Social Monitoring Report Semiannual Report Project no: 44219-014 Loan/Grant: 3139/0397 Period Covered: July-Dec 2018 January 2019 NEP: South Asia Sub-regional Economic Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Social Monitoring Report

Semiannual Report Project no: 44219-014 Loan/Grant: 3139/0397 Period Covered: July-Dec 2018 January 2019

NEP: South Asia Sub-regional Economic

Cooperation (SASEC) Power System Expansion

Project (On- Grid)- (Annexure 1-9,11,12,13)

Prepared by the Nepal Electricity Authority and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure-1

Tower Foundation and Tower Erection Details

DKTLP

District: Parbat

S.N Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi Govt)

1 AP01 1 PVT 1 ku.na.pa-2

2 AP01A 1 PVT 1 ku.na.pa-2

3 AP01B 1 PVT 1 ku.na.pa-2

4 AP01C 1 PVT 1 ku.na.pa-2

5 AP02 1 Guthi 1 ku.na.pa-1

6 AP02/1 1 PVT 1 ku.na.pa-1

7 AP02/2 1 PVT 1 ku.na.pa-1

8 AP02A/0 1 PVT 1 ku.na.pa-1

9 AP03 1 PVT Forest 1 ku.na.pa-1

10 AP04 1 PVT Forest 1 ku.na.pa-1

11 AP05 1 PVT Forest 1 ku.na.pa-1

12 AP06 1 PVT 1 Jaljala-8

13 AP06A 1 PVT Guthi Jaljala-8

14 AP06B 1 PVT 1 Jaljala-8

15 AP07 1 PVT Forest 1 Jaljala-8

16 AP07A 1 PVT Jaljala-8

17 AP08 1 PVT Forest 1 Jaljala-8

18 AP08A 1 Forest Jaljala-8

19 AP09 1 Forest Jaljala-8

20 AP09A 1 Forest Jaljala-8

21 AP09B 1 Forest Jaljala-8

22 AP09C 1 Forest 1 Jaljala-8

23 AP10 1 PVT Forest 1 Jaljala-8

24 AP11 1 PVT Forest Jaljala-7

25 AP11A PVT Jaljala-7

26 AP12 1 PVT Jaljala-7

27 AP13 1 PVT 1 Jaljala-7

28 AP13/1 1 PVT Jaljala-7

29 AP13A 1 PVT 1 Jaljala-7

30 AP13B 1 Forest 1 Jaljala-7

31 AP13C 1 Forest 1 Jaljala-7

32 AP14 1 Forest 1 Jaljala-7

33 AP14/1 1 Forest 1 Jaljala-7

34 AP14A 1 Forest Jaljala-7

Page 3: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

35 AP15 1 PVT 1 Jaljala-7

36 AP16 1

Forest 1 Jaljala-4

37 AP16A 1 Forest 1 Jaljala-4

38 AP17 1 PVT 1 Jaljala-4

39 AP17A 1 PVT 1 Jaljala-4

40 AP17B PVT Jaljala-4

41 AP18 1 PVT Jaljala-4

42 AP18A 1 PVT Jaljala-3

43 AP18B 1 Forest 1 Jaljala-3

44 AP18C 1 Forest 1 Jaljala-3

45 AP19 PVT Jaljala-3

46 AP20 1 Forest 1 Jaljala-3

47 AP21 1 PVT 1 Jaljala-3

48 AP21A 1 PVT 1 Jaljala-2

49 AP22 1 PVT Jaljala-2

50 AP23 1 PVT 1 Jaljala-2

51 AP24 1 PVT Jaljala-2

52 AP24A 1 PVT Jaljala-2

53 AP25 1 PVT 1 Jaljala-2

54 AP25A 1 PVT Jaljala-2

55 AP25B 1 PVT 1 Jaljala-2

56 AP26 1 PVT 1 Jaljala-1

Total 45 8 36 1

District: Myagdi

SN Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi Govt)

57 27/0 1 PVT 1 Rahuganga-3

58 27A/0 1 PVT 1 Rahuganga-3

59 27B/0 1 PVT 1 Rahuganga-3

60 28/0 1 PVT

1 Rahuganga-3

61 28A/0 1 PVT 1 Rahuganga-3

62 29/0 1 PVT Rahuganga-3

63 30/0 1 PVT

Rahuganga-2

64 31/0 PVT Rahuganga-2

65 32/0 1 PVT Rahuganga-2

66 32A/0 PVT Rahuganga-2

67 33/0 PVT Rahuganga-2

68 33A/0 PVT Rahuganga-2

69 33B/0 1 PVT 1 Rahuganga-2

70 34/0 1 PVT 1 Rahuganga-2

71 34A/0 1 PVT 1 Rahuganga-2

72 34B/0 1 PVT 1 Rahuganga-2

Page 4: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

73 35/0 1 Forest 1 Rahuganga-1

74 35A/0 1 Forest Rahuganga-1

75 35B/0 1 PVT 1 Rahuganga-1

76 35C/0 1 PVT Rahuganga-1

77 36/0 1 PVT 1 Rahuganga-1

78 36A/0 1 PVT 1 Rahuganga-1

79 37/0 1 PVT 1 Annapurna-7

80 38/0 1 PVT 1 Annapurna-7

81 39/0 1 PVT Forest 1 Annapurna-7

82 39A/0 1 PVT Guthi 1 Annapurna-7

83 39B/0 1 PVT Guthi 1 Annapurna-7

84 39C/0 1 PVT Guthi 1 Annapurna-7

85 39D/0 1 PVT 1 Annapurna-1

86 40/0 1 Forest Annapurna-6

87 40A/0 1 PVT 1 Annapurna-1

88 41/0 1 PVT 1 Annapurna-1

89 41A/0 PVT ROW Annapurna-6

90 41B/0 PVT ROW Annapurna-6

91 42/0 PVT ROW Annapurna-6

92 42A/0 PVT ROW Annapurna-6

93 42B/0 PVT ROW Annapurna-6

94 43/0 PVT ROW Annapurna-6

95 44/0 1 PVT 1 Annapurna-2

96 44A/0 1 PVT Forest 1 Annapurna-2

97 45/0 1 Forest Annapurna-2

98 46/0 Govn Annapurna-2

99 46A/0 1 PVT 1 Annapurna-3

100 46B/0 1 Forest Annapurna-3

101 47/0 1 PVT Annapurna-3

102 47A/0 1 forest Annapurna-3

103 47B/0 1 PVT Annapurna-3

104 47C/0 1 PVT 1 Annapurna-3

105 48/0 1 Forest 1 Annapurna-3

106 48A/0 1 PVT 1 Annapurna-3

107 49/0 1 PVT 1 Annapurna-3

108 50/0 1 PVT 1 Annapurna-3

109 51/0 1 PVT 1 Annapurna-3

110 DE 1 PVT 1 Annapurna-3

Total 38 5 29 3

Grand Total 83 13 65 4

Page 5: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

MKTLP

SN Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi-Govt)

1 TP 0 0 0 Bandbhanjyang, Ktm.

2 AP-0/0 DE 1 0 0 Bandbhanjyang

3 AP-1/0 1 0 0 Land Acquisition not done

Bandbhanjyang

4 AP-2/0 1 0 0 Land Acquisition not done

Bandbhanjyang

5 AP-2/A 1 0 0 Land Acquisition not done

Bandbhanjyang

Total 0 0 3 1 0 0 4

District: Dhading

SN Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi-Govt)

1 AP-2/B 1 Naubise,Dhunibesi

2 AP-2/C 1 Naubise,Dhunibesi

3 AP-3/0 1 Poultry form has constructed at foundation location.

Naubise,Dhunibesi

4 AP-4/0 1 Land has excavated by land owner about 12 m down than original.

Naubise,Dhunibesi

5 AP-5/0 1 Naubise,Dhunibesi

6 AP-5/A/0 1 Naubise,Dhunibes

Page 6: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

i

7 AP-5/B/0 1 Naubise,Dhunibesi

8 AP-6/0 1 Naubise,Dhunibesi

9 AP-6/A/0 1 Naubise,Dhunibesi

10 AP-7/0 1 1 Naubise,Dhunibesi

11 AP-7/A 1

1 Naubise,Dhunibesi

12 AP-7/B 1 1 Naubise,Dhunibesi

13 AP-7/C 1 1 Naubise,Dhunibesi

14 AP-7/D 1 1 Naubise,Dhunibesi

15 AP-7/D/1 1 Not clear Naubise,Dhunibesi

16 AP-7/D/2 1 House at foundation

(ROW)

