NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)
TRANSMISSION DIRECTORATE
Electricity Transmission Expansion and Supply Improvement
Project
TAMAKOSHI – KATHMANDU 220/400 KV TRANSMISSION LINE PROJECT
BIDDING DOCUMENT
FOR
Procurement of Plant for Barhabise – Kathmandu 400/220 kV and 132 kV Transmission Line (Design, Supply and Install)
Single-Stage, Two-Envelope
Bidding Procedure
Issued on: …………………. Invitation for Bids No.: ICB-TD-TKTLP–073/74 - 01 ICB No.: ICB-TD-TKTLP–073/74 - 01 Employer: Nepal Electricity Authority Country: Nepal
VOLUME –III OF III
August 2016
Contract.
Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Transmission Directorate, NEA Training Center Complex Kharipati, Bhaktapur, Nepal Telephone: +977-1-6620016 Fax: +977-1-6620016
SCHEDULE - 1 PAGE 1 OF 10
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
FC: Foreign Currency LC: Local Currency
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
I 400 kV Quad Barhabise - Lapsephedi Transmission
Line
1.1Design, fabrication & supply of following types of
towers & tower extension parts complete with stubs,
step bolts, hangers, D-shackles, bolts & nuts etc but
excluding tower accessories such as danger plates,
number plates, phase plates, anti-climbing devices
1.1.1 Suspension Tower DA
a) Basic tower 42 Nos.
b) -4.5 m Leg Extension 6 Nos.
c) -3 m Leg Extension 4 Nos.
d) -1.5 m Leg Extension 7 Nos.
e) +/- 0 m Leg Extension 128 Nos.
f) +1.5 m Leg Extension 5 Nos.
g) +3 m Leg Extension 18 Nos.
h) +4.5 m Leg Extension 6 Nos.
i) +6 m Leg Extension 20 Nos.
Country of
origin
FCQuantity
Item
No.Item description
Estimated
NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
Unit
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV
Transmission Line
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
SCHEDULE - 1 PAGE 2 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
j) +7.5 m Leg Extension 10 Nos.
k) +9 m Leg Extension 24 Nos.
1.1.2 Tension Tower DB
a) Basic tower 31 Nos.
b) -4.5 m Leg Extension 4 Nos.
c) -3 m Leg Extension 3 Nos.
d) -1.5 m Leg Extension 5 Nos.
e) +/- 0 m Leg Extension 96 Nos.
f) +1.5 m Leg Extension 4 Nos.
g) +3 m Leg Extension 12 Nos.
h) +4.5 m Leg Extension 4 Nos.
i) +6 m Leg Extension 16 Nos.
j) +7.5 m Leg Extension 8 Nos.
k) +9 m Leg Extension 20 Nos.
1.1.3 Tension Tower DC
a) Basic tower 21 Nos.
b) -4.5 m Leg Extension 3 Nos.
c) -3 m Leg Extension 2 Nos.
d) -1.5 m Leg Extension 3 Nos.
e) +/- 0 m Leg Extension 64 Nos.
f) +1.5 m Leg Extension 3 Nos.
g) +3 m Leg Extension 9 Nos.
h) +4.5 m Leg Extension 3 Nos.
i) +6 m Leg Extension 10 Nos.
j) +7.5 m Leg Extension 5 Nos.
k) +9 m Leg Extension 12 Nos.
SCHEDULE - 1 PAGE 3 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
1.1.4 Tension Tower DD
a) Basic tower 42 Nos.
b) -4.5 m Leg Extension 5 Nos.
c) -3 m Leg Extension 3 Nos.
d) -1.5 m Leg Extension 6 Nos.
e) +/- 0 m Leg Extension 126 Nos.
f) +1.5 m Leg Extension 4 Nos.
g) +3 m Leg Extension 14 Nos.
h) +4.5 m Leg Extension 5 Nos.
i) +6 m Leg Extension 18 Nos.
j) +7.5 m Leg Extension 9 Nos.
k) +9 m Leg Extension 16 Nos.
l) +18 m Leg Extension 12
m) +25 m Leg Extension 12 Nos.
1.1.5 Tension Tower DDS
a) Basic tower 2 Nos.
b) +9 m Leg Extension 4 Nos.
c) +35m Leg Extension 4 Nos.
2 Supply of Earthing of towers
i. Pipe Type 48 Nos.
ii. Counterpoise Type 90 Nos.
SCHEDULE - 1 PAGE 4 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
3 Supply of following tower accessories
i. Danger Plate 138 Nos.
ii. Number Plate 138 Nos.
iii. Phase Plate ( Set of three) 276 Sets
iv. Circuit Plate(Set of two) 138 Sets
v. Anti climbimg device 138 Nos.
