New Competencies of TESDA in Electrical

Installation and Maintenance

By : Gamaliel F. Itao, P.E.E,M.Entr. President/GM, Industrial Controls Corporation

and Mechatronics Technologies Corporation

Page 2: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

ELECTRICAL INSTALLATION AND MAINTENANCE NC II

ELECTRICAL and ELECTRONICS Sector

Page 3: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNIT OF COMPETENCIES( EIM NC II)

Existing TR

Amended TR

Core Competencies •  Prepare electrical power and hydraulic tools

•  Perform roughing-in activities, wiring and cabling works for single-phase distribution, power, lighting and auxiliary systems

•  Install wiring devices of floor and wall mounted outlets, lighting fixtures/switches, and auxiliary outlets

•  Install electrical protective devices for distribution, power, lighting, auxiliary, lightning protection and grounding systems

•  Perform roughing-in activities for communication and distribution systems

•  Install wiring devices for floor and ground fault current interrupting outlets

•  Install electrical protection system for lighting and grounding

•  Install electrical lighting systems on auxiliary outlets and lighting fixtures

Page 4: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

Qualifica(onDescrip(ons

Existing TR

§ Electrical Installation and Maintenance NC II

§ The ELECTRICAL INSTALLATION & MAINTENANCE NC II Qualification consists of competencies that a person must achieve to enable him/her to install and maintain electrical wiring, lighting and related equipment and systems where the voltage does not exceed 600 volts in residential houses/buildings.

Amended TR

§ No Amendments

Page 5: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNIT OF COMPETENCIES

Existing TR

Amended TR

Basic Competencies

•  Participate in workplace communication •  No Amendments

•  Work in a team environment •  Practice career professionalism •  Practice occupational health and safety

procedures

Common Competencies •  Prepare construction materials and tools •  Unit codes amended

•  Observe procedures, specifications and manuals of instruction

•  Interpret technical drawings and plans

•  Perform mensurations and calculations

•  Maintain tools and equipment

Page 6: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC II:

Existing TR

Amended TR TOOLS EQUIPMENT MATERIALS

QTY ITEM QTY ITEM QTY ITEM

5 pcs. Spirit level 5 units Power drill 50

pcs. RSC

5 pcs. Hack saw 5 units

Portable grinder

50 pcs. IMC

5 pcs. Pipe cutter 1 unit Power saw 50

pcs. EMT

5 pcs. Plumb bob 5 units

Fire alarm system 5 pcs. Entrance cap

5 pcs. Pipe reamer 5 units

Pipe-in Music/ Paging

125 pcs. Locknut

5 pcs. Pipe threader

5 units

Security equipment

125 pcs. Bushing

5 pcs. Pipe bender 5 units CCTV 250

pcs. Metal strap

5 pcs. Bolt cutter 5 units MATV Master 10

pcs. Floor outlet

5 pcs. Jack hammer set

5 units

Car park ramp detector 5 pcs. Ground fault

TOOLS EQUIPMENT MATERIALS QTY ITEM QTY ITEM QTY ITEM

5 pcs. Spirit level 5 units Electric drill 25

pcs. RSC/IMC

5 pcs. Hack saw 5 units Portable grinder 5 pcs. Entrance cap

5 pcs. Pipe cutter 5 units Multi-tester 50

pairs Locknut & bushing

5 pcs. Pipe reamer 1 set

Fire alarm system (5units detector, 1 control panel)

5 pcs.

Ground Fault Current interrupting device (GFCI)

5 pcs. Pipe threader 3 sets Motion sensors 100

pcs. 3/16’ x 1” Metal Screw

5 pcs. Pipe bender 1 set

Security equipment Access Control

50 pcs.

Conduit strap/clamp

5 pcs. Bolt cutter 1 set CCTV (4 cameras, 1 DVR) 5 sets

Wiring boards, ¾ ft. x 4 ft. x 8 ft.

5 pcs. Ball hammer

5 units Clamp-on meter 10

pcs. Floor outlet

25 pcs.

Electrician Pliers 1 unit Insulation

Resistance Tester 25

pcs. Working gloves

Page 7: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC II:

Existing TR

Amended TR TOOLS EQUIPMENT MATERIALS

QTY ITEM QTY ITEM QTY ITEM

25 pcs.

Electrician Pliers

10 units Multi-tester 5 pcs.

Current interrupting outlet

25 pcs.

Screwdrivers set

5 units

Mega-ohmmeter

25 pcs.

Working gloves

25 pcs. Wrench box 5

units Clamp ammeter

25 pcs. Safety shoes

25 pcs. Wire splicer 5

units Megger 25 pcs.

