop High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

39 Souhegan Cooperative Souhegan Coop High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

39 Souhegan Cooperative Souhegan Coop High School Q.14a a. Roofs 1992|2004|2013|||

39 Souhegan Cooperative Souhegan Coop High School Q.14b b. Lighting Systems 1992|2004|2019|||

39 Souhegan Cooperative Souhegan Coop High School Q.14c c. Windows 1992|2004||||

39 Souhegan Cooperative Souhegan Coop High School Q.14d d. Ceilings 1992|2004||||

39 Souhegan Cooperative Souhegan Coop High School Q.14e e. Plumbing 1992|2004||||

39 Souhegan Cooperative Souhegan Coop High School Q.14f f. Heating Systems 1992|2004||||

39 Souhegan Cooperative Souhegan Coop High School Q.14g g. Ventilation Systems 1992|2004||||

39 Souhegan Cooperative Souhegan Coop High School Q.14h h. Conditioning Systems |||||

39 Souhegan Cooperative Souhegan Coop High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

39 Souhegan Cooperative Souhegan Coop High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

39 Souhegan Cooperative Souhegan Coop High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

39 Souhegan Cooperative Souhegan Coop High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

39 Souhegan Cooperative Souhegan Coop High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

39 Souhegan Cooperative Souhegan Coop High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

39 Souhegan Cooperative Souhegan Coop High School Q.21 Is your building a CHP's or LEED certified? No

39 Souhegan Cooperative Souhegan Coop High School Q.22 Have you had energy audits of all your school facilities? No

39 Souhegan Cooperative Souhegan Coop High School Q.23 Do you have an energy performance contract in place? No

Page 111 of 238

Page 112: New Hampshire Department of Education Bureau of School

39 Souhegan Cooperative Souhegan Coop High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 0

39 Souhegan Cooperative Souhegan Coop High School Q.25 What is the R-Value of the roof? 0

39 Souhegan Cooperative Souhegan Coop High School Q.28 Do you have a facility maintenance plan? Yes

39 Souhegan Cooperative Souhegan Coop High School Q.29 What is your maintenance budget? 985958

39 Souhegan Cooperative Souhegan Coop High School Q.31 What is your capital construction budget? 0

39 Souhegan Cooperative Souhegan Coop High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?260000

39 Souhegan Cooperative Souhegan Coop High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

40 Milford Heron Pond Elementary School Q.01 Approximate year of the original construction date 2001

40 Milford Heron Pond Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

40 Milford Heron Pond Elementary School Q.03 Gross Square footage (including portables) 115000

40 Milford Heron Pond Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

40 Milford Heron Pond Elementary School Q.05 How many parking spaces does the facility have? 130

40 Milford Heron Pond Elementary School Q.06 Does your building have a basement? No

40 Milford Heron Pond Elementary School Q.07 How many portable classrooms are in use? 0

40 Milford Heron Pond Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

40 Milford Heron Pond Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

40 Milford Heron Pond Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

40 Milford Heron Pond Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

40 Milford Heron Pond Elementary School Q.14a a. Roofs 2001|2005|2018|||

40 Milford Heron Pond Elementary School Q.14b b. Lighting Systems 2001|2005||||

40 Milford Heron Pond Elementary School Q.14c c. Windows 2001|2005||||

40 Milford Heron Pond Elementary School Q.14d d. Ceilings 2001|2005||||

40 Milford Heron Pond Elementary School Q.14e e. Plumbing 2001|2005||||

40 Milford Heron Pond Elementary School Q.14f f. Heating Systems 2001|2005||||

40 Milford Heron Pond Elementary School Q.14g g. Ventilation Systems 2001|2005||||

40 Milford Heron Pond Elementary School Q.14h h. Conditioning Systems 2001|2005||||

40 Milford Heron Pond Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

40 Milford Heron Pond Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

40 Milford Heron Pond Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

40 Milford Heron Pond Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

40 Milford Heron Pond Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

40 Milford Heron Pond Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

40 Milford Heron Pond Elementary School Q.21 Is your building a CHP's or LEED certified? No

40 Milford Heron Pond Elementary School Q.22 Have you had energy audits of all your school facilities? No

40 Milford Heron Pond Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

40 Milford Heron Pond Elementary School Q.23 Do you have an energy performance contract in place? No

40 Milford Heron Pond Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 12

40 Milford Heron Pond Elementary School Q.25 What is the R-Value of the roof? 12

40 Milford Heron Pond Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

40 Milford Heron Pond Elementary School Q.27 Do you have a presence of: (click all that apply) Lead in Water

40 Milford Heron Pond Elementary School Q.28 Do you have a facility maintenance plan? Yes

40 Milford Heron Pond Elementary School Q.29 What is your maintenance budget? 65000

40 Milford Heron Pond Elementary School Q.30 What is your operational budget? 42000000

40 Milford Heron Pond Elementary School Q.31 What is your capital construction budget? 0

40 Milford Heron Pond Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?110000

40 Milford Heron Pond Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

40 Milford Heron Pond Elementary School Q.34 Do you have a maintenance contract in place? No

40 Milford Heron Pond Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

40 Milford Jacques Memorial Elementary School Q.01 Approximate year of the original construction date 1958

Page 112 of 238

Page 113: New Hampshire Department of Education Bureau of School

40 Milford Jacques Memorial Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

40 Milford Jacques Memorial Elementary School Q.03 Gross Square footage (including portables) 42600

40 Milford Jacques Memorial Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

40 Milford Jacques Memorial Elementary School Q.05 How many parking spaces does the facility have? 100

40 Milford Jacques Memorial Elementary School Q.06 Does your building have a basement? No

40 Milford Jacques Memorial Elementary School Q.07 How many portable classrooms are in use? 0

40 Milford Jacques Memorial Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

40 Milford Jacques Memorial Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

40 Milford Jacques Memorial Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

40 Milford Jacques Memorial Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

40 Milford Jacques Memorial Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

40 Milford Jacques Memorial Elementary School Q.14a a. Roofs 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14b b. Lighting Systems 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14c c. Windows 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14d d. Ceilings 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14e e. Plumbing 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14f f. Heating Systems 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14g g. Ventilation Systems 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.14h h. Conditioning Systems 1958|2001|2011|||

40 Milford Jacques Memorial Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

40 Milford Jacques Memorial Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

40 Milford Jacques Memorial Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

40 Milford Jacques Memorial Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

40 Milford Jacques Memorial Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

40 Milford Jacques Memorial Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

40 Milford Jacques Memorial Elementary School Q.21 Is your building a CHP's or LEED certified? No

40 Milford Jacques Memorial Elementary School Q.22 Have you had energy audits of all your school facilities? No

40 Milford Jacques Memorial Elementary School Q.23 Do you have an energy performance contract in place? No

40 Milford Jacques Memorial Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 12

40 Milford Jacques Memorial Elementary School Q.25 What is the R-Value of the roof? 12

40 Milford Jacques Memorial Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

40 Milford Jacques Memorial Elementary School Q.27 Do you have a presence of: (click all that apply) Lead in Water|Vapor Instrusions

40 Milford Jacques Memorial Elementary School Q.28 Do you have a facility maintenance plan? Yes

40 Milford Jacques Memorial Elementary School Q.29 What is your maintenance budget? 55000

40 Milford Jacques Memorial Elementary School Q.30 What is your operational budget? 42000000

40 Milford Jacques Memorial Elementary School Q.31 What is your capital construction budget? 0

40 Milford Jacques Memorial Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100000

40 Milford Jacques Memorial Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

40 Milford Jacques Memorial Elementary School Q.34 Do you have a maintenance contract in place? No

40 Milford Jacques Memorial Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

40 Milford Milford High School Q.01 Approximate year of the original construction date 1960

40 Milford Milford High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2008

40 Milford Milford High School Q.03 Gross Square footage (including portables) 145000

40 Milford Milford High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

40 Milford Milford High School Q.05 How many parking spaces does the facility have? 200

40 Milford Milford High School Q.06 Does your building have a basement? No

40 Milford Milford High School Q.07 How many portable classrooms are in use? 0

40 Milford Milford High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

40 Milford Milford High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

Page 113 of 238

Page 114: New Hampshire Department of Education Bureau of School

40 Milford Milford High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

40 Milford Milford High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

40 Milford Milford High School Q.13 Are all instructional and service areas within the facility ADA compliant? No

40 Milford Milford High School Q.14a a. Roofs 1960|1971|1996|2003|2007|

40 Milford Milford High School Q.14b b. Lighting Systems 1960|1970|1990|||

40 Milford Milford High School Q.14c c. Windows 1960|2008||||

40 Milford Milford High School Q.14d d. Ceilings 1960|2008||||

40 Milford Milford High School Q.14e e. Plumbing |||||

40 Milford Milford High School Q.14f f. Heating Systems 1960|1996|2008|2018|2019|

40 Milford Milford High School Q.14g g. Ventilation Systems 1960|1996|2008|||

40 Milford Milford High School Q.14h h. Conditioning Systems 1960|1996|2008|2018||

40 Milford Milford High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

40 Milford Milford High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

40 Milford Milford High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

40 Milford Milford High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

40 Milford Milford High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

40 Milford Milford High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

40 Milford Milford High School Q.21 Is your building a CHP's or LEED certified? No

40 Milford Milford High School Q.22 Have you had energy audits of all your school facilities? No

40 Milford Milford High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

40 Milford Milford High School Q.23 Do you have an energy performance contract in place? No

40 Milford Milford High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 12

40 Milford Milford High School Q.25 What is the R-Value of the roof? 12

40 Milford Milford High School Q.26 Do you have carbon monoxide detector(s) in your building? No

40 Milford Milford High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water|Vapor Instrusions

40 Milford Milford High School Q.28 Do you have a facility maintenance plan? Yes

40 Milford Milford High School Q.29 What is your maintenance budget? 100000

40 Milford Milford High School Q.30 What is your operational budget? 42000000

40 Milford Milford High School Q.31 What is your capital construction budget? 0

40 Milford Milford High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?188000

40 Milford Milford High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

40 Milford Milford High School Q.34 Do you have a maintenance contract in place? No

40 Milford Milford High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

40 Milford Milford Middle School Q.01 Approximate year of the original construction date 1971

40 Milford Milford Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

40 Milford Milford Middle School Q.03 Gross Square footage (including portables) 104000

40 Milford Milford Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

40 Milford Milford Middle School Q.05 How many parking spaces does the facility have? 120

40 Milford Milford Middle School Q.06 Does your building have a basement? No

40 Milford Milford Middle School Q.07 How many portable classrooms are in use? 0

40 Milford Milford Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

40 Milford Milford Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

40 Milford Milford Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

40 Milford Milford Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

40 Milford Milford Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

40 Milford Milford Middle School Q.14a a. Roofs 1971|1992|2016|||

40 Milford Milford Middle School Q.14b b. Lighting Systems 1971|1992||||

40 Milford Milford Middle School Q.14c c. Windows 1971|1992|2018|||

40 Milford Milford Middle School Q.14d d. Ceilings 1971|1992||||

Page 114 of 238

Page 115: New Hampshire Department of Education Bureau of School

40 Milford Milford Middle School Q.14e e. Plumbing 1971|1992||||

40 Milford Milford Middle School Q.14f f. Heating Systems 1971|1992|2018|||

40 Milford Milford Middle School Q.14g g. Ventilation Systems 10971|1992|2018|||

40 Milford Milford Middle School Q.14h h. Conditioning Systems 1971|1992|2018|||

40 Milford Milford Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

40 Milford Milford Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

40 Milford Milford Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

40 Milford Milford Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

40 Milford Milford Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

40 Milford Milford Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

40 Milford Milford Middle School Q.21 Is your building a CHP's or LEED certified? No

40 Milford Milford Middle School Q.22 Have you had energy audits of all your school facilities? No

40 Milford Milford Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

40 Milford Milford Middle School Q.23 Do you have an energy performance contract in place? No

40 Milford Milford Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 12

40 Milford Milford Middle School Q.25 What is the R-Value of the roof? 12

40 Milford Milford Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

40 Milford Milford Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

40 Milford Milford Middle School Q.28 Do you have a facility maintenance plan? Yes

40 Milford Milford Middle School Q.29 What is your maintenance budget? 55000

40 Milford Milford Middle School Q.30 What is your operational budget? 42000000

40 Milford Milford Middle School Q.31 What is your capital construction budget? 0

40 Milford Milford Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?150000

40 Milford Milford Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

40 Milford Milford Middle School Q.34 Do you have a maintenance contract in place? Yes

40 Milford Milford Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41 Brookline Captain Samuel Douglass Academy Q.01 Approximate year of the original construction date 2000

41 Brookline Captain Samuel Douglass Academy Q.03 Gross Square footage (including portables) 51353

41 Brookline Captain Samuel Douglass Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

41 Brookline Captain Samuel Douglass Academy Q.05 How many parking spaces does the facility have? 93

41 Brookline Captain Samuel Douglass Academy Q.06 Does your building have a basement? No

41 Brookline Captain Samuel Douglass Academy Q.07 How many portable classrooms are in use? 1

41 Brookline Captain Samuel Douglass Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

41 Brookline Captain Samuel Douglass Academy Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Special (music, art, etc)

41 Brookline Captain Samuel Douglass Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41 Brookline Captain Samuel Douglass Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

41 Brookline Captain Samuel Douglass Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

41 Brookline Captain Samuel Douglass Academy Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

41 Brookline Captain Samuel Douglass Academy Q.14a a. Roofs ||||x|

41 Brookline Captain Samuel Douglass Academy Q.14b b. Lighting Systems |||||x

41 Brookline Captain Samuel Douglass Academy Q.14c c. Windows |||||x

41 Brookline Captain Samuel Douglass Academy Q.14d d. Ceilings |||||x

41 Brookline Captain Samuel Douglass Academy Q.14e e. Plumbing |||||x

41 Brookline Captain Samuel Douglass Academy Q.14f f. Heating Systems |||||x

41 Brookline Captain Samuel Douglass Academy Q.14g g. Ventilation Systems |||||x

41 Brookline Captain Samuel Douglass Academy Q.14h h. Conditioning Systems |||||x

41 Brookline Captain Samuel Douglass Academy Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

41 Brookline Captain Samuel Douglass Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

41 Brookline Captain Samuel Douglass Academy Q.17 What type of studding is used at your school facility? (click all that apply) Steel

Page 115 of 238

Page 116: New Hampshire Department of Education Bureau of School

41 Brookline Captain Samuel Douglass Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41 Brookline Captain Samuel Douglass Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

41 Brookline Captain Samuel Douglass Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

41 Brookline Captain Samuel Douglass Academy Q.21 Is your building a CHP's or LEED certified? No

41 Brookline Captain Samuel Douglass Academy Q.22 Have you had energy audits of all your school facilities? No

41 Brookline Captain Samuel Douglass Academy Q.23 Do you have an energy performance contract in place? No

41 Brookline Captain Samuel Douglass Academy Q.26 Do you have carbon monoxide detector(s) in your building? No

41 Brookline Captain Samuel Douglass Academy Q.28 Do you have a facility maintenance plan? Yes

41 Brookline Captain Samuel Douglass Academy Q.29 What is your maintenance budget? 304012

41 Brookline Captain Samuel Douglass Academy Q.30 What is your operational budget? 4248518

41 Brookline Captain Samuel Douglass Academy Q.31 What is your capital construction budget? 0

41 Brookline Captain Samuel Douglass Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?81200

41 Brookline Captain Samuel Douglass Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

41 Brookline Captain Samuel Douglass Academy Q.34 Do you have a maintenance contract in place? No

41 Brookline Captain Samuel Douglass Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41 Brookline Richard Maghakian Memorial School Q.01 Approximate year of the original construction date 1962

41 Brookline Richard Maghakian Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

41 Brookline Richard Maghakian Memorial School Q.03 Gross Square footage (including portables) 57263

41 Brookline Richard Maghakian Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

41 Brookline Richard Maghakian Memorial School Q.05 How many parking spaces does the facility have? 102

41 Brookline Richard Maghakian Memorial School Q.06 Does your building have a basement? Yes

41 Brookline Richard Maghakian Memorial School Q.07 How many portable classrooms are in use? 0

41 Brookline Richard Maghakian Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

41 Brookline Richard Maghakian Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41 Brookline Richard Maghakian Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

41 Brookline Richard Maghakian Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

41 Brookline Richard Maghakian Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? No

41 Brookline Richard Maghakian Memorial School Q.14a a. Roofs ||x|||x

41 Brookline Richard Maghakian Memorial School Q.14b b. Lighting Systems |||||x

41 Brookline Richard Maghakian Memorial School Q.14c c. Windows |||||x

41 Brookline Richard Maghakian Memorial School Q.14d d. Ceilings |||||x

41 Brookline Richard Maghakian Memorial School Q.14e e. Plumbing |||||x

41 Brookline Richard Maghakian Memorial School Q.14f f. Heating Systems x|x|x|x|x|x

41 Brookline Richard Maghakian Memorial School Q.14g g. Ventilation Systems |||||x

41 Brookline Richard Maghakian Memorial School Q.14h h. Conditioning Systems |||||x

41 Brookline Richard Maghakian Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

41 Brookline Richard Maghakian Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Wood siding on masonry

41 Brookline Richard Maghakian Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

41 Brookline Richard Maghakian Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41 Brookline Richard Maghakian Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

41 Brookline Richard Maghakian Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

41 Brookline Richard Maghakian Memorial School Q.21 Is your building a CHP's or LEED certified? No

41 Brookline Richard Maghakian Memorial School Q.22 Have you had energy audits of all your school facilities? No

41 Brookline Richard Maghakian Memorial School Q.23 Do you have an energy performance contract in place? No

41 Brookline Richard Maghakian Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? No

41 Brookline Richard Maghakian Memorial School Q.27 Do you have a presence of: (click all that apply) Asbestos

41 Brookline Richard Maghakian Memorial School Q.28 Do you have a facility maintenance plan? Yes

41 Brookline Richard Maghakian Memorial School Q.29 What is your maintenance budget? 311468

41 Brookline Richard Maghakian Memorial School Q.30 What is your operational budget? 5430758

Page 116 of 238

Page 117: New Hampshire Department of Education Bureau of School

41 Brookline Richard Maghakian Memorial School Q.31 What is your capital construction budget? 0

41 Brookline Richard Maghakian Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100250

41 Brookline Richard Maghakian Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

41 Brookline Richard Maghakian Memorial School Q.34 Do you have a maintenance contract in place? No

41 Brookline Richard Maghakian Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41 Hollis Hollis Primary School Q.01 Approximate year of the original construction date 1952

41 Hollis Hollis Primary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

41 Hollis Hollis Primary School Q.03 Gross Square footage (including portables) 46918

41 Hollis Hollis Primary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

41 Hollis Hollis Primary School Q.05 How many parking spaces does the facility have? 78

41 Hollis Hollis Primary School Q.06 Does your building have a basement? No

41 Hollis Hollis Primary School Q.07 How many portable classrooms are in use? 0

41 Hollis Hollis Primary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

41 Hollis Hollis Primary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41 Hollis Hollis Primary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

41 Hollis Hollis Primary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

41 Hollis Hollis Primary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

41 Hollis Hollis Primary School Q.14a a. Roofs |||||x

41 Hollis Hollis Primary School Q.14b b. Lighting Systems |||||x

41 Hollis Hollis Primary School Q.14c c. Windows x|||||

41 Hollis Hollis Primary School Q.14d d. Ceilings |||||x

41 Hollis Hollis Primary School Q.14e e. Plumbing |||||x

41 Hollis Hollis Primary School Q.14f f. Heating Systems x|||||x

41 Hollis Hollis Primary School Q.14g g. Ventilation Systems |||||x

41 Hollis Hollis Primary School Q.14h h. Conditioning Systems |||||x

41 Hollis Hollis Primary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

41 Hollis Hollis Primary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Non-wood siding attached to brick

41 Hollis Hollis Primary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

41 Hollis Hollis Primary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41 Hollis Hollis Primary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

41 Hollis Hollis Primary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Solar

41 Hollis Hollis Primary School Q.21 Is your building a CHP's or LEED certified? No

41 Hollis Hollis Primary School Q.22 Have you had energy audits of all your school facilities? Yes

41 Hollis Hollis Primary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

41 Hollis Hollis Primary School Q.23 Do you have an energy performance contract in place? No

41 Hollis Hollis Primary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 31

41 Hollis Hollis Primary School Q.25 What is the R-Value of the roof? 30

41 Hollis Hollis Primary School Q.26 Do you have carbon monoxide detector(s) in your building? No

41 Hollis Hollis Primary School Q.27 Do you have a presence of: (click all that apply) Asbestos

41 Hollis Hollis Primary School Q.28 Do you have a facility maintenance plan? Yes

41 Hollis Hollis Primary School Q.29 What is your maintenance budget? 346603

41 Hollis Hollis Primary School Q.30 What is your operational budget? 6696734

41 Hollis Hollis Primary School Q.31 What is your capital construction budget? 0

41 Hollis Hollis Primary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?78000

41 Hollis Hollis Primary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

41 Hollis Hollis Primary School Q.34 Do you have a maintenance contract in place? No

41 Hollis Hollis Primary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41 Hollis Hollis Upper Elementary School Q.01 Approximate year of the original construction date 1972

41 Hollis Hollis Upper Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

Page 117 of 238

Page 118: New Hampshire Department of Education Bureau of School

41 Hollis Hollis Upper Elementary School Q.03 Gross Square footage (including portables) 96258

41 Hollis Hollis Upper Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

41 Hollis Hollis Upper Elementary School Q.05 How many parking spaces does the facility have? 113

41 Hollis Hollis Upper Elementary School Q.06 Does your building have a basement? No

41 Hollis Hollis Upper Elementary School Q.07 How many portable classrooms are in use? 0

41 Hollis Hollis Upper Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

41 Hollis Hollis Upper Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41 Hollis Hollis Upper Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

41 Hollis Hollis Upper Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

41 Hollis Hollis Upper Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

41 Hollis Hollis Upper Elementary School Q.14a a. Roofs X|||||X

41 Hollis Hollis Upper Elementary School Q.14b b. Lighting Systems |||||x

41 Hollis Hollis Upper Elementary School Q.14c c. Windows |||||x

41 Hollis Hollis Upper Elementary School Q.14d d. Ceilings |||||x

41 Hollis Hollis Upper Elementary School Q.14e e. Plumbing |||||

41 Hollis Hollis Upper Elementary School Q.14f f. Heating Systems x|||||

41 Hollis Hollis Upper Elementary School Q.14g g. Ventilation Systems |||||x

41 Hollis Hollis Upper Elementary School Q.14h h. Conditioning Systems |||||x

41 Hollis Hollis Upper Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

41 Hollis Hollis Upper Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

41 Hollis Hollis Upper Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

41 Hollis Hollis Upper Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41 Hollis Hollis Upper Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

41 Hollis Hollis Upper Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Solar

41 Hollis Hollis Upper Elementary School Q.21 Is your building a CHP's or LEED certified? No

41 Hollis Hollis Upper Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

41 Hollis Hollis Upper Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

41 Hollis Hollis Upper Elementary School Q.23 Do you have an energy performance contract in place? No

41 Hollis Hollis Upper Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

41 Hollis Hollis Upper Elementary School Q.25 What is the R-Value of the roof? 15

41 Hollis Hollis Upper Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

41 Hollis Hollis Upper Elementary School Q.28 Do you have a facility maintenance plan? Yes

41 Hollis Hollis Upper Elementary School Q.29 What is your maintenance budget? 415578

41 Hollis Hollis Upper Elementary School Q.30 What is your operational budget? 5692946

41 Hollis Hollis Upper Elementary School Q.31 What is your capital construction budget? 0

41 Hollis Hollis Upper Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?97000

41 Hollis Hollis Upper Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

41 Hollis Hollis Upper Elementary School Q.34 Do you have a maintenance contract in place? No

41 Hollis Hollis Upper Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.01 Approximate year of the original construction date 1997

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.03 Gross Square footage (including portables) 144995

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.05 How many parking spaces does the facility have? 350

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.06 Does your building have a basement? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.07 How many portable classrooms are in use? 0

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 118 of 238

Page 119: New Hampshire Department of Education Bureau of School

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14a a. Roofs x|||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14b b. Lighting Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14c c. Windows |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14d d. Ceilings |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14e e. Plumbing |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14f f. Heating Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14g g. Ventilation Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.14h h. Conditioning Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.21 Is your building a CHP's or LEED certified? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.22 Have you had energy audits of all your school facilities? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.23 Do you have an energy performance contract in place? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.28 Do you have a facility maintenance plan? Yes

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.29 What is your maintenance budget? 824761

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.30 What is your operational budget? 15530982

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.31 What is your capital construction budget? 0

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?206825

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.34 Do you have a maintenance contract in place? No

41Hollis-Brookline

CooperativeHollis-Brookline High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.01 Approximate year of the original construction date 1963

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.03 Gross Square footage (including portables) 92033

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.05 How many parking spaces does the facility have? 80

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.06 Does your building have a basement? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.07 How many portable classrooms are in use? 0

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14a a. Roofs |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14b b. Lighting Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14c c. Windows |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14d d. Ceilings |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14e e. Plumbing |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14f f. Heating Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14g g. Ventilation Systems |||||x

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.14h h. Conditioning Systems |||||x

Page 119 of 238

Page 120: New Hampshire Department of Education Bureau of School

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Metal siding on masonry

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.21 Is your building a CHP's or LEED certified? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.22 Have you had energy audits of all your school facilities? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.23 Do you have an energy performance contract in place? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.28 Do you have a facility maintenance plan? Yes

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.29 What is your maintenance budget? 449821

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.30 What is your operational budget? 7235925

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.31 What is your capital construction budget? 0

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?114578

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.34 Do you have a maintenance contract in place? No

41Hollis-Brookline

CooperativeHollis-Brookline Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

44 Nottingham Nottingham Elementary School Q.01 Approximate year of the original construction date 1995

44 Nottingham Nottingham Elementary School Q.03 Gross Square footage (including portables) 64000

44 Nottingham Nottingham Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

44 Nottingham Nottingham Elementary School Q.05 How many parking spaces does the facility have? 112

44 Nottingham Nottingham Elementary School Q.06 Does your building have a basement? No

44 Nottingham Nottingham Elementary School Q.07 How many portable classrooms are in use? 0

44 Nottingham Nottingham Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

44 Nottingham Nottingham Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

44 Nottingham Nottingham Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

44 Nottingham Nottingham Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

44 Nottingham Nottingham Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

44 Nottingham Nottingham Elementary School Q.14a a. Roofs 1995|||||

44 Nottingham Nottingham Elementary School Q.14b b. Lighting Systems 2008|2018||||

44 Nottingham Nottingham Elementary School Q.14c c. Windows 1995|||||

44 Nottingham Nottingham Elementary School Q.14d d. Ceilings 1995|||||

44 Nottingham Nottingham Elementary School Q.14e e. Plumbing 1995|||||

44 Nottingham Nottingham Elementary School Q.14f f. Heating Systems 1995|||||

44 Nottingham Nottingham Elementary School Q.14g g. Ventilation Systems 1995|||||

44 Nottingham Nottingham Elementary School Q.14h h. Conditioning Systems 2018|2000||||

44 Nottingham Nottingham Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

44 Nottingham Nottingham Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

44 Nottingham Nottingham Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

44 Nottingham Nottingham Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

44 Nottingham Nottingham Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

44 Nottingham Nottingham Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

44 Nottingham Nottingham Elementary School Q.21 Is your building a CHP's or LEED certified? No

44 Nottingham Nottingham Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

44 Nottingham Nottingham Elementary School Q.23 Do you have an energy performance contract in place? No

44 Nottingham Nottingham Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 10

Page 120 of 238

Page 121: New Hampshire Department of Education Bureau of School

44 Nottingham Nottingham Elementary School Q.25 What is the R-Value of the roof? 10

44 Nottingham Nottingham Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

44 Nottingham Nottingham Elementary School Q.28 Do you have a facility maintenance plan? Yes

44 Nottingham Nottingham Elementary School Q.29 What is your maintenance budget? 550000

44 Nottingham Nottingham Elementary School Q.30 What is your operational budget? 12.7

44 Nottingham Nottingham Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?118000

44 Nottingham Nottingham Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?160

44 Nottingham Nottingham Elementary School Q.34 Do you have a maintenance contract in place? Yes

44 Nottingham Nottingham Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

44 Nottingham Nottingham Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Elementary School Addition

44 Nottingham Nottingham Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 6

44 Nottingham Nottingham Elementary School Q.35c c. If yes, provide estimated year of construction. 2021

44 Strafford Strafford School Q.14a a. Roofs |||||

44 Strafford Strafford School Q.14b b. Lighting Systems |||||

44 Strafford Strafford School Q.14c c. Windows |||||

44 Strafford Strafford School Q.14d d. Ceilings |||||

44 Strafford Strafford School Q.14e e. Plumbing |||||

44 Strafford Strafford School Q.14f f. Heating Systems |||||

44 Strafford Strafford School Q.14g g. Ventilation Systems |||||

44 Strafford Strafford School Q.14h h. Conditioning Systems |||||

45 Moultonborough Moultonborough Academy Q.01 Approximate year of the original construction date 1979

45 Moultonborough Moultonborough Academy Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

45 Moultonborough Moultonborough Academy Q.03 Gross Square footage (including portables) 91000

45 Moultonborough Moultonborough Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

45 Moultonborough Moultonborough Academy Q.05 How many parking spaces does the facility have? 170

45 Moultonborough Moultonborough Academy Q.06 Does your building have a basement? No

45 Moultonborough Moultonborough Academy Q.07 How many portable classrooms are in use? 0

45 Moultonborough Moultonborough Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

45 Moultonborough Moultonborough Academy Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

45 Moultonborough Moultonborough Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

45 Moultonborough Moultonborough Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

45 Moultonborough Moultonborough Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

45 Moultonborough Moultonborough Academy Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

45 Moultonborough Moultonborough Academy Q.14a a. Roofs 1980|1982|2002|||

45 Moultonborough Moultonborough Academy Q.14b b. Lighting Systems 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14c c. Windows 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14d d. Ceilings 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14e e. Plumbing 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14f f. Heating Systems 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14g g. Ventilation Systems 1980|2002||||

45 Moultonborough Moultonborough Academy Q.14h h. Conditioning Systems 2002|||||

45 Moultonborough Moultonborough Academy Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

45 Moultonborough Moultonborough Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

45 Moultonborough Moultonborough Academy Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

45 Moultonborough Moultonborough Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

45 Moultonborough Moultonborough Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

45 Moultonborough Moultonborough Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

45 Moultonborough Moultonborough Academy Q.21 Is your building a CHP's or LEED certified? No

45 Moultonborough Moultonborough Academy Q.22 Have you had energy audits of all your school facilities? Yes

Page 121 of 238

Page 122: New Hampshire Department of Education Bureau of School

45 Moultonborough Moultonborough Academy Q.23 Do you have an energy performance contract in place? No

45 Moultonborough Moultonborough Academy Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

45 Moultonborough Moultonborough Academy Q.25 What is the R-Value of the roof? 19

45 Moultonborough Moultonborough Academy Q.26 Do you have carbon monoxide detector(s) in your building? No

45 Moultonborough Moultonborough Academy Q.28 Do you have a facility maintenance plan? No

45 Moultonborough Moultonborough Academy Q.29 What is your maintenance budget? 110228

45 Moultonborough Moultonborough Academy Q.30 What is your operational budget? 565009

45 Moultonborough Moultonborough Academy Q.31 What is your capital construction budget? 400000

45 Moultonborough Moultonborough Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?141500

45 Moultonborough Moultonborough Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

45 Moultonborough Moultonborough Academy Q.34 Do you have a maintenance contract in place? No

45 Moultonborough Moultonborough Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

45 Moultonborough Moultonborough Central School Q.01 Approximate year of the original construction date 1948

45 Moultonborough Moultonborough Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1976

45 Moultonborough Moultonborough Central School Q.03 Gross Square footage (including portables) 69000

45 Moultonborough Moultonborough Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

45 Moultonborough Moultonborough Central School Q.06 Does your building have a basement? Yes

45 Moultonborough Moultonborough Central School Q.07 How many portable classrooms are in use? 0

45 Moultonborough Moultonborough Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

45 Moultonborough Moultonborough Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

45 Moultonborough Moultonborough Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

45 Moultonborough Moultonborough Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

45 Moultonborough Moultonborough Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

45 Moultonborough Moultonborough Central School Q.14a a. Roofs 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14b b. Lighting Systems 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14c c. Windows 1948|1959|1976|1988|2003|2015

45 Moultonborough Moultonborough Central School Q.14d d. Ceilings 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14e e. Plumbing 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14f f. Heating Systems 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14g g. Ventilation Systems 1948|1959|1976|1988|2003|

45 Moultonborough Moultonborough Central School Q.14h h. Conditioning Systems 1976|1988|2003|||

45 Moultonborough Moultonborough Central School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

45 Moultonborough Moultonborough Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

45 Moultonborough Moultonborough Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

45 Moultonborough Moultonborough Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

45 Moultonborough Moultonborough Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

45 Moultonborough Moultonborough Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

45 Moultonborough Moultonborough Central School Q.21 Is your building a CHP's or LEED certified? No

45 Moultonborough Moultonborough Central School Q.22 Have you had energy audits of all your school facilities? Yes

45 Moultonborough Moultonborough Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

45 Moultonborough Moultonborough Central School Q.23 Do you have an energy performance contract in place? No

45 Moultonborough Moultonborough Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 30

45 Moultonborough Moultonborough Central School Q.25 What is the R-Value of the roof? 19

45 Moultonborough Moultonborough Central School Q.26 Do you have carbon monoxide detector(s) in your building? No

45 Moultonborough Moultonborough Central School Q.28 Do you have a facility maintenance plan? No

45 Moultonborough Moultonborough Central School Q.29 What is your maintenance budget? 134790

45 Moultonborough Moultonborough Central School Q.30 What is your operational budget? 521546

45 Moultonborough Moultonborough Central School Q.31 What is your capital construction budget? 0

45 Moultonborough Moultonborough Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?151850

Page 122 of 238

Page 123: New Hampshire Department of Education Bureau of School

45 Moultonborough Moultonborough Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

45 Moultonborough Moultonborough Central School Q.34 Do you have a maintenance contract in place? No

45 Moultonborough Moultonborough Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Boscawen Elementary School Q.01 Approximate year of the original construction date 1996

46 Merrimack Valley Boscawen Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

46 Merrimack Valley Boscawen Elementary School Q.03 Gross Square footage (including portables) 55000

46 Merrimack Valley Boscawen Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Boscawen Elementary School Q.05 How many parking spaces does the facility have? 69

46 Merrimack Valley Boscawen Elementary School Q.06 Does your building have a basement? No

46 Merrimack Valley Boscawen Elementary School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Boscawen Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Boscawen Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Boscawen Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Boscawen Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Boscawen Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Boscawen Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Boscawen Elementary School Q.14a a. Roofs 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14b b. Lighting Systems 1996|.|2006|.|.|2014

46 Merrimack Valley Boscawen Elementary School Q.14c c. Windows 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14d d. Ceilings 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14e e. Plumbing 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14f f. Heating Systems 1996|2017|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14g g. Ventilation Systems 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.14h h. Conditioning Systems 1996|.|.|.|.|.

46 Merrimack Valley Boscawen Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

46 Merrimack Valley Boscawen Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|vinyl

46 Merrimack Valley Boscawen Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Boscawen Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Boscawen Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Boscawen Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

46 Merrimack Valley Boscawen Elementary School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Boscawen Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Boscawen Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Boscawen Elementary School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Boscawen Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Boscawen Elementary School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Boscawen Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Boscawen Elementary School Q.27 Do you have a presence of: (click all that apply) Other|N/A

46 Merrimack Valley Boscawen Elementary School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Boscawen Elementary School Q.29 What is your maintenance budget? 201000

46 Merrimack Valley Boscawen Elementary School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Boscawen Elementary School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Boscawen Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?74181.37

46 Merrimack Valley Boscawen Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?120

46 Merrimack Valley Boscawen Elementary School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Boscawen Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Loudon Elementary School Q.01 Approximate year of the original construction date 1954

46 Merrimack Valley Loudon Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

46 Merrimack Valley Loudon Elementary School Q.03 Gross Square footage (including portables) 58600

Page 123 of 238

Page 124: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Loudon Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Loudon Elementary School Q.05 How many parking spaces does the facility have? 101

46 Merrimack Valley Loudon Elementary School Q.06 Does your building have a basement? No

46 Merrimack Valley Loudon Elementary School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Loudon Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Loudon Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Loudon Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Loudon Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Loudon Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Loudon Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Loudon Elementary School Q.14a a. Roofs 1954|1988|1990|2001|2006|

46 Merrimack Valley Loudon Elementary School Q.14b b. Lighting Systems 1954|1988|1990|2001|2006|

46 Merrimack Valley Loudon Elementary School Q.14c c. Windows 1954|1988|1990|2001|2003|2006

46 Merrimack Valley Loudon Elementary School Q.14d d. Ceilings 1954|1988|1990|2001|2006|

46 Merrimack Valley Loudon Elementary School Q.14e e. Plumbing 1954|1988|1990|2001|2006|

46 Merrimack Valley Loudon Elementary School Q.14f f. Heating Systems 1988|2001|2006|2013||

46 Merrimack Valley Loudon Elementary School Q.14g g. Ventilation Systems 1988|1990|2001|2006||

46 Merrimack Valley Loudon Elementary School Q.14h h. Conditioning Systems N/A|||||

46 Merrimack Valley Loudon Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

46 Merrimack Valley Loudon Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

46 Merrimack Valley Loudon Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Loudon Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Loudon Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Loudon Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

46 Merrimack Valley Loudon Elementary School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Loudon Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Loudon Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Loudon Elementary School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Loudon Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Loudon Elementary School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Loudon Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Loudon Elementary School Q.29 What is your maintenance budget? 23440

46 Merrimack Valley Loudon Elementary School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Loudon Elementary School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Loudon Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?56525.21

46 Merrimack Valley Loudon Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?120

46 Merrimack Valley Loudon Elementary School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Loudon Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Merrimack Valley High School Q.01 Approximate year of the original construction date 1967

46 Merrimack Valley Merrimack Valley High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

46 Merrimack Valley Merrimack Valley High School Q.03 Gross Square footage (including portables) 141000

46 Merrimack Valley Merrimack Valley High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Merrimack Valley High School Q.05 How many parking spaces does the facility have? 348

46 Merrimack Valley Merrimack Valley High School Q.06 Does your building have a basement? No

46 Merrimack Valley Merrimack Valley High School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Merrimack Valley High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Merrimack Valley High School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Merrimack Valley High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Merrimack Valley High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 124 of 238

Page 125: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Merrimack Valley High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Merrimack Valley High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Merrimack Valley High School Q.14a a. Roofs 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14b b. Lighting Systems 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14c c. Windows 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14d d. Ceilings 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14e e. Plumbing 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14f f. Heating Systems 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14g g. Ventilation Systems 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.14h h. Conditioning Systems 1967|1999|2006|||

46 Merrimack Valley Merrimack Valley High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

46 Merrimack Valley Merrimack Valley High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|cement board

46 Merrimack Valley Merrimack Valley High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Merrimack Valley High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Merrimack Valley High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Merrimack Valley High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

46 Merrimack Valley Merrimack Valley High School Q.21 Is your building a CHP's or LEED certified? Yes

46 Merrimack Valley Merrimack Valley High School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Merrimack Valley High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Merrimack Valley High School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Merrimack Valley High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Merrimack Valley High School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Merrimack Valley High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Merrimack Valley High School Q.27 Do you have a presence of: (click all that apply) Other|N/A

46 Merrimack Valley Merrimack Valley High School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Merrimack Valley High School Q.29 What is your maintenance budget? 56400

46 Merrimack Valley Merrimack Valley High School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Merrimack Valley High School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Merrimack Valley High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?120282.82

46 Merrimack Valley Merrimack Valley High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?240

46 Merrimack Valley Merrimack Valley High School Q.34 Do you have a maintenance contract in place? Yes

46 Merrimack Valley Merrimack Valley High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Merrimack Valley Middle School Q.01 Approximate year of the original construction date 1987

46 Merrimack Valley Merrimack Valley Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

46 Merrimack Valley Merrimack Valley Middle School Q.03 Gross Square footage (including portables) 92000

46 Merrimack Valley Merrimack Valley Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Merrimack Valley Middle School Q.05 How many parking spaces does the facility have? 113

46 Merrimack Valley Merrimack Valley Middle School Q.06 Does your building have a basement? No

46 Merrimack Valley Merrimack Valley Middle School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Merrimack Valley Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Merrimack Valley Middle School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Merrimack Valley Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Merrimack Valley Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Merrimack Valley Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Merrimack Valley Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Merrimack Valley Middle School Q.14a a. Roofs 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14b b. Lighting Systems 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14c c. Windows 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14d d. Ceilings 1987|1990|2006|||

Page 125 of 238

Page 126: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Merrimack Valley Middle School Q.14e e. Plumbing 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14f f. Heating Systems 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14g g. Ventilation Systems 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.14h h. Conditioning Systems 1987|1990|2006|||

46 Merrimack Valley Merrimack Valley Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

46 Merrimack Valley Merrimack Valley Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

46 Merrimack Valley Merrimack Valley Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Merrimack Valley Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Merrimack Valley Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Merrimack Valley Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

46 Merrimack Valley Merrimack Valley Middle School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Merrimack Valley Middle School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Merrimack Valley Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Merrimack Valley Middle School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Merrimack Valley Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Merrimack Valley Middle School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Merrimack Valley Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Merrimack Valley Middle School Q.27 Do you have a presence of: (click all that apply) Other|N/A

46 Merrimack Valley Merrimack Valley Middle School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Merrimack Valley Middle School Q.29 What is your maintenance budget? 36800

46 Merrimack Valley Merrimack Valley Middle School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Merrimack Valley Middle School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Merrimack Valley Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?89653.74

46 Merrimack Valley Merrimack Valley Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?160

46 Merrimack Valley Merrimack Valley Middle School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Merrimack Valley Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Penacook Elementary School Q.01 Approximate year of the original construction date 2001

46 Merrimack Valley Penacook Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

46 Merrimack Valley Penacook Elementary School Q.03 Gross Square footage (including portables) 66000

46 Merrimack Valley Penacook Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Penacook Elementary School Q.05 How many parking spaces does the facility have? 101

46 Merrimack Valley Penacook Elementary School Q.06 Does your building have a basement? No

46 Merrimack Valley Penacook Elementary School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Penacook Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Penacook Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Penacook Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Penacook Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Penacook Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Penacook Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Penacook Elementary School Q.14a a. Roofs |||||

46 Merrimack Valley Penacook Elementary School Q.14b b. Lighting Systems |||||

46 Merrimack Valley Penacook Elementary School Q.14c c. Windows |||||

46 Merrimack Valley Penacook Elementary School Q.14d d. Ceilings |||||

46 Merrimack Valley Penacook Elementary School Q.14e e. Plumbing |||||

46 Merrimack Valley Penacook Elementary School Q.14f f. Heating Systems |||||

46 Merrimack Valley Penacook Elementary School Q.14g g. Ventilation Systems |||||

46 Merrimack Valley Penacook Elementary School Q.14h h. Conditioning Systems |||||

46 Merrimack Valley Penacook Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

46 Merrimack Valley Penacook Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

Page 126 of 238

Page 127: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Penacook Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Penacook Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Penacook Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Penacook Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

46 Merrimack Valley Penacook Elementary School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Penacook Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Penacook Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Penacook Elementary School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Penacook Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Penacook Elementary School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Penacook Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Penacook Elementary School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Penacook Elementary School Q.29 What is your maintenance budget? 26400

46 Merrimack Valley Penacook Elementary School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Penacook Elementary School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Penacook Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?109536.28

46 Merrimack Valley Penacook Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?120

46 Merrimack Valley Penacook Elementary School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Penacook Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Salisbury Elementary School Q.01 Approximate year of the original construction date 1960

46 Merrimack Valley Salisbury Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2013

46 Merrimack Valley Salisbury Elementary School Q.03 Gross Square footage (including portables) 18000

46 Merrimack Valley Salisbury Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

46 Merrimack Valley Salisbury Elementary School Q.05 How many parking spaces does the facility have? 48

46 Merrimack Valley Salisbury Elementary School Q.06 Does your building have a basement? No

46 Merrimack Valley Salisbury Elementary School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Salisbury Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Salisbury Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Salisbury Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Salisbury Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Salisbury Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Salisbury Elementary School Q.14a a. Roofs 1960|1988|2001|2013||

46 Merrimack Valley Salisbury Elementary School Q.14b b. Lighting Systems 1960|1988|2001|2013||

46 Merrimack Valley Salisbury Elementary School Q.14c c. Windows 1960|1988|2001|2013||

46 Merrimack Valley Salisbury Elementary School Q.14d d. Ceilings 1960|1988|2001|2013||

46 Merrimack Valley Salisbury Elementary School Q.14e e. Plumbing 1960|1988|2001|2013||

46 Merrimack Valley Salisbury Elementary School Q.14f f. Heating Systems 1988|2013||||

46 Merrimack Valley Salisbury Elementary School Q.14g g. Ventilation Systems 1988|2001|2013|||

46 Merrimack Valley Salisbury Elementary School Q.14h h. Conditioning Systems 2013|||||

46 Merrimack Valley Salisbury Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

46 Merrimack Valley Salisbury Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

46 Merrimack Valley Salisbury Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Salisbury Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Salisbury Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

46 Merrimack Valley Salisbury Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

46 Merrimack Valley Salisbury Elementary School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Salisbury Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Salisbury Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Salisbury Elementary School Q.23 Do you have an energy performance contract in place? No

Page 127 of 238

Page 128: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Salisbury Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Salisbury Elementary School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Salisbury Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Salisbury Elementary School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Salisbury Elementary School Q.29 What is your maintenance budget? 7200

46 Merrimack Valley Salisbury Elementary School Q.30 What is your operational budget? 3432443

46 Merrimack Valley Salisbury Elementary School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Salisbury Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?29684.21

46 Merrimack Valley Salisbury Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

46 Merrimack Valley Salisbury Elementary School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Salisbury Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

