Upload
energy-dealers
View
214
Download
0
Embed Size (px)
Citation preview
8/8/2019 Networking BR Latvia
1/40
Renewable Energy
research, employmentand education
features in LatviaProf. Gotfrids Noviks,
University of Rezekne,LatviaFlorianpolis, Brazil, 10th June 2009
International JELARE
Networking Workshop
Education&Researchon
RenewableEnergy
at
EuropeanandLatin
AmericanUniversities
8/8/2019 Networking BR Latvia
2/40
LATVIA
10th June, 2009Florianopolis
2
Project is funded
by the EuropeanUnion
Baltic sea
64milj. km2
2,3 milj
inhabitants
8/8/2019 Networking BR Latvia
3/40
The structure of primary resources ofenergy used in Latvia
10th June, 2009Florianopolis3
Project is fundedby the EuropeanUnion
32,6 32,632,3
31,6
34,5
0
20
40
60
80
100
120
140
160
180
200
2000 2001 2002 2003 2004
PJ
20
22
24
26
28
30
32
34
36
38
40% Importt
elektroenerija
Vja enerija
Hidroenerija
Biogze
Dabas gze
Koksne
Kdra
Ogles
Naftas produkti
AERpatsvars
Import.el.
wind
hydro
biogas
Natural gas
wood
peat
coal
oil
RE%
8/8/2019 Networking BR Latvia
4/40
Prjie
0,7%
Vja eneratori
0.28%
Biogze
0.42%
Koksne82.9%
HES
16.4%
THE STRUCTURE OF ENERGY PRODUCED
FROM RENEWABLE RESOURCES(100%) IN LATV
Biogas
Wind generatorsWood
Others
HPS
Project is funded
by the EuropeanUnion10th June, 2009
Florianopolis4
8/8/2019 Networking BR Latvia
5/40
Potential renewable energy resources inLatvia
WOOD 44.582.5 PJ Int.al.
firewood 1216PJ
remains of forestry 1218PJ
wood from bushes 25PJ
stems 0.7 3PJ
wood
processing byproducts
14
37PJ
BIOGAS 2PJ
BIODIESELFUEL 1,6PJ secondary
BIOETHANOL 0,9PJ
HYDROENERGY 3,1 4,5PJ
WINDENERGY 0,84,5PJ
10th.June, 2009Florianopolis
5
Project is funded
by the EuropeanUnion
15300-28900
GWh
total
55
104
PJ
8/8/2019 Networking BR Latvia
6/40
Prognosis of electric power requirements
70008500GWh
HPS level
Project is fundedby the EuropeanUnion
10th June, 2009
Florianopolis
6
8/8/2019 Networking BR Latvia
7/40
Kinds of energy resources prognosed
for electric power production
BIOMASS
Project is funded
by the EuropeanUnion10th June, 2009Florianopolis
8/8/2019 Networking BR Latvia
8/40
Source of energy 2004 2010
Total consumption of elektric power in the
country
6786 7642
Large HPS 2790 2790Existing small HPS 58 70
New small HPS 8 (2,5 MW)
Existing wind power stations 47 47
New wind power stations 298 (135 MW)
Existing biomas and biogas power stations 25 27
New biomas and biogas power stations 510 (78 MW)
Biomas as additional fuel for cogeneration 18 (3MW)
Total 2926 3768
% 43,0% 49,3%
Input of Renewable energy in
the electric power production ,GWh
Florianpolis, Brazil,10th June 2009
Project is fundedby the EuropeanUnion
8
6.3 X
19 X
8/8/2019 Networking BR Latvia
9/40
44531
23806
53899
35683
Biomass resources.Quantity ofstraw(thausand tonnes) ,wood (million m3)and biogas(million m3)resources available for energetic usage in Latvia regions
2978
1226
890
1232
20452
20350
7137
5990
13.3PJ
22%
30.9
PJ
54%
13.1PJ
22%
1.73PJ 2%
Vidzeme
Kurzeme
LatgaleZemgale
Florianpolis, Brazil,10th June 2009Project is fundedby the EuropeanUnion
9
8/8/2019 Networking BR Latvia
10/40
Average wind velocity in Latvia (h=10 m )
Latgale
Vidzeme
ZemgaleKurzeme
Florianpolis, Brazil,10th June 2009
Project is fundedby the EuropeanUnion
10
8/8/2019 Networking BR Latvia
11/40
2000 2002 2004 2006 2008
WIND
GENERATORS
4,4 3,4 11,2 48,5 49,1
Energy obtained from wind generators,GWh
Average theoretical wind energy potential 250
1250GWh,
(0,84,5PJ/year)
Assumed that itis possible toinstall wind
generators with total power 600MW
x11
4%
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion11
8/8/2019 Networking BR Latvia
12/40
.p
Intensity of solar energy in
Latvia
Florianpolis, Brazil,
10th June 2009 Project is fundedby the EuropeanUnion
12
8/8/2019 Networking BR Latvia
13/40
Total amount of solar energy in Latvia
1109kWh
/m2.year
PV panels usage time per year~1800h
from April (last decade)toSeptember(first decade)
( Energy intensity ~120 kWh/m2 )
According to other data usage time may be from February to
October
and intensity May September 700-740 kWh/m2October- April - 200-240 kWh/m2
November- February 40-50 kWh/m2
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion13
8/8/2019 Networking BR Latvia
14/40
Topic problems
1.Competitiveness of REfossil fuelsand their conventional consumption technologies is
lessexpensive than REtoday.
