  • 2013/14 Sustainability update

  • Contents

    Delivering a railway fit for the future 04

    Chief executive and directors statement 06

    Environment

    Natural resources 08

    Environmental protection 12

    Land 14

    Energy and carbon 18

    Weather resilience and climate change adaptation 22

    Communities

    Communities 24

    Accessibility and inclusion 28

    Passenger and public safety 32

    Workplace

    Employee health, safety and wellbeing 36

    Employee engagement and development 40

    Diversity and inclusion 44

    Customers

    Value 48

    Performance, passenger satisfaction and communication 52

    Ethics and transparency 56

    Integration

    Integrating sustainable development 60

    Independent Assurance Statement 64

  • 4Case study

    Kings Cross stationThe new Kings Cross Square in London opened in September 2013. This 75,000 sq ft public space is the final part of the redevelopment of Kings Cross station to be completed and follows the renovation of the original station building and its platforms and the construction of the spectacular new western concourse, which opened to passengers in March 2012. The demolition of the 1970s concourse and the creation of Kings Cross Square in its place means the Grade 1 listed stations full historic faade can be seen in all its glory for the first time for 150 years.

    I have been travelling to and from my Derbyshire constituency for years and I remember when Kings Cross and St Pancras were not places you would hang around. Now it is a destination in its own right.

    With more platforms, a redesigned concourse and improved facilities, work at this iconic station has transformed the experience of thousands of rail passengers travelling into London for the better.

    Transport Secretary Patrick McLoughlin

    The transformation of Kings Cross is not only beautiful but it has also triggered all sorts of regeneration, with new jobs, huge numbers of homes being built and businesses relocating here. What has emerged is a fantastic open space which has led to the creation of a whole new vibrant district. It is the perfect example of a point I have always made, if you support good transport links the jobs and growth will follow.

    Mayor of London Boris Johnson

    A better railway for a better Britain, with sustainability at the heart of everything we do

    Delivering a railway fit for the future

  • 5Progress In May 2013 we published our first ever Sustainable development strategy. This Sustainability update explains our progress in delivering the priorities and objectives of that strategy, grouped into five sustainability themes:

    Environment: how we are reducing our environmental impact

    Communities: how we are improving the safety and accessibility of our network and contributing to the communities within which we operate

    Workplace: how we are making our business a safer, healthier and more inclusive place to work and engaging and developing our people

    Customers: how we are delivering value, improved performance and a safer network to our passengers and the public and taxpayer

    Integration: how we are working across our business and with our supply chain and industry partners to deliver our sustainable development objectives.

    The demand for rail travel is high and numbers are increasing quickly. Every day four million people use our network and today we carry 50 per cent more passengers than ten years ago. Weve enabled around 120,000 more trains to run a year than we did in 2009 and the amount of freight transported has increased by 13 per cent.

    Our annual investment in the rail network has grown from around 3.5bn per year to around 5bn since 2009. Improvements to infrastructure, modernisation and smarter ways of working have delivered more frequent, more reliable, safer services and brighter and better stations. Projects delivered in 2013/14 are mentioned throughout this Sustainability update.

    Rail travel is a cornerstone of economic growth.

    Rail travel contributes to a greener economy.

    Rail travel improves social and economic opportunities.

    Sustained community support recognising the importance of rail.

    Network Rail as a great place to work.

    Why it mattersOur role is to improve, maintain and operate the rail infrastructure across Britain, in partnership with our customers, suppliers and other stakeholders. People and businesses rely on us.

    We are seeking to deliver a safer, more reliable railway, with greater transparency, capacity and efficiency, that contributes towards a thriving, low-carbon economy with better connections between people and jobs. Sustainable development is at the heart of enabling us to achieve this.

    TargetsWithin each section of this Sustainability update, we describe the sustainable development targets and our performance against them. In many cases these targets relate back to our business plan when we entered our regulatory Control Period 4 on 1 April 2009.

    We also provide information on performance measured by other sustainability metrics that were collected in 2013/14.

    Sustainable development objectives

    What happens nextOur focus in 2014/15 will be on:

    Embedding core plans and processes to enable us to achieve our sustainable development objectives

    Engaging with our internal and external stakeholders to develop a shared understanding of priorities and a clear responsibility for delivering them

    Working to meet the targets and commitments within our Delivery Plan for Control Period 5 (2014 to 2019) and which are explained at betterrailway.co.uk.

  • 6Our sustainable development vision is to deliver a railway fit for the future, and we aim to achieve asafer, more reliable and better value railway

    We will do that by working more effectively and continuing to improve how we engage our industry partners, our supply chain and the people living in the communities close to where we operate.

    The rail network is experiencing significant investment. Over the coming five years, we will spend 38 Bln enhancing, renewing and running the infrastructure. This level of investment reflects the growth in the demand for rail travel and the economic significance of the railway to this country.

    We will deliver better stations and greater capacity for more trains. Alongside this, we are committed to becoming a more efficient business and will reduce costs by 20% from 2014 to 2019.

    Sustainable Development is one of Network Rails ten strategic themes. Last year we published Network Rails first ever Sustainable Development Strategy.

    To deliver this strategy, we are:

    Continuing to reduce safety risk to the public, our passengers and our workforce. For example we will reduce risk at level crossings by 25%. We are also committed to developing a positive safety culture throughout the organisation.

    Implementing an ambitious and collaborative 10-year strategy to improve the health and wellbeing of our people, supported by data and evidence-based decisions and interventions.

    Taking action to mitigate the impact of extreme weather on our infrastructure and addressing other issues which impact on rail industry performance and passenger satisfaction.

    Using resources responsibly and disposing of them carefully. This includes reducing the amount of energy and water we use and the carbon embedded in the materials we buy.

    Acting to prevent pollution to land, air and water.

    Investing in the communities in which we operate and in our people.

    Creating an organisational culture that embraces accessibility, diversity, inclusivity, transparency and a high standard of business ethics.

    Chief executive and directors statement

  • 7This Sustainability Update summarises our progress in implementing our sustainable development strategy during the financial year 2013/14 and sets out how we are laying the foundations to perform even better in future years.

    We thank you for your interest in our approach to sustainable development and we look forward to working together to create a Better Railway for a Better Britain.

    Mark Carne, chief executive

    Gareth Llewellyn, director safety and sustainable development

  • 8Natural resources

    We will use our natural resources in a responsible and sustainable manner, minimising the amount of material we use and reusing and recycling as much of our waste as possible

    To design and build low embodied carbon infrastructure and buildings.

    To implement the waste hierarchy to minimise waste.

    To minimise the environmental, social and health impacts of the goods and services we procure through responsible sourcing.

    To minimise potable water consumption through efficiency and substitution.

    Objectives

    Why it mattersManaging and operating the rail network is resource intensive. We can deliver enhanced value by procuring more sustainable materials and producing less waste. Most of the resources we use are finite and consequently volatile in price.

  • 9Waste data 2011/12 2012/13 2013/14

    Waste generated

    (tonnes)

    Waste diverted from landfill

    (%)

    Waste generated

    (tonnes)

    Waste diverted from landfill

    (%)

    Waste generated

    (tonnes)

    Waste diverted from landfill

    (%)

    Target waste diverted from

    landfill (%)

    Construction waste managed by contractors

    786,536 86% 634,000 84% 1,847,710 81% 80%

    Construction, track maintenance and renewals managed by our National Delivery Service

    1,465,057 86% 1,524,812 86% 1,341,039 95% 97%

    Waste from our stations 22,657 55% 13,885 65% 20,515 61% 60%

    Waste from our offices and training centres

    1,918 54% 1,438 63% 3,027 97% 60%

    Waste from depots, signalling locations, operations and maintenance sites

    20,887 41% 16,472 48% 19,400 52% 60%

    Performance against targets

    Other metricsWaste disposal Status of the timber forest products that we purchase:

    sleepers, fencing and timber procured through builders merchants framework agreements

    Waste sent to landfill

    Waste diverted from landfill

    0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    2013/142012/132011/12

    341,169 331,345432,704

    1,955,886

    Total 2,297,055

    Million to

    nnes

    1,821,625

    Total 2,152,970

    2,798,987

    Total 3,231,691

    2013/14

    Credibly certified (i.e. FSC purchased with chain of custody)

    Sourced verified (i.e. PEFC purchased with chain of custody or in the process if becoming credibly certified)

    Sourced assessed (i.e. legal origin verified)

    Limited knowledge of source

  • 10

    Case study 1

    Low carbon concrete sleepersWeve developed a low embodied carbon concrete sleeper. We replaced 25 per cent of conventional concrete mix with pulverised fuel ash (PFA). PFA is the ash left over from generating energy in coal-fired power stations and has a carbon footprint far lower than that of cement. Independent sustainability experts calculated that the carbon footprint of the sleepers has been reduced by more than 11 per cent by using PFA.

