    THIS TALK DEALS WITH ONLY

    ONE ASPECT OF THE FRC

    THE 1.5Bn COST

  • 8/12/2019 New Forth Crossing cost analysis 2014

    3/73

    3

    Firsta wee bit history

    4thApril 2000

    Holyrood Building Debate

    A presentation was arranged prior to the debate

    ONLY SIXTEEN MSPs TURNED UP

    15thJanuary 2009- Forth Replacement Crossing Debate

    Scotlands biggest ever project.

    ONLY SEVENTEEN MSPs TURNED UP

    So before we start lets deal with the politicians

  • 8/12/2019 New Forth Crossing cost analysis 2014

    4/73

    4

    SCOTLANDS RECENT

    MAJOR PROJECTS RECORD

    UK average motorway cost per

    mile is 30m

    M8 motorway missing link andother work to cost 415m

    M8 was 70m per mile

  • 8/12/2019 New Forth Crossing cost analysis 2014

    5/73

    5

    EDINBURGH TRAMS

    Now over

    1,000 millionThe TIE Directors who made a mess of this resigned

    They were awarded severance payment totalling

    406,635.

    Originally 2003 cost was 375 million

  • 8/12/2019 New Forth Crossing cost analysis 2014

    6/73

    6

    SKYE BRIDGEcost 25m

    now 93m

    BORDERS

    RAILWAY

    Was 155m now 295M

    Edinburgh Infirmary

    Cost 185mRepayment 1,000+

    Stirling-Kincardine

    Railway line-just finishedneeds to be rebui l t

    Would you like to see some more

    disasters for the taxpayer?

  • 8/12/2019 New Forth Crossing cost analysis 2014

    7/73

    7

    Wendy AlexanderSarah Boyack Iain Gray Nicol Stephen

    Tavish Scott Jack McConnell Stewart Stevenson Keith Brown

    Holyrood started business in 1999

    How many Ministers of Transport

    do you think have been appointed ?

    Less than two years in office????

  • 8/12/2019 New Forth Crossing cost analysis 2014

    8/73

    Alex S

    870 of the 1,041 orders have gone to Scottish companies (84%)

    Somethings missing Alex!!

    118 Subcontracts awarded to Scottish firms from the total of 155 (76%)

    First Ministers Questions 2 Feb 2012

  • 8/12/2019 New Forth Crossing cost analysis 2014

    9/73

    Who is actually building the bridgeCONTRACT COMPANY NATIONALITY

    CONSTRUCTIONCONSORTIUM

    DRAGADOS SPANISH

    HOCHTIEF GERMAN

    AMERICAN BRIDGE USA

    MORRISON CONSTRUCTION ENGLISH (Now)

    9

    CONTRACT COMPANY NATIONALITY

    MAJOR

    MANUFACTURERS

    Zhenhua Heavy Industries CHINATecade-Megusa SPAIN

    Crist-Gdansk POLAND

    Cleveland Bridge ENGLAND

    Scottish contractor awards = 143 million (1%)

    870 of the 1,041 orders have gone to Scottish companies (84%)