46 Merrimack Valley Webster Elementary School Q.01 Approximate year of the original construction date 1944

46 Merrimack Valley Webster Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

46 Merrimack Valley Webster Elementary School Q.03 Gross Square footage (including portables) 21295

46 Merrimack Valley Webster Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

46 Merrimack Valley Webster Elementary School Q.05 How many parking spaces does the facility have? 29

46 Merrimack Valley Webster Elementary School Q.06 Does your building have a basement? No

46 Merrimack Valley Webster Elementary School Q.07 How many portable classrooms are in use? 0

46 Merrimack Valley Webster Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

46 Merrimack Valley Webster Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|N/A

46 Merrimack Valley Webster Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

46 Merrimack Valley Webster Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

46 Merrimack Valley Webster Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

46 Merrimack Valley Webster Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

46 Merrimack Valley Webster Elementary School Q.14a a. Roofs 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14b b. Lighting Systems 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14c c. Windows 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14d d. Ceilings 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14e e. Plumbing 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14f f. Heating Systems 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14g g. Ventilation Systems 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.14h h. Conditioning Systems 1944|1953|1962|1988|2001|2006

46 Merrimack Valley Webster Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

46 Merrimack Valley Webster Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood|Other|masonite

46 Merrimack Valley Webster Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

46 Merrimack Valley Webster Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

46 Merrimack Valley Webster Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

46 Merrimack Valley Webster Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

46 Merrimack Valley Webster Elementary School Q.21 Is your building a CHP's or LEED certified? No

46 Merrimack Valley Webster Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

46 Merrimack Valley Webster Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

46 Merrimack Valley Webster Elementary School Q.23 Do you have an energy performance contract in place? No

46 Merrimack Valley Webster Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 21

46 Merrimack Valley Webster Elementary School Q.25 What is the R-Value of the roof? 38

46 Merrimack Valley Webster Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

46 Merrimack Valley Webster Elementary School Q.27 Do you have a presence of: (click all that apply) Other|N/A

46 Merrimack Valley Webster Elementary School Q.28 Do you have a facility maintenance plan? Yes

46 Merrimack Valley Webster Elementary School Q.29 What is your maintenance budget? 8518.00

46 Merrimack Valley Webster Elementary School Q.30 What is your operational budget? 3432443

Page 128 of 238

Page 129: New Hampshire Department of Education Bureau of School

46 Merrimack Valley Webster Elementary School Q.31 What is your capital construction budget? 301345

46 Merrimack Valley Webster Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?37791

46 Merrimack Valley Webster Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

46 Merrimack Valley Webster Elementary School Q.34 Do you have a maintenance contract in place? No

46 Merrimack Valley Webster Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

47 Jaffrey-Rindge Cooperative Conant High School Q.01 Approximate year of the original construction date 1972

47 Jaffrey-Rindge Cooperative Conant High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2009

47 Jaffrey-Rindge Cooperative Conant High School Q.03 Gross Square footage (including portables) 70088

47 Jaffrey-Rindge Cooperative Conant High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.05 How many parking spaces does the facility have? 149

47 Jaffrey-Rindge Cooperative Conant High School Q.06 Does your building have a basement? No

47 Jaffrey-Rindge Cooperative Conant High School Q.07 How many portable classrooms are in use? 0

47 Jaffrey-Rindge Cooperative Conant High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

47 Jaffrey-Rindge Cooperative Conant High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.13 Are all instructional and service areas within the facility ADA compliant? No

47 Jaffrey-Rindge Cooperative Conant High School Q.14a a. Roofs 2005|2010|2018|||

47 Jaffrey-Rindge Cooperative Conant High School Q.14b b. Lighting Systems 2017|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14c c. Windows 2005|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14d d. Ceilings 1972|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14e e. Plumbing 1972|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14f f. Heating Systems 2017|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14g g. Ventilation Systems 2005|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.14h h. Conditioning Systems 2005|||||

47 Jaffrey-Rindge Cooperative Conant High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

47 Jaffrey-Rindge Cooperative Conant High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

47 Jaffrey-Rindge Cooperative Conant High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

47 Jaffrey-Rindge Cooperative Conant High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

47 Jaffrey-Rindge Cooperative Conant High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

47 Jaffrey-Rindge Cooperative Conant High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

47 Jaffrey-Rindge Cooperative Conant High School Q.21 Is your building a CHP's or LEED certified? No

47 Jaffrey-Rindge Cooperative Conant High School Q.22 Have you had energy audits of all your school facilities? Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.23 Do you have an energy performance contract in place? No

47 Jaffrey-Rindge Cooperative Conant High School Q.26 Do you have carbon monoxide detector(s) in your building? No

47 Jaffrey-Rindge Cooperative Conant High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

47 Jaffrey-Rindge Cooperative Conant High School Q.28 Do you have a facility maintenance plan? Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.29 What is your maintenance budget? 387618

47 Jaffrey-Rindge Cooperative Conant High School Q.30 What is your operational budget? 3495308

47 Jaffrey-Rindge Cooperative Conant High School Q.31 What is your capital construction budget? 0

47 Jaffrey-Rindge Cooperative Conant High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?91144

47 Jaffrey-Rindge Cooperative Conant High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

47 Jaffrey-Rindge Cooperative Conant High School Q.34 Do you have a maintenance contract in place? No

47 Jaffrey-Rindge Cooperative Conant High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

47 Jaffrey-Rindge Cooperative Conant High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Parking lot renovations; new activities building

47 Jaffrey-Rindge Cooperative Conant High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 5

47 Jaffrey-Rindge Cooperative Conant High School Q.35c c. If yes, provide estimated year of construction. 2022

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.01 Approximate year of the original construction date 1936

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

Page 129 of 238

Page 130: New Hampshire Department of Education Bureau of School

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.03 Gross Square footage (including portables) 57830

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.05 How many parking spaces does the facility have? 70

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.06 Does your building have a basement? Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.07 How many portable classrooms are in use? 0

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.13 Are all instructional and service areas within the facility ADA compliant? No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14a a. Roofs 2004|2016||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14b b. Lighting Systems 2017|||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14c c. Windows 1988|||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14d d. Ceilings 1936|2004||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14e e. Plumbing 1936|2004||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14f f. Heating Systems 2017|||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14g g. Ventilation Systems 2017|||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.14h h. Conditioning Systems 2006|||||

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.21 Is your building a CHP's or LEED certified? No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.22 Have you had energy audits of all your school facilities? Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.23 Do you have an energy performance contract in place? No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.26 Do you have carbon monoxide detector(s) in your building? No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.27 Do you have a presence of: (click all that apply) Asbestos

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.28 Do you have a facility maintenance plan? Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.29 What is your maintenance budget? 372418

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.30 What is your operational budget? 2852095

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.31 What is your capital construction budget? 0

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?57712

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.34 Do you have a maintenance contract in place? No

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Parking lot renovations

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 1

47 Jaffrey-Rindge Cooperative Jaffrey Grade School Q.35c c. If yes, provide estimated year of construction. 2021

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.01 Approximate year of the original construction date 1915

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.03 Gross Square footage (including portables) 69312

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.05 How many parking spaces does the facility have? 79

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.06 Does your building have a basement? Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.07 How many portable classrooms are in use? 0

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

Page 130 of 238

Page 131: New Hampshire Department of Education Bureau of School

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14a a. Roofs 1988|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14b b. Lighting Systems 2017|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14c c. Windows 2008|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14d d. Ceilings 2008|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14e e. Plumbing 1915|2008||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14f f. Heating Systems 2017|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14g g. Ventilation Systems 2007|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.14h h. Conditioning Systems 2007|||||

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric|Wood Chip/Pellet

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.21 Is your building a CHP's or LEED certified? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.22 Have you had energy audits of all your school facilities? Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.23 Do you have an energy performance contract in place? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.28 Do you have a facility maintenance plan? Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.29 What is your maintenance budget? 386079

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.30 What is your operational budget? 2820858

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.31 What is your capital construction budget? 0

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?89840

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.34 Do you have a maintenance contract in place? No

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.35a a. If yes, provide a short description. (e.g., "High School Addition")Parking lot renovations; gym/auditorium

remodeling

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

47 Jaffrey-Rindge Cooperative Jaffrey-Rindge Middle School Q.35c c. If yes, provide estimated year of construction. 2022

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.01 Approximate year of the original construction date 1952

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.03 Gross Square footage (including portables) 59045

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.05 How many parking spaces does the facility have? 83

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.06 Does your building have a basement? Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.07 How many portable classrooms are in use? 4

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14a a. Roofs 2007|2016||||

Page 131 of 238

Page 132: New Hampshire Department of Education Bureau of School

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14b b. Lighting Systems 2017|||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14c c. Windows 1952|2003||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14d d. Ceilings 1952|2003||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14e e. Plumbing 1952|2003||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14f f. Heating Systems 2017|||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14g g. Ventilation Systems 2017|||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.14h h. Conditioning Systems n/a|||||

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.21 Is your building a CHP's or LEED certified? No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.23 Do you have an energy performance contract in place? No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.28 Do you have a facility maintenance plan? Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.29 What is your maintenance budget? 338419

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.30 What is your operational budget? 3185853

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.31 What is your capital construction budget? 0

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?84392

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.34 Do you have a maintenance contract in place? No

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Parking lot renovations

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 1.2

47 Jaffrey-Rindge Cooperative Rindge Memorial School Q.35c c. If yes, provide estimated year of construction. 2021

48 Campton Campton Elementary School Q.01 Approximate year of the original construction date 1961

48 Campton Campton Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1990

48 Campton Campton Elementary School Q.03 Gross Square footage (including portables) 57000

48 Campton Campton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

48 Campton Campton Elementary School Q.05 How many parking spaces does the facility have? 80

48 Campton Campton Elementary School Q.06 Does your building have a basement? No

48 Campton Campton Elementary School Q.07 How many portable classrooms are in use? 0

48 Campton Campton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Campton Campton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Campton Campton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Campton Campton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Campton Campton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Campton Campton Elementary School Q.14a a. Roofs 2012-2016|||||

48 Campton Campton Elementary School Q.14b b. Lighting Systems 1995-2019|||||

48 Campton Campton Elementary School Q.14c c. Windows 1995-2008|||||

48 Campton Campton Elementary School Q.14d d. Ceilings 2008|||||

48 Campton Campton Elementary School Q.14e e. Plumbing 2008|||||

48 Campton Campton Elementary School Q.14f f. Heating Systems 1998|||||

48 Campton Campton Elementary School Q.14g g. Ventilation Systems 2008|||||

Page 132 of 238

Page 133: New Hampshire Department of Education Bureau of School

48 Campton Campton Elementary School Q.14h h. Conditioning Systems 2008|||||

48 Campton Campton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

48 Campton Campton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

48 Campton Campton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

48 Campton Campton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

48 Campton Campton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Campton Campton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

48 Campton Campton Elementary School Q.21 Is your building a CHP's or LEED certified? No

48 Campton Campton Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

48 Campton Campton Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Campton Campton Elementary School Q.23 Do you have an energy performance contract in place? No

48 Campton Campton Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1219

48 Campton Campton Elementary School Q.25 What is the R-Value of the roof? 19

48 Campton Campton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Campton Campton Elementary School Q.28 Do you have a facility maintenance plan? Yes

48 Campton Campton Elementary School Q.29 What is your maintenance budget? 36700

48 Campton Campton Elementary School Q.30 What is your operational budget? 382763

48 Campton Campton Elementary School Q.31 What is your capital construction budget? 0

48 Campton Campton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?75400

48 Campton Campton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

48 Campton Campton Elementary School Q.34 Do you have a maintenance contract in place? Yes

48 Campton Campton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

48 Holderness Holderness Central School Q.01 Approximate year of the original construction date 1954

48 Holderness Holderness Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

48 Holderness Holderness Central School Q.03 Gross Square footage (including portables) 55000

48 Holderness Holderness Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

48 Holderness Holderness Central School Q.05 How many parking spaces does the facility have? 60

48 Holderness Holderness Central School Q.06 Does your building have a basement? Yes

48 Holderness Holderness Central School Q.07 How many portable classrooms are in use? 0

48 Holderness Holderness Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Holderness Holderness Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Holderness Holderness Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Holderness Holderness Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Holderness Holderness Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Holderness Holderness Central School Q.14a a. Roofs 2010|||||

48 Holderness Holderness Central School Q.14b b. Lighting Systems 2007|||||

48 Holderness Holderness Central School Q.14c c. Windows 2007-2019|||||

48 Holderness Holderness Central School Q.14d d. Ceilings 2007|||||

48 Holderness Holderness Central School Q.14e e. Plumbing 2007|||||

48 Holderness Holderness Central School Q.14f f. Heating Systems 2007|||||

48 Holderness Holderness Central School Q.14g g. Ventilation Systems 2007|||||

48 Holderness Holderness Central School Q.14h h. Conditioning Systems 2007|||||

48 Holderness Holderness Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

48 Holderness Holderness Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

48 Holderness Holderness Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

48 Holderness Holderness Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

48 Holderness Holderness Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Holderness Holderness Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

48 Holderness Holderness Central School Q.21 Is your building a CHP's or LEED certified? No

Page 133 of 238

Page 134: New Hampshire Department of Education Bureau of School

48 Holderness Holderness Central School Q.22 Have you had energy audits of all your school facilities? Yes

48 Holderness Holderness Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Holderness Holderness Central School Q.23 Do you have an energy performance contract in place? No

48 Holderness Holderness Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1015

48 Holderness Holderness Central School Q.25 What is the R-Value of the roof? 20

48 Holderness Holderness Central School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Holderness Holderness Central School Q.28 Do you have a facility maintenance plan? Yes

48 Holderness Holderness Central School Q.29 What is your maintenance budget? 50000

48 Holderness Holderness Central School Q.30 What is your operational budget? 364504

48 Holderness Holderness Central School Q.31 What is your capital construction budget? 0

48 Holderness Holderness Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?695000

48 Holderness Holderness Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

48 Holderness Holderness Central School Q.34 Do you have a maintenance contract in place? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.01 Approximate year of the original construction date 1969

48 Pemi-Baker Regional Plymouth Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

48 Pemi-Baker Regional Plymouth Regional High School Q.03 Gross Square footage (including portables) 170000

48 Pemi-Baker Regional Plymouth Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.05 How many parking spaces does the facility have? 500

48 Pemi-Baker Regional Plymouth Regional High School Q.06 Does your building have a basement? No

48 Pemi-Baker Regional Plymouth Regional High School Q.07 How many portable classrooms are in use? 0

48 Pemi-Baker Regional Plymouth Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Pemi-Baker Regional Plymouth Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Pemi-Baker Regional Plymouth Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.14a a. Roofs 2010-2018|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14b b. Lighting Systems 2016|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14c c. Windows 1999-2019|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14d d. Ceilings 1999-present|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14e e. Plumbing 1970-2019|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14f f. Heating Systems 2016|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14g g. Ventilation Systems 1999-2019|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.14h h. Conditioning Systems 2000-2019|||||

48 Pemi-Baker Regional Plymouth Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

48 Pemi-Baker Regional Plymouth Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

48 Pemi-Baker Regional Plymouth Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

48 Pemi-Baker Regional Plymouth Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

48 Pemi-Baker Regional Plymouth Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Pemi-Baker Regional Plymouth Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

48 Pemi-Baker Regional Plymouth Regional High School Q.21 Is your building a CHP's or LEED certified? No

48 Pemi-Baker Regional Plymouth Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.23 Do you have an energy performance contract in place? No

48 Pemi-Baker Regional Plymouth Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1030

48 Pemi-Baker Regional Plymouth Regional High School Q.25 What is the R-Value of the roof? 25

48 Pemi-Baker Regional Plymouth Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Pemi-Baker Regional Plymouth Regional High School Q.28 Do you have a facility maintenance plan? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.29 What is your maintenance budget? 75000

48 Pemi-Baker Regional Plymouth Regional High School Q.30 What is your operational budget? 1376798

Page 134 of 238

Page 135: New Hampshire Department of Education Bureau of School

48 Pemi-Baker Regional Plymouth Regional High School Q.31 What is your capital construction budget? 0

48 Pemi-Baker Regional Plymouth Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?232000

48 Pemi-Baker Regional Plymouth Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

48 Pemi-Baker Regional Plymouth Regional High School Q.34 Do you have a maintenance contract in place? Yes

48 Pemi-Baker Regional Plymouth Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

48 Plymouth Plymouth Elementary School Q.01 Approximate year of the original construction date 1990

48 Plymouth Plymouth Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2010

48 Plymouth Plymouth Elementary School Q.03 Gross Square footage (including portables) 75000

48 Plymouth Plymouth Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

48 Plymouth Plymouth Elementary School Q.05 How many parking spaces does the facility have? 125

48 Plymouth Plymouth Elementary School Q.06 Does your building have a basement? No

48 Plymouth Plymouth Elementary School Q.07 How many portable classrooms are in use? 0

48 Plymouth Plymouth Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Plymouth Plymouth Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Plymouth Plymouth Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Plymouth Plymouth Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Plymouth Plymouth Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Plymouth Plymouth Elementary School Q.14a a. Roofs 2008|||||

48 Plymouth Plymouth Elementary School Q.14b b. Lighting Systems 1990|||||

48 Plymouth Plymouth Elementary School Q.14c c. Windows 1990|||||

48 Plymouth Plymouth Elementary School Q.14d d. Ceilings 2010|||||

48 Plymouth Plymouth Elementary School Q.14e e. Plumbing 1990-2010|||||

48 Plymouth Plymouth Elementary School Q.14f f. Heating Systems 2010|||||

48 Plymouth Plymouth Elementary School Q.14g g. Ventilation Systems 2010|||||

48 Plymouth Plymouth Elementary School Q.14h h. Conditioning Systems 2010|||||

48 Plymouth Plymouth Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

48 Plymouth Plymouth Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

48 Plymouth Plymouth Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

48 Plymouth Plymouth Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

48 Plymouth Plymouth Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Plymouth Plymouth Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

48 Plymouth Plymouth Elementary School Q.21 Is your building a CHP's or LEED certified? No

48 Plymouth Plymouth Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

48 Plymouth Plymouth Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Plymouth Plymouth Elementary School Q.23 Do you have an energy performance contract in place? No

48 Plymouth Plymouth Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

48 Plymouth Plymouth Elementary School Q.25 What is the R-Value of the roof? 25

48 Plymouth Plymouth Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Plymouth Plymouth Elementary School Q.28 Do you have a facility maintenance plan? Yes

48 Plymouth Plymouth Elementary School Q.29 What is your maintenance budget? 50000

48 Plymouth Plymouth Elementary School Q.30 What is your operational budget? 526336

48 Plymouth Plymouth Elementary School Q.31 What is your capital construction budget? 0

48 Plymouth Plymouth Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?105000

48 Plymouth Plymouth Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

48 Plymouth Plymouth Elementary School Q.34 Do you have a maintenance contract in place? Yes

48 Plymouth Plymouth Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

48 Rumney Russell Elementary School Q.01 Approximate year of the original construction date 1957

48 Rumney Russell Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

48 Rumney Russell Elementary School Q.03 Gross Square footage (including portables) 27976

Page 135 of 238

Page 136: New Hampshire Department of Education Bureau of School

48 Rumney Russell Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

48 Rumney Russell Elementary School Q.05 How many parking spaces does the facility have? 40

48 Rumney Russell Elementary School Q.06 Does your building have a basement? No

48 Rumney Russell Elementary School Q.07 How many portable classrooms are in use? 0

48 Rumney Russell Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Rumney Russell Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Rumney Russell Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Rumney Russell Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Rumney Russell Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

48 Rumney Russell Elementary School Q.14a a. Roofs 1989-2010|||||

48 Rumney Russell Elementary School Q.14b b. Lighting Systems 1998-2010|||||

48 Rumney Russell Elementary School Q.14c c. Windows 1999|||||

48 Rumney Russell Elementary School Q.14d d. Ceilings 2002|||||

48 Rumney Russell Elementary School Q.14e e. Plumbing 1956-2008|||||

48 Rumney Russell Elementary School Q.14f f. Heating Systems 1995|||||

48 Rumney Russell Elementary School Q.14g g. Ventilation Systems 1989|||||

48 Rumney Russell Elementary School Q.14h h. Conditioning Systems |||||

48 Rumney Russell Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

48 Rumney Russell Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Cement Board, veneer

48 Rumney Russell Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood|Other|Metal

48 Rumney Russell Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

48 Rumney Russell Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Rumney Russell Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

48 Rumney Russell Elementary School Q.21 Is your building a CHP's or LEED certified? No

48 Rumney Russell Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

48 Rumney Russell Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Rumney Russell Elementary School Q.23 Do you have an energy performance contract in place? No

48 Rumney Russell Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 319

48 Rumney Russell Elementary School Q.25 What is the R-Value of the roof? 319

48 Rumney Russell Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Rumney Russell Elementary School Q.28 Do you have a facility maintenance plan? Yes

48 Rumney Russell Elementary School Q.29 What is your maintenance budget? 38000

48 Rumney Russell Elementary School Q.30 What is your operational budget? 238000

48 Rumney Russell Elementary School Q.31 What is your capital construction budget? 0

48 Rumney Russell Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?44500

48 Rumney Russell Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

48 Rumney Russell Elementary School Q.34 Do you have a maintenance contract in place? Yes

48 Rumney Russell Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

48 Rumney Russell Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Elementary Addition

48 Rumney Russell Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 6.1

48 Rumney Russell Elementary School Q.35c c. If yes, provide estimated year of construction. 2020

48 Thornton Thornton Central School Q.01 Approximate year of the original construction date 1955

48 Thornton Thornton Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2010

48 Thornton Thornton Central School Q.03 Gross Square footage (including portables) 45000

48 Thornton Thornton Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

48 Thornton Thornton Central School Q.05 How many parking spaces does the facility have? 50

48 Thornton Thornton Central School Q.06 Does your building have a basement? No

48 Thornton Thornton Central School Q.07 How many portable classrooms are in use? 0

48 Thornton Thornton Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 136 of 238

Page 137: New Hampshire Department of Education Bureau of School

48 Thornton Thornton Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Thornton Thornton Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Thornton Thornton Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Thornton Thornton Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Thornton Thornton Central School Q.14a a. Roofs 2018|||||

48 Thornton Thornton Central School Q.14b b. Lighting Systems 2004-2010|||||

48 Thornton Thornton Central School Q.14c c. Windows 1990-2010|||||

48 Thornton Thornton Central School Q.14d d. Ceilings 2004-2010|||||

48 Thornton Thornton Central School Q.14e e. Plumbing 1980-2010|||||

48 Thornton Thornton Central School Q.14f f. Heating Systems 2000|||||

48 Thornton Thornton Central School Q.14g g. Ventilation Systems 1990-2010|||||

48 Thornton Thornton Central School Q.14h h. Conditioning Systems 2004-2010|||||

48 Thornton Thornton Central School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

48 Thornton Thornton Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

48 Thornton Thornton Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

48 Thornton Thornton Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

48 Thornton Thornton Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Thornton Thornton Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

48 Thornton Thornton Central School Q.21 Is your building a CHP's or LEED certified? No

48 Thornton Thornton Central School Q.22 Have you had energy audits of all your school facilities? Yes

48 Thornton Thornton Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Thornton Thornton Central School Q.23 Do you have an energy performance contract in place? No

48 Thornton Thornton Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 630

48 Thornton Thornton Central School Q.25 What is the R-Value of the roof? 20

48 Thornton Thornton Central School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Thornton Thornton Central School Q.28 Do you have a facility maintenance plan? Yes

48 Thornton Thornton Central School Q.29 What is your maintenance budget? 49255

48 Thornton Thornton Central School Q.30 What is your operational budget? 370136

48 Thornton Thornton Central School Q.31 What is your capital construction budget? 0

48 Thornton Thornton Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?76000

48 Thornton Thornton Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

48 Thornton Thornton Central School Q.34 Do you have a maintenance contract in place? Yes

48 Thornton Thornton Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

48 Thornton Thornton Central School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Gym addition

48 Thornton Thornton Central School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 7

48 Waterville Valley Waterville Valley Elementary School Q.01 Approximate year of the original construction date 1974

48 Waterville Valley Waterville Valley Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

48 Waterville Valley Waterville Valley Elementary School Q.03 Gross Square footage (including portables) 30000

48 Waterville Valley Waterville Valley Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

48 Waterville Valley Waterville Valley Elementary School Q.05 How many parking spaces does the facility have? 30

48 Waterville Valley Waterville Valley Elementary School Q.06 Does your building have a basement? No

48 Waterville Valley Waterville Valley Elementary School Q.07 How many portable classrooms are in use? 0

48 Waterville Valley Waterville Valley Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Waterville Valley Waterville Valley Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Waterville Valley Waterville Valley Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Waterville Valley Waterville Valley Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Waterville Valley Waterville Valley Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

48 Waterville Valley Waterville Valley Elementary School Q.14a a. Roofs 2005-2010|||||

48 Waterville Valley Waterville Valley Elementary School Q.14b b. Lighting Systems 2008|||||

Page 137 of 238

Page 138: New Hampshire Department of Education Bureau of School

48 Waterville Valley Waterville Valley Elementary School Q.14c c. Windows 2015|||||

48 Waterville Valley Waterville Valley Elementary School Q.14d d. Ceilings 2008|||||

48 Waterville Valley Waterville Valley Elementary School Q.14e e. Plumbing 2005|||||

48 Waterville Valley Waterville Valley Elementary School Q.14f f. Heating Systems 2016|||||

48 Waterville Valley Waterville Valley Elementary School Q.14g g. Ventilation Systems 2005|||||

48 Waterville Valley Waterville Valley Elementary School Q.14h h. Conditioning Systems 2016|||||

48 Waterville Valley Waterville Valley Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

48 Waterville Valley Waterville Valley Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

48 Waterville Valley Waterville Valley Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

48 Waterville Valley Waterville Valley Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

48 Waterville Valley Waterville Valley Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Waterville Valley Waterville Valley Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

48 Waterville Valley Waterville Valley Elementary School Q.21 Is your building a CHP's or LEED certified? No

48 Waterville Valley Waterville Valley Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

48 Waterville Valley Waterville Valley Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Waterville Valley Waterville Valley Elementary School Q.23 Do you have an energy performance contract in place? No

48 Waterville Valley Waterville Valley Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

48 Waterville Valley Waterville Valley Elementary School Q.25 What is the R-Value of the roof? 30

48 Waterville Valley Waterville Valley Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Waterville Valley Waterville Valley Elementary School Q.28 Do you have a facility maintenance plan? Yes

48 Waterville Valley Waterville Valley Elementary School Q.29 What is your maintenance budget? 12700

48 Waterville Valley Waterville Valley Elementary School Q.30 What is your operational budget? 167590

48 Waterville Valley Waterville Valley Elementary School Q.31 What is your capital construction budget? 0

48 Waterville Valley Waterville Valley Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?28800

48 Waterville Valley Waterville Valley Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

48 Waterville Valley Waterville Valley Elementary School Q.34 Do you have a maintenance contract in place? Yes

48 Waterville Valley Waterville Valley Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

48 Wentworth Wentworth Elementary School Q.01 Approximate year of the original construction date 1971

48 Wentworth Wentworth Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

48 Wentworth Wentworth Elementary School Q.03 Gross Square footage (including portables) 17000

48 Wentworth Wentworth Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

48 Wentworth Wentworth Elementary School Q.05 How many parking spaces does the facility have? 30

48 Wentworth Wentworth Elementary School Q.06 Does your building have a basement? No

48 Wentworth Wentworth Elementary School Q.07 How many portable classrooms are in use? 0

48 Wentworth Wentworth Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

48 Wentworth Wentworth Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

48 Wentworth Wentworth Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

48 Wentworth Wentworth Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

48 Wentworth Wentworth Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

48 Wentworth Wentworth Elementary School Q.14a a. Roofs 1974-2017|||||

48 Wentworth Wentworth Elementary School Q.14b b. Lighting Systems 2000|||||

48 Wentworth Wentworth Elementary School Q.14c c. Windows 2000-2010|||||

48 Wentworth Wentworth Elementary School Q.14d d. Ceilings 2010|||||

48 Wentworth Wentworth Elementary School Q.14e e. Plumbing 2010|||||

48 Wentworth Wentworth Elementary School Q.14f f. Heating Systems 1998|||||

48 Wentworth Wentworth Elementary School Q.14g g. Ventilation Systems 2008|||||

48 Wentworth Wentworth Elementary School Q.14h h. Conditioning Systems 0|||||

48 Wentworth Wentworth Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

48 Wentworth Wentworth Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Metal|Other|Vinyl

Page 138 of 238

Page 139: New Hampshire Department of Education Bureau of School

48 Wentworth Wentworth Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

48 Wentworth Wentworth Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

48 Wentworth Wentworth Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

48 Wentworth Wentworth Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

48 Wentworth Wentworth Elementary School Q.21 Is your building a CHP's or LEED certified? No

48 Wentworth Wentworth Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

48 Wentworth Wentworth Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

48 Wentworth Wentworth Elementary School Q.23 Do you have an energy performance contract in place? No

48 Wentworth Wentworth Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

48 Wentworth Wentworth Elementary School Q.25 What is the R-Value of the roof? 1015

48 Wentworth Wentworth Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

48 Wentworth Wentworth Elementary School Q.28 Do you have a facility maintenance plan? Yes

48 Wentworth Wentworth Elementary School Q.29 What is your maintenance budget? 10000

48 Wentworth Wentworth Elementary School Q.30 What is your operational budget? 106290

48 Wentworth Wentworth Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?0

48 Wentworth Wentworth Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?33500

48 Wentworth Wentworth Elementary School Q.34 Do you have a maintenance contract in place? Yes

48 Wentworth Wentworth Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalCarpenter Elementary School Q.01 Approximate year of the original construction date 1925

49Governor Wentworth

RegionalCarpenter Elementary School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

49Governor Wentworth

RegionalCarpenter Elementary School Q.03 Gross Square footage (including portables) 64030

49Governor Wentworth

RegionalCarpenter Elementary School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.05 How many parking spaces does the facility have? 60

49Governor Wentworth

RegionalCarpenter Elementary School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalCarpenter Elementary School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalCarpenter Elementary School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalCarpenter Elementary School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalCarpenter Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.14a a. Roofs 1925|||||

49Governor Wentworth

RegionalCarpenter Elementary School Q.14b b. Lighting Systems 1925|1954|1984|1998|2016|

49Governor Wentworth

RegionalCarpenter Elementary School Q.14c c. Windows 1925|1954|1984|1998||

49Governor Wentworth

RegionalCarpenter Elementary School Q.14d d. Ceilings 1925|1954|1984|1998||

49Governor Wentworth

RegionalCarpenter Elementary School Q.14e e. Plumbing 1925|1954|1984|1998||

49Governor Wentworth

RegionalCarpenter Elementary School Q.14f f. Heating Systems 1925|1954|1984|1998|2016|

49Governor Wentworth

RegionalCarpenter Elementary School Q.14g g. Ventilation Systems 1925|1954|1984|1998||

49Governor Wentworth

RegionalCarpenter Elementary School Q.14h h. Conditioning Systems 1925|1954|1984|1998||

49Governor Wentworth

RegionalCarpenter Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

49Governor Wentworth

RegionalCarpenter Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

49Governor Wentworth

RegionalCarpenter Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

49Governor Wentworth

RegionalCarpenter Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalCarpenter Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

49Governor Wentworth

RegionalCarpenter Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

49Governor Wentworth

RegionalCarpenter Elementary School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalCarpenter Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

Page 139 of 238

Page 140: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalCarpenter Elementary School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalCarpenter Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalCrescent Lake School Q.01 Approximate year of the original construction date 1997

49Governor Wentworth

RegionalCrescent Lake School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

49Governor Wentworth

RegionalCrescent Lake School Q.03 Gross Square footage (including portables) 42150

49Governor Wentworth

RegionalCrescent Lake School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

49Governor Wentworth

RegionalCrescent Lake School Q.05 How many parking spaces does the facility have? 82

49Governor Wentworth

RegionalCrescent Lake School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalCrescent Lake School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalCrescent Lake School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalCrescent Lake School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalCrescent Lake School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalCrescent Lake School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalCrescent Lake School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.14a a. Roofs 1997|2016|2018|||

49Governor Wentworth

RegionalCrescent Lake School Q.14b b. Lighting Systems 2016|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14c c. Windows 1997|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14d d. Ceilings 1997|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14e e. Plumbing 1997|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14f f. Heating Systems 2015|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14g g. Ventilation Systems 1997|||||

49Governor Wentworth

RegionalCrescent Lake School Q.14h h. Conditioning Systems 1997|||||

49Governor Wentworth

RegionalCrescent Lake School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

49Governor Wentworth

RegionalCrescent Lake School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

49Governor Wentworth

RegionalCrescent Lake School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

49Governor Wentworth

RegionalCrescent Lake School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalCrescent Lake School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

49Governor Wentworth

RegionalCrescent Lake School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

49Governor Wentworth

RegionalCrescent Lake School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalCrescent Lake School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalCrescent Lake School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalEffingham Elementary School Q.01 Approximate year of the original construction date 2003

49Governor Wentworth

RegionalEffingham Elementary School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

49Governor Wentworth

RegionalEffingham Elementary School Q.03 Gross Square footage (including portables) 24730

49Governor Wentworth

RegionalEffingham Elementary School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

49Governor Wentworth

RegionalEffingham Elementary School Q.05 How many parking spaces does the facility have? 54

49Governor Wentworth

RegionalEffingham Elementary School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalEffingham Elementary School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalEffingham Elementary School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalEffingham Elementary School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalEffingham Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.14a a. Roofs 2003|2016|2018|||

Page 140 of 238

Page 141: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalEffingham Elementary School Q.14b b. Lighting Systems 2003|2016||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14c c. Windows 2003|||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14d d. Ceilings 2003|||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14e e. Plumbing 2003|||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14f f. Heating Systems 2003|2016||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14g g. Ventilation Systems 2003|||||

49Governor Wentworth

RegionalEffingham Elementary School Q.14h h. Conditioning Systems 2003|||||

49Governor Wentworth

RegionalEffingham Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

49Governor Wentworth

RegionalEffingham Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

49Governor Wentworth

RegionalEffingham Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

49Governor Wentworth

RegionalEffingham Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalEffingham Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

49Governor Wentworth

RegionalEffingham Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

49Governor Wentworth

RegionalEffingham Elementary School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalEffingham Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalEffingham Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalKingswood Regional High School Q.01 Approximate year of the original construction date 1964

49Governor Wentworth

RegionalKingswood Regional High School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2012

49Governor Wentworth

RegionalKingswood Regional High School Q.03 Gross Square footage (including portables) 124840

49Governor Wentworth

RegionalKingswood Regional High School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

49Governor Wentworth

RegionalKingswood Regional High School Q.05 How many parking spaces does the facility have? 233

49Governor Wentworth

RegionalKingswood Regional High School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalKingswood Regional High School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalKingswood Regional High School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalKingswood Regional High School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalKingswood Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.14a a. Roofs 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14b b. Lighting Systems 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14c c. Windows 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14d d. Ceilings 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14e e. Plumbing 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14f f. Heating Systems 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14g g. Ventilation Systems 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.14h h. Conditioning Systems 1964|2012||||

49Governor Wentworth

RegionalKingswood Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

49Governor Wentworth

RegionalKingswood Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

49Governor Wentworth

RegionalKingswood Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

49Governor Wentworth

RegionalKingswood Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalKingswood Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

49Governor Wentworth

RegionalKingswood Regional High School Q.21 Is your building a CHP's or LEED certified? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

Page 141 of 238

Page 142: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalKingswood Regional High School Q.27 Do you have a presence of: (click all that apply) Asbestos

49Governor Wentworth

RegionalKingswood Regional High School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalKingswood Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalKingswood Regional Middle School Q.01 Approximate year of the original construction date 1986

49Governor Wentworth

RegionalKingswood Regional Middle School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2012

49Governor Wentworth

RegionalKingswood Regional Middle School Q.03 Gross Square footage (including portables) 864389

49Governor Wentworth

RegionalKingswood Regional Middle School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

49Governor Wentworth

RegionalKingswood Regional Middle School Q.05 How many parking spaces does the facility have? 75

49Governor Wentworth

RegionalKingswood Regional Middle School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalKingswood Regional Middle School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalKingswood Regional Middle School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalKingswood Regional Middle School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalKingswood Regional Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14a a. Roofs 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14b b. Lighting Systems 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14c c. Windows 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14d d. Ceilings 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14e e. Plumbing 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14f f. Heating Systems 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14g g. Ventilation Systems 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.14h h. Conditioning Systems 1986|2012||||

49Governor Wentworth

RegionalKingswood Regional Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

49Governor Wentworth

RegionalKingswood Regional Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

49Governor Wentworth

RegionalKingswood Regional Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

49Governor Wentworth

RegionalKingswood Regional Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

49Governor Wentworth

RegionalKingswood Regional Middle School Q.21 Is your building a CHP's or LEED certified? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

49Governor Wentworth

RegionalKingswood Regional Middle School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalKingswood Regional Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalLakes Region Technology Center Q.01 Approximate year of the original construction date 1983

49Governor Wentworth

RegionalLakes Region Technology Center Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2012

49Governor Wentworth

RegionalLakes Region Technology Center Q.03 Gross Square footage (including portables) 61602

49Governor Wentworth

RegionalLakes Region Technology Center Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

49Governor Wentworth

RegionalLakes Region Technology Center Q.05 How many parking spaces does the facility have? 45

49Governor Wentworth

RegionalLakes Region Technology Center Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalLakes Region Technology Center Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalLakes Region Technology Center Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalLakes Region Technology Center Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

Page 142 of 238

Page 143: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalLakes Region Technology Center Q.14a a. Roofs 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14b b. Lighting Systems 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14c c. Windows 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14d d. Ceilings 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14e e. Plumbing 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14f f. Heating Systems 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14g g. Ventilation Systems 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.14h h. Conditioning Systems 1983|2012||||

49Governor Wentworth

RegionalLakes Region Technology Center Q.15 What types of roofs are on your school facility? (click all that apply) Flat

49Governor Wentworth

RegionalLakes Region Technology Center Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

49Governor Wentworth

RegionalLakes Region Technology Center Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

49Governor Wentworth

RegionalLakes Region Technology Center Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalLakes Region Technology Center Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

49Governor Wentworth

RegionalLakes Region Technology Center Q.21 Is your building a CHP's or LEED certified? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.27 Do you have a presence of: (click all that apply) Asbestos

49Governor Wentworth

RegionalLakes Region Technology Center Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalLakes Region Technology Center Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalNew Durham Elementary School Q.01 Approximate year of the original construction date 1964

49Governor Wentworth

RegionalNew Durham Elementary School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

49Governor Wentworth

RegionalNew Durham Elementary School Q.03 Gross Square footage (including portables) 36660

49Governor Wentworth

RegionalNew Durham Elementary School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

49Governor Wentworth

RegionalNew Durham Elementary School Q.05 How many parking spaces does the facility have? 75

49Governor Wentworth

RegionalNew Durham Elementary School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalNew Durham Elementary School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalNew Durham Elementary School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalNew Durham Elementary School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalNew Durham Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.14a a. Roofs 1964|1976|1994|2003|2014|

49Governor Wentworth

RegionalNew Durham Elementary School Q.14b b. Lighting Systems 1964|1976|1994|2003|2014|

49Governor Wentworth

RegionalNew Durham Elementary School Q.14c c. Windows 1964|1976|1994|2003||

49Governor Wentworth

RegionalNew Durham Elementary School Q.14d d. Ceilings 1964|1976|1994|2003||

49Governor Wentworth

RegionalNew Durham Elementary School Q.14e e. Plumbing 1964|1976|1994|2003||

49Governor Wentworth

RegionalNew Durham Elementary School Q.14f f. Heating Systems 1964|2007||||

49Governor Wentworth

RegionalNew Durham Elementary School Q.14g g. Ventilation Systems 1964|1976|1994|2003||

49Governor Wentworth

RegionalNew Durham Elementary School Q.14h h. Conditioning Systems 1964|1976|1994|2003||

49Governor Wentworth

RegionalNew Durham Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

49Governor Wentworth

RegionalNew Durham Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

49Governor Wentworth

RegionalNew Durham Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

49Governor Wentworth

RegionalNew Durham Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalNew Durham Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

49Governor Wentworth

RegionalNew Durham Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

49Governor Wentworth

RegionalNew Durham Elementary School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalNew Durham Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

Page 143 of 238

Page 144: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalNew Durham Elementary School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalNew Durham Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalOssipee Central School Q.01 Approximate year of the original construction date 1964

49Governor Wentworth

RegionalOssipee Central School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1993

49Governor Wentworth

RegionalOssipee Central School Q.03 Gross Square footage (including portables) 63680

49Governor Wentworth

RegionalOssipee Central School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

49Governor Wentworth

RegionalOssipee Central School Q.05 How many parking spaces does the facility have? 132

49Governor Wentworth

RegionalOssipee Central School Q.06 Does your building have a basement? No

49Governor Wentworth

RegionalOssipee Central School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalOssipee Central School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalOssipee Central School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalOssipee Central School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

49Governor Wentworth

RegionalOssipee Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalOssipee Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalOssipee Central School Q.14a a. Roofs 1964|1972|1977|1993||

49Governor Wentworth

RegionalOssipee Central School Q.14b b. Lighting Systems 1964|1972|1977|1993|2016|

49Governor Wentworth

RegionalOssipee Central School Q.14c c. Windows 1964|1972|1977|1993||

49Governor Wentworth

RegionalOssipee Central School Q.14d d. Ceilings 1964|1972|1977|1993||

49Governor Wentworth

RegionalOssipee Central School Q.14e e. Plumbing 1964|1972|1977|1993||

49Governor Wentworth

RegionalOssipee Central School Q.14f f. Heating Systems 1964|2003|2016|||

49Governor Wentworth

RegionalOssipee Central School Q.14g g. Ventilation Systems 1964|||||

49Governor Wentworth

RegionalOssipee Central School Q.14h h. Conditioning Systems 1964|||||

49Governor Wentworth

RegionalOssipee Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

49Governor Wentworth

RegionalOssipee Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

49Governor Wentworth

RegionalOssipee Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

49Governor Wentworth

RegionalOssipee Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalOssipee Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

49Governor Wentworth

RegionalOssipee Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

49Governor Wentworth

RegionalOssipee Central School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalOssipee Central School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalOssipee Central School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalOssipee Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalOssipee Central School Q.27 Do you have a presence of: (click all that apply) Asbestos

49Governor Wentworth

RegionalOssipee Central School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalOssipee Central School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalOssipee Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

49Governor Wentworth

RegionalTuftonboro Central School Q.01 Approximate year of the original construction date 1938

49Governor Wentworth

RegionalTuftonboro Central School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

49Governor Wentworth

RegionalTuftonboro Central School Q.03 Gross Square footage (including portables) 37470

49Governor Wentworth

RegionalTuftonboro Central School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.05 How many parking spaces does the facility have? 60

49Governor Wentworth

RegionalTuftonboro Central School Q.06 Does your building have a basement? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.07 How many portable classrooms are in use? 0

49Governor Wentworth

RegionalTuftonboro Central School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

49Governor Wentworth

RegionalTuftonboro Central School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 144 of 238

Page 145: New Hampshire Department of Education Bureau of School

49Governor Wentworth

RegionalTuftonboro Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

49Governor Wentworth

RegionalTuftonboro Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.14a a. Roofs 1938|1982|1995|2002|2004|2014

49Governor Wentworth

RegionalTuftonboro Central School Q.14b b. Lighting Systems 1938|1982|1995|2016||

49Governor Wentworth

RegionalTuftonboro Central School Q.14c c. Windows 1938|1982|1995|||

49Governor Wentworth

RegionalTuftonboro Central School Q.14d d. Ceilings 1938|1982|1995|||

49Governor Wentworth

RegionalTuftonboro Central School Q.14e e. Plumbing 1938|1982|1995|||

49Governor Wentworth

RegionalTuftonboro Central School Q.14f f. Heating Systems 1938|1982|1994|2016||

49Governor Wentworth

RegionalTuftonboro Central School Q.14g g. Ventilation Systems 1938|1982|1994|||

49Governor Wentworth

RegionalTuftonboro Central School Q.14h h. Conditioning Systems 1938|1982|1994|||

49Governor Wentworth

RegionalTuftonboro Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

49Governor Wentworth

RegionalTuftonboro Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

49Governor Wentworth

RegionalTuftonboro Central School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

49Governor Wentworth

RegionalTuftonboro Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

49Governor Wentworth

RegionalTuftonboro Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

49Governor Wentworth

RegionalTuftonboro Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

49Governor Wentworth

RegionalTuftonboro Central School Q.21 Is your building a CHP's or LEED certified? No

49Governor Wentworth

RegionalTuftonboro Central School Q.22 Have you had energy audits of all your school facilities? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.23 Do you have an energy performance contract in place? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.27 Do you have a presence of: (click all that apply) Asbestos

49Governor Wentworth

RegionalTuftonboro Central School Q.28 Do you have a facility maintenance plan? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.34 Do you have a maintenance contract in place? Yes

49Governor Wentworth

RegionalTuftonboro Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

53 Deerfield Deerfield Community School Q.01 Approximate year of the original construction date 1990

53 Deerfield Deerfield Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

53 Deerfield Deerfield Community School Q.03 Gross Square footage (including portables) 74000

53 Deerfield Deerfield Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

53 Deerfield Deerfield Community School Q.05 How many parking spaces does the facility have? 150

53 Deerfield Deerfield Community School Q.06 Does your building have a basement? No

53 Deerfield Deerfield Community School Q.07 How many portable classrooms are in use? 4

53 Deerfield Deerfield Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

53 Deerfield Deerfield Community School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

53 Deerfield Deerfield Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

53 Deerfield Deerfield Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

53 Deerfield Deerfield Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

53 Deerfield Deerfield Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

53 Deerfield Deerfield Community School Q.14a a. Roofs 29|||||

53 Deerfield Deerfield Community School Q.14b b. Lighting Systems 1|||||

53 Deerfield Deerfield Community School Q.14c c. Windows 29|||||

53 Deerfield Deerfield Community School Q.14d d. Ceilings 29|||||

53 Deerfield Deerfield Community School Q.14e e. Plumbing 29|||||

53 Deerfield Deerfield Community School Q.14f f. Heating Systems 10|||||

53 Deerfield Deerfield Community School Q.14g g. Ventilation Systems 29|||||

53 Deerfield Deerfield Community School Q.14h h. Conditioning Systems |||||

53 Deerfield Deerfield Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

53 Deerfield Deerfield Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

53 Deerfield Deerfield Community School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|Concrete

53 Deerfield Deerfield Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

Page 145 of 238

Page 146: New Hampshire Department of Education Bureau of School

53 Deerfield Deerfield Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

53 Deerfield Deerfield Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

53 Deerfield Deerfield Community School Q.21 Is your building a CHP's or LEED certified? No

53 Deerfield Deerfield Community School Q.22 Have you had energy audits of all your school facilities? Yes

53 Deerfield Deerfield Community School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

53 Deerfield Deerfield Community School Q.23 Do you have an energy performance contract in place? Yes

53 Deerfield Deerfield Community School Q.26 Do you have carbon monoxide detector(s) in your building? No

53 Deerfield Deerfield Community School Q.27 Do you have a presence of: (click all that apply) Other|Radon units installed

53 Deerfield Deerfield Community School Q.28 Do you have a facility maintenance plan? No

53 Deerfield Deerfield Community School Q.29 What is your maintenance budget? 40000

53 Deerfield Deerfield Community School Q.30 What is your operational budget? 13531421

53 Deerfield Deerfield Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100000

53 Deerfield Deerfield Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

53 Deerfield Deerfield Community School Q.34 Do you have a maintenance contract in place? Yes

53 Deerfield Deerfield Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

53 Deerfield Deerfield Community School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Middle School Addition - preliminary stages

53 Pembroke Pembroke Academy Q.01 Approximate year of the original construction date 1937

53 Pembroke Pembroke Academy Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

53 Pembroke Pembroke Academy Q.03 Gross Square footage (including portables) 160000

53 Pembroke Pembroke Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

53 Pembroke Pembroke Academy Q.05 How many parking spaces does the facility have? 335

53 Pembroke Pembroke Academy Q.06 Does your building have a basement? No

53 Pembroke Pembroke Academy Q.07 How many portable classrooms are in use? 0

53 Pembroke Pembroke Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

53 Pembroke Pembroke Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

53 Pembroke Pembroke Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

53 Pembroke Pembroke Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

53 Pembroke Pembroke Academy Q.13 Are all instructional and service areas within the facility ADA compliant? No

53 Pembroke Pembroke Academy Q.14a a. Roofs 2008|2009|1993|2010|2011|

53 Pembroke Pembroke Academy Q.14b b. Lighting Systems 2016|||||

53 Pembroke Pembroke Academy Q.14c c. Windows 2010|||||

53 Pembroke Pembroke Academy Q.14d d. Ceilings |||||

53 Pembroke Pembroke Academy Q.14e e. Plumbing |||||

53 Pembroke Pembroke Academy Q.14f f. Heating Systems 2010|1999||||

53 Pembroke Pembroke Academy Q.14g g. Ventilation Systems |||||

53 Pembroke Pembroke Academy Q.14h h. Conditioning Systems |||||

53 Pembroke Pembroke Academy Q.15 What types of roofs are on your school facility? (click all that apply) Flat

53 Pembroke Pembroke Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal|Wood

53 Pembroke Pembroke Academy Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

53 Pembroke Pembroke Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

53 Pembroke Pembroke Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

53 Pembroke Pembroke Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet|Solar

53 Pembroke Pembroke Academy Q.21 Is your building a CHP's or LEED certified? No

53 Pembroke Pembroke Academy Q.22 Have you had energy audits of all your school facilities? Yes

53 Pembroke Pembroke Academy Q.23 Do you have an energy performance contract in place? No

53 Pembroke Pembroke Academy Q.26 Do you have carbon monoxide detector(s) in your building? Yes

53 Pembroke Pembroke Academy Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint|Lead in Water

53 Pembroke Pembroke Academy Q.28 Do you have a facility maintenance plan? Yes

53 Pembroke Pembroke Academy Q.29 What is your maintenance budget? 164000

Page 146 of 238

Page 147: New Hampshire Department of Education Bureau of School

53 Pembroke Pembroke Academy Q.30 What is your operational budget? 1370000

53 Pembroke Pembroke Academy Q.31 What is your capital construction budget? 50000

53 Pembroke Pembroke Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?184000

53 Pembroke Pembroke Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?320

53 Pembroke Pembroke Academy Q.34 Do you have a maintenance contract in place? No

53 Pembroke Pembroke Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

53 Pembroke Pembroke Hill School Q.01 Approximate year of the original construction date 1962

53 Pembroke Pembroke Hill School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1985

53 Pembroke Pembroke Hill School Q.03 Gross Square footage (including portables) 44000

53 Pembroke Pembroke Hill School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

53 Pembroke Pembroke Hill School Q.05 How many parking spaces does the facility have? 98

53 Pembroke Pembroke Hill School Q.06 Does your building have a basement? No

53 Pembroke Pembroke Hill School Q.07 How many portable classrooms are in use? 2

53 Pembroke Pembroke Hill School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

53 Pembroke Pembroke Hill School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Other|We will be adding one modular w/ two

classrooms in it over the summer of 2019. They

53 Pembroke Pembroke Hill School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

53 Pembroke Pembroke Hill School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

53 Pembroke Pembroke Hill School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

53 Pembroke Pembroke Hill School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

53 Pembroke Pembroke Hill School Q.14a a. Roofs 2007|2012||||

53 Pembroke Pembroke Hill School Q.14b b. Lighting Systems 2016|2010||||

53 Pembroke Pembroke Hill School Q.14c c. Windows 2010|1985||||

53 Pembroke Pembroke Hill School Q.14d d. Ceilings 1962|1985||||

53 Pembroke Pembroke Hill School Q.14e e. Plumbing 1962|1985||||

53 Pembroke Pembroke Hill School Q.14f f. Heating Systems 2010|1985||||

53 Pembroke Pembroke Hill School Q.14g g. Ventilation Systems 1985|2016||||

53 Pembroke Pembroke Hill School Q.14h h. Conditioning Systems 1985|||||

53 Pembroke Pembroke Hill School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

53 Pembroke Pembroke Hill School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

53 Pembroke Pembroke Hill School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

53 Pembroke Pembroke Hill School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

53 Pembroke Pembroke Hill School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

53 Pembroke Pembroke Hill School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

53 Pembroke Pembroke Hill School Q.21 Is your building a CHP's or LEED certified? No

53 Pembroke Pembroke Hill School Q.22 Have you had energy audits of all your school facilities? Yes

53 Pembroke Pembroke Hill School Q.23 Do you have an energy performance contract in place? No

53 Pembroke Pembroke Hill School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

53 Pembroke Pembroke Hill School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

53 Pembroke Pembroke Hill School Q.28 Do you have a facility maintenance plan? Yes

53 Pembroke Pembroke Hill School Q.29 What is your maintenance budget? 50000

53 Pembroke Pembroke Hill School Q.30 What is your operational budget? 196000

53 Pembroke Pembroke Hill School Q.31 What is your capital construction budget? 20000

53 Pembroke Pembroke Hill School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?35000

53 Pembroke Pembroke Hill School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?100

53 Pembroke Pembroke Hill School Q.34 Do you have a maintenance contract in place? No

53 Pembroke Pembroke Hill School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

53 Pembroke Pembroke Hill School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Addition to add classrooms and remove modular.