Proper working clothes

25 pcs. Wire stripper 5

units High potential tester

25 pcs. Hard hat

25 pcs.

Electrician knife

5 units

Earth resistance tester

25 pcs.

Safety goggles

25 pcs. Tools holster 5

units Labeling machine

5 boxes

Wire AWG #12

5 pcs. Push-pull 0-5 mtrs

1 unit

Fire extinguisher KGS ABC

5 boxes

Wire AWG #14

5 pcs. Claw hammer

1 unit OHP 5 rolls Electrical

tape

5 pcs. Ballpeen hammer

5 units Industrial Fan 1 box Wood screw

½” x 8

TOOLS EQUIPMENT MATERIALS QTY ITEM QTY ITEM QTY ITEM

25 pcs. Screwdrivers set

1 unit

Earth resistance tester

10 pairs Safety shoes

5 pcs. Box Wrench 1 unit

Labeling machine 10 pcs. Hard hat

5 pcs. Wire splicer 1 unit

Fire extinguisher KGS ABC

10 pcs. Safety goggles

5 pcs. Wire stripper 1 unit

LCD Projector 5 boxes Wire AWG #12,

(3.5mm2)

5 pcs. Electrician knife     5 boxes Wire AWG #14

(2.0mm2)

10 pcs. Tools holster     5 rolls Electrical tape

5 pcs. Push-pull 0-5 mtrs     1 box Wood screw ½” x 8

5 pcs. Claw hammer     25 pcs. Receptacle surface

type

5 pcs. Prick punch     25 pcs. Receptacle flush type

5 pcs. Heat gun 1200 watts     25 pcs. Incandescent bulb

50 w/ 250V AC

5 pcs. Heavy-duty soldering iron     25 sets

Convenient outlet c.o. (grounding type,/flush type) 2 gang w/ plate and cover

Page 8: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

Existing TR

Amended TR TOOLS EQUIPMENT MATERIALS

QTY ITEM QTY ITEM QTY ITEM

5 pcs. Prick punch 50 m Circular loom (mica

tubing 3/8”)

5 pcs. Heat gun 1200 watts

25 pcs. Receptacle surface type

5 pcs.

Heavy-duty soldering iron 1000 watts

25 pcs. Receptacle flush type

5 pcs. Flat file smooth 8”

25 pcs. Incandescent bulb 50 w/ 250V AC

25 sets Convenient outlet C.O. (flush type) 2 gang w/ plate and cover

10 pcs PVC square box 4 x 4

100 pcs PVC clamp ½ 100 pcs PVC clamp ¾

50 Assorted condulet 50 mtrs Corrugated PVC ½”, ¾

5 pcs. Flat file smooth 8”     10 pcs. PVC square box, 4

x 4 5

Kgs. #16 G.I wire     25 mtrs

flexible conduit ½”, ¾

1 pc. Whiteboard 4 x 8 x ¾     10 pcs. PVC conduit ½, ¾

1 pc.

Whiteboard 4 x 4 x ¾ with movable stand

    25 pcs. Junction box PVC

1 box Whiteboard marker, assorted color

    25 pcs. Utility box

1 box Push pin     50 pcs Connectors PVC, ½

1 pc. Pencil sharpener     50 pcs Connectors PVC,

¾ 25

pcs. Pencil with eraser     50 pcs Connectors RSC,

¾ 2 kgs Rags     20 pcs. Elbow PVC ½

5 ltrs Cleaning agent liquid     20 pcs. Elbow PVC ¾

TOOLS EQUIPMENT MATERIALS

QTY ITEM QTY ITEM QTY ITEM

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training in Electrical Installation and Maintenance NC II:

Page 9: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.5 TRAINING FACILITIES

Existing TR

Amended TR

TEACHING/ LEARNING

AREAS

SIZE IN METERS

AREA IN SQ.

METERS

QTY TOTAL AREA IN

SQ. METERS

Lecture Area 5 x 8 40 1 40

Laboratory Area

5 x 8 40 1 40

Learning Resource Area

4 x 5 20 1 20

Tool Room / Storage Area

4 x 5 20 1 20

Wash ,Toilet & Locker Room

1 x 2 2 2 4

Sub-Total 124 Facilities / Equipment / Circulation**

** Area requirement is equivalent to 30% of the total teaching/learning areas 

38

TOTAL AREA

162

Based on class size of 25 students/trainees the space requirements for the teaching/learning and circulation areas are as follows:

  SPACE

REQUIREMENTS

  SIZE IN

METERS

  AREA IN

SQ. METERS

  TOTAL

AREA IN SQ.

