g
Attracting PPP Investment
The role of the Technical Advisor
Making infrastructure deals more bankable
Burak Sencer
June 2015
g About Mott MacDonald
g Infrastructure Finance Services
PPP services we provide…
Public Sector Private Sector
• PPP programme generation • Sponsors Procurement Advisor
• Feasibility Study / Business Case • Lenders Technical Advisor
• PPP Procurement • Investors Due Diligence Advisor
• ‘Shadow’ LTA • Sponsors Risk Advisor
• Capacity building • Post FC Monitoring
• Independent Checker • Insurer’s Advisor
• Contract Manager • Operational Stage Monitoring
g
• The amount of risk exposure, or potential adverse impact
of an event, that an investor is willing to accept
• Where an investor cannot quantify the risk exposure, an
independent expert is often employed to advise on this
• Sponsor risk management techniques (treatments and
controls) are used to eliminate risks or maintain risks at
an acceptable level
Risk Appetite / Risk Tolerance
g
Risk Management Standard (AS/NZ 4360:2004)
Identification: What can go wrong?
Context: Assess strategic and
organisational context.
Analysis/Measurement:
Assess risk likelihood &
consequence. Review controls.
Assessment/Prioritisation:
Compare risks. Set risk
priorities.
Treatment Options: Reduce,
avoid, transfer or retain.
Assess risks and controls
Establish context
Identify risks
Treat risks
Evaluate risks
Analyse risks
Risk Management Cycle
g
1. Consortia competence and capacity
2. Technical risks (design and site conditions)
3. Methodology and programme
4. Facilities management and lifecycle risks
5. Cost / Pricing risks
6. Payment Mechanism risks
7. Contract risk allocation and magnitude
Key Private Finance Risk Areas
g Consortium Competence & Capacity
• Completeness of consortium team
• Management, organisational and contract structure
• Project Sponsor(s)
• Construction contractor(s)
• Design supply chain
• Principal subcontractors
• Asset / Facilities Maintenance Contractor(s)
• Soft Facilities Management services providers
• Facilities Management subcontractors
g Technical Risks
• Authority requirements
• Site risks
• Environmental risks
• Ground conditions
• Planning and authorisations
• Design solution
• Civil / structural solution
• Mechanical / electrical solution
• Environmental solution
g Facilities / Asset Management & Lifecycle
• Authority services requirements
• ‘Availability’ definition
• Failure events
• ‘Qualitative’ failures
• Response and rectification times
• Services Methodologies
• Resource plans
• Specification compliance
• Planned preventative maintenance proposals
g Payment Mechanism Risk
• Availability / utilisation payment
• Unavailability deductions
• Services payment
• Service failure deductions
• Caps on deductions
• Energy consumption (volume and/or tariff risk)
• Quality failure points
• Calibration of penalties
g Contract Technical Risks
• Variations procedure
• Changes in Law
• Delay, Relief & Compensation events
• Longstop Date
• Liquidated Damages
• Termination (Default and Compensation)
• Liability Caps
• Pass Through
g When should the TA get involved?
Pre-
Qualification
Tender
Period
Tender
Preparation
Evaluation
and
Preferred
Bidder
Negotiations
to Financial
Close
Construction
Operation Operation
g PPP Project/Pipeline Generation
• Government capacity building
• Knowledge transfer
• Dissemination of best practice
• Avoiding investment ‘show-stoppers’
• Filtering projects for PPP suitability
• Standardisation of documentation
• Develop PPP Business Cases
g
www.mottmac.com
Helping to make PPP deals bankable
Thank You
Burak Sencer
Mott MacDonald Turkey
Sun Plaza, Kat 13
Maslak Mah. Bilim Sk
Sisli-Maslak, Istanbul
Tel: +90 (0)212 366 5819
Mobile: +90 (0)549 350 5066
Email: [email protected]