Naubise,Dhunibesi

17 AP-7/E 1 1 Naubise,Dhunibesi

18 AP8/0 1 1 Archale

19 AP8/1 1 0 1 Archale

20 AP8/2 1 1 Archale

21 AP-8/A 1 1 Ganishe

22 AP-8/B 1 1 Ganishe Chaur

23 AP-9/0 1 1 Ganishe Chaur

24 AP-10/0 1 1

Tower parts off loaded at

site

Pandit Pauwa

25 AP-11/0 1 1 Pandit Pauwa

26 AP-11/A 1 1 Pandit Pauwa

27 AP-11/B 1 1

Tower parts off loaded at

site

Pandit Pauwa

Page 7: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

28 AP-11/C 1 1 Pandit Pauwa

29 AP-12/0 1 1 Pandit Pauwa

30 AP-12A 1 1

Kebalpur

31 AP-12/A/1 1 1 Kebalpur

32 AP-12/B 1 Angur Kheti Kebalpur

33 AP-13/0 1 1 Kebalpur

34 AP-13/A 1 1 Kebalpur

35 AP-13/B 1 1 Kebalpur

36 AP-13/C 1 1 Tower parts off loaded at

site

Kebalpur

37 AP-13/D 1 1 Kebalpur

38 AP-14/0 1 1 leg Kebalpur

39 AP-14/A 1 1 Kebalpur

40 AP-14/B 1 1 Kebalpur

41 AP-14/C 1 1 Kebalpur

42 AP-15/0 1 1 Tower parts off loaded at

site

Kebalpur

43 AP-16/0 1 1 Goganpani

44 AP-16/A 1 1 2 pit Goganpani

45 AP-16/B 1 1 Tower parts off loaded

Goganpani

46 AP-16/C 1 1 Tower parts off loaded

Goganpani

47 AP-17/0 1 1 Tower parts off loaded

Goganpani

48 AP-17/A 1 Goganpani

49 AP-17/B 1 Goganpani

50 AP-18/0 1 Goganpani

51 AP-18/A 1 Goganpani

52 AP-18/B 1 Goganpani

Page 8: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

53 AP-18/B/1 1 2 pit Goganpani

54 AP-18/C 1

Goganpani

55 AP19/0 1 Goganpani

56 AP-19/A 1 Goganpani

57 AP-19/B 1 Goganpani

58 AP-19/C 1 Goganpani

59 AP-20/0 1 Galchhi

60 AP-20/A 1 Galchhi

61 AP-20/B 1 1 Galchhi

62 AP-20/C 1 1 Galchhi

63 AP-20/D 1 1 Galchhi (Kalleri)

64 AP-21/0 1 1 Galchhi

65 AP-21/1

1

ROW Issue Galchhi

66 AP-21/1/1 1 1 Galchhi

67 AP-21/A 1 1 Galchhi

68 AP-21/B 1 ROW Issue Galchhi

69 AP-21/C 1 1 3 pit Galchhi

70 AP-21/D 1 1 Galchhi

71 AP-21/E 1

Galchhi

72 AP-21/F 1 ROW Issue Galchhi

73 AP-21/G 1 1 Baireni

74 AP-21/H 1 1 Baireni

75 AP-21/I 1 1 Baireni

76 AP-21/J 1 1 Baireni

77 AP-22/0 1 Peda

78 AP-23/0 1

Peda

79 AP-23/A 1

1 Pipaltar,Kumpur

80 AP-24/0 1 1 Pipaltar,Kumpur

Page 9: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

AP-24/1 1 3 pit Pipaltar,Kumpur

81 AP-24/A 1 Pipaltar,Kumpur

82 AP-24/B 1 Pipaltar,Kumpur

83 AP-24/C 1 Pipaltar,Kumpur

84 AP-24/D 1 1 2 pit Pipaltar,Kumpur

85 AP-24/D/1 1 1 Pipaltar,Kumpur

86 AP-24/D/2 1 1 Pipaltar,Kumpur

87 AP-24/D/3 1 1 Pipaltar,Kumpur

88 AP-24/E 1 Pipaltar,Kumpur

89 AP-24/F 1 Pipaltar,Kumpur

90 AP-24/G 1 Pipaltar,Kumpur

91 AP-25/0 1 1 Chhapdanda

92 AP-25/A 1 1 Chhapdanda

93 AP-25/B 1 1 Chhapdanda

94 AP-25/B/1 1 1 Tower parts off loaded

Chhapdanda

95 AP-25/C 1 1 Tower parts off loaded

Chhapdanda

96 AP-26/0 1 1 Tower parts off loaded

Chhapdanda

97 AP-26/A 1 1 Kumpur (Siddalek)

98 AP-26/B Kumpur

99 AP-27/0 1

1 Kumpur

100 AP-27/A 1 1 Kumpur

101 AP-27/A/1 1 Kumpur

102 AP-27/B 1 Kumpur

103 AP-27/C 1 Kumpur

104 AP-27/D 1 Kumpur

105 AP-27/E 1 Kumpur

106 AP-28/0 1 1 Kumpur

107 AP-28/A 1 Dhading Besi

Page 10: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Road

108 AP-29/0 1 Land excavated about 17 m

down by land owner new tower foundation

design to be done.

Malekhu

109 AP-29/A 1 Land rate now

finalized on19-08-

018

Malekhu

110 AP-29/B 1 do Malekhu

111 AP-30/0 1 do Malekhu

112 AP-30/A 1 do Malekhu

113 AP-31/0 1 1

Salang

114 AP-31/1 1 1 Salang

115 AP-31/2 1 1 Salang

116 AP-31/A 1 1 Salang

117 AP-32/0 1 1 Salang

118 AP-32/1 1 1 Salang

119 AP-33/0 1 1 Salang

120 AP-33/A 1 1 Salang

121 AP-33/B 1 1 Salang

122 AP-33/B/1 1 1 Salang

123 AP-34/0 1 1 Salang

124 AP-34/A 1 Land rate finalized(RO

W)

Benighat

125 AP-34/A/1 1 1 Salang

126 AP-35/0 1 1 Salang

127 AP-37/0 1 1 Bishaltar

128 AP-37/A 1 3 pit Bishaltar

129 AP-43/B 1 ROW Issue Jogimara

130 AP-44/0 1 1 Jogimara

131 AP-44/A 1 1 Tower parts off loaded

Jogimara

132 AP-45/0 1 1 Jogimara

133 AP-46/0 1 1 Jogimara

134 AP-46/1 1 1 Jogimara

135 AP-46/A 1 1 Jogimara

136 AP-46/B 1 1 Jogimara

Page 11: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

137 AP-46/C 1 1 pit Jogimara

138 AP-47/0 1 1 Jogimara

139 AP-47/A 1 1 Jogimara

140 AP-47/B 1 1 Jogimara

141 AP-47/C 1 1 Jogimara

142 AP-47/D 1 1 Jogimara

143 AP-48/0 1 1 Jogimara

Total 101 14 24 4 76 13 143

District: Chitwan

SN Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi Gvt)

1 AP-49/0 0 1 Darechowk

2 AP-49/A 0 1 Darechowk

3 AP-49/B 1 1 Darechowk

4 AP-50/0 1 1 Darechowk

5 AP-50/A 1 1 Darechowk

6 AP-51/0 1 1 Darechowk

7 AP-51/A 1 1 Darechowk

8 AP-51/B 1 Darechowk

9 AP-52/0 1 1 Darechowk

10 AP-52/A 0 1 Darechowk

11 AP-52/B 1 1 Darechowk

12 AP-53/0 1 1 Darechowk

13 AP-54/0 1 1 Darechowk

14 AP-54/A 1 1 Darechowk

15 AP-54/B 1 1 Darechowk

16 AP-54/C 0 1 House Darechowk

17 AP-55/0 1 Darechowk

18 AP-56/0 0 1 Darechowk

19 AP-56/A 0 1 2 pit Darechowk

20 AP-57/0 0 1 3 pit Darechowk

21 AP-57/A 0 0 1 Darechowk

22 AP-57/B 0 0 1 Darechowk

23 AP-57/C 1 1 Darechowk

24 AP-58/0 1 1 Darechowk

25 AP-58/A 1 Darechowk

26 AP-58/B 0 1 2 pit Darechowk

27 AP-58/C 0 1 1 pit Darechowk

28 AP-59/0 0 1 Darechowk

29 AP-60/0 1 Darechowk

Total 17 6 2 4 12 1 29

Page 12: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

District: Gorkha

S. No.

Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi Gvt)

1 AP-35/1 1 1 Siurenitar

2 AP-35/A 1 1 Siurenitar

3 AP-36/0 1 1 Siurenitar

4 AP-37/B 1 1

Ghyalchowk

5 AP-37/C 1 1 Ghyalchowk

6 AP-37/D 1 1 Ghyalchowk

7 AP-38/0 1 1 Ghyalchowk

8 AP-38/1 1 1 Ghyalchowk

9 AP-38/A 1 1 Ghyalchowk

10 AP-38/B 1 1 Ghyalchowk

11 AP-39/0 1 1 Ghyalchowk

12 AP-39/A 1 1 Ghyalchowk

13 AP-40/0 1 1 Ghyalchowk

14 AP-40/A 1 1 Ghyalchowk

15 AP-41/0 1 Ghyalchowk

16 AP-42/0 1 1 Ghyalchowk

17 AP-43/0 1 1 Ghyalchowk

18 AP-43/A 1 1 Ghyalchowk

19 AP-60/A 1 Gyaja

20 AP-61/0 1 Gyaja

21 AP-61/1 1 3 pit Gyaja

22 AP-61/A 1 Gyaja

23 AP-61/B 1 Gyaja

24 AP-62/0 1 Gyaja

25 AP-63/0 1 Gyaja

26 AP-64/0 1 Gyaja

27 AP-65/0 1 Gyaja

28 AP-65/A 1 Gyaja

29 AP-65/B 1 Gyaja

30 AP-66/0 1 Gyaja

31 AP-67/0 1 1 Gyaja

32 AP-67/A 1 Manakamana

33 AP-68/0 1 1 Manakamana

34 AP-69/0 1 1 Manakamana

35 AP-69/1 1 1 Manakamana

36 AP-69/A 1 1 Manakamana

37 AP-70/0 1 1 Deurali

38 AP-70/A 1 Deurali

39 AP-70/B 1 Deurali

Page 13: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

40 AP-70/C 1 Deurali

41 AP-70/D 1 1 Deurali

42 AP-71/0 1 1 Deurali

43 AP-72/0 1 1 Deurali

44 AP-72/A 1 Deurali

45 AP-72/B 1 1 Deurali

46 AP-73/0 1 Deurali

47 AP-73/A 1 3 leg completed 1 leg at house

Deurali

48 AP-74/0 1 1 Deurali

49 AP-74/1 1 1 Deurali

50 AP-74/2 1 3 leg complete 1 leg ROW

issue

Deurali

51 AP-75/0 1 1 Deurali

Total 43 6 0 2 27 3 51

District: Tanahun

S. No.

Angle Point Completed Foundation

Foundation Under Progress

Remaining Completed Erection

Erection Under

progress

Remarks Location

Private Land

Jungle Ailani (Semi Gvt)