2.Little amount of independent REproducersand small enterprises.
3. Lackof stable government support and absence oflongterm program
in the REdevelopment in Latvia .
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion14
8/8/2019 Networking BR Latvia
15/40
As a result insufficient development of appliedresearches in RE
and market oriented design of REecotechnologies,
e.g.wind and solar energy conservation and
balancing systems.
4. Incomplete information for employers on RE
resourcesand their exploiting technologies .
5.Insufficient number of specialists .
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion15
8/8/2019 Networking BR Latvia
16/40
Latvian Council of Science in 2006
adopted priorities inscientific researches on the period 20062013.
Among 9priorities is one related toenergy resources:
POWER
INDUSTRY
ENVIRONMENTAL
FRIENDLY
RENEWABLEENERGYFORMS,SAFETYDELIVEROF
ENERGYANDEFFECTIVEENERGYUTILIZATION
Laws and regulations
Florianpolis, Brazil,
10th June 2009
Researches in RE in Latvia.
Project is fundedby the EuropeanUnion16
8/8/2019 Networking BR Latvia
17/40
Florianpolis, Brazil,
10th June 2009
Latvia Ministry of Environment
prepared draft for Regulation ofCabinet of Ministers
Principal statement of exploitationrenewable energy resources for
years 2006-2013.
Project is fundedby the European
Union17
8/8/2019 Networking BR Latvia
18/40
Regulations by the Cabinet of Ministers
issued in February 24, 2009, Nr. 198
On Production Electric Power
by Exploiting Renewable EnergyResources
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union18
8/8/2019 Networking BR Latvia
19/40
Researches in RE in Latvia.
There are about 10research institutes,where the researches
in the field of renewable are implemented .
Among them:Latvian State Institute of Wood Chemistry
Physical Energy Institute,Forestry Science Institute
Environmental Protection and Thermal
Systems Institute(RTU)
Latgale Sustanaible Development ResearchInstitute(RA)
Latgale Agriculture Institute
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union
8/8/2019 Networking BR Latvia
20/40
Physical energy institute fulfilled
research :Exploitation of renewable energy resources in
Latvia regions and assesment of theirenvironmental , social and economic
benefits on the national and regional levels
Latgale SustainableDevelopment Research
Institute(RA)Extraction , processing and
efficient complex utilization of
renewable energy ecotechnologies
Florianpolis, Brazil,10th June 2009
Project is fundedby the European
Union20
8/8/2019 Networking BR Latvia
21/40
Education in RE in LatviaNoone university in Latvia has special study programs
on renewable energy
they do not prepare specialists in RE .
Study programs in environmental sciences have
6universities, but
the study courses in renewable energy are
offered only in three Universities :
Riga technical university
Latvian agriculture universityRezekne university
Florianpolis, Brazil,10th June 2009
Project is fundedby the European
Union21
8/8/2019 Networking BR Latvia
22/40
in Riga Technical University
(RTU)speciality
Heat Power and HeatEngineering
professionalbachelor(4years),master
degree(2years),
doctoral(3years)study programs
However we have study programs moreor less nearer to renewable energy
engineering.
Florianpolis, Brazil,10th June 2009
Project is fundedby the European
Union22
8/8/2019 Networking BR Latvia
23/40
in Latvian Agricultural University (LLU)
specialityAgricultural Power Engineering
professionalbachelor(4
years
)
,masterdegree(2years),
doctoral(3years)study programs
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union23
8/8/2019 Networking BR Latvia
24/40
In Rezekne University
(RA)
speciality
Environmental
Engineering professionalbachelor(4years) ,
masterdegree(2years),
doctoral(3years)
study programs
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union24
8/8/2019 Networking BR Latvia
25/40
St udent s spec ia l iza t ion
on RE is prov ided dur ingthe i r p rac t i c a l t raining
and prepar ing degree
w ork o r g raduat ion t hes isIt is total about 40 c.p.