    We will use over 800,000 of these sleepers a year, saving around 26,700 tonnes of CO2 each year. The new mix also protects the sleepers from risk of corrosion. They will last longer and are cheaper to produce than conventional concrete sleepers.

    ProgressWater consumptionWater is a vital resource to our business and is used for cleaning, track and lineside treatment, sanitary and other purposes. In 2013/14 we consumed around 1.5 million m3 of water, costing us around 2.9m (down from around 3.2m in 2012/13). Our reduction in water consumption is due to infrastructure works such as the upgrade of signalling boxes.

    Sustainable timberWe have a long standing commitment to procure legal and sustainable timber. In 2013/14 we developed a Responsible Timber Sourcing Policy to reinforce our requirements. There has been a drop in the proportion of credibly certified timber compared to previous years. This is partly due to widening our scope of reporting to incorporate timber data from our fencing and builders merchants; we previously only reported sleepers consumption.

    Furthermore, following a recent third party audit, irregularities in categorising timber certification status have been identified. Consequently the data released in previous sustainability updates are incorrect. We are working actively with our procurement team and our supply chain to provide adequate training and ensure a robust assurance process is put in place.

    Embodied carbon toolWe are committed to measuring and reducing embodied carbon in the materials we use. In 2013/14 we scoped an embodied carbon calculation pilot involving three major infrastructure projects. The pilot takes place between April and September 2014 and will inform how we identify opportunities to reduce embodied carbon and embed measurement and reduction across our project process.

    Responsible sourcingOur Thameslink programme is implementing a responsible sourcing policy and supply chain partners such as Costain are using it to inform their sourcing of materials. The sustainability charter signed by Infrastructure Projects commercial directors forum (see Integration section) commits major supply chain partners to source materials to be sourced from recognised responsible sourcing schemes.

  • 11

    What happens nextOur focus in 2014/15 will be on:

    Rolling out a toolkit to enable measurement and reduction of embodied carbon on our infrastructure projects

    Minimising our waste production and improving our reuse and recycling rate

    Working with our supply chain to achieve greater assurance around the sustainability of materials and products used across our business, including timber.

    Case study 2

    Reducing use of resources through good designOur Thameslink programme facilitated workshops with design teams and contractors, to make better use of resources by addressing sustainability at design stage. Achievements include:

    During the design of our Bermondsey dive under infrastructure, contractor Skanska identified and implemented major opportunities to reduce costs, time, material use, and environmental impacts in the development of the GRIP 5 design. Benefits include a reduction in the number of piles required from approximately 1,600 to 1,000

    Siemens and Balfour Beatty Rail are reducing the use of concrete at REBs (housing units for signalling). The concrete base size has been reduced by incorporating the access steps into the REB unit thus removing the requirement for in-situ construction of a concrete step post installation. The resultant reduction in concrete use is approximately 46 tonnes

    Balfour Beatty Rail has redesigned gantries, so that they require less materials, less time to install and create less waste, as existing posts are reused.

    Case study 3

    End-of-life vehicle specificationThe end-of-life vehicle directive requires the safe and sustainable disposal of road vehicles when they reach the end of their lives. Rail-related vehicles are exempt. We are going beyond legal compliance by including end-of-life requirements in the contract specifications for the design, build and supply of a new stone-blower train. In defining the requirements weve worked closely with the supply chain to design out waste and identify an end-of-life disassembly plan that will maximise recovery of recyclable and reusable materials and safely capture and dispose of hazardous components.

  • 12

    Environmental protection

    We will protect land, air and water from pollution and other negative impacts

    To avoid pollution and reduce the amount of potential hazardous substances we use.

    To ensure we have the right processes to mitigate impacts that do occur.

    To reduce important nuisance elements such as environmental noise.

    Objectives

    Why it mattersOur interaction with the natural environment is considerable. Protecting the environment is both a legal obligation and a sign of a responsible business. Preventing pollution and environmental damage will also make us more efficient.

    Other metricsWe are improving processes for collecting information on all environmental incidents. In 2013/14 we identified:

    29 notable spills (spills of between 200 and 999 litres)

    102 minor reportable spills (spills of between 20 and 199 litres).

    Performance against targetsA significant pollution incident is defined as a spill of more than 1,000 litres or contamination getting into a watercourse or a Site of Special Scientific Interest.

    Seven of the significant incidents in 2013/14 related to spillages of silt, which has a relatively low environmental impact but requires remediation. The other four significant incidents were due to spillages of fuels and oils.

    0

    2

    4

    6

    8

    10

    12

    2013/142012/132011/122010/112009/10

    Target number not to exceed

    Num

    ber o

    f significan

    t pollutio

    n incide

    nts

  • 13

    ProgressClose calls monitoring and reportingAll organisations have situations of near misses when a harmful incident almost occurs, but doesnt. We call these close calls. We seek to investigate and understand why these happened and put measures in place to ensure that the situation is less likely to happen again.

    Most close calls are to do with health and safety issues (see Employee safety and wellbeing section), but environmental issues account for around five to 10 per cent of them.

    Weve developed a system for logging and acting on close calls. We log around 2,000 close calls each month and a further 2,000 or so are submitted by contractors working on major infrastructure projects. They result from issues such as a near miss that could have resulted in pollution (e.g. spills of liquid or releases of dust). We are closing out around 25 per cent of all new calls within one month of them being logged.

    To enable staff in the field to use the close call system easily, we have introduced an app. Almost half of all close call events are now reported through the app and the rest are reported through email and phone.

    Memorandum of understanding with the Environment AgencyThe Environment Agency is a key regulator in England and Wales.

    In 2013/14 we prepared a memorandum of understanding that sets out how will work together on issues such as flood defence and legislative compliance in a safe and efficient manner.

    Monitoring and reportingWe have begun a project to improve the way we capture, assess and report on environmental incidents. We will complete this over the coming year to enable significant improvements in our number and management of such incidents.

    Case study

    Anti-icing Throughout the winter there is a risk that ballast being delivered to work sites will freeze in rail wagons and cant be unloaded. To address this, and to continue to maintain the railway during the colder months, we

    sometimes use an anti-icing fluid to release the ballast. Anti-icing products can pose a risk to the local environment, if not used properly.

    We chose a de-icing product that it is effective but doesnt pose an unacceptable risk to the environment; it is non-hazardous and biodegradable. To manage the risk of unrestricted use causing harm to the environment, weve developed

    a procedure document that restricts the use of the anti-icer to times when freezing is forecast and to sites where it wont pose an environmental threat.

    What happens nextOur focus in 2014/15 will be on:

    Reviewing processes around our management of environmental permits

    Working with the Rail Safety and Standards Board to develop an industry-wide approach to close-call reporting and investigation

    Investigating opportunities for memorandum of understandings with Natural Resources Wales and the Scottish Environmental Protection Agency.

  • 14

    Land

    Case study 1

    The Tree Council partnership We partner with The Tree Council so that we can collaborate with independent experts and find the right solutions for managing our lineside land and vegetation. This independent input is important to our lineside neighbours and other stakeholders.

    The Tree Council is providing advice on estates management on a trial basis, with a view to extending this across the business. This has generated cost savings and enhanced stakeholder relationships. On our London North Eastern and East Midlands route the independent and expert advice of The Tree Council was well received by the community.

    We will manage our land sustainably and engage with our neighbours to our mutual benefit

  • 15

    To reduce operational risk associated with the contamination of land.

    To enhance ecological value.

    Objectives

    Case study 2

    Net gain in biodiversity on the Thameslink programme

    Thameslink is our first project to set a net gain target for biodiversity through a biodiversity policy. By doing so, we hope to set a precedent not just for rail projects but

    for all construction projects.

    To achieve a net gain we follow a mitigation hierarchy of avoidance of biodiversity loss, mitigation and then compensation

    as last resort. We have undertaken on-site planting wherever possible and trained our staff in biodiversity protection and enhancement measures. We use Defras new metric for calculating

    biodiversity loss and the associated level of compensation needed. Weve been named by Defra as a UK demonstration project.

    To achieve the net gain, we are working with Parsons Brinckerhoff, the London Wildlife Trust and Lambeth Council to plant trees on Streatham Common in South London. This site was carefully selected to generate many benefits for wildlife and the local communities. On

    17 December 2013, Environment Secretary Owen Paterson joined us on Streatham Common to launch Defras national biodiversity offset and to

    help us plant trees.