1 AP-75/A 1 1

2 AP-75/B 1 1

3 AP-75/C 1 1

4 AP-76/0 1 0 0 Markichowk

Total 4 0 0 0 3 0 4

Grand Total 165 26 29 11 118 17 231

Page 14: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure-2

Status of Compliance with Loan Covenants

Sch. Para No.

Description Current Status

4. 9. The Borrower shall ensure that no Works contract which involves involuntary resettlement impacts is awarded, until the Borrower and NEA have prepared and submitted to ADB the final RIPP based on the Project’s detailed design, and obtained ADB’s clearance of such RIPP.

Being complied

4. 10. The Borrower shall ensure that no Works contract which involves impacts on indigenous peoples is awarded until the Borrower and NEA have prepared and submitted to ADB the final RIPP, and obtained ADB’s clearance of such RIPP.

Being complied

5. 7. The Borrower shall establish and maintain, or cause NEA and AEPC to establish and maintain, a grievance redress mechanism acceptable to ADB for the purpose of addressing any grievances arising out of the Project, including those from affected peoples concerning land acquisition, environment and any other social issues in a timely manner.

Being complied

5. 12. The Borrower shall ensure, or cause NEA and AEPC, as applicable, to ensure, that all land and all rights-of-way required for the Project, each Subproject and all Project facilities are made available to the Works contractor in accordance with the schedule agreed under the related Works contract and all land acquisition and resettlement activities are implemented in compliance with (a) all applicable laws and regulations of the Borrower relating to land acquisition and involuntary resettlement; (b) the Involuntary Resettlement Safeguards; (c) the RF (for Subprojects); and (d) all measures and requirements set forth in the RIPP, as appropriate, and any corrective or preventative actions set forth in the Safeguards Monitoring Report.

Being complied

5. 13. Without limiting the application of the Involuntary Resettlement Safeguards or the RIPP, the Borrower shall ensure, or cause NEA to ensure, that no physical or economic displacement takes place in connection with the Project until: (a) compensation and other entitlements have been provided to affected people in accordance with the RIPP, as appropriate; and (b) a comprehensive income and livelihood restoration program has been established in accordance with the RIPP, as appropriate.

Being complied

5. 14. The Borrower shall ensure, or cause NEA and AEPC to ensure, as applicable, that the preparation, design, construction, implementation and operation of the Project, each Subproject and all project facilities comply with (a) all applicable laws and regulations of the Borrower relating to indigenous peoples; (b) the Indigenous Peoples Safeguards; and (c) the IPPF (for Subprojects); and (d) all measures and requirements set forth in the RIPP, as appropriate, and any corrective or preventative actions set forth in a Safeguards Monitoring Report.

Being complied

5. 15. The Borrower shall ensure that Part 3 of the Project does not have any indigenous peoples or involuntary resettlement impacts, all within the meaning of SPS. In the event that Part 3 of the Project does have any such impact, the Borrower shall take all steps to ensure that the Project complies with (a) the applicable laws and regulations of the Borrower; (b) the SPS; and (c) the IPPF and the RF, as applicable.

Being complied

5. 16. The Borrower shall make available, or cause NEA and AEPC to make available, necessary budgetary and human resources to fully implement the EMP and the RIPP.

Being complied

5. 17. The Borrower shall ensure, or cause NEA and AEPC to ensure, that all bidding documents and contracts for Works contain provisions that require contractors to: (a) comply with the measures relevant to the contractor set forth in the IEE, the EMP and the RIPP (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a Safeguards Monitoring Report; (b) make available a budget for all such environmental and social measures; (c) provide the Borrower with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP and the RIPP; (d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and (e) Reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction.

Being complied

5. 18. The Borrower shall do the following or cause NEA and AEPC to do the following: (a) submit semiannual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;

(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, and the RIPP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; (c) report any actual or potential breach of compliance with the measures and requirements set forth in the EMP and the RIPP promptly after becoming aware of the breach.

Being complied

Page 15: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 16: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 3

Rate Fixation for compensation

Compensation Rate Fixation in MKTLP- Chitwan district

Location

Land Rate (per Kaththa)

Access to earthen motor Way

Access to track way / Gully

No access to road

Ikchhakamana RM (Former Darechowk VDC, Ward N. 1 and 7)

8 Lakh 7 Lakh 6 Lakh

IkchhakamanaIkchhakamana RM (Former Darechowk VDC, Ward No.

2 and 3) 6.50 Lakh 5.50 Lakh 4.75 Lakh

Compensation Rate Fixation in MKTLP- Dhading district

Location

Land Rate (per Ropani)

Access to earthen motor Way

Access to track way / Gully

No access to road

Berighat Rorang RM ( Surrounding area of Malekhu Bazar of former Benighat VDC ward no-6)

24 Lakh 23 Lakh 22 Lakh

23 Lakh 22 Lakh 21 Lakh

Berighat Rorang RM ( Surrounding area of Benighat and Bishaltar of forrmer Benighat VDC

ward no-8)

22 Lakh 21 Lakh 20 Lakh

21 Lakh 20 Lakh 19 Lakh

Page 17: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Rate Fixation Meeting minutes of CDC, Dhading district

Page 18: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 19: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Land acquisition notice of Kathmandu district-MKTLP

Page 20: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 4 Status of Compensation Distribution and Land Acquisition

Details of Compensation Distribution due to land acquired in Myagdi-District (DKTLP)

S.N. Land Owner’s Name Address Tower No.