vi. Bird Guard (set of three) 84 Sets
4 Supply of following Line Materials
4.1 Conductor
i) ACSR MOOSE Conductor 1088 KM
ii) AACSR MOOSE Conductor 27 KM
4.2 GS Earthwire
i) 7/3.66mm Earthwire 47 KM
ii) AACSR Eartwire 1.2 KM
4.3 Insulators
Disc Insulators
(i) 120kN Disc Insulator 19125 Nos
(ii 160kN Disc Insulator 115200 Nos
(iii) 320kN Disc Insulator 1200 Nos
SCHEDULE - 1 PAGE 5 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
4.4 Hardware Fittings
i) Double Suspension 'I' Insulator String ( Suitable for 2x25,
120 KN Type Disc Insulators)255 Sets
ii) Single Suspension Pilot Insulator String (suitable for 1x25,
120 KN Type Disc Insulators)255 Sets
iii) Quadruple Tension Insulator String (suitable for 4x25, 160
KN Type Disc Insulators)1152 Sets
iv) Quadruple Tension Insulator String (suitable for 4x23, 320
KN Type Disc Insulators)12 Sets
4.5 Conductor and Earthwire Accessories
i) Mid span compression joint for ACSR Moose 675 Nos
ii) Mid span compression joint for 7/3.66mm GS earthwire 26 Nos
iii) Repair Sleeve for ACSR Moose Conductor 203 Nos
iv) Flexible Copper Bond for 7/3.66mm GS Earthwire 469 Nos
v) Vibration Damper for for 7/3.66mm GS Earthwire 937 Nos
vi) Quadruple Bundle spacer damper for ACSR/AACSR
Moose Conductor5812 Nos
vii)
Quadruple Rigid Spacer for ACSR/AACSR Moose
Conductor1709 Nos
viii)
Earthwire suspension Clamp for 7/3.66mm GS Earthwire85 Nos
ix) Earthwire Tension Clamp for 7/3.66mm GS Earthwire 384 Nos
x) Mid span compression joint for AACSR Moose 17 Nos
xi) Mid span compression joint for AACSR earthwire 1 Nos
xii) Repair Sleeve for AACSR Moose Conductor 1 Nos
xiii) Flexible Copper Bond for AACSR Earthwire 4 Nos
xiv) Vibration Damper for AACSR Earthwire 8 Nos
xv) Earthwire Tension Clamp for AACSR Earthwire 4 Nos
SCHEDULE - 1 PAGE 6 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
4.6 Fibre Cable & Accessories
4.6.1 OPGW cable & Accessories
i) 24 Fibre (DWSM) OPGW fibre optic cable 73 km
ii) Installation Hardware set for above 24 Fibre OPGW Fibre
Optic cabling including all cable fittings & accessories as
per below :
73 Sets
iii) Joint Box 25 No.
4.6.2 FODP
i) FODP 48F : Indoor Type, rack mounted with FCPC
coupling and pig tails (5 mtrs each). 5 No.
4.6.3 Fibre Optic approach cable
i) 24 Fibre (DWSM) 4 Km.
ii) Installation hardware set for above 24 Fibre, Fibre Optic
Approach Cable4 Set
4.7 Mandatory Spares of OPGW Cabling
4.7.1 OPGW cable & Accessoriesi) 24 Fibre (DWSM) OPGW fibre optic cable 5 Km.
ii) Installation Hardware set for above 24 Fibre OPGW Fibre
Optic cabling including all cable fittings & accessories as
per below :
5 Sets
iii) Joint Box (24 fibre) 3 No.
4.7.2 Fibre Optic approach cablei) 24 Fibre (DWSM) 2 Km.
ii) Installation hardware set for above 24 Fibre, Approach
Fibre Optic Cable2 Set
SCHEDULE - 1 PAGE 7 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
II 132 kV Lapsephedi - Changunarayan & LILO
Transmission Line
1.1Design, fabrication & supply of following types of
towers & tower extension parts complete with stubs,
step bolts, hangers, D-shackles, bolts & nuts etc but
excluding tower accessories such as danger plates,
number plates, phase plates, anti-climbing devices
1.1.1 Suspension Tower DA
a) Basic tower 21 Nos.
b) -3 m Leg Extension 4 Nos.
c) -1.5 m Leg Extension 4 Nos.
d) +/- 0 m Leg Extension 72 Nos.
e) +1.5 m Leg Extension 4 Nos.
f) +3 m Leg Extension 8 Nos.
g) +4.5 m Leg Extension 2 Nos.
h) +6 m Leg Extension 8 Nos.
i) +7.5 m Leg Extension 2 Nos.
j) +9 m Leg Extension 8 Nos.
SCHEDULE - 1 PAGE 8 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
1.1.2 Tension Tower DD
a) Basic tower 21 Nos.
b) -3 m Leg Extension 4 Nos.
c) -1.5 m Leg Extension 4 Nos.
d) +/- 0 m Leg Extension 72 Nos.
e) +1.5 m Leg Extension 4 Nos.
f) +3 m Leg Extension 10 Nos.
g) +4.5 m Leg Extension 2 Nos.
h) +6 m Leg Extension 10 Nos.
i) +7.5 m Leg Extension 2 Nos.
j) +9 m Leg Extension 12 Nos.
k) +18 m Leg Extension 4 Nos.
l) +25 m Leg Extension 4 Nos.
1.1.3 Suspension Tower QA Multi circuit
a) Basic tower 8 Nos.
b) +0 m Leg Extension 32 Nos.
1.1.4 Tension Tower QD Multi circuit
a) Basic tower 6 Nos.
b) +0 m Leg Extension 24 Nos.
2 Supply of Earthing of towers
i. Pipe Type 36 Nos.
ii. Counterpoise Type 20 Nos.