    The creation of new woodland on Streatham Common will provide a rich wildlife environment and improve the park for local residents and visitors. We welcome Thameslinks commitment to sustainable development.

    Carlo Laurenzi OBE, Chief Executive of London Wildlife Trust

    Why it mattersHow we manage our land estate of 400,000 hectares impacts on the people who use our network, the 5 million people who are our lineside neighbours and the one third of Britains population who live within 0.5km of a railway line. We must manage our lineside environment so that we enhance biodiversity and increase its economic and social value.

    MetricsThe Department for Environment, Food and Rural Affairs (Defra) and its strategy Biodiversity 2020 recommends that at least 50 per cent of the Sites of Special Scientific Interest that we manage are in a favourable condition, and at least 95 per cent are in a favourable or recovering condition by 2020. We have achieved this.

    We have developed site management statements at route level, in partnership with Natural England, for 162 of all 181 Sites of Special Scientific Interests that we manage in England.

  • 16

    ProgressTrees and the railway Storm, rain and wind events resulted in approximately 1,500 incidents in 2013/14 where trees caused disruption to the network. This is a four fold increase on the previous year and indicates the severe impact of the adverse weather of winter 2013/14. All events were resolved with lines back up and running again as soon as possible.

    We are putting further mitigating measures in place to manage our lineside land and the vegetation on it to reduce the frequency and risk of these kinds of events happening in the coming years. We will also be clearing up the railway to improve overall safety of our network. And were not doing this in isolation; were actively engaging with local community groups and other stakeholders to ensure we get the best solution for everyone.

    Sustainable vegetation management strategyWith KDA Design and Peter Neal Consulting, weve developed a strategy that establishes a set of new principles and techniques to create a more productive, attractive and cost-effective lineside estate. This helps us to view the lineside estate as an asset with value, rather than cost liability and to look for opportunities to enhance its value to us, our lineside communities and to ecological habitats.

    NEWP32 ProgrammeThe NEWP32 Programme is working with the Highways Agency and Natural England on nature improvements areas at Morecambe Bay and Humberhead Levels. Were identifying opportunities to manage transport infrastructure to the benefit of the community and local biodiversity, for example by joining up flood alleviation schemes, restoring natural habitats and linking areas of high biodiversity value. We plan to widen the trial out to other parts of the network, undertake specific monitoring of species to see how they react and take the process nationwide.

    Case study 3

    Kent House embankment projectUrgent maintenance work was required to stabilise the embankment close to Kent House station in the London Borough of Bromley. The biodiversity of the area was assessed as being of low ecological value due to non-native trees and scrubland. We set ourselves a target to leave a legacy of improved ecological value. We planted wildflower meadow grasses along the top of the embankment to provide a wildlife corridor for the Jersey Tiger Moth, which was known to be living in the area, and used trees felled on the site to build homes for reptiles and invertebrates.

    We also engaged closely with residents and local schools to minimise disruption and to educate children of the benefits and dangers of the railway environment.

    Awards We won Landscape Institutes 2013 Strategic Landscape Planning Award for our sustainable vegetation management strategy.

  • 17

    What happens nextOur focus in 2014/15 will be on:

    Implementing a biodiversity action plan

    Embedding requirements for land and biodiversity management into asset policy and standards

    Better understanding the long term management of our contaminated land risk.

    Case study 4

    Habitat management at WhitemoorWhen we were redeveloping our marshalling yard at Whitemoor, Cambridgeshire, an ecological survey identified that the site consists of acid grassland, which is a unique habitat for the Anglian region.

    We were permitted to develop the site, but worked closely with Cambridgeshire County Council, the Wildlife Trust and Natural England to maintain the habitat and support protected species. We maintained a number of rare and newly recorded plant species on site, identified a good number of key invertebrate species and new uncommon species and have supported the population of Great Crested Newts to increase in number since 2011.

  • 18

    Case study 2

    Smart meteringWe started a programme to install

    smart electricity meters into our estate in 2012/13. We continued this

    programme through 2013/14 and by November 2014 we will have installed a further 2,400 smart electricity meters.

    We will have installed 580 electricity submeters by the end of September 2014 and 380 smart gas meters by July 2014.

    Once the programme is complete, these meters will cover some 98 per cent of our estate and save us carbon and around

    6m per year in energy costs.

    Energy and carbon

    We will become more energy efficient and reduce our carbon emissions through the operation of our business

    To improve the energy efficiency of our activities, including better demand management.

    To reduce the carbon intensity of our energy supply.

    To achieve an efficient level of spend on energy and mitigate price risk.

    Objectives

    Case study 1

    Battery-powered trainsIt would be costly to electrify the many short stretches of track between major routes on our network (branchlines). We are therefore undertaking a project to test the feasibility of using battery-powered trains on such routes. In collaboration with Valence we are undertaking a trial to fit a Class 379 electric train with a lithium battery. These modified electric trains are known as independently powered electrical multiple units and should run for up to 50km on non-electrified track under their own battery power. If the tests prove successful, this technology has the potential to deliver the benefits of electrification to branchlines without the significant infrastructure cost.

  • 19

    Why it mattersWe need a secure supply of energy to run our network reliably, safely and efficiently. This includes energy created through self-generation from renewables. We need to control energy costs to save money. Our annual energy spend is approximately 330m, of which 70m is on energy consumed within our own operations and 260m on the traction electricity we supply to train operators. Through better management of our energy we will play our part in delivering the UKs carbon emission reduction targets and mitigate climate change.

    Overall carbon footprint Carbon emissions

    Carbon emissions generated (tonnes CO2e) 2010/11

    Carbon emissions generated (tonnes CO2e) 2011/12

    Carbon emissions generated (tonnes CO2e) 2012/13

    Carbon emissions generated (tonnes CO2e) 2013/14

    Scope 1

    Natural gas 15,457 10,965 13,028 10,293

    Road vehicle fuel use 55,274 53,311 50,794 52,504

    Gas oil 1,541 1,623 1,603 1,557

    Calor gas 151 106 134 111

    Scope 2

    Electricity (non-traction) 232,931 240,929 237,248 194,247

    Scope 3

    Electricity transmission and distribution

    N/A N/A N/A 16,609

    Business travel by domestic rail 3,149 2,220 2,022 1,896

    Business travel by London taxi 3 2 2 4

    Business travel by air 969 1,079 946 1,936

    Aviation fuel for helicopters 459 435 405 726

    Total for scope 1, 2 and 3 309,933 310,670 306,182 279,883

    TOTAL excluding business travel and calor gas - for comparison with 2006/7 baseline

    305,661 307,263 303,078 275,936

    We have achieved a nine per cent reduction in our carbon footprint in 2013/14 compared to 2012/13.

    Performance against our Control Period 4 targets CO2 emissions relating to managed stations, offices and depots against our 2006/07 baseline

    Whilst we missed our internal CP4 target we have achieved an 18 per cent reduction in scope 1 and 2 and business travel emissions during Control Period 4. This was achieved through the use of more energy efficient equipment, the closure of older, less-efficient buildings, and the move to our new, BREEAM excellent HQ in Milton Keynes.

    -20

    -15

    -5

    0

    -10

    2009/10

    Target

    2010/11 2011/12 2012/13 2013/14

  • 20

    ProgressEnergy policy

    In 2013/14 we developed an energy policy which requires consideration of price, security of supply and CO2 emissions.

    ElectrificationOur programme of electrification of the network is reducing traction carbon emissions. Our programme of electrification, combined with decarbonisation of grid supplied electricity and other operational improvements, has the potential to reduce the CO2 emissions by 37 per cent per passenger kilometre and by 11 per cent per freight-tonne kilometre and to achieve operating cost savings of around 40 per cent (see Value section).

    In conjunction with industry partners we are looking at ways to reduce traction electricity transmission losses. This includes a pilot project to consider the case for converting third rail to overhead line electrification between Southampton and Basingstoke, the latter is much more efficient in terms of transmission losses.

    Road vehicle fleetWe continue to work to reduce the carbon emissions from our road vehicle fleet by replacing older vehicles with more efficient and cleaner models and by specifying that they must meet the Euro V emissions limits. We have reduced CO2 emissions by 5 per cent over the last three years.

    Awards British Renewable Energy Awards 2013: for Blackfriars Station. Solar Century won the Project Award.