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union25
8/8/2019 Networking BR Latvia
26/40
Takingintoaccount,thatLatvia
Is a small country and
Latvian
industrywas destroyed
during
incorrect
conversion
fromSovietsystem
toopen market system thereare limited perspectives
forsuch
narrow
(onlyintheRE)
specialistsin labormarketnow.
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union
26
8/8/2019 Networking BR Latvia
27/40
Itwouldbeinteresting(and essential too)to
develope specialstudyprogramfor
specializationin
Renewable Energy Engineering
butnot
for
Latvia
by itself.
We see it in the future as
International joint studyprogram for
universitiesfrom
different
countries.
Florianpolis, Brazil,
10th June 2009
Project isfundedby theEuropeanUnion
27
8/8/2019 Networking BR Latvia
28/40
At the moment the best way for Latvia is
significantly to supplementexisting study
programs with deepened special courses
and modules in RE physics and
engineering
to provide young specialists with
theoretical and practical knowledge in the
RE, necessary for successive work on RE
problems
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union
28
8/8/2019 Networking BR Latvia
29/40
Latvia has one additional problem wehavelimited amount of highlevel
graduatedspecialists(lecturers,
professors)for
teaching
and
training in
RE
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union29
8/8/2019 Networking BR Latvia
30/40
Itmeans
weare forced to
educate
educators at
first
andthisjobwill be more successive
withcooperation
and
mutual
support
betweenuniversities .
Florianpolis, Brazil,10th June 2009
Project is fundedby the European
Union30
8/8/2019 Networking BR Latvia
31/40
It is necessary :-Tostimulate higher and technical education in RE,
and to
prepare specialists for RE
industry .
-To work out education materials ,textbooks specially
for REoriented target groups .
-Toencourage progressive teaching methods toprovide
linkage between education and REindustry.
Project is fundedby the European
Union
Florianpolis, Brazil,
10th June 2009
31
8/8/2019 Networking BR Latvia
32/40
Thank you for attention!
Project is fundedby the European
Union
8/8/2019 Networking BR Latvia
33/40
Study courses with RE subjects in LLU
1.Heat Power2.Electrical Power Production, Transmission
and Exploiting
3.Alternative Energy and Economics4.Managment of Power Equipment and
Processes.
Florianpolis, Brazil,
10th June 2009
Project is funded
by the European
Union
8/8/2019 Networking BR Latvia
34/40
Course Solar Energy Syst em s
Methods of solar energy systems analyse
Mathematicaldescriptionofprocesses
Computerprograms
Simulationofenergyprocesses
Collectionof
data
and
treatment
Solarresearchlaboratories
Equipment
Measuringprocesses
Solarsystems
optimization
models
LCAofsolarsystems
Florianpolis, Brazil,
10th June 2009
Project is fundedby the European
Union
34
8/8/2019 Networking BR Latvia
35/40
Examples of courses contents :Course Unc onvent ional Syst em s
of Energy Convers ion and
Accumu la t i onWind generators,
turbines ,
regulation,
connection with network,
special electrical machines ,
sensors,
piezoelectric generators ,photogenerators ,
accumulators .
Florianpolis, Brazil,10th June 2009Project is fundedby the EuropeanUnion
35
8/8/2019 Networking BR Latvia
36/40
HYDROPOWER
STATIONS
INSTALLED CAPACITY
Paviu HPS 870Rgas HPS 263eguma HPS 401Small HPS 26.2
Installed capacity of hydropower stations MW,
2000 2001 2002 2003 2004
Large
HPS
2794 2796 2431 2212 3039
Small
HPS 25.3 37.1 32.6 50.85
2%
65.52
Energy produced by HPS, GWh
10th June 2009Florianpolis,
Project is fundedby the European
Union
36
8/8/2019 Networking BR Latvia
37/40
The structure of primary resources used in Latvia(LONG TERM PROGNOSIS)
Biomass
Project is fundedby the European
Union
10th June, 2009
Florianopolis
Ekonomika
8/8/2019 Networking BR Latvia
38/40
Ekonomika
Project is fundedby the EuropeanUnion
10th June, 2009
Florianopolis
Emissions of CO2 in Latvia -prognosis
8/8/2019 Networking BR Latvia
39/40
Study courses with RE subjects in RTU
1.Heat and Power Engineering
2.Renewable Energy Sources
3.Solar Energy Systems
4.Unconventional Systems of Energy Conversionand Accumulation
5.Heat Supply and Heating Systems
6.Alternative Energy Sources for House Heating
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion
8/8/2019 Networking BR Latvia
40/40
Study courses with RE subjects in RA:
1.Fluid Mechanics and Hydraulics
2.Foundation of Ecotechnology
3.Wood Resources and Forestry Technologies
4.Energy Supply in Enterprises
5.Thermodynamics and Heat Engineering.
Florianpolis, Brazil,
10th June 2009
Project is fundedby the EuropeanUnion