8
NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED ALPHA CONSORTIUM LIMITED

NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

Embed Size (px)

Citation preview

Page 1: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

NEPA RCM PROJECT

ALPHA CONSORTIUM LIMITEDALPHA CONSORTIUM LIMITED

Page 2: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

INVESTMENTS

Collection Infrastructure– Investments in new Cash Offices. – Refurbishment of existing cash offices.– Provision of tools and equipment.– Motor Vehicles

Personnel development and training to enhance capacity building.

Page 3: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

BILLING CYCLE PROCESS

Enhancements in the billing software application to improve the billing system.

IT development in computerised offline cash downloading system for all cash points.

Investment in hardware infrastructure to improving the efficiency of the bill production.

Improved bill distribution with route sequencing system.

Page 4: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

MANAGEMENT INFORMATION SYSTEMS

Introduced measurement standards with KPI on all levels of management.

Evaluate workflows to enhance and support management operations.

Computerised customer service center Developed systematic tools to assist daily

management operations.

Page 5: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

NET ENERGY AVAILABLE VERSUS ENERGY BILLED

Energy Availabe/Energy Sold

0.0010,000.0020,000.0030,000.0040,000.0050,000.0060,000.0070,000.0080,000.0090,000.00

De

c-0

1

Ma

r-0

2

Ju

n-0

2

Se

p-0

2

De

c-0

2

Ma

r-0

3

Ju

n-0

3

Se

p-0

3

De

c-0

3

Months

MW

h

Energy Avaialble

Energy Sold

Linear (Energy Sold)

Linear (EnergyAvaialble)

Page 6: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

Performance Ratio

Performance Ratios

0%20%

40%60%

80%100%

120%140%

Ja

n-0

2

Ma

r-0

2

Ma

y-0

2

Ju

l-0

2

Se

p-0

2

No

v-0

2

Ja

n-0

3

Ma

r-0

3

Ma

y-0

3

Ju

l-0

3

Se

p-0

3

No

v-0

3Months

%

Billing Ratio

Collection Ratio

Performance Ratio

Linear (Billing Ratio)

Linear (Collection Ratio)

Linear (PerformanceRatio)

Page 7: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

CONTRACT NET BENEFIT TO NEPA (accumulated)

-10

40

90

140

190

240

290

340

Nair

a M

illi

on

naira

Page 8: NEPA RCM PROJECT ALPHA CONSORTIUM LIMITED. INVESTMENTS Collection Infrastructure – Investments in new Cash Offices. – Refurbishment of existing cash offices

THE END

THANK YOU

MERCI BEAUCOUP!