53 Pembroke Pembroke Hill School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 10000000

53 Pembroke Pembroke Hill School Q.35c c. If yes, provide estimated year of construction. 20232024

Page 147 of 238

Page 148: New Hampshire Department of Education Bureau of School

53 Pembroke Pembroke Village School Q.01 Approximate year of the original construction date 1907

53 Pembroke Pembroke Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1957

53 Pembroke Pembroke Village School Q.03 Gross Square footage (including portables) 33000

53 Pembroke Pembroke Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

53 Pembroke Pembroke Village School Q.05 How many parking spaces does the facility have? 52

53 Pembroke Pembroke Village School Q.06 Does your building have a basement? Yes

53 Pembroke Pembroke Village School Q.07 How many portable classrooms are in use? 0

53 Pembroke Pembroke Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

53 Pembroke Pembroke Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

53 Pembroke Pembroke Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

53 Pembroke Pembroke Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

53 Pembroke Pembroke Village School Q.13 Are all instructional and service areas within the facility ADA compliant? No

53 Pembroke Pembroke Village School Q.14a a. Roofs 2007|||||

53 Pembroke Pembroke Village School Q.14b b. Lighting Systems 2016|||||

53 Pembroke Pembroke Village School Q.14c c. Windows 2010|||||

53 Pembroke Pembroke Village School Q.14d d. Ceilings |||||

53 Pembroke Pembroke Village School Q.14e e. Plumbing |||||

53 Pembroke Pembroke Village School Q.14f f. Heating Systems 2010|||||

53 Pembroke Pembroke Village School Q.14g g. Ventilation Systems |||||

53 Pembroke Pembroke Village School Q.14h h. Conditioning Systems |||||

53 Pembroke Pembroke Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

53 Pembroke Pembroke Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

53 Pembroke Pembroke Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

53 Pembroke Pembroke Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

53 Pembroke Pembroke Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

53 Pembroke Pembroke Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

53 Pembroke Pembroke Village School Q.21 Is your building a CHP's or LEED certified? No

53 Pembroke Pembroke Village School Q.22 Have you had energy audits of all your school facilities? Yes

53 Pembroke Pembroke Village School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

53 Pembroke Pembroke Village School Q.23 Do you have an energy performance contract in place? No

53 Pembroke Pembroke Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

53 Pembroke Pembroke Village School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

53 Pembroke Pembroke Village School Q.28 Do you have a facility maintenance plan? Yes

53 Pembroke Pembroke Village School Q.29 What is your maintenance budget? 44080

53 Pembroke Pembroke Village School Q.30 What is your operational budget? 165000

53 Pembroke Pembroke Village School Q.31 What is your capital construction budget? 5000

53 Pembroke Pembroke Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?43000

53 Pembroke Pembroke Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?100

53 Pembroke Pembroke Village School Q.34 Do you have a maintenance contract in place? No

53 Pembroke Pembroke Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

53 Pembroke Three Rivers School Q.01 Approximate year of the original construction date 1992

53 Pembroke Three Rivers School Q.03 Gross Square footage (including portables) 65000

53 Pembroke Three Rivers School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

53 Pembroke Three Rivers School Q.05 How many parking spaces does the facility have? 94

53 Pembroke Three Rivers School Q.06 Does your building have a basement? No

53 Pembroke Three Rivers School Q.07 How many portable classrooms are in use? 0

53 Pembroke Three Rivers School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

53 Pembroke Three Rivers School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

53 Pembroke Three Rivers School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 148 of 238

Page 149: New Hampshire Department of Education Bureau of School

53 Pembroke Three Rivers School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

53 Pembroke Three Rivers School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

53 Pembroke Three Rivers School Q.14a a. Roofs 2016|||||

53 Pembroke Three Rivers School Q.14b b. Lighting Systems 2016|1992||||

53 Pembroke Three Rivers School Q.14c c. Windows 1992|||||

53 Pembroke Three Rivers School Q.14d d. Ceilings 1992|||||

53 Pembroke Three Rivers School Q.14e e. Plumbing 1992|||||

53 Pembroke Three Rivers School Q.14f f. Heating Systems 1992|2010||||

53 Pembroke Three Rivers School Q.14g g. Ventilation Systems 1992|2016||||

53 Pembroke Three Rivers School Q.14h h. Conditioning Systems 1992|2016||||

53 Pembroke Three Rivers School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

53 Pembroke Three Rivers School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

53 Pembroke Three Rivers School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

53 Pembroke Three Rivers School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

53 Pembroke Three Rivers School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

53 Pembroke Three Rivers School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

53 Pembroke Three Rivers School Q.21 Is your building a CHP's or LEED certified? No

53 Pembroke Three Rivers School Q.22 Have you had energy audits of all your school facilities? Yes

53 Pembroke Three Rivers School Q.23 Do you have an energy performance contract in place? No

53 Pembroke Three Rivers School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

53 Pembroke Three Rivers School Q.28 Do you have a facility maintenance plan? Yes

53 Pembroke Three Rivers School Q.29 What is your maintenance budget? 47000

53 Pembroke Three Rivers School Q.30 What is your operational budget? 337000

53 Pembroke Three Rivers School Q.31 What is your capital construction budget? 45000

53 Pembroke Three Rivers School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?61000

53 Pembroke Three Rivers School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?160

53 Pembroke Three Rivers School Q.34 Do you have a maintenance contract in place? No

53 Pembroke Three Rivers School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

56 Somersworth Idlehurst Elementary School Q.01 Approximate year of the original construction date 2011

56 Somersworth Idlehurst Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

56 Somersworth Idlehurst Elementary School Q.03 Gross Square footage (including portables) 82000

56 Somersworth Idlehurst Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

56 Somersworth Idlehurst Elementary School Q.05 How many parking spaces does the facility have? 186

56 Somersworth Idlehurst Elementary School Q.06 Does your building have a basement? No

56 Somersworth Idlehurst Elementary School Q.07 How many portable classrooms are in use? 0

56 Somersworth Idlehurst Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

56 Somersworth Idlehurst Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

56 Somersworth Idlehurst Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

56 Somersworth Idlehurst Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

56 Somersworth Idlehurst Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

56 Somersworth Idlehurst Elementary School Q.14a a. Roofs 2011|||||

56 Somersworth Idlehurst Elementary School Q.14b b. Lighting Systems 2011|||||

56 Somersworth Idlehurst Elementary School Q.14c c. Windows 2011|||||

56 Somersworth Idlehurst Elementary School Q.14d d. Ceilings 2011|||||

56 Somersworth Idlehurst Elementary School Q.14e e. Plumbing 2011|||||

56 Somersworth Idlehurst Elementary School Q.14f f. Heating Systems 2011|||||

56 Somersworth Idlehurst Elementary School Q.14g g. Ventilation Systems 2011|||||

56 Somersworth Idlehurst Elementary School Q.14h h. Conditioning Systems 2011|||||

56 Somersworth Idlehurst Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

Page 149 of 238

Page 150: New Hampshire Department of Education Bureau of School

56 Somersworth Idlehurst Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

56 Somersworth Idlehurst Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

56 Somersworth Idlehurst Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

56 Somersworth Idlehurst Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

56 Somersworth Idlehurst Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

56 Somersworth Idlehurst Elementary School Q.21 Is your building a CHP's or LEED certified? Yes

56 Somersworth Idlehurst Elementary School Q.22 Have you had energy audits of all your school facilities? No

56 Somersworth Idlehurst Elementary School Q.23 Do you have an energy performance contract in place? No

56 Somersworth Idlehurst Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

56 Somersworth Idlehurst Elementary School Q.28 Do you have a facility maintenance plan? Yes

56 Somersworth Idlehurst Elementary School Q.29 What is your maintenance budget? 13800

56 Somersworth Idlehurst Elementary School Q.30 What is your operational budget? 131679

56 Somersworth Idlehurst Elementary School Q.31 What is your capital construction budget? 0

56 Somersworth Idlehurst Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?117500

56 Somersworth Idlehurst Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

56 Somersworth Idlehurst Elementary School Q.34 Do you have a maintenance contract in place? Yes

56 Somersworth Idlehurst Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

56 Somersworth Maple Wood Elementary School Q.01 Approximate year of the original construction date 1980

56 Somersworth Maple Wood Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

56 Somersworth Maple Wood Elementary School Q.03 Gross Square footage (including portables) 35697

56 Somersworth Maple Wood Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

56 Somersworth Maple Wood Elementary School Q.05 How many parking spaces does the facility have? 78

56 Somersworth Maple Wood Elementary School Q.06 Does your building have a basement? No

56 Somersworth Maple Wood Elementary School Q.07 How many portable classrooms are in use? 0

56 Somersworth Maple Wood Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

56 Somersworth Maple Wood Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

56 Somersworth Maple Wood Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

56 Somersworth Maple Wood Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

56 Somersworth Maple Wood Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

56 Somersworth Maple Wood Elementary School Q.14a a. Roofs 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14b b. Lighting Systems 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14c c. Windows 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14d d. Ceilings 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14e e. Plumbing 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14f f. Heating Systems 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14g g. Ventilation Systems 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.14h h. Conditioning Systems 1980|1999||||

56 Somersworth Maple Wood Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

56 Somersworth Maple Wood Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Other|Vinyl Siding

56 Somersworth Maple Wood Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

56 Somersworth Maple Wood Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

56 Somersworth Maple Wood Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

56 Somersworth Maple Wood Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

56 Somersworth Maple Wood Elementary School Q.21 Is your building a CHP's or LEED certified? No

56 Somersworth Maple Wood Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

56 Somersworth Maple Wood Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

56 Somersworth Maple Wood Elementary School Q.23 Do you have an energy performance contract in place? Yes

56 Somersworth Maple Wood Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

56 Somersworth Maple Wood Elementary School Q.27 Do you have a presence of: (click all that apply) Lead in Water

Page 150 of 238

Page 151: New Hampshire Department of Education Bureau of School

56 Somersworth Maple Wood Elementary School Q.28 Do you have a facility maintenance plan? Yes

56 Somersworth Maple Wood Elementary School Q.29 What is your maintenance budget? 26348

56 Somersworth Maple Wood Elementary School Q.30 What is your operational budget? 69100

56 Somersworth Maple Wood Elementary School Q.31 What is your capital construction budget? 26963

56 Somersworth Maple Wood Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?69206

56 Somersworth Maple Wood Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

56 Somersworth Maple Wood Elementary School Q.34 Do you have a maintenance contract in place? Yes

56 Somersworth Maple Wood Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

56 Somersworth Maple Wood Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Main entry security upgrade, office upgrade PC

56 Somersworth Maple Wood Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

56 Somersworth Maple Wood Elementary School Q.35c c. If yes, provide estimated year of construction. 2019

56 Somersworth Somersworth Career Technical Center Q.01 Approximate year of the original construction date 1990

56 Somersworth Somersworth Career Technical Center Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

56 Somersworth Somersworth Career Technical Center Q.03 Gross Square footage (including portables) 72000

56 Somersworth Somersworth Career Technical Center Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

56 Somersworth Somersworth Career Technical Center Q.05 How many parking spaces does the facility have? 33

56 Somersworth Somersworth Career Technical Center Q.06 Does your building have a basement? No

56 Somersworth Somersworth Career Technical Center Q.07 How many portable classrooms are in use? 0

56 Somersworth Somersworth Career Technical Center Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

56 Somersworth Somersworth Career Technical Center Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

56 Somersworth Somersworth Career Technical Center Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

56 Somersworth Somersworth Career Technical Center Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

56 Somersworth Somersworth Career Technical Center Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

56 Somersworth Somersworth Career Technical Center Q.14a a. Roofs 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14b b. Lighting Systems 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14c c. Windows 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14d d. Ceilings 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14e e. Plumbing 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14f f. Heating Systems 2018|||||

56 Somersworth Somersworth Career Technical Center Q.14g g. Ventilation Systems 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.14h h. Conditioning Systems 1990|2018||||

56 Somersworth Somersworth Career Technical Center Q.15 What types of roofs are on your school facility? (click all that apply) Flat

56 Somersworth Somersworth Career Technical Center Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

56 Somersworth Somersworth Career Technical Center Q.17 What type of studding is used at your school facility? (click all that apply) Steel

56 Somersworth Somersworth Career Technical Center Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

56 Somersworth Somersworth Career Technical Center Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

56 Somersworth Somersworth Career Technical Center Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

56 Somersworth Somersworth Career Technical Center Q.21 Is your building a CHP's or LEED certified? No

56 Somersworth Somersworth Career Technical Center Q.22 Have you had energy audits of all your school facilities? Yes

56 Somersworth Somersworth Career Technical Center Q.23 Do you have an energy performance contract in place? No

56 Somersworth Somersworth Career Technical Center Q.26 Do you have carbon monoxide detector(s) in your building? Yes

56 Somersworth Somersworth Career Technical Center Q.27 Do you have a presence of: (click all that apply) Other|Copper in water

56 Somersworth Somersworth Career Technical Center Q.28 Do you have a facility maintenance plan? Yes

56 Somersworth Somersworth Career Technical Center Q.29 What is your maintenance budget? 12327

56 Somersworth Somersworth Career Technical Center Q.30 What is your operational budget? 60000

56 Somersworth Somersworth Career Technical Center Q.31 What is your capital construction budget? 0

56 Somersworth Somersworth Career Technical Center Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?110500

56 Somersworth Somersworth Career Technical Center Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

56 Somersworth Somersworth Career Technical Center Q.34 Do you have a maintenance contract in place? Yes

Page 151 of 238

Page 152: New Hampshire Department of Education Bureau of School

56 Somersworth Somersworth Career Technical Center Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

56 Somersworth Somersworth High School Q.01 Approximate year of the original construction date 1956

56 Somersworth Somersworth High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2016

56 Somersworth Somersworth High School Q.03 Gross Square footage (including portables) 107000

56 Somersworth Somersworth High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

56 Somersworth Somersworth High School Q.05 How many parking spaces does the facility have? 159

56 Somersworth Somersworth High School Q.06 Does your building have a basement? Yes

56 Somersworth Somersworth High School Q.07 How many portable classrooms are in use? 0

56 Somersworth Somersworth High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

56 Somersworth Somersworth High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

56 Somersworth Somersworth High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

56 Somersworth Somersworth High School Q.14a a. Roofs 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14b b. Lighting Systems 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14c c. Windows 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14d d. Ceilings 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14e e. Plumbing 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14f f. Heating Systems 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14g g. Ventilation Systems 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.14h h. Conditioning Systems 1956|1964|1990|1997|2016|

56 Somersworth Somersworth High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

56 Somersworth Somersworth High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

56 Somersworth Somersworth High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

56 Somersworth Somersworth High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

56 Somersworth Somersworth High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

56 Somersworth Somersworth High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

56 Somersworth Somersworth High School Q.21 Is your building a CHP's or LEED certified? No

56 Somersworth Somersworth High School Q.23 Do you have an energy performance contract in place? No

56 Somersworth Somersworth High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

56 Somersworth Somersworth High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

56 Somersworth Somersworth High School Q.28 Do you have a facility maintenance plan? Yes

56 Somersworth Somersworth High School Q.29 What is your maintenance budget? 44924

56 Somersworth Somersworth High School Q.30 What is your operational budget? 200065

56 Somersworth Somersworth High School Q.31 What is your capital construction budget? 0

56 Somersworth Somersworth High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?189368

56 Somersworth Somersworth High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

56 Somersworth Somersworth High School Q.34 Do you have a maintenance contract in place? Yes

56 Somersworth Somersworth High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

56 Somersworth Somersworth Middle School Q.01 Approximate year of the original construction date 1962

56 Somersworth Somersworth Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1994

56 Somersworth Somersworth Middle School Q.03 Gross Square footage (including portables) 64000

56 Somersworth Somersworth Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

56 Somersworth Somersworth Middle School Q.05 How many parking spaces does the facility have? 40

56 Somersworth Somersworth Middle School Q.06 Does your building have a basement? No

56 Somersworth Somersworth Middle School Q.07 How many portable classrooms are in use? 0

56 Somersworth Somersworth Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

56 Somersworth Somersworth Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

56 Somersworth Somersworth Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

56 Somersworth Somersworth Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

56 Somersworth Somersworth Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? No

Page 152 of 238

Page 153: New Hampshire Department of Education Bureau of School

56 Somersworth Somersworth Middle School Q.14a a. Roofs 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14b b. Lighting Systems 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14c c. Windows 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14d d. Ceilings 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14e e. Plumbing 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14f f. Heating Systems 1962|1968|1989|1994||

56 Somersworth Somersworth Middle School Q.14g g. Ventilation Systems 1962|1968|1989|1994|2019|

56 Somersworth Somersworth Middle School Q.14h h. Conditioning Systems 1919|||||

56 Somersworth Somersworth Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

56 Somersworth Somersworth Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

56 Somersworth Somersworth Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

56 Somersworth Somersworth Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

56 Somersworth Somersworth Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

56 Somersworth Somersworth Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

56 Somersworth Somersworth Middle School Q.21 Is your building a CHP's or LEED certified? No

56 Somersworth Somersworth Middle School Q.22 Have you had energy audits of all your school facilities? Yes

56 Somersworth Somersworth Middle School Q.23 Do you have an energy performance contract in place? No

56 Somersworth Somersworth Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 0

56 Somersworth Somersworth Middle School Q.25 What is the R-Value of the roof? 0

56 Somersworth Somersworth Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

56 Somersworth Somersworth Middle School Q.29 What is your maintenance budget? 45800

56 Somersworth Somersworth Middle School Q.30 What is your operational budget? 90100

56 Somersworth Somersworth Middle School Q.31 What is your capital construction budget? 0

56 Somersworth Somersworth Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?189368

56 Somersworth Somersworth Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

56 Somersworth Somersworth Middle School Q.34 Do you have a maintenance contract in place? Yes

56 Somersworth Somersworth Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

58 Northumberland Groveton Elementary School Q.01 Approximate year of the original construction date 1908

58 Northumberland Groveton Elementary School Q.03 Gross Square footage (including portables) 26037

58 Northumberland Groveton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

58 Northumberland Groveton Elementary School Q.05 How many parking spaces does the facility have? 3

58 Northumberland Groveton Elementary School Q.06 Does your building have a basement? Yes

58 Northumberland Groveton Elementary School Q.07 How many portable classrooms are in use? 1

58 Northumberland Groveton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

58 Northumberland Groveton Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special (music, art, etc)|Other|After School

Program

58 Northumberland Groveton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

58 Northumberland Groveton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

58 Northumberland Groveton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

58 Northumberland Groveton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

58 Northumberland Groveton Elementary School Q.14a a. Roofs NA|||||x

58 Northumberland Groveton Elementary School Q.14b b. Lighting Systems NA||||x|

58 Northumberland Groveton Elementary School Q.14c c. Windows NA|||||x

58 Northumberland Groveton Elementary School Q.14d d. Ceilings NA|||||x

58 Northumberland Groveton Elementary School Q.14e e. Plumbing NA|||||x

58 Northumberland Groveton Elementary School Q.14f f. Heating Systems NA|||||x

58 Northumberland Groveton Elementary School Q.14g g. Ventilation Systems NA|||||x

58 Northumberland Groveton Elementary School Q.14h h. Conditioning Systems NA|||||x

58 Northumberland Groveton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

58 Northumberland Groveton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

Page 153 of 238

Page 154: New Hampshire Department of Education Bureau of School

58 Northumberland Groveton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

58 Northumberland Groveton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

58 Northumberland Groveton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

58 Northumberland Groveton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

58 Northumberland Groveton Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

58 Northumberland Groveton Elementary School Q.23 Do you have an energy performance contract in place? No

58 Northumberland Groveton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

58 Northumberland Groveton Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

58 Northumberland Groveton Elementary School Q.28 Do you have a facility maintenance plan? Yes

58 Northumberland Groveton Elementary School Q.29 What is your maintenance budget? 22000.00

58 Northumberland Groveton Elementary School Q.30 What is your operational budget? 1436275.68

58 Northumberland Groveton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?33635.00

58 Northumberland Groveton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?40

58 Northumberland Groveton Elementary School Q.34 Do you have a maintenance contract in place? No

58 Northumberland Groveton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

58 Northumberland Groveton High School Q.01 Approximate year of the original construction date 1926

58 Northumberland Groveton High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1986

58 Northumberland Groveton High School Q.03 Gross Square footage (including portables) 56010

58 Northumberland Groveton High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

58 Northumberland Groveton High School Q.06 Does your building have a basement? Yes

58 Northumberland Groveton High School Q.07 How many portable classrooms are in use? 0

58 Northumberland Groveton High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

58 Northumberland Groveton High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

58 Northumberland Groveton High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

58 Northumberland Groveton High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

58 Northumberland Groveton High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

58 Northumberland Groveton High School Q.14a a. Roofs unknown|||||

58 Northumberland Groveton High School Q.14b b. Lighting Systems unknown|||||

58 Northumberland Groveton High School Q.14c c. Windows unknown|||||

58 Northumberland Groveton High School Q.14d d. Ceilings unknown|||||

58 Northumberland Groveton High School Q.14e e. Plumbing unknown|||||

58 Northumberland Groveton High School Q.14f f. Heating Systems unknown|||||

58 Northumberland Groveton High School Q.14g g. Ventilation Systems unknown|||||

58 Northumberland Groveton High School Q.14h h. Conditioning Systems unknown|||||

58 Northumberland Groveton High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

58 Northumberland Groveton High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

58 Northumberland Groveton High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

58 Northumberland Groveton High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

58 Northumberland Groveton High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

58 Northumberland Groveton High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

58 Northumberland Groveton High School Q.21 Is your building a CHP's or LEED certified? No

58 Northumberland Groveton High School Q.22 Have you had energy audits of all your school facilities? Yes

58 Northumberland Groveton High School Q.23 Do you have an energy performance contract in place? Yes

58 Northumberland Groveton High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

58 Northumberland Groveton High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

58 Northumberland Groveton High School Q.28 Do you have a facility maintenance plan? Yes

58 Northumberland Groveton High School Q.29 What is your maintenance budget? 465629

58 Northumberland Groveton High School Q.30 What is your operational budget? 5556567

58 Northumberland Groveton High School Q.31 What is your capital construction budget? 0

Page 154 of 238

Page 155: New Hampshire Department of Education Bureau of School

58 Northumberland Groveton High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?63323

58 Northumberland Groveton High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

58 Northumberland Groveton High School Q.34 Do you have a maintenance contract in place? Yes

58 Northumberland Groveton High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

58 Northumberland Groveton High School (Middle) Q.01 Approximate year of the original construction date 1926

58 Northumberland Groveton High School (Middle) Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1986

58 Northumberland Groveton High School (Middle) Q.03 Gross Square footage (including portables) 56010

58 Northumberland Groveton High School (Middle) Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

58 Northumberland Groveton High School (Middle) Q.05 How many parking spaces does the facility have? 7

58 Northumberland Groveton High School (Middle) Q.06 Does your building have a basement? Yes

58 Northumberland Groveton High School (Middle) Q.07 How many portable classrooms are in use? 0

58 Northumberland Groveton High School (Middle) Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

58 Northumberland Groveton High School (Middle) Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

58 Northumberland Groveton High School (Middle) Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

58 Northumberland Groveton High School (Middle) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

58 Northumberland Groveton High School (Middle) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

58 Northumberland Groveton High School (Middle) Q.14a a. Roofs unknown|||||

58 Northumberland Groveton High School (Middle) Q.14b b. Lighting Systems unknown|||||

58 Northumberland Groveton High School (Middle) Q.14c c. Windows unknown|||||

58 Northumberland Groveton High School (Middle) Q.14d d. Ceilings unknown|||||

58 Northumberland Groveton High School (Middle) Q.14e e. Plumbing unknown|||||

58 Northumberland Groveton High School (Middle) Q.14f f. Heating Systems unknown|||||

58 Northumberland Groveton High School (Middle) Q.14g g. Ventilation Systems unknown|||||

58 Northumberland Groveton High School (Middle) Q.14h h. Conditioning Systems unknown|||||

58 Northumberland Groveton High School (Middle) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

58 Northumberland Groveton High School (Middle) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

58 Northumberland Groveton High School (Middle) Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

58 Northumberland Groveton High School (Middle) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

58 Northumberland Groveton High School (Middle) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

58 Northumberland Groveton High School (Middle) Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

58 Northumberland Groveton High School (Middle) Q.21 Is your building a CHP's or LEED certified? No

58 Northumberland Groveton High School (Middle) Q.22 Have you had energy audits of all your school facilities? Yes

58 Northumberland Groveton High School (Middle) Q.23 Do you have an energy performance contract in place? Yes

58 Northumberland Groveton High School (Middle) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

58 Northumberland Groveton High School (Middle) Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

58 Northumberland Groveton High School (Middle) Q.28 Do you have a facility maintenance plan? Yes

58 Northumberland Groveton High School (Middle) Q.29 What is your maintenance budget? 465629

58 Northumberland Groveton High School (Middle) Q.30 What is your operational budget? 5556567.

58 Northumberland Groveton High School (Middle) Q.31 What is your capital construction budget? 0

58 Northumberland Groveton High School (Middle) Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?63323.

58 Northumberland Groveton High School (Middle) Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

58 Northumberland Groveton High School (Middle) Q.34 Do you have a maintenance contract in place? Yes

58 Northumberland Groveton High School (Middle) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

58 Stark Stark Village School Q.01 Approximate year of the original construction date 1890

58 Stark Stark Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1991

58 Stark Stark Village School Q.03 Gross Square footage (including portables) 6500

58 Stark Stark Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

58 Stark Stark Village School Q.05 How many parking spaces does the facility have? 15

58 Stark Stark Village School Q.06 Does your building have a basement? No

Page 155 of 238

Page 156: New Hampshire Department of Education Bureau of School

58 Stark Stark Village School Q.07 How many portable classrooms are in use? 0

58 Stark Stark Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

58 Stark Stark Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

58 Stark Stark Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

58 Stark Stark Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

58 Stark Stark Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

58 Stark Stark Village School Q.14a a. Roofs |||||28yrs.

58 Stark Stark Village School Q.14b b. Lighting Systems 1|||||

58 Stark Stark Village School Q.14c c. Windows |||||28 yrs.

58 Stark Stark Village School Q.14d d. Ceilings |||||28 yrs.

58 Stark Stark Village School Q.14e e. Plumbing |||||28 yrs.

58 Stark Stark Village School Q.14f f. Heating Systems |||||28 yrs.

58 Stark Stark Village School Q.14g g. Ventilation Systems |||||28 yrs.

58 Stark Stark Village School Q.14h h. Conditioning Systems |||||NA

58 Stark Stark Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

58 Stark Stark Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

58 Stark Stark Village School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

58 Stark Stark Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

58 Stark Stark Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

58 Stark Stark Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

58 Stark Stark Village School Q.21 Is your building a CHP's or LEED certified? No

58 Stark Stark Village School Q.22 Have you had energy audits of all your school facilities? Yes

58 Stark Stark Village School Q.23 Do you have an energy performance contract in place? No

58 Stark Stark Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

58 Stark Stark Village School Q.28 Do you have a facility maintenance plan? Yes

58 Stark Stark Village School Q.29 What is your maintenance budget? 8500

58 Stark Stark Village School Q.30 What is your operational budget? 1099000

58 Stark Stark Village School Q.31 What is your capital construction budget? 112639

58 Stark Stark Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?12000

58 Stark Stark Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?05

58 Stark Stark Village School Q.34 Do you have a maintenance contract in place? Yes

58 Stark Stark Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

58 Stratford Stratford Public School Q.01 Approximate year of the original construction date 1916

58 Stratford Stratford Public School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1993

58 Stratford Stratford Public School Q.03 Gross Square footage (including portables) 36750

58 Stratford Stratford Public School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

58 Stratford Stratford Public School Q.05 How many parking spaces does the facility have? 40

58 Stratford Stratford Public School Q.06 Does your building have a basement? Yes

58 Stratford Stratford Public School Q.07 How many portable classrooms are in use? 0

58 Stratford Stratford Public School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

58 Stratford Stratford Public School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

58 Stratford Stratford Public School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

58 Stratford Stratford Public School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

58 Stratford Stratford Public School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

58 Stratford Stratford Public School Q.14a a. Roofs NA|||||

58 Stratford Stratford Public School Q.14b b. Lighting Systems NA|||||

58 Stratford Stratford Public School Q.14c c. Windows NA|||||

58 Stratford Stratford Public School Q.14d d. Ceilings NA|||||

58 Stratford Stratford Public School Q.14e e. Plumbing NA|||||

Page 156 of 238

Page 157: New Hampshire Department of Education Bureau of School

58 Stratford Stratford Public School Q.14f f. Heating Systems NA|||||

58 Stratford Stratford Public School Q.14g g. Ventilation Systems NA|||||

58 Stratford Stratford Public School Q.14h h. Conditioning Systems NA|||||

58 Stratford Stratford Public School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

58 Stratford Stratford Public School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

58 Stratford Stratford Public School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

58 Stratford Stratford Public School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

58 Stratford Stratford Public School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

58 Stratford Stratford Public School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

58 Stratford Stratford Public School Q.21 Is your building a CHP's or LEED certified? No

58 Stratford Stratford Public School Q.22 Have you had energy audits of all your school facilities? Yes

58 Stratford Stratford Public School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

58 Stratford Stratford Public School Q.23 Do you have an energy performance contract in place? No

58 Stratford Stratford Public School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

58 Stratford Stratford Public School Q.27 Do you have a presence of: (click all that apply) Asbestos

58 Stratford Stratford Public School Q.28 Do you have a facility maintenance plan? Yes

58 Stratford Stratford Public School Q.29 What is your maintenance budget? 30000

58 Stratford Stratford Public School Q.30 What is your operational budget? 191000

58 Stratford Stratford Public School Q.31 What is your capital construction budget? 0

58 Stratford Stratford Public School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?56000

58 Stratford Stratford Public School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?19

58 Stratford Stratford Public School Q.34 Do you have a maintenance contract in place? Yes

58 Stratford Stratford Public School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

59 Winnisquam Regional Sanbornton Central School Q.01 Approximate year of the original construction date 1949

59 Winnisquam Regional Sanbornton Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1994

59 Winnisquam Regional Sanbornton Central School Q.03 Gross Square footage (including portables) 31298

59 Winnisquam Regional Sanbornton Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

59 Winnisquam Regional Sanbornton Central School Q.05 How many parking spaces does the facility have? 49

59 Winnisquam Regional Sanbornton Central School Q.06 Does your building have a basement? Yes

59 Winnisquam Regional Sanbornton Central School Q.07 How many portable classrooms are in use? 0

59 Winnisquam Regional Sanbornton Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

59 Winnisquam Regional Sanbornton Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

59 Winnisquam Regional Sanbornton Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

59 Winnisquam Regional Sanbornton Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

59 Winnisquam Regional Sanbornton Central School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

59 Winnisquam Regional Sanbornton Central School Q.14a a. Roofs 1994|2012||||

59 Winnisquam Regional Sanbornton Central School Q.14b b. Lighting Systems 1994|||||

59 Winnisquam Regional Sanbornton Central School Q.14c c. Windows 1994|||||

59 Winnisquam Regional Sanbornton Central School Q.14d d. Ceilings 1994|||||

59 Winnisquam Regional Sanbornton Central School Q.14e e. Plumbing 1949|1994||||

59 Winnisquam Regional Sanbornton Central School Q.14f f. Heating Systems 2011|2017||||

59 Winnisquam Regional Sanbornton Central School Q.14g g. Ventilation Systems 1994|||||

59 Winnisquam Regional Sanbornton Central School Q.14h h. Conditioning Systems 1994|||||

59 Winnisquam Regional Sanbornton Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

59 Winnisquam Regional Sanbornton Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

59 Winnisquam Regional Sanbornton Central School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

59 Winnisquam Regional Sanbornton Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

59 Winnisquam Regional Sanbornton Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

59 Winnisquam Regional Sanbornton Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Wood Chip/Pellet

Page 157 of 238

Page 158: New Hampshire Department of Education Bureau of School

59 Winnisquam Regional Sanbornton Central School Q.21 Is your building a CHP's or LEED certified? No

59 Winnisquam Regional Sanbornton Central School Q.22 Have you had energy audits of all your school facilities? Yes

59 Winnisquam Regional Sanbornton Central School Q.23 Do you have an energy performance contract in place? No

59 Winnisquam Regional Sanbornton Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 9

59 Winnisquam Regional Sanbornton Central School Q.25 What is the R-Value of the roof? 15

59 Winnisquam Regional Sanbornton Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

59 Winnisquam Regional Sanbornton Central School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

59 Winnisquam Regional Sanbornton Central School Q.28 Do you have a facility maintenance plan? Yes

59 Winnisquam Regional Sanbornton Central School Q.29 What is your maintenance budget? 241000

59 Winnisquam Regional Sanbornton Central School Q.30 What is your operational budget? 2185000

59 Winnisquam Regional Sanbornton Central School Q.31 What is your capital construction budget? 42813

59 Winnisquam Regional Sanbornton Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?23000

59 Winnisquam Regional Sanbornton Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?90

59 Winnisquam Regional Sanbornton Central School Q.34 Do you have a maintenance contract in place? No

59 Winnisquam Regional Sanbornton Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

59 Winnisquam Regional Southwick School Q.01 Approximate year of the original construction date 1995

59 Winnisquam Regional Southwick School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

59 Winnisquam Regional Southwick School Q.03 Gross Square footage (including portables) 42119

59 Winnisquam Regional Southwick School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

59 Winnisquam Regional Southwick School Q.05 How many parking spaces does the facility have? 68

59 Winnisquam Regional Southwick School Q.06 Does your building have a basement? No

59 Winnisquam Regional Southwick School Q.07 How many portable classrooms are in use? 0

59 Winnisquam Regional Southwick School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

59 Winnisquam Regional Southwick School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

59 Winnisquam Regional Southwick School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

59 Winnisquam Regional Southwick School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

59 Winnisquam Regional Southwick School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

59 Winnisquam Regional Southwick School Q.14a a. Roofs 2014|||||

59 Winnisquam Regional Southwick School Q.14b b. Lighting Systems 1995|||||

59 Winnisquam Regional Southwick School Q.14c c. Windows 1995|||||

59 Winnisquam Regional Southwick School Q.14d d. Ceilings 1995|||||

59 Winnisquam Regional Southwick School Q.14e e. Plumbing 1995|||||

59 Winnisquam Regional Southwick School Q.14f f. Heating Systems 1995|||||

59 Winnisquam Regional Southwick School Q.14g g. Ventilation Systems 1995|||||

59 Winnisquam Regional Southwick School Q.14h h. Conditioning Systems 1995|||||

59 Winnisquam Regional Southwick School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

59 Winnisquam Regional Southwick School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

59 Winnisquam Regional Southwick School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

59 Winnisquam Regional Southwick School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

59 Winnisquam Regional Southwick School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

59 Winnisquam Regional Southwick School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

59 Winnisquam Regional Southwick School Q.21 Is your building a CHP's or LEED certified? No

59 Winnisquam Regional Southwick School Q.22 Have you had energy audits of all your school facilities? Yes

59 Winnisquam Regional Southwick School Q.23 Do you have an energy performance contract in place? No

59 Winnisquam Regional Southwick School Q.24 What is the R-Value of the exterior walls, windows, and doors? 9

59 Winnisquam Regional Southwick School Q.25 What is the R-Value of the roof? 15

59 Winnisquam Regional Southwick School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

59 Winnisquam Regional Southwick School Q.28 Do you have a facility maintenance plan? Yes

59 Winnisquam Regional Southwick School Q.29 What is your maintenance budget? 257000

Page 158 of 238

Page 159: New Hampshire Department of Education Bureau of School

59 Winnisquam Regional Southwick School Q.30 What is your operational budget? 2649000

59 Winnisquam Regional Southwick School Q.31 What is your capital construction budget? 57000

59 Winnisquam Regional Southwick School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?58000

59 Winnisquam Regional Southwick School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?90

59 Winnisquam Regional Southwick School Q.34 Do you have a maintenance contract in place? No

59 Winnisquam Regional Southwick School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

59 Winnisquam Regional Union Sanborn School Q.01 Approximate year of the original construction date 1920

59 Winnisquam Regional Union Sanborn School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

59 Winnisquam Regional Union Sanborn School Q.03 Gross Square footage (including portables) 44347

59 Winnisquam Regional Union Sanborn School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

59 Winnisquam Regional Union Sanborn School Q.05 How many parking spaces does the facility have? 73

59 Winnisquam Regional Union Sanborn School Q.06 Does your building have a basement? No

59 Winnisquam Regional Union Sanborn School Q.07 How many portable classrooms are in use? 0

59 Winnisquam Regional Union Sanborn School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

59 Winnisquam Regional Union Sanborn School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

59 Winnisquam Regional Union Sanborn School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

59 Winnisquam Regional Union Sanborn School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

59 Winnisquam Regional Union Sanborn School Q.13 Are all instructional and service areas within the facility ADA compliant? No