Received Amount

1 Dani Prasad Gauchan Annapurna-3 AP 51 1753906.00

2 Deu Bahadur Garbuja Annapurna-7 AP 38 209375.00

3 Man Bahadur Purja Annapurna-7 AP 37 1196875.00

4 Kum Bahadur Garbuja Annapurna-7 AP 38 175000.00

5 Gam Bahadur Biswakarma Annapurna-3 AP 52 603125.00

6 Mati Maya Thapa Annapurna-3 AP 48 A 218359.00

7 Chandra Prasad Sherchan Annapurna-3 AP 46 A 1828125.00

8 Gomati Bhanne Gau Devi Tilija

Raghuganga-1 AP 36 1371094.00

9 Krishan Prasad Tulachan Annapurna-3 AP 52 175000.00

10 Purna Bahadur Karki Raghuganga-3 AP 27 B 995313.00

11 Dhan Kumari Bhandari Raghuganga-2 AP 32 925000.00

12 Dil Kumari Pun Raghuganga-1 AP 36 A 462109.00

13 Dalfi Ramjali Magar Annapurna-1 AP 40 A 812500.00

14 Tul Bahadur KC Raghuganga-2 AP 30 415625.00

15 Om Prasad Pun Raghuganga-1 AP 36 A 345313.00

16 Tek BahadurTilija Raghuganga-1 AP 36 A 218359.00

17 Man Bahadur Pun Raghuganga-1 AP 49 96484.00

18 Nand Bahadur Katuwal Chhetri

Annapurna-3 AP 47 C 776953.00

19 Lil Bahadur Pun Annapurna-3 AP 49 817578.00

20 Tug Bahadur Mallla Raghuganga-3 AP 27

1911328.00 AP 28

21 Toran Kumari Karki Raghuganga-2 AP 33 B 162500.00

22 Karn Bahadur Karki Raghuganga-2 AP 33 B 890625.00

23 Hark Bahadur Ramjali Annapurna-3 AP 50 1002930.00

24 Nar Bahadur Purja Annapurna-3 AP 49 10156.00

25 Tilisara Thapa Magar Annapurna-3 AP 47 B 1015625.00

26 Rammaya Ramjali Annapurna-3 AP 47 A 271680.00

Page 21: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

27 Chameli KC Raghuganga-2 AP 30 312500.00

28 Som Bahadur Bhandari Raghuganga-3 AP 27 A 502734.00

29 Indra Bahadur Karki Raghuganga-3 AP 28 18750.00

30 Bishnu Bahadur Karki,Ram Bahadur Karki

Raghuganga-3 AP 28 9375.00

31 Basant Karki KC, Rajan KC Raghuganga-2 AP 31 765625.00

32 Dirgha Bahadur Thapa Annapurna-3 AP 47 B 10156.00

33 Na Bahadur Purja Annapurna-1 AP 41 1546875.00

34 Rim Bahadur Karki Raghuganga-3 AP 298437.00

35 Jang Bahadur Rantija Pun, Nandsari

Annapurna-7 AP 39 653125.00

36 Harikala Sherchan Annapurna-3 AP 48 180273.00

37 Jang Bahadur Thapa Annapurna-3 AP 48 A 469727.00

38 Chandra Bahadur Garbuja Annapurna-3 AP 39 C 208203.00

39 Tekku Pun Annapurna-7 AP 39 C 203125.00

40 Ha Bahadur Purja Annapurna-1 AP 39 D 835352.00

41 Rabisha Purja Raghuganga-1 AP 36 A 335157.00

42 Dhan Bahadur Pun ,Sant Bahadur Garbuja

Annapurna-3 AP 47 343750.00

43 Thaman Bahadur Purja,Chha Bahadur Purja

Annapurna-7 AP 39 121875.00

44 Fulu Padhyaya Mangala-1 AP 30 456250.00

45 Raju Kumari Shahi Raghuganga-3 AP 27 A 523047.00

46 Takmati Purja Raghuganga-1 AP 35 B 593750.00

47 BalKumari Sunar Annapurna-2 AP 44 671875.00

48 Hira Bahadur Rantija ,Kum Bahadur

Annapurna-7 AP 38 821875.00

49 Tirth Bahadur and Dhan Bahadur Purja

Raghuganga-1 AP 35 B 898438.00

50 Samita Sherchan Annapurna-2 AP 44 A 212500.00

Page 22: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

51 Ram Bahadur Sherchan Annapurna-2 AP 44 A 425000.00

52 Pritam Rantija Annapurna-7 AP 39 C 337695.00

53 Ruk Devi Sherpunja Annapurna-7 AP 39 C 337695.00

54 Min Bahadur Karki Chhetri Annapurna-2 AP 47 C 203125.00

TOTAL 30957226.00

Page 23: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Distribution of the land acquired for tower construction in Parbat District-DKTLP

S.N. Angel Point

Land Owner Address Compensation

Received Amount

1

AP1

Khantari Padhyaya

Kusma-2

46875/-

2 Chandra Datta Jaisi 31,250/-

3 Gayatri Devi Padhyani 11,09,375/-

4

AP1A

Padma Devi Sharma

Kusma-2

5,39,062/-

5 Ishwari Prasad Padhya 402343/-

6 Tej Kumari Padhyani 125000/-

7 Motikala Padhyani 93750/-

8 Gagan Raj Sharma 97656/-

9 AP1B

Putali Nepali Kusma -2

601562/-

10 Tara Devi Sharma 332031/-

11

AP1 C

Fanindra Paudel

Kusma-1

115625/-

12 Bhumiraj Paudel 271875/-

13 Loknath Paudel 109375/-

14 Pabitra Jaisi 159375/-

15 Rabilal Sharma Paudel 228125/-

16 Bal Krishna Upadhyaya 143750/-

17 Pitambar Das Bairagi 15625/-

18

AP2A

Sabitra Gharti

Kusma-1

58593/-

19 Ramakant Paudel 539062/-

20 Ishwari Prasad Rijal 31250/-

21 Gobind Prasad Rijal 171874/-

22 Kul Prasad Paudel 128906/-

23 Dhaka Ram Paudel 171875/-

24 Netra Lal Rijal 335937/-

25 AP2/1 Madan Prasad Paudel Kusma-1

62,500/-

26 Yadav Prasad Paudel 421875/-

27

AP2/2

Sunil Rijal

Kusma-1

287500/-

28 Khyam Raj Rijal 106250/-

29 Jamuna Kadel 193750/-

30 Kopila Rijal 9375/-

31 AP3 Bishnu Prasad Upadhyaya Kusma-1 18750/-

32

Atma Hari KC

262500/-

33 Baburam KC 128906/-

Page 24: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N. Angel Point

Land Owner Address Compensation

Received Amount

34

AP6

Gajendra Bahadur Khatri

Jaljala-8

253125/-

35 Parshuram KC 229687/-

36 Bhim Bahadur Gharti

Chhetri 18750/-

37 Bisi Damini 9375/-

38 Hank Bahadur Chhetri 7031/-

39 Durga Bahadur Chhetri 7031/-

40 Khum Bahadur GC 4687/-

41

AP6A

Bhime Damai

Jaljala -8

378125/-

42 Purna Lal Sharma 134375/-

43 Rishiram Padhya 12500/-

44

AP6 B

Laxmi Prasad Upadhyaya

Jaljala-7

119531/-

45 Jayashwar Upadhyaya 241406/-

46 Narayan Prasad

Upadhyaya 7031/-

47

AP7

Dandpani Padhya

Jaljala-7

124609/-

48 Taranath Regmi 124609/-

49 Kamal Prasad Regmi 270703/-

50 AP11 Gokul Prasad Jaisi Jaljala-7 96679/-

51

AP12

Shiv Prasad Acharya

Jaljala-7

23437/-

52 Kedarnath Acharya 843750/-

53 Lilawati Rijal 73242/-

54

AP21

Dil Bahadur Damai

Jaljala-2

45410/-

55 Bagbir Damai 308007/-

56 Durge Damai 185546/-

57 AP21A

Bagbir Damai Jaljala-2

11132/-

58 Balbir Darji 55664/-

59 AP24

Guma Kumari Baruwal Jaljala-2

311717/-

60 Chandra Bahadur Baruwal 582617/-

61 AP25 Guman Singh Karki

Chhetri Jaljala-2 968750/-

62 AP2/1 Manarupa Rijal Kusma-2 Parbat 421875/-

63 AP12 Shiv Prasad Acharya Jaljala-7 Parbat 98437/-

64 AP13 Man Kumari Upadhyaya Jaljala-7 Parbat 219736/-

Page 25: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N. Angel Point

Land Owner Address Compensation

Received Amount

65 AP18A Shyam Bahadur Shrestha Jaljala-3 Parbat 205859/-

66 AP18 Durga Bahadur Karki Jaljala-4 Parbat 260351/-

67 AP1 Durga Bahadur Sharki Jaljala-4 Parbat 248632/-

68 AP18A Ishwari Kumari Shrestha 151366/-

69 AP13A Dandpani Upadhyaya Jaljala-7 Parbat 1084375/-

70 AP2/1 Dilli Raj Upadhyaya Kusma-1 Parbat 25000/-

71 AP22

Bam Bahadur Bishwakarma

Jaljala-3 Parbat 423046/-

72 AP17 Arjun Bahadur Malla Jaljala-4 Parbat 404492/-

73

AP18

Saraswati Karki Jaljala-4 Parbat 284570/-

74 Muna Damai Jaljala-4 Parbat 45410/-

Total 16,673,246.00/-

Page 26: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of Compensation Distribution due to land acquired in Dhading-District (MKTLP)

