21

New customer pack

Embed Size (px)

DESCRIPTION

Information for Customers

Citation preview

Page 1: New customer pack
Page 2: New customer pack

New Customer Pack

Page 3: New customer pack
Page 4: New customer pack

New Customer Pack

Page 5: New customer pack
Page 6: New customer pack

New Customer Pack

Page 7: New customer pack
Page 8: New customer pack

New Customer Pack

Page 9: New customer pack
Page 10: New customer pack

New Customer Pack

Page 11: New customer pack
Page 12: New customer pack

New Customer Pack

Page 13: New customer pack
Page 14: New customer pack

New Customer Pack

REQUEST FOR CREDIT ACCOUNT

Company Name Telephone

Email

Address Company Reg No

VAT Reg No

Post Code Telephone

Business Type: Public Limited Company / Private Limited Company / Partnership / Sole Trader Other(please specify)

Name of Proprietor/Managing Director or Partners in Partnership:

Bank Details Full Name & Address Post Code

Account Number Sort Code

Trade Reference (1) Address Post Code

Trade Reference (2) Address Post Code

Amount of credit per month £

Invoicing Address(if different from above) Post Code

General Contact Name Telephone email

Accounts Contact Name Telephone email

CREDIT TERMS see attached Standard Terms and Conditions of Sale January 2005

We accept Standard Terms and Conditions of Sale January 2005.

Signature Print Name Position Date

Page 15: New customer pack
Page 16: New customer pack

Details

Smoke Control Systems worked closely the main and elec-trical contractor to install two powered shaft systems dur-ing a conversion from commercial to residential use above Wallington Square Shopping Centre.

Each system comprised of a pressure controlled powered shaft with damper and grille assemblies at each fl oor level and a control panel with dual power supply monitoring and change over.

Client

Project

Value

Duration

Canvey Contractors - Wallington Square ph1 2 Powered Smoke Shaft Control Systems£50,000.00

5 Weeks

Wallington Square - London

Page 17: New customer pack

Details

Removal of existing roof vents and Control System and re-place with new.

Due to the poor state of the existing vents and their instal-lation system Smoke Control Systems came up with a vent design and installation not only reducing the installation costs but 50% but also did not eff ecting any of the existing glazing system seals.

This was a very time critical job with the fi rst vents being de-livered to site and fi tted within 3 weeks of receipt of order.

Working closely with Fanhear staff all work was carried out, out of hours thus not aff ecting footfall for the centre.

Client

Project

Value

Duration

Merseyway Shopping Centre

Roof Vent & Controls Refurbishment£75,000

6 Weeks

Merseyway - Stockport

Page 18: New customer pack

Details

Smoke Control Systems worked closely the main contrac-tor to help them achieve their completion dates on time, in-stalling a pressure diff erential controlled smoke shaft over 7 stories.

Installing all hardware including AOV Doors, Fansets and controls. Due to last minute building design change SCS were also asked at short notice to supply, install and com-mission a Smoke Curtain to the entrance lobby.

Client

Project

Value

Duration

Cubbitt - Idis Hotal Bristol

Powered Smoke Shaft & Smoke Curtian£50,000.00 +£5,000.00

10 Weeks

Ibis - Bristol

Page 19: New customer pack

Details

Design and Supply of control system for a natural smoke shaft

Working with the Ventilation Contractor Smoke Controls Systems designed a controls package incorporating the CommsMaster Control System to operate a series of damp-ers and ventilators in a natural smoke shaft.

Client

Project

Value

Duration

Cosaf - Great Ormand Street Hospital Natural Smoke Shaft Control system

£10,000.00

3 Weeks

Great Ormand Street Hospital-London

Page 20: New customer pack

Details

Smoke Control Systems worked closely the electrical con-tractor to help them achieve their completion dates on time for all phases of the in town waterside development for Mil-lar Homes

Each of the multi occupancy apartment blocks was installed with multizone control panels to interface the fi re alarm with a range of AOV windows and Roof vents.

Client

Project

Value

Duration

DJR Smith / Miller Homes -

Yarn Street-H2010

£50,000.00

52 weeks

H2010 - Leeds