    118 Subcontracts awarded to Scottish firms from the total of 155 (76%)

  • 8/12/2019 New Forth Crossing cost analysis 2014

    10/73

    BEFORE WE

    START

    10

    3 TECHNICAL

    ASPECTS

  • 8/12/2019 New Forth Crossing cost analysis 2014

    11/73

    Cable Stayed Bridge

    11

    Before we begin you should be you should be

    aware of the difference between these structures

    A SUSPENSION BRIDGE

    A CABLE STAYED BRIDGE

    A MULTIMODAL BRIDGE

    SUSPENSION BRIDGE STRUCTUREORIGINAL FORTH ROAD BRIDGE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    12/73

    12

    Cable Stayed Bridge

    The New Forth Bridge

  • 8/12/2019 New Forth Crossing cost analysis 2014

    13/73

    13

    PROPOSED FRC STRUCTUREWAS MULTIMODAL

  • 8/12/2019 New Forth Crossing cost analysis 2014

    14/73

    14

    LETS START WITH A LOOK AT THE

    GOVERNMENTS COST OF THE 1965

    FORTH ROAD BRIDGE

    Their 1965 cost is 19.5m

    Their 2005 inflation figure is 250

    My 2016 inflation figure is 340m

    Their data can be verified on their web

  • 8/12/2019 New Forth Crossing cost analysis 2014

    15/73

    15

    STRUCTURE COST COMPARISON

    The old bridge is a

    SUSPENSION BRIDGE

    The new bridge is a CABLE

    STAYED BRIDGE

    Structural engineers will tell you that suspension bridges are

    10% more expensive than cable stayed bridges

    SO WHY IS THE NEW BRIDGE

    5 TIMES MORE EXPENSIVE

    Made in

    UK

    Made in

    China

    16 miles of road

    24 other bridges8 miles of roadNo other bridges

  • 8/12/2019 New Forth Crossing cost analysis 2014

    16/73

    16

    NOWADAYSCana cable stayed bridge of

    similar structure be built for around 340m

    OF COURSE IT CAN - I T HAS BEEN DONE

    ANDby one of the main contractors

    involved with Scotlands FRC

  • 8/12/2019 New Forth Crossing cost analysis 2014

    17/73

    Hong Kongs Stone Cutters Bridge

    Examine the location

    Over one of the worlds busies sea routes

    Land prices 10 times the cost

    Located over a built up area

    Please examine the access roads...

    And the cost??

    245m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    18/73

    18

    THE COST FLUCTUATION FARCE

    THE COST REVISIONS ARE QUITE STAGGERING

    DESIGN CHANGES ARE MINIMAL

    ONE CHANGE ILLUSTRATES THE POINT

  • 8/12/2019 New Forth Crossing cost analysis 2014

    19/73

    19

    No Date Source Cost

    2 Jan 05 Faber and Maunsell 500m

    1 Jun 04 FETA 500m

    3 Feb 07 Scottish Government 1,000+m

    4 Dec 07 Scottish Government 2,790 to 3,630m

    5 Jan 08 Scottish Government 3,250 to 4.220m

    7 Mar 11 Scottish Government 1,470 to 1.620m

    6 Sep 09 Scottish Government 1,700 to 2,300m

    4,220m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    20/73

    20SKYSCRAPERCITY.COM

    Scotland to build theWorld's most expensive bridge

    This pretty average 2km bridge

    has a budget of up to 4.2 billion

    This is a larger amount than even the entire

    Fehmarn Belt project.

    Scottish Finance Secretary, John Swinney,

    announced "Forth Replacement Crossing",

  • 8/12/2019 New Forth Crossing cost analysis 2014

    21/73

    21

    The FRC cost here are when the quoted price

    was 4,220m

    World Bridge Graphs

    Lets compare.

  • 8/12/2019 New Forth Crossing cost analysis 2014

    22/73

    22

    COST of VARIOUS TYPES TYPES OF WORLD BRIDGES -M

    The FRC was the worlds most

    expensive bridge.

    36

    84

    102

    106

    136

    146

    163

    198

    319

    357

    367

    392

    497

    498

    510

    561

    567

    576

    796

    854

    941

    1,08

    1

    1,08

    1

    4,050

    4,1094,220

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    4,000

    4,500

  • 8/12/2019 New Forth Crossing cost analysis 2014

    23/73

    23

    36

    84

    102

    106

    146

    163 3

    19

    367

    392

    497

    561

    5

    67

    5

    76

    796 9

    41 1

    ,081

    4,220

    0

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    4,000

    4,500

    COST of ONLY CABLE STAYED BRIDGES -m

    Again

    the FRC wasby far the most costly

  • 8/12/2019 New Forth Crossing cost analysis 2014

    24/73

    0240

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    45000

    1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100103106109112115118121124127

    COMPARATIVE LENGTHof WORLD BRIDGES

    The FRC is tiny: a mere 127thin world ranking..