S.N Angle Point

Land Owner Name Vulnerable Groups Deed transf

er

Municipality/RM

Ward No

Plot No

Required Land Area

Total affected

land sq m

Compensation Amount

Month

IP Womenheaded

Dalit Below poverty line

Disabled

1 AP8/0 Raj Kumar Tamang 1 1 1 Thakre RM 8 371 0 10 3 0 341.85 839843.75 May

2 AP8/0 Bishnu Kumar Tamang 1 1 Thakre RM 8 373 0 10 3 2 345.83 849609.38 May

3 AP8/1 Ramesh Thapa 1 Thakre RM 8 405 0 11 3 0 373.65 917968.75 May

4 AP46/

0 Rudra Devi Mainali 1

Benighat Rorang

10 79 0 7 1 0 230.55 453125.2 May

5 AP8/2 Sani Maiya

Khadka/Hom Bdr Khadka

1 Thakre RM 8 235 0 8 3 0 278.25 683593.75 May

6 AP17/

0 Bishnu Bhujel 1 1 Thakre RM 11 118 0 13 2 0 429.3 1012500 May

7 AP24F

/0 Chandra B.Shrestha 1 1 Siddha Lek 7 182 0 1 3 2 59.63 134765.63 May

8 AP24D

/1 Sunita Khatiwada 1 Siddha Lek 7 133 0 14 3 0 469.05 1198437.5 May

9 AP25A

/0 Raj Kumar Shrestha 1 1 Siddha Lek 7 223 1 1 3 1 566.38 1280273.44 May

10 AP24G

/0 Samsere Sarki 1 1 Siddha Lek 7 272 0 13 0 1 415.39 938867.19 May

11 AP25C

/0 Rewati Prasad Pandey 1 Siddha Lek 7 9 0 15 2 2 496.88 1269531.25 May

12 8A/0 Kul Bahadur Thapa 1 Thakre RM 8 17 0 8 3 3 284.22 782031.25 May

13 AP33/

0 Hem Lal Sedai 1 Siddha Lek 3 134 0 10 1 2 329.93 713281.25 May

14 AP33/

0 Lila Nath Sedai 1 Siddha Lek 3 135 0 11 3 0 373.65 807812.5 May

15 AP33B

/0 Khun Prasad Sedai 1 Siddha Lek 3 120 0 10 2 3 339.87 734765.63 May

16 AP33A

/0 Deb Kumari Sedai/Than

Nath Sedai 1 Siddha Lek 3 122 0 2 3 3 93.42 201953.13 May

17 AP34/

0 Ram Prasad Pandey 1 Siddha Lek 3 181 0 2 3 1 89.44 193359.38 May

Page 27: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

18 AP7D/

0 Duna Raj Koirala 1 Dhunibesi 6 104 0 9 3 0 310.05 731258 May

19 AP7/0 Dinesh Thapa Magar 1 1 Dhunibesi 6 529 0 3 1 2 107.33 253125 May

Sub Total 6 0 1 1 0 19 5934.67 13996101.98

20

AP12/0

Padam Kumari Pandit 1 Thakre RM 9 402 0 11 3 0 373.65 881258 June

AP12/0

Padam Kumari Pandit 1 Thakre RM 9 400 0 0 1 2 11.93 28125 June

21 AP2C/

0 Janak K.C 1 Dhunibesi 9 433 0 12 1 2 393.53 1,082,812.50 June

22 AP23A

/0 Mandira Khatiwada 1 Siddha Lek 7 123 0 15 2 1 494.89 1264453.13 June

23 AP46/

0 Buddhi Lal Shrestha 1 1

Benighat Rorang

10 80 1 1 1 0 548.49 1078125 June

24

AP13C/0

Rudra Prasad Adhikari 1 Thakre RM 10 105 0 2 3 1 89.44 210937.5 June

AP13C/0

Rudra Prasad Adhikari 1 Thakre RM 10 156 0 13 2 1 431.29 1017187.5 June

25 AP

8A/0 Durga Ba.Shrestha 1 1 Thakre RM 8 196 0 0 2 1 17.89 49218.75 June

26 AP

13/0 Saili Shrestha 1 1 Thakre RM 10 157 0 1 3 1 57.64 135937.5 June

27 AP25C

/0 Yedu Kumar Ghimire 1 Siddha Lek 7 10 0 6 1 2 202.73 458203.13 June

28 AP32/

1 Keshar Bahadur Thapa

Magar 1 1 Siddha Lek 4 43 0 15 0 1 478.99 941406.25 June

29 AP24G

/0 Yek Maya Mijar 1 1 Siddha Lek 7 271 0 10 2 0 333.9 853125 June

30 AP47A

/0 Om Pd. Shrestha 1 1

Benighat Rorang

10 9 0 3 0 0 95.4 187500 June

31 45/0 Dil Bahadur Parja 1 1 Benighat Rorang

10 271 1 4 1 1 645.88 1269531.25 June

Total 6 0 1 0 0 14 0 120 2656 2 93 22 13

4175.65 9457820.51

32 AP24G

/0 Krishne Sarki 1 1 Siddha Lek 7 270 0 1 3 3 61.62 157421 July

33

AP25/0

Chandra Bahadur Shrestha

1 Siddha Lek 7 125 0 8 1 0 262.35 670312.5 July

AP24F/0

Chandra B Shrestha 1 1 Siddha Lek 7 178 0 4 3 0 151.05 341406.25 July

34 AP28/ Kashi Bahadur Magar 1 1 Siddha Lek 6 4 0 9 2 0 302.10 771875 July

Page 28: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

0

35

AP28/0

Nanda Kumari Darlami Magar

1 Siddha Lek 6 5 0 10 0 0 318.00 500000 July

AP28/0

Nanda Kumari Darlami Magar

1 1 Siddha Lek 6 3 0 0 2 3 21.87 49414.06 July

36 AP32/

0 Indra Kumari Tripathi 1 Siddha Lek 4 138 0 3 1 0 103.35 284375 July

37 AP32/

1 Yam Kumari Thapa

Magar 1 1 Siddha Lek 4 42 0 2 2 1 81.49 176171.88 July

38 AP32/

1 Satal Sing Magar 1 1 Siddha Lek 4 44 0 1 0 2 35.78 77343.75 July

39 31A/0 Nira Kumari Tripathi 1 1 Siddha Lake

4 376 1 1 1 0 548.49 1509375 July

40 AP33C

/0 Sita Devi Pandey 1 Siddha Lek 3 239 0 2 3 0 87.45 189062.5 July

41

AP34/0

Mohan Lal Thapa/Magagr

1 1 Siddha Lek 3 163 0 1 3 0 55.65 120312.5 July

AP34/0

Mohan Lal Thapa/Magar 1 Siddha Lek 164 0 12 1 2 393.53 850781.25 July

42

AP44/0

Bhim,Udaya, Keshara 1 Benighat Rorang

9 10 0 1 1 0 39.75 218750 July

AP44/0

Bhim,Udaya, Keshara 1 Benighat Rorang

9 13 0 9 1 0 294.15 218750 July

43 AP44A

/0 Tilak Ba. Malla Thakuri 1

Benighat Rorang

9 3 1 4 3 0 659.79 1296875 July

44 AP46B

/0 Dhan Kumari Saudi 1

Benighat Rorang

9 172 0 10 1 3 331.92 652343.75 July

45

AP47A/0

Om Pd. Shrestha 1 Benighat Rorang

10 11 1 0 2 2 528.62 1039062.5 July

AP47A/0

Om Pd. Shrestha 1 1 Benighat Rorang

10 113 0 0 0 2 3.98 7812.5 July

46

AP21I/0

Shyam L Shrestha(Anila Rana)

1 Galchhi

RM 4 283 0 12 1 0 389.55 995312.5 July

AP21I/0

Shyam L Shrestha(Anila Rana)