59 Winnisquam Regional Union Sanborn School Q.14a a. Roofs 1995|2011||||

59 Winnisquam Regional Union Sanborn School Q.14b b. Lighting Systems 1995|2010||||

59 Winnisquam Regional Union Sanborn School Q.14c c. Windows 1995|||||

59 Winnisquam Regional Union Sanborn School Q.14d d. Ceilings 1960|1994||||

59 Winnisquam Regional Union Sanborn School Q.14e e. Plumbing 1960|1994||||

59 Winnisquam Regional Union Sanborn School Q.14f f. Heating Systems 1960|1994||||

59 Winnisquam Regional Union Sanborn School Q.14g g. Ventilation Systems 1994|||||

59 Winnisquam Regional Union Sanborn School Q.14h h. Conditioning Systems 1994|||||

59 Winnisquam Regional Union Sanborn School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

59 Winnisquam Regional Union Sanborn School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

59 Winnisquam Regional Union Sanborn School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

59 Winnisquam Regional Union Sanborn School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

59 Winnisquam Regional Union Sanborn School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air|Steam

59 Winnisquam Regional Union Sanborn School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

59 Winnisquam Regional Union Sanborn School Q.21 Is your building a CHP's or LEED certified? No

59 Winnisquam Regional Union Sanborn School Q.22 Have you had energy audits of all your school facilities? Yes

59 Winnisquam Regional Union Sanborn School Q.23 Do you have an energy performance contract in place? No

59 Winnisquam Regional Union Sanborn School Q.24 What is the R-Value of the exterior walls, windows, and doors? 9

59 Winnisquam Regional Union Sanborn School Q.25 What is the R-Value of the roof? 15

59 Winnisquam Regional Union Sanborn School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

59 Winnisquam Regional Union Sanborn School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

59 Winnisquam Regional Union Sanborn School Q.28 Do you have a facility maintenance plan? Yes

59 Winnisquam Regional Union Sanborn School Q.29 What is your maintenance budget? 213000

59 Winnisquam Regional Union Sanborn School Q.30 What is your operational budget? 2217000

59 Winnisquam Regional Union Sanborn School Q.31 What is your capital construction budget? 61000

59 Winnisquam Regional Union Sanborn School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?45000

59 Winnisquam Regional Union Sanborn School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?90

59 Winnisquam Regional Union Sanborn School Q.34 Do you have a maintenance contract in place? No

59 Winnisquam Regional Union Sanborn School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

59 Winnisquam Regional Winnisquam Regional High School Q.01 Approximate year of the original construction date 1938

59 Winnisquam Regional Winnisquam Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

Page 159 of 238

Page 160: New Hampshire Department of Education Bureau of School

59 Winnisquam Regional Winnisquam Regional High School Q.03 Gross Square footage (including portables) 132000

59 Winnisquam Regional Winnisquam Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

59 Winnisquam Regional Winnisquam Regional High School Q.05 How many parking spaces does the facility have? 251

59 Winnisquam Regional Winnisquam Regional High School Q.06 Does your building have a basement? No

59 Winnisquam Regional Winnisquam Regional High School Q.07 How many portable classrooms are in use? 0

59 Winnisquam Regional Winnisquam Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

59 Winnisquam Regional Winnisquam Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

59 Winnisquam Regional Winnisquam Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

59 Winnisquam Regional Winnisquam Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

59 Winnisquam Regional Winnisquam Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

59 Winnisquam Regional Winnisquam Regional High School Q.14a a. Roofs 2004|||||

59 Winnisquam Regional Winnisquam Regional High School Q.14b b. Lighting Systems 2004|||||

59 Winnisquam Regional Winnisquam Regional High School Q.14c c. Windows 1961|1988|2004|||

59 Winnisquam Regional Winnisquam Regional High School Q.14d d. Ceilings 1988|2004||||

59 Winnisquam Regional Winnisquam Regional High School Q.14e e. Plumbing 1961|1988|2004|||

59 Winnisquam Regional Winnisquam Regional High School Q.14f f. Heating Systems 2004|2010||||

59 Winnisquam Regional Winnisquam Regional High School Q.14g g. Ventilation Systems 1988|2004||||

59 Winnisquam Regional Winnisquam Regional High School Q.14h h. Conditioning Systems 1988|2004||||

59 Winnisquam Regional Winnisquam Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

59 Winnisquam Regional Winnisquam Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

59 Winnisquam Regional Winnisquam Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

59 Winnisquam Regional Winnisquam Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

59 Winnisquam Regional Winnisquam Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

59 Winnisquam Regional Winnisquam Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

59 Winnisquam Regional Winnisquam Regional High School Q.21 Is your building a CHP's or LEED certified? No

59 Winnisquam Regional Winnisquam Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

59 Winnisquam Regional Winnisquam Regional High School Q.23 Do you have an energy performance contract in place? No

59 Winnisquam Regional Winnisquam Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 9

59 Winnisquam Regional Winnisquam Regional High School Q.25 What is the R-Value of the roof? 15

59 Winnisquam Regional Winnisquam Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

59 Winnisquam Regional Winnisquam Regional High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

59 Winnisquam Regional Winnisquam Regional High School Q.28 Do you have a facility maintenance plan? Yes

59 Winnisquam Regional Winnisquam Regional High School Q.29 What is your maintenance budget? 581000

59 Winnisquam Regional Winnisquam Regional High School Q.30 What is your operational budget? 5534000

59 Winnisquam Regional Winnisquam Regional High School Q.31 What is your capital construction budget? 180000

59 Winnisquam Regional Winnisquam Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?136200

59 Winnisquam Regional Winnisquam Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?200

59 Winnisquam Regional Winnisquam Regional High School Q.34 Do you have a maintenance contract in place? No

59 Winnisquam Regional Winnisquam Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

59 Winnisquam Regional Winnisquam Regional Middle School Q.01 Approximate year of the original construction date 1973

59 Winnisquam Regional Winnisquam Regional Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

59 Winnisquam Regional Winnisquam Regional Middle School Q.03 Gross Square footage (including portables) 79200

59 Winnisquam Regional Winnisquam Regional Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

59 Winnisquam Regional Winnisquam Regional Middle School Q.05 How many parking spaces does the facility have? 84

59 Winnisquam Regional Winnisquam Regional Middle School Q.06 Does your building have a basement? No

59 Winnisquam Regional Winnisquam Regional Middle School Q.07 How many portable classrooms are in use? 0

59 Winnisquam Regional Winnisquam Regional Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

59 Winnisquam Regional Winnisquam Regional Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 160 of 238

Page 161: New Hampshire Department of Education Bureau of School

59 Winnisquam Regional Winnisquam Regional Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.14a a. Roofs 1973|2004||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14b b. Lighting Systems 2004|||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14c c. Windows 1973|2004||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14d d. Ceilings 2004|||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14e e. Plumbing 1973|2004||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14f f. Heating Systems 1973|2004|2010|||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14g g. Ventilation Systems 1973|2004||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.14h h. Conditioning Systems 2004|||||

59 Winnisquam Regional Winnisquam Regional Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

59 Winnisquam Regional Winnisquam Regional Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

59 Winnisquam Regional Winnisquam Regional Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

59 Winnisquam Regional Winnisquam Regional Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

59 Winnisquam Regional Winnisquam Regional Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

59 Winnisquam Regional Winnisquam Regional Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Wood Chip/Pellet

59 Winnisquam Regional Winnisquam Regional Middle School Q.21 Is your building a CHP's or LEED certified? No

59 Winnisquam Regional Winnisquam Regional Middle School Q.22 Have you had energy audits of all your school facilities? Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.23 Do you have an energy performance contract in place? No

59 Winnisquam Regional Winnisquam Regional Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 9

59 Winnisquam Regional Winnisquam Regional Middle School Q.25 What is the R-Value of the roof? 15

59 Winnisquam Regional Winnisquam Regional Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

59 Winnisquam Regional Winnisquam Regional Middle School Q.28 Do you have a facility maintenance plan? Yes

59 Winnisquam Regional Winnisquam Regional Middle School Q.29 What is your maintenance budget? 328000

59 Winnisquam Regional Winnisquam Regional Middle School Q.30 What is your operational budget? 3906000

59 Winnisquam Regional Winnisquam Regional Middle School Q.31 What is your capital construction budget? 108000

59 Winnisquam Regional Winnisquam Regional Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?74000

59 Winnisquam Regional Winnisquam Regional Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?140

59 Winnisquam Regional Winnisquam Regional Middle School Q.34 Do you have a maintenance contract in place? No

59 Winnisquam Regional Winnisquam Regional Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Charlestown Middle School Q.01 Approximate year of the original construction date 1948

60 Fall Mountain Regional Charlestown Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1948

60 Fall Mountain Regional Charlestown Middle School Q.03 Gross Square footage (including portables) 38280

60 Fall Mountain Regional Charlestown Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Charlestown Middle School Q.05 How many parking spaces does the facility have? 20

60 Fall Mountain Regional Charlestown Middle School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Charlestown Middle School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Charlestown Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Charlestown Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Charlestown Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Charlestown Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Charlestown Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Charlestown Middle School Q.14a a. Roofs 2013|||||

60 Fall Mountain Regional Charlestown Middle School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Charlestown Middle School Q.14c c. Windows 2002|||||

60 Fall Mountain Regional Charlestown Middle School Q.14d d. Ceilings 1948|||||

60 Fall Mountain Regional Charlestown Middle School Q.14e e. Plumbing 1948|||||

60 Fall Mountain Regional Charlestown Middle School Q.14f f. Heating Systems 2008|2014||||

Page 161 of 238

Page 162: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Charlestown Middle School Q.14g g. Ventilation Systems 1948|||||

60 Fall Mountain Regional Charlestown Middle School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Charlestown Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

60 Fall Mountain Regional Charlestown Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional Charlestown Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Concrete blocks

60 Fall Mountain Regional Charlestown Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional Charlestown Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

60 Fall Mountain Regional Charlestown Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

60 Fall Mountain Regional Charlestown Middle School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional Charlestown Middle School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Charlestown Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Charlestown Middle School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Charlestown Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Charlestown Middle School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Charlestown Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Charlestown Middle School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Charlestown Middle School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Charlestown Middle School Q.29 What is your maintenance budget? 3500

60 Fall Mountain Regional Charlestown Middle School Q.30 What is your operational budget? 312645

60 Fall Mountain Regional Charlestown Middle School Q.31 What is your capital construction budget? 0

60 Fall Mountain Regional Charlestown Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?38250

60 Fall Mountain Regional Charlestown Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20

60 Fall Mountain Regional Charlestown Middle School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Charlestown Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Charlestown Primary School Q.01 Approximate year of the original construction date 1966

60 Fall Mountain Regional Charlestown Primary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

60 Fall Mountain Regional Charlestown Primary School Q.03 Gross Square footage (including portables) 35573

60 Fall Mountain Regional Charlestown Primary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Charlestown Primary School Q.05 How many parking spaces does the facility have? 68

60 Fall Mountain Regional Charlestown Primary School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Charlestown Primary School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Charlestown Primary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Charlestown Primary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Charlestown Primary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Charlestown Primary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Charlestown Primary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Charlestown Primary School Q.14a a. Roofs 1992|2006|2011|2012|2013|2018

60 Fall Mountain Regional Charlestown Primary School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Charlestown Primary School Q.14c c. Windows pre-1999|2006||||

60 Fall Mountain Regional Charlestown Primary School Q.14d d. Ceilings 1966|1999|2006|2018||

60 Fall Mountain Regional Charlestown Primary School Q.14e e. Plumbing 1966|||||

60 Fall Mountain Regional Charlestown Primary School Q.14f f. Heating Systems 2005|||||

60 Fall Mountain Regional Charlestown Primary School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional Charlestown Primary School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Charlestown Primary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

60 Fall Mountain Regional Charlestown Primary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

60 Fall Mountain Regional Charlestown Primary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood|Other|Concrete blocks

60 Fall Mountain Regional Charlestown Primary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional Charlestown Primary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

Page 162 of 238

Page 163: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Charlestown Primary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

60 Fall Mountain Regional Charlestown Primary School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional Charlestown Primary School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Charlestown Primary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Charlestown Primary School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Charlestown Primary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Charlestown Primary School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Charlestown Primary School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Charlestown Primary School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Charlestown Primary School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Charlestown Primary School Q.29 What is your maintenance budget? 3500

60 Fall Mountain Regional Charlestown Primary School Q.30 What is your operational budget? 236354.

60 Fall Mountain Regional Charlestown Primary School Q.31 What is your capital construction budget? 72000.

60 Fall Mountain Regional Charlestown Primary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?36500

60 Fall Mountain Regional Charlestown Primary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?20

60 Fall Mountain Regional Charlestown Primary School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Charlestown Primary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.01 Approximate year of the original construction date 1964

60 Fall Mountain Regional Fall Mountain Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2010

60 Fall Mountain Regional Fall Mountain Regional High School Q.03 Gross Square footage (including portables) 95165

60 Fall Mountain Regional Fall Mountain Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Fall Mountain Regional High School Q.05 How many parking spaces does the facility have? 222

60 Fall Mountain Regional Fall Mountain Regional High School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Fall Mountain Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Fall Mountain Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.14a a. Roofs 2010|||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14c c. Windows 2010|||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14d d. Ceilings 2010|||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14e e. Plumbing 1964|1999|2010|2017||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14f f. Heating Systems 2010|2018||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14g g. Ventilation Systems 2010|||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Fall Mountain Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

60 Fall Mountain Regional Fall Mountain Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional Fall Mountain Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Wood|Other|Concrete blocks

60 Fall Mountain Regional Fall Mountain Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

60 Fall Mountain Regional Fall Mountain Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

60 Fall Mountain Regional Fall Mountain Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

60 Fall Mountain Regional Fall Mountain Regional High School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Fall Mountain Regional High School Q.25 What is the R-Value of the roof? 30

Page 163 of 238

Page 164: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Fall Mountain Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Fall Mountain Regional High School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Fall Mountain Regional High School Q.29 What is your maintenance budget? 30000

60 Fall Mountain Regional Fall Mountain Regional High School Q.30 What is your operational budget? 611514

60 Fall Mountain Regional Fall Mountain Regional High School Q.31 What is your capital construction budget? 257100

60 Fall Mountain Regional Fall Mountain Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?134000

60 Fall Mountain Regional Fall Mountain Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

60 Fall Mountain Regional Fall Mountain Regional High School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Fall Mountain Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional N. Charlestown Community School Q.01 Approximate year of the original construction date 1889

60 Fall Mountain Regional N. Charlestown Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

60 Fall Mountain Regional N. Charlestown Community School Q.03 Gross Square footage (including portables) 11557

60 Fall Mountain Regional N. Charlestown Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional N. Charlestown Community School Q.05 How many parking spaces does the facility have? 14

60 Fall Mountain Regional N. Charlestown Community School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional N. Charlestown Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional N. Charlestown Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional N. Charlestown Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional N. Charlestown Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional N. Charlestown Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.14a a. Roofs 1996|||||

60 Fall Mountain Regional N. Charlestown Community School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional N. Charlestown Community School Q.14c c. Windows 1996|||||

60 Fall Mountain Regional N. Charlestown Community School Q.14d d. Ceilings 1889|1996||||

60 Fall Mountain Regional N. Charlestown Community School Q.14e e. Plumbing 1889|1996||||

60 Fall Mountain Regional N. Charlestown Community School Q.14f f. Heating Systems 1994|2003|2014|||

60 Fall Mountain Regional N. Charlestown Community School Q.14g g. Ventilation Systems 1996|||||

60 Fall Mountain Regional N. Charlestown Community School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional N. Charlestown Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

60 Fall Mountain Regional N. Charlestown Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood|Other|Stone building

60 Fall Mountain Regional N. Charlestown Community School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

60 Fall Mountain Regional N. Charlestown Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional N. Charlestown Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

60 Fall Mountain Regional N. Charlestown Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

60 Fall Mountain Regional N. Charlestown Community School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional N. Charlestown Community School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional N. Charlestown Community School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

60 Fall Mountain Regional N. Charlestown Community School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional N. Charlestown Community School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional N. Charlestown Community School Q.29 What is your maintenance budget? 2500

60 Fall Mountain Regional N. Charlestown Community School Q.30 What is your operational budget? 312645.

60 Fall Mountain Regional N. Charlestown Community School Q.31 What is your capital construction budget? 12000

60 Fall Mountain Regional N. Charlestown Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?24750

60 Fall Mountain Regional N. Charlestown Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?12

Page 164 of 238

Page 165: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional N. Charlestown Community School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional N. Charlestown Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional North Walpole School Q.01 Approximate year of the original construction date 1954

60 Fall Mountain Regional North Walpole School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

60 Fall Mountain Regional North Walpole School Q.03 Gross Square footage (including portables) 13835

60 Fall Mountain Regional North Walpole School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional North Walpole School Q.05 How many parking spaces does the facility have? 25

60 Fall Mountain Regional North Walpole School Q.06 Does your building have a basement? No

60 Fall Mountain Regional North Walpole School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional North Walpole School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional North Walpole School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional North Walpole School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional North Walpole School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional North Walpole School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional North Walpole School Q.14a a. Roofs 2012|2018||||

60 Fall Mountain Regional North Walpole School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional North Walpole School Q.14c c. Windows 2003|||||

60 Fall Mountain Regional North Walpole School Q.14d d. Ceilings 1954|||||

60 Fall Mountain Regional North Walpole School Q.14e e. Plumbing 1954|||||

60 Fall Mountain Regional North Walpole School Q.14f f. Heating Systems 1990|||||

60 Fall Mountain Regional North Walpole School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional North Walpole School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional North Walpole School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

60 Fall Mountain Regional North Walpole School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional North Walpole School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Concrete blocks

60 Fall Mountain Regional North Walpole School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional North Walpole School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

60 Fall Mountain Regional North Walpole School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

60 Fall Mountain Regional North Walpole School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional North Walpole School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional North Walpole School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional North Walpole School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional North Walpole School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional North Walpole School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional North Walpole School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional North Walpole School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional North Walpole School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional North Walpole School Q.29 What is your maintenance budget? 2000

60 Fall Mountain Regional North Walpole School Q.30 What is your operational budget? 110000

60 Fall Mountain Regional North Walpole School Q.31 What is your capital construction budget? 0

60 Fall Mountain Regional North Walpole School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?18700

60 Fall Mountain Regional North Walpole School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

60 Fall Mountain Regional North Walpole School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional North Walpole School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Sarah Porter School Q.01 Approximate year of the original construction date 1930

60 Fall Mountain Regional Sarah Porter School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

60 Fall Mountain Regional Sarah Porter School Q.03 Gross Square footage (including portables) 4100

60 Fall Mountain Regional Sarah Porter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Sarah Porter School Q.05 How many parking spaces does the facility have? 7

Page 165 of 238

Page 166: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Sarah Porter School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Sarah Porter School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Sarah Porter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Sarah Porter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Sarah Porter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Sarah Porter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Sarah Porter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Sarah Porter School Q.14a a. Roofs 2015|||||

60 Fall Mountain Regional Sarah Porter School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Sarah Porter School Q.14c c. Windows 2002|2014||||

60 Fall Mountain Regional Sarah Porter School Q.14d d. Ceilings 1930,s|||||

60 Fall Mountain Regional Sarah Porter School Q.14e e. Plumbing 2014|||||

60 Fall Mountain Regional Sarah Porter School Q.14f f. Heating Systems 1997|||||

60 Fall Mountain Regional Sarah Porter School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional Sarah Porter School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Sarah Porter School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

60 Fall Mountain Regional Sarah Porter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

60 Fall Mountain Regional Sarah Porter School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

60 Fall Mountain Regional Sarah Porter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional Sarah Porter School Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

60 Fall Mountain Regional Sarah Porter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

60 Fall Mountain Regional Sarah Porter School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Sarah Porter School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Sarah Porter School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Sarah Porter School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Sarah Porter School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Sarah Porter School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Sarah Porter School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Sarah Porter School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Sarah Porter School Q.29 What is your maintenance budget? 1500

60 Fall Mountain Regional Sarah Porter School Q.30 What is your operational budget? 31808

60 Fall Mountain Regional Sarah Porter School Q.31 What is your capital construction budget? 0

60 Fall Mountain Regional Sarah Porter School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?4950

60 Fall Mountain Regional Sarah Porter School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

60 Fall Mountain Regional Sarah Porter School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Sarah Porter School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Vilas Elementary School Q.01 Approximate year of the original construction date 1934

60 Fall Mountain Regional Vilas Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

60 Fall Mountain Regional Vilas Elementary School Q.03 Gross Square footage (including portables) 25150

60 Fall Mountain Regional Vilas Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Vilas Elementary School Q.05 How many parking spaces does the facility have? 21

60 Fall Mountain Regional Vilas Elementary School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Vilas Elementary School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Vilas Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

60 Fall Mountain Regional Vilas Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

60 Fall Mountain Regional Vilas Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Vilas Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Vilas Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Vilas Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

Page 166 of 238

Page 167: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Vilas Elementary School Q.14a a. Roofs 1934|2017||||

60 Fall Mountain Regional Vilas Elementary School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Vilas Elementary School Q.14c c. Windows 2004|2014||||

60 Fall Mountain Regional Vilas Elementary School Q.14d d. Ceilings 1935|||||

60 Fall Mountain Regional Vilas Elementary School Q.14e e. Plumbing 2001|||||

60 Fall Mountain Regional Vilas Elementary School Q.14f f. Heating Systems 1997|||||

60 Fall Mountain Regional Vilas Elementary School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional Vilas Elementary School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Vilas Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

60 Fall Mountain Regional Vilas Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional Vilas Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Block won them.alls with plaster

60 Fall Mountain Regional Vilas Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional Vilas Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

60 Fall Mountain Regional Vilas Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

60 Fall Mountain Regional Vilas Elementary School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional Vilas Elementary School Q.22 Have you had energy audits of all your school facilities? No

60 Fall Mountain Regional Vilas Elementary School Q.23 Do you have an energy performance contract in place? No

60 Fall Mountain Regional Vilas Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Vilas Elementary School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Vilas Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Vilas Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Vilas Elementary School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Vilas Elementary School Q.29 What is your maintenance budget? 2500.

60 Fall Mountain Regional Vilas Elementary School Q.30 What is your operational budget? 239894

60 Fall Mountain Regional Vilas Elementary School Q.31 What is your capital construction budget? 55000

60 Fall Mountain Regional Vilas Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?35500

60 Fall Mountain Regional Vilas Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

60 Fall Mountain Regional Vilas Elementary School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Vilas Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Walpole Elementary School Q.01 Approximate year of the original construction date 1950

60 Fall Mountain Regional Walpole Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

60 Fall Mountain Regional Walpole Elementary School Q.03 Gross Square footage (including portables) 42750

60 Fall Mountain Regional Walpole Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

60 Fall Mountain Regional Walpole Elementary School Q.05 How many parking spaces does the facility have? 62

60 Fall Mountain Regional Walpole Elementary School Q.06 Does your building have a basement? Yes

60 Fall Mountain Regional Walpole Elementary School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Walpole Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Walpole Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Walpole Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

60 Fall Mountain Regional Walpole Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Walpole Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Walpole Elementary School Q.14a a. Roofs 2011|2019||||

60 Fall Mountain Regional Walpole Elementary School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Walpole Elementary School Q.14c c. Windows 2004|||||

60 Fall Mountain Regional Walpole Elementary School Q.14d d. Ceilings 1950|||||

60 Fall Mountain Regional Walpole Elementary School Q.14e e. Plumbing 1950|||||

60 Fall Mountain Regional Walpole Elementary School Q.14f f. Heating Systems 2008|2014||||

60 Fall Mountain Regional Walpole Elementary School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional Walpole Elementary School Q.14h h. Conditioning Systems |||||

Page 167 of 238

Page 168: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Walpole Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

60 Fall Mountain Regional Walpole Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional Walpole Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Concrete blocks

60 Fall Mountain Regional Walpole Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

60 Fall Mountain Regional Walpole Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

60 Fall Mountain Regional Walpole Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Wood Chip/Pellet

60 Fall Mountain Regional Walpole Elementary School Q.21 Is your building a CHP's or LEED certified? No

60 Fall Mountain Regional Walpole Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Walpole Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Walpole Elementary School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Walpole Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Walpole Elementary School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Walpole Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Walpole Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Walpole Elementary School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Walpole Elementary School Q.29 What is your maintenance budget? 3500

60 Fall Mountain Regional Walpole Elementary School Q.30 What is your operational budget? 398437

60 Fall Mountain Regional Walpole Elementary School Q.31 What is your capital construction budget? 111000

60 Fall Mountain Regional Walpole Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?42500

60 Fall Mountain Regional Walpole Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

60 Fall Mountain Regional Walpole Elementary School Q.34 Do you have a maintenance contract in place? Yes

60 Fall Mountain Regional Walpole Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

60 Fall Mountain Regional Walpole Primary School Q.01 Approximate year of the original construction date 1956

60 Fall Mountain Regional Walpole Primary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

60 Fall Mountain Regional Walpole Primary School Q.03 Gross Square footage (including portables) 10000

60 Fall Mountain Regional Walpole Primary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

60 Fall Mountain Regional Walpole Primary School Q.05 How many parking spaces does the facility have? 14

60 Fall Mountain Regional Walpole Primary School Q.06 Does your building have a basement? No

60 Fall Mountain Regional Walpole Primary School Q.07 How many portable classrooms are in use? 0

60 Fall Mountain Regional Walpole Primary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

60 Fall Mountain Regional Walpole Primary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

60 Fall Mountain Regional Walpole Primary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

60 Fall Mountain Regional Walpole Primary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

60 Fall Mountain Regional Walpole Primary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

60 Fall Mountain Regional Walpole Primary School Q.14a a. Roofs 1996|2013|2018|||

60 Fall Mountain Regional Walpole Primary School Q.14b b. Lighting Systems 2000,s|||||

60 Fall Mountain Regional Walpole Primary School Q.14c c. Windows 2015|||||

60 Fall Mountain Regional Walpole Primary School Q.14d d. Ceilings 2013|||||

60 Fall Mountain Regional Walpole Primary School Q.14e e. Plumbing 1956|||||

60 Fall Mountain Regional Walpole Primary School Q.14f f. Heating Systems 1996|2014||||

60 Fall Mountain Regional Walpole Primary School Q.14g g. Ventilation Systems |||||

60 Fall Mountain Regional Walpole Primary School Q.14h h. Conditioning Systems |||||

60 Fall Mountain Regional Walpole Primary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

60 Fall Mountain Regional Walpole Primary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

60 Fall Mountain Regional Walpole Primary School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Concrete blocks

60 Fall Mountain Regional Walpole Primary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

60 Fall Mountain Regional Walpole Primary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

60 Fall Mountain Regional Walpole Primary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

60 Fall Mountain Regional Walpole Primary School Q.21 Is your building a CHP's or LEED certified? No

Page 168 of 238

Page 169: New Hampshire Department of Education Bureau of School

60 Fall Mountain Regional Walpole Primary School Q.22 Have you had energy audits of all your school facilities? Yes

60 Fall Mountain Regional Walpole Primary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

60 Fall Mountain Regional Walpole Primary School Q.23 Do you have an energy performance contract in place? Yes

60 Fall Mountain Regional Walpole Primary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

60 Fall Mountain Regional Walpole Primary School Q.25 What is the R-Value of the roof? 30

60 Fall Mountain Regional Walpole Primary School Q.26 Do you have carbon monoxide detector(s) in your building? No

60 Fall Mountain Regional Walpole Primary School Q.27 Do you have a presence of: (click all that apply) Asbestos

60 Fall Mountain Regional Walpole Primary School Q.28 Do you have a facility maintenance plan? Yes

60 Fall Mountain Regional Walpole Primary School Q.29 What is your maintenance budget? 2000

60 Fall Mountain Regional Walpole Primary School Q.30 What is your operational budget? 75000

60 Fall Mountain Regional Walpole Primary School Q.31 What is your capital construction budget? 12000

60 Fall Mountain Regional Walpole Primary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?11700

60 Fall Mountain Regional Walpole Primary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8

60 Fall Mountain Regional Walpole Primary School Q.34 Do you have a maintenance contract in place? No

60 Fall Mountain Regional Walpole Primary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

61 Farmington Farmington Senior High School Q.01 Approximate year of the original construction date 1995

61 Farmington Farmington Senior High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

61 Farmington Farmington Senior High School Q.03 Gross Square footage (including portables) 59284

61 Farmington Farmington Senior High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

61 Farmington Farmington Senior High School Q.05 How many parking spaces does the facility have? 256

61 Farmington Farmington Senior High School Q.06 Does your building have a basement? No

61 Farmington Farmington Senior High School Q.07 How many portable classrooms are in use? 0

61 Farmington Farmington Senior High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

61 Farmington Farmington Senior High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

61 Farmington Farmington Senior High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

61 Farmington Farmington Senior High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

61 Farmington Farmington Senior High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

61 Farmington Farmington Senior High School Q.14a a. Roofs 1995|||||2018

61 Farmington Farmington Senior High School Q.14b b. Lighting Systems 1995|||||

61 Farmington Farmington Senior High School Q.14c c. Windows 1995|||||

61 Farmington Farmington Senior High School Q.14d d. Ceilings 1995|||||

61 Farmington Farmington Senior High School Q.14e e. Plumbing 1995|||||

61 Farmington Farmington Senior High School Q.14f f. Heating Systems 1995|||||

61 Farmington Farmington Senior High School Q.14g g. Ventilation Systems 1995|||||

61 Farmington Farmington Senior High School Q.14h h. Conditioning Systems 1995|||||2014

61 Farmington Farmington Senior High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

61 Farmington Farmington Senior High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

61 Farmington Farmington Senior High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

61 Farmington Farmington Senior High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

61 Farmington Farmington Senior High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

61 Farmington Farmington Senior High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

61 Farmington Farmington Senior High School Q.21 Is your building a CHP's or LEED certified? No

61 Farmington Farmington Senior High School Q.22 Have you had energy audits of all your school facilities? No

61 Farmington Farmington Senior High School Q.23 Do you have an energy performance contract in place? No

61 Farmington Farmington Senior High School Q.25 What is the R-Value of the roof? 30

61 Farmington Farmington Senior High School Q.26 Do you have carbon monoxide detector(s) in your building? No

61 Farmington Farmington Senior High School Q.28 Do you have a facility maintenance plan? Yes

61 Farmington Farmington Senior High School Q.29 What is your maintenance budget? 1261198

61 Farmington Farmington Senior High School Q.30 What is your operational budget? 14962969.15

Page 169 of 238

Page 170: New Hampshire Department of Education Bureau of School

61 Farmington Farmington Senior High School Q.31 What is your capital construction budget? 0

61 Farmington Farmington Senior High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?70000

61 Farmington Farmington Senior High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8000

61 Farmington Farmington Senior High School Q.34 Do you have a maintenance contract in place? No

61 Farmington Farmington Senior High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

61 Farmington Henry Wilson Memorial School Q.01 Approximate year of the original construction date 1952

61 Farmington Henry Wilson Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1980

61 Farmington Henry Wilson Memorial School Q.03 Gross Square footage (including portables) 81300

61 Farmington Henry Wilson Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

61 Farmington Henry Wilson Memorial School Q.05 How many parking spaces does the facility have? 121

61 Farmington Henry Wilson Memorial School Q.06 Does your building have a basement? No

61 Farmington Henry Wilson Memorial School Q.07 How many portable classrooms are in use? 0

61 Farmington Henry Wilson Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

61 Farmington Henry Wilson Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

61 Farmington Henry Wilson Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

61 Farmington Henry Wilson Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

61 Farmington Henry Wilson Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

61 Farmington Henry Wilson Memorial School Q.14a a. Roofs 1952||||2002|2018

61 Farmington Henry Wilson Memorial School Q.14b b. Lighting Systems |||||2007

61 Farmington Henry Wilson Memorial School Q.14c c. Windows |||||1960

61 Farmington Henry Wilson Memorial School Q.14d d. Ceilings |||||2002

61 Farmington Henry Wilson Memorial School Q.14e e. Plumbing 1952|||||1952

61 Farmington Henry Wilson Memorial School Q.14f f. Heating Systems 1952|||||2002

61 Farmington Henry Wilson Memorial School Q.14g g. Ventilation Systems |||||2001

61 Farmington Henry Wilson Memorial School Q.14h h. Conditioning Systems |||||

61 Farmington Henry Wilson Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

61 Farmington Henry Wilson Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

61 Farmington Henry Wilson Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

61 Farmington Henry Wilson Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

61 Farmington Henry Wilson Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

61 Farmington Henry Wilson Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

61 Farmington Henry Wilson Memorial School Q.21 Is your building a CHP's or LEED certified? No

61 Farmington Henry Wilson Memorial School Q.22 Have you had energy audits of all your school facilities? No

61 Farmington Henry Wilson Memorial School Q.23 Do you have an energy performance contract in place? No

61 Farmington Henry Wilson Memorial School Q.25 What is the R-Value of the roof? 25

61 Farmington Henry Wilson Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

61 Farmington Henry Wilson Memorial School Q.28 Do you have a facility maintenance plan? Yes

61 Farmington Henry Wilson Memorial School Q.29 What is your maintenance budget? 1261198

61 Farmington Henry Wilson Memorial School Q.30 What is your operational budget? 14962969.15

61 Farmington Henry Wilson Memorial School Q.31 What is your capital construction budget? 0

61 Farmington Henry Wilson Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?80000

61 Farmington Henry Wilson Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8000

61 Farmington Henry Wilson Memorial School Q.34 Do you have a maintenance contract in place? No

61 Farmington Henry Wilson Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

61 Farmington Valley View Community School Q.01 Approximate year of the original construction date 2002

61 Farmington Valley View Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

61 Farmington Valley View Community School Q.03 Gross Square footage (including portables) 61400

61 Farmington Valley View Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

61 Farmington Valley View Community School Q.05 How many parking spaces does the facility have? 108

Page 170 of 238

Page 171: New Hampshire Department of Education Bureau of School

61 Farmington Valley View Community School Q.06 Does your building have a basement? No

61 Farmington Valley View Community School Q.07 How many portable classrooms are in use? 0

61 Farmington Valley View Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

61 Farmington Valley View Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

61 Farmington Valley View Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

61 Farmington Valley View Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

61 Farmington Valley View Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

61 Farmington Valley View Community School Q.14a a. Roofs 2002|||||2002

61 Farmington Valley View Community School Q.14b b. Lighting Systems 2002|||||

61 Farmington Valley View Community School Q.14c c. Windows 2002|||||

61 Farmington Valley View Community School Q.14d d. Ceilings 2002|||||

61 Farmington Valley View Community School Q.14e e. Plumbing 2002|||||

61 Farmington Valley View Community School Q.14f f. Heating Systems 2002|||||

61 Farmington Valley View Community School Q.14g g. Ventilation Systems 2002|||||

61 Farmington Valley View Community School Q.14h h. Conditioning Systems 2002|||||

61 Farmington Valley View Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

61 Farmington Valley View Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

61 Farmington Valley View Community School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

61 Farmington Valley View Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

61 Farmington Valley View Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

61 Farmington Valley View Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

61 Farmington Valley View Community School Q.21 Is your building a CHP's or LEED certified? No

61 Farmington Valley View Community School Q.22 Have you had energy audits of all your school facilities? No

61 Farmington Valley View Community School Q.23 Do you have an energy performance contract in place? No

61 Farmington Valley View Community School Q.25 What is the R-Value of the roof? 25

61 Farmington Valley View Community School Q.26 Do you have carbon monoxide detector(s) in your building? No

61 Farmington Valley View Community School Q.28 Do you have a facility maintenance plan? Yes

61 Farmington Valley View Community School Q.29 What is your maintenance budget? 1261198

61 Farmington Valley View Community School Q.30 What is your operational budget? 14962969.15

61 Farmington Valley View Community School Q.31 What is your capital construction budget? 0

61 Farmington Valley View Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?63000

61 Farmington Valley View Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7000

61 Farmington Valley View Community School Q.34 Do you have a maintenance contract in place? No

61 Farmington Valley View Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

62 Mascoma Valley Regional Canaan Elementary School Q.01 Approximate year of the original construction date 1967

62 Mascoma Valley Regional Canaan Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1982

62 Mascoma Valley Regional Canaan Elementary School Q.03 Gross Square footage (including portables) 37942

62 Mascoma Valley Regional Canaan Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

62 Mascoma Valley Regional Canaan Elementary School Q.05 How many parking spaces does the facility have? 65

62 Mascoma Valley Regional Canaan Elementary School Q.06 Does your building have a basement? No

62 Mascoma Valley Regional Canaan Elementary School Q.07 How many portable classrooms are in use? 0

62 Mascoma Valley Regional Canaan Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

62 Mascoma Valley Regional Canaan Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

62 Mascoma Valley Regional Canaan Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

62 Mascoma Valley Regional Canaan Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

62 Mascoma Valley Regional Canaan Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

62 Mascoma Valley Regional Canaan Elementary School Q.14a a. Roofs 2012|||||

62 Mascoma Valley Regional Canaan Elementary School Q.14b b. Lighting Systems 2016|||||

62 Mascoma Valley Regional Canaan Elementary School Q.14c c. Windows 2015|||||

Page 171 of 238

Page 172: New Hampshire Department of Education Bureau of School

62 Mascoma Valley Regional Canaan Elementary School Q.14d d. Ceilings 2001|||||

62 Mascoma Valley Regional Canaan Elementary School Q.14e e. Plumbing 2015|2012||||

62 Mascoma Valley Regional Canaan Elementary School Q.14f f. Heating Systems 2015|2005||||

62 Mascoma Valley Regional Canaan Elementary School Q.14g g. Ventilation Systems 2004|||||

62 Mascoma Valley Regional Canaan Elementary School Q.14h h. Conditioning Systems 1982|||||

62 Mascoma Valley Regional Canaan Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

62 Mascoma Valley Regional Canaan Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|

62 Mascoma Valley Regional Canaan Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood|Other|

62 Mascoma Valley Regional Canaan Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

62 Mascoma Valley Regional Canaan Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

62 Mascoma Valley Regional Canaan Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric|Wood Chip/Pellet|Solar

62 Mascoma Valley Regional Canaan Elementary School Q.21 Is your building a CHP's or LEED certified? No

62 Mascoma Valley Regional Canaan Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

62 Mascoma Valley Regional Canaan Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

62 Mascoma Valley Regional Canaan Elementary School Q.23 Do you have an energy performance contract in place? Yes

62 Mascoma Valley Regional Canaan Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 40

62 Mascoma Valley Regional Canaan Elementary School Q.25 What is the R-Value of the roof? 8

62 Mascoma Valley Regional Canaan Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

62 Mascoma Valley Regional Canaan Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

62 Mascoma Valley Regional Canaan Elementary School Q.28 Do you have a facility maintenance plan? Yes

62 Mascoma Valley Regional Canaan Elementary School Q.29 What is your maintenance budget? 344947

62 Mascoma Valley Regional Canaan Elementary School Q.30 What is your operational budget? 2962166

62 Mascoma Valley Regional Canaan Elementary School Q.31 What is your capital construction budget? 0

62 Mascoma Valley Regional Canaan Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?43354

62 Mascoma Valley Regional Canaan Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?16

62 Mascoma Valley Regional Canaan Elementary School Q.34 Do you have a maintenance contract in place? No

62 Mascoma Valley Regional Canaan Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

62 Mascoma Valley Regional Enfield Village School Q.01 Approximate year of the original construction date 1883

62 Mascoma Valley Regional Enfield Village School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

62 Mascoma Valley Regional Enfield Village School Q.03 Gross Square footage (including portables) 42468

62 Mascoma Valley Regional Enfield Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

62 Mascoma Valley Regional Enfield Village School Q.05 How many parking spaces does the facility have? 80

62 Mascoma Valley Regional Enfield Village School Q.06 Does your building have a basement? Yes

62 Mascoma Valley Regional Enfield Village School Q.07 How many portable classrooms are in use? 0

62 Mascoma Valley Regional Enfield Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

62 Mascoma Valley Regional Enfield Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

62 Mascoma Valley Regional Enfield Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

62 Mascoma Valley Regional Enfield Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

62 Mascoma Valley Regional Enfield Village School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

62 Mascoma Valley Regional Enfield Village School Q.14a a. Roofs 2014|2001|2000|||

62 Mascoma Valley Regional Enfield Village School Q.14b b. Lighting Systems 2015|2001||||

62 Mascoma Valley Regional Enfield Village School Q.14c c. Windows 2018|2017|2016|2015|2014|

62 Mascoma Valley Regional Enfield Village School Q.14d d. Ceilings 2001|||||

62 Mascoma Valley Regional Enfield Village School Q.14e e. Plumbing 2015|2003|2001|||

62 Mascoma Valley Regional Enfield Village School Q.14f f. Heating Systems 2015|2000||||

62 Mascoma Valley Regional Enfield Village School Q.14g g. Ventilation Systems 2001|2000||||

62 Mascoma Valley Regional Enfield Village School Q.14h h. Conditioning Systems 2001|||||

62 Mascoma Valley Regional Enfield Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

62 Mascoma Valley Regional Enfield Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

Page 172 of 238

Page 173: New Hampshire Department of Education Bureau of School

62 Mascoma Valley Regional Enfield Village School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

62 Mascoma Valley Regional Enfield Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

62 Mascoma Valley Regional Enfield Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

62 Mascoma Valley Regional Enfield Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet|Solar

62 Mascoma Valley Regional Enfield Village School Q.21 Is your building a CHP's or LEED certified? No

62 Mascoma Valley Regional Enfield Village School Q.22 Have you had energy audits of all your school facilities? Yes

62 Mascoma Valley Regional Enfield Village School Q.23 Do you have an energy performance contract in place? Yes

62 Mascoma Valley Regional Enfield Village School Q.24 What is the R-Value of the exterior walls, windows, and doors? 40

62 Mascoma Valley Regional Enfield Village School Q.25 What is the R-Value of the roof? 8

62 Mascoma Valley Regional Enfield Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

62 Mascoma Valley Regional Enfield Village School Q.27 Do you have a presence of: (click all that apply) Asbestos

62 Mascoma Valley Regional Enfield Village School Q.28 Do you have a facility maintenance plan? Yes

62 Mascoma Valley Regional Enfield Village School Q.29 What is your maintenance budget? 383112

62 Mascoma Valley Regional Enfield Village School Q.30 What is your operational budget? 2494264

62 Mascoma Valley Regional Enfield Village School Q.31 What is your capital construction budget? 0

62 Mascoma Valley Regional Enfield Village School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?38086

62 Mascoma Valley Regional Enfield Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?21

62 Mascoma Valley Regional Enfield Village School Q.34 Do you have a maintenance contract in place? Yes

62 Mascoma Valley Regional Enfield Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

62 Mascoma Valley Regional Indian River School Q.01 Approximate year of the original construction date 1987

62 Mascoma Valley Regional Indian River School Q.03 Gross Square footage (including portables) 48510

62 Mascoma Valley Regional Indian River School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

62 Mascoma Valley Regional Indian River School Q.05 How many parking spaces does the facility have? 64

62 Mascoma Valley Regional Indian River School Q.06 Does your building have a basement? No

62 Mascoma Valley Regional Indian River School Q.07 How many portable classrooms are in use? 0

62 Mascoma Valley Regional Indian River School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

62 Mascoma Valley Regional Indian River School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

62 Mascoma Valley Regional Indian River School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

62 Mascoma Valley Regional Indian River School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

62 Mascoma Valley Regional Indian River School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

62 Mascoma Valley Regional Indian River School Q.14a a. Roofs 2018|2017|2016|1987||

62 Mascoma Valley Regional Indian River School Q.14b b. Lighting Systems 2015|||||

62 Mascoma Valley Regional Indian River School Q.14c c. Windows 2014|1986||||

62 Mascoma Valley Regional Indian River School Q.14d d. Ceilings 1986|||||

62 Mascoma Valley Regional Indian River School Q.14e e. Plumbing 2015|2002||||

62 Mascoma Valley Regional Indian River School Q.14f f. Heating Systems 2015|1987||||

62 Mascoma Valley Regional Indian River School Q.14g g. Ventilation Systems 1987|||||

62 Mascoma Valley Regional Indian River School Q.14h h. Conditioning Systems 2000|||||

62 Mascoma Valley Regional Indian River School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

62 Mascoma Valley Regional Indian River School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

62 Mascoma Valley Regional Indian River School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

62 Mascoma Valley Regional Indian River School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

62 Mascoma Valley Regional Indian River School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

62 Mascoma Valley Regional Indian River School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet|Solar

62 Mascoma Valley Regional Indian River School Q.21 Is your building a CHP's or LEED certified? No

62 Mascoma Valley Regional Indian River School Q.22 Have you had energy audits of all your school facilities? Yes

62 Mascoma Valley Regional Indian River School Q.23 Do you have an energy performance contract in place? Yes

62 Mascoma Valley Regional Indian River School Q.24 What is the R-Value of the exterior walls, windows, and doors? 40

62 Mascoma Valley Regional Indian River School Q.25 What is the R-Value of the roof? 8

Page 173 of 238

Page 174: New Hampshire Department of Education Bureau of School

62 Mascoma Valley Regional Indian River School Q.26 Do you have carbon monoxide detector(s) in your building? No

62 Mascoma Valley Regional Indian River School Q.28 Do you have a facility maintenance plan? Yes

62 Mascoma Valley Regional Indian River School Q.29 What is your maintenance budget? 383112

62 Mascoma Valley Regional Indian River School Q.30 What is your operational budget? 3908242

62 Mascoma Valley Regional Indian River School Q.31 What is your capital construction budget? 0

62 Mascoma Valley Regional Indian River School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?59196

62 Mascoma Valley Regional Indian River School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?21

62 Mascoma Valley Regional Indian River School Q.34 Do you have a maintenance contract in place? No

62 Mascoma Valley Regional Indian River School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.01 Approximate year of the original construction date 1963

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2018

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.03 Gross Square footage (including portables) 100882

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.05 How many parking spaces does the facility have? 263

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.06 Does your building have a basement? No

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.07 How many portable classrooms are in use? 0

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14a a. Roofs 2018|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14b b. Lighting Systems 2016|2015||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14c c. Windows 2015|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14d d. Ceilings 2016|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14e e. Plumbing 2016|2007||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14f f. Heating Systems 2015|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14g g. Ventilation Systems 2015|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.14h h. Conditioning Systems 2015|||||

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.21 Is your building a CHP's or LEED certified? No

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.23 Do you have an energy performance contract in place? Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 40

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.25 What is the R-Value of the roof? 8

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.27 Do you have a presence of: (click all that apply) Asbestos

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.28 Do you have a facility maintenance plan? Yes

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.29 What is your maintenance budget? 603776

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.30 What is your operational budget? 6638632

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.31 What is your capital construction budget? 0

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?127070

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.34 Do you have a maintenance contract in place? No

Page 174 of 238

Page 175: New Hampshire Department of Education Bureau of School

62 Mascoma Valley Regional Mascoma Valley Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge Regional James House Preschool Q.01 Approximate year of the original construction date 1962

65 Kearsarge Regional James House Preschool Q.03 Gross Square footage (including portables) 5000

65 Kearsarge Regional James House Preschool Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

65 Kearsarge Regional James House Preschool Q.05 How many parking spaces does the facility have? 80

65 Kearsarge Regional James House Preschool Q.06 Does your building have a basement? No

65 Kearsarge Regional James House Preschool Q.07 How many portable classrooms are in use? 1

65 Kearsarge Regional James House Preschool Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

65 Kearsarge Regional James House Preschool Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Support Space|Storage

65 Kearsarge Regional James House Preschool Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge Regional James House Preschool Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

65 Kearsarge Regional James House Preschool Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

65 Kearsarge Regional James House Preschool Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge Regional James House Preschool Q.14a a. Roofs 2015|||||

65 Kearsarge Regional James House Preschool Q.14b b. Lighting Systems 2014|||||

65 Kearsarge Regional James House Preschool Q.14c c. Windows 2002|||||

65 Kearsarge Regional James House Preschool Q.14d d. Ceilings 2014|||||

65 Kearsarge Regional James House Preschool Q.14e e. Plumbing 2014|||||

65 Kearsarge Regional James House Preschool Q.14f f. Heating Systems 1962|||||

65 Kearsarge Regional James House Preschool Q.14g g. Ventilation Systems 2011|||||

65 Kearsarge Regional James House Preschool Q.14h h. Conditioning Systems 2011|||||

65 Kearsarge Regional James House Preschool Q.15 What types of roofs are on your school facility? (click all that apply) Flat