  • 8/12/2019 New Forth Crossing cost analysis 2014

    25/73

    25

    -

    200

    400

    600

    800

    1,000

    1,200

    1,400

    1,600

    1,800

    WORLD AVERAGE COST PER METRE

    200K

    The FRC COST PER METRE WAS

    1,500

    LETS NOW EXAMINE THE COST PER METRE

    WEVE SEEN TOTAL COST

    LETS NOW CHECK THE COST PER LENGTH1,563

  • 8/12/2019 New Forth Crossing cost analysis 2014

    26/73

    26

    US CONSTRUCTION INDUSTRY DATA (Jan 2004)

    Between $4k and $5K per square metre

    The FRC cost- $60k per sq m.

    COST OF (Cable Stayed) BRIDGES

    PER SQUARE METRE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    27/73

    2009

    THE WORLDS THREE

    MOST EXPENSIVE BRIDGES

    27

    1st

    - Scotlands Multimodal FRC2nd- Japans Pearl Bridge

    3rd- Sweden/Denmarks -Oresund Crossing

    Cost over 4,000m+ world crossings

  • 8/12/2019 New Forth Crossing cost analysis 2014

    28/73

    028

    2nd-The Pearl Bridge Japan Opened in 1998 for

    $4,300m

    The worlds longest suspension bridge -3,910m

    Tornadoes (180mph)hinged-girder system

    Fierce sea currents & deep water

    Why is it so expensive

    Earthquakes (8.5 Richter scale)TMD pendulumstuned mass damper

  • 8/12/2019 New Forth Crossing cost analysis 2014

    29/73

    3rd - THE ORESUND CROSSING

    29

    WORLDS LARGEST

    MULTIMODAL CROSSING

    An Island

    A Bridge

    and

    A Tunnel

  • 8/12/2019 New Forth Crossing cost analysis 2014

    30/73

    30

    Bridge

    Tunnel

    DENMARK SWEDEN

    Island

    SATELLITE VIEW

    The Oresund Project

    Lets build it in Fife!!!!!

  • 8/12/2019 New Forth Crossing cost analysis 2014

    31/73

    31

    A 4 km Artificial Island

  • 8/12/2019 New Forth Crossing cost analysis 2014

    32/73

    32

    A 4 km multimodal tunnel

    Road &

    Rail

    Tunnel

    4050 metres

  • 8/12/2019 New Forth Crossing cost analysis 2014

    33/73

    33

    A 8 km multimodal bridge

    Road

    & Rail Bridge 8km long

    O d C i 4 100 *

  • 8/12/2019 New Forth Crossing cost analysis 2014

    34/73

    34

    Oresund Crossing cost 4,100m *

    Oresund Project 8 times the size of the FRC

    Built in 5 years; and the FRC???

    5 years

    * Transport Scotland data says 4,400m

    Forth Crossing cost 4,220m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    35/73

    35

    Professor John Kay.

    Do you know this man?

    Chosen Financial Adviser

    to the

    SCOTTISHGOVERNMENT.

    Public lectureSept 2007 on

    the FRC

    Expressed astonishment

    ..more than 4 times the final cost of

    the Oresund bridge

  • 8/12/2019 New Forth Crossing cost analysis 2014

    36/73

    36

    THE NEW

    MERSEY GATEWAY BRIDGE

    Englands MULTI-MODAL Comparison

    COMPLETION 2016

    STRUCTURE MULTI-MODAL

    TYPE CABLE STAYED

    LENGTH 2.3 Km

    TOWERS 3

    LANES 6

    COST UNDER 600 million

  • 8/12/2019 New Forth Crossing cost analysis 2014

    37/73

    37

    The Occasion

    Project Director

    Steve NicholsonFeb. 27th, 2012

    The Statement

    Dropping the double deck and

    other measures will save

    ..30m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    38/73

    38

    The Occasion

    Finance Secretary

    John SwinneyScottish Parliament

    Dec. 19th, 2007

    The Statement

    The tram section removed..