    Case study 3

    Light emitting diode lighting (LED)LED lighting is more energy efficient and has a longer lifespan than conventional fluorescent lighting, It also has a lower lifetime cost and emits less CO2. We have developed and embedded guidance on how we and our partners (train and fright operating companies and our contractors) can choose and install energy efficient LED lighting.

    Our Thameslink programme has taken the decision to make London Bridge the first station at which LED lighting will be used throughout and LED lighting is being used on our stabling site in Brighton following a whole life cost analysis by Carillion.

  • 21

    Case study 5

    Installing solar panels at Blackfriars station

    Commuters arriving at London Blackfriars station on 22 January 2014 were treated to a free cuppa drawn from Britains biggest tea cup to celebrate the launch of the worlds largest

    solar bridge. The station, which crosses the Thames, hosts the largest solar photo-voltaic roof array in the UK.

    More than 4,400 panels, covering an area of more than 6,000m are generating electricity from the suns light. The electricity generated could account for up to 50 per cent of the stations energy demand and

    will reduce the stations carbon dioxide emissions by an estimated 511 tonnes each year. Any excess energy is exported to the national grid.

    What happens nextOur focus in 2014/15 will be on:

    Implementing actions to deliver our Control Period 5 (2014 2019) targets to achieve an 11 per cent reduction in specific CO2 emissions

    Continuing Project Edisons pipeline of energy projects

    Progressing approaches to low carbon self-generation.

    Case study 4

    Project EdisonIn autumn 2013 we commenced Project Edison to mitigate risk in the following three areas:

    Security of supply: to make sure we have sufficient energy now and in the future to support the electrification programme and to operate our buildings

    Managing demand: making sure we use our electricity efficiently

    Managing the price we pay for our electricity: to ensure we get a good deal on the energy we buy on behalf of our customers, the train operating trains and the travelling public.

    These areas have a direct effect on how we operate the rail infrastructure cost-effectively and sustainably. For example, the installation of photo-voltaic cells at Rugby provides greater security of supply and reduces CO2. We can also gain value through feed in tariffs through the energy we export back to the grid.

  • 22

    Weather resilience and climate change adaptation

    We are working to make our network resilient to weather impacts and future changes in the climate

    Increase current weather resilience to enhance climate change adaptation capability.

    Embed adaptation in asset policies, design standards and investment processes.

    Understand the role of rail infrastructure in national weather and climate change resilience.

    Objectives

    Why it mattersThe frequency and intensity of extreme weather events is anticipated to increase in future years and this could impact on the performance of our network. As a key infrastructure manager in Great Britain, we need to make our assets resilient to the weather and maintain the provision of rail services.

    Performance against targetsThe impact of weather on our service is reported as part of the Public Performance Measure (PPM). Our performance against PPM target is detailed in the Passenger satisfaction and communication section.

    Case study 1

    Dawlish, Devon The extreme winter weather of 2013/14 caused particular difficulties on our line through Somerset, Devon and Cornwall. The line had washed away entirely

    at Dawlish and this emergency was widely reported in the British media.

    Communities and businesses rely on this line for their livelihoods and so it was vital to reopen it as quickly as possible. We and our partners mobilised immediately to assess the damage and started the process of repairing the line.

    Our teams and a wide range of contractors spent some 300,000 hours on site, working around the clock for two months to rebuild the line. The line was reopened

    by Prime Minister David Cameron on 4 April 2014, thereby providing access to the South West in time for the economically important Easter Bank Holiday.

  • 23

    ProgressRoute weather resilience and climate change adaptation plans Our first route climate change adaptation plan has been developed for the Western route. This assesses the vulnerability of the route to weather impacts and regional climate change and details actions to be taken over Control Period 5 (2014 to 2019) and beyond to increase the resilience of the route.

    All of our routes will produce weather resilience and climate change adaptation plans by the end of September 2014. These plans are being informed by the detailed information that we collect and store about the minutes of delay caused by specific weather impacts.

    Weather resilience and climate change adaptation programme Following the severe weather impacts we experienced on our routes this winter, we enhanced our weather resilience and climate change programme. We reviewed all our existing projects and identified the need for any additional projects in order to support and develop enhance sustained long term resilience. The WRCC programme takes a long-term view of the infrastructure works we need to put in place to mitigate the risk of disruption from extreme weather and maintain an efficient service.

    National Infrastructure Owners Adaptation ForumWe continue to engage in the National Infrastructure Owners Adaptation Forum, sharing best practice with other key infrastructure managers such as National Grid, Transport for London and the Highways Agency.

    Strategic crisis management teamThe strategic crisis management team was formed to provide a strategic and co-ordinated response to the disruption caused by the very wet and windy weather of winter 2013/14 and to take action to manage future risk from extreme weather. The team brought together experts from across our business with different perspectives on how we can best manage impacts on our routes and assets and keep trains moving. Lessons learnt by the team have been passed onto routes for integration into route weather resilience and climate change adaptation plans and our weather resilience and climate change adaptation programme.

    Memorandum of Understanding (MoU) with the Environment AgencyOur MoU with the Environment Agency, described in the Environmental protection section, is particularly important in defining how we will work together to manage risks associated with extreme weather.

    What happens nextOur focus in 2014/15 will be on:

    Developing our route weather resilience and climate change adaptation plans by September 2014 and continuing implementation of our weather resilience and climate change adaptation programme

    Working with the Environment Agency, Scottish Environment Protection Agency and Natural Resources Wales to improve flood risk management

    Taking our second adaptation report to Government, explaining progress to increase our knowledge of the vulnerabilities of the network and actions being taken to increase weather resilience.

    Case study 2

    Preventing flooding in Scotland Our Scotland route takes part in quarterly meeting of the SCOTS Flood Group, which comprises representatives from Scottish Government, SEPA, Scottish Water and Flood Risk Managers from each of the 32 Local Authorities in Scotland. The group shares details of and discusses the Flood Risk Assessments under the Flood Prevention Scotland Act 2009, climate change impacts and drainage maintenance in order to plan actions to mitigate and reduce flooding. We take part in the annual Flood Forum conference in Edinburgh to provide key input to this process.

    Case Study 3

    Tomorrows railway and climate change adaptation

    We are contributing to the Tomorrows Railway and Climate Change Adaptation programme. Led by the Rail Safety and Standards Board, its purpose is to coordinate a programme of climate change research for the whole

    rail industry. The programme is assessing the economics of resilience, evaluating appropriate metrics for monitoring resilience, and reviewing geographical information system

    based decision support tools. The programme is also undertaking an overseas study to assess how rail organisations

    in countries with climates that the UK is projected to experience manage weather impact on their rail networks.

  • 24

    Communities

    We contribute to our local communities and neighbours

    To contribute time and money to good causes through the charitable giving and actions of employees.

    To address key social issues through strategic national social programmes and partnerships.

    To invest in the local communities within which we operate.

    Objectives

    Why it mattersMany people use and are impacted by the railways. We are committed to work in a conscientious way so that we maximise the wider social benefits of our network. We want to be a national example of best practice in community investment and to share the socio-economic opportunities created by the way we do business.

    We receive over 200,000 public enquiries per year and most are resolved at point of contact. We are seeking to improve our resolution times for lineside issues such as litter, fly tipping, graffiti and vegetation. These currently stand at 40 days and we are looking to reduce this to 20.

  • 25

    Performance against targetsTarget: year on year increases in take-up for employee schemes such as volunteer leave, payroll giving and matched giving.

    Payroll giving

    Per cent of employees taking part in payroll giving

    Other metricsPartnership with Charity of Choice, Action for Children

    10%2012/13

    11%2013/14

    0

    200

    400

    600

    800

    1,000

    1,200

    2010/11

    Number of employee volunteers

    Number of days given

    2011/12 2012/13 2013/14

    Employee volunteer leave20

    10/11

    2011

    /12

    2012

    /13

    2013

    /14

    2009

    /10

    0

    50,000

    100,000

    150,000

    200,000

    Annual matched giving

    Gifts in kind

    Matched funding

    Workplace funding

    Other initiatives

    2013/14

    2012/13

    0 300,000 600,000 900,000 1,200,000 1,500,000

    Total 767,138

    Total 1,251,110.16

  • 26

    ProgressCharity panels Over 50 charities applied to be our Charity of Choice for 2014/15 and 2015/16. Our central charities panel shortlisted these and a staff vote across our business in January 2014 selected CLIC Sargent.

    Our central charities panel continues to meet six times a year to lead and monitor our charitable activities. The panel involves people from across our business, particularly our 80 or so charity ambassadors. The panel chose to support eight additional charities in 2013/14.