METERS  

•  Student/Trainee Working Space

2.50 x 2.50 per student/

trainee

6.25 per student

  156.25

•  C o n t e x t u a l Learning

Laboratory

  4 x 5

  20

  20

•  L e a r n i n g Resource

Center

  4 x 5

  20

  20

•  F a c i l i t i e s / Equipment/

Circulation area

  10 x 6

  60

  60

  TOTAL AREA

      256.25

Page 10: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

SECTION 4: NATIONAL CERTIFICATION AND CERTIFICATION ASSESSMENTS

4.3 Accumulation and submission of all COCs acquired for the relevant units of competency comprising a qualification, an individual shall be issued the corresponding National Certificate.

4.4 Assessment shall focus on the core units of competency. The basic and common units shall be integrated or assessed concurrently with the core units.

4.5 The following are qualified to apply for assessment and certification: �  Graduate of formal, non-formal, and informal

including enterprise-based training programs. �  Experienced workers (wage employed or self

employed)

4.6 The guidelines on assessment and certification are discussed in detail in the “Procedures Manual on Assessment and Certification” and “Guidelines on the Implementation of the Philippine TVET Qualification and Certification System (PTQCS)”.

Existing TR

Amended TR

4.5 For those holders of existing National Certificate (NC) of individuals in Electrical Installation and Maintenance NC II, automatic conversion will be implemented.

4.6 Clustering of competencies is not applicable.

4.7 Individuals who already possess Certificate of Competency (COC) in Electrical Installation & Maintenance NC II are advised to take the assessment for this amended TR on or before the expiration of their COCs.

4.8 The guidelines on assessment and certification are discussed in detail in the “Procedures Manual on Assessment and Certification” and “Guidelines on the Implementation of the Philippine TVET Competency Assessment and Certification System (PTCACS)”.

Page 11: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 12: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 13: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 14: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 15: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 16: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 17: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 18: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

¢ Task: ROUGHING-IN ACTIVITIES ¢ Layout the wiring booth for specific location of the panel, boxes

(utility box -UB) ¢ Octagonal (box- OB) and fittings. ¢ Apply the types of bend necessary for the test package. ¢ Mount and install the conduit with conduit strap.

Page 19: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

LIST OF MATERIALS, TOOLS & EQUIPMENT (PER CANDIDATE)

NAME SPECIFICATION QUANTITY 1 Octagonal Box 4” x 4” Dip type PVC 7 pcs. 2 Utility Box 2” x 4” Dip type PVC 4 pcs. 3 Square Box 6‘ x 6“ 1 pc.

4 Panel Board 16“ x 12“ x 6“ w/ one 60 AT MCB and 4 branches (2-15AT & 2-20AT

1set.

5 Conduit ½” diameter (8’) PVC 3pcs 6 Conduit Strap ½” diameter two hole 16pcs 7 Metal Screw 3/16“ x 1 “ 50 pcs. 8 Cable wire #3.5 mm², THW Stranded Cu. wire 6m 9 Cable wire #2.0 mm², THW Stranded Cu. wire 20m

10 Lock nut and bushing ½” diameter PVC 24 pcs. 11 Straight Connector ½” diameter PVC 24 pcs 12 PVC Cement Natural 1 pint 13 Tape Electrical (Friction) Tape 2 roll

Hand Tools 14 Heat gun 100 w, 230 V 1 pc 15 Pliers Standard 1 pair 16 Screwdrivers Standard (+,-) 2 pcs 17 Hacksaw Standard 1 pc 18 Electrician knife Standard 1 pc

Page 20: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 21: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNITS OF COMPETENCY: Install wiring devices of floor and wall mounted outlets, lighting fixtures/switches and auxiliary outlets Instructions: ¢ Prepare the materials, devices and auxiliary device for the

installation ¢  Install the circuit home run for convenience outlet. ¢ Set the CCTV monitor/recorder in accordance with the

requirement. ¢  Install the CCTV Camera based on the required location. ¢ Perform testing and commissioning activities.

QUALIFICATION: ELECTRICAL INSTALLATION & MAINTENANCE

Page 22: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 23: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

LIST OF MATERIALS, TOOLS & EQUIPMENT

NAME SPECIFICATION QUANTITY

Utility Box 2” x 4” Deep type PVC 2 pcs.

Panel Board 16“ x 12“ x 6“ w/ one 60 AT MCB and 4 branches (2-15AT & 2-20AT 1 set

Cable wire #3.5 mm², THW Stranded Cu. wire 5 M Metal Screw 3/16“ x 1 “ 30 pcs. Conduit Strap ½” diameter two hole 10 pcs. Conduit ½” diameter (8’) PVC 2 pcs.