3 Supply of following tower accessories
i. Danger Plate 56 Nos.
ii. Number Plate 56 Nos.
SCHEDULE - 1 PAGE 9 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
iii. Phase Plate ( Set of three) 140 Sets
iv. Circuit Plate(Set of two) 70 Sets
v. Anti climbimg device 56 Nos.
vi. Bird Guard (set of three) 74 Sets
4 Supply of following Line Materials
4.1 Conductor
i) ACSR BEAR Conductor 110 KM
4.2 GS Earthwire
i) 7/3.15mm Earthwire 0 KM
4.3 Insulators
Option-1: Disc Insulators
(i) 70 kN Disc Insulator 2250 Nos
(ii) 120 kN Disc Insulator 4554 Nos
4.4 Hardware Fittings
i) Single Suspension 'I' Insulator String ( Suitable for 1x10,
70 KN Disc Insulators )225 Sets
ii) Single Tension Insulator String (suitable for 1x11, 120 KN
Disc Insulators)388 Sets
iii) Double Tension Insulator String ( suitable for 2x11,120
KN Disc Insulators )13 Sets
SCHEDULE - 1 PAGE 10 OF 10
Total Amount
(Excluding Taxes
and Duties)
Custom, VAT and
other taxes
FC LC
Currency# Unit Rate Amount
1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10
Country of
origin
FCQuantity
Item
No.Item description
Estimated
Unit
CIP (site) including insurance, clearing,
forwarding and transportation to site
(Excluding Taxes and Duties applicable
in Nepal)
4.5 Conductor Accessories
i) Mid span compression joint for ACSR BEAR conductor 99 Nos
ii) Repair Sleeve for ACSR BEAR Conductor 40 Nos
iii) Vibration Damper for ACSR BEAR conductor 1273 Nos
TOTAL (Total of column 11 and 12 to be carried
forward to Schedule No. 5: Grand Summary)
Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
#
* Strike-out whichever is not applicable.
Name of Bidder: Date:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during
detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.
Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
2.) The Prices of equipments are inclusive of type test charges except towers, conductors and earthwires.
SCHEDULE - 2 PAGE 1 OF 7
All prices in local currency, NRsTotal Amount
(Excluding Taxes)VAT and other
taxesTotal Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
I 400 kV Quad Barhabise - Lapsephedi Transmission Line
1.1Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices
1.1.1 Suspension Tower DAa) Basic tower 42 Nos.
b) -4.5 m Leg Extension 6 Nos.
c) -3 m Leg Extension 4 Nos.
d) -1.5 m Leg Extension 7 Nos.
e) +/- 0 m Leg Extension 128 Nos.
f) +1.5 m Leg Extension 5 Nos.
g) +3 m Leg Extension 18 Nos.
h) +4.5 m Leg Extension 6 Nos.
i) +6 m Leg Extension 20 Nos.
j) +7.5 m Leg Extension 10 Nos.
k) +9 m Leg Extension 24 Nos.
1.1.2 Tension Tower DBa) Basic tower 31 Nos.
b) -4.5 m Leg Extension 4 Nos.
c) -3 m Leg Extension 3 Nos.
d) -1.5 m Leg Extension 5 Nos.
e) +/- 0 m Leg Extension 96 Nos.
f) +1.5 m Leg Extension 4 Nos.
Item No. Item Description UnitQuantity
NEPAL ELECTRICITY AUTHORITY
TRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
Ex Faxtory Price (Excluding VAT)
Inland Transportation up to Site
SCHEDULE - 2 PAGE 2 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
g) +3 m Leg Extension 12 Nos.
h) +4.5 m Leg Extension 4 Nos.
i) +6 m Leg Extension 16 Nos.
j) +7.5 m Leg Extension 8 Nos.
k) +9 m Leg Extension 20 Nos.
1.1.3 Tension Tower DCa) Basic tower 21 Nos.
b) -4.5 m Leg Extension 3 Nos.
c) -3 m Leg Extension 2 Nos.
d) -1.5 m Leg Extension 3 Nos.
e) +/- 0 m Leg Extension 64 Nos.
f) +1.5 m Leg Extension 3 Nos.
g) +3 m Leg Extension 9 Nos.
h) +4.5 m Leg Extension 3 Nos.
i) +6 m Leg Extension 10 Nos.
j) +7.5 m Leg Extension 5 Nos.
k) +9 m Leg Extension 12 Nos.
1.1.4 Tension Tower DDa) Basic tower 42 Nos.
b) -4.5 m Leg Extension 5 Nos.
c) -3 m Leg Extension 3 Nos.
d) -1.5 m Leg Extension 6 Nos.
e) +/- 0 m Leg Extension 126 Nos.
f) +1.5 m Leg Extension 4 Nos.
g) +3 m Leg Extension 14 Nos.
h) +4.5 m Leg Extension 5 Nos.
i) +6 m Leg Extension 18 Nos.
j) +7.5 m Leg Extension 9 Nos.
k) +9 m Leg Extension 16 Nos.
l) +18 m Leg Extension 12
m) +25 m Leg Extension 12 Nos.
SCHEDULE - 2 PAGE 3 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
1.1.5 Tension Tower DDSa) Basic tower 2 Nos.
b) +9 m Leg Extension 4 Nos.
c) +35m Leg Extension 4 Nos.