    A revised saving will be

    ..580m

    D 2009 t i 1 600

  • 8/12/2019 New Forth Crossing cost analysis 2014

    39/73

    39

    Dec 2009 cost is now 1,600m

    Lets compare it with

    another UK crossing

    THE SEVERN BRIDGE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    40/73

    AN EXCELLENT COMPARISON

    Both UK projects

    Similar environments

    Contemporary

    Cable Stayed Structures

    40

  • 8/12/2019 New Forth Crossing cost analysis 2014

    41/73

    041

    Second Severn Crossing FORTH REPLACEMENT CROSSING

    MADE IN CHINAMADE IN UK

    Six+hs Lanes Four+hs5,200 m Length 2,700

    18.5 km Roads 4.5 km

    4 years Build time 5.5 years810 m Cost 1,500

    *Transport Scotland have it at 890m

    HardShoulder

    FRC IS HALF THE SIZE & TWICE THE PRICE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    42/73

    42

    Three ICONIC world bridges.

    Is the FRC really so expensive?

  • 8/12/2019 New Forth Crossing cost analysis 2014

    43/73

    Greece -Rio Antirio Bridge

    WORLDS MOST

    DIFFICULT BRIDGE

    TO BUILD

  • 8/12/2019 New Forth Crossing cost analysis 2014

    44/73

    44

    2,880 Metres Cable Stayed

    No bedrock

    64 metre deep Sea crossing Seismic & Tsunami

  • 8/12/2019 New Forth Crossing cost analysis 2014

    45/73

    45

    65 metres

    SEA DEPTH

    800 i 200 i 2 di 25/30 l

  • 8/12/2019 New Forth Crossing cost analysis 2014

    46/73

    200 STEEL PIPES

    2 METRE IN DIAMETER

    30 METRE IN LENGTH

    BURIED IN THE SEA BED

    46

    800 pipes200 per pier - 2m diameter25/30 m long

    F i ti CAISSONS

  • 8/12/2019 New Forth Crossing cost analysis 2014

    47/73

    47

    Four gigantic CAISSONS

    installed over the pipes

  • 8/12/2019 New Forth Crossing cost analysis 2014

    48/73

    48

  • 8/12/2019 New Forth Crossing cost analysis 2014

    49/73

    049

    Length

    m

    Lanes Towers Build

    Time

    Cost

    2016

    Rio Antirio 2880 6 4 6.0 576m

    Forth 2700 4 3 5.5 1,600m

    Rio Antirio

    Opened in 2004

    at a cost of

    630M

    WORLDS MOSTDIFFICULT BRIDGE

    MILLAU

  • 8/12/2019 New Forth Crossing cost analysis 2014

    50/73

    WORLDSHIGHEST BRIDGE

    MILLAU

    VIADUCTFrance

    Opened in 2004350m

    Lengthm

    Lanes Towers BuildTime

    Cost2016

    Millau 2460 4 7 3 400m

    Forth 2700 4 3 5.5 1,600m

    VASCO d

  • 8/12/2019 New Forth Crossing cost analysis 2014

    51/73

    051

    VASCO de

    GAMA

    Opened in 1998

    at a cost of$1000m

    Length

    m

    Lanes Towers Build

    Time

    Cost

    2016Vasco de

    Gama17200 6 2 1.5 941m

    Forth 2700 4 3 5.5 1,600m

    EUROPESLONGEST BRIDGE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    52/73

  • 8/12/2019 New Forth Crossing cost analysis 2014

    53/73

    COULD IT BE

    SOMEONE DIDNTWANT A TUNNEL?

    THEIR LIST IN FAVOUR OF A TUNNEL

  • 8/12/2019 New Forth Crossing cost analysis 2014

    54/73

    THEIR LIST IN FAVOUR OF A TUNNEL

    GOVERMENT LIST AGAINST A TUNNEL

  • 8/12/2019 New Forth Crossing cost analysis 2014

    55/73

    1. 5km more roadway

    3. 4 million tonnes of spoil

    4. Multi-modal option needs another tunnel

    5. Prohibited goods (like whisky)

    8. More expensive

    7. No pedestrians or cyclists

    6. Would take 7.5 years

    2. Special Protection Areas

    GOVERMENT LIST AGAINST A TUNNEL

    An underground tunnel has less environmental impact.