CCTV AND AUXILLIARIES

Camera Z-D V800C (Vandal Proof Day and Night View Indoor Camera) 2 units

Recorder ATTN 8-Channel NVR (OPS-HD 7208PN) HD NVR RECORDER 1 unit

Monitor AOC 18.5 Wide LED Monitor 1 unit Adapter AC/DC CCTV Adapter 12 v/5A 1unit Power Splitter CCTV 8 port DC Power Splitter 1 unit Hand Tools Pliers Standard 1 pair Screwdrivers Standard (+, -) 2 pcs. Hack saw Standard 1 pc. Electrician Knives Standard 1 pc. Heat gun 100 w, 230 V 1 pc.

INSTRUMENTS Multi-tester Analog type, tester 1 unit Insulation Tester Analog type Insulation tester 1 unit

Page 24: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

¢ SAMPLE TASK PACKAGE: ¢ Prepare the materials and tools as per job requirement ¢ Install the protective device feeding the Fire Alarm System in the panel board, ¢ Terminate the entire circuit home run base on the load scheduling. ¢ Install all the necessary fittings such as Utility Boxes, Square Box/Pull Box, Octagonal Boxes and Fire Alarm Control Panel. ¢ Set and Install Manual Pull Station, Fire Alarm Bell, and the Conventional Smoke Detector.. ¢ Perform testing and commissioning activities.

DEMONSTRATION

Page 25: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

INSTALLATION SETUP (SET B)

Page 26: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

LIST OF MATERIALS, TOOLS & EQUIPMENT

NAME SPECIFICATION QUANTITY

Pull Box 4” x 4” SQUARE BOX 2 pcs Box 4“ x 4“ Octagonal PVC Box 3 pcs Cable wire #2.0 mm², THW Stranded Cu. wire 5 M Metal Screw 3/16“ x 1 “ 24 pcs. Conduit Strap ½” diameter two hole 10 pcs. Conduit 3/4” diameter (8’) PVC 2 pcs.

FIRE ALARM SYSTEM AND AUXILLIARIES

Fire Alarm System Panel 8” x 10” x 6” Panel Enclosure 1 pc

Smoke Detector Standard 2 unit Fire Alarm Bell Standard 1 unit

Manual Pull Station Switch Standard 1unit

Hand Tools Pliers Standard 1 pair Screwdrivers Standard (+, -) 2 pcs. Hack saw Standard 1 pc. Electrician Knives Standard 1 pc. Heat gun 100 w, 230 V 1 pc. Screw Driver Jeweller Screw Driver (Assorted Size) 1 set Wire Stripper Automatic Wire Stripper (Standard) 1 pair Tape Electrical (friction) Tape 1 roll

INSTRUMENTS Multi-tester Analog type, tester 1 unit

Page 27: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

GOING IN GOING OUT

ML - Magnetic Lock EB - Exit Button EBG – Emergency Break Glass DC - Door Contact

Exit Button

EBG EBG

EBG EB

ML

BRC

BRC – Biometric Reader and Controller

Sample Test Package 1 Door Access Control System

DC

Page 28: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

GOING IN

EIM NCII Sample Test Package 1 Door Access Control System Conduit Layout

PVC ¾”

90deg bend UB1

UB4 UB3 UB2

UB1 – PVC Utility Box for ML UB2 – PVC Utility Box for BRC UB3 – PVC Utility Box for EBG UB4 – PVC Utility Box for EB A1 – 300x300x200mm Box for 20A Circuit Breaker, Power Supply Module and 12VDC Battery

A1

90deg bend

Industrial Socket (F)

300mm

300mm

RSC ¾”

Page 29: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

ELECTRICAL INSTALLATION AND MAINTENANCE NC III

ELECTRICAL and ELECTRONICS Sector

Page 30: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNIT OF COMPETENCIES

Existing TR

Amended TR

Core Competencies •  Prepare electrical and hydraulic tools

•  Perform roughing-in and wiring activities for three-

phase distribution system for power, lighting and motor control panel

•  Perform installation of data measurement and control system on electrical and auxiliary equipment

•  Install, assemble, test and maintain motor control system

•  Perform roughing-in and wiring for activities for bus and underfloor ducts

•  Perform installation of wiring devices for floor and ground fault current interrupting outlets

•  Perform installation of standard electrical protection system for lightning and grounding

•  Perform installation of electrical lighting systems, auxiliary outlets and lighting fixtures

•  Perform installation of data measurement and control system on electrical and auxiliary equipment