2 Supply of Earthing of towersi. Pipe Type 48 Nos.
ii. Counterpoise Type 90 Nos.
3 Supply of following tower accessoriesi. Danger Plate 138 Nos.
ii. Number Plate 138 Nos.
iii. Phase Plate ( Set of three) 276 Sets
iv. Circuit Plate(Set of two) 138 Sets
v. Anti climbimg device 138 Nos.
vi. Bird Guard (set of three) 84 Sets
4 Supply of following Line Materials4.1 Conductori) ACSR MOOSE Conductor 1088 KM
ii) AACSR MOOSE Conductor 27 KM
4.2 GS Earthwirei) 7/3.66mm Earthwire 47 KM
ii) AACSR Eartwire 1.2 KM
4.3 InsulatorsDisc Insulators
(i) 120kN Disc Insulator 19125 Nos
(ii 160kN Disc Insulator 115200 Nos
(iii) 320kN Disc Insulator 1200 Nos
4.4 Hardware Fittingsi) Double Suspension 'I' Insulator String ( Suitable for
2x25, 120 KN Type Disc Insulators)255 Sets
ii) Single Suspension Pilot Insulator String (suitable for 1x25, 120 KN Type Disc Insulators)
255 Sets
SCHEDULE - 2 PAGE 4 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
iii) Quadruple Tension Insulator String (suitable for 4x25, 160 KN Type Disc Insulators)
1152 Sets
iv) Quadruple Tension Insulator String (suitable for 4x23, 320 KN Type Disc Insulators)
12 Sets
4.5 Conductor and Earthwire Accessoriesi) Mid span compression joint for ACSR Moose 675 Nos
ii) Mid span compression joint for 7/3.66mm GS earthwire
26 Nos
iii) Repair Sleeve for ACSR Moose Conductor 203 Nos
iv) Flexible Copper Bond for 7/3.66mm GS Earthwire 469 Nos
v) Vibration Damper for for 7/3.66mm GS Earthwire 937 Nos
vi) Quadruple Bundle spacer damper for ACSR/AACSR Moose Conductor
5812 Nos
vii)Quadruple Rigid Spacer for ACSR/AACSR Moose Conductor
1709 Nos
viii)Earthwire suspension Clamp for 7/3.66mm GS Earthwire
85 Nos
ix)Earthwire Tension Clamp for 7/3.66mm GS Earthwire
384 Nos
x) Mid span compression joint for AACSR Moose 17 Nos
xi) Mid span compression joint for AACSR earthwire 1 Nos
xii) Repair Sleeve for AACSR Moose Conductor 1 Nos
xiii) Flexible Copper Bond for AACSR Earthwire 4 Nos
xiv) Vibration Damper for AACSR Earthwire 8 Nos
xv) Earthwire Tension Clamp for AACSR Earthwire 4 Nos
4.6 Fibre Cable & Accessories 4.6.1 OPGW cable & Accessories
i) 24 Fibre (DWSM) OPGW fibre optic cable 73 km
ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below :
73 Sets
iii) Joint Box 25 No.
4.6.2 FODPi) FODP 48F : Indoor Type, rack mounted with FCPC
coupling and pig tails (5 mtrs each). 5 No.
SCHEDULE - 2 PAGE 5 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
4.6.3 Fibre Optic approach cablei) 24 Fibre (DWSM) 4 Km.
ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable
4 Set
4.7 Mandatory Spares of OPGW Cabling4.7.1 OPGW cable & Accessories
i) 24 Fibre (DWSM) OPGW fibre optic cable 5 Km.
ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below :
5 Sets
iii) Joint Box (24 fibre) 3 No.
4.7.2 Fibre Optic approach cablei) 24 Fibre (DWSM) 2 Km.
ii) Installation hardware set for above 24 Fibre, Approach Fibre Optic Cable
2 Set
II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line
1.1Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices
1.1.1 Suspension Tower DAa) Basic tower 21 Nos.
b) -3 m Leg Extension 4 Nos.
c) -1.5 m Leg Extension 4 Nos.
d) +/- 0 m Leg Extension 72 Nos.
e) +1.5 m Leg Extension 4 Nos.
f) +3 m Leg Extension 8 Nos.
g) +4.5 m Leg Extension 2 Nos.
h) +6 m Leg Extension 8 Nos.
i) +7.5 m Leg Extension 2 Nos.
j) +9 m Leg Extension 8 Nos.
SCHEDULE - 2 PAGE 6 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
1.1.2 Tension Tower DDa) Basic tower 21 Nos.
b) -3 m Leg Extension 4 Nos.
c) -1.5 m Leg Extension 4 Nos.
d) +/- 0 m Leg Extension 72 Nos.
e) +1.5 m Leg Extension 4 Nos.
f) +3 m Leg Extension 10 Nos.
g) +4.5 m Leg Extension 2 Nos.
h) +6 m Leg Extension 10 Nos.
i) +7.5 m Leg Extension 2 Nos.
j) +9 m Leg Extension 12 Nos.
k) +18 m Leg Extension 4 Nos.
l) +25 m Leg Extension 4 Nos.
1.1.3 Suspension Tower QA Multi circuit a) Basic tower 8 Nos.
b) +0 m Leg Extension 32 Nos.