65 Kearsarge Regional James House Preschool Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge Regional James House Preschool Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

65 Kearsarge Regional James House Preschool Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

65 Kearsarge Regional James House Preschool Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge Regional James House Preschool Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

65 Kearsarge Regional James House Preschool Q.21 Is your building a CHP's or LEED certified? No

65 Kearsarge Regional James House Preschool Q.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge Regional James House Preschool Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge Regional James House Preschool Q.23 Do you have an energy performance contract in place? Yes

65 Kearsarge Regional James House Preschool Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge Regional James House Preschool Q.25 What is the R-Value of the roof? 30

65 Kearsarge Regional James House Preschool Q.26 Do you have carbon monoxide detector(s) in your building? Yes

65 Kearsarge Regional James House Preschool Q.28 Do you have a facility maintenance plan? Yes

65 Kearsarge Regional James House Preschool Q.29 What is your maintenance budget? 5000

65 Kearsarge Regional James House Preschool Q.30 What is your operational budget? 15000

65 Kearsarge Regional James House Preschool Q.31 What is your capital construction budget? 1.00

65 Kearsarge Regional James House Preschool Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?10000

65 Kearsarge Regional James House Preschool Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?80

65 Kearsarge Regional James House Preschool Q.34 Do you have a maintenance contract in place? Yes

65 Kearsarge Regional James House Preschool Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.01 Approximate year of the original construction date 1989

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.03 Gross Square footage (including portables) 44719

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.05 How many parking spaces does the facility have? 100

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.06 Does your building have a basement? No

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.07 How many portable classrooms are in use? 1

Page 175 of 238

Page 176: New Hampshire Department of Education Bureau of School

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.09

If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14a a. Roofs 2003|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14b b. Lighting Systems 1989|2018||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14c c. Windows 2014|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14d d. Ceilings 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14e e. Plumbing 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14f f. Heating Systems 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14g g. Ventilation Systems 2011|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.14h h. Conditioning Systems 2011|||||

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.15 What types of roofs are on your school facility? (click all that apply) Flat

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.17 What type of studding is used at your school facility? (click all that apply) Steel

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.21 Is your building a CHP's or LEED certified? No

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.23 Do you have an energy performance contract in place? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.25 What is the R-Value of the roof? 30

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.26 Do you have carbon monoxide detector(s) in your building? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.28 Do you have a facility maintenance plan? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.29 What is your maintenance budget? 30000

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.30 What is your operational budget? 100000

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.31 What is your capital construction budget? 25000

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?60

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7500

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.34 Do you have a maintenance contract in place? Yes

65 Kearsarge RegionalKearsarge Reg. Elem. School at New

LondonQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.01 Approximate year of the original construction date 1989

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.03 Gross Square footage (including portables) 16264

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.05 How many parking spaces does the facility have? 40

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.06 Does your building have a basement? No

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.07 How many portable classrooms are in use? 0

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14a a. Roofs 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14b b. Lighting Systems 1989|||||

Page 176 of 238

Page 177: New Hampshire Department of Education Bureau of School

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14c c. Windows 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14d d. Ceilings 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14e e. Plumbing 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14f f. Heating Systems 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14g g. Ventilation Systems 1989|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.14h h. Conditioning Systems 2014|||||

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.15 What types of roofs are on your school facility? (click all that apply) Flat

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.17 What type of studding is used at your school facility? (click all that apply) Steel

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.21 Is your building a CHP's or LEED certified? No

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.23 Do you have an energy performance contract in place? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.25 What is the R-Value of the roof? 30

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.26 Do you have carbon monoxide detector(s) in your building? No

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.29 What is your maintenance budget? 30000

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.30 What is your operational budget? 85000

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.31 What is your capital construction budget? 25000

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?37000

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.34 Do you have a maintenance contract in place? Yes

65 Kearsarge RegionalKearsarge Reg. Elementary School -

BradfordQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge Regional Kearsarge Regional High School Q.01 Approximate year of the original construction date 1969

65 Kearsarge Regional Kearsarge Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

65 Kearsarge Regional Kearsarge Regional High School Q.03 Gross Square footage (including portables) 116000

65 Kearsarge Regional Kearsarge Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

65 Kearsarge Regional Kearsarge Regional High School Q.05 How many parking spaces does the facility have? 200

65 Kearsarge Regional Kearsarge Regional High School Q.06 Does your building have a basement? No

65 Kearsarge Regional Kearsarge Regional High School Q.07 How many portable classrooms are in use? 0

65 Kearsarge Regional Kearsarge Regional High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

65 Kearsarge Regional Kearsarge Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge Regional Kearsarge Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge Regional Kearsarge Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.14a a. Roofs 1996|||||

65 Kearsarge Regional Kearsarge Regional High School Q.14b b. Lighting Systems 2011|2018||||

65 Kearsarge Regional Kearsarge Regional High School Q.14c c. Windows 1996|2017||||

65 Kearsarge Regional Kearsarge Regional High School Q.14d d. Ceilings 1996|||||

65 Kearsarge Regional Kearsarge Regional High School Q.14e e. Plumbing 1969|1996||||

65 Kearsarge Regional Kearsarge Regional High School Q.14f f. Heating Systems 1996|2018||||

65 Kearsarge Regional Kearsarge Regional High School Q.14g g. Ventilation Systems 2011|||||

65 Kearsarge Regional Kearsarge Regional High School Q.14h h. Conditioning Systems 2011|||||

65 Kearsarge Regional Kearsarge Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

65 Kearsarge Regional Kearsarge Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

65 Kearsarge Regional Kearsarge Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|Brick

Page 177 of 238

Page 178: New Hampshire Department of Education Bureau of School

65 Kearsarge Regional Kearsarge Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

65 Kearsarge Regional Kearsarge Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge Regional Kearsarge Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

65 Kearsarge Regional Kearsarge Regional High School Q.21 Is your building a CHP's or LEED certified? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.23 Do you have an energy performance contract in place? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge Regional Kearsarge Regional High School Q.25 What is the R-Value of the roof? 30

65 Kearsarge Regional Kearsarge Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

65 Kearsarge Regional Kearsarge Regional High School Q.28 Do you have a facility maintenance plan? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.29 What is your maintenance budget? 150000

65 Kearsarge Regional Kearsarge Regional High School Q.30 What is your operational budget? 200000

65 Kearsarge Regional Kearsarge Regional High School Q.31 What is your capital construction budget? 100000

65 Kearsarge Regional Kearsarge Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?260000

65 Kearsarge Regional Kearsarge Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?12480

65 Kearsarge Regional Kearsarge Regional High School Q.34 Do you have a maintenance contract in place? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

65 Kearsarge Regional Kearsarge Regional High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Second floor addition for STEAM education

65 Kearsarge Regional Kearsarge Regional High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 10

65 Kearsarge Regional Kearsarge Regional High School Q.35c c. If yes, provide estimated year of construction. 2021

65 Kearsarge Regional Kearsarge Regional Middle School Q.01 Approximate year of the original construction date 2007

65 Kearsarge Regional Kearsarge Regional Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

65 Kearsarge Regional Kearsarge Regional Middle School Q.03 Gross Square footage (including portables) 134000

65 Kearsarge Regional Kearsarge Regional Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.05 How many parking spaces does the facility have? 200

65 Kearsarge Regional Kearsarge Regional Middle School Q.06 Does your building have a basement? No

65 Kearsarge Regional Kearsarge Regional Middle School Q.07 How many portable classrooms are in use? 0

65 Kearsarge Regional Kearsarge Regional Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

65 Kearsarge Regional Kearsarge Regional Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

65 Kearsarge Regional Kearsarge Regional Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.14a a. Roofs 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14b b. Lighting Systems 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14c c. Windows 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14d d. Ceilings 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14e e. Plumbing 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14f f. Heating Systems 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14g g. Ventilation Systems 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.14h h. Conditioning Systems 2008|||||

65 Kearsarge Regional Kearsarge Regional Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

65 Kearsarge Regional Kearsarge Regional Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge Regional Kearsarge Regional Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

65 Kearsarge Regional Kearsarge Regional Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

65 Kearsarge Regional Kearsarge Regional Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge Regional Kearsarge Regional Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric|Wood Chip/Pellet

65 Kearsarge Regional Kearsarge Regional Middle School Q.21 Is your building a CHP's or LEED certified? No

65 Kearsarge Regional Kearsarge Regional Middle School Q.22 Have you had energy audits of all your school facilities? Yes

Page 178 of 238

Page 179: New Hampshire Department of Education Bureau of School

65 Kearsarge Regional Kearsarge Regional Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.23 Do you have an energy performance contract in place? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge Regional Kearsarge Regional Middle School Q.25 What is the R-Value of the roof? 30

65 Kearsarge Regional Kearsarge Regional Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.28 Do you have a facility maintenance plan? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.29 What is your maintenance budget? 100000

65 Kearsarge Regional Kearsarge Regional Middle School Q.30 What is your operational budget? 100000

65 Kearsarge Regional Kearsarge Regional Middle School Q.31 What is your capital construction budget? 0

65 Kearsarge Regional Kearsarge Regional Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?80000

65 Kearsarge Regional Kearsarge Regional Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?12480

65 Kearsarge Regional Kearsarge Regional Middle School Q.34 Do you have a maintenance contract in place? Yes

65 Kearsarge Regional Kearsarge Regional Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge Regional Simonds Elementary School Q.01 Approximate year of the original construction date 1870

65 Kearsarge Regional Simonds Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

65 Kearsarge Regional Simonds Elementary School Q.03 Gross Square footage (including portables) 16466

65 Kearsarge Regional Simonds Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

65 Kearsarge Regional Simonds Elementary School Q.05 How many parking spaces does the facility have? 40

65 Kearsarge Regional Simonds Elementary School Q.06 Does your building have a basement? Yes

65 Kearsarge Regional Simonds Elementary School Q.07 How many portable classrooms are in use? 0

65 Kearsarge Regional Simonds Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

65 Kearsarge Regional Simonds Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge Regional Simonds Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge Regional Simonds Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

65 Kearsarge Regional Simonds Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

65 Kearsarge Regional Simonds Elementary School Q.14a a. Roofs 2003|2019||||

65 Kearsarge Regional Simonds Elementary School Q.14b b. Lighting Systems 2017|||||

65 Kearsarge Regional Simonds Elementary School Q.14c c. Windows 2003|||||

65 Kearsarge Regional Simonds Elementary School Q.14d d. Ceilings 2011|||||

65 Kearsarge Regional Simonds Elementary School Q.14e e. Plumbing 2003|||||

65 Kearsarge Regional Simonds Elementary School Q.14f f. Heating Systems 2003|||||

65 Kearsarge Regional Simonds Elementary School Q.14g g. Ventilation Systems 2011|||||

65 Kearsarge Regional Simonds Elementary School Q.14h h. Conditioning Systems 0|||||

65 Kearsarge Regional Simonds Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

65 Kearsarge Regional Simonds Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge Regional Simonds Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

65 Kearsarge Regional Simonds Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

65 Kearsarge Regional Simonds Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge Regional Simonds Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

65 Kearsarge Regional Simonds Elementary School Q.21 Is your building a CHP's or LEED certified? No

65 Kearsarge Regional Simonds Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge Regional Simonds Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

65 Kearsarge Regional Simonds Elementary School Q.23 Do you have an energy performance contract in place? Yes

65 Kearsarge Regional Simonds Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge Regional Simonds Elementary School Q.25 What is the R-Value of the roof? 30

65 Kearsarge Regional Simonds Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

65 Kearsarge Regional Simonds Elementary School Q.28 Do you have a facility maintenance plan? Yes

65 Kearsarge Regional Simonds Elementary School Q.29 What is your maintenance budget? 30000

65 Kearsarge Regional Simonds Elementary School Q.30 What is your operational budget? 75000

Page 179 of 238

Page 180: New Hampshire Department of Education Bureau of School

65 Kearsarge Regional Simonds Elementary School Q.31 What is your capital construction budget? 50000

65 Kearsarge Regional Simonds Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?58000

65 Kearsarge Regional Simonds Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

65 Kearsarge Regional Simonds Elementary School Q.34 Do you have a maintenance contract in place? Yes

65 Kearsarge Regional Simonds Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

65 Kearsarge Regional Sutton Central Elementary School Q.01 Approximate year of the original construction date 1950

65 Kearsarge Regional Sutton Central Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

65 Kearsarge Regional Sutton Central Elementary School Q.03 Gross Square footage (including portables) 15000

65 Kearsarge Regional Sutton Central Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

65 Kearsarge Regional Sutton Central Elementary School Q.05 How many parking spaces does the facility have? 30

65 Kearsarge Regional Sutton Central Elementary School Q.06 Does your building have a basement? No

65 Kearsarge Regional Sutton Central Elementary School Q.07 How many portable classrooms are in use? 0

65 Kearsarge Regional Sutton Central Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

65 Kearsarge Regional Sutton Central Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special (music, art, etc)|Small Group|Support

Space

65 Kearsarge Regional Sutton Central Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

65 Kearsarge Regional Sutton Central Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

65 Kearsarge Regional Sutton Central Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.14a a. Roofs 1998|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14b b. Lighting Systems 2012|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14c c. Windows 2012|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14d d. Ceilings 1998|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14e e. Plumbing 1998|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14f f. Heating Systems 2012|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14g g. Ventilation Systems 2012|||||

65 Kearsarge Regional Sutton Central Elementary School Q.14h h. Conditioning Systems 2019|||||

65 Kearsarge Regional Sutton Central Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

65 Kearsarge Regional Sutton Central Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

65 Kearsarge Regional Sutton Central Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

65 Kearsarge Regional Sutton Central Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

65 Kearsarge Regional Sutton Central Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

65 Kearsarge Regional Sutton Central Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

65 Kearsarge Regional Sutton Central Elementary School Q.21 Is your building a CHP's or LEED certified? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.23 Do you have an energy performance contract in place? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

65 Kearsarge Regional Sutton Central Elementary School Q.25 What is the R-Value of the roof? 30

65 Kearsarge Regional Sutton Central Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.28 Do you have a facility maintenance plan? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.29 What is your maintenance budget? 25000

65 Kearsarge Regional Sutton Central Elementary School Q.30 What is your operational budget? 65000

65 Kearsarge Regional Sutton Central Elementary School Q.31 What is your capital construction budget? 30000

65 Kearsarge Regional Sutton Central Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?42000

65 Kearsarge Regional Sutton Central Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10

65 Kearsarge Regional Sutton Central Elementary School Q.34 Do you have a maintenance contract in place? Yes

65 Kearsarge Regional Sutton Central Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

67 Bow Bow Elementary School Q.01 Approximate year of the original construction date 1979

67 Bow Bow Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

67 Bow Bow Elementary School Q.03 Gross Square footage (including portables) 61200

Page 180 of 238

Page 181: New Hampshire Department of Education Bureau of School

67 Bow Bow Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

67 Bow Bow Elementary School Q.05 How many parking spaces does the facility have? 146

67 Bow Bow Elementary School Q.06 Does your building have a basement? No

67 Bow Bow Elementary School Q.07 How many portable classrooms are in use? 0

67 Bow Bow Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

67 Bow Bow Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

67 Bow Bow Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

67 Bow Bow Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

67 Bow Bow Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

67 Bow Bow Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

67 Bow Bow Elementary School Q.14a a. Roofs 1979|1985|1989|||

67 Bow Bow Elementary School Q.14b b. Lighting Systems 1979|1985|1989|||

67 Bow Bow Elementary School Q.14c c. Windows 1979|1985|1989|||

67 Bow Bow Elementary School Q.14d d. Ceilings 1979|1985|1989|||

67 Bow Bow Elementary School Q.14e e. Plumbing 1979|1985|1989|||

67 Bow Bow Elementary School Q.14f f. Heating Systems 1979|1985|1989|||

67 Bow Bow Elementary School Q.14g g. Ventilation Systems 1979|1985|1989|||

67 Bow Bow Elementary School Q.14h h. Conditioning Systems ||1989|||

67 Bow Bow Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

67 Bow Bow Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Vinyl Siding

67 Bow Bow Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

67 Bow Bow Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

67 Bow Bow Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

67 Bow Bow Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

67 Bow Bow Elementary School Q.21 Is your building a CHP's or LEED certified? No

67 Bow Bow Elementary School Q.22 Have you had energy audits of all your school facilities? No

67 Bow Bow Elementary School Q.23 Do you have an energy performance contract in place? No

67 Bow Bow Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

67 Bow Bow Elementary School Q.25 What is the R-Value of the roof? 21

67 Bow Bow Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

67 Bow Bow Elementary School Q.27 Do you have a presence of: (click all that apply) Radon in Water

67 Bow Bow Elementary School Q.28 Do you have a facility maintenance plan? Yes

67 Bow Bow Elementary School Q.29 What is your maintenance budget? 2144590

67 Bow Bow Elementary School Q.30 What is your operational budget? 29027903

67 Bow Bow Elementary School Q.31 What is your capital construction budget? 751375

67 Bow Bow Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?119000

67 Bow Bow Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10100

67 Bow Bow Elementary School Q.34 Do you have a maintenance contract in place? No

67 Bow Bow Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

67 Bow Bow Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") BES Renovation and Addition

67 Bow Bow Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 5.5

67 Bow Bow Elementary School Q.35c c. If yes, provide estimated year of construction. 2021

67 Bow Bow High School Q.01 Approximate year of the original construction date 1997

67 Bow Bow High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

67 Bow Bow High School Q.03 Gross Square footage (including portables) 137000

67 Bow Bow High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

67 Bow Bow High School Q.05 How many parking spaces does the facility have? 300

67 Bow Bow High School Q.06 Does your building have a basement? Yes

67 Bow Bow High School Q.07 How many portable classrooms are in use? 0

Page 181 of 238

Page 182: New Hampshire Department of Education Bureau of School

67 Bow Bow High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

67 Bow Bow High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

67 Bow Bow High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

67 Bow Bow High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

67 Bow Bow High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

67 Bow Bow High School Q.14a a. Roofs 1997|||||

67 Bow Bow High School Q.14b b. Lighting Systems 1997|||||

67 Bow Bow High School Q.14c c. Windows 1997|||||

67 Bow Bow High School Q.14d d. Ceilings 1997|||||

67 Bow Bow High School Q.14e e. Plumbing 1997|||||

67 Bow Bow High School Q.14f f. Heating Systems 1997|||||

67 Bow Bow High School Q.14g g. Ventilation Systems 1997|||||

67 Bow Bow High School Q.14h h. Conditioning Systems 1997|||||

67 Bow Bow High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

67 Bow Bow High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

67 Bow Bow High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

67 Bow Bow High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

67 Bow Bow High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

67 Bow Bow High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

67 Bow Bow High School Q.21 Is your building a CHP's or LEED certified? No

67 Bow Bow High School Q.22 Have you had energy audits of all your school facilities? Yes

67 Bow Bow High School Q.23 Do you have an energy performance contract in place? No

67 Bow Bow High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

67 Bow Bow High School Q.25 What is the R-Value of the roof? 25

67 Bow Bow High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

67 Bow Bow High School Q.27 Do you have a presence of: (click all that apply) Radon in Water

67 Bow Bow High School Q.28 Do you have a facility maintenance plan? Yes

67 Bow Bow High School Q.29 What is your maintenance budget? 2144590

67 Bow Bow High School Q.30 What is your operational budget? 29027903

67 Bow Bow High School Q.31 What is your capital construction budget? 751375

67 Bow Bow High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?250000

67 Bow Bow High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?18400

67 Bow Bow High School Q.34 Do you have a maintenance contract in place? Yes

67 Bow Bow High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

67 Bow Bow Memorial School Q.01 Approximate year of the original construction date 1960

67 Bow Bow Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

67 Bow Bow Memorial School Q.03 Gross Square footage (including portables) 83000

67 Bow Bow Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

67 Bow Bow Memorial School Q.05 How many parking spaces does the facility have? 146

67 Bow Bow Memorial School Q.06 Does your building have a basement? No

67 Bow Bow Memorial School Q.07 How many portable classrooms are in use? 0

67 Bow Bow Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

67 Bow Bow Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

67 Bow Bow Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

67 Bow Bow Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

67 Bow Bow Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

67 Bow Bow Memorial School Q.14a a. Roofs 2005|||||

67 Bow Bow Memorial School Q.14b b. Lighting Systems 2005|||||

67 Bow Bow Memorial School Q.14c c. Windows 1960|2001|2005|||

Page 182 of 238

Page 183: New Hampshire Department of Education Bureau of School

67 Bow Bow Memorial School Q.14d d. Ceilings 2005|||||

67 Bow Bow Memorial School Q.14e e. Plumbing 2005|||||

67 Bow Bow Memorial School Q.14f f. Heating Systems 2005|||||

67 Bow Bow Memorial School Q.14g g. Ventilation Systems 2005|||||

67 Bow Bow Memorial School Q.14h h. Conditioning Systems 2005|||||

67 Bow Bow Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

67 Bow Bow Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

67 Bow Bow Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

67 Bow Bow Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

67 Bow Bow Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

67 Bow Bow Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

67 Bow Bow Memorial School Q.21 Is your building a CHP's or LEED certified? No

67 Bow Bow Memorial School Q.22 Have you had energy audits of all your school facilities? No

67 Bow Bow Memorial School Q.23 Do you have an energy performance contract in place? No

67 Bow Bow Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 13

67 Bow Bow Memorial School Q.25 What is the R-Value of the roof? 35

67 Bow Bow Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? No

67 Bow Bow Memorial School Q.27 Do you have a presence of: (click all that apply) Radon in Water|Asbestos

67 Bow Bow Memorial School Q.28 Do you have a facility maintenance plan? Yes

67 Bow Bow Memorial School Q.29 What is your maintenance budget? 2144590

67 Bow Bow Memorial School Q.30 What is your operational budget? 29027903

67 Bow Bow Memorial School Q.31 What is your capital construction budget? 751375

67 Bow Bow Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?129000

67 Bow Bow Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?10100

67 Bow Bow Memorial School Q.34 Do you have a maintenance contract in place? No

67 Bow Bow Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

67 Dunbarton Dunbarton Elementary School Q.01 Approximate year of the original construction date 1972

67 Dunbarton Dunbarton Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

67 Dunbarton Dunbarton Elementary School Q.03 Gross Square footage (including portables) 31000

67 Dunbarton Dunbarton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

67 Dunbarton Dunbarton Elementary School Q.06 Does your building have a basement? No

67 Dunbarton Dunbarton Elementary School Q.07 How many portable classrooms are in use? 0

67 Dunbarton Dunbarton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

67 Dunbarton Dunbarton Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

67 Dunbarton Dunbarton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

67 Dunbarton Dunbarton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

67 Dunbarton Dunbarton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

67 Dunbarton Dunbarton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

67 Dunbarton Dunbarton Elementary School Q.14a a. Roofs 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14b b. Lighting Systems 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14c c. Windows 1989|2019||||

67 Dunbarton Dunbarton Elementary School Q.14d d. Ceilings 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14e e. Plumbing 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14f f. Heating Systems 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14g g. Ventilation Systems 2019|||||

67 Dunbarton Dunbarton Elementary School Q.14h h. Conditioning Systems 2019|||||

67 Dunbarton Dunbarton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

67 Dunbarton Dunbarton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Vinyl Siding

67 Dunbarton Dunbarton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

Page 183 of 238

Page 184: New Hampshire Department of Education Bureau of School

67 Dunbarton Dunbarton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

67 Dunbarton Dunbarton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

67 Dunbarton Dunbarton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

67 Dunbarton Dunbarton Elementary School Q.21 Is your building a CHP's or LEED certified? No

67 Dunbarton Dunbarton Elementary School Q.22 Have you had energy audits of all your school facilities? No

67 Dunbarton Dunbarton Elementary School Q.23 Do you have an energy performance contract in place? No

67 Dunbarton Dunbarton Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 19

67 Dunbarton Dunbarton Elementary School Q.25 What is the R-Value of the roof? 38

67 Dunbarton Dunbarton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

67 Dunbarton Dunbarton Elementary School Q.27 Do you have a presence of: (click all that apply) Radon in Water

67 Dunbarton Dunbarton Elementary School Q.28 Do you have a facility maintenance plan? Yes

67 Dunbarton Dunbarton Elementary School Q.29 What is your maintenance budget? 262945

67 Dunbarton Dunbarton Elementary School Q.30 What is your operational budget? 7244682

67 Dunbarton Dunbarton Elementary School Q.31 What is your capital construction budget? 240000

67 Dunbarton Dunbarton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?55000

67 Dunbarton Dunbarton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5600

67 Dunbarton Dunbarton Elementary School Q.34 Do you have a maintenance contract in place? No

67 Dunbarton Dunbarton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.01 Approximate year of the original construction date 1992

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2009

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.03 Gross Square footage (including portables) 28000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.05 How many parking spaces does the facility have? 60

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.06 Does your building have a basement? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.07 How many portable classrooms are in use? 0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14a a. Roofs |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14b b. Lighting Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14c c. Windows |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14d d. Ceilings |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14e e. Plumbing |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14f f. Heating Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14g g. Ventilation Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.14h h. Conditioning Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.17 What type of studding is used at your school facility? (click all that apply) Other|Combination of steel and wood

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.22 Have you had energy audits of all your school facilities? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.23 Do you have an energy performance contract in place? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.28 Do you have a facility maintenance plan? Yes

Page 184 of 238

Page 185: New Hampshire Department of Education Bureau of School

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.29 What is your maintenance budget? 110000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.30 What is your operational budget? 8000000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.31 What is your capital construction budget? 650000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?16

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.34 Do you have a maintenance contract in place? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Elem) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.01 Approximate year of the original construction date 1964

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1984

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.03 Gross Square footage (including portables) 52000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.05 How many parking spaces does the facility have? 100

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.06 Does your building have a basement? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.07 How many portable classrooms are in use? 0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14a a. Roofs |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14b b. Lighting Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14c c. Windows |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14d d. Ceilings |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14e e. Plumbing |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14f f. Heating Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14g g. Ventilation Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.14h h. Conditioning Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Wood

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.17 What type of studding is used at your school facility? (click all that apply) Other|steel, wood and brick

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.22 Have you had energy audits of all your school facilities? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.23 Do you have an energy performance contract in place? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.28 Do you have a facility maintenance plan? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.29 What is your maintenance budget? 110000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.30 What is your operational budget? 8000000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.31 What is your capital construction budget? 650000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?24

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.34 Do you have a maintenance contract in place? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (High) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.01 Approximate year of the original construction date 1964

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1984

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.03 Gross Square footage (including portables) 52000

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.05 How many parking spaces does the facility have? 1

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.06 Does your building have a basement? No

Page 185 of 238

Page 186: New Hampshire Department of Education Bureau of School

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.07 How many portable classrooms are in use? 0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14a a. Roofs |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14b b. Lighting Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14c c. Windows |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14d d. Ceilings |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14e e. Plumbing |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14f f. Heating Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14g g. Ventilation Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.14h h. Conditioning Systems |||||

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

68Lincoln-Woodstock

CooperativeLin-Wood Public School (Middle) Q.23 Do you have an energy performance contract in place? No

69 Middleton Middleton Elementary School Q.01 Approximate year of the original construction date 2015

69 Middleton Middleton Elementary School Q.03 Gross Square footage (including portables) 27720

69 Middleton Middleton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

69 Middleton Middleton Elementary School Q.05 How many parking spaces does the facility have? 55

69 Middleton Middleton Elementary School Q.06 Does your building have a basement? No

69 Middleton Middleton Elementary School Q.07 How many portable classrooms are in use? 0

69 Middleton Middleton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

69 Middleton Middleton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

69 Middleton Middleton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

69 Middleton Middleton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

69 Middleton Middleton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

69 Middleton Middleton Elementary School Q.14a a. Roofs |||x||

69 Middleton Middleton Elementary School Q.14b b. Lighting Systems |||x||

69 Middleton Middleton Elementary School Q.14c c. Windows |||x||

69 Middleton Middleton Elementary School Q.14d d. Ceilings |||x||

69 Middleton Middleton Elementary School Q.14e e. Plumbing |||x||

69 Middleton Middleton Elementary School Q.14f f. Heating Systems |||x||

69 Middleton Middleton Elementary School Q.14g g. Ventilation Systems |||x||

69 Middleton Middleton Elementary School Q.14h h. Conditioning Systems |||x||

69 Middleton Middleton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

69 Middleton Middleton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|cement board

69 Middleton Middleton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

69 Middleton Middleton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

69 Middleton Middleton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

69 Middleton Middleton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

69 Middleton Middleton Elementary School Q.21 Is your building a CHP's or LEED certified? No

69 Middleton Middleton Elementary School Q.22 Have you had energy audits of all your school facilities? No

69 Middleton Middleton Elementary School Q.23 Do you have an energy performance contract in place? Yes

69 Middleton Middleton Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 15

Page 186 of 238

Page 187: New Hampshire Department of Education Bureau of School

69 Middleton Middleton Elementary School Q.25 What is the R-Value of the roof? 49

69 Middleton Middleton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

69 Middleton Middleton Elementary School Q.28 Do you have a facility maintenance plan? Yes

69 Middleton Middleton Elementary School Q.29 What is your maintenance budget? 165505.35

69 Middleton Middleton Elementary School Q.31 What is your capital construction budget? 25401.18

69 Middleton Middleton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?35571.00

69 Middleton Middleton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4160

69 Middleton Middleton Elementary School Q.34 Do you have a maintenance contract in place? No

69 Middleton Middleton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

71 Lempster Lempster Community School Q.01 Approximate year of the original construction date 1957

71 Lempster Lempster Community School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1988

71 Lempster Lempster Community School Q.03 Gross Square footage (including portables) 32000

71 Lempster Lempster Community School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

71 Lempster Lempster Community School Q.05 How many parking spaces does the facility have? 50

71 Lempster Lempster Community School Q.06 Does your building have a basement? No

71 Lempster Lempster Community School Q.07 How many portable classrooms are in use? 0

71 Lempster Lempster Community School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

71 Lempster Lempster Community School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

71 Lempster Lempster Community School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

71 Lempster Lempster Community School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

71 Lempster Lempster Community School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

71 Lempster Lempster Community School Q.14a a. Roofs |X|X|X|X|X

71 Lempster Lempster Community School Q.14b b. Lighting Systems ||X|||X

71 Lempster Lempster Community School Q.14c c. Windows X|||||

71 Lempster Lempster Community School Q.14d d. Ceilings |||||

71 Lempster Lempster Community School Q.14e e. Plumbing |||||X+

71 Lempster Lempster Community School Q.14f f. Heating Systems |||||X

71 Lempster Lempster Community School Q.14g g. Ventilation Systems |||||X+

71 Lempster Lempster Community School Q.14h h. Conditioning Systems |||||N/A

71 Lempster Lempster Community School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

71 Lempster Lempster Community School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

71 Lempster Lempster Community School Q.17 What type of studding is used at your school facility? (click all that apply) Wood|Other|concrete block

71 Lempster Lempster Community School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

71 Lempster Lempster Community School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

71 Lempster Lempster Community School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

71 Lempster Lempster Community School Q.21 Is your building a CHP's or LEED certified? No

71 Lempster Lempster Community School Q.22 Have you had energy audits of all your school facilities? Yes

71 Lempster Lempster Community School Q.23 Do you have an energy performance contract in place? No

71 Lempster Lempster Community School Q.26 Do you have carbon monoxide detector(s) in your building? No

71 Lempster Lempster Community School Q.27 Do you have a presence of: (click all that apply) Asbestos

71 Lempster Lempster Community School Q.28 Do you have a facility maintenance plan? Yes

71 Lempster Lempster Community School Q.30 What is your operational budget? 165168

71 Lempster Lempster Community School Q.31 What is your capital construction budget? 0

71 Lempster Lempster Community School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?46000

71 Lempster Lempster Community School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?12

71 Lempster Lempster Community School Q.34 Do you have a maintenance contract in place? No

71 Lempster Lempster Community School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

72 Alton Alton Central School (Elem) Q.01 Approximate year of the original construction date 1956

72 Alton Alton Central School (Elem) Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2016

Page 187 of 238

Page 188: New Hampshire Department of Education Bureau of School

72 Alton Alton Central School (Elem) Q.03 Gross Square footage (including portables) 856522

72 Alton Alton Central School (Elem) Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

72 Alton Alton Central School (Elem) Q.05 How many parking spaces does the facility have? 97

72 Alton Alton Central School (Elem) Q.06 Does your building have a basement? No

72 Alton Alton Central School (Elem) Q.07 How many portable classrooms are in use? 0

72 Alton Alton Central School (Elem) Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

72 Alton Alton Central School (Elem) Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

72 Alton Alton Central School (Elem) Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

72 Alton Alton Central School (Elem) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

72 Alton Alton Central School (Elem) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

72 Alton Alton Central School (Elem) Q.14a a. Roofs |||||X

72 Alton Alton Central School (Elem) Q.14b b. Lighting Systems |||X||

72 Alton Alton Central School (Elem) Q.14c c. Windows ||X|||

72 Alton Alton Central School (Elem) Q.14d d. Ceilings ||X|||

72 Alton Alton Central School (Elem) Q.14e e. Plumbing ||X|||

72 Alton Alton Central School (Elem) Q.14f f. Heating Systems X|||||

72 Alton Alton Central School (Elem) Q.14g g. Ventilation Systems ||X|||

72 Alton Alton Central School (Elem) Q.14h h. Conditioning Systems ||X|||

72 Alton Alton Central School (Elem) Q.15 What types of roofs are on your school facility? (click all that apply) Flat

72 Alton Alton Central School (Elem) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

72 Alton Alton Central School (Elem) Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

72 Alton Alton Central School (Elem) Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

72 Alton Alton Central School (Elem) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air|Steam

72 Alton Alton Central School (Elem) Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

72 Alton Alton Central School (Elem) Q.21 Is your building a CHP's or LEED certified? No

72 Alton Alton Central School (Elem) Q.22 Have you had energy audits of all your school facilities? Yes

72 Alton Alton Central School (Elem) Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

72 Alton Alton Central School (Elem) Q.23 Do you have an energy performance contract in place? No

72 Alton Alton Central School (Elem) Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

72 Alton Alton Central School (Elem) Q.25 What is the R-Value of the roof? 30

72 Alton Alton Central School (Elem) Q.26 Do you have carbon monoxide detector(s) in your building? Yes

72 Alton Alton Central School (Elem) Q.28 Do you have a facility maintenance plan? Yes

72 Alton Alton Central School (Elem) Q.29 What is your maintenance budget? 865920

72 Alton Alton Central School (Elem) Q.30 What is your operational budget? 15642144

72 Alton Alton Central School (Elem) Q.31 What is your capital construction budget? 0

72 Alton Alton Central School (Elem) Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?171000

72 Alton Alton Central School (Elem) Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?48

72 Alton Alton Central School (Elem) Q.34 Do you have a maintenance contract in place? Yes

72 Alton Alton Central School (Elem) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

73 Gilford Gilford Elementary School Q.01 Approximate year of the original construction date 1938

73 Gilford Gilford Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

73 Gilford Gilford Elementary School Q.03 Gross Square footage (including portables) 68000

73 Gilford Gilford Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

73 Gilford Gilford Elementary School Q.05 How many parking spaces does the facility have? 120

73 Gilford Gilford Elementary School Q.06 Does your building have a basement? No

73 Gilford Gilford Elementary School Q.07 How many portable classrooms are in use? 0

73 Gilford Gilford Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

73 Gilford Gilford Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

73 Gilford Gilford Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 188 of 238

Page 189: New Hampshire Department of Education Bureau of School

73 Gilford Gilford Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

73 Gilford Gilford Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

73 Gilford Gilford Elementary School Q.14a a. Roofs |||||2008

73 Gilford Gilford Elementary School Q.14b b. Lighting Systems |||||2003

73 Gilford Gilford Elementary School Q.14c c. Windows |||||1976

73 Gilford Gilford Elementary School Q.14d d. Ceilings |||||2002

73 Gilford Gilford Elementary School Q.14e e. Plumbing |||||2018

73 Gilford Gilford Elementary School Q.14f f. Heating Systems |||||2011

73 Gilford Gilford Elementary School Q.14g g. Ventilation Systems |||||2018

73 Gilford Gilford Elementary School Q.14h h. Conditioning Systems |||||2018

73 Gilford Gilford Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

73 Gilford Gilford Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

73 Gilford Gilford Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

73 Gilford Gilford Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

73 Gilford Gilford Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

73 Gilford Gilford Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

73 Gilford Gilford Elementary School Q.21 Is your building a CHP's or LEED certified? No

73 Gilford Gilford Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

73 Gilford Gilford Elementary School Q.23 Do you have an energy performance contract in place? No

73 Gilford Gilford Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 18

73 Gilford Gilford Elementary School Q.25 What is the R-Value of the roof? 23

73 Gilford Gilford Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

73 Gilford Gilford Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

73 Gilford Gilford Elementary School Q.28 Do you have a facility maintenance plan? Yes

73 Gilford Gilford Elementary School Q.29 What is your maintenance budget? 2132398

73 Gilford Gilford Elementary School Q.30 What is your operational budget? 26237939

73 Gilford Gilford Elementary School Q.31 What is your capital construction budget? 335000

73 Gilford Gilford Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100115

73 Gilford Gilford Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

73 Gilford Gilford Elementary School Q.34 Do you have a maintenance contract in place? Yes

73 Gilford Gilford Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

73 Gilford Gilford High School Q.01 Approximate year of the original construction date 1974

73 Gilford Gilford High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

73 Gilford Gilford High School Q.03 Gross Square footage (including portables) 150000

73 Gilford Gilford High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

73 Gilford Gilford High School Q.05 How many parking spaces does the facility have? 225

73 Gilford Gilford High School Q.06 Does your building have a basement? No

73 Gilford Gilford High School Q.07 How many portable classrooms are in use? 0

73 Gilford Gilford High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

73 Gilford Gilford High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

73 Gilford Gilford High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

73 Gilford Gilford High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

73 Gilford Gilford High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

73 Gilford Gilford High School Q.14a a. Roofs |||||2008

73 Gilford Gilford High School Q.14b b. Lighting Systems |||||2002

73 Gilford Gilford High School Q.14c c. Windows |||||1974

73 Gilford Gilford High School Q.14d d. Ceilings |||||2002

73 Gilford Gilford High School Q.14e e. Plumbing ||||1974|2002

73 Gilford Gilford High School Q.14f f. Heating Systems |||||2012

Page 189 of 238

Page 190: New Hampshire Department of Education Bureau of School

73 Gilford Gilford High School Q.14g g. Ventilation Systems |||||2002

73 Gilford Gilford High School Q.14h h. Conditioning Systems |||||2000

73 Gilford Gilford High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

73 Gilford Gilford High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

73 Gilford Gilford High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

73 Gilford Gilford High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

73 Gilford Gilford High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

73 Gilford Gilford High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

73 Gilford Gilford High School Q.21 Is your building a CHP's or LEED certified? No

73 Gilford Gilford High School Q.22 Have you had energy audits of all your school facilities? Yes

73 Gilford Gilford High School Q.23 Do you have an energy performance contract in place? No

73 Gilford Gilford High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 16

73 Gilford Gilford High School Q.25 What is the R-Value of the roof? 23

73 Gilford Gilford High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

73 Gilford Gilford High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

73 Gilford Gilford High School Q.28 Do you have a facility maintenance plan? Yes

73 Gilford Gilford High School Q.29 What is your maintenance budget? 2132398

73 Gilford Gilford High School Q.30 What is your operational budget? 26237939

73 Gilford Gilford High School Q.31 What is your capital construction budget? 335000

73 Gilford Gilford High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?246900

73 Gilford Gilford High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

73 Gilford Gilford High School Q.34 Do you have a maintenance contract in place? Yes

73 Gilford Gilford High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

73 Gilford Gilford Middle School Q.01 Approximate year of the original construction date 2002

73 Gilford Gilford Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

73 Gilford Gilford Middle School Q.03 Gross Square footage (including portables) 96900

73 Gilford Gilford Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

73 Gilford Gilford Middle School Q.05 How many parking spaces does the facility have? 200

73 Gilford Gilford Middle School Q.06 Does your building have a basement? No

73 Gilford Gilford Middle School Q.07 How many portable classrooms are in use? 0

73 Gilford Gilford Middle School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

73 Gilford Gilford Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

73 Gilford Gilford Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

73 Gilford Gilford Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

73 Gilford Gilford Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

73 Gilford Gilford Middle School Q.14a a. Roofs 2018|||||

73 Gilford Gilford Middle School Q.14b b. Lighting Systems |||||2002

73 Gilford Gilford Middle School Q.14c c. Windows |||||2002

73 Gilford Gilford Middle School Q.14d d. Ceilings |||||2002

73 Gilford Gilford Middle School Q.14e e. Plumbing |||||2002

73 Gilford Gilford Middle School Q.14f f. Heating Systems |||||2002

73 Gilford Gilford Middle School Q.14g g. Ventilation Systems |||||2002

73 Gilford Gilford Middle School Q.14h h. Conditioning Systems |||||2002

73 Gilford Gilford Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

73 Gilford Gilford Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

73 Gilford Gilford Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

73 Gilford Gilford Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

73 Gilford Gilford Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

73 Gilford Gilford Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

Page 190 of 238

Page 191: New Hampshire Department of Education Bureau of School

73 Gilford Gilford Middle School Q.21 Is your building a CHP's or LEED certified? No

73 Gilford Gilford Middle School Q.22 Have you had energy audits of all your school facilities? Yes

73 Gilford Gilford Middle School Q.23 Do you have an energy performance contract in place? No

73 Gilford Gilford Middle School Q.24 What is the R-Value of the exterior walls, windows, and doors? 23

73 Gilford Gilford Middle School Q.25 What is the R-Value of the roof? 23

73 Gilford Gilford Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

73 Gilford Gilford Middle School Q.27 Do you have a presence of: (click all that apply) Lead in Water

73 Gilford Gilford Middle School Q.28 Do you have a facility maintenance plan? Yes

73 Gilford Gilford Middle School Q.29 What is your maintenance budget? 2132398

73 Gilford Gilford Middle School Q.30 What is your operational budget? 26237939

73 Gilford Gilford Middle School Q.31 What is your capital construction budget? 335000

73 Gilford Gilford Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?173640

73 Gilford Gilford Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

73 Gilford Gilford Middle School Q.34 Do you have a maintenance contract in place? Yes

73 Gilford Gilford Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

76 Lyme Lyme Elementary School Q.01 Approximate year of the original construction date 19062014

76 Lyme Lyme Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2014

76 Lyme Lyme Elementary School Q.03 Gross Square footage (including portables) 47000

76 Lyme Lyme Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

76 Lyme Lyme Elementary School Q.05 How many parking spaces does the facility have? 40

76 Lyme Lyme Elementary School Q.06 Does your building have a basement? No

76 Lyme Lyme Elementary School Q.07 How many portable classrooms are in use? 0

76 Lyme Lyme Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

76 Lyme Lyme Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

76 Lyme Lyme Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

76 Lyme Lyme Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

76 Lyme Lyme Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

76 Lyme Lyme Elementary School Q.14a a. Roofs 2014|2018||||

76 Lyme Lyme Elementary School Q.14b b. Lighting Systems 2018|2014|1994|||x

76 Lyme Lyme Elementary School Q.14c c. Windows 2014|2018|2017|2016|1994|

76 Lyme Lyme Elementary School Q.14d d. Ceilings Various|||||x

76 Lyme Lyme Elementary School Q.14e e. Plumbing 1994|2014||||

76 Lyme Lyme Elementary School Q.14f f. Heating Systems 2014||||x|

76 Lyme Lyme Elementary School Q.14g g. Ventilation Systems 1994|2014||||

76 Lyme Lyme Elementary School Q.14h h. Conditioning Systems 2017|2014||||

76 Lyme Lyme Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

76 Lyme Lyme Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Wood

76 Lyme Lyme Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

76 Lyme Lyme Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

76 Lyme Lyme Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

76 Lyme Lyme Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet|Solar

76 Lyme Lyme Elementary School Q.21 Is your building a CHP's or LEED certified? No

76 Lyme Lyme Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

76 Lyme Lyme Elementary School Q.23 Do you have an energy performance contract in place? No

76 Lyme Lyme Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1630

76 Lyme Lyme Elementary School Q.25 What is the R-Value of the roof? 30

76 Lyme Lyme Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

76 Lyme Lyme Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

76 Lyme Lyme Elementary School Q.28 Do you have a facility maintenance plan? No

Page 191 of 238

Page 192: New Hampshire Department of Education Bureau of School

76 Lyme Lyme Elementary School Q.29 What is your maintenance budget? 317000

76 Lyme Lyme Elementary School Q.30 What is your operational budget? 7320373

76 Lyme Lyme Elementary School Q.31 What is your capital construction budget? 0

76 Lyme Lyme Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?60000

76 Lyme Lyme Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?25

76 Lyme Lyme Elementary School Q.34 Do you have a maintenance contract in place? No

76 Lyme Lyme Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

79 Gilmanton Gilmanton Elementary School Q.01 Approximate year of the original construction date 1962

79 Gilmanton Gilmanton Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1995

79 Gilmanton Gilmanton Elementary School Q.03 Gross Square footage (including portables) 55000

79 Gilmanton Gilmanton Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

79 Gilmanton Gilmanton Elementary School Q.05 How many parking spaces does the facility have? 101

79 Gilmanton Gilmanton Elementary School Q.06 Does your building have a basement? No

79 Gilmanton Gilmanton Elementary School Q.07 How many portable classrooms are in use? 2

79 Gilmanton Gilmanton Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

79 Gilmanton Gilmanton Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom

79 Gilmanton Gilmanton Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

79 Gilmanton Gilmanton Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

79 Gilmanton Gilmanton Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

79 Gilmanton Gilmanton Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

79 Gilmanton Gilmanton Elementary School Q.14a a. Roofs 1962|1978|1995|||

79 Gilmanton Gilmanton Elementary School Q.14b b. Lighting Systems 1962|1978|1995|||

79 Gilmanton Gilmanton Elementary School Q.14c c. Windows 1962|1978|1995|||

79 Gilmanton Gilmanton Elementary School Q.14d d. Ceilings 1962|1978|1995|||

79 Gilmanton Gilmanton Elementary School Q.14e e. Plumbing 1962|1995||||

79 Gilmanton Gilmanton Elementary School Q.14f f. Heating Systems 1962|1995||||

79 Gilmanton Gilmanton Elementary School Q.14g g. Ventilation Systems 1995|||||

79 Gilmanton Gilmanton Elementary School Q.14h h. Conditioning Systems 1995|||||

79 Gilmanton Gilmanton Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

79 Gilmanton Gilmanton Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

79 Gilmanton Gilmanton Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

79 Gilmanton Gilmanton Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

79 Gilmanton Gilmanton Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

79 Gilmanton Gilmanton Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

79 Gilmanton Gilmanton Elementary School Q.21 Is your building a CHP's or LEED certified? No

79 Gilmanton Gilmanton Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

79 Gilmanton Gilmanton Elementary School Q.23 Do you have an energy performance contract in place? No

79 Gilmanton Gilmanton Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

79 Gilmanton Gilmanton Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

79 Gilmanton Gilmanton Elementary School Q.28 Do you have a facility maintenance plan? No

79 Gilmanton Gilmanton Elementary School Q.29 What is your maintenance budget? 419582

79 Gilmanton Gilmanton Elementary School Q.30 What is your operational budget? 10521999

79 Gilmanton Gilmanton Elementary School Q.31 What is your capital construction budget? 104373

79 Gilmanton Gilmanton Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?114000

79 Gilmanton Gilmanton Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?9000

79 Gilmanton Gilmanton Elementary School Q.34 Do you have a maintenance contract in place? No

79 Gilmanton Gilmanton Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

79 Gilmanton Gilmanton Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") New main entrance, new sau and main office.