•  Assemble and install electrical lighting and motor control systems

•  Perform maintenance and troubleshooting works

Page 31: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNIT OF COMPETENCIES

Existing TR

Amended TR

Basic Competencies •  Lead workplace communication •  No Amendments •  Lead several small working teams •  Develop and practice negotiating skills with team

members •  Guide effective solutions to problems arising from work

activities •  Check and develop the use mathematical concepts and

techniques

•  Use relevant technologies applicable to assigned work

Common Competencies •  Prepare construction materials and tools •  Prepare construction materials and tools •  Ensure compliance with standard procedures,

specifications and manuals of instruction •  Observe procedures, specifications and manuals of

instruction

•  Interpret and follow technical drawings and plans •  Interpret technical drawings and plans

•  Supervise mensurations and related computations •  Perform mensurations and calculations

•  Supervise proper use and maintenance of tools and equipment

•  Maintain tools and equipment

Note: Other unit titles are rephrased

Page 32: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

ELECTRICAL INSTALLATION AND MAINTENANCE NC III

¢  A person who has achieved this qualification is competent to be:

¢ Assistant Supervising Technician ¢ Assistant Electrical Supervisor ¢ Assistant Electrical Foreman ¢ Electrical Leadman

§  A person who has achieved this qualification is competent to be:

§  Industrial Electrician §  Electrical Lead man §  Electrical Foreman

Existing TR

Amended TR

Page 33: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

SECTION 3: TRAINING STANDARDS

3.1 Curriculum Design:   Course Title: ELECTRICAL INSTALLATION AND MAINTENANCE NC Level : NC III

Nominal Training Hours: 20 Hours (Basic Competencies)

+ 32 Hours (Common Competencies) 344 Hours (Core Competencies) --------------------------------------- 396 Hours - TOTAL

  Course Description:

This course is designed to equip individual with operational skills required for Electrical Installation & Maintenance III with learning outcomes, methodology and assessment approach as listed herein. Trainees who have completed training in or are holders of Electrical Installation & Maintenance NC II may forego training in core units of competency (1) to (5).

3.1 Curriculum Design:   Course Title: ELECTRICAL INSTALLATION AND MAINTENANCE NC Level : NC III

Nominal Training Hours: 32 Hours (Basic Competencies)

+ 32 Hours (Common Competencies) 96 Hours (Core Competencies) --------------------------------------- 160 Hours - TOTAL

  Course Description: § This course is designed to develop & enhance the knowledge, skills, & attitudes of an electrical, mechatronics and automation technician, in accordance with industry standards. It covers the basic & common competencies in addition to the core competencies as enumerated in Section 1 of this training regulations.

Existing TR

Amended TR

Page 34: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.2 TRAINING DELIVERY

¢  Supervised industry training or on-the-job training is an approach in training designed to enhance the knowledge and skills of the trainee through actual experience in the workplace to acquire a specific competencies prescribed in the training regulations.

¢  Distance learning is a formal education process in which majority of the instruction occurs when the students and instructors are not in the same place. Distance learning may employ correspondence study, or audio, video or computer technologies.

§  The traditional classroom-based or in-center

instruction may be enhanced through use of learner-centered methods as well as laboratory or field-work components.

2.2 Enterprise-Based:

§  Formal Apprenticeship – Training within employment involving a contract between an apprentice and an enterprise on an approved apprenticeable occupation.

§  Enterprise-based Training- where training is implemented within the company in accordance with the requirements of the specific company. Specific guidelines on this mode shall be issued by the TESDA Secretariat.

Existing TR

Amended TR

Page 35: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.3 TRAINEE ENTRY REQUIREMENTS

To qualify as trainee for Electrical Installation & Maintenance NC III, a candidate must be:

¢  a holder of Electrical Installation & Maintenance NC II or equivalent experience and training

¢  able communicate both orally and in writing ¢  physically and mentally fit ¢ with good moral character ¢  can perform basic mathematical computation

This list does not include specific institutional requirements such as educational attainment, appropriate work experience, and others that may be required of the trainees by the school or training center delivering the TVET program.

The trainees who wish to enter the course should possess the following requirement/s:

§ Must be a holder and/or have undergone

training in Electrical Installation & Maintenance NC II or Mechatronics Servicing NC II

This list does not include specific institutional requirements such as educational attainment, appropriate work experience, and others that may be required of the trainees by the school or training center delivering the TVET program.