1.1.4 Tension Tower QD Multi circuit a) Basic tower 6 Nos.
b) +0 m Leg Extension 24 Nos.
2 Supply of Earthing of towersi. Pipe Type 36 Nos.
ii. Counterpoise Type 20 Nos.
3 Supply of following tower accessoriesi. Danger Plate 56 Nos.
ii. Number Plate 56 Nos.
iii. Phase Plate ( Set of three) 140 Sets
iv. Circuit Plate(Set of two) 70 Sets
v. Anti climbimg device 56 Nos.
vi. Bird Guard (set of three) 74 Sets
4 Supply of following Line Materials4.1 Conductori) ACSR BEAR Conductor 110 KM
SCHEDULE - 2 PAGE 7 OF 7
Total Amount (Excluding Taxes)
VAT and other taxes
Total Amount
Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11
Item No. Item Description UnitQuantityEx Faxtory Price (Excluding
VAT)Inland Transportation up to Site
4.2 GS Earthwirei) 7/3.15mm Earthwire 0 KM
4.3 InsulatorsOption-1: Disc Insulators
(i) 70 kN Disc Insulator 2250 Nos
(ii) 120 kN Disc Insulator 4554 Nos
4.4 Hardware Fittingsi) Single Suspension 'I' Insulator String ( Suitable for
1x10, 70 KN Disc Insulators )225 Sets
ii) Single Tension Insulator String (suitable for 1x11, 120 KN Disc Insulators)
388 Sets
iii) Double Tension Insulator String ( suitable for 2x11,120 KN Disc Insulators )
13 Sets
4.5 Conductor Accessoriesi) Mid span compression joint for ACSR BEAR conductor 99 Nos
ii) Repair Sleeve for ACSR BEAR Conductor 40 Nos
iii) Vibration Damper for ACSR BEAR conductor 1273 Nos
Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
#
Name of Bidder: Date:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
2.) The Prices of equipment are inclusive of type test charges except towers, conductors and earthwires.3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.
4) For Bought out items, all applicable taxes, duties and levies except Octroi/Entry tax are to be included in the Ex Works Price (Col 7.)
Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
Total Ex-works Price ( Total of column 9 to be carried forward to Schedule No. 5A: Grand Summary)
SCHEDULE - 3 PAGE 1 OF 1
Local Currency portion Foreign Currency Portion
Quantity Unit NRs Currency LC FC1 2 3 4 5 6 7=3x5 8=3x6
Name of Bidder: Date:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
Schedule 3: Design Services : NOT APPLICABLE
Estimated Unit Prices Total Prices
Item No.
Item Description
1 NOT APPLICABLE
NEPAL ELECTRICITY AUTHORITY
TRANSMISSION DIRECTORATETamakoshi-Kathmandu 220/400kV Transmission Line Project
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
SCHEDULE - 4 (a) PAGE 1 OF 11
Schedule No. 4: Installation Services(a): Installation and Construction Charges
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
I 400 kV Quad Barhabise - Lapsephedi Transmission Line
1 Surveyi) Detailed survey including route alignment, profiling, tower spotting KM 46ii) Check Survey including tower spotting KM 46
2 Detailed soil Investigationi) All kind of soil except FR & HR Loc. 4ii) Fissured/soft rock Loc. 8iii) Hard rock Loc. 4iv) River Crossing locations Loc.
3 Benchingi) All kind of soil except FR & HR Cum. 3200ii) Fissured Rock Cum. 8000iii) Hard Rock Cum. 2500
4 Work associated with tower foundations. 4.1 Suspension Tower DA
a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)
i) Dry Foundation Nos. 4ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 4b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m
i) Dry Foundation Nos. 4
Unit
Installation Charges
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
Sl. No. Qty.Item Description
NEPAL ELECTRICITY AUTHORITY
TRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
Portion in Nepaln Currency (in NRs)
Portion in Foreign Currency
SCHEDULE - 4 (a) PAGE 2 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 4
4.2 Tension Tower DBa) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m
Extension)i) Dry Foundation Nos. 1ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 5vi) Wet Fissured Rock Nos. 3vii) Sandy Soil Foundation Nos. 1b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m
Extensioni) Dry Foundation Nos. 1ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 6vi) Wet Fissured Rock Nos. 3vii) Sandy Soil Foundation Nos. 1
4.3 Tension Tower DC
a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)
i) Dry Foundation Nos. 3ii) Wet Foundation Nos. 1iii) Partially Submerged Foundation Nos. 1iv) Dry Fissured Rock Nos. 5v) Wet Fissured Rock Nos. 1
SCHEDULE - 4 (a) PAGE 3 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension
i) Dry Foundation Nos. 2ii) Wet Foundation Nos. 1iii) Partially Submerged Foundation Nos. 1iv) Dry Fissured Rock Nos. 4v) Wet Fissured Rock Nos. 2
4.4 Tension Tower DD
a)Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)