    Nine route charity panels supported 34 charities local to them who meet our overall charitable objectives.

    Our peopleOur people and supply chain partners continue to organise their own charity fundraising and volunteering activities. For example:

    11 staff from signalling Scotland and North East cycled over 170 miles coast-to-coast from Morecambe to Scarborough and raised 4,829.02 for Macmillan Cancer Support

    Infrastructure Projects signalling Southern region, Waterloo station and South West Trains organised for 60 children from Waterloo to have a tour around the station and a train ride, to support curriculum activities and to educate them about safety

    Through the Southwark Education Business Alliance volunteers from the London Bridge station redevelopment have dedicated an hour a week to Snowsfield Primary School as reading partners, helping students with reading and literacy skills. A group of 11 year olds from the school have also visited the site

    Our people from Reading station and the Great Western electrification project worked with the Construction Youth Trust and Bath University on a Budding Brunels programme, which provided accredited engineering skills training to 22 young people from disadvantaged backgrounds.

    National safety programmeWe continue an important programme with the Samaritans to address the problem of attempted suicide on our network (see Passenger and public safety section).

    Community RailOur Community Rail initiative rallied the support of over 300 volunteers to undertake environmental improvement works to over 90 sites around our routes. The years biggest scheme was at Snodland in Kent, where we worked with housing association Moat to construct a food-growing area for local residents. Other initiatives around Britain involved clearing invasive buddleia, cutting back undergrowth, litter collection, and the production of a mural in Stockport.

    Heritage We work hard to maintain the many heritage assets on the railways, as we know that they are enjoyed by the communities in which they are located. Where the assets are technologically redundant and have to be removed, we try to find new homes for them where they will remain accessible to the public. In 2013/14, for example:

    Billinghust signal box, which dates from 1876, was relocated to Amberley Museum

    Signal boxes from Brereton and Hednesford have been donated to Chasewater Railway and Cannock Chase Council

    At London Bridge station, archaeological finds are being carefully preserved for future public display. 10 of the upright columns and 10 of the foliate spandrels (decorative angle pieces) are being retained to form the cornerstone of a new locomotive museum near Aberystwyth.

    Jobs, apprenticeships and skills The creation of jobs, apprenticeships and skills is an absolute priority to stakeholders such as local authorities, and individuals in the communities within which we operate.

    In 2013/14 we recruited over 240 new apprentices to On Track, our national, advanced apprenticeship programme. This provides apprenticeships in track, signalling, electrification and plant, telecoms, and overhead line and equips successful candidates with the skills they need to transform our vast rail network. Our graduate recruitment scheme seeks applicants for opportunities related to electrical and electronic engineering, mechanical engineering, business services, supply chain and property. We offer industrial placements and our STAR scheme, delivered in partnership with Sheffield Hallam University, trains and develops track design engineers.

    Where our infrastructure projects are impacted by section 106 planning agreements, our teams and supply chain partners make particular efforts to create and report the skills, jobs and apprenticeships they are providing to local people, including young people and those previously unemployed. Significant benefits are being delivered to communities from the redevelopment of New Street station at Birmingham Gateway (see Value section) and Thameslinks redevelopment of London Bridge station. We are delivering the overground works for Crossrail and so we are supporting delivery of Crossrails objectives around targeted recruitment and training.

    Community contact We explain how we communicate with communities in the Performance, passenger satisfaction and communication section.

  • 27

    Case study 1

    Engineering Development Trust (EDT)We work with EDT to deliver a range of educational programmes that link students with people working in science, technology, engineering and maths, to boost skills and aspiration.

    In 2013/14, together with our supply chain partners in London, the Midlands, South East and South West regions we have delivered EDTs Go4Set programmes to year 8 and 9 students in 17 different schools and academies. In Southwark and Lewisham, the groups explored the theme of energy in your school and took part in follow-up site visits.

    In Swindon, year 12 students are undertaking a six month flood prevention monitoring programme with three of our engineers as part of the Engineering Education Scheme.

    Case study 2

    London Bridge Skills Academy

    The redevelopment of London Bridge station requires workforce skills that we

    have found difficult to access. Thameslink and contractor Costain have, therefore, established a virtual Skills Academy, to

    provide training and apprenticeships in a range of construction trades.

    The Skills Academy was formally launched on 27 September 2013 and our first apprentices and are being trained as formworkers, steel

    fixers and brick layers. We will be able to change the training we provide as the programme of works progress and different skills are needed.

    As the Skills Academy is virtual, we will be able to move it onto another project as London Bridge works approach their 2018 completion date.

    Participants in the Skills Academy are amongst the 100 or so local people who have benefited from skills, apprenticeship and job opportunities at London Bridge to date. We have successfully recruited to roles

    as diverse as cleaning, procurement and commercial, traffic marshalling and traditional construction trades.

    What happens nextOur focus in 2014/15 will be on:

    Better defining our process for work placements and work experience to engage people from as wide a range of backgrounds as possible

    Providing input as an employer partner to the new Sir Simon Milton Westminster University Technical College. This is opening in Victoria, London in September 2016 and will educate and train young 14 to 18 year old Londoners for jobs in the transport and construction industries

    Addressing how to train and develop the British resource pool to deliver our electrification programme (see Value section).

    Awards / accoladesThe National Payroll Giving Excellence Awards; we won Best Large Employer Campaign.

    Gold Quality Mark from Payroll Giving; weve moved from bronze to gold in three years.

  • 28

    Accessibility and inclusion

    Enabling everyone to travel for work and leisure, so that they can play their role in an inclusive and diverse society

    Case study:

    Perth stationOn 20 September 2013, John Swinney MSP for Perthshire North and the Scottish Governments Cabinet Secretary for Finance, Employment and Sustainable Growth officially opened Perth stations new, fully-accessible passenger footbridge.

    The 2.4m bridge provides step-free access via lifts to platforms one to five. Mr Swinney, said: Its very welcome that Perth is the latest station to benefit from the Access for All scheme. These enhancements have protected the historic appearance of the station while also providing a huge increase in amenity for those travelling to or from Perth.

    This is a very significant investment in our station which underscores both the necessity of maximising access to rail travel for all in our communities, and the importance of Perth on Scotlands national rail network.

    During the opening attended by local councillors and partners, Mr Swinney made a point of praising the way we and ScotRail are working in an increasingly collaboratively way for the benefit of passengers and to deliver investment efficiently. Perth is the twelfth station in Scot-land to benefit from Access for All.

  • 29

    To deliver a more inclusive and accessible railway, that serves existing and potential customers, and connects, people, communities, markets and jobs.

    Objective Why it mattersThe rail network plays a vital socio-economic role. The accessibility of the railway can determine the extent to which people who face challenges when travelling can be part of the community, workforce, economy and wider society. We need to understand and respond to population and demographic changes that make issues of accessibility and inclusion more important than ever.

    MetricsProjects under the Access for All programme completed

    2011 2012 2013 201420100

    20

    40

    60

    80

    120

    100

    Cumulat

    ive nu

    mbe

    r of p

    rojects co

    mpleted 150

    stations will gain step-free routes in 20062015

    1,100stations will benefit from smaller-scale

    accessibility improvements in 20062015

  • 30

    ProgressAccess for AllAccess for All is part of the Department for Transports Railways for All Strategy. It was designed to address the issues faced by disabled passengers using railway stations in Great Britain. Central to Access for All is 350m of ring-fenced funds per year to deliver obstacle free, accessible routes to and between platforms at priority stations. This includes the provision of lifts or ramps, as associated works and refurbishment along the defined route; the redevelopment of stations to provide step-free access and a range of other facilities, such as improved lighting, hearing induction loops and passenger information screens. We are tasked with delivering this programme of improvements, working closely with train operating companies and other relevant stakeholders to ensure a co-ordinated approach to works at stations.

    Inclusive designWe follow an industry-wide accessible train station design code of practice to improve the accessibility and inclusive design of stations for everyone. This code also describes our duties to meet European standards of accessibility.

    We are taking a new, cost effective approach to inclusive design which considers accessibility for everyone and considers sustainable design in stations, offices, depots and training centres.

    Built environment accessibility panelWe are embedding inclusive design into our built environment processes and have created a new built environment accessibility panel to help us achieve this. The panel has 12 members, 75 per cent of whom are disabled. All members are rail users and technical experts in inclusion and access. They assist us to deliver inclusive and accessible buildings and infrastructure. Membership will be renewed every three years.