79 Gilmanton Gilmanton Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 1.6

Page 192 of 238

Page 193: New Hampshire Department of Education Bureau of School

79 Gilmanton Gilmanton Elementary School Q.35c c. If yes, provide estimated year of construction. 2019

80 Shaker Regional Belmont Elementary School Q.01 Approximate year of the original construction date 1985

80 Shaker Regional Belmont Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1990

80 Shaker Regional Belmont Elementary School Q.03 Gross Square footage (including portables) 44500

80 Shaker Regional Belmont Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

80 Shaker Regional Belmont Elementary School Q.05 How many parking spaces does the facility have? 75

80 Shaker Regional Belmont Elementary School Q.06 Does your building have a basement? No

80 Shaker Regional Belmont Elementary School Q.07 How many portable classrooms are in use? 0

80 Shaker Regional Belmont Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

80 Shaker Regional Belmont Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

80 Shaker Regional Belmont Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

80 Shaker Regional Belmont Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

80 Shaker Regional Belmont Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

80 Shaker Regional Belmont Elementary School Q.14a a. Roofs |||||

80 Shaker Regional Belmont Elementary School Q.14b b. Lighting Systems ||2017|||

80 Shaker Regional Belmont Elementary School Q.14c c. Windows ||||2015|

80 Shaker Regional Belmont Elementary School Q.14d d. Ceilings |||||

80 Shaker Regional Belmont Elementary School Q.14e e. Plumbing |||||

80 Shaker Regional Belmont Elementary School Q.14f f. Heating Systems ||2017|||

80 Shaker Regional Belmont Elementary School Q.14g g. Ventilation Systems |||||

80 Shaker Regional Belmont Elementary School Q.14h h. Conditioning Systems |||||

80 Shaker Regional Belmont Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

80 Shaker Regional Belmont Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

80 Shaker Regional Belmont Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

80 Shaker Regional Belmont Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

80 Shaker Regional Belmont Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

80 Shaker Regional Belmont Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

80 Shaker Regional Belmont Elementary School Q.21 Is your building a CHP's or LEED certified? No

80 Shaker Regional Belmont Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

80 Shaker Regional Belmont Elementary School Q.23 Do you have an energy performance contract in place? Yes

80 Shaker Regional Belmont Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

80 Shaker Regional Belmont Elementary School Q.28 Do you have a facility maintenance plan? Yes

80 Shaker Regional Belmont Elementary School Q.29 What is your maintenance budget? 50000

80 Shaker Regional Belmont Elementary School Q.30 What is your operational budget? 40000

80 Shaker Regional Belmont Elementary School Q.31 What is your capital construction budget? 0

80 Shaker Regional Belmont Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?26000

80 Shaker Regional Belmont Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?26

80 Shaker Regional Belmont Elementary School Q.34 Do you have a maintenance contract in place? Yes

80 Shaker Regional Belmont Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

80 Shaker Regional Belmont High School Q.01 Approximate year of the original construction date 1998

80 Shaker Regional Belmont High School Q.03 Gross Square footage (including portables) 72000

80 Shaker Regional Belmont High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

80 Shaker Regional Belmont High School Q.05 How many parking spaces does the facility have? 120

80 Shaker Regional Belmont High School Q.06 Does your building have a basement? No

80 Shaker Regional Belmont High School Q.07 How many portable classrooms are in use? 0

80 Shaker Regional Belmont High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

80 Shaker Regional Belmont High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

80 Shaker Regional Belmont High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

80 Shaker Regional Belmont High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

Page 193 of 238

Page 194: New Hampshire Department of Education Bureau of School

80 Shaker Regional Belmont High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

80 Shaker Regional Belmont High School Q.14a a. Roofs 1998|||||

80 Shaker Regional Belmont High School Q.14b b. Lighting Systems 2017|||||

80 Shaker Regional Belmont High School Q.14c c. Windows 1998|||||

80 Shaker Regional Belmont High School Q.14d d. Ceilings 1998|||||

80 Shaker Regional Belmont High School Q.14e e. Plumbing 1998|||||

80 Shaker Regional Belmont High School Q.14f f. Heating Systems 2017|||||

80 Shaker Regional Belmont High School Q.14g g. Ventilation Systems 1998|||||

80 Shaker Regional Belmont High School Q.14h h. Conditioning Systems 1998|||||

80 Shaker Regional Belmont High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

80 Shaker Regional Belmont High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

80 Shaker Regional Belmont High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

80 Shaker Regional Belmont High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

80 Shaker Regional Belmont High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

80 Shaker Regional Belmont High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

80 Shaker Regional Belmont High School Q.21 Is your building a CHP's or LEED certified? No

80 Shaker Regional Belmont High School Q.22 Have you had energy audits of all your school facilities? Yes

80 Shaker Regional Belmont High School Q.23 Do you have an energy performance contract in place? Yes

80 Shaker Regional Belmont High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

80 Shaker Regional Belmont High School Q.28 Do you have a facility maintenance plan? Yes

80 Shaker Regional Belmont High School Q.29 What is your maintenance budget? 50000

80 Shaker Regional Belmont High School Q.30 What is your operational budget? 65000

80 Shaker Regional Belmont High School Q.31 What is your capital construction budget? 0

80 Shaker Regional Belmont High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?65000

80 Shaker Regional Belmont High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?32

80 Shaker Regional Belmont High School Q.34 Do you have a maintenance contract in place? Yes

80 Shaker Regional Belmont High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

80 Shaker Regional Belmont Middle School Q.01 Approximate year of the original construction date 1936

80 Shaker Regional Belmont Middle School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

80 Shaker Regional Belmont Middle School Q.03 Gross Square footage (including portables) 64000

80 Shaker Regional Belmont Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

80 Shaker Regional Belmont Middle School Q.05 How many parking spaces does the facility have? 94

80 Shaker Regional Belmont Middle School Q.06 Does your building have a basement? Yes

80 Shaker Regional Belmont Middle School Q.07 How many portable classrooms are in use? 0

80 Shaker Regional Belmont Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

80 Shaker Regional Belmont Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

80 Shaker Regional Belmont Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

80 Shaker Regional Belmont Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

80 Shaker Regional Belmont Middle School Q.14a a. Roofs |2018||||

80 Shaker Regional Belmont Middle School Q.14b b. Lighting Systems ||2017|||

80 Shaker Regional Belmont Middle School Q.14c c. Windows ||2017|||

80 Shaker Regional Belmont Middle School Q.14d d. Ceilings |||||

80 Shaker Regional Belmont Middle School Q.14e e. Plumbing |||||

80 Shaker Regional Belmont Middle School Q.14f f. Heating Systems ||2017|||

80 Shaker Regional Belmont Middle School Q.14g g. Ventilation Systems |||||

80 Shaker Regional Belmont Middle School Q.14h h. Conditioning Systems |||||

80 Shaker Regional Belmont Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

80 Shaker Regional Belmont Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

80 Shaker Regional Belmont Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

Page 194 of 238

Page 195: New Hampshire Department of Education Bureau of School

80 Shaker Regional Belmont Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

80 Shaker Regional Belmont Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

80 Shaker Regional Belmont Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Wood Chip/Pellet

80 Shaker Regional Belmont Middle School Q.21 Is your building a CHP's or LEED certified? No

80 Shaker Regional Belmont Middle School Q.22 Have you had energy audits of all your school facilities? Yes

80 Shaker Regional Belmont Middle School Q.23 Do you have an energy performance contract in place? Yes

80 Shaker Regional Belmont Middle School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

80 Shaker Regional Belmont Middle School Q.27 Do you have a presence of: (click all that apply) Lead in Water

80 Shaker Regional Belmont Middle School Q.28 Do you have a facility maintenance plan? Yes

80 Shaker Regional Belmont Middle School Q.29 What is your maintenance budget? 905019

80 Shaker Regional Belmont Middle School Q.30 What is your operational budget? 1016819

80 Shaker Regional Belmont Middle School Q.31 What is your capital construction budget? 0

80 Shaker Regional Belmont Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?50000

80 Shaker Regional Belmont Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

80 Shaker Regional Belmont Middle School Q.34 Do you have a maintenance contract in place? Yes

80 Shaker Regional Belmont Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

80 Shaker Regional Canterbury Elementary School Q.01 Approximate year of the original construction date 1956

80 Shaker Regional Canterbury Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1990

80 Shaker Regional Canterbury Elementary School Q.03 Gross Square footage (including portables) 30000

80 Shaker Regional Canterbury Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

80 Shaker Regional Canterbury Elementary School Q.05 How many parking spaces does the facility have? 50

80 Shaker Regional Canterbury Elementary School Q.06 Does your building have a basement? Yes

80 Shaker Regional Canterbury Elementary School Q.07 How many portable classrooms are in use? 0

80 Shaker Regional Canterbury Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

80 Shaker Regional Canterbury Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

80 Shaker Regional Canterbury Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

80 Shaker Regional Canterbury Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

80 Shaker Regional Canterbury Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

80 Shaker Regional Canterbury Elementary School Q.14a a. Roofs |||||

80 Shaker Regional Canterbury Elementary School Q.14b b. Lighting Systems 2017|||||

80 Shaker Regional Canterbury Elementary School Q.14c c. Windows |||||

80 Shaker Regional Canterbury Elementary School Q.14d d. Ceilings |||||

80 Shaker Regional Canterbury Elementary School Q.14e e. Plumbing |||||

80 Shaker Regional Canterbury Elementary School Q.14f f. Heating Systems 2017|||||

80 Shaker Regional Canterbury Elementary School Q.14g g. Ventilation Systems |||||

80 Shaker Regional Canterbury Elementary School Q.14h h. Conditioning Systems 2018|||||

80 Shaker Regional Canterbury Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

80 Shaker Regional Canterbury Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

80 Shaker Regional Canterbury Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

80 Shaker Regional Canterbury Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

80 Shaker Regional Canterbury Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

80 Shaker Regional Canterbury Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Wood Chip/Pellet

80 Shaker Regional Canterbury Elementary School Q.21 Is your building a CHP's or LEED certified? No

80 Shaker Regional Canterbury Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

80 Shaker Regional Canterbury Elementary School Q.23 Do you have an energy performance contract in place? Yes

80 Shaker Regional Canterbury Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

80 Shaker Regional Canterbury Elementary School Q.28 Do you have a facility maintenance plan? Yes

80 Shaker Regional Canterbury Elementary School Q.29 What is your maintenance budget? 25000

80 Shaker Regional Canterbury Elementary School Q.30 What is your operational budget? 30000

Page 195 of 238

Page 196: New Hampshire Department of Education Bureau of School

80 Shaker Regional Canterbury Elementary School Q.31 What is your capital construction budget? 0

80 Shaker Regional Canterbury Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?20000

80 Shaker Regional Canterbury Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?15

80 Shaker Regional Canterbury Elementary School Q.34 Do you have a maintenance contract in place? Yes

80 Shaker Regional Canterbury Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

81 Hudson Alvirne High School Q.01 Approximate year of the original construction date 1950

81 Hudson Alvirne High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1992

81 Hudson Alvirne High School Q.03 Gross Square footage (including portables) 210046

81 Hudson Alvirne High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

81 Hudson Alvirne High School Q.05 How many parking spaces does the facility have? 415

81 Hudson Alvirne High School Q.06 Does your building have a basement? No

81 Hudson Alvirne High School Q.07 How many portable classrooms are in use? 0

81 Hudson Alvirne High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

81 Hudson Alvirne High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

81 Hudson Alvirne High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

81 Hudson Alvirne High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

81 Hudson Alvirne High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

81 Hudson Alvirne High School Q.14a a. Roofs 1975|2014|2016|2017||

81 Hudson Alvirne High School Q.14b b. Lighting Systems 1975|2017|2018|||

81 Hudson Alvirne High School Q.14c c. Windows 1975|1992|2008|||

81 Hudson Alvirne High School Q.14d d. Ceilings 1975|1992||||

81 Hudson Alvirne High School Q.14e e. Plumbing 1975|1992||||

81 Hudson Alvirne High School Q.14f f. Heating Systems 1975|1992|2006|||

81 Hudson Alvirne High School Q.14g g. Ventilation Systems 1975|1992|2006|||

81 Hudson Alvirne High School Q.14h h. Conditioning Systems 1975|1992|2017|||

81 Hudson Alvirne High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

81 Hudson Alvirne High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

81 Hudson Alvirne High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

81 Hudson Alvirne High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

81 Hudson Alvirne High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

81 Hudson Alvirne High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

81 Hudson Alvirne High School Q.21 Is your building a CHP's or LEED certified? No

81 Hudson Alvirne High School Q.22 Have you had energy audits of all your school facilities? Yes

81 Hudson Alvirne High School Q.23 Do you have an energy performance contract in place? No

81 Hudson Alvirne High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

81 Hudson Alvirne High School Q.25 What is the R-Value of the roof? 14

81 Hudson Alvirne High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

81 Hudson Alvirne High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

81 Hudson Alvirne High School Q.28 Do you have a facility maintenance plan? Yes

81 Hudson Alvirne High School Q.29 What is your maintenance budget? 7200000

81 Hudson Alvirne High School Q.30 What is your operational budget? 548000000

81 Hudson Alvirne High School Q.31 What is your capital construction budget? 0

81 Hudson Alvirne High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?344500

81 Hudson Alvirne High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?500

81 Hudson Alvirne High School Q.34 Do you have a maintenance contract in place? No

81 Hudson Alvirne High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

81 Hudson Alvirne High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") CTE Renovation

81 Hudson Alvirne High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 25

81 Hudson Alvirne High School Q.35c c. If yes, provide estimated year of construction. 2019

Page 196 of 238

Page 197: New Hampshire Department of Education Bureau of School

81 Hudson Dr. H. O. Smith Elementary School Q.01 Approximate year of the original construction date 1939

81 Hudson Dr. H. O. Smith Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1989

81 Hudson Dr. H. O. Smith Elementary School Q.03 Gross Square footage (including portables) 74753

81 Hudson Dr. H. O. Smith Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

81 Hudson Dr. H. O. Smith Elementary School Q.05 How many parking spaces does the facility have? 50

81 Hudson Dr. H. O. Smith Elementary School Q.06 Does your building have a basement? No

81 Hudson Dr. H. O. Smith Elementary School Q.07 How many portable classrooms are in use? 0

81 Hudson Dr. H. O. Smith Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

81 Hudson Dr. H. O. Smith Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

81 Hudson Dr. H. O. Smith Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

81 Hudson Dr. H. O. Smith Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

81 Hudson Dr. H. O. Smith Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

81 Hudson Dr. H. O. Smith Elementary School Q.14a a. Roofs 2002|||||

81 Hudson Dr. H. O. Smith Elementary School Q.14b b. Lighting Systems 1989|2002||||

81 Hudson Dr. H. O. Smith Elementary School Q.14c c. Windows 1954|2017|2018|||

81 Hudson Dr. H. O. Smith Elementary School Q.14d d. Ceilings 1954|1989||||

81 Hudson Dr. H. O. Smith Elementary School Q.14e e. Plumbing 1939|1954|1989|||

81 Hudson Dr. H. O. Smith Elementary School Q.14f f. Heating Systems 2010|2016|1989|1939||

81 Hudson Dr. H. O. Smith Elementary School Q.14g g. Ventilation Systems 1989|||||

81 Hudson Dr. H. O. Smith Elementary School Q.14h h. Conditioning Systems 1989|||||

81 Hudson Dr. H. O. Smith Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

81 Hudson Dr. H. O. Smith Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

81 Hudson Dr. H. O. Smith Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

81 Hudson Dr. H. O. Smith Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

81 Hudson Dr. H. O. Smith Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air|Steam

81 Hudson Dr. H. O. Smith Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

81 Hudson Dr. H. O. Smith Elementary School Q.21 Is your building a CHP's or LEED certified? No

81 Hudson Dr. H. O. Smith Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

81 Hudson Dr. H. O. Smith Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

81 Hudson Dr. H. O. Smith Elementary School Q.23 Do you have an energy performance contract in place? No

81 Hudson Dr. H. O. Smith Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

81 Hudson Dr. H. O. Smith Elementary School Q.25 What is the R-Value of the roof? 14

81 Hudson Dr. H. O. Smith Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

81 Hudson Dr. H. O. Smith Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

81 Hudson Dr. H. O. Smith Elementary School Q.28 Do you have a facility maintenance plan? Yes

81 Hudson Dr. H. O. Smith Elementary School Q.29 What is your maintenance budget? 7200000

81 Hudson Dr. H. O. Smith Elementary School Q.30 What is your operational budget? 548000000

81 Hudson Dr. H. O. Smith Elementary School Q.31 What is your capital construction budget? 0

81 Hudson Dr. H. O. Smith Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?111950

81 Hudson Dr. H. O. Smith Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?340

81 Hudson Dr. H. O. Smith Elementary School Q.34 Do you have a maintenance contract in place? No

81 Hudson Dr. H. O. Smith Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

81 Hudson Hills Garrison Elementary School Q.01 Approximate year of the original construction date 2002

81 Hudson Hills Garrison Elementary School Q.03 Gross Square footage (including portables) 80600

81 Hudson Hills Garrison Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

81 Hudson Hills Garrison Elementary School Q.05 How many parking spaces does the facility have? 106

81 Hudson Hills Garrison Elementary School Q.06 Does your building have a basement? No

81 Hudson Hills Garrison Elementary School Q.07 How many portable classrooms are in use? 2

81 Hudson Hills Garrison Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 197 of 238

Page 198: New Hampshire Department of Education Bureau of School

81 Hudson Hills Garrison Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special Education|Special (music, art,

etc)|Support Space

81 Hudson Hills Garrison Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

81 Hudson Hills Garrison Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

81 Hudson Hills Garrison Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

81 Hudson Hills Garrison Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

81 Hudson Hills Garrison Elementary School Q.14a a. Roofs 2002|||||

81 Hudson Hills Garrison Elementary School Q.14b b. Lighting Systems 2002|2017||||

81 Hudson Hills Garrison Elementary School Q.14c c. Windows 2002|||||

81 Hudson Hills Garrison Elementary School Q.14d d. Ceilings 2002|||||

81 Hudson Hills Garrison Elementary School Q.14e e. Plumbing 2002|||||

81 Hudson Hills Garrison Elementary School Q.14f f. Heating Systems 2002|||||

81 Hudson Hills Garrison Elementary School Q.14g g. Ventilation Systems 2002|||||

81 Hudson Hills Garrison Elementary School Q.14h h. Conditioning Systems 2002|||||

81 Hudson Hills Garrison Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

81 Hudson Hills Garrison Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

81 Hudson Hills Garrison Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

81 Hudson Hills Garrison Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

81 Hudson Hills Garrison Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

81 Hudson Hills Garrison Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

81 Hudson Hills Garrison Elementary School Q.21 Is your building a CHP's or LEED certified? No

81 Hudson Hills Garrison Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

81 Hudson Hills Garrison Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

81 Hudson Hills Garrison Elementary School Q.23 Do you have an energy performance contract in place? No

81 Hudson Hills Garrison Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

81 Hudson Hills Garrison Elementary School Q.25 What is the R-Value of the roof? 14

81 Hudson Hills Garrison Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

81 Hudson Hills Garrison Elementary School Q.28 Do you have a facility maintenance plan? Yes

81 Hudson Hills Garrison Elementary School Q.29 What is your maintenance budget? 7200000

81 Hudson Hills Garrison Elementary School Q.30 What is your operational budget? 548000000

81 Hudson Hills Garrison Elementary School Q.31 What is your capital construction budget? 0

81 Hudson Hills Garrison Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?150100

81 Hudson Hills Garrison Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?300

81 Hudson Hills Garrison Elementary School Q.34 Do you have a maintenance contract in place? No

81 Hudson Hills Garrison Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

81 Hudson Hudson Memorial School Q.01 Approximate year of the original construction date 1965

81 Hudson Hudson Memorial School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

81 Hudson Hudson Memorial School Q.03 Gross Square footage (including portables) 148220

81 Hudson Hudson Memorial School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

81 Hudson Hudson Memorial School Q.05 How many parking spaces does the facility have? 254

81 Hudson Hudson Memorial School Q.06 Does your building have a basement? No

81 Hudson Hudson Memorial School Q.07 How many portable classrooms are in use? 0

81 Hudson Hudson Memorial School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

81 Hudson Hudson Memorial School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

81 Hudson Hudson Memorial School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

81 Hudson Hudson Memorial School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

81 Hudson Hudson Memorial School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

81 Hudson Hudson Memorial School Q.14a a. Roofs 2002|2018||||

81 Hudson Hudson Memorial School Q.14b b. Lighting Systems 1965|2002||||

81 Hudson Hudson Memorial School Q.14c c. Windows 1965|2001||||

Page 198 of 238

Page 199: New Hampshire Department of Education Bureau of School

81 Hudson Hudson Memorial School Q.14d d. Ceilings 1965|2002||||

81 Hudson Hudson Memorial School Q.14e e. Plumbing 1965|2002||||

81 Hudson Hudson Memorial School Q.14f f. Heating Systems 1965|2002||||

81 Hudson Hudson Memorial School Q.14g g. Ventilation Systems 1965|2002||||

81 Hudson Hudson Memorial School Q.14h h. Conditioning Systems 1965|2002||||

81 Hudson Hudson Memorial School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

81 Hudson Hudson Memorial School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

81 Hudson Hudson Memorial School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

81 Hudson Hudson Memorial School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

81 Hudson Hudson Memorial School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

81 Hudson Hudson Memorial School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

81 Hudson Hudson Memorial School Q.21 Is your building a CHP's or LEED certified? No

81 Hudson Hudson Memorial School Q.22 Have you had energy audits of all your school facilities? Yes

81 Hudson Hudson Memorial School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

81 Hudson Hudson Memorial School Q.23 Do you have an energy performance contract in place? No

81 Hudson Hudson Memorial School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

81 Hudson Hudson Memorial School Q.25 What is the R-Value of the roof? 14

81 Hudson Hudson Memorial School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

81 Hudson Hudson Memorial School Q.27 Do you have a presence of: (click all that apply) Asbestos

81 Hudson Hudson Memorial School Q.28 Do you have a facility maintenance plan? Yes

81 Hudson Hudson Memorial School Q.29 What is your maintenance budget? 7200000

81 Hudson Hudson Memorial School Q.30 What is your operational budget? 548000000

81 Hudson Hudson Memorial School Q.31 What is your capital construction budget? 0

81 Hudson Hudson Memorial School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?197500

81 Hudson Hudson Memorial School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?420

81 Hudson Hudson Memorial School Q.34 Do you have a maintenance contract in place? No

81 Hudson Hudson Memorial School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

81 Hudson Hudson Memorial School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 0

81 Hudson Nottingham West Elementary School Q.01 Approximate year of the original construction date 1989

81 Hudson Nottingham West Elementary School Q.03 Gross Square footage (including portables) 83000

81 Hudson Nottingham West Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

81 Hudson Nottingham West Elementary School Q.05 How many parking spaces does the facility have? 123

81 Hudson Nottingham West Elementary School Q.06 Does your building have a basement? No

81 Hudson Nottingham West Elementary School Q.07 How many portable classrooms are in use? 2

81 Hudson Nottingham West Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

81 Hudson Nottingham West Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special Education|Special (music, art,

etc)|Support Space

81 Hudson Nottingham West Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

81 Hudson Nottingham West Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

81 Hudson Nottingham West Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

81 Hudson Nottingham West Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

81 Hudson Nottingham West Elementary School Q.14a a. Roofs 2002|||||

81 Hudson Nottingham West Elementary School Q.14b b. Lighting Systems 1989|2018||||

81 Hudson Nottingham West Elementary School Q.14c c. Windows 1989|||||

81 Hudson Nottingham West Elementary School Q.14d d. Ceilings 1989|||||

81 Hudson Nottingham West Elementary School Q.14e e. Plumbing 1989|||||

81 Hudson Nottingham West Elementary School Q.14f f. Heating Systems 1989|||||

81 Hudson Nottingham West Elementary School Q.14g g. Ventilation Systems 1989|||||

81 Hudson Nottingham West Elementary School Q.14h h. Conditioning Systems 1989|||||

81 Hudson Nottingham West Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

Page 199 of 238

Page 200: New Hampshire Department of Education Bureau of School

81 Hudson Nottingham West Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

81 Hudson Nottingham West Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

81 Hudson Nottingham West Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

81 Hudson Nottingham West Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

81 Hudson Nottingham West Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

81 Hudson Nottingham West Elementary School Q.21 Is your building a CHP's or LEED certified? No

81 Hudson Nottingham West Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

81 Hudson Nottingham West Elementary School Q.23 Do you have an energy performance contract in place? No

81 Hudson Nottingham West Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

81 Hudson Nottingham West Elementary School Q.25 What is the R-Value of the roof? 14

81 Hudson Nottingham West Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

81 Hudson Nottingham West Elementary School Q.28 Do you have a facility maintenance plan? Yes

81 Hudson Nottingham West Elementary School Q.29 What is your maintenance budget? 7200000

81 Hudson Nottingham West Elementary School Q.30 What is your operational budget? 548000000

81 Hudson Nottingham West Elementary School Q.31 What is your capital construction budget? 0

81 Hudson Nottingham West Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100200

81 Hudson Nottingham West Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?320

81 Hudson Nottingham West Elementary School Q.34 Do you have a maintenance contract in place? No

81 Hudson Nottingham West Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

82 Chester Chester Academy Q.01 Approximate year of the original construction date 1998

82 Chester Chester Academy Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2003

82 Chester Chester Academy Q.03 Gross Square footage (including portables) 84568

82 Chester Chester Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

82 Chester Chester Academy Q.05 How many parking spaces does the facility have? 151

82 Chester Chester Academy Q.06 Does your building have a basement? No

82 Chester Chester Academy Q.07 How many portable classrooms are in use? 0

82 Chester Chester Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

82 Chester Chester Academy Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Other|Administration

82 Chester Chester Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

82 Chester Chester Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

82 Chester Chester Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

82 Chester Chester Academy Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

82 Chester Chester Academy Q.14a a. Roofs 1998|||||

82 Chester Chester Academy Q.14b b. Lighting Systems 1998|||||

82 Chester Chester Academy Q.14c c. Windows 1998|||||

82 Chester Chester Academy Q.14d d. Ceilings 1998|||||

82 Chester Chester Academy Q.14e e. Plumbing 1998|||||

82 Chester Chester Academy Q.14f f. Heating Systems 1998|||||

82 Chester Chester Academy Q.14g g. Ventilation Systems 1998|||||

82 Chester Chester Academy Q.14h h. Conditioning Systems 1998|||||

82 Chester Chester Academy Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

82 Chester Chester Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood|Other|Designer Brick

82 Chester Chester Academy Q.17 What type of studding is used at your school facility? (click all that apply) Steel

82 Chester Chester Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

82 Chester Chester Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

82 Chester Chester Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

82 Chester Chester Academy Q.21 Is your building a CHP's or LEED certified? No

82 Chester Chester Academy Q.22 Have you had energy audits of all your school facilities? No

82 Chester Chester Academy Q.23 Do you have an energy performance contract in place? No

Page 200 of 238

Page 201: New Hampshire Department of Education Bureau of School

82 Chester Chester Academy Q.24 What is the R-Value of the exterior walls, windows, and doors? 2

82 Chester Chester Academy Q.25 What is the R-Value of the roof? 20

82 Chester Chester Academy Q.26 Do you have carbon monoxide detector(s) in your building? No

82 Chester Chester Academy Q.28 Do you have a facility maintenance plan? Yes

82 Chester Chester Academy Q.29 What is your maintenance budget? 369922

82 Chester Chester Academy Q.30 What is your operational budget? 12396705

82 Chester Chester Academy Q.31 What is your capital construction budget? 0

82 Chester Chester Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?140000

82 Chester Chester Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?36

82 Chester Chester Academy Q.34 Do you have a maintenance contract in place? Yes

82 Chester Chester Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

83 Fremont Ellis School Q.01 Approximate year of the original construction date 1950

83 Fremont Ellis School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

83 Fremont Ellis School Q.03 Gross Square footage (including portables) 60000

83 Fremont Ellis School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

83 Fremont Ellis School Q.05 How many parking spaces does the facility have? 85

83 Fremont Ellis School Q.06 Does your building have a basement? No

83 Fremont Ellis School Q.07 How many portable classrooms are in use? 2

83 Fremont Ellis School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

83 Fremont Ellis School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Special

(music, art, etc)

83 Fremont Ellis School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

83 Fremont Ellis School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

83 Fremont Ellis School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

83 Fremont Ellis School Q.13 Are all instructional and service areas within the facility ADA compliant? No

83 Fremont Ellis School Q.14a a. Roofs 2004|2019||||

83 Fremont Ellis School Q.14b b. Lighting Systems 2005|||||

83 Fremont Ellis School Q.14c c. Windows 2012|||||

83 Fremont Ellis School Q.14d d. Ceilings 2010|||||

83 Fremont Ellis School Q.14e e. Plumbing 1950|2004||||

83 Fremont Ellis School Q.14f f. Heating Systems 2016|||||

83 Fremont Ellis School Q.14g g. Ventilation Systems |||||

83 Fremont Ellis School Q.14h h. Conditioning Systems |||||

83 Fremont Ellis School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

83 Fremont Ellis School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Wood

83 Fremont Ellis School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

83 Fremont Ellis School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

83 Fremont Ellis School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

83 Fremont Ellis School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

83 Fremont Ellis School Q.21 Is your building a CHP's or LEED certified? No

83 Fremont Ellis School Q.22 Have you had energy audits of all your school facilities? No

83 Fremont Ellis School Q.23 Do you have an energy performance contract in place? No

83 Fremont Ellis School Q.25 What is the R-Value of the roof? 30

83 Fremont Ellis School Q.26 Do you have carbon monoxide detector(s) in your building? No

83 Fremont Ellis School Q.27 Do you have a presence of: (click all that apply) Asbestos

83 Fremont Ellis School Q.28 Do you have a facility maintenance plan? Yes

83 Fremont Ellis School Q.29 What is your maintenance budget? 454710.68

83 Fremont Ellis School Q.30 What is your operational budget? 1200000

83 Fremont Ellis School Q.31 What is your capital construction budget? 0

83 Fremont Ellis School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?50000

Page 201 of 238

Page 202: New Hampshire Department of Education Bureau of School

83 Fremont Ellis School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3375

83 Fremont Ellis School Q.34 Do you have a maintenance contract in place? Yes

83 Fremont Ellis School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

83 Fremont Ellis School Q.35a a. If yes, provide a short description. (e.g., "High School Addition")Replacement of 2 modulars with new

construction.

83 Fremont Ellis School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 3

83 Fremont Ellis School Q.35c c. If yes, provide estimated year of construction. 202122

84 Littleton Littleton High School Q.01 Approximate year of the original construction date 1955

84 Littleton Littleton High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2011

84 Littleton Littleton High School Q.03 Gross Square footage (including portables) 121000

84 Littleton Littleton High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

84 Littleton Littleton High School Q.05 How many parking spaces does the facility have? 140

84 Littleton Littleton High School Q.06 Does your building have a basement? No

84 Littleton Littleton High School Q.07 How many portable classrooms are in use? 0

84 Littleton Littleton High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

84 Littleton Littleton High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

84 Littleton Littleton High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

84 Littleton Littleton High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

84 Littleton Littleton High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

84 Littleton Littleton High School Q.14a a. Roofs |1||||

84 Littleton Littleton High School Q.14b b. Lighting Systems |||||

84 Littleton Littleton High School Q.14c c. Windows 1|||||

84 Littleton Littleton High School Q.14d d. Ceilings |||||

84 Littleton Littleton High School Q.14e e. Plumbing |||||

84 Littleton Littleton High School Q.14f f. Heating Systems |||||

84 Littleton Littleton High School Q.14g g. Ventilation Systems |||||

84 Littleton Littleton High School Q.14h h. Conditioning Systems |||||

84 Littleton Littleton High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

84 Littleton Littleton High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

84 Littleton Littleton High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

84 Littleton Littleton High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

84 Littleton Littleton High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

84 Littleton Littleton High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

84 Littleton Littleton High School Q.21 Is your building a CHP's or LEED certified? No

84 Littleton Littleton High School Q.22 Have you had energy audits of all your school facilities? No

84 Littleton Littleton High School Q.23 Do you have an energy performance contract in place? No

84 Littleton Littleton High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 8

84 Littleton Littleton High School Q.25 What is the R-Value of the roof? 23

84 Littleton Littleton High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

84 Littleton Littleton High School Q.27 Do you have a presence of: (click all that apply) Asbestos

84 Littleton Littleton High School Q.28 Do you have a facility maintenance plan? Yes

84 Littleton Littleton High School Q.29 What is your maintenance budget? 38300

84 Littleton Littleton High School Q.30 What is your operational budget? 826221

84 Littleton Littleton High School Q.31 What is your capital construction budget? 0

84 Littleton Littleton High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?282000

84 Littleton Littleton High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6620

84 Littleton Littleton High School Q.34 Do you have a maintenance contract in place? Yes

84 Littleton Littleton High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

84 Littleton Mildred C. Lakeway School Q.01 Approximate year of the original construction date 1950

84 Littleton Mildred C. Lakeway School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2000

Page 202 of 238

Page 203: New Hampshire Department of Education Bureau of School

84 Littleton Mildred C. Lakeway School Q.03 Gross Square footage (including portables) 57000

84 Littleton Mildred C. Lakeway School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

84 Littleton Mildred C. Lakeway School Q.05 How many parking spaces does the facility have? 7

84 Littleton Mildred C. Lakeway School Q.06 Does your building have a basement? Yes

84 Littleton Mildred C. Lakeway School Q.07 How many portable classrooms are in use? 2

84 Littleton Mildred C. Lakeway School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

84 Littleton Mildred C. Lakeway School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special Education|Other|Library

84 Littleton Mildred C. Lakeway School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

84 Littleton Mildred C. Lakeway School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

84 Littleton Mildred C. Lakeway School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

84 Littleton Mildred C. Lakeway School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

84 Littleton Mildred C. Lakeway School Q.14a a. Roofs ||1|||

84 Littleton Mildred C. Lakeway School Q.14b b. Lighting Systems |||||

84 Littleton Mildred C. Lakeway School Q.14c c. Windows |||||

84 Littleton Mildred C. Lakeway School Q.14d d. Ceilings |||||

84 Littleton Mildred C. Lakeway School Q.14e e. Plumbing |||||

84 Littleton Mildred C. Lakeway School Q.14f f. Heating Systems |||||

84 Littleton Mildred C. Lakeway School Q.14g g. Ventilation Systems |||||

84 Littleton Mildred C. Lakeway School Q.14h h. Conditioning Systems |||||

84 Littleton Mildred C. Lakeway School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

84 Littleton Mildred C. Lakeway School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

84 Littleton Mildred C. Lakeway School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

84 Littleton Mildred C. Lakeway School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

84 Littleton Mildred C. Lakeway School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

84 Littleton Mildred C. Lakeway School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

84 Littleton Mildred C. Lakeway School Q.21 Is your building a CHP's or LEED certified? No

84 Littleton Mildred C. Lakeway School Q.22 Have you had energy audits of all your school facilities? No

84 Littleton Mildred C. Lakeway School Q.23 Do you have an energy performance contract in place? No

84 Littleton Mildred C. Lakeway School Q.24 What is the R-Value of the exterior walls, windows, and doors? 5

84 Littleton Mildred C. Lakeway School Q.25 What is the R-Value of the roof? 23

84 Littleton Mildred C. Lakeway School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

84 Littleton Mildred C. Lakeway School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

84 Littleton Mildred C. Lakeway School Q.28 Do you have a facility maintenance plan? Yes

84 Littleton Mildred C. Lakeway School Q.29 What is your maintenance budget? 37000

84 Littleton Mildred C. Lakeway School Q.30 What is your operational budget? 496148

84 Littleton Mildred C. Lakeway School Q.31 What is your capital construction budget? 0

84 Littleton Mildred C. Lakeway School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?120000

84 Littleton Mildred C. Lakeway School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4860

84 Littleton Mildred C. Lakeway School Q.34 Do you have a maintenance contract in place? Yes

84 Littleton Mildred C. Lakeway School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

84 Littleton Mildred C. Lakeway School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Plan is to build a new Elementary School

84 Littleton Mildred C. Lakeway School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 20000000

85 Sunapee Sunapee Central School Q.01 Approximate year of the original construction date 1928

85 Sunapee Sunapee Central School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1986

85 Sunapee Sunapee Central School Q.03 Gross Square footage (including portables) 38000

85 Sunapee Sunapee Central School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

85 Sunapee Sunapee Central School Q.05 How many parking spaces does the facility have? 28

85 Sunapee Sunapee Central School Q.06 Does your building have a basement? Yes

85 Sunapee Sunapee Central School Q.07 How many portable classrooms are in use? 1

Page 203 of 238

Page 204: New Hampshire Department of Education Bureau of School

85 Sunapee Sunapee Central School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

85 Sunapee Sunapee Central School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

85 Sunapee Sunapee Central School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

85 Sunapee Sunapee Central School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

85 Sunapee Sunapee Central School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

85 Sunapee Sunapee Central School Q.13 Are all instructional and service areas within the facility ADA compliant? No

85 Sunapee Sunapee Central School Q.14a a. Roofs |||||x

85 Sunapee Sunapee Central School Q.14b b. Lighting Systems |||||x

85 Sunapee Sunapee Central School Q.14c c. Windows |||||x

85 Sunapee Sunapee Central School Q.14d d. Ceilings |||||x

85 Sunapee Sunapee Central School Q.14e e. Plumbing |||||x

85 Sunapee Sunapee Central School Q.14f f. Heating Systems |||||x

85 Sunapee Sunapee Central School Q.14g g. Ventilation Systems |||||x

85 Sunapee Sunapee Central School Q.14h h. Conditioning Systems |||||x

85 Sunapee Sunapee Central School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

85 Sunapee Sunapee Central School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

85 Sunapee Sunapee Central School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

85 Sunapee Sunapee Central School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

85 Sunapee Sunapee Central School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Steam

85 Sunapee Sunapee Central School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

85 Sunapee Sunapee Central School Q.21 Is your building a CHP's or LEED certified? No

85 Sunapee Sunapee Central School Q.22 Have you had energy audits of all your school facilities? Yes

85 Sunapee Sunapee Central School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

85 Sunapee Sunapee Central School Q.23 Do you have an energy performance contract in place? No

85 Sunapee Sunapee Central School Q.24 What is the R-Value of the exterior walls, windows, and doors? 3

85 Sunapee Sunapee Central School Q.25 What is the R-Value of the roof? 11

85 Sunapee Sunapee Central School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

85 Sunapee Sunapee Central School Q.28 Do you have a facility maintenance plan? Yes

85 Sunapee Sunapee Central School Q.29 What is your maintenance budget? 117050

85 Sunapee Sunapee Central School Q.30 What is your operational budget? 12500000

85 Sunapee Sunapee Central School Q.31 What is your capital construction budget? 192000

85 Sunapee Sunapee Central School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?68000

85 Sunapee Sunapee Central School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?120

85 Sunapee Sunapee Central School Q.34 Do you have a maintenance contract in place? No

85 Sunapee Sunapee Central School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

85 Sunapee Sunapee Central School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") renovation addition

85 Sunapee Sunapee Central School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 26

85 Sunapee Sunapee Central School Q.35c c. If yes, provide estimated year of construction. 2020

85 Sunapee Sunapee Middle High School Q.01 Approximate year of the original construction date 1973

85 Sunapee Sunapee Middle High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

85 Sunapee Sunapee Middle High School Q.03 Gross Square footage (including portables) 68000

85 Sunapee Sunapee Middle High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

85 Sunapee Sunapee Middle High School Q.05 How many parking spaces does the facility have? 140

85 Sunapee Sunapee Middle High School Q.06 Does your building have a basement? Yes

85 Sunapee Sunapee Middle High School Q.07 How many portable classrooms are in use? 0

85 Sunapee Sunapee Middle High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

85 Sunapee Sunapee Middle High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

85 Sunapee Sunapee Middle High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

85 Sunapee Sunapee Middle High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

Page 204 of 238

Page 205: New Hampshire Department of Education Bureau of School

85 Sunapee Sunapee Middle High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

85 Sunapee Sunapee Middle High School Q.14a a. Roofs |||||x

85 Sunapee Sunapee Middle High School Q.14b b. Lighting Systems |x||||

85 Sunapee Sunapee Middle High School Q.14c c. Windows |||||x

85 Sunapee Sunapee Middle High School Q.14d d. Ceilings |||||x

85 Sunapee Sunapee Middle High School Q.14e e. Plumbing |||||x

85 Sunapee Sunapee Middle High School Q.14f f. Heating Systems |||||x

85 Sunapee Sunapee Middle High School Q.14g g. Ventilation Systems |||||x

85 Sunapee Sunapee Middle High School Q.14h h. Conditioning Systems |||||x

85 Sunapee Sunapee Middle High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

85 Sunapee Sunapee Middle High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood|Other|Vi

85 Sunapee Sunapee Middle High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

85 Sunapee Sunapee Middle High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

85 Sunapee Sunapee Middle High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

85 Sunapee Sunapee Middle High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

85 Sunapee Sunapee Middle High School Q.21 Is your building a CHP's or LEED certified? No

85 Sunapee Sunapee Middle High School Q.22 Have you had energy audits of all your school facilities? Yes

85 Sunapee Sunapee Middle High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

85 Sunapee Sunapee Middle High School Q.23 Do you have an energy performance contract in place? No

85 Sunapee Sunapee Middle High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 8

85 Sunapee Sunapee Middle High School Q.25 What is the R-Value of the roof? 12

85 Sunapee Sunapee Middle High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

85 Sunapee Sunapee Middle High School Q.27 Do you have a presence of: (click all that apply) Asbestos

85 Sunapee Sunapee Middle High School Q.28 Do you have a facility maintenance plan? Yes

85 Sunapee Sunapee Middle High School Q.29 What is your maintenance budget? 350000

85 Sunapee Sunapee Middle High School Q.30 What is your operational budget? 12000000

85 Sunapee Sunapee Middle High School Q.31 What is your capital construction budget? 186289

85 Sunapee Sunapee Middle High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?180000

85 Sunapee Sunapee Middle High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?200

85 Sunapee Sunapee Middle High School Q.34 Do you have a maintenance contract in place? Yes

85 Sunapee Sunapee Middle High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

85 Sunapee Sunapee Middle High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") HVAC updated

85 Sunapee Sunapee Middle High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

85 Sunapee Sunapee Middle High School Q.35c c. If yes, provide estimated year of construction. 2021

85 Sunapee Sunapee Sr. High School Q.01 Approximate year of the original construction date 1973

85 Sunapee Sunapee Sr. High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1998

85 Sunapee Sunapee Sr. High School Q.03 Gross Square footage (including portables) 68000

85 Sunapee Sunapee Sr. High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

85 Sunapee Sunapee Sr. High School Q.05 How many parking spaces does the facility have? 140

85 Sunapee Sunapee Sr. High School Q.06 Does your building have a basement? Yes

85 Sunapee Sunapee Sr. High School Q.07 How many portable classrooms are in use? 0

85 Sunapee Sunapee Sr. High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

85 Sunapee Sunapee Sr. High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

85 Sunapee Sunapee Sr. High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

85 Sunapee Sunapee Sr. High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

85 Sunapee Sunapee Sr. High School Q.14a a. Roofs |||||x

85 Sunapee Sunapee Sr. High School Q.14b b. Lighting Systems |x||||

85 Sunapee Sunapee Sr. High School Q.14c c. Windows |||||x

85 Sunapee Sunapee Sr. High School Q.14d d. Ceilings |||||x

Page 205 of 238

Page 206: New Hampshire Department of Education Bureau of School

85 Sunapee Sunapee Sr. High School Q.14e e. Plumbing |||||x

85 Sunapee Sunapee Sr. High School Q.14f f. Heating Systems |||||x

85 Sunapee Sunapee Sr. High School Q.14g g. Ventilation Systems |||||x

85 Sunapee Sunapee Sr. High School Q.14h h. Conditioning Systems |||||x

85 Sunapee Sunapee Sr. High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

85 Sunapee Sunapee Sr. High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|

85 Sunapee Sunapee Sr. High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

85 Sunapee Sunapee Sr. High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

85 Sunapee Sunapee Sr. High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

85 Sunapee Sunapee Sr. High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Electric

85 Sunapee Sunapee Sr. High School Q.21 Is your building a CHP's or LEED certified? No

85 Sunapee Sunapee Sr. High School Q.22 Have you had energy audits of all your school facilities? Yes

85 Sunapee Sunapee Sr. High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

85 Sunapee Sunapee Sr. High School Q.23 Do you have an energy performance contract in place? Yes

85 Sunapee Sunapee Sr. High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 8

85 Sunapee Sunapee Sr. High School Q.25 What is the R-Value of the roof? 12

85 Sunapee Sunapee Sr. High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

85 Sunapee Sunapee Sr. High School Q.28 Do you have a facility maintenance plan? Yes

85 Sunapee Sunapee Sr. High School Q.29 What is your maintenance budget? 350000

85 Sunapee Sunapee Sr. High School Q.30 What is your operational budget? 12500000

85 Sunapee Sunapee Sr. High School Q.31 What is your capital construction budget? 186289

85 Sunapee Sunapee Sr. High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?180000

85 Sunapee Sunapee Sr. High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?200

85 Sunapee Sunapee Sr. High School Q.34 Do you have a maintenance contract in place? Yes

85 Sunapee Sunapee Sr. High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

85 Sunapee Sunapee Sr. High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") HVAC updated

85 Sunapee Sunapee Sr. High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 2

85 Sunapee Sunapee Sr. High School Q.35c c. If yes, provide estimated year of construction. 2021

88 Lebanon Hanover Street School Q.01 Approximate year of the original construction date 1953

88 Lebanon Hanover Street School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2002

88 Lebanon Hanover Street School Q.03 Gross Square footage (including portables) 54223

88 Lebanon Hanover Street School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

88 Lebanon Hanover Street School Q.05 How many parking spaces does the facility have? 157

88 Lebanon Hanover Street School Q.06 Does your building have a basement? No

88 Lebanon Hanover Street School Q.07 How many portable classrooms are in use? 0

88 Lebanon Hanover Street School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

88 Lebanon Hanover Street School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

88 Lebanon Hanover Street School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

88 Lebanon Hanover Street School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

88 Lebanon Hanover Street School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

88 Lebanon Hanover Street School Q.14a a. Roofs |||||

88 Lebanon Hanover Street School Q.14b b. Lighting Systems |||||

88 Lebanon Hanover Street School Q.14c c. Windows |||||

88 Lebanon Hanover Street School Q.14d d. Ceilings |||||

88 Lebanon Hanover Street School Q.14e e. Plumbing |||||

88 Lebanon Hanover Street School Q.14f f. Heating Systems |||||

88 Lebanon Hanover Street School Q.14g g. Ventilation Systems |||||

88 Lebanon Hanover Street School Q.14h h. Conditioning Systems |||||

88 Lebanon Hanover Street School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

Page 206 of 238

Page 207: New Hampshire Department of Education Bureau of School

88 Lebanon Hanover Street School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

88 Lebanon Hanover Street School Q.17 What type of studding is used at your school facility? (click all that apply) Other|Cement block interior walls

