20

New Doc 2019-10-21 11.26...xiii. xiv. w. xvi. Rate of items of work should be as per SOR of PWD and PHE Department for civil work, bore- well, water supply, whichever is applicable

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview