26
New and In-Process New and In-Process Software Capabilities Software Capabilities Status Update to AIM FRB Status Update to AIM FRB Danette Likens and Jamie Stewart, AIM ISD Support 23-25 Aug 11

New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Embed Size (px)

Citation preview

Page 1: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

New and In-Process New and In-Process Software Capabilities Software Capabilities

Status Update to AIM FRBStatus Update to AIM FRB

Danette Likens and Jamie Stewart, AIM ISD Support

23-25 Aug 11

Page 2: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

OverviewOverview• Summary of AIM I and AIM II 5.0 Functionality

‒ Demo of selected Functionality• Summary of CPM 5.0

‒ Demo of selected Functionality• Summary of LO Module 5.0 Functionality

‒ Demo of selected Functionality• Summary of in-process software capabilities

‒ CPM‒ LO Module‒ AIM I‒ AIM II

• Discussion of potential future capabilities

Page 3: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of AIM I/II in Rel 5.0Summary of AIM I/II in Rel 5.0• FRB Prioritized ACRs

‒ Supporting AIM I and AIM II• Include:

‒ AIM II Content Comparison Report/Chg Pkg‒ AIM I Exercise Controller Guide support‒ AIM II Associated Curriculum Documents

• Numerous Smaller Items:‒ Ease of Use

• NETC specific items (mostly related to TPP)

Note: Details of functionality in backup slides (time permitting).

Page 4: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of AIM I/II in Rel 5.0Summary of AIM I/II in Rel 5.0(contd)(contd)

• Some other items include:‒ Standardized Introduction DP’s (Establish contact, etc.)‒ Enhanced COI Split/Join Unit Topic functionality

Select EO, click “Join EO”, select another EO (even from another TO)

‒ Spell check – Course, Module, Lesson, Section

Note: Details of functionality in backup slides (time permitting).

Page 5: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM Rel 5.0Summary of CPM Rel 5.0• NLOS search capability• More ISD Considerations items support IMDP

report• TPP Modification/Cancelation • Warn to Save before Exit• Select All for checkbox functionality• JDTA Enhancements

‒ Copy and link/paste (in Project tab, too)‒ Search – Condition, Standard, Source

Note: Details of functionality in backup slides (time permitting).

Page 6: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

OCCSTDS Support in CPMOCCSTDS Support in CPM• How did we get here?:

– Started with NETC N74/NAVMAC discussions– AIM Team Provided a CPM “sandbox” for NAVMAC

familiarization– NAVMAC developed an OCCSTDS Storybook PPT to describe

high-level functionality– Initial OCCSTDS tab implementation in Rel 5.0 for

creation/management of OCCSTDS data by NAVMAC – crawl functionality

• Working toward business rule definition of:– How OCCSTDS data pulls forward into JDTA tab– Life-cycle impacts of OCCSTDS revisions on JDTA-based learning

content

Page 7: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of LO Module Rel 5.0Summary of LO Module Rel 5.0• Spell check – Course, Module, Lesson,

Section• Sub-DPs for ILT (with RIAs)• Before and after text for RRL links• Update from EDE (no data loss)• Copy and paste elements and resources

Note: Details of functionality in backup slides (time permitting).

Page 8: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of In-ProcessSummary of In-ProcessFunctionalityFunctionality

• FEA support in CPM• NETC tasked and funded priorities• NAVSPECWARCEN funded AIM II

enhancements• MT Continuum lessons learned – ACRs in

process

Note: Details of functionality in backup slides (time permitting).

Page 9: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

NAVEDTRA 139 Driving Changes NAVEDTRA 139 Driving Changes to CPM - Post 5.0to CPM - Post 5.0

Note: BCA support in CPM to follow.

Page 10: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Upcoming Tasked/Funded ChangesUpcoming Tasked/Funded Changes• Course Master Schedule (CMS) re-engineering per

NETC N7/AIM FRB working group AIM Change Request

• Improved semi-automated functionality for repurposing traditional AIM LP/TG content curricula into LO Module *

• CTTL Report Capability in CPM• Selection of traditional CTTL (and other tiered data)

for semi-automated pre-conference population of JDTA data

• LP/TG portion marking to support classified curricula and supporting documents

* Multiple DP, RIA, RRL tiered items at the same time.

Page 11: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Upcoming Tasked/Funded ChangesUpcoming Tasked/Funded Changes(contd)(contd)

• Center-based filtering of selections in CPM• CPM ‘gatekeeper’ functionality to reduce duplication

and promote standardization• Interfaces with BAH Atlas Pro toolset (LMS / ROCCE /

Assessment Engine / Survey Engine)• AIM II Modification TPP• Migration from SQL Server to Oracle as backend

database to leverage Navy enterprise license

Page 12: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Discussion of Potential FunctionalityDiscussion of Potential Functionality• Test Plan

– Needs updating in AIM I and AIM II to support NAVEDTRA 132 requirement – Have input from CPPD which is a good start on potential ACR

– Not covered in CPM/LO Module*

• Sub-elements in LO Module for self-paced rather than just ILT‒ How many levels?‒ LO Module ILT supports 4 total

* Test Plan was not part of CPM/LO Module design, the thought at that time was that all test work would be done in QM Perception.

Page 13: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Questions?

Page 14: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Backup Slides

Page 15: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0

Page 16: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0(contd)(contd)

Page 17: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0(contd)(contd)

Page 18: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1

Page 19: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1(contd)(contd)

Page 20: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1(contd)(contd)

Page 21: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0

Page 22: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Page 23: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Page 24: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Page 25: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Page 26: New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)