    TrainingFollowing on from the successful disability training delivered to our customer-facing staff for the London 2012 Olympic and Paralympic Games, we updated the training. It has now become the Inclusive Service Training and is being delivered across our managed stations. This improved training makes a firm connection between disability awareness and the delivery of a high quality service for everyone whilst directing people and companies working on our managed stations to take a holistic approach to inclusion. This course is co-presented by disabled trainers, offering a more passenger-centred and inclusive learning experience using a discussion-based learning process. This work was commended by the Accessible Transport Select Committee.

    We are developing refresher training for staff who have been with us for a long time so that they have access to current inclusive service advice and approaches.

    Working with rail industry partnersWe work closely with our industry partners, including the Department for Transport, Transport Scotland and the Office of Rail Regulation (ORR), to improve journey experiences for every passenger, including disabled and older travellers or those who are travelling with young children, buggies or luggage. Along with considering the physical needs of our passengers and staff, we also make provisions for people with sensory or cognitive impairments and people who have mental health issues. For example, we are members of the Office for Rail Regulation ramps and wheelchair users project group and scooter access project group and we are working with Passenger Focus to review the accessibility of our services.

    Influencing policyWe attend quarterly meetings on access with the Department for Transport, we are part of the Rail Safety and Standards Board project team on disability and we are feeding into discussions around diversity and inclusion approaches at High Speed 2.

    Using our staff networksTwenty members of our disabled staff network, CAN DO, met senior leaders to discuss access to the railways. Their first hand experience is proving invaluable in shaping our priorities and future activity.

  • 31

    What happens nextOur focus in 2014/15 will be on:

    Completing delivery of the Access for All programme in 2015. Well then improve a further 42 stations identified in Access for Alls additional 105m, of funding

    Continue to train our staff to deliver a high quality service to people who have specific needs, because improving access to, from and through stations is about more than physical enhancements alone

    Developing inclusive design guidance and build inclusive design competence through training and support.

  • 32

    Case study 1

    Moors Gorse crossing, Cannock ChaseMoors Gorse level crossing was a user worked, public bridleway and cycleway crossing being used by up to 3,000 cyclists every weekend, after new mountain bike trails were created in the adjoining woodland.

    A number of near miss incidents had occurred at the site. We replaced the level crossing by investing 1.5m in a new bridge suitable for equestrians and cyclists. We had to buy the private rights attached to the user worked element of the crossing but we later resold the property and recouped the initial outlay.

    The closure of this crossing was the 700th of our Control Period 4 programme and was seen as a welcome improvement by former crossing users.

    Passenger and public safety

    By putting safety at the heart of how we design, manage and maintain our railway we will reduce safety risks for passengers and the public

    To eliminate fatalities and serious injury, reduce minor injury and eliminate repeat-cause accidents.

    Objective Why it mattersOur railway is one of the safest in Europe. But continuing to improve the safety of people who use or come into contact with our railway is important because accidents, trespass, acts of vandalism and cable theft can lead to injury, damage and delay.

  • 33

    Case study 2

    Track tests In September 2013, UK rapper Wretch 32 and spoken word performer George the Poet put their hearing to the test in a unique experiment as part of our new safety campaign aimed at young men called Track Tests.

    In the previous year 41 people had lost their lives after trespassing on the railway - a total of 270 in five years - with 16-24 year old males making up four out of 10 fatalities. Incidents occurred both at stations and along the railway. A survey for Track Tests reveals that despite most agreeing its dangerous to trespass on the tracks, a third of people think they would hear a train in time to move out of the way. This increases to more than half of 1624 years old males.

    The Track Tests video (available on YouTube youtube.com/user/networkrail) shows how Wretch 32 and George the Poet battle to make a split second decision, relying only on their hearing to work out which direction a train is coming from as it travels towards them at 80mph in the dark. In this instance its not a real train but a mocked-up railway in a warehouse, but the impact is very realistic.

    Ive got 97 per cent hearing, so should have a good idea of where sound is coming from. As soon as I stepped into the Track Test simulator and the normal sounds youd expect to hear when youre on the tracks, like traffic noise, are added, I didnt make it across in time. No matter how much confidence youve got in your hearing and speed, when youre in the dark and a train is coming towards you at 80mph, confidence is not enough to get you across safely.

    Performance against targetsPassenger safety

    2010/11 2011/12 2012/13 2013/14

    Target 0.24

    2009/100.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.30

    Passen

    ger s

    afety indica

    tor m

    oving an

    nual ave

    rage

  • 34

    Slips, trips and falls are the largest primary causes of accidents at our managed stations.

    Other metricsPassenger safety

    0Fatalities

    at Network Rail managed stations

    2013/14

    54Major accidents at Network Rail

    managed stations 2013/14

    2012/13 2013/142010/112009/10 2011/12

    0

    50

    100

    150

    200

    250

    300

    Total number of Category A signals passed at danger

    2012/13 2013/14

    0

    5

    10

    15

    20

    30

    35

    25

    Total number of potentially high risk

    train accidents

    Potentially high risk train accidents due to factors within Network Rails control

    0

    50

    100

    150

    200

    300

    250

    2009/10 2010/11 2011/12 2012/13 2013/14

    Tota

    l suicide

    s an

    d su

    spec

    ted su

    icides

    Suicides and suspected suicides

    Number of infrastructure wrong side failures

    Track failure

    Structure failure

    Signalling failure

    Other

    2012/13Total failures: 74

    2013/14Total failures: 115

    9 368 28.31

    7 351 27.00

    Accidental trespasser fatalities (excluding incidents at level crossings)

    432012/13

    182013/14

    Safety at level crossings

    Fatalities at level crossings

    Number of significant incidents

    Rate of significant level crossing events

    Level crossing closures

    Number of level crossing closures in 2013/14

    Actual146

    Target

    110

    Total number of

    level crossing closures in CP4

    804

    All fatalities at level crossings during the year involved adults. The rate of significant level crossing events is at its lowest rate for the whole of Control Period 4 (2009 to 2014).

    2012

    /13

    2013

    /14

  • 35

    ProgressTrends in public safetyThroughout Control Period 4 (2009 2014) the average number of trespasser fatalities has remained relatively consistent. There has been a general reduction in the number of malicious acts (route crime) in 2013/14 and through Control Period 4.

    Reducing route crimeCrime on the route includes issues such as obstruction on the line, interference with equipment, vandalism, missiles thrown or fired, and theft (e.g. of cable). We are addressing these issues by:

    Preventing unauthorised access to the network, for example by improving the security of our construction sites

    Working with the British Transport Police and other industry partners to target and co-ordinate approaches to reduce crime against our infrastructure and the people who use it.

    Partnership with SamaritansEvery incident of suicide and attempted suicide on the railways is devastating to families. Such incidents also impact negatively on train performance and the travelling public. There are 26 locations on our network that are of particular concern in relation to acts of self-harm. We are introducing physical or psychological barriers at these and other places. The number of incidents at these locations has reduced in 2013/14.

    Weve extended our contract with the Samaritans until 2020, so that we can continue to improve our capabilities to deal with suicides and attempted suicides. Together we are undertaking activity such as training staff to identify, approach and help a person who might be at risk. Were offering post incident support to the staff involved in traumatic events.

    Safety at level crossings Weve achieved a 30 per cent risk reduction in Control Period 4 (2009 2014) by closing over 800 level crossings.

    The House of Commons Transport Select Committee made twenty six recommendations to improve the safety of level crossings and eleven of these are specific to us. In response, our chief executive Mark Carne made a full and unreserved apology for past failings.

    Mark committed to continue implementation of our level crossing programme. This has exceeded internal targets in 2013/14 and is achieving whole life operational benefits of over 200m in return for 25m investment.

    Internal developments To continue to prioritise the safety of our passengers and the public, in 2013/14, we have:

    Undertaken deep dive risk reviews for our track assets, earthworks, structures, level crossings, workforce safety and irregular working. These reviews enable us to understand the causes and mitigations of safety incidents

    Brought our health and safety management system into conformance with the OHSAS18001 standard

    Started to roll out the business critical rules programme to improve the management of competency of those working on our infrastructure

    Continued to train our workforce and promote change to behaviour and culture that supports safer working and the reporting of close calls.

    What happens nextOur focus in 2014/15 will be on:

    Continuing to progress level crossing safety through closures and other risk reduction using the 99m allocated for Control Period 5

    Raising public awareness, particularly amongst young people, of the dangers of railway trespass

    Reducing train accident risk through improvements to our asset management and operational controls.