Existing TR

Amended TR

Page 36: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC III:

Existing TR

Amended TR

TOOLS MATERIALS Qty. Description Qty. Description 5 pcs. Crimping tools 5 pcs. Circuit breakers/Fuses

(Din rail type)     5 pcs. PLC materials

5 pcs. Pliers 5 pcs. Relays (Din rail type) 5 sets Screw drivers 5 pcs. Timers (Din rail type) 5 sets Wrenches (box &

open) 5 pcs. Terminal Blocks/Lugs

(Din rail type) 5 pcs. Wire splicers/

strippers 5 pcs. Pilot lamps

5 pcs. Measuring tools (e.g. Pull-push meter)  

5 pcs. Actuators   20 pcs. Push buttons (panel

type)

20 pcs. Selector Switches (panel type)

5 lengths Cable duct

4 lengths Din rail

3 packs Wire Strap 20 pcs. Wire Markers 5 pack Cable Tie

20 meters Cable (Royal cord)

TOOLS/INSTRUMENT MATERIALS

Qty. Description Qty. Description 5 units Measuring tools (e.g.

Pull-push meter) 5 pcs. Circuit breakers/Fuses

(Din rail type)

5 pcs. Crimping tools 15 pcs. Controller/Contactors 5 pcs. Pliers 10 pcs. Relays (Din rail type) 5 sets Screw drivers 5 pcs. Timers (Din rail type) 5 sets Wrenches (box &

open) 5 pcs. Terminal Blocks/Lugs

(Din rail type) 5 pcs. Wire splicers/

strippers 15 pcs./

color Pilot lamps (red, green,

yellow) 5 pcs. Multi-Tester/VOM 5 pcs. Actuators/solenoids

5 units Insulation Tester 5 pcs. NO Push buttons (panel type)

5 pcs. Spirit level 5 pcs. NC Push buttons (panel type)

5 pcs. Hack saw 5 pcs. Selector Switches (panel type)

5 pcs. Pipe cutter 5 lengths Cable duct 5 pcs. Pipe reamer 4 lengths Din rail 5 pcs. Pipe threader 3 packs Wire Strap 5 pcs. Pipe bender 5 pcs. Wire Markers 5 pcs. Bolt cutter 5 pack Cable Tie

Page 37: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC III:

Existing TR

Amended TR

EQUIPMENT MATERIALS Qty. Description Qty. Description

5 units Power supply 10 pcs. Glands/Grommet

  - Automatic Voltage Regulator (AVR)

2 boxes Conductors

  - Un-interruptible power supply (UPS)

5 rolls Insulators

5 units Generators and motors

20 pcs. Proper working clothes

5 units Transformer Forms/Manuals 5 units Capacitors

As

requ

ired

PLC plan and specification

5 units Inverters/Rectifiers Requisition form(s) 5 units Controllers Industry/Institution

Quality Manual 10 sets - Motor controls User’s guide  1 set - Electro-mechanical

controllers (e.g. Solenoid)

Drawings/diagrams

1 set - Electro-Pneumatic controller

5 pcs. Pressure gauge

TOOLS/INSTRUMENT MATERIALS Qty. Description Qty. Description

5 pcs. Ball hammer 20 meters Cable (Royal cord) 5 pairs Electrician Pliers 10 pcs. Glands/Grommet 5 pcs. Box Wrench 2 boxes Conductors 5 pcs. Wire splicer 5 rolls Insulators 5 pcs. Wire stripper 5 pcs. Proper working clothes

5 pcs. Electrician knife 300 m TF (75m or 150m per box)

or automotive wires, (30m)

5 pcs. Tools holster 5 sets Wiring boards, ¾’x4’x8’ 5 pcs. Push-pull 0-5 mtrs 25 pcs. RSC/IMC 5 pcs. Claw hammer 5 pcs. Entrance cap

5 units Multi-tester 50 Pairs. Locknut & bushing

EQUIPMENT 100 pcs. 3/16’ x 1” Metal Screw 3 units Motors, 3-phase, 220

volts 50 pcs. Conduit strap/clamp

5 units Electric drill 5 boxes Wire AWG #12, (3.5mm2) 5 units Portable grinder 5 boxes Wire AWG #14(2.0mm2) 2 units Automatic Voltage

Regulator (AVR) 5 rolls Electrical tape

3 units Clamp-on meter 5 Kgs. #16 G.I wire

1 unit Insulation resistance tester 1 pc. Whiteboard 4’ x 8’ x ¾’

Page 38: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC III:

Existing TR

Amended TR

EQUIPMENT Qty. Description

5 pcs. Pressure Analyzer/ Gauge manifold

   

5 pcs. Leak tester 10 units Micro PLC  

25 lic. PLC Simulator Software

 