1 1 Galchhi

RM 4 282 0 0 0 1 1.99 5078.13 July

47

AP24/0

Krishna Giri 1 Siddha Lek 7 30 0 0 3 1 25.84 66015 July

AP24/0

Krishna Giri 1 Siddha Lek 7 346 0 13 2 2 433.28 1107031.25 July

48 AP24D

/3 Aannada Adhikari 1 Siddha Lek 7 502 0 14 3 1 471.04 1203515.63 July

Page 29: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

49 AP24F

/0 Purna Lal Shrestha 1 1 Siddha Lek 7 179 0 4 2 0 143.10 323437.5 July

50 AP24F

/0 Bhawa Nath Bhatta 1 Siddha Lek 7 183 0 13 0 0 413.40 934375 July

51 33B/1 Ramesh Prasad Pandey 1 Siddha Lek 4 238 0 10 1 1 327.94 708984.38 July

52 AP2C/

0 Sarada Baral 1 Dhunibesi 9 434 0 3 3 0 119.25 281250 July

53 AP5A/

0 Sanu Babu Upreti 1 Dhunibesi 7 110 0 15 2 0 492.90 1162500 July

54 AP6A/

0 Aambar Ba.Upreti 1 Dhunibesi 7 87 0 4 2 2 147.08 346875 July

55 AP7A/

0 Danda Prasad Upreti 1 Dhunibesi 6 202 0 11 3 0 373.65 881250 July

56 AP

7B/0 Jagat Ba. Upreti 1 Dhunibesi 6 183 0 8 3 0 278.25 656250 July

57 AP

7B/0 Hari Maya Tiwari 1 Dhunibesi 6 203 0 6 0 0 190.80 450000 July

58 AP7C/

0 Krishna Ba. Khatri 1 1 Dhunibesi 6 10 0 4 3 2 155.03 365625 July

59

AP7C/0

Bishnu Prasad Upreti 1 Dhunibesi 6 15 0 7 1 0 230.55 543750 July

AP7C/0

Bishnu Prasad Upreti 1 Dhunibesi 6 16 0 3 2 0 111.30 262500 July

60 AP

7D/0 Krishna Prasad.Koirala 1 Dhunibesi 6 103 0 3 2 0 111.30 229687.5 July

61 AP7E/

0 Kaili Lama 1 1 Dhunibesi 6 22 0 2 0 3 69.57 164062.5 July

62 AP

7E/0 Keshab Basnet 1 Dhunibesi 6 23 1 2 3 0 596.19 1406250 July

63 AP8/1 Ram Chandra Thapa 1 1 Thakre RM 8 406 0 3 2 1 113.29 278320.31 July

64 AP 9/0 Bharat Dangol(Deb

Singh Dongol) 1 1 Thakre RM 8 143 1 0 3 0 532.59 1256250 July

65 AP10/

0 Siddhi Ba.Adhikari 1 Thakre RM 9 357 0 5 2 0 174.90 412500 July

66 AP13A

/0 Nani Ram Dongol 1 1 Thakre RM 10 13 0 12 2 1 399.49 942187.5 July

67 AP13B

/0 Arjun Tamang 1 1 Thakre RM 10 199 0 7 3 0 246.45 581250 July

68 AP13B

/0 Raj Kumar Tamang 1 1 Thakre RM 10 200 0 7 0 1 224.59 529687.5 July

69 14A/0 Asta Man Lama 1 1 Thakre RM 45 0 10 2 2 337.88 796875 July

Page 30: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

70 AP17A

/0 Som Bdr Shrestha 1 1 Thakre RM 11 14 0 0 1 1 9.94 20507.81 July

Sub Total 16 2 1 0 1 47 5 256

81 37

11402.08 26042771.95

71 AP7/0 Bishnu Prasad Upreti 1 Dhunibesi 6 83 0 0 2 3 21.87 51562.5 August

72 AP7/0 Laxmi Thapa Magar 1 1 Dhunibesi 6 84 0 0 1 1 9.94 18750 August

73 AP8/2 Shyam Ba. Khadka 1 Thakre Rm 8 234 0 6 2 0 206.7 487500 August

74 AP10/

0 Bhakta K Adhikari(Lila

Nath Adhikari) 1 Thakre Rm 9 73 0 6 1 2 202.73 478125 August

75 AP10/

0 Ram Kumar Adhikari 1 Thakre Rm 9 356 0 3 2 1 113.29 267187.5 August

76 AP10/

0 Purnda Ba. Bhandari 1 Thakre Rm 9 75 0 13 0 0 413.4 975000 August

77 AP12A

/0 Anad Kumar koirala 1 Thakre Rm 9 52 0 13 2 0 429.3 1012500 August

78

AP 16B/0

Krishna Ba. Lama/Thuli Lama

1 1 Thakre RM 11 29 0 12 3 1 407.44 960937.5 August

AP16B/0

Krishna Ba. Lama/Thuli Lama

1 Thakre RM 11 30 0 3 1 3 109.32 225585.94 August

79 AP19C

/0 Bhim Pd. Khatiwada 1

Galchhi RM

8 4 1 2 2 0 588.24 1618750 August

80 AP31A

/0 Dambar Bahadur

Gurung 1 1

Siddha Lake

4 16 0 2 2 0 79.5 218750 August

81 AP33A

/0 Prem Nath Sedai 1

Siddha Lake

3 123 0 2 3 3 93.42 201953.13 August

82 AP33A

/0 Dhruba Prasad Sedai 1

Siddha Lake

3 257 0 3 2 3 117.27 253515.63 August

83 AP46/

1 Dor Ba. Shrestha 1 1

Benighat Ror-

10 120 0 11 2 0 365.7 695312.5 August

84 AP21H

/0 Kana Ba. Shrestha 1 1

Galchhi RM

4 295 0 2 3 0 87.45 206250 August

85 AP23A

/0 Khema Kumari Dhakal 1

Siddha Lake

7 124 0 5 2 0 174.9 446875 August

86 AP24D

/2 Laxmi Giri 1

Siddha Lake

7 45 0 4 3 0 151.05 341406.25 August

87

AP24D/2

Yek Kumar Sedai 1 Siddha Lake

7 167 0 0 1 2 11.93 30468.75 August

AP24D/2

Yek Kumar Sedai 1 Siddha Lake

7 171 0 0 2 0 15.9 40625 August

88 AP24D

/2 Bhoj Raj Sedai 1

Siddha Lake

7 169 0 5 2 0 174.9 446875 August

Page 31: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

89 AP24D

/2 Som Natha Sedai 1

Siddha Lake

7 170 0 6 3 2 218.63 558593.75 August

Sub Total 5 21 3992.88 9536523.45

90 AP10/

0 Ranga Nath Adhikari 1 Thakre Rm 9 72 0 0 1 0 7.95 18750

September

91 AP25B

/0 Ram Maya Bhujel(Jana

Bahadur Bhujel) 1 1

Siddha Lake

7 118 0 7 1 2 230.19 530078.13 September

92 AP25B

/0 Hasta B Bhujel(Bhadra

Kumari Ghatri) 1 1

Siddha Lake

7 120 0 7 2 0 234.16 609375 September

93 AP32/

0 Lila Nath Tripathi 1

Siddha Lake

4 137 0 10 3 1 337.64 946093.75 September

94 AP44/

0 Bhakta Ba. Malla 1

Benighat Ror-

9 12 0 10 0 1 313.79 628906.25 September

95 AP24/

0 Pampha Devi Dhakal 1

Siddha Lake

7 31 0 1 3 2 59.01 101562.5 September

Sub Total 2 0 0 0 0 6 0 35 10 6 1182.74 2834765.63

96 AP3/0 Prasant Khadka 1 Dhunibesi 9 349/512

0 0 0 3 5.97 230850 Octobe

r

97 AP3/0 Ananda Kumar Agrawal 9 349/512

0 12 0 2 385.58 230859 Octobe

r

98 AP3/0 Rita Agrawal 9 349/512

230859 Octobe

r

99 AP3/0 Nanda Kishor Gupta 1 349/512

230859 Octobe

r

100 AP5/0 Kaji Babu.Shrestha 1 Dhunibesi 7 32 1 0 0 0 508.74 1170112 Octobe

r

101 AP5B/

0 Krishna prasad Upreti 1 Dhunibesi 7 459 0 6 3 3 220.62 515625

October

102 AP5B/

0 Gagan Upreti 1 Dhunibesi 7 460 0 8 2 1 272.29 642187.5

October

103 AP5B/

0 Binod Upreti 1 Dhunibesi 7 461 0 0 2 1 17.89 42187.5

October

104 AP11B

/0 Keshav Prasad Subedi 1 Thakre Rm 9 242 1 2 0 0 572.34 1316615

October

105 AP12/

0 Thakur Nath Pandit 1 Thakre Rm 9 401 0 2 0 3 69.57 164062.5

October

106 AP12/

0 Thakur Nath Pandit 1 Thakre Rm 9 403 0 4 2 1 145.09 342187.5

October

107 AP17A

/0 Gopi Lal Shrestha 1 Thakre RM 11 40 0 4 1 2 139.13 341796.88

October

Page 32: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

AP17A/0

Gopi Lal Shrestha Thakre RM 11 41 0 7 3 0 246.45 605468.75 Octobe

r

108 AP31/

2 Tika Prasad Silwal 1

Siddha Lake

4 61 1 0 1 0 516.69 1089410.16 Octobe

r

109 AP31A

/0 Tek Bahadur Silwal 1

Siddha Lake

4 239 0 0 1 0 7.95 21885 Octobe

r

110 AP32/

0 Indra Kumari Tripathi 1

Siddha Lake

4 207 0 0 3 0 23.85 65625 Octobe

r

111 AP32/

0 Subba Tripathi 1

Siddha Lake

4 206 0 1 0 0 31.8 87500 Octobe

r Sub Total 0 14 3163.96 7328089.79

112 AP

11A/0 Guru Pd. Pandey 1 Thakre Rm 9 159 0 0 3 1 25.84 60937.5

November

113 AP19C

/0 Trilok Ba.Magar 1 1

Galchhi RM

8 12 0 0 1 0 7.95 21875 Novem

ber

114 AP26A

/0 Bishnu Koirala/Sarki 1 1

Siddha Lake

6 27 0 1 1 2 43.11 111718.75 Novem

ber

115 AP33B

/0 Khun prasad Sedai 1

Siddha Lake

3 117 0 0 1 3 13.92 30078.13 Novem

ber

116 AP37/

0 Bhola Bisural 1

Benighat Ror-

5 36 0 5 0 2 159.88 738281.25 Novem

ber Sub Total 1 0 1 0 0 5 250.7 962890.63

117 AP37/

0 Teka Bahadur Bisural 1

Benighat Ror-

5 400 0 6 3 3 216.9 910546.88 Decem

ber

118 33B/1 Dibya Kanta Sedai 1 Siddha Lake

4 31 0 5 0 3 161.87 356640 Decem

ber Sub Total 0 0 0 0 0 2 378.77 1267186.88

Total 36 2 4 1 1 128 30481.45 71426150.82

Page 33: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Distribution for land acquired in Chitwan-MKTLP

SN

Tower Number

Address Name of Aps Targeted

Amount (NRs.) Received

Status

1 AP 50 Ikchhchhakamana-3 Prithivi Gurung 820000.00 Received

2 AP51/0 Ikchhchhakamana-3 Dhanikala Gurung 340000.00 Received

3 AP51/0 Ikchhchhakamana-3 Harimaya Gurung 1470000.00 Received

4 AP51/0 Ikchhchhakamana-3 Sanbahadur Gurung 60000.00 Received

5 AP52B Ikchhchhakamana-3 Dipakraj Poudel 750000.00 Received

6 AP52B Ikchhchhakamana-3 Ramchandra Lamichane 830000.00 Received

7 AP54A Ikchhchhakamana-3 Uttam Gurung 1420000.00 Received

8 AP54A Ikchhchhakamana-3 Om Gurung 100000.00 Received

9 AP59/0 Ikchhchhakamana-4 Lekhbahadur Thapa 406250.00 Received

10 AP59/0 Ikchhchhakamana-4 SombahadurThapa 446875.00 Received

11 AP59/0 Ikchhchhakamana-4 Khilbahadur Thapa 146250.00 Received

12 AP 52 Ikchhchhakamana-3 Sukmaya Gurung 1023750.00 Received

13 AP 50A Ikchhchhakamana-3 Suryabahadur Gurung 460000.00 Received

14 AP 50A Ikchhchhakamana-3 Dhan Bahadur Gurung 270000.00 Received

15 AP51A Ikchhchhakamana-3 Narbahadur Gurung 1447800.00 Received

16 AP57 Ikchhchhakamana-4 Serbahadur Parja 804375.00 Received

17 APAP50A Ikchhchhakamana-3 Chepti Gurung 920000.00 Received

Total Amount 11715300.00

Page 34: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Distribution for land acquired in Gorkha-MKTLP