    The bridge is 2.7km the tunnel is 8kmwhy more

    The Eurotunnel used their spoil to prevent erosion.

    The tram link was dropped simply not valid.

    Londons M25 tunnel escort goods- we still have a bridge

    How come - the 31 mile Channel Tunnel was built in 6 years

    Tourists would prefer the bridge stupid

    LETS EXAMINE THIS CLAIM IN DETAIL..

  • 8/12/2019 New Forth Crossing cost analysis 2014

    56/73

    The best means available to assess this

    cost is again by comparison

    You are about to see why!!!!

    Gotthard Base Tunnel

    A single comparison here will suffice

    Well use the worlds longest tunnel

    ld' l l

  • 8/12/2019 New Forth Crossing cost analysis 2014

    57/73

    World's longest tunnel

    Its very deep too!!!

  • 8/12/2019 New Forth Crossing cost analysis 2014

    58/73

    Its very deep too!!!

  • 8/12/2019 New Forth Crossing cost analysis 2014

    59/73

    ROUTE LENGTH 58 km+

    Additional shafts 152 km

    Construction Time 17 Years

    Construction Team 2,600

  • 8/12/2019 New Forth Crossing cost analysis 2014

    60/73

    4 Giant borers used

    simultaneously

    T l li i

  • 8/12/2019 New Forth Crossing cost analysis 2014

    61/73

    Tunnel lining

    Cement cladding

  • 8/12/2019 New Forth Crossing cost analysis 2014

    62/73

    Cement cladding

    L t b ild it th

  • 8/12/2019 New Forth Crossing cost analysis 2014

    63/73

    MAIN SHAFT58 kM

    AUXILIARY SHAFTS152 kM

    Lets build it across the

    Forth for comparison

    Oor wee tunnel

    Now the Swiss one

  • 8/12/2019 New Forth Crossing cost analysis 2014

    64/73

    TOTAL COST AS OF NOV 2010

    6,300m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    65/73

    Now the ForthsBored Tunnel Option

    FETA commissionedthis study in

    JAN 2005

    FORTH ESTUARY TRANSPORT AUTHORITYS d F th R d C i C lid t d t

  • 8/12/2019 New Forth Crossing cost analysis 2014

    66/73

    66

    This detailed 80 page report was commission to examine FRC options

    Second Forth Road Crossing Consolidated report

    Jan 2005 FABER MAUNSELL

  • 8/12/2019 New Forth Crossing cost analysis 2014

    67/73

    Page 23

    ..Bored Tunnel cost..

  • 8/12/2019 New Forth Crossing cost analysis 2014

    68/73

    598M

    Why did FETA remove this document from

    their web site???

  • 8/12/2019 New Forth Crossing cost analysis 2014

    69/73

    SCALE MODELS

    Forth

    tunnel 8km

    You wont believe it!!!

    Cost 6,300m

  • 8/12/2019 New Forth Crossing cost analysis 2014

    70/73

    70

    The Occasion

    Finance Secretary

    John SwinneyScottish Parliament

    Dec. 19th, 2007

    The Statement

    I have the cost estimates..

    A bored tunnel would cost..

    ..6,600m

    BACK TO HOLLYROOD

  • 8/12/2019 New Forth Crossing cost analysis 2014

    71/73

    71

    I'm still awaiting an answer to the following simple question

    Quote to me .. Remember we are just laymen

    Not one MSP has questioned these outrageous costs

    Labour started this cost fiasco SNP continued

    AUDIT SCOTLAND has never investigated these costs

    Please provide a list of more

    expensive comparable bridges

    YOU

    JUDGE

  • 8/12/2019 New Forth Crossing cost analysis 2014

    72/73

    72

    Facts do not cease to exist

    because they are ignored.Aldous Huxley