EQUIPMENT MATERIALS Qty. Description Qty. Description

1 unit Earth resistance tester 1 pc. Whiteboard 4 x 4 x ¾ with movable stand

1 unit Labeling machine 1 box Whiteboard marker, assorted color

1 unit Fire extinguisher KGS ABC 2 pcs. Whiteboard eraser

magnetic 1 unit LCD Projector 1 box Push pin

PPEs 1 pc. Pencil sharpener Qty. Description 3 boxes Pencil with eraser

25 pcs. Working gloves 2 kgs Rags

10 pairs Safety shoes 5 ltrs Cleaning agent liquid

10 pcs. Hard hat 1 unit First aid kit

10 pcs. Safety goggles 2 reams Bond paper   Forms/Manuals

Qty. Description

As

requ

ired

Motor Controller and specification

    Requisition form(s)

    Industry/Institution Quality Manual

    User’s guide     Drawings/diagrams

Page 39: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.5 TRAINING FACILITIES

Existing TR

Amended TR

TEACHING/ LEARNING

AREAS

SIZE IN METERS

AREA IN SQ.

METERS

QTY TOTAL AREA IN

SQ. METERS

Lecture Area/

Laboratory Area

5 x 8

5 x 8

40

40

1

1

40

40

Learning Resource Area

4 x 5 20 1 20

Tool Room / Storage Area

4 x 5 20 1 20

Wash ,Toilet & Locker Room

1 x 2 2 2 4

Sub-Total 124 Facilities / Equipment / Circulation**

** Area requirement is equivalent to 30% of the total teaching/learning areas 

38

TOTAL AREA

162

Based on class size of 25 students/trainees the space requirements for the teaching/learning and circulation areas are as follows:

  SPACE

REQUIREMENTS

  SIZE IN METERS

  AREA IN

SQ. METERS

  TOTAL

AREA IN SQ.

METERS  

•  Student/Trainee Working Space

2.50 x 2.50 per student/

trainee

6.25 per student

  156.25

•  C o n t e x t u a l Learning

Laboratory

  4 x 5

  20

  20

•  L e a r n i n g Resource

Center

  4 x 5

  20

  20

•  F a c i l i t i e s / Equipment/

Circulation area

  10 x 6

  60

  60

  TOTAL AREA

      256.25

Page 40: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.6 TRAINER’S QUALIFICATIONS

ELECTRICAL INSTALLATION & MAINTENANCE NC III

 

The trainer who will handle the course must have the following qualifications:

�  Be a graduate of BS in Industrial Education, Major in Electrical Technology or its equivalent

�  Must have undergone training on Training Methodology III

�  He must be a holder of at least Electrical Installation & Maintenance NC IV

�  Good moral character �  Must be computer literate �  Must be physically and mentally fit �  Minimum of three (3) years relevant job/industry

experience*

 

*Optional. Only when required by the hiring institution

Reference: TESDA Board Resolution No. 2004-03

 

Electrical Installation and Maintenance NC III

The trainer who will handle the course must have the following qualifications:

§  a holder of NTTC I in Electrical Installation & Maintenance NC III or higher

§  Have at least three (3) years relevant job/ industry or teaching experience

Existing TR

Amended TR

Page 41: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

3.7 INSTITUTIONAL ASSESSMENT

Institutional assessment is undertaken by trainees to determine their achievement of units of competency. A certificate of achievement is issued for each unit of competency.

Institutional assessment is undertaken by trainees to determine their achievement of units of competency. A certificate of achievement is issued for each unit of competency.

The result of the institutional assessment may be considered as evidence for the assessment for national certification. As a matter of policy, graduates of programs registered with TESDA under this training regulation are required to undergo mandatory national competency assessment upon completion of the program.

Existing TR

Amended TR

Page 42: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

UNITS OF COMPETENCY:

¢  INSTALL, ASSEMBLE, TEST AND MAINTAIN MOTOR CONTROL SYSTEMS

Task: ¢ Prepare and select the materials, tools and equipment, ¢ Select appropriate motor and control component sizes and ratings ¢  Inspect motor and motor control components ¢ Wire a control circuit for a wye-delta reduced voltage starter ¢ Wire a power circuit for a wye-delta reduced voltage starter ¢ Perform test run on the motor

Page 43: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

POWER CIRCUIT

Page 44: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

CONTROL CIRCUIT

Page 45: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 46: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 47: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 48: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 49: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

ELECTRICAL INSTALLATION AND MAINTENANCE NC IV

ELECTRICAL and ELECTRONICS Sector

Page 50: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

NC IV COMPETENCIES ELECTRICAL INSTALLATION AND MAINTENANCE

1.  Supervise/Monitor Installation and Maintenance of electrical system , auxiliary including control , Lighting and Power and protection equipment/System ;

2.  Perform commissioning of electrical equipment /system; 3.  Perform programming and installation of Basic PLC System.

Page 51: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

PROGRAMMABLE LOGIC CONTROLLERS

•  Defined by NEMA as a digital electronic apparatus with a programmable memory for storing instructions to implement specific functions (logic, sequencing, timing, counting, and arithmetic) to control machines and processes.