Compensation Distribution Status in Shahidlakhan RM, Gorkha District, MKTLP

S.N

Tower Number Address

AP Name Compensation

Status Present Former

1 69/ADDO Sahid

Lakhan RM -3

Manakamana- 6

Tam Bahadur Thapa Distributed

2 69/ADDO Sahid

Lakhan RM -3

Manakamana- 6

Buddhi bal Thapa Distributed

3 GMT Sahid

Lakhan RM -3

Manakamana- 6

Rikta Bahadur Thapa In process

4 69/1DDO Sahid

Lakhan RM -3

Manakamana- 6

Thakur Thapa Distributed

5 69DD9 Sahid

Lakhan RM -3

Manakamana- 6

Mangal sing Thapa Distributed

6 69DD10 Sahid

Lakhan RM -3

Manakamana- 6

Nar bahadur Gyami Distributed

7 68DD9 Sahid

Lakhan RM -3

Manakamana- 6

Yugananda Koirela Distributed

8 68DD9 Sahid

Lakhan RM -3

Manakamana- 6

Rameshwor Pokheral Distributed

9 68DD9 Sahid

Lakhan RM -3

Manakamana- 6

Narayan Prasad Pokheral

Distributed

10 67ADBO Sahid

Lakhan RM -3

Manakamana- 6

Kali Aamaghai Distributed

11 67ADBO Sahid

Lakhan RM -3

Manakamana- 6

Kabidatta Aryal Distributed

12 66DDO Sahid

Lakhan RM -3

Manakamana- 7

Setimaya Gurung Distributed

13 65/BDC3 Sahid

Lakhan RM -3

Manakamana- 7

Mahabir Gurung Distributed

14 65/BDC3 Sahid

Lakhan RM -3

Manakamana- 7

Chandra Bhadur Magar Distributed

15 65/BDC3 Sahid

Lakhan RM -3

Manakamana- 7

Man Bahadur Thapa Magar

Distributed

16 64DD9 Sahid

Lakhan RM -3

Manakamana- 8

Khadka Bahadur Thapa Distributed

17 64DD9 Sahid

Lakhan RM -3

Manakamana- 8

Tek Bahadur Thapa Distributed

Page 35: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N

Tower Number Address

AP Name Compensation

Status Present Former

18 64DD9 Sahid

Lakhan RM -3

Manakamana- 8

Thaman Bahadur Thapa Distributed

19 64DD9 Sahid

Lakhan RM -3

Manakamana- 8

Tek Bahadur Thapa Distributed

20 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Chandra bahadur Thapa Distributed

21 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Lil Bahadur Thapa Distributed

22 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Ran Bahadur Thapa Distributed

23 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Ram Bahadur Thapa In process

24 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Gyan Bahadur Thapa Distributed

25 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Kaman shing Thapa Distributed

26 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Kul Bahadur Thapa Distributed

27 63DC0 Sahid

Lakhan RM -3

Manakamana- 8

Hasta Bir Thapa Distributed

28 62DB9 Sahid

Lakhan RM -3

Manakamana- 8

Nar bahadur Thapa Distributed

29 62DB9 Sahid

Lakhan RM -3

Manakamana- 8

Indra bahadur Thapa Distributed

30 62DB9 Sahid

Lakhan RM -3

Manakamana- 8

Ekman Thapa Magar Distributed

31 62DB9 Sahid

Lakhan RM -3

Manakamana- 8

Suk bahadur Thapa Distributed

32 61/BDB6 Sahid

Lakhan RM -3

Manakamana- 8

Hasta Bahadur Gurung Distributed

33 61/BDB6 Sahid

Lakhan RM -3

Manakamana- 8

Gaj Bahadur Gurung Distributed

34 61/BDB6 Sahid

Lakhan RM -3

Manakamana- 8

Non-Title Holder 678

35 61/ADB3 Sahid

Lakhan RM -3

Manakamana- 8

Non-Title Holder 705

36 61/ADB3 Sahid Manakamana- Buddhiman Gurung Distributed

Page 36: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N

Tower Number Address

AP Name Compensation

Status Present Former

Lakhan RM -3

8

37 61/ADB3 Sahid

Lakhan RM -3

Manakamana- 8

Chitra Bahadur Gurung Distributed

38 61/1DB6 Sahid

Lakhan RM -3

Manakamana- 8

Dal Bahadur Gurung Distributed

39 61/1DB6 Sahid

Lakhan RM -3

Manakamana- 8

Keshar sing Gurung Distributed

40 61BDO Sahid

Lakhan RM -3

Manakamana- 8

Ishor Shrestha Distributed

41 61BDO Sahid

Lakhan RM -3

Manakamana- 8

Non-Title Holder 756

42 61BDO Sahid

Lakhan RM -3

Manakamana- 8

Khilman Shrestha Distributed

43 61BDO Sahid

Lakhan RM -3

Manakamana- 8

Chet Bahadur Thapa Distributed

44 60/ADDO Sahid

Lakhan RM -3

Manakamana- 8

Purnalal shrestha Distributed

45 60/ADDO Sahid

Lakhan RM -3

Manakamana- 8

Bhim bahadur Thapa Distributed

46 60/ADDO Sahid

Lakhan RM -3

Manakamana- 8

Krishna Babu Shrestha Distributed

Page 37: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Distribution Status in Gandaki RM, Gorkha District, MKTLP

SN Tower Name Address

AP Name

Compensation Status

Present Former

1 35/ADD0 Gandaki RM-7 Ghyalchowk 9 Shiva Bahadur Majhi Distributed

2 35/ADD0 Gandaki RM-7 Ghyalchowk 9 Non Tital Holder

3 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Santa bahadur Dabadi Distributed

4 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Dhakalman Shrestha Distributed

5 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Ambar Bahadur Khadka Distributed

6 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dipendra Khadka Distributed

7 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed

8 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed

9 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed

10 37/DDB0 Gandaki RM-7 Ghyalchowk 9 In Kumari Regmi Distributed

11 37/DDB0 Gandaki RM-7 Ghyalchowk 9 Non Tital Holder

12 38DB0 Gandaki RM-7 Ghyalchowk 9 Ganga Bahadur Bhujel Distributed

13 38DB0 Gandaki RM-7 Ghyalchowk 9 Kulman Shrestha Distributed

14 38/1DB3 Gandaki RM-7 Ghyalchowk 9 Chanamati Sarkeni Distributed

15 38/1DB3 Gandaki RM-7 Ghyalchowk 9 Dal Narayan Shrestha Distributed

16 38/ADB9 Gandaki RM-7 Ghyalchowk 9 Lok Bahadur Ranamagar Distributed

17 38/ADB9 Gandaki RM-7 Ghyalchowk 9 Chanamaya Sharki Distributed

18 38/BDB0 Gandaki RM-8 Ghyalchowk 5 Purna Prasad Poudel Distributed

19 38/BDB0 Gandaki RM-8 Ghyalchowk 5 Purna Prasad Poudel Distributed

20 39DB0 Gandaki RM-8 Ghyalchowk 5 Yog Kumari Regmi Distributed

21 39DB0 Gandaki RM-8 Ghyalchowk 5 Pusparaj Rej Regmi Distributed

22 39DB0 Gandaki RM-8 Ghyalchowk 5 Mishra Regmi In Process

23 39DB0 Gandaki RM-8 Ghyalchowk 5 Non Tital Holder

24 39/ADBO Gandaki RM-8 Ghyalchowk 5 Bimaya Ranamagar Distributed

25 39/ADBO Gandaki RM-8 Ghyalchowk 5 Hit Bahadur Ranamagar Distributed

26 4QDB3 Gandaki RM-8 Ghyalchowk 5 Lalimaya BK Kami Distributed

27 4QDB3 Gandaki RM-8 Ghyalchowk 5 Non Tital Holder

28 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Bhup Bahadur Bhattarai Distributed

29 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Resam Bahadur Bhattarai Distributed

30 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Rohini Kumari Chaapagai Distributed

31 42DD0 Gandaki RM-8 Ghyalchowk 5 Gagendar Prasad Regmi Distributed

32 43DB0 Gandaki RM-8 Ghyalchowk 5 Ishwor Prasad Regmi Distributed

33 43DB0 Gandaki RM-8 Ghyalchowk 5 Praksah Babu Regmi Distributed

34 43BDD0 Gandaki RM-8 Ghyalchowk 5 Govinda Prasad Regmi Distributed

35 43BDD0 Gandaki RM-8 Ghyalchowk 5 Sushila Regmi Distributed

36 43BDD0 Gandaki RM-8 Ghyalchowk 5 Bhubaneshwor Regmi In Process

Page 38: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Compensation Distribution Status in Gorkha Municipality, Gorkha District, MKTLP