i) Dry Foundation Nos. 2ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 1iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 2vii) Sandy Soil Foundation Nos. 1
b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension
i) Dry Foundation Nos. 3ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 2vii) Sandy Soil Foundation Nos. 1
SCHEDULE - 4 (a) PAGE 4 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
4.5 Tension Tower DD+ 18/25
i) Dry Foundation Nos. 2
ii) Partially Submerged Foundation Nos. 1
iii) Dry Fissured Rock Nos. 3
4.6 Tension Tower DDS
a) Foundation for +9 m Extension
i) Dry Fissured Rock Nos. 1
b) Foundation for +35 m Extension
i) Dry Fissured Rock Nos. 1
5 Erection of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc, tack welding and supply and application of enamel & zinc rich paint but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices
5.1 Suspension Tower DA
a) Basic tower Nos. 42b) -4.5 m Leg Extension Nos. 6c) -3 m Leg Extension Nos. 4d) -1.5 m Leg Extension Nos. 7e) +/- 0 m Leg Extension Nos. 128f) +1.5 m Leg Extension Nos. 5g) +3 m Leg Extension Nos. 18h) +4.5 m Leg Extension Nos. 6i) +6 m Leg Extension Nos. 20j) +7.5 m Leg Extension Nos. 10k) +9 m Leg Extension Nos. 24
SCHEDULE - 4 (a) PAGE 5 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
5.2 Tension Tower DBa) Basic tower Nos. 31b) -4.5 m Leg Extension Nos. 4c) -3 m Leg Extension Nos. 3d) -1.5 m Leg Extension Nos. 5e) +/- 0 m Leg Extension Nos. 96f) +1.5 m Leg Extension Nos. 4g) +3 m Leg Extension Nos. 12
h) +4.5 m Leg Extension Nos. 4i) +6 m Leg Extension Nos. 16j) +7.5 m Leg Extension Nos. 8k) +9 m Leg Extension Nos. 20
5.3 Tension Tower DCa) Basic tower Nos. 21b) -4.5 m Leg Extension Nos. 3c) -3 m Leg Extension Nos. 2d) -1.5 m Leg Extension Nos. 3e) +/- 0 m Leg Extension Nos. 64f) +1.5 m Leg Extension Nos. 3g) +3 m Leg Extension Nos. 9h) +4.5 m Leg Extension Nos. 3i) +6 m Leg Extension Nos. 10j) +7.5 m Leg Extension Nos. 5k) +9 m Leg Extension Nos. 12
5.4 Tension Tower DDa) Basic tower Nos. 42b) -4.5 m Leg Extension Nos. 5c) -3 m Leg Extension Nos. 3d) -1.5 m Leg Extension Nos. 6e) +/- 0 m Leg Extension Nos. 126f) +1.5 m Leg Extension Nos. 4g) +3 m Leg Extension Nos. 14h) +4.5 m Leg Extension Nos. 5i) +6 m Leg Extension Nos. 18j) +7.5 m Leg Extension Nos. 9
SCHEDULE - 4 (a) PAGE 6 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
k) +9 m Leg Extension Nos. 16l) +18 m Leg Extension Nos. 12
m) +25 m Leg Extension Nos. 12
5.5 Tension Tower DDSa) Basic tower Nos. 2b) +9 m Leg Extension Nos. 4c) +35m Leg Extension Nos. 4
6 Installation of Earthing of towers
i. Pipe Type Nos. 48ii. Counterpoise Type Nos. 90
7 Installation of following tower accessoriesi. Danger Plate Nos. 138ii. Number Plate Nos. 138iii. Phase Plate ( Set of three) Sets 276iv. Circuit Plate(Set of two) Sets 138v. Anti climbimg device Nos. 138vi. Bird Guard (set of three) Sets 84
8 Protection of tower footingi) Random rubble stone masonary including excavation (1:5 cement concrete) Cu.m.
3200
ii) Stone bound in galvanising wire netting including excavation Cu.m. 1800iii) Back filling and levelling of volumes enclosed by revetment for All kind of soil
except wet soil, fissured rock & hard rock Cu.m. 3100
iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 200
SCHEDULE - 4 (a) PAGE 7 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
9 Installation of insulator strings complete with arcing horns & necessary hardware, installing & stringing of bundle conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories (Quad bundle Conductor) in Double Ckt Line.
i) Normal Stretch (Double Ckt. Portion) kms 46
10 Installation of Optical Fibre Cable & Accessories for 400 KV Barhabise -Haledi,132 KV Haledi-Changunarayan&LILO of Bhaktapur-Chapali line at Changunarayan
A. OPGW cable & Accessories
i) 24 Fibre (DWSM) OPGW fibre optic cable (OFFLINE) km 61ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling
including all cable fittings & accessories except joint boxSets
61
iii) 24 Fibre (DWSM) OPGW fibre optic cable (Live Line 132 KV) km 12iv) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling
including all cable fittings & accessories except joint boxSets
12
iv) Joint box (24 Fibres) No. 25B. FODPi) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails (5 mtrs
each)No. 5
C. Fibre Optic approach cablei) 24 Fibre (DWSM) km 4ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable Sets
4
II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line
1 Survey
i) Detailed survey including route alignment, profiling, tower spotting km 14
ii)Check Survey &identification of right of way and Land Parcel including tower spotting