• Considered as the first industrial-based computer

Page 52: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

ADVANTAGES OF USING PLC

Shorter Project Implementation

Easier Modification Without Cost Penalty

Design Easily Change Using Software

Project Cost Can be Accurately Calculated

Shorter Training Time Required

A Wide Range of Control Operations

Easy Maintenance

Able to Withstand Harsh Plant Environment

High Reliability

Standardization of Controller Hardware

Page 53: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

FUNCTIONS OF PLC

Sequence Control

Conventional Relay Logic Replacer

Timer and Counter Functions

Auto / Semi / Manual Control of Machines and Processes

Sophisticated Control

Arithmetic Operations

Analog Control (Temperature, Pressure, etc.)

PID (Proportional Integral Derivation)

Stepper / Servo Motor Control

Page 54: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

CONTROL SYSTEM

I. OPEN LOOP SYSTEM

INPUT LOGIC OUTPUT

- Pushbuttons

- Limit Switches

- Level Switches

- Flow Switches

- Relays

- Timers

- Counters

- Motors

- Solenoid valves

- Lamps

PLC

Page 55: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

BASIC CONTROL SYSTEM

Closed Loop System

Controller Final Control Element

Process Variable

Transmitter

Set value

Error

Process Variable Primary

Element / Transducer

Temperature

Flow +

_

Page 56: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

A TYPICAL CONTROL SYSTEM (ELECTROMECHANICAL)

CONTROLLER

CNT

ELECTRONIC CARDS

RESET

COUNTER

CLOCK

TIMER COIL

LATCHING COIL

COIL

RELAY

8 8 8

INPUT DEVICES

PUSHBUTTON

LIMIT SWITCH

THUMB WHEEL SWITCH

LEVEL SWITCH

FLOW SWITCH

OUTPUT DEVICES

HEATER

8 8

MOTOR

SOLENOID

LED DISPLAY

HEATER

LAMP

Page 57: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

STEPS IN PLC PROGRAMMING

Draw the Schematic Diagram

Draw Control Diagram

Develop PLC Ladder Diagram

I/O Assignment

Convert to Mnemonic (Boolean)

PLC Layout

Page 58: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

HARDWARE COMPONENTS

Central Processing Unit (CPU)

Power Supply

Input Module

Output Module

Peripheral Device

Page 59: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

SOFTWARE COMPONENTS

1. Ladder Diagram Language – a symbolic instruction type language

2. Boolean Language- Basic level language that composed of three (3) Boolean logic operation: AND, OR, NOT

4. English Statement Language – considered derivative of computer language such as BASIC.

3. Functional Blocks Language – high level instructions that permit the user to program more complex functions using the ladder diagram format

Page 60: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

6 DESIGN STEPS IN PLC BASED SYSTEM STEP I. SCHEMATIC OR POWER DIAGRAM

Exercise 1 FORWARD/ REVERSE SCHEMATIC DIGRAM OF 3-PHASE MOTOR

M

Page 61: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

STEP II.CONTROL DIAGRAM (RELAY DIAGRAM) OF EXERCISE 1 PB FORWARD

PB STOP

REV

FWD

FWD

REV

FWD

REV

Page 62: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

100 01

100 02

STEP IV. PLC DIGRAM

1 3 10002

10001 10001

10002

3 2

STEP III. INPUT/OUTPUT ASSIGNMENT OF EXERCISE 1 PB FWD –1 FWD-10001

PB REV - 2 REV-10002

PB STOP- 3

Page 63: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

STEP V. (BOOLEAN/MNEMONIC STATEMENTS) OF EXERCISE 1

ADDRESS/STEP INSTRUCTION DATA 0 LD 1 1 OR 10001 2 ANDN 3 3 ANDN 10002 4 OUT 10001 5 LD 2 6 OR 10002 7 ANDN 3 8 ANDN 10001 9 OUT 10002 10 END

Page 64: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

STEP VI. PLC LAY-OUT

CENTRAL PROCESSING UNIT

1 2 3

FWD

REV

L1 L2

INPUT MODULE OUTPUT MODULE

Page 65: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 66: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 67: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic
Page 68: New Competencies of TESDA in Electrical Installation …iiee.org.ph/wp-content/uploads/2018/01/RME-FINAL_EIM-NC-I-IV...TESDA in Electrical ... Prepare electrical power and hydraulic

¢  THANK YOU

[email protected]