    AwardsManagement Consultancies Association (MCA) Awards 2014; our national level crossing team and partners Atkins Management Consultants won Change Management in the Public Sector award.

    National Rail Awards 2013; partnership between Samaritans, Network Rail, East Midland Trains, ASLEF and British Transport Police won The Safety Award.

  • 36

    Case study 1

    Health kiosksWe are using machines allow people to measure weight, body mass index, body fat, blood pressure and heart rate. The health kiosk is quick and self service and no occupational nurse is required. Results can be printed instantly or emailed to the user. Results come with bespoke recommendations on what changes the user might want to make to improve their health. The user can use the kiosk as many times as they wish to measure progress.

    Three health kiosks were trialled in London North Western and Kent, and in the first month alone over 1,000 users registered and more than 2,500 tests were completed on the kiosks. We found that 35 per cent of people had raised blood pressure, 69 per cent had elevated body fat levels and 68 per cent had an elevated body mass index. 13 health kiosks are now circulating across our business visiting over 60 buildings during the six-month period. Infrastructure Projects Scotland and North Eastern team, for example, are promoting the kiosks widely to their teams.

    Employee health, safety and wellbeing

    We are committed to the health, safety and wellbeing of our people and our visions of everyone home safe every day and everyone fit for the future

    Objectives Why it mattersWorking in the safest manner possible, every day, drives performance and makes us a success. We can lower the financial cost of ill-health to our business through investment in health and wellbeing interventions, leading to improved workplace attendance and productivity.

    To manage a safe and healthy workplace, with opportunities to promote wellbeing and a supportive culture to do so.

    To eliminate fatalities and serious injury,

    reduce minor injury and eliminate repeat-case accidents.

  • 37

    Performance against targetsLost time injury frequency rate

    Other metrics

    Close calls

    2013/1437,284

    Target20,000 or more

    Target 8 or less

    2013/14

    7

    Health and safety enforcement notices

    This significant number of close-calls indicates how our people are becoming more confident in reporting them.

    The workforce safety indicator continues to remain around 0.15 fatalities and weighted injuries per million hours worked. The accident frequency rate and lost time injury frequency rate have also remained constant over the past 18 months.

    The annual ratio of working time lost against number of RIDDOR major injuries is 2.48 to 1. This is below the benchmark (as recommended by the Rail Safety and Standards Board) of 3 to 1. The ratio for Infrastructure Projects and Asset Management contractors is 1.42 to 1, which is below the construction industry average of 2 to 1.

    0

    2

    4

    6

    10

    8

    2009/10

    Averag

    e da

    ys

    2010/11 2011/12 2012/13 2013/14

    Average sick days per employee

    0

    0.5

    1.0

    2.0

    1.5

    % of e

    mploy

    ees o

    n long

    -term

    sick leav

    e

    2009/10 2010/11 2011/12 2012/13 2013/14

    Per centage of employees on long-term sick leave

    Most common referrals (%)

    2012/13 2013/142010/112009/10 2011/120

    10

    20

    30

    40

    Musculoskeletal issues Psychological conditions

    Use of health surveillance and occupational health services

    2012/13

    2013/14

    2011/12

    Noise surveillance

    Hand arm vibration syndrome

    Musculoskeletal disorder referrals

    Psychological referrals

    Exposure to lead

    Exposure to asbestos

    0

    2,000

    1,000

    3,000

    4,000

    5,000

    6,000

    2012/13

    2013/14

    2011/12

    Noise surveillance

    Hand arm vibration syndrome

    Musculoskeletal disorder referrals

    Psychological referrals

    Exposure to lead

    Exposure to asbestos

    0

    2,000

    1,000

    3,000

    4,000

    5,000

    6,000

    2011/12 2012/13 2013/140.0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    Mov

    ing an

    nual average

    of t

    he num

    ber o

    f fatal

    and lost time injurie

    s pe

    r 100

    ,000

    hou

    rs worked

  • 38

    ProgressPrioritising safetyImmediately upon his appointment as our new chief executive on 24 February 2104, Mark Carne emphasised the importance of our safety vision of everyone home safe every day and the role that every one of our people has in its achievement.

    Our safety vision, the belief that safety and business performance go hand in hand, and our requirement that commitments around safety be integrated into personal performance objectives have been rolled out from the executive committee across our organisation during the latter part of March 2014.

    CultureWe continue to embed our Lifesaving Rules and we have used the bow-tie method to identify key risks in our business. We are integrating the rules into our asset management risks and associated implementation programmes.

    We have been working hard to change behaviour and culture to create a safer network:

    Weve agreed principles of a fair culture with trades unions and launched them across our business

    Weve involved around 1,000 staff, whose roles include investigators, line managers, human resources representatives and Trades Union representatives, in Fair Culture workshops.

    Safety conversation training has been delivered to our 400 most senior leaders

    We have developed a Big Picture toolkit, which helps staff understand what a safety culture looks like and what it means for them.

    A higher per centage of our people now agree with safety statements such as where I work, we always apply our learning from mistakes and accidents than they did in a survey than a year ago.

    Safe workingWe have been rolling out our workforce safety 10 point plan, which is intended to create momentum around improving workforce and contractor safety. We are accelerating two particular elements of the plan:

    Roles and responsibilities: establishing clearer accountability for safety on site

    Control of work: delivering an electronic permit to work that gives the safe work leader risk information and the tools to brief the site team effectively.

    Safety stand downsIn response to the death of a colleague in January 2014, we organised safety stand down events in early April 2014 at maintenance delivery units across the country. The events comprised animated reconstruction to enable local teams to have safety conversations that will help all of us take better responsibility for keeping ourselves and each other safe.

    Employee health and wellbeing strategyWeve received executive committee approval to roll out an ambitious and collaborative 10-year strategy to improve the health and wellbeing of our people. Were resourcing delivery of this strategy by increasing the size of the central health and wellness strategy team and recruiting a full-time, permanent occupational health and wellbeing manager for each of our routes.

    Health and wellbeing dataWere focused on improving the quality of data in areas such as occupational health diagnoses, health surveillance compliance, employee absence, mental health (including stress) and general wellbeing.

    Managing occupational healthWe have improved our understanding of our organisational health and wellbeing performance. Were working more effectively with our third party service providers and improving understanding of occupational health diagnoses, management referrals, drug and alcohols outcomes and mental wellbeing.

    We are working hard to reduce hand arm vibration syndrome (HAVS) by identifying and addressing risk associated with plant and equipment. Weve conducted a feasibility trial of HAVS monitors on our Kent route and are investigating the potential to roll these across the business. Were developing material to enable our routes to develop local action plans to address HAVS.

    To address occupational respiratory hazards, we are measuring the risk posed by exposure to respirable crystalline silica during specific tasks and will use this information to inform future improvement actions. Weve worked with our occupational health service provider, BUPA, to make an incidental asbestos exposure assessment available.

    Weve developed educational materials such as videos, posters and presentations to raise the awareness of occupational health and wellbeing.

  • 39

    What happens nextOur focus in 2014/15 will be on:

    Reducing road-related risk and developing technology for safer trackside working

    Reducing risk from hand-arm vibration and work-related stress

    Continuing to improve safety culture.

    Mental wellbeingWe ran a series of articles and events related to World Mental Health Day and Mental Health Awareness Week. During December 2013 and April 2014, we delivered courses in both mental health first aid and mental resilience and our business functions are now further developing skills and competencies around mental wellbeing through these courses. We worked with our professional development and training function to embed content related to workplace stress and resilience within our Tomorrows Leaders training programme.

    One of the key risks for our peoples mental wellbeing is exposure to potentially traumatic incidents, such as suicides or fatalities on our infrastructure. We have trialled the use of traumatic incident management training in our South East route, with the aim of developing a peer network that is able to support colleagues and spot potential warning signs relating to mental health.

    Working collaboratively for employee health and wellbeingOur chief medical officer has met with members of the rail Industry Safety Leadership Group and established a cross-industry working group focused on the issue of HAVS, as well as working with our internal group strategy team on the issue of effluent discharge from moving trains.

    Our contracts and procurement team is embedding principles of effective health management into the pre-qualifying questionnaire process for contingent labour supply.

    We publically signed up to the Department of Healths Responsibility Deal for Construction and Civil Engineering and then partnered with our Infrastructure Projects function to encourage their major contractors to do the same.

    We are currently in the process of installing automated external defibrillators in approximately 400 of our major corporate buildings, managed stations, depots and delivery units.

    Weve expanded the range of health-related offers available to our people, including discounted memberships at 2,500 gyms nationwide, discounted health assessments and wellness vouchers, as well as promoting our Cycle-to-Work scheme.