km 14
2 Detailed soil Investigation
i) All kind of soil except FR & HR Loc. 3
ii) Fissured/soft rock Loc. 4
iii) Hard rock Loc. 3
iv) River Crossing locations Loc. 0
3 Benching
i) All kind of soil except FR & HR Cum. 850
SCHEDULE - 4 (a) PAGE 8 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
ii) Fissured Rock Cum. 2500
iii) Hard Rock Cum. 700
4 Work associated with tower foundations.
4.1 Suspension Tower DA
a) Foundation for Basic Body (including -3m, -1.5m, +/- 0m Extension)
i) Dry Foundation Nos. 2
ii) Wet Foundation Nos. 3
iii) Fully Submerged Foundation Nos. 1
iv) Partially Submerged Foundation Nos. 2
v) Dry Fissured Rock Nos. 4
vi) Wet Fissured Rock Nos. 1
vii) Sandy Soil Foundation Nos. 1
b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension
i) Dry Foundation Nos. 1
ii) Wet Foundation Nos. 1
iii) Partially Submerged Foundation Nos. 1
iv) Dry Fissured Rock Nos. 4
4.2 Tension Tower DD
a) Foundation for Basic Body (including -3m, -1.5m, +/- 0m Extension)
i) Dry Foundation Nos. 1
ii) Wet Foundation Nos. 2
iii) Fully Submerged Foundation Nos. 1
iv) Partially Submerged Foundation Nos. 1
v) Dry Fissured Rock Nos. 5
b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension
i) Dry Foundation Nos. 2
ii) Wet Foundation Nos. 1
iii) Fully Submerged Foundation Nos. 1
SCHEDULE - 4 (a) PAGE 9 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
iv) Partially Submerged Foundation Nos. 1
v) Dry Fissured Rock Nos. 3
vi) Wet Fissured Rock Nos. 1
4.3 Tension Tower DD+ 18/25
i) Wet Foundation Nos. 1
ii) Dry Fissured Rock Nos. 1
4.4 Suspension Tower QA Multi circuit
a) Foundation for +0 m Extension
i) Dry Foundation Nos. 1
ii) Wet Foundation Nos. 2
iii) Partially Submerged Foundation Nos. 2
iii) Dry Fissured Rock Nos. 3
4.5 Tension Tower QD Multi circuit
a) Foundation for +0 m Extension
i) Dry Foundation Nos. 1
ii) Wet Foundation Nos. 2
iii) Partially Submerged Foundation Nos. 1
iv) Dry Fissured Rock Nos. 2
5
Erection of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc, tack welding and supply and application of enamel & zinc rich paint but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices
5.1 Suspension Tower DA
i) Basic tower Nos. 21
ii) -3 m Leg Extension Nos. 4
iii) -1.5 m Leg Extension Nos. 4
iv) +/- 0 m Leg Extension Nos. 72
v) +1.5 m Leg Extension Nos. 4
vi) +3 m Leg Extension Nos. 8
SCHEDULE - 4 (a) PAGE 10 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
vii) +4.5 m Leg Extension Nos. 2
viii) +6 m Leg Extension Nos. 8
ix) +7.5 m Leg Extension Nos. 2
x) +9 m Leg Extension Nos. 8
5.2 Tension Tower DD
i) Basic tower Nos. 21
ii) -3 m Leg Extension Nos. 4
iii) -1.5 m Leg Extension Nos. 4
iv) +/- 0 m Leg Extension Nos. 72
v) +1.5 m Leg Extension Nos. 4
vi) +3 m Leg Extension Nos. 10
vii) +4.5 m Leg Extension Nos. 2
viii) +6 m Leg Extension Nos. 10
ix) +7.5 m Leg Extension Nos. 2
x) +9 m Leg Extension Nos. 12
xi) +18 m Leg Extension Nos. 4
xii) +25 m Leg Extension Nos. 4
5.3 Suspension Tower QA Multi circuit
i) Basic tower Nos. 8
ii) +0 m Leg Extension Nos. 32
5.4 Tension Tower QD Multi circuit
i) Basic tower Nos. 6
ii) +0 m Leg Extension Nos. 24
6 Installation of Earthing of towers
i. Pipe Type Nos. 36
ii. Counterpoise Type Nos. 20
7 Installation of following tower accessories
i) Danger Plate Nos. 56
ii) Number Plate Nos. 56
SCHEDULE - 4 (a) PAGE 11 OF 11
Currency* Unit Rate Total Charges Unit Rate Total Charges
(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)
Unit
Installation Charges
Sl. No. Qty.Item DescriptionPortion in Nepaln Currency
(in NRs)Portion in Foreign Currency
iii) Phase Plate ( Set of three) Sets 140
iv) Circuit Plate(Set of two) Sets 70
v) Anti climbimg device Nos. 56
vi) Bird Guard (set of three) Sets 74
8 Protection of tower footing
i) Random rubble stone masonary including excavation (1:5 cement concrete) Cu.m. 900
ii) Stone bound in galvanising wire netting including excavation Cu.m. 500
iii) Back filling and levelling of volumes enclosed by revetment
a) All kind of soil except wet soil, fissured rock & hard rock Cu.m. 800
iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 60
9Installation of insulator strings complete with arcing horns & necessary hardware, installing & stringing of bundle conductor including fixing of conductor accessories, (Single Bear Conductor) in Double Ckt Line.
(i) Normal Stretch (Double Ckt. Portion) kms 10
(i) Normal Stretch (Multi Ckt. Portion) kms 4
Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
*Φ Strike out if not applicable
Name of Bidder: Date:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
TOTAL INSTALATION SERVICES (Total of column 7 and 9 to be carried forward to Schedule No. 5: Grand Summary)
Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
2.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.