88 Lebanon Hanover Street School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

88 Lebanon Hanover Street School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

88 Lebanon Hanover Street School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

88 Lebanon Hanover Street School Q.21 Is your building a CHP's or LEED certified? No

88 Lebanon Hanover Street School Q.22 Have you had energy audits of all your school facilities? Yes

88 Lebanon Hanover Street School Q.23 Do you have an energy performance contract in place? Yes

88 Lebanon Hanover Street School Q.26 Do you have carbon monoxide detector(s) in your building? No

88 Lebanon Hanover Street School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

88 Lebanon Hanover Street School Q.28 Do you have a facility maintenance plan? Yes

88 Lebanon Hanover Street School Q.29 What is your maintenance budget? 162200

88 Lebanon Hanover Street School Q.30 What is your operational budget? 127200

88 Lebanon Hanover Street School Q.31 What is your capital construction budget? 124000

88 Lebanon Hanover Street School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?88100

88 Lebanon Hanover Street School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

88 Lebanon Hanover Street School Q.34 Do you have a maintenance contract in place? Yes

88 Lebanon Hanover Street School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

88 Lebanon Hanover Street School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Library, cafeteria, classrooms, secure entrance

88 Lebanon Hanover Street School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 10.34

88 Lebanon Hanover Street School Q.35c c. If yes, provide estimated year of construction. 2023

88 Lebanon Lebanon High School Q.01 Approximate year of the original construction date 1959

88 Lebanon Lebanon High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1985

88 Lebanon Lebanon High School Q.03 Gross Square footage (including portables) 102382

88 Lebanon Lebanon High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

88 Lebanon Lebanon High School Q.05 How many parking spaces does the facility have? 295

88 Lebanon Lebanon High School Q.06 Does your building have a basement? No

88 Lebanon Lebanon High School Q.07 How many portable classrooms are in use? 0

88 Lebanon Lebanon High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

88 Lebanon Lebanon High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

88 Lebanon Lebanon High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

88 Lebanon Lebanon High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

88 Lebanon Lebanon High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

88 Lebanon Lebanon High School Q.14a a. Roofs |||||

88 Lebanon Lebanon High School Q.14b b. Lighting Systems |||||

88 Lebanon Lebanon High School Q.14c c. Windows |||||

88 Lebanon Lebanon High School Q.14d d. Ceilings |||||

88 Lebanon Lebanon High School Q.14e e. Plumbing |||||

88 Lebanon Lebanon High School Q.14f f. Heating Systems |||||

88 Lebanon Lebanon High School Q.14g g. Ventilation Systems |||||

88 Lebanon Lebanon High School Q.14h h. Conditioning Systems |||||

88 Lebanon Lebanon High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

88 Lebanon Lebanon High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|Cement block interior walls

88 Lebanon Lebanon High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

88 Lebanon Lebanon High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

88 Lebanon Lebanon High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

88 Lebanon Lebanon High School Q.21 Is your building a CHP's or LEED certified? No

88 Lebanon Lebanon High School Q.22 Have you had energy audits of all your school facilities? Yes

88 Lebanon Lebanon High School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

Page 207 of 238

Page 208: New Hampshire Department of Education Bureau of School

88 Lebanon Lebanon High School Q.23 Do you have an energy performance contract in place? Yes

88 Lebanon Lebanon High School Q.26 Do you have carbon monoxide detector(s) in your building? No

88 Lebanon Lebanon High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

88 Lebanon Lebanon High School Q.28 Do you have a facility maintenance plan? Yes

88 Lebanon Lebanon High School Q.29 What is your maintenance budget? 535400

88 Lebanon Lebanon High School Q.30 What is your operational budget? 85900

88 Lebanon Lebanon High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?168100

88 Lebanon Lebanon High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

88 Lebanon Lebanon High School Q.34 Do you have a maintenance contract in place? Yes

88 Lebanon Lebanon High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

88 Lebanon Lebanon High School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Secure entrance, student center, music/arts, aud

88 Lebanon Lebanon High School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 13.2

88 Lebanon Lebanon High School Q.35c c. If yes, provide estimated year of construction. 2023

88 Lebanon Lebanon Middle School Q.01 Approximate year of the original construction date 2012

88 Lebanon Lebanon Middle School Q.03 Gross Square footage (including portables) 105578

88 Lebanon Lebanon Middle School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

88 Lebanon Lebanon Middle School Q.05 How many parking spaces does the facility have? 104

88 Lebanon Lebanon Middle School Q.06 Does your building have a basement? No

88 Lebanon Lebanon Middle School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

88 Lebanon Lebanon Middle School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

88 Lebanon Lebanon Middle School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

88 Lebanon Lebanon Middle School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

88 Lebanon Lebanon Middle School Q.14a a. Roofs |||||

88 Lebanon Lebanon Middle School Q.14b b. Lighting Systems |||||

88 Lebanon Lebanon Middle School Q.14c c. Windows |||||

88 Lebanon Lebanon Middle School Q.14d d. Ceilings |||||

88 Lebanon Lebanon Middle School Q.14e e. Plumbing |||||

88 Lebanon Lebanon Middle School Q.14f f. Heating Systems |||||

88 Lebanon Lebanon Middle School Q.14g g. Ventilation Systems |||||

88 Lebanon Lebanon Middle School Q.14h h. Conditioning Systems |||||

88 Lebanon Lebanon Middle School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

88 Lebanon Lebanon Middle School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal

88 Lebanon Lebanon Middle School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|Cement block interior walls

88 Lebanon Lebanon Middle School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

88 Lebanon Lebanon Middle School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

88 Lebanon Lebanon Middle School Q.20 What types of energy sources are used in your school facility? (click all that apply) Wood Chip/Pellet

88 Lebanon Lebanon Middle School Q.21 Is your building a CHP's or LEED certified? Yes

88 Lebanon Lebanon Middle School Q.22 Have you had energy audits of all your school facilities? Yes

88 Lebanon Lebanon Middle School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

88 Lebanon Lebanon Middle School Q.23 Do you have an energy performance contract in place? Yes

88 Lebanon Lebanon Middle School Q.26 Do you have carbon monoxide detector(s) in your building? No

88 Lebanon Lebanon Middle School Q.28 Do you have a facility maintenance plan? Yes

88 Lebanon Lebanon Middle School Q.29 What is your maintenance budget? 450800

88 Lebanon Lebanon Middle School Q.30 What is your operational budget? 52500

88 Lebanon Lebanon Middle School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?132400

88 Lebanon Lebanon Middle School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

88 Lebanon Lebanon Middle School Q.34 Do you have a maintenance contract in place? Yes

88 Lebanon Lebanon Middle School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

88 Lebanon Mt. Lebanon School Q.01 Approximate year of the original construction date 1953

Page 208 of 238

Page 209: New Hampshire Department of Education Bureau of School

88 Lebanon Mt. Lebanon School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1988

88 Lebanon Mt. Lebanon School Q.03 Gross Square footage (including portables) 32770

88 Lebanon Mt. Lebanon School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

88 Lebanon Mt. Lebanon School Q.05 How many parking spaces does the facility have? 54

88 Lebanon Mt. Lebanon School Q.06 Does your building have a basement? No

88 Lebanon Mt. Lebanon School Q.07 How many portable classrooms are in use? 0

88 Lebanon Mt. Lebanon School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

88 Lebanon Mt. Lebanon School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

88 Lebanon Mt. Lebanon School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

88 Lebanon Mt. Lebanon School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

88 Lebanon Mt. Lebanon School Q.13 Are all instructional and service areas within the facility ADA compliant? No

88 Lebanon Mt. Lebanon School Q.14a a. Roofs |||||

88 Lebanon Mt. Lebanon School Q.14b b. Lighting Systems |||||

88 Lebanon Mt. Lebanon School Q.14c c. Windows |||||

88 Lebanon Mt. Lebanon School Q.14d d. Ceilings |||||

88 Lebanon Mt. Lebanon School Q.14e e. Plumbing |||||

88 Lebanon Mt. Lebanon School Q.14f f. Heating Systems |||||

88 Lebanon Mt. Lebanon School Q.14g g. Ventilation Systems |||||

88 Lebanon Mt. Lebanon School Q.14h h. Conditioning Systems |||||

88 Lebanon Mt. Lebanon School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

88 Lebanon Mt. Lebanon School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco|Metal

88 Lebanon Mt. Lebanon School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Other|Cement Block interior walls

88 Lebanon Mt. Lebanon School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

88 Lebanon Mt. Lebanon School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

88 Lebanon Mt. Lebanon School Q.20 What types of energy sources are used in your school facility? (click all that apply) Wood Chip/Pellet

88 Lebanon Mt. Lebanon School Q.21 Is your building a CHP's or LEED certified? No

88 Lebanon Mt. Lebanon School Q.22 Have you had energy audits of all your school facilities? Yes

88 Lebanon Mt. Lebanon School Q.23 Do you have an energy performance contract in place? Yes

88 Lebanon Mt. Lebanon School Q.26 Do you have carbon monoxide detector(s) in your building? No

88 Lebanon Mt. Lebanon School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead in Water

88 Lebanon Mt. Lebanon School Q.28 Do you have a facility maintenance plan? Yes

88 Lebanon Mt. Lebanon School Q.29 What is your maintenance budget? 141450

88 Lebanon Mt. Lebanon School Q.30 What is your operational budget? 151750

88 Lebanon Mt. Lebanon School Q.31 What is your capital construction budget? 124000

88 Lebanon Mt. Lebanon School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?62600

88 Lebanon Mt. Lebanon School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3

88 Lebanon Mt. Lebanon School Q.34 Do you have a maintenance contract in place? Yes

88 Lebanon Mt. Lebanon School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

88 Lebanon Mt. Lebanon School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Secure entry, enlarged multi-purpose room, office

88 Lebanon Mt. Lebanon School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 4.03

88 Lebanon Mt. Lebanon School Q.35c c. If yes, provide estimated year of construction. 2023

89 Mason Mason Elementary School Q.01 Approximate year of the original construction date 1810

89 Mason Mason Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2009

89 Mason Mason Elementary School Q.03 Gross Square footage (including portables) 20200

89 Mason Mason Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

89 Mason Mason Elementary School Q.05 How many parking spaces does the facility have? 16

89 Mason Mason Elementary School Q.06 Does your building have a basement? No

89 Mason Mason Elementary School Q.07 How many portable classrooms are in use? 0

89 Mason Mason Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

Page 209 of 238

Page 210: New Hampshire Department of Education Bureau of School

89 Mason Mason Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

89 Mason Mason Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

89 Mason Mason Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

89 Mason Mason Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

89 Mason Mason Elementary School Q.14a a. Roofs |||||

89 Mason Mason Elementary School Q.14b b. Lighting Systems |||||

89 Mason Mason Elementary School Q.14c c. Windows |||||

89 Mason Mason Elementary School Q.14d d. Ceilings |||||

89 Mason Mason Elementary School Q.14e e. Plumbing |||||

89 Mason Mason Elementary School Q.14f f. Heating Systems |||||

89 Mason Mason Elementary School Q.14g g. Ventilation Systems |||||

89 Mason Mason Elementary School Q.14h h. Conditioning Systems |||||

89 Mason Mason Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

89 Mason Mason Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood|Other|Fiber Cement siding

89 Mason Mason Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

89 Mason Mason Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

89 Mason Mason Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

89 Mason Mason Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric|Wood Chip/Pellet

89 Mason Mason Elementary School Q.21 Is your building a CHP's or LEED certified? Yes

89 Mason Mason Elementary School Q.22 Have you had energy audits of all your school facilities? No

89 Mason Mason Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

89 Mason Mason Elementary School Q.23 Do you have an energy performance contract in place? No

89 Mason Mason Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

89 Mason Mason Elementary School Q.25 What is the R-Value of the roof? 12

89 Mason Mason Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

89 Mason Mason Elementary School Q.27 Do you have a presence of: (click all that apply) Radon in Water

89 Mason Mason Elementary School Q.28 Do you have a facility maintenance plan? No

89 Mason Mason Elementary School Q.29 What is your maintenance budget? 127000

89 Mason Mason Elementary School Q.30 What is your operational budget? 3200000

89 Mason Mason Elementary School Q.31 What is your capital construction budget? 0

89 Mason Mason Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?43000

89 Mason Mason Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

89 Mason Mason Elementary School Q.34 Do you have a maintenance contract in place? No

89 Mason Mason Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

90 Hampton Adeline C. Marston School Q.01 Approximate year of the original construction date 1958

90 Hampton Adeline C. Marston School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

90 Hampton Adeline C. Marston School Q.03 Gross Square footage (including portables) 71200

90 Hampton Adeline C. Marston School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

90 Hampton Adeline C. Marston School Q.05 How many parking spaces does the facility have? 95

90 Hampton Adeline C. Marston School Q.06 Does your building have a basement? Yes

90 Hampton Adeline C. Marston School Q.07 How many portable classrooms are in use? 0

90 Hampton Adeline C. Marston School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

90 Hampton Adeline C. Marston School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

90 Hampton Adeline C. Marston School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

90 Hampton Adeline C. Marston School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

90 Hampton Adeline C. Marston School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

90 Hampton Adeline C. Marston School Q.14a a. Roofs 1996|2004|2007|2016|2017|2019

90 Hampton Adeline C. Marston School Q.14b b. Lighting Systems 1996|2009|2012|2019||

90 Hampton Adeline C. Marston School Q.14c c. Windows 1980|1996||||

Page 210 of 238

Page 211: New Hampshire Department of Education Bureau of School

90 Hampton Adeline C. Marston School Q.14d d. Ceilings 1975|1980|1996|||

90 Hampton Adeline C. Marston School Q.14e e. Plumbing 1958|1975|1996|||

90 Hampton Adeline C. Marston School Q.14f f. Heating Systems 1990|1996||||

90 Hampton Adeline C. Marston School Q.14g g. Ventilation Systems 1970|1996|2006|||

90 Hampton Adeline C. Marston School Q.14h h. Conditioning Systems 1996|2010|2013|2018||

90 Hampton Adeline C. Marston School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

90 Hampton Adeline C. Marston School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|CMU

90 Hampton Adeline C. Marston School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood|Other|CMU

90 Hampton Adeline C. Marston School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes|Other|Incandescent

90 Hampton Adeline C. Marston School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

90 Hampton Adeline C. Marston School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

90 Hampton Adeline C. Marston School Q.21 Is your building a CHP's or LEED certified? No

90 Hampton Adeline C. Marston School Q.22 Have you had energy audits of all your school facilities? No

90 Hampton Adeline C. Marston School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

90 Hampton Adeline C. Marston School Q.23 Do you have an energy performance contract in place? No

90 Hampton Adeline C. Marston School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1316

90 Hampton Adeline C. Marston School Q.25 What is the R-Value of the roof? 3034

90 Hampton Adeline C. Marston School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

90 Hampton Adeline C. Marston School Q.28 Do you have a facility maintenance plan? Yes

90 Hampton Adeline C. Marston School Q.29 What is your maintenance budget? 453324

90 Hampton Adeline C. Marston School Q.30 What is your operational budget? 21752640

90 Hampton Adeline C. Marston School Q.31 What is your capital construction budget? 100000

90 Hampton Adeline C. Marston School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?99380

90 Hampton Adeline C. Marston School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?5

90 Hampton Adeline C. Marston School Q.34 Do you have a maintenance contract in place? No

90 Hampton Adeline C. Marston School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

90 Hampton Hampton Academy Q.01 Approximate year of the original construction date 1938

90 Hampton Hampton Academy Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

90 Hampton Hampton Academy Q.03 Gross Square footage (including portables) 121000

90 Hampton Hampton Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

90 Hampton Hampton Academy Q.05 How many parking spaces does the facility have? 93

90 Hampton Hampton Academy Q.06 Does your building have a basement? Yes

90 Hampton Hampton Academy Q.07 How many portable classrooms are in use? 0

90 Hampton Hampton Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

90 Hampton Hampton Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

90 Hampton Hampton Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

90 Hampton Hampton Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

90 Hampton Hampton Academy Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

90 Hampton Hampton Academy Q.14a a. Roofs 2018|||||

90 Hampton Hampton Academy Q.14b b. Lighting Systems 2018|2019||||

90 Hampton Hampton Academy Q.14c c. Windows 2018|2019||||

90 Hampton Hampton Academy Q.14d d. Ceilings 2018|2019||||

90 Hampton Hampton Academy Q.14e e. Plumbing 2018|2019||||

90 Hampton Hampton Academy Q.14f f. Heating Systems 2018|2019||||

90 Hampton Hampton Academy Q.14g g. Ventilation Systems 2018|2019||||

90 Hampton Hampton Academy Q.14h h. Conditioning Systems 2018|2019||||

90 Hampton Hampton Academy Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

90 Hampton Hampton Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Metal|Other|CMU

90 Hampton Hampton Academy Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood|Other|CMU

Page 211 of 238

Page 212: New Hampshire Department of Education Bureau of School

90 Hampton Hampton Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

90 Hampton Hampton Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

90 Hampton Hampton Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

90 Hampton Hampton Academy Q.21 Is your building a CHP's or LEED certified? No

90 Hampton Hampton Academy Q.22 Have you had energy audits of all your school facilities? Yes

90 Hampton Hampton Academy Q.23 Do you have an energy performance contract in place? No

90 Hampton Hampton Academy Q.24 What is the R-Value of the exterior walls, windows, and doors? 1725

90 Hampton Hampton Academy Q.25 What is the R-Value of the roof? 2438

90 Hampton Hampton Academy Q.26 Do you have carbon monoxide detector(s) in your building? Yes

90 Hampton Hampton Academy Q.28 Do you have a facility maintenance plan? Yes

90 Hampton Hampton Academy Q.29 What is your maintenance budget? 475154

90 Hampton Hampton Academy Q.30 What is your operational budget? 21752640

90 Hampton Hampton Academy Q.31 What is your capital construction budget? 100000

90 Hampton Hampton Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?116050

90 Hampton Hampton Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6

90 Hampton Hampton Academy Q.34 Do you have a maintenance contract in place? No

90 Hampton Hampton Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

90 Hampton Hampton Centre School Q.01 Approximate year of the original construction date 1927

90 Hampton Hampton Centre School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2013

90 Hampton Hampton Centre School Q.03 Gross Square footage (including portables) 65800

90 Hampton Hampton Centre School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

90 Hampton Hampton Centre School Q.05 How many parking spaces does the facility have? 76

90 Hampton Hampton Centre School Q.06 Does your building have a basement? Yes

90 Hampton Hampton Centre School Q.07 How many portable classrooms are in use? 0

90 Hampton Hampton Centre School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

90 Hampton Hampton Centre School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

90 Hampton Hampton Centre School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

90 Hampton Hampton Centre School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

90 Hampton Hampton Centre School Q.13 Are all instructional and service areas within the facility ADA compliant? No

90 Hampton Hampton Centre School Q.14a a. Roofs 1999|2006|2007|2013||

90 Hampton Hampton Centre School Q.14b b. Lighting Systems 1999|2009|2012|2013||

90 Hampton Hampton Centre School Q.14c c. Windows 1980|1999|2013|||

90 Hampton Hampton Centre School Q.14d d. Ceilings 1980|1999|2013|||

90 Hampton Hampton Centre School Q.14e e. Plumbing 1927|1960|1999|2013||

90 Hampton Hampton Centre School Q.14f f. Heating Systems 1999|2003||||

90 Hampton Hampton Centre School Q.14g g. Ventilation Systems 1927|1999||||

90 Hampton Hampton Centre School Q.14h h. Conditioning Systems 1999|2007||||

90 Hampton Hampton Centre School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

90 Hampton Hampton Centre School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|CMU

90 Hampton Hampton Centre School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood|Other|CMU

90 Hampton Hampton Centre School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes|Other|Incandescent

90 Hampton Hampton Centre School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

90 Hampton Hampton Centre School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

90 Hampton Hampton Centre School Q.21 Is your building a CHP's or LEED certified? No

90 Hampton Hampton Centre School Q.22 Have you had energy audits of all your school facilities? No

90 Hampton Hampton Centre School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

90 Hampton Hampton Centre School Q.23 Do you have an energy performance contract in place? No

90 Hampton Hampton Centre School Q.24 What is the R-Value of the exterior walls, windows, and doors? 1316

90 Hampton Hampton Centre School Q.25 What is the R-Value of the roof? 3034

Page 212 of 238

Page 213: New Hampshire Department of Education Bureau of School

90 Hampton Hampton Centre School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

90 Hampton Hampton Centre School Q.28 Do you have a facility maintenance plan? Yes

90 Hampton Hampton Centre School Q.29 What is your maintenance budget? 398740

90 Hampton Hampton Centre School Q.30 What is your operational budget? 21752640

90 Hampton Hampton Centre School Q.31 What is your capital construction budget? 100000

90 Hampton Hampton Centre School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?79370

90 Hampton Hampton Centre School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?4

90 Hampton Hampton Centre School Q.34 Do you have a maintenance contract in place? No

90 Hampton Hampton Centre School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

92 Hinsdale Hinsdale Elementary School Q.01 Approximate year of the original construction date 1950

92 Hinsdale Hinsdale Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

92 Hinsdale Hinsdale Elementary School Q.03 Gross Square footage (including portables) 65800

92 Hinsdale Hinsdale Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

92 Hinsdale Hinsdale Elementary School Q.05 How many parking spaces does the facility have? 76

92 Hinsdale Hinsdale Elementary School Q.06 Does your building have a basement? Yes

92 Hinsdale Hinsdale Elementary School Q.07 How many portable classrooms are in use? 0

92 Hinsdale Hinsdale Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

92 Hinsdale Hinsdale Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

92 Hinsdale Hinsdale Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

92 Hinsdale Hinsdale Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

92 Hinsdale Hinsdale Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

92 Hinsdale Hinsdale Elementary School Q.14a a. Roofs 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14b b. Lighting Systems 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14c c. Windows 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14d d. Ceilings 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14e e. Plumbing 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14f f. Heating Systems 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14g g. Ventilation Systems 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.14h h. Conditioning Systems 2019|2007||||

92 Hinsdale Hinsdale Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

92 Hinsdale Hinsdale Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

92 Hinsdale Hinsdale Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

92 Hinsdale Hinsdale Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

92 Hinsdale Hinsdale Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

92 Hinsdale Hinsdale Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

92 Hinsdale Hinsdale Elementary School Q.21 Is your building a CHP's or LEED certified? No

92 Hinsdale Hinsdale Elementary School Q.22 Have you had energy audits of all your school facilities? No

92 Hinsdale Hinsdale Elementary School Q.23 Do you have an energy performance contract in place? No

92 Hinsdale Hinsdale Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

92 Hinsdale Hinsdale Elementary School Q.25 What is the R-Value of the roof? 32

92 Hinsdale Hinsdale Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

92 Hinsdale Hinsdale Elementary School Q.28 Do you have a facility maintenance plan? Yes

92 Hinsdale Hinsdale Elementary School Q.29 What is your maintenance budget? 525532

92 Hinsdale Hinsdale Elementary School Q.30 What is your operational budget? 6088614

92 Hinsdale Hinsdale Elementary School Q.31 What is your capital construction budget? 0

92 Hinsdale Hinsdale Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?123000

92 Hinsdale Hinsdale Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?8343

92 Hinsdale Hinsdale Elementary School Q.34 Do you have a maintenance contract in place? No

92 Hinsdale Hinsdale Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

Page 213 of 238

Page 214: New Hampshire Department of Education Bureau of School

92 Hinsdale Hinsdale High School Q.01 Approximate year of the original construction date 1960

92 Hinsdale Hinsdale High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

92 Hinsdale Hinsdale High School Q.03 Gross Square footage (including portables) 52000

92 Hinsdale Hinsdale High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

92 Hinsdale Hinsdale High School Q.05 How many parking spaces does the facility have? 76

92 Hinsdale Hinsdale High School Q.06 Does your building have a basement? Yes

92 Hinsdale Hinsdale High School Q.07 How many portable classrooms are in use? 0

92 Hinsdale Hinsdale High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

92 Hinsdale Hinsdale High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

92 Hinsdale Hinsdale High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

92 Hinsdale Hinsdale High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

92 Hinsdale Hinsdale High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

92 Hinsdale Hinsdale High School Q.14a a. Roofs 2007|2008|2009|||

92 Hinsdale Hinsdale High School Q.14b b. Lighting Systems 2007|||||

92 Hinsdale Hinsdale High School Q.14c c. Windows 2007|||||

92 Hinsdale Hinsdale High School Q.14d d. Ceilings 2007|||||

92 Hinsdale Hinsdale High School Q.14e e. Plumbing 2007|||||

92 Hinsdale Hinsdale High School Q.14f f. Heating Systems 2007|||||

92 Hinsdale Hinsdale High School Q.14g g. Ventilation Systems 2007|||||

92 Hinsdale Hinsdale High School Q.14h h. Conditioning Systems 2007|||||

92 Hinsdale Hinsdale High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

92 Hinsdale Hinsdale High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

92 Hinsdale Hinsdale High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

92 Hinsdale Hinsdale High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

92 Hinsdale Hinsdale High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

92 Hinsdale Hinsdale High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

92 Hinsdale Hinsdale High School Q.21 Is your building a CHP's or LEED certified? No

92 Hinsdale Hinsdale High School Q.22 Have you had energy audits of all your school facilities? No

92 Hinsdale Hinsdale High School Q.23 Do you have an energy performance contract in place? No

92 Hinsdale Hinsdale High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

92 Hinsdale Hinsdale High School Q.25 What is the R-Value of the roof? 32

92 Hinsdale Hinsdale High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

92 Hinsdale Hinsdale High School Q.28 Do you have a facility maintenance plan? Yes

92 Hinsdale Hinsdale High School Q.29 What is your maintenance budget? 482105

92 Hinsdale Hinsdale High School Q.30 What is your operational budget? 5006194

92 Hinsdale Hinsdale High School Q.31 What is your capital construction budget? 0

92 Hinsdale Hinsdale High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?132000

92 Hinsdale Hinsdale High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?6860

92 Hinsdale Hinsdale High School Q.34 Do you have a maintenance contract in place? No

92 Hinsdale Hinsdale High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

92 Hinsdale Hinsdale Middle High School Q.01 Approximate year of the original construction date 2007

92 Hinsdale Hinsdale Middle High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2007

92 Hinsdale Hinsdale Middle High School Q.03 Gross Square footage (including portables) 24000

92 Hinsdale Hinsdale Middle High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

92 Hinsdale Hinsdale Middle High School Q.05 How many parking spaces does the facility have? 36

92 Hinsdale Hinsdale Middle High School Q.06 Does your building have a basement? Yes

92 Hinsdale Hinsdale Middle High School Q.07 How many portable classrooms are in use? 0

92 Hinsdale Hinsdale Middle High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

92 Hinsdale Hinsdale Middle High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

Page 214 of 238

Page 215: New Hampshire Department of Education Bureau of School

92 Hinsdale Hinsdale Middle High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

92 Hinsdale Hinsdale Middle High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

92 Hinsdale Hinsdale Middle High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

92 Hinsdale Hinsdale Middle High School Q.14a a. Roofs 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14b b. Lighting Systems 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14c c. Windows 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14d d. Ceilings 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14e e. Plumbing 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14f f. Heating Systems 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14g g. Ventilation Systems 2007|||||

92 Hinsdale Hinsdale Middle High School Q.14h h. Conditioning Systems 2007|||||

92 Hinsdale Hinsdale Middle High School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

92 Hinsdale Hinsdale Middle High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

92 Hinsdale Hinsdale Middle High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

92 Hinsdale Hinsdale Middle High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

92 Hinsdale Hinsdale Middle High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

92 Hinsdale Hinsdale Middle High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

92 Hinsdale Hinsdale Middle High School Q.21 Is your building a CHP's or LEED certified? No

92 Hinsdale Hinsdale Middle High School Q.22 Have you had energy audits of all your school facilities? No

92 Hinsdale Hinsdale Middle High School Q.23 Do you have an energy performance contract in place? No

92 Hinsdale Hinsdale Middle High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 25

92 Hinsdale Hinsdale Middle High School Q.25 What is the R-Value of the roof? 32

92 Hinsdale Hinsdale Middle High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

92 Hinsdale Hinsdale Middle High School Q.28 Do you have a facility maintenance plan? Yes

92 Hinsdale Hinsdale Middle High School Q.29 What is your maintenance budget? 210213

92 Hinsdale Hinsdale Middle High School Q.30 What is your operational budget? 2435446

92 Hinsdale Hinsdale Middle High School Q.31 What is your capital construction budget? 0

92 Hinsdale Hinsdale Middle High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?66000

92 Hinsdale Hinsdale Middle High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?3372

92 Hinsdale Hinsdale Middle High School Q.34 Do you have a maintenance contract in place? No

92 Hinsdale Hinsdale Middle High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

93 Monadnock Regional Cutler Elementary School Q.01 Approximate year of the original construction date 1900

93 Monadnock Regional Cutler Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

93 Monadnock Regional Cutler Elementary School Q.03 Gross Square footage (including portables) 26500

93 Monadnock Regional Cutler Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

93 Monadnock Regional Cutler Elementary School Q.05 How many parking spaces does the facility have? 40

93 Monadnock Regional Cutler Elementary School Q.06 Does your building have a basement? Yes

93 Monadnock Regional Cutler Elementary School Q.07 How many portable classrooms are in use? 2

93 Monadnock Regional Cutler Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

93 Monadnock Regional Cutler Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom|Special (music, art, etc)

93 Monadnock Regional Cutler Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

93 Monadnock Regional Cutler Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

93 Monadnock Regional Cutler Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

93 Monadnock Regional Cutler Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

93 Monadnock Regional Cutler Elementary School Q.14a a. Roofs 1945|1970 addition|1996 addition|||

93 Monadnock Regional Cutler Elementary School Q.14b b. Lighting Systems original|||||

93 Monadnock Regional Cutler Elementary School Q.14c c. Windows original|||||

93 Monadnock Regional Cutler Elementary School Q.14d d. Ceilings original|||||

93 Monadnock Regional Cutler Elementary School Q.14e e. Plumbing original|||||

Page 215 of 238

Page 216: New Hampshire Department of Education Bureau of School

93 Monadnock Regional Cutler Elementary School Q.14f f. Heating Systems 1950|1996||||

93 Monadnock Regional Cutler Elementary School Q.14g g. Ventilation Systems original|||||

93 Monadnock Regional Cutler Elementary School Q.14h h. Conditioning Systems none|||||

93 Monadnock Regional Cutler Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

93 Monadnock Regional Cutler Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

93 Monadnock Regional Cutler Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

93 Monadnock Regional Cutler Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

93 Monadnock Regional Cutler Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

93 Monadnock Regional Cutler Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

93 Monadnock Regional Cutler Elementary School Q.21 Is your building a CHP's or LEED certified? No

93 Monadnock Regional Cutler Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock Regional Cutler Elementary School Q.23 Do you have an energy performance contract in place? No

93 Monadnock Regional Cutler Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

93 Monadnock Regional Cutler Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

93 Monadnock Regional Cutler Elementary School Q.28 Do you have a facility maintenance plan? Yes

93 Monadnock Regional Cutler Elementary School Q.29 What is your maintenance budget? 230652

93 Monadnock Regional Cutler Elementary School Q.30 What is your operational budget? 2442498

93 Monadnock Regional Cutler Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?38972

93 Monadnock Regional Cutler Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

93 Monadnock Regional Cutler Elementary School Q.34 Do you have a maintenance contract in place? No

93 Monadnock Regional Cutler Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

93 Monadnock Regional Cutler Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Potential construction/renovation - Feasibility St

93 Monadnock Regional Cutler Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 45

93 Monadnock Regional Cutler Elementary School Q.35c c. If yes, provide estimated year of construction. 2022

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.01 Approximate year of the original construction date 1925

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1999

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.03 Gross Square footage (including portables) 28000

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.05 How many parking spaces does the facility have? 50

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.06 Does your building have a basement? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.07 How many portable classrooms are in use? 0

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14a a. Roofs 2012 partial|2019 partial||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14b b. Lighting Systems original|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14c c. Windows unknown|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14d d. Ceilings original|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14e e. Plumbing original|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14f f. Heating Systems 1987|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14g g. Ventilation Systems 1999|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.14h h. Conditioning Systems none|||||

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.15 What types of roofs are on your school facility? (click all that apply) Pitched

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.17 What type of studding is used at your school facility? (click all that apply) Wood

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

Page 216 of 238

Page 217: New Hampshire Department of Education Bureau of School

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.21 Is your building a CHP's or LEED certified? No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.22a. a. If yes, do you have an implementation plan for energy saving projects? No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.23 Do you have an energy performance contract in place? No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.26 Do you have carbon monoxide detector(s) in your building? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.27 Do you have a presence of: (click all that apply) Asbestos

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.28 Do you have a facility maintenance plan? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.29 What is your maintenance budget? 219854

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.30 What is your operational budget? 1833317

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.31 What is your capital construction budget? 188860

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?43100

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.34 Do you have a maintenance contract in place? No

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.35a a. If yes, provide a short description. (e.g., "High School Addition") Potential construction/renovation - Feasibility St

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 45

93 Monadnock RegionalDr. George S. Emerson Elementary

SchoolQ.35c c. If yes, provide estimated year of construction. 2022

93 Monadnock Regional Gilsum STEAM Academy Q.01 Approximate year of the original construction date 1930

93 Monadnock Regional Gilsum STEAM Academy Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1996

93 Monadnock Regional Gilsum STEAM Academy Q.03 Gross Square footage (including portables) 16600

93 Monadnock Regional Gilsum STEAM Academy Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

93 Monadnock Regional Gilsum STEAM Academy Q.05 How many parking spaces does the facility have? 20

93 Monadnock Regional Gilsum STEAM Academy Q.06 Does your building have a basement? Yes

93 Monadnock Regional Gilsum STEAM Academy Q.07 How many portable classrooms are in use? 0

93 Monadnock Regional Gilsum STEAM Academy Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

93 Monadnock Regional Gilsum STEAM Academy Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

93 Monadnock Regional Gilsum STEAM Academy Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

93 Monadnock Regional Gilsum STEAM Academy Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

93 Monadnock Regional Gilsum STEAM Academy Q.13 Are all instructional and service areas within the facility ADA compliant? No

93 Monadnock Regional Gilsum STEAM Academy Q.14a a. Roofs 2018|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14b b. Lighting Systems original|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14c c. Windows unknown|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14d d. Ceilings original|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14e e. Plumbing original|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14f f. Heating Systems 1996|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14g g. Ventilation Systems 1970|||||

93 Monadnock Regional Gilsum STEAM Academy Q.14h h. Conditioning Systems none|||||

93 Monadnock Regional Gilsum STEAM Academy Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

93 Monadnock Regional Gilsum STEAM Academy Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood|Other|vinyl

93 Monadnock Regional Gilsum STEAM Academy Q.17 What type of studding is used at your school facility? (click all that apply) Wood

93 Monadnock Regional Gilsum STEAM Academy Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

93 Monadnock Regional Gilsum STEAM Academy Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

93 Monadnock Regional Gilsum STEAM Academy Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

93 Monadnock Regional Gilsum STEAM Academy Q.21 Is your building a CHP's or LEED certified? No

93 Monadnock Regional Gilsum STEAM Academy Q.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock Regional Gilsum STEAM Academy Q.23 Do you have an energy performance contract in place? No

93 Monadnock Regional Gilsum STEAM Academy Q.28 Do you have a facility maintenance plan? Yes

93 Monadnock Regional Gilsum STEAM Academy Q.29 What is your maintenance budget? 96355

Page 217 of 238

Page 218: New Hampshire Department of Education Bureau of School

93 Monadnock Regional Gilsum STEAM Academy Q.30 What is your operational budget? 757827

93 Monadnock Regional Gilsum STEAM Academy Q.31 What is your capital construction budget? 56584

93 Monadnock Regional Gilsum STEAM Academy Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?28000

93 Monadnock Regional Gilsum STEAM Academy Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?63

93 Monadnock Regional Gilsum STEAM Academy Q.34 Do you have a maintenance contract in place? No

93 Monadnock Regional Gilsum STEAM Academy Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

93 Monadnock Regional Monadnock Regional High School Q.01 Approximate year of the original construction date 1962

93 Monadnock Regional Monadnock Regional High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2015

93 Monadnock Regional Monadnock Regional High School Q.03 Gross Square footage (including portables) 142000

93 Monadnock Regional Monadnock Regional High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

93 Monadnock Regional Monadnock Regional High School Q.05 How many parking spaces does the facility have? 350

93 Monadnock Regional Monadnock Regional High School Q.06 Does your building have a basement? No

93 Monadnock Regional Monadnock Regional High School Q.07 How many portable classrooms are in use? 4

93 Monadnock Regional Monadnock Regional High School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Support

Space

93 Monadnock Regional Monadnock Regional High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

93 Monadnock Regional Monadnock Regional High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

93 Monadnock Regional Monadnock Regional High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

93 Monadnock Regional Monadnock Regional High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

93 Monadnock Regional Monadnock Regional High School Q.14a a. Roofs 2003|||||

93 Monadnock Regional Monadnock Regional High School Q.14b b. Lighting Systems 2012|2015||||

93 Monadnock Regional Monadnock Regional High School Q.14c c. Windows 2012|2015||||

93 Monadnock Regional Monadnock Regional High School Q.14d d. Ceilings 2012|2015||||

93 Monadnock Regional Monadnock Regional High School Q.14e e. Plumbing original|||||

93 Monadnock Regional Monadnock Regional High School Q.14f f. Heating Systems 2012|2015||||

93 Monadnock Regional Monadnock Regional High School Q.14g g. Ventilation Systems 2012|2015||||

93 Monadnock Regional Monadnock Regional High School Q.14h h. Conditioning Systems NA|||||

93 Monadnock Regional Monadnock Regional High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

93 Monadnock Regional Monadnock Regional High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|EIFS System

93 Monadnock Regional Monadnock Regional High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

93 Monadnock Regional Monadnock Regional High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

93 Monadnock Regional Monadnock Regional High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

93 Monadnock Regional Monadnock Regional High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

93 Monadnock Regional Monadnock Regional High School Q.21 Is your building a CHP's or LEED certified? No

93 Monadnock Regional Monadnock Regional High School Q.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock Regional Monadnock Regional High School Q.23 Do you have an energy performance contract in place? No

93 Monadnock Regional Monadnock Regional High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

93 Monadnock Regional Monadnock Regional High School Q.25 What is the R-Value of the roof? 11

93 Monadnock Regional Monadnock Regional High School Q.26 Do you have carbon monoxide detector(s) in your building? No

93 Monadnock Regional Monadnock Regional High School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

93 Monadnock Regional Monadnock Regional High School Q.28 Do you have a facility maintenance plan? Yes

93 Monadnock Regional Monadnock Regional High School Q.29 What is your maintenance budget? 790851

93 Monadnock Regional Monadnock Regional High School Q.30 What is your operational budget? 8607771

93 Monadnock Regional Monadnock Regional High School Q.31 What is your capital construction budget? 35000

93 Monadnock Regional Monadnock Regional High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?148500

93 Monadnock Regional Monadnock Regional High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

93 Monadnock Regional Monadnock Regional High School Q.34 Do you have a maintenance contract in place? No

93 Monadnock Regional Monadnock Regional High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

93 Monadnock Regional Mt. Caesar Elementary School Q.01 Approximate year of the original construction date 1940

93 Monadnock Regional Mt. Caesar Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

Page 218 of 238

Page 219: New Hampshire Department of Education Bureau of School

93 Monadnock Regional Mt. Caesar Elementary School Q.03 Gross Square footage (including portables) 133600

93 Monadnock Regional Mt. Caesar Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

93 Monadnock Regional Mt. Caesar Elementary School Q.05 How many parking spaces does the facility have? 115

93 Monadnock Regional Mt. Caesar Elementary School Q.06 Does your building have a basement? No

93 Monadnock Regional Mt. Caesar Elementary School Q.07 How many portable classrooms are in use? 0

93 Monadnock Regional Mt. Caesar Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

93 Monadnock Regional Mt. Caesar Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

93 Monadnock Regional Mt. Caesar Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

93 Monadnock Regional Mt. Caesar Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

93 Monadnock Regional Mt. Caesar Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

93 Monadnock Regional Mt. Caesar Elementary School Q.14a a. Roofs 1970|2003||||

93 Monadnock Regional Mt. Caesar Elementary School Q.14b b. Lighting Systems 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.14c c. Windows 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.14d d. Ceilings 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.14e e. Plumbing 2016|2017||||

93 Monadnock Regional Mt. Caesar Elementary School Q.14f f. Heating Systems 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.14g g. Ventilation Systems 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.14h h. Conditioning Systems 2016|2017|2019|||

93 Monadnock Regional Mt. Caesar Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

93 Monadnock Regional Mt. Caesar Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|EIFS System

93 Monadnock Regional Mt. Caesar Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

93 Monadnock Regional Mt. Caesar Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

93 Monadnock Regional Mt. Caesar Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

93 Monadnock Regional Mt. Caesar Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

93 Monadnock Regional Mt. Caesar Elementary School Q.21 Is your building a CHP's or LEED certified? No

93 Monadnock Regional Mt. Caesar Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock Regional Mt. Caesar Elementary School Q.23 Do you have an energy performance contract in place? No

93 Monadnock Regional Mt. Caesar Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 20

93 Monadnock Regional Mt. Caesar Elementary School Q.25 What is the R-Value of the roof? 20

93 Monadnock Regional Mt. Caesar Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

93 Monadnock Regional Mt. Caesar Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

93 Monadnock Regional Mt. Caesar Elementary School Q.28 Do you have a facility maintenance plan? No

93 Monadnock Regional Mt. Caesar Elementary School Q.29 What is your maintenance budget? 203842

93 Monadnock Regional Mt. Caesar Elementary School Q.30 What is your operational budget? 3000725

93 Monadnock Regional Mt. Caesar Elementary School Q.31 What is your capital construction budget? 1400000

93 Monadnock Regional Mt. Caesar Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?42518

93 Monadnock Regional Mt. Caesar Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

93 Monadnock Regional Mt. Caesar Elementary School Q.34 Do you have a maintenance contract in place? No

93 Monadnock Regional Mt. Caesar Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

93 Monadnock Regional Troy Elementary School Q.01 Approximate year of the original construction date 1895

93 Monadnock Regional Troy Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1977

93 Monadnock Regional Troy Elementary School Q.03 Gross Square footage (including portables) 27400

93 Monadnock Regional Troy Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

93 Monadnock Regional Troy Elementary School Q.05 How many parking spaces does the facility have? 40

93 Monadnock Regional Troy Elementary School Q.06 Does your building have a basement? Yes

93 Monadnock Regional Troy Elementary School Q.07 How many portable classrooms are in use? 0

93 Monadnock Regional Troy Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

93 Monadnock Regional Troy Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

93 Monadnock Regional Troy Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

Page 219 of 238

Page 220: New Hampshire Department of Education Bureau of School

93 Monadnock Regional Troy Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

93 Monadnock Regional Troy Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? No

93 Monadnock Regional Troy Elementary School Q.14a a. Roofs 1999|||||

93 Monadnock Regional Troy Elementary School Q.14b b. Lighting Systems 2013|||||

93 Monadnock Regional Troy Elementary School Q.14c c. Windows 1994|||||

93 Monadnock Regional Troy Elementary School Q.14d d. Ceilings 1992|||||

93 Monadnock Regional Troy Elementary School Q.14e e. Plumbing original|||||

93 Monadnock Regional Troy Elementary School Q.14f f. Heating Systems 1985|||||

93 Monadnock Regional Troy Elementary School Q.14g g. Ventilation Systems none|||||

93 Monadnock Regional Troy Elementary School Q.14h h. Conditioning Systems none|||||

93 Monadnock Regional Troy Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

93 Monadnock Regional Troy Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

93 Monadnock Regional Troy Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

93 Monadnock Regional Troy Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

93 Monadnock Regional Troy Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

93 Monadnock Regional Troy Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

93 Monadnock Regional Troy Elementary School Q.21 Is your building a CHP's or LEED certified? No

93 Monadnock Regional Troy Elementary School Q.22 Have you had energy audits of all your school facilities? Yes

93 Monadnock Regional Troy Elementary School Q.23 Do you have an energy performance contract in place? No

93 Monadnock Regional Troy Elementary School Q.24 What is the R-Value of the exterior walls, windows, and doors? 7

93 Monadnock Regional Troy Elementary School Q.25 What is the R-Value of the roof? 7

93 Monadnock Regional Troy Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? No

93 Monadnock Regional Troy Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint

93 Monadnock Regional Troy Elementary School Q.28 Do you have a facility maintenance plan? No

93 Monadnock Regional Troy Elementary School Q.29 What is your maintenance budget? 210102

93 Monadnock Regional Troy Elementary School Q.30 What is your operational budget? 2185471

93 Monadnock Regional Troy Elementary School Q.31 What is your capital construction budget? 53800

93 Monadnock Regional Troy Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?39400

93 Monadnock Regional Troy Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

93 Monadnock Regional Troy Elementary School Q.34 Do you have a maintenance contract in place? No

93 Monadnock Regional Troy Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

93 Monadnock Regional Troy Elementary School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") Potential construction/renovation - Feasibility St