    Case study 3

    New Sentinel systemSentinel is the system that monitors and records the competency of our employees and contractors to work

    on our infrastructure. The new Sentinel system was introduced and rolled-out in 2013/14 and uses smartcard

    technology to encrypt, store and update information. This enables us to better verify that everyone who accesses the railways has the correct credentials to do so. This is

    enabling better competence management and control over the contingent labour force and there are already

    indications of improved management of safety risk. We have also rationalised sponsorship arrangements for each cardholder, so that there is one single, accountable sponsor

    for an individuals health, safety and wellbeing. This is a step forward in managing fatigue risk to our workforce.

    Case study 2

    Short films to change behaviour

    and cultureSix Lifesaving Rules short films were developed, depicting the human

    consequences of breaking these rules. Designed to be hard-hitting, they were aimed at all our employees, and made available from

    the end of January 2014 on the Safety Central website and on our corporate YouTube channel youtube.com/user/networkrail

  • 40

    Employee engagement and development

    We are investing in our people

    Case study 1

    Your VoiceIn 2013/14 we commissioned ORC International to design a new

    survey and approach to employee engagement that was better focussed on business drivers than our previous Q12 employee

    questionnaire, and that included scope for localisation.

    The resultant Your Voice questionnaire focused on behavioural issues. We explained our reasons for using the questionnaire to our employees through an extensive internal communications programme and issued it

    to all direct employees in November 2013. We tried hard to make sure that the questionnaire was accessible to employees with dyslexia and all types

    of disability.

    We invited responses on a voluntary rather than mandatory basis; on-line, on paper or over the phone. The response rate exceeded our expectations,

    at 46 per cent.

    We analysed all the responses at a corporate and a team level. We fed the learning back to all teams during March and April 2014, by managers talking through slide decks of findings, at their regular team meetings.

    We have delivered:

    Presentations to all leaders across our business; 21 in total

    Results to 4,500 line managers and we are supporting them with engagement planning through training

    Comments reports to 250 line managers.

  • 41

    To engage employees, manage talent and plan for succession.

    Objective Why it mattersTo deliver our strategic objectives we need a high-performing culture across our 34,000 staff. This means having engaged employees, who are motivated to go the extra mile, and have the freedom to innovate. Our employees must be well trained and receive the support necessary to maximise their potential and provide the best possible pool of talent to continuously drive the business forward.

    MetricsInvestment in further education and formal qualifications

    2012 201320102009 20110

    100

    150

    50

    200

    250

    Apprenticeship

    Graduates

    MSc

    Part time PGC

    Part time BEng

    Foundation degree

    Conversion engineers

    Num

    ber o

    f peo

    ple

    Employee training

    2012 201320102009 2011 2012 201320102009 20110

    2

    3

    1

    4

    5

    Delegate days

    Delegate days per capita0

    30,000

    60,000

    90,000

    120,000

    150,000

    Del

    egat

    e da

    ys

    Del

    egat

    e da

    ys p

    er c

    apita

  • 42

    ProgressPerformance managementWeve clarified processes, guidance and forms around performance reviews for executive and bands one to eight employees. We have enhanced our process for setting SMART (specific, measurable, aligned, realistic and time-specific) objectives and goals, to ensure they address behaviours, safety and, where relevant, the management of people. Alongside formal interim and final performance review meetings, we encourage managers to have regular one to one meetings with their staff.

    Talent managementWe now have a realistic view of the succession pipelines, and their readiness, for top 21 key roles.

    Training and developmentWe provide employees (leaders, line managers and front line staff) with training, learning opportunities and support to help them meet development needs and business objectives:

    We support line managers with the Assessment in the Line process, providing feedback and guidance to help managers make the right decisions on the competence of their staff and decide whether any training is needed or not

    We work across our business to implement the development needs analysis process for our employees

    We offer employees a range of instructor lead training, e-learning and workshops, through an on-line training catalogue

    Weve invested 25m in four state-of the-art workforce development centres in Larbert, Paddock Wood, Bristol, York and Walsall and others are in development. These are comprehensively equipped to enable practical training in safe and increasingly realistic environments, including replicas of internal and external track layouts and overhead line spans

    We have an accelerated leadership programme to train our leaders of the future and a tomorrows leader programme for those who manage people

    We facilitate coaching and mentoring and support people to become coaches and mentors, themselves

    We train and support all staff working on our infrastructure to achieve our intent of everyone home safe everyday. This is outlined in the Employee health, safety and wellbeing section.

    Technology strategyWeve embarked on a programme that will migrate our performance management and talent and succession processes to online systems for executive and Band 1 8 employees by mid 2015. This will drive greater consistency of deployment, enhance the support tools available to employees and allow more visible alignment between peoples personal objectives and the overall goals of the business.

    Employee consultation and engagement In 2013/14 we undertook Your Voice to engage and consult with our employees and to work out what we need to do better in the future.

    Internal communicationWe work hard to reach our 34,000 employees at their 1,350 workplaces, with information about our activities and plans. We also explain what we require of those employees and how we can support them to achieve:

    Weve adapted our Connect News weekly e-newsletter to be accessible on mobile devices as well as laptops and PCs

    Weve introduced a new magazine for our people called Network. We circulate this in both hard copy and electronic versions. It is people-orientated with a strong emphasis on telling human stories at pace

    We continue to organise an annual programme of business briefings along with management cascades and team briefings

    We celebrate success by sharing information, through Connect News, on all the awards that we and our staff win. We organise our own Make the Difference awards. At our November 2013 ceremony, there were eight winners who had been selected, by 60 employee judges, from more than 850 nominations.

    Preparing for Control Period 5We have identified the competences and established the management structure that we need to deliver our commitments for Control Period 5 (20142019). This has involved the implementation of a management efficiency programme that will achieve a 15 per cent executive and management salary bill reduction.

  • 43

    What happens nextOur focus in 2014/15 will be on:

    Delivering our new, one-day corporate induction programme to all new employees

    Undertaking comments text mining on the comments received back through Your Voice engagement and undertaking Pulse cultural surveys

    Preparing a new process to move the business to review all talent that will support the work of talent review boards.

    Case study 2

    Our behavioursIn late 2012, our board defined how to put our values into action by defining our behaviours. These identify how we will only be successful if we are customer driven, accountable, collaborative, and prepared to challenge. These are now being passed through our business by integrating them into:

    The Strategic Business Plan which sets out how the business will deliver our outputs for Control Period 5 (2014 2019)

    The key stages of employee lifecycle, including recruitment, induction and performance management

    The core capability framework that is applied to organisational resourcing, learning and development

    The work of the safety leadership team, who deliver training, workshops and toolbox talks to our 17,000 frontline staff.

    We have produced a simple, one-page Help Guide to our behaviours, so that employees and managers better understand how to demonstrate them.

    Case study 3

    Business briefingsWe organise an annual programme of half day business briefings, at venues across the UK, each year. At these, our chief executive, representatives of our routes and our infrastructure projects and other internal and external speakers explain our and rail industry priorities and what we will all be doing to achieve these over the next few years.

    Our 2012/13 programme comprised 18 briefings at nine different venues between 8 March 2012 and 26 April 2013. Attendance is voluntary. Around 7,000 employees chose to register for and attend these sessions.

    We invited participants to submit questions for speakers, in advance. We posted responses to these questions, and reports on each session from participants themselves, on our intranet.

  • 44

    Diversity and inclusion

    We are building a more open, diverse and inclusive organisation so that we attract the best possible talent, encourage creativity and innovation, and continually improve our safety and performance

    Access and inclusion: We will establish a culture which is inclusive for all our employees, enhances their individual and our collective performance and makes our recruitment and promotion processes open and accessible for all.

    Behaviours and benchmarking: We will promote our corporate behaviours that support collaboration, being customer driven, accountable and challenging.

    We measure our approach against other businesses to gauge our progress.

    Collaboration: We will work internally across the business and externally with other organisations and stakeholders to

    promote diversity and inclusion.

    Objectives

    Why it mattersBy being more open, diverse and inclusive we will enhance our safety and performance. We will realise the creativity, innovation and problem-solving of our people. This will help us to attract and retain the best people from diverse backgrounds and experiences and build more effective working relationships with our customers, partners and suppliers.

  • 45

    MetricsEthnicity data

    Gender pay gap

    Network Rail: 1%National: 10%Our performance is significantly better than the national average.

    We know there is limited staff turn-over within our business and so, ethnicity and gender data gives a partial picture of our approach to diversity an