New Data Center Update
Brian Shannon & Anne Silvester
Our New Data Center Located At One Summer St. Boston
Our New Data CenterBuilding Characteristics
3,300 sq ft5 20 Ton A/C Units250KW UPSGeneratorN + 1 Infrastructure Redundancy Throughout Facility. Multiple Entry Fiber Paths. Multiple Power Grids for Redundant Power. 24 Hour Manned Security, Cameras & Digital Monitoring. Up to Twenty-Four (24) Day Fuel Supply On Site.
“If You Build It They Will Come”
Our new Data Center at One Summer St. will be used for Enterprise Servers
The space and power regained in W91 will allow for the expansion of co-location services
Our Lovely New Room
Timeline
Working with the design & engineering firm Vanderweil on the room Fit Out
Target completion date for Fit Out construction & cabinets deployed – April 15 2008
Target completion for network Build Out – June 15 2008
Q1 FY09 Server Ops move 25% of servers
Q2-Q3 FY09 Server Ops move an additional 50%
Q4 FY09 Server Ops move last 25% of servers
Relocation Strategies
Relocate “simpler” environments first
Take advantage of virtualization in advance, if eligible
Locate applications/services on hardware renewal schedules
Establish advance network requirements (F5s, network fabrics, SAN)