Schedule-4 (b) Page 1 of 1
Schedule No. 4 : Installation and Other Services(b):Training Charges for training to be imparted abroad
Currency Total Training Charges
1 2 3 4 5 6 7 = 4x5 x 6
Total for Training Charges (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary)
Name of Bidder: Date:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
NOT APPLICABLE
Sl. No.
Total Training Charges
Training to Owners personnel on Design , testing and Maintenance aspect as per Section Project, Technical Specification at manufacturer's works
Description
Country where
training is to be imparted
Nos. of Trainee
Item for which training is to be imparted.
NEPAL ELECTRICITY AUTHORITY
TRANSMISSION DIRECTORATETamakoshi-Kathmandu 220/400kV Transmission Line Project
A
Training duration in
days
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
Schedule 4 (c) Page 1 of 1
Schedule No. 4 : Installation and Other Services(c):Training Charges for training to be imparted to Employer's Personnel by Bidder's Instructor in Nepal
Item for which training is to be imparted. Currency Total Training Charges
1 2 3 4 5 6 = 4x 5
Total for Training Charges ( total of column 6 To be carried forward to Schedule 5: Grand Summary)
Date: Signature:
Printed Name:
Designation:
Common Seal:
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
a)
Sl. No.Description of the Test
Training duration in
days
Training Charges for Contractors
NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
On Job training on operation, maintenance and testing & commissioning aspectat at one Location in Nepal as per section Project, Technical Specification
NOT APPLICABLE
Schedule 4 (d) Page 1 of 1
Schedule No. 4 : Installation and Other Services(d): Maintenance Charges
Currency Total Maintenance Charges
12
Total Maintenance Charges (To be carriedforward to Schedule 5: Grand Summary)
Date: Signature:
Printed Name:
Designation:
Common Seal:
Total Maintenance Charges
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
NOT APPLICABLE
NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
Sl No Description Unit Qty.
SCHEDULE - 4 (e) PAGE 1 OF 2
Schedule No. 4 : Installation and Other Services(e): Type Test charges for Type Tests to be conducted abroad
(1) (2) (3) (4) (5) (6) (7)=(5) x (6)I 400 kV Quad Barhabise - Lapsephedi Transmission Line
1 Proto Type Testing of towers1.1 Tower Type DA with extension No. 11.2 Tower Type DB with extension No. 11.3 Tower Type DC with extension No. 11.4 Tower Type DD with extension No. 1
2 ACSR MOOSE Conductor2.1 UTS Test No. 12.2 DC Resistance Test No. 12.3 Corona & RIV Test No. 1
3 AACSR MOOSE Conductor3.1 UTS Test No. 13.2 DC Resistance Test No. 13.3 Corona & RIV Test No. 1
4 7/3.66 mm GS Earthwire3.1 UTS Test No. 13.2 D.C. Resistance Test No. 1
Country of Testing Unit Qty.
Tamakoshi-Kathmandu 220/400kV Transmission Line ProjectTRANSMISSION DIRECTORATE
Currency # AmountSl. No. Description of Tests
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
SCHEDULE - 4 (e) PAGE 2 OF 2
(1) (2) (3) (4) (5) (6) (7)=(5) x (6)
Country of Testing Unit Qty. Currency # AmountSl. No. Description of Tests
II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line
1 Proto Type Testing of towers1.1 Tower Type DA with extension No. 11.2 Tower Type DD with extension No. 11.3 Tower Type QA with extension No. 11.4 Tower Type QD with extension No. 1
2 ACSR BEAR Conductor2.1 UTS Test No. 12.2 DC Resistance Test No. 1
TOTAL (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary)
#
Name of Bidder: Date:Signature of Bidder: (Printed Name)
(Designation) (Common Seal)
Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
Schedule 5 Page 1 of 1
Schedule No. 5: Grand Summary
1 TOTAL SCHEDULE NO. 1Plant and Equipment including Mandatory Spares tobe supplied from abroad.
2 TOTAL SCHEDULE NO. 2Plant and Equipment including Mandatory SparesParts to be supplied from within Nepal
3 TOTAL SCHEDULE NO. 3Design Services
4 TOTAL SCHEDULE NO. 4(a) Installation and construction charges(b) Training charges for training to be imparted abroad( c) Training charges for training to be imparted in Nepal(d) Maintenance charges(e) Type Tests charges for type Tests to be conducted abroad
GRAND TOTAL FOR PART A [1+2+3+4]
Date: Signature:
Printed Name:
Designation:
Common Seal:
NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line Project
Sl. No. DescriptionTotal Price Foreign
( )Total Price Local
( )
IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line
SCHEDULE - 6 PAGE 1 OF 1
Item No. Name & Description of Parts
Name of Original Manufacturer
Part No. Number of Units in each set
Total No. of Sets to be provided
Unit Price Total Price Remarks
Name of Bidder: Date: Signature of Bidder: (Printed Name) (Designation) (Common Seal)
Schedule No. 6: Recommended Availability/Optional Spares parts and Recommended Test Equipment (in line with Technical Specifications)
NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400kV Transmission Line ProjectIFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and
132 kV Transmission Line