93 Monadnock Regional Troy Elementary School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 45

93 Monadnock Regional Troy Elementary School Q.35c c. If yes, provide estimated year of construction. 2022

94 Winchester Winchester School Q.01 Approximate year of the original construction date 1922

94 Winchester Winchester School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2004

94 Winchester Winchester School Q.03 Gross Square footage (including portables) 100000

94 Winchester Winchester School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

94 Winchester Winchester School Q.05 How many parking spaces does the facility have? 140

94 Winchester Winchester School Q.06 Does your building have a basement? No

94 Winchester Winchester School Q.07 How many portable classrooms are in use? 0

94 Winchester Winchester School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

94 Winchester Winchester School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

94 Winchester Winchester School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

94 Winchester Winchester School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

94 Winchester Winchester School Q.13 Are all instructional and service areas within the facility ADA compliant? No

94 Winchester Winchester School Q.14a a. Roofs 1922|||||

94 Winchester Winchester School Q.14b b. Lighting Systems 1922|||||

94 Winchester Winchester School Q.14c c. Windows 1922|||||

Page 220 of 238

Page 221: New Hampshire Department of Education Bureau of School

94 Winchester Winchester School Q.14d d. Ceilings 1922|||||

94 Winchester Winchester School Q.14e e. Plumbing 1922|||||

94 Winchester Winchester School Q.14f f. Heating Systems 1922|||||

94 Winchester Winchester School Q.14g g. Ventilation Systems 1922|||||

94 Winchester Winchester School Q.14h h. Conditioning Systems 1922|||||

94 Winchester Winchester School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

94 Winchester Winchester School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Stucco

94 Winchester Winchester School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

94 Winchester Winchester School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

94 Winchester Winchester School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

94 Winchester Winchester School Q.21 Is your building a CHP's or LEED certified? No

94 Winchester Winchester School Q.22 Have you had energy audits of all your school facilities? No

94 Winchester Winchester School Q.23 Do you have an energy performance contract in place? No

94 Winchester Winchester School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

94 Winchester Winchester School Q.27 Do you have a presence of: (click all that apply) Asbestos|Lead Paint|Lead in Water

94 Winchester Winchester School Q.28 Do you have a facility maintenance plan? Yes

94 Winchester Winchester School Q.29 What is your maintenance budget? 709016.00

94 Winchester Winchester School Q.30 What is your operational budget? 11600188.00

94 Winchester Winchester School Q.31 What is your capital construction budget? 150000.00

94 Winchester Winchester School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?155000.00

94 Winchester Winchester School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?80

94 Winchester Winchester School Q.34 Do you have a maintenance contract in place? No

94 Winchester Winchester School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

99 Croydon Croydon Village School Q.01 Approximate year of the original construction date 1800

99 Croydon Croydon Village School Q.03 Gross Square footage (including portables) 3000

99 Croydon Croydon Village School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

99 Croydon Croydon Village School Q.05 How many parking spaces does the facility have? 10

99 Croydon Croydon Village School Q.06 Does your building have a basement? No

99 Croydon Croydon Village School Q.07 How many portable classrooms are in use? 2

99 Croydon Croydon Village School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

99 Croydon Croydon Village School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Special

(music, art, etc)|Small Group|Support

99 Croydon Croydon Village School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

99 Croydon Croydon Village School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

99 Croydon Croydon Village School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

99 Croydon Croydon Village School Q.13 Are all instructional and service areas within the facility ADA compliant? No

99 Croydon Croydon Village School Q.14a a. Roofs |||||

99 Croydon Croydon Village School Q.14b b. Lighting Systems |||||

99 Croydon Croydon Village School Q.14c c. Windows |||||

99 Croydon Croydon Village School Q.14d d. Ceilings |||||

99 Croydon Croydon Village School Q.14e e. Plumbing |||||

99 Croydon Croydon Village School Q.14f f. Heating Systems |||||

99 Croydon Croydon Village School Q.14g g. Ventilation Systems |||||

99 Croydon Croydon Village School Q.14h h. Conditioning Systems |||||

99 Croydon Croydon Village School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

99 Croydon Croydon Village School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Other|Vinyl on Portables

99 Croydon Croydon Village School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

99 Croydon Croydon Village School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

99 Croydon Croydon Village School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

99 Croydon Croydon Village School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil|Electric

Page 221 of 238

Page 222: New Hampshire Department of Education Bureau of School

99 Croydon Croydon Village School Q.21 Is your building a CHP's or LEED certified? No

99 Croydon Croydon Village School Q.22 Have you had energy audits of all your school facilities? No

99 Croydon Croydon Village School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

99 Croydon Croydon Village School Q.23 Do you have an energy performance contract in place? No

99 Croydon Croydon Village School Q.26 Do you have carbon monoxide detector(s) in your building? No

99 Croydon Croydon Village School Q.28 Do you have a facility maintenance plan? Yes

99 Croydon Croydon Village School Q.31 What is your capital construction budget? 0

99 Croydon Croydon Village School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?05

99 Croydon Croydon Village School Q.34 Do you have a maintenance contract in place? No

99 Croydon Croydon Village School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

101 Wakefield Paul Elementary School Q.01 Approximate year of the original construction date 1950

101 Wakefield Paul Elementary School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1997

101 Wakefield Paul Elementary School Q.03 Gross Square footage (including portables) 25000

101 Wakefield Paul Elementary School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

101 Wakefield Paul Elementary School Q.05 How many parking spaces does the facility have? 140

101 Wakefield Paul Elementary School Q.06 Does your building have a basement? Yes

101 Wakefield Paul Elementary School Q.07 How many portable classrooms are in use? 2

101 Wakefield Paul Elementary School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?3

101 Wakefield Paul Elementary School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Special Education|Other|Pre School Program and

SAU

101 Wakefield Paul Elementary School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

101 Wakefield Paul Elementary School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

101 Wakefield Paul Elementary School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

101 Wakefield Paul Elementary School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

101 Wakefield Paul Elementary School Q.14a a. Roofs 2018|2017|2015|2014|2013|2002

101 Wakefield Paul Elementary School Q.14b b. Lighting Systems |||||1997

101 Wakefield Paul Elementary School Q.14c c. Windows |||||1980's

101 Wakefield Paul Elementary School Q.14d d. Ceilings |||||1980's

101 Wakefield Paul Elementary School Q.14e e. Plumbing |||||1997

101 Wakefield Paul Elementary School Q.14f f. Heating Systems |||||1980's

101 Wakefield Paul Elementary School Q.14g g. Ventilation Systems |||||1980's

101 Wakefield Paul Elementary School Q.14h h. Conditioning Systems |||||1997

101 Wakefield Paul Elementary School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

101 Wakefield Paul Elementary School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick|Wood

101 Wakefield Paul Elementary School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

101 Wakefield Paul Elementary School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes|Other|CFL

101 Wakefield Paul Elementary School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

101 Wakefield Paul Elementary School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil

101 Wakefield Paul Elementary School Q.21 Is your building a CHP's or LEED certified? No

101 Wakefield Paul Elementary School Q.22 Have you had energy audits of all your school facilities? No

101 Wakefield Paul Elementary School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

101 Wakefield Paul Elementary School Q.23 Do you have an energy performance contract in place? No

101 Wakefield Paul Elementary School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

101 Wakefield Paul Elementary School Q.27 Do you have a presence of: (click all that apply) Asbestos

101 Wakefield Paul Elementary School Q.28 Do you have a facility maintenance plan? Yes

101 Wakefield Paul Elementary School Q.29 What is your maintenance budget? 50000

101 Wakefield Paul Elementary School Q.30 What is your operational budget? 300000

101 Wakefield Paul Elementary School Q.31 What is your capital construction budget? 0

101 Wakefield Paul Elementary School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?100000

101 Wakefield Paul Elementary School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?220

Page 222 of 238

Page 223: New Hampshire Department of Education Bureau of School

101 Wakefield Paul Elementary School Q.34 Do you have a maintenance contract in place? Yes

101 Wakefield Paul Elementary School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

103 Hill Jennie D. Blake School Q.01 Approximate year of the original construction date 1972

103 Hill Jennie D. Blake School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2001

103 Hill Jennie D. Blake School Q.03 Gross Square footage (including portables) 15900

103 Hill Jennie D. Blake School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

103 Hill Jennie D. Blake School Q.05 How many parking spaces does the facility have? 30

103 Hill Jennie D. Blake School Q.06 Does your building have a basement? No

103 Hill Jennie D. Blake School Q.07 How many portable classrooms are in use? 0

103 Hill Jennie D. Blake School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

103 Hill Jennie D. Blake School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)|Small Group

103 Hill Jennie D. Blake School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

103 Hill Jennie D. Blake School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

103 Hill Jennie D. Blake School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

103 Hill Jennie D. Blake School Q.14a a. Roofs ||||X|

103 Hill Jennie D. Blake School Q.14b b. Lighting Systems X|||||

103 Hill Jennie D. Blake School Q.14c c. Windows |||||18

103 Hill Jennie D. Blake School Q.14d d. Ceilings |||||18

103 Hill Jennie D. Blake School Q.14e e. Plumbing |||||18

103 Hill Jennie D. Blake School Q.14f f. Heating Systems |||||15

103 Hill Jennie D. Blake School Q.14g g. Ventilation Systems |||||18

103 Hill Jennie D. Blake School Q.14h h. Conditioning Systems |||||18

103 Hill Jennie D. Blake School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

103 Hill Jennie D. Blake School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

103 Hill Jennie D. Blake School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

103 Hill Jennie D. Blake School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

103 Hill Jennie D. Blake School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

103 Hill Jennie D. Blake School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

103 Hill Jennie D. Blake School Q.21 Is your building a CHP's or LEED certified? No

103 Hill Jennie D. Blake School Q.22 Have you had energy audits of all your school facilities? Yes

103 Hill Jennie D. Blake School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

103 Hill Jennie D. Blake School Q.23 Do you have an energy performance contract in place? No

103 Hill Jennie D. Blake School Q.24 What is the R-Value of the exterior walls, windows, and doors? 35

103 Hill Jennie D. Blake School Q.25 What is the R-Value of the roof? 1736

103 Hill Jennie D. Blake School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

103 Hill Jennie D. Blake School Q.28 Do you have a facility maintenance plan? Yes

103 Hill Jennie D. Blake School Q.29 What is your maintenance budget? 15700

103 Hill Jennie D. Blake School Q.30 What is your operational budget? 1110000

103 Hill Jennie D. Blake School Q.31 What is your capital construction budget? 0

103 Hill Jennie D. Blake School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?40000

103 Hill Jennie D. Blake School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

103 Hill Jennie D. Blake School Q.34 Do you have a maintenance contract in place? No

103 Hill Jennie D. Blake School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

301 Prospect Mountain JMA Prospect Mountain High School Q.01 Approximate year of the original construction date 2004

301 Prospect Mountain JMA Prospect Mountain High School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2017

301 Prospect Mountain JMA Prospect Mountain High School Q.03 Gross Square footage (including portables) 145000

301 Prospect Mountain JMA Prospect Mountain High School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.05 How many parking spaces does the facility have? 330

301 Prospect Mountain JMA Prospect Mountain High School Q.06 Does your building have a basement? No

Page 223 of 238

Page 224: New Hampshire Department of Education Bureau of School

301 Prospect Mountain JMA Prospect Mountain High School Q.07 How many portable classrooms are in use? 0

301 Prospect Mountain JMA Prospect Mountain High School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

301 Prospect Mountain JMA Prospect Mountain High School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

301 Prospect Mountain JMA Prospect Mountain High School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.14a a. Roofs 2004|2017||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14b b. Lighting Systems 2004|2012|2017|||

301 Prospect Mountain JMA Prospect Mountain High School Q.14c c. Windows 2004|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14d d. Ceilings 2004|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14e e. Plumbing 2004|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14f f. Heating Systems 2004|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14g g. Ventilation Systems 2004|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.14h h. Conditioning Systems 2019|||||

301 Prospect Mountain JMA Prospect Mountain High School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

301 Prospect Mountain JMA Prospect Mountain High School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

301 Prospect Mountain JMA Prospect Mountain High School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

301 Prospect Mountain JMA Prospect Mountain High School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

301 Prospect Mountain JMA Prospect Mountain High School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

301 Prospect Mountain JMA Prospect Mountain High School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Oil|Electric

301 Prospect Mountain JMA Prospect Mountain High School Q.21 Is your building a CHP's or LEED certified? No

301 Prospect Mountain JMA Prospect Mountain High School Q.22 Have you had energy audits of all your school facilities? No

301 Prospect Mountain JMA Prospect Mountain High School Q.23 Do you have an energy performance contract in place? No

301 Prospect Mountain JMA Prospect Mountain High School Q.24 What is the R-Value of the exterior walls, windows, and doors? 599

301 Prospect Mountain JMA Prospect Mountain High School Q.25 What is the R-Value of the roof? 50

301 Prospect Mountain JMA Prospect Mountain High School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.27 Do you have a presence of: (click all that apply) Lead in Water

301 Prospect Mountain JMA Prospect Mountain High School Q.28 Do you have a facility maintenance plan? Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.29 What is your maintenance budget? 961675

301 Prospect Mountain JMA Prospect Mountain High School Q.30 What is your operational budget? 8069237

301 Prospect Mountain JMA Prospect Mountain High School Q.31 What is your capital construction budget? 0

301 Prospect Mountain JMA Prospect Mountain High School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?188000

301 Prospect Mountain JMA Prospect Mountain High School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?7

301 Prospect Mountain JMA Prospect Mountain High School Q.34 Do you have a maintenance contract in place? Yes

301 Prospect Mountain JMA Prospect Mountain High School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.01 Approximate year of the original construction date 1985

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.03 Gross Square footage (including portables) 66830

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.05 How many parking spaces does the facility have? 77

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.06 Does your building have a basement? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.07 How many portable classrooms are in use? 0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14a a. Roofs 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14b b. Lighting Systems 2014|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14c c. Windows 1985|||||

Page 224 of 238

Page 225: New Hampshire Department of Education Bureau of School

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14d d. Ceilings 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14e e. Plumbing 1985|2012||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14f f. Heating Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14g g. Ventilation Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.14h h. Conditioning Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.17 What type of studding is used at your school facility? (click all that apply) Steel

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.21 Is your building a CHP's or LEED certified? No

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.22 Have you had energy audits of all your school facilities? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.23 Do you have an energy performance contract in place? No

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.26 Do you have carbon monoxide detector(s) in your building? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.27 Do you have a presence of: (click all that apply) Asbestos

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.28 Do you have a facility maintenance plan? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.29 What is your maintenance budget? 20000

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.30 What is your operational budget? 4061283

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.31 What is your capital construction budget? 0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?86000

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1120

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.34 Do you have a maintenance contract in place? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (H)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.01 Approximate year of the original construction date 1985

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.03 Gross Square footage (including portables) 66830

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.05 How many parking spaces does the facility have? 77

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.07 How many portable classrooms are in use? 0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14a a. Roofs 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14b b. Lighting Systems 2014|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14c c. Windows 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14d d. Ceilings 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14e e. Plumbing 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14f f. Heating Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14g g. Ventilation Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.14h h. Conditioning Systems 1985|||||

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.17 What type of studding is used at your school facility? (click all that apply) Steel

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.21 Is your building a CHP's or LEED certified? No

Page 225 of 238

Page 226: New Hampshire Department of Education Bureau of School

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.22 Have you had energy audits of all your school facilities? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.23 Do you have an energy performance contract in place? No

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.26 Do you have carbon monoxide detector(s) in your building? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.27 Do you have a presence of: (click all that apply) Asbestos

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.28 Do you have a facility maintenance plan? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.29 What is your maintenance budget? 20000

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.30 What is your operational budget? 4061283

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.31 What is your capital construction budget? 0

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?86000

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1120

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.34 Do you have a maintenance contract in place? Yes

401Academy for Science and

Design Charter School

Academy for Science and Design

Charter (M)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.05 How many parking spaces does the facility have? 10

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.06 Does your building have a basement? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.07 How many portable classrooms are in use? 0

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.09

If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special (music, art, etc)|Small

Group

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14a a. Roofs |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14b b. Lighting Systems |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14c c. Windows |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14d d. Ceilings |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14e e. Plumbing |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14f f. Heating Systems |x||||

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14g g. Ventilation Systems |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.14h h. Conditioning Systems |||||x

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.22 Have you had energy audits of all your school facilities? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.23 Do you have an energy performance contract in place? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.28 Do you have a facility maintenance plan? No

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.31 What is your capital construction budget? 0

401Cocheco Academy for the

ArtsCocheco Academy for the Arts Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.01 Approximate year of the original construction date 1972

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).0

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.03 Gross Square footage (including portables) 19005

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.05 How many parking spaces does the facility have? 90

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.06 Does your building have a basement? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.07 How many portable classrooms are in use? 0

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

Page 226 of 238

Page 227: New Hampshire Department of Education Bureau of School

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14a a. Roofs |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14b b. Lighting Systems |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14c c. Windows |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14d d. Ceilings |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14e e. Plumbing |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14f f. Heating Systems |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14g g. Ventilation Systems |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.14h h. Conditioning Systems |||||

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.15 What types of roofs are on your school facility? (click all that apply) Flat

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.16 What type of exterior surfacing is your school facility? (click all that apply) Stucco

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.17 What type of studding is used at your school facility? (click all that apply) Steel

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.21 Is your building a CHP's or LEED certified? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.22 Have you had energy audits of all your school facilities? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.23 Do you have an energy performance contract in place? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.26 Do you have carbon monoxide detector(s) in your building? Yes

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.27 Do you have a presence of: (click all that apply) Asbestos

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.28 Do you have a facility maintenance plan? Yes

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.31 What is your capital construction budget? 0

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.34 Do you have a maintenance contract in place? No

401Granite State Arts Academy

Charter School

Granite State Arts Academy Charter

SchoolQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.01 Approximate year of the original construction date 1924

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1924

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.03 Gross Square footage (including portables) 38000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.05 How many parking spaces does the facility have? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.06 Does your building have a basement? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.07 How many portable classrooms are in use? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?4

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.09

If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Special

(music, art, etc)|Small Group|Support Space

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14a a. Roofs 2019|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14b b. Lighting Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14c c. Windows 1960|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14d d. Ceilings 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14e e. Plumbing 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14f f. Heating Systems 2010|||||8

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14g g. Ventilation Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.14h h. Conditioning Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

Page 227 of 238

Page 228: New Hampshire Department of Education Bureau of School

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.17 What type of studding is used at your school facility? (click all that apply) Wood

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Steam

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.21 Is your building a CHP's or LEED certified? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.22 Have you had energy audits of all your school facilities? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.23 Do you have an energy performance contract in place? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.26 Do you have carbon monoxide detector(s) in your building? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.28 Do you have a facility maintenance plan? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.29 What is your maintenance budget? 6000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.30 What is your operational budget? 26000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.31 What is your capital construction budget? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?18000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1500

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.34 Do you have a maintenance contract in place? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(H)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.01 Approximate year of the original construction date 1924

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1924

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.03 Gross Square footage (including portables) 38000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.05 How many parking spaces does the facility have? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.06 Does your building have a basement? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.07 How many portable classrooms are in use? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?4

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.09

If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)

Regular Classroom|Special Education|Special

(music, art, etc)|Small Group|Support Space

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14a a. Roofs 2019|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14b b. Lighting Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14c c. Windows 1960|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14d d. Ceilings 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14e e. Plumbing 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14f f. Heating Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14g g. Ventilation Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.14h h. Conditioning Systems 2010|||||

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.17 What type of studding is used at your school facility? (click all that apply) Wood

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.19 What types of heating systems are in your school facility? (click all that apply) Steam

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.21 Is your building a CHP's or LEED certified? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.22 Have you had energy audits of all your school facilities? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.23 Do you have an energy performance contract in place? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.24 What is the R-Value of the exterior walls, windows, and doors? 1

Page 228 of 238

Page 229: New Hampshire Department of Education Bureau of School

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.25 What is the R-Value of the roof? 1

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.26 Do you have carbon monoxide detector(s) in your building? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.28 Do you have a facility maintenance plan? No

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.29 What is your maintenance budget? 6000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.30 What is your operational budget? 26000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.31 What is your capital construction budget? 0

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?18000

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1500

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.34 Do you have a maintenance contract in place? Yes

401Kreiva Academy Public

Charter School District

Kreiva Academy Public Charter School

(M)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401 Ledyard Charter School Ledyard Charter School Q.01 Approximate year of the original construction date 1970

401 Ledyard Charter School Ledyard Charter School Q.03 Gross Square footage (including portables) 10250

401 Ledyard Charter School Ledyard Charter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401 Ledyard Charter School Ledyard Charter School Q.06 Does your building have a basement? No

401 Ledyard Charter School Ledyard Charter School Q.07 How many portable classrooms are in use? 0

401 Ledyard Charter School Ledyard Charter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401 Ledyard Charter School Ledyard Charter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401 Ledyard Charter School Ledyard Charter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401 Ledyard Charter School Ledyard Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401 Ledyard Charter School Ledyard Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401 Ledyard Charter School Ledyard Charter School Q.14a a. Roofs |||||20

401 Ledyard Charter School Ledyard Charter School Q.14b b. Lighting Systems |||||17

401 Ledyard Charter School Ledyard Charter School Q.14c c. Windows |||||17

401 Ledyard Charter School Ledyard Charter School Q.14d d. Ceilings |||||20

401 Ledyard Charter School Ledyard Charter School Q.14e e. Plumbing |||||19

401 Ledyard Charter School Ledyard Charter School Q.14f f. Heating Systems |||||12

401 Ledyard Charter School Ledyard Charter School Q.14g g. Ventilation Systems |||||12

401 Ledyard Charter School Ledyard Charter School Q.14h h. Conditioning Systems |||||20

401 Ledyard Charter School Ledyard Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401 Ledyard Charter School Ledyard Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401 Ledyard Charter School Ledyard Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

401 Ledyard Charter School Ledyard Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401 Ledyard Charter School Ledyard Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401 Ledyard Charter School Ledyard Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

401 Ledyard Charter School Ledyard Charter School Q.21 Is your building a CHP's or LEED certified? No

401 Ledyard Charter School Ledyard Charter School Q.22 Have you had energy audits of all your school facilities? No

401 Ledyard Charter School Ledyard Charter School Q.23 Do you have an energy performance contract in place? No

401 Ledyard Charter School Ledyard Charter School Q.26 Do you have carbon monoxide detector(s) in your building? No

401 Ledyard Charter School Ledyard Charter School Q.28 Do you have a facility maintenance plan? No

401 Ledyard Charter School Ledyard Charter School Q.29 What is your maintenance budget? 9250

401 Ledyard Charter School Ledyard Charter School Q.30 What is your operational budget? 44000

401 Ledyard Charter School Ledyard Charter School Q.31 What is your capital construction budget? 0

401 Ledyard Charter School Ledyard Charter School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?14100

401 Ledyard Charter School Ledyard Charter School Q.34 Do you have a maintenance contract in place? No

401 Ledyard Charter School Ledyard Charter School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

401 Ledyard Charter School Ledyard Charter School Q.35a a. If yes, provide a short description. (e.g., "High School Addition") purchase the building

401 Ledyard Charter School Ledyard Charter School Q.35b b. If yes, provide rough cost of project in millions. (e.g., $20 million) 1

401 Ledyard Charter School Ledyard Charter School Q.35c c. If yes, provide estimated year of construction. 2019

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.01 Approximate year of the original construction date 1866

Page 229 of 238

Page 230: New Hampshire Department of Education Bureau of School

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1970

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.03 Gross Square footage (including portables) 8081

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.05 How many parking spaces does the facility have? 20

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.06 Does your building have a basement? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.07 How many portable classrooms are in use? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14a a. Roofs |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14b b. Lighting Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14c c. Windows |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14d d. Ceilings |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14e e. Plumbing |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14f f. Heating Systems |||2019||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14g g. Ventilation Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.14h h. Conditioning Systems |||2019||

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.15 What types of roofs are on your school facility? (click all that apply) Pitched

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.20 What types of energy sources are used in your school facility? (click all that apply) Electric

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.21 Is your building a CHP's or LEED certified? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.22 Have you had energy audits of all your school facilities? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.23 Do you have an energy performance contract in place? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.26 Do you have carbon monoxide detector(s) in your building? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.28 Do you have a facility maintenance plan? No

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.29 What is your maintenance budget? 157405

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.30 What is your operational budget? 1607208

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.31 What is your capital construction budget? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?6721.35

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?0

401Making Community

Connections Charter School

Making Community Connections

Charter School - MonadnockQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.01 Approximate year of the original construction date 1990

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.07 How many portable classrooms are in use? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14a a. Roofs |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14b b. Lighting Systems |2017||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14c c. Windows |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14d d. Ceilings |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14e e. Plumbing |||||

Page 230 of 238

Page 231: New Hampshire Department of Education Bureau of School

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14f f. Heating Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14g g. Ventilation Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.14h h. Conditioning Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.21 Is your building a CHP's or LEED certified? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.22 Have you had energy audits of all your school facilities? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.23 Do you have an energy performance contract in place? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.28 Do you have a facility maintenance plan? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.29 What is your maintenance budget? 148904

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.30 What is your operational budget? 1607208

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.31 What is your capital construction budget? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.34 Do you have a maintenance contract in place? Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School (H)Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.01 Approximate year of the original construction date 1990

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.06 Does your building have a basement? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.07 How many portable classrooms are in use? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14a a. Roofs |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14b b. Lighting Systems |2017||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14c c. Windows |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14d d. Ceilings |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14e e. Plumbing |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14f f. Heating Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14g g. Ventilation Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.14h h. Conditioning Systems |||||

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.21 Is your building a CHP's or LEED certified? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.22 Have you had energy audits of all your school facilities? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.23 Do you have an energy performance contract in place? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.28 Do you have a facility maintenance plan? No

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.29 What is your maintenance budget? 148904

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.30 What is your operational budget? 1607208

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.31 What is your capital construction budget? 0

401Making Community

Connections Charter School

Making Community Connections

Charter School (M)Q.34 Do you have a maintenance contract in place? Yes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.01 Approximate year of the original construction date 2015

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2015

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.03 Gross Square footage (including portables) 185000

Page 231 of 238

Page 232: New Hampshire Department of Education Bureau of School

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.05 How many parking spaces does the facility have? 52

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.06 Does your building have a basement? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.07 How many portable classrooms are in use? 0

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14a a. Roofs ?|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14b b. Lighting Systems 2017|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14c c. Windows ?|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14d d. Ceilings 2015|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14e e. Plumbing 2015|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14f f. Heating Systems 2015|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14g g. Ventilation Systems 2015|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.14h h. Conditioning Systems 2015|||||

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.15 What types of roofs are on your school facility? (click all that apply) Flat

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.21 Is your building a CHP's or LEED certified? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.22 Have you had energy audits of all your school facilities? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.22a. a. If yes, do you have an implementation plan for energy saving projects? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.23 Do you have an energy performance contract in place? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.26 Do you have carbon monoxide detector(s) in your building? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.28 Do you have a facility maintenance plan? Yes

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.29 What is your maintenance budget? 18000

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.30 What is your operational budget? 1700000

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?37000

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.34 Do you have a maintenance contract in place? No

401MicroSociety Academy

Charter School Foundation

MicroSociety Academy Charter School

FoundationQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401 Mill Falls Charter School Mill Falls Charter School Q.01 Approximate year of the original construction date 1989

401 Mill Falls Charter School Mill Falls Charter School Q.03 Gross Square footage (including portables) 14000

401 Mill Falls Charter School Mill Falls Charter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401 Mill Falls Charter School Mill Falls Charter School Q.05 How many parking spaces does the facility have? 150

401 Mill Falls Charter School Mill Falls Charter School Q.06 Does your building have a basement? Yes

401 Mill Falls Charter School Mill Falls Charter School Q.07 How many portable classrooms are in use? 0

401 Mill Falls Charter School Mill Falls Charter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401 Mill Falls Charter School Mill Falls Charter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401 Mill Falls Charter School Mill Falls Charter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401 Mill Falls Charter School Mill Falls Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401 Mill Falls Charter School Mill Falls Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401 Mill Falls Charter School Mill Falls Charter School Q.14a a. Roofs 2017|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14b b. Lighting Systems 2012|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14c c. Windows 1989|||||

Page 232 of 238

Page 233: New Hampshire Department of Education Bureau of School

401 Mill Falls Charter School Mill Falls Charter School Q.14d d. Ceilings 2012|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14e e. Plumbing 1989|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14f f. Heating Systems 1989|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14g g. Ventilation Systems 1989|||||

401 Mill Falls Charter School Mill Falls Charter School Q.14h h. Conditioning Systems 1989|||||

401 Mill Falls Charter School Mill Falls Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Flat

401 Mill Falls Charter School Mill Falls Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401 Mill Falls Charter School Mill Falls Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

401 Mill Falls Charter School Mill Falls Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401 Mill Falls Charter School Mill Falls Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

401 Mill Falls Charter School Mill Falls Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401 Mill Falls Charter School Mill Falls Charter School Q.22 Have you had energy audits of all your school facilities? Yes

401 Mill Falls Charter School Mill Falls Charter School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? N/A

401 Mill Falls Charter School Mill Falls Charter School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

401 Mill Falls Charter School Mill Falls Charter School Q.28 Do you have a facility maintenance plan? Yes

401 Mill Falls Charter School Mill Falls Charter School Q.29 What is your maintenance budget? 6500

401 Mill Falls Charter School Mill Falls Charter School Q.30 What is your operational budget? 1445220

401 Mill Falls Charter School Mill Falls Charter School Q.31 What is your capital construction budget? 0

401 Mill Falls Charter School Mill Falls Charter School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?0

401 Mill Falls Charter School Mill Falls Charter School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?75

401 Mill Falls Charter School Mill Falls Charter School Q.34 Do you have a maintenance contract in place? No

401 Mill Falls Charter School Mill Falls Charter School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401 Next Charter School Next Charter School Q.01 Approximate year of the original construction date 1951

401 Next Charter School Next Charter School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2005

401 Next Charter School Next Charter School Q.03 Gross Square footage (including portables) 6000

401 Next Charter School Next Charter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401 Next Charter School Next Charter School Q.05 How many parking spaces does the facility have? 8

401 Next Charter School Next Charter School Q.06 Does your building have a basement? Yes

401 Next Charter School Next Charter School Q.07 How many portable classrooms are in use? 0

401 Next Charter School Next Charter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401 Next Charter School Next Charter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401 Next Charter School Next Charter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401 Next Charter School Next Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401 Next Charter School Next Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401 Next Charter School Next Charter School Q.14a a. Roofs |||||

401 Next Charter School Next Charter School Q.14b b. Lighting Systems |||||

401 Next Charter School Next Charter School Q.14c c. Windows |||||

401 Next Charter School Next Charter School Q.14d d. Ceilings |||||

401 Next Charter School Next Charter School Q.14e e. Plumbing |||||

401 Next Charter School Next Charter School Q.14f f. Heating Systems |||||

401 Next Charter School Next Charter School Q.14g g. Ventilation Systems |||||

401 Next Charter School Next Charter School Q.14h h. Conditioning Systems |||||

401 Next Charter School Next Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

401 Next Charter School Next Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401 Next Charter School Next Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Steel

401 Next Charter School Next Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401 Next Charter School Next Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401 Next Charter School Next Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401 Next Charter School Next Charter School Q.22 Have you had energy audits of all your school facilities? Yes

Page 233 of 238

Page 234: New Hampshire Department of Education Bureau of School

401 Next Charter School Next Charter School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? Yes

401 Next Charter School Next Charter School Q.23 Do you have an energy performance contract in place? Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.01 Approximate year of the original construction date 1990

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.03 Gross Square footage (including portables) 5200

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.05 How many parking spaces does the facility have? 3

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.06 Does your building have a basement? Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.07 How many portable classrooms are in use? 0

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14a a. Roofs 1|||||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14b b. Lighting Systems ||1|||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14c c. Windows |||||1

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14d d. Ceilings ||1|||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14e e. Plumbing |||||1

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14f f. Heating Systems ||1|||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14g g. Ventilation Systems ||1|||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.14h h. Conditioning Systems ||1|||

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.15 What types of roofs are on your school facility? (click all that apply) Pitched|Flat

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.21 Is your building a CHP's or LEED certified? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.22 Have you had energy audits of all your school facilities? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.23 Do you have an energy performance contract in place? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.24 What is the R-Value of the exterior walls, windows, and doors? 0

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.25 What is the R-Value of the roof? 0

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.26 Do you have carbon monoxide detector(s) in your building? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.28 Do you have a facility maintenance plan? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.29 What is your maintenance budget? 2000

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.30 What is your operational budget? 695000

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.31 What is your capital construction budget? 84000

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?0

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.34 Do you have a maintenance contract in place? No

401North Country Charter

AcademyNorth Country Charter Academy (H) Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401 Robert Frost Charter School Robert Frost Charter School Q.01 Approximate year of the original construction date 1950

401 Robert Frost Charter School Robert Frost Charter School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2006

401 Robert Frost Charter School Robert Frost Charter School Q.03 Gross Square footage (including portables) 5030

401 Robert Frost Charter School Robert Frost Charter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401 Robert Frost Charter School Robert Frost Charter School Q.05 How many parking spaces does the facility have? 25

401 Robert Frost Charter School Robert Frost Charter School Q.06 Does your building have a basement? Yes

401 Robert Frost Charter School Robert Frost Charter School Q.07 How many portable classrooms are in use? 0

Page 234 of 238

Page 235: New Hampshire Department of Education Bureau of School

401 Robert Frost Charter School Robert Frost Charter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401 Robert Frost Charter School Robert Frost Charter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401 Robert Frost Charter School Robert Frost Charter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401 Robert Frost Charter School Robert Frost Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401 Robert Frost Charter School Robert Frost Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401 Robert Frost Charter School Robert Frost Charter School Q.14a a. Roofs 2019|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14b b. Lighting Systems 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14c c. Windows |||||

401 Robert Frost Charter School Robert Frost Charter School Q.14d d. Ceilings 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14e e. Plumbing 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14f f. Heating Systems 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14g g. Ventilation Systems 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.14h h. Conditioning Systems 2006|||||

401 Robert Frost Charter School Robert Frost Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

401 Robert Frost Charter School Robert Frost Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401 Robert Frost Charter School Robert Frost Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

401 Robert Frost Charter School Robert Frost Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

401 Robert Frost Charter School Robert Frost Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401 Robert Frost Charter School Robert Frost Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401 Robert Frost Charter School Robert Frost Charter School Q.21 Is your building a CHP's or LEED certified? No

401 Robert Frost Charter School Robert Frost Charter School Q.22 Have you had energy audits of all your school facilities? No

401 Robert Frost Charter School Robert Frost Charter School Q.23 Do you have an energy performance contract in place? No

401 Robert Frost Charter School Robert Frost Charter School Q.26 Do you have carbon monoxide detector(s) in your building? No

401 Robert Frost Charter School Robert Frost Charter School Q.27 Do you have a presence of: (click all that apply) Asbestos

401 Robert Frost Charter School Robert Frost Charter School Q.28 Do you have a facility maintenance plan? No

401 Robert Frost Charter School Robert Frost Charter School Q.29 What is your maintenance budget? 1500

401 Robert Frost Charter School Robert Frost Charter School Q.31 What is your capital construction budget? 0

401 Robert Frost Charter School Robert Frost Charter School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?10600

401 Robert Frost Charter School Robert Frost Charter School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?1000

401 Robert Frost Charter School Robert Frost Charter School Q.34 Do you have a maintenance contract in place? Yes

401 Robert Frost Charter School Robert Frost Charter School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401 Seacoast Charter School Seacoast Charter School Q.01 Approximate year of the original construction date 1967

401 Seacoast Charter School Seacoast Charter School Q.02Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).1993

401 Seacoast Charter School Seacoast Charter School Q.03 Gross Square footage (including portables) 34400

401 Seacoast Charter School Seacoast Charter School Q.04Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401 Seacoast Charter School Seacoast Charter School Q.05 How many parking spaces does the facility have? 100

401 Seacoast Charter School Seacoast Charter School Q.06 Does your building have a basement? Yes

401 Seacoast Charter School Seacoast Charter School Q.07 How many portable classrooms are in use? 0

401 Seacoast Charter School Seacoast Charter School Q.08Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401 Seacoast Charter School Seacoast Charter School Q.09If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Special (music, art, etc)

401 Seacoast Charter School Seacoast Charter School Q.10Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?No

401 Seacoast Charter School Seacoast Charter School Q.11Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401 Seacoast Charter School Seacoast Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? Yes

401 Seacoast Charter School Seacoast Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401 Seacoast Charter School Seacoast Charter School Q.14a a. Roofs 1967|1988|1991|1998|2012|

401 Seacoast Charter School Seacoast Charter School Q.14b b. Lighting Systems 1967|1988|1991|1998||

401 Seacoast Charter School Seacoast Charter School Q.14c c. Windows 1967|1988|1991|1998||

401 Seacoast Charter School Seacoast Charter School Q.14d d. Ceilings 1967|1988|1991|1998||

401 Seacoast Charter School Seacoast Charter School Q.14e e. Plumbing 1967|1988|1991|1998||

Page 235 of 238

Page 236: New Hampshire Department of Education Bureau of School

401 Seacoast Charter School Seacoast Charter School Q.14f f. Heating Systems 1967|1988|1991|1998|2007|

401 Seacoast Charter School Seacoast Charter School Q.14g g. Ventilation Systems 1967|1988|1991|1998||

401 Seacoast Charter School Seacoast Charter School Q.14h h. Conditioning Systems 1988|2013||||

401 Seacoast Charter School Seacoast Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

401 Seacoast Charter School Seacoast Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Wood

401 Seacoast Charter School Seacoast Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Wood

401 Seacoast Charter School Seacoast Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401 Seacoast Charter School Seacoast Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Air

401 Seacoast Charter School Seacoast Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Oil

401 Seacoast Charter School Seacoast Charter School Q.21 Is your building a CHP's or LEED certified? No

401 Seacoast Charter School Seacoast Charter School Q.22 Have you had energy audits of all your school facilities? Yes

401 Seacoast Charter School Seacoast Charter School Q.23 Do you have an energy performance contract in place? No

401 Seacoast Charter School Seacoast Charter School Q.24 What is the R-Value of the exterior walls, windows, and doors? 191414

401 Seacoast Charter School Seacoast Charter School Q.25 What is the R-Value of the roof? 19

401 Seacoast Charter School Seacoast Charter School Q.26 Do you have carbon monoxide detector(s) in your building? Yes

401 Seacoast Charter School Seacoast Charter School Q.28 Do you have a facility maintenance plan? No

401 Seacoast Charter School Seacoast Charter School Q.32What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?54000

401 Seacoast Charter School Seacoast Charter School Q.33How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?2080

401 Seacoast Charter School Seacoast Charter School Q.34 Do you have a maintenance contract in place? No

401 Seacoast Charter School Seacoast Charter School Q.35 Are there any anticipated projects for this school with costs greater than $1,000,000? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.01 Approximate year of the original construction date 2004

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.02

Excluding maintenance costs, identify the year of the last major addition or renovation

project that was completed (with costs greater than $500,000).2019

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.03 Gross Square footage (including portables) 24200

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.05 How many parking spaces does the facility have? 65

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.06 Does your building have a basement? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.07 How many portable classrooms are in use? 2

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?2

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.09

If portable or temporary classrooms are on site, for what instructional purpose(s) are the

facilities used? (Click all that apply)Regular Classroom|Special (music, art, etc)

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14a a. Roofs |||X||

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14b b. Lighting Systems X|||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14c c. Windows X|||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14d d. Ceilings X|||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14e e. Plumbing |||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14f f. Heating Systems |||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14g g. Ventilation Systems |||X||X

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.14h h. Conditioning Systems |||||

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.15 What types of roofs are on your school facility? (click all that apply) Pitched

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.16 What type of exterior surfacing is your school facility? (click all that apply) Other|vinyl siding

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.17 What type of studding is used at your school facility? (click all that apply) Steel|Wood

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.18 What type of lighting systems are used in your school facility? (click all that apply) LED|Fluorescent tubes

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.19 What types of heating systems are in your school facility? (click all that apply) Forced Hot Water|Forced Hot Air

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.20 What types of energy sources are used in your school facility? (click all that apply) Gas

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.21 Is your building a CHP's or LEED certified? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.22 Have you had energy audits of all your school facilities? No

Page 236 of 238

Page 237: New Hampshire Department of Education Bureau of School

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.22a. a. If yes, do you have an implementation plan for energy saving projects? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.23 Do you have an energy performance contract in place? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.26 Do you have carbon monoxide detector(s) in your building? No

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.28 Do you have a facility maintenance plan? Yes

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.29 What is your maintenance budget? 26200

401Strong Foundations Charter

SchoolStrong Foundations Charter School Q.30 What is your operational budget? 2700000

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.05 How many parking spaces does the facility have? 50

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.06 Does your building have a basement? No

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.07 How many portable classrooms are in use? 0

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?1

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14a a. Roofs |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14b b. Lighting Systems |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14c c. Windows |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14d d. Ceilings |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14e e. Plumbing |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14f f. Heating Systems |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14g g. Ventilation Systems |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.14h h. Conditioning Systems |||||

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.15 What types of roofs are on your school facility? (click all that apply) Flat

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.16 What type of exterior surfacing is your school facility? (click all that apply) Brick

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.17 What type of studding is used at your school facility? (click all that apply) Other|not sure. we are located in a mall

401The Birches Academy of

Academics & Art A Public

The Birches Academy of Academics -

Art A Public Charter SchQ.18 What type of lighting systems are used in your school facility? (click all that apply) Fluorescent tubes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.01 Approximate year of the original construction date 2019

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.03 Gross Square footage (including portables) 20000

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.04

Are student bus loading areas segregated from other vehicular traffic and pedestrian

walkways?Yes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.05 How many parking spaces does the facility have? 50

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.06 Does your building have a basement? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.07 How many portable classrooms are in use? 6

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.08

Not including portable classrooms, how many temporary classrooms are in use (e.g., the

auditorium stage set up as a classroom, art on a cart, etc.)?0

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.10

Does the building support technology requirements associated with academic standards

and provide necessary space for technology instruction?Yes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.11

Does the school facility have a separate room designated as a library/resource/media

center in support of academic standards?No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.12 Do you have classrooms that are exposed to excessive noise or have acoustical issues? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.13 Are all instructional and service areas within the facility ADA compliant? Yes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14a a. Roofs X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14b b. Lighting Systems X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14c c. Windows X|||||X

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14d d. Ceilings X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14e e. Plumbing X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14f f. Heating Systems X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14g g. Ventilation Systems X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.14h h. Conditioning Systems X|||||

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.15 What types of roofs are on your school facility? (click all that apply) Flat

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.16 What type of exterior surfacing is your school facility? (click all that apply) Other|Exterior insulation and finish system (EIFS)

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.17 What type of studding is used at your school facility? (click all that apply) Steel

Page 237 of 238

Page 238: New Hampshire Department of Education Bureau of School

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.18 What type of lighting systems are used in your school facility? (click all that apply) LED

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.20 What types of energy sources are used in your school facility? (click all that apply) Gas|Electric

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.21 Is your building a CHP's or LEED certified? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.22 Have you had energy audits of all your school facilities? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.23 Do you have an energy performance contract in place? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.24 What is the R-Value of the exterior walls, windows, and doors? 30

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.25 What is the R-Value of the roof? 13

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.26 Do you have carbon monoxide detector(s) in your building? Yes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.28 Do you have a facility maintenance plan? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.29 What is your maintenance budget? 22500

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.30 What is your operational budget? 480000

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.31 What is your capital construction budget? 50000

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.32

What is your total average annual cost of your energy bills for this school (heating,

lighting, etc.)?0000

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.33

How many full time equivalent (FTE) hours are dedicated to operation and maintenance

of this facility?260

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.34 Do you have a maintenance contract in place? No

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.35 Are there any anticipated projects for this school with costs greater than $1,000,000? Yes

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.35a a. If yes, provide a short description. (e.g., "High School Addition") Looking to add on in a few years

401Windham Academy Public

Charter School

Windham Academy Public Charter

SchoolQ.35c c. If yes, provide estimated year of construction. 20222023

Page 238 of 238