S.N

Tower Number Address AP Name Compensation

status Present Former

1 74/2DBO Gorkha

Municipality -14 Deurali -4 Krishna Bahadur Sunar Distributed

2 74/2DBO Gorkha

Municipality -14 Deurali -4 Padm bahadur Sunar In Process

3 74/2DBO Gorkha

Municipality -14 Deurali -4 Kheme Kami Distributed

4 74/2DBO Gorkha

Municipality -14 Deurali -4 Non-Title Holder 474

5 74/2DBO Gorkha

Municipality -14 Deurali -4 Non-Title Holder 476

6 74/1DB1.5 Gorkha

Municipality -14 Deurali -4 Dhak Bahadur Bk Distributed

7 74/1DB1.5 Gorkha

Municipality -14 Deurali -4 Maite BK Distributed

8 74/1DB1.5 Gorkha

Municipality -14 Deurali -4 Mangal Bahadur BK Distributed

9 74DB9 Gorkha

Municipality -14 Deurali -4 Lila Bahadur Karki Distributed

10 73/ADBO Gorkha

Municipality -14 Deurali -4 Maiya Karakheti Distributed

11 73/ADBO Gorkha

Municipality -14 Deurali -4 Non-Title Holder 239

12 72/ADBO Gorkha

Municipality -13 Deurali -7 Bhim Kumari Mahat Distributed

13 72/ADBO Gorkha

Municipality -13 Deurali -7 Man Kumari Pulami Distributed

14 72/ADBO Gorkha

Municipality -13 Deurali -7 Rishiram Khanal Distributed

15 72DD3 Gorkha

Municipality -13 Deurali -7 Sudama Pandey Distributed

Page 39: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of Compensation Distribution in Chitwan District -MKTLP

Page 40: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of Compensation Distribution at MKTLP,-in Gorkha district

Page 41: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Land acquisition notice of Kathmandu district-MKTLP

Page 42: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 5

Details of Compensation Distribution for Structure Loss

DKTLP

Finalized Compensation by CDC for structure in Myagdi District

S.N. Land Owner’s Name Address Tower No. Received Amount

1 Dalfi Ramjali Annapurna 1 40 A 501608

2 Tek Bahadur Karki Raghuganga 3 29 2000211

3 Dudh Bahadur Purja Raghuganga 2 35 C 937500

4 Dhan Kumari Bhandari Raghuganga-2 32 1167211 Total 4606530

Compensation Distribution for structure loss at Parbat -DKTLP

S.N. Land Owner’s Name Address Tower No. Received Amount

1 Tike Damai Budhi Nepali Jaljala-8 10 61425

2 Sarala Padhyaya Jaljala-8 7A 838148

3 Gorkha Bahadur Karki Jaljala-2 24 A 1505117 Total 2404690

Page 43: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

MKTLP

Finalized Compensation by CDC for structure in Dhading District

S.N Angle point

Name of official land

owner Address Property

Total Compensation Target Amount

1 6A/0 Guna Raj

Upreti

Aaru Bote, Dhunibesi-7

Tin Shade 241635.31

Cow Tin Shade 103382.35 Cow Tin Shade 35411.11 Sub Total 380428.77

2 6A/0 Ambar

Bahadur Uprety

Aaru Bote, Dhunibesi-7

Tin Shade 35651.81

Stone Masonry Toilet 46685.45 Sub Total 82337.26

3 7D/2 Shankar Tamang

Waibatol-Dhunibesi-6

Tin Shade 189907.82

Cow Tin Shade 45566.37 Sub Total 235474.19

4 7D/2 Saraswoti Tamang

Waibatol-Dhunibesi-6

Tin Shade 154011.48

Sub Total 154011.48

5 7D/2 Ram

Bahadur Tamang

Waibatol-Dhunibesi-6

Tin Shade 204540.81

Stone Masonry Toilet 54030.77 Sub Total 258571.58

6 7D/2 Subba

Tamang

Waibatol-Dhunibesi-6

Tin Shade 157573.22

Cow Tin Shade 37319.36 Sub Total 194892.58

7 7D/2

Roshan Tamang

Waibatol-Dhunibesi-6

Tin Shade 221477.2

Sub Total 221477.2

8 13B/0

Arjun Tamang / Raj Kumar Tamang

Thakre-10 Tin Shade 109965.59

Sub Total 109965.59

9 24/0 Ram Sharan

Giri

Siddhalek-7,Adamtar

Tin cow Shade 100630.77

Sub Total 100630.77

10 3/0 Sunrise

Breeding Center

Dhunibesi-9 Poultry Truss Works 3111559.17

Egg Collection Centre 114605.2 Sub Total 3226164.37

11 47C/0 Rajesh

Chepang

Benighat Rorang-10

Khar Shed 17974.78

CGI Sheet Shed 42505.43 Khar Shed 1 29438.44 Sub Total 89918.65

Total 5053872.44

Page 44: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 45: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of Compensation Distribution for Structure Loss in Dhading District

SN Angle point

Name of official land owner

Address Property

Total Compensation

Target Amount

Total Compensated

Amount Remarks

1 3/0 Sunrise Breeding

Center

Dhunibesi-9

Poultry Truss Works 3111559.17

1613000

Egg Collection Centre 114605.2

2 13B/0 Arjun Tamang /

Raj Kumar Tamang Thakre-10 Tin Shade 109965.59 109965.59

3 24/0 Ram Sharan Giri Siddhalek-7,Adamtar

Tin cow Shade 100630.77 100630.77

4 47C/0 Rajesh Chepang

Benighat Rorang-10

Khar Shed 17974.78

89918.64 CGI Sheet Shed 42505.43

Khar Shed 1 29438.44

5 6A/0 Ambar Bahadur Upreti Aaru Bote, Dhunibesi-

7

Tin Shade 35651.81 82337.26

Stone Masonry Toilet 46685.45

Total

1,995,852.26

Page 46: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of APs for Structure Loss in Chitwan District

SN. House Owner Section House Details Address

1 Prem Bahadur Magar AP 59 to AP 58C Hut 1 Ichchhakaman -4

2 Fullmaya Chepang AP 55 to AP 54C House 1 Ichchhakaman -4

3 Kumar Chepang AP 55 to AP 54C House 2, Hut 1 Ichchhakaman -4

4 Santa Bahadur Chepang AP 55 to AP 54C House 1 Ichchhakaman -4

5 Fullmaya Chepang AP 54C House 2, Toilet 1 Ichchhakaman -4

6 Om Gurung AP 54A to AP 54 House 1, Hut 1 Ichchhakaman -4

7 Ramchandra Lamichane AP 53 to AP 52B Hut 1, Ichchhakaman -4

8 Kamal Bdr. Gurung AP 51A to AP 51 House 1, Hut 2,

Toilet 1, Ichchhakaman -3

9 Harimaya Gurung AP 51 to AP 50A House 1, Hut 3,

Toilet 1, Ichchhakaman -3

10 Surya Bahadur Gurung AP 50A to AP 50 Hut 1 Ichchhakaman -3

11 Min Bahadur Gurung AP 59 to AP 49B Hut 3 Ichchhakaman -3

Details of Compensation Distribution for Structure loss in Gorkha District

SN Angle Point Name of official land

owner Address

Total Compensated Amount

1 AP 40/0 Lalimaya BK Gyalchowk-5, Gandaki

Rural Municipality, Gorkha 458,077.11

2 AP 61 Gaj Bahadur Gurung Sahidlakhan Rural

Municipality, Gorkha 235,175.51

Total 693,252.62

Page 47: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 6

Details of Compensation Distribution for Crop Loss

DKTLP

Myagdi District

S.N. Name Address Received Amount

Remarks

1 Diwakar Subedi Kusma-1 2474.28

2 Kashi Ram Subedi Kusma-1 1592.64

3 Tika Kumari Malla Jaljala-4 5771.82

4 Purna Kumari Malla Jaljala-4 19283.13

5 Hira Kumari Malla Jaljala-4 6733.79

6 Hari Bahadur GC Jaljala-4 5063

7 Nand Kumari /Tirth Kumari

Malla Jaljala-4 3724.04

8 Resham Bahadur

Hamal(Putali Hamal) Jaljala-4 15373.62

9 Nar Bahadur Hamal (Putali

Hamal) Jaljala-4 3088.43

10 Dhan Kumari Bhandari Raghuganga-2 30580.08

11 Purna Kumari Malla Jaljala-4 10568.3

12 Ashok Malla Jaljala-4 15867.82

13 Chandra Bahadur Malla Jaljala-4 32417.74

14 Nar Bahadur Hamal(Lok

Bahadur Hamal) Jaljala-4 13416.95

15 Nar Bahadur Hamal(Indra

Bahadur Malla) Jaljala-4 12505.61

16 Chandra Bahadur Malla Jaljala-4 16594.86

17 Arjun Bahadur Malla Jaljala-4 22175.94

18 Tirth Bahadur Malla Jaljala-4 32621.43

19 Karn Bahadur KC Jaljala-3 7330.82

20 Lal Bahadur Thapa Jaljala-3 7120.87

21 Durga Bahadur Sharki Jaljala-3 8731.72

22 Baghbir Damai Jaljala-3 9481.71

23 Durge Damai Jaljala-3 6542.39

24 Seti Baruwal Jaljala-2 12850.62

25 Baghbir Damai Jaljala-2 405.32

26 Balbir Darji Jaljala-2 1727.24

27 Bam Bahadur Biswakarma Jaljala-2 2715.15

28 Bam Bahadur Biswakarma Jaljala-2 1652.07

29 Chakra Bahadur Kami Jaljala-2 6338.01

30 Tug Bahadur Malla Raghuganga-3 25640.72 Plot no.72

31 Tug Bahadur Malla Raghuganga-3 45787.29 Plot no.134

32 Dil KUmari KC Raghuganga-2 8462.40

33 Tika Bahadur KC Raghuganga-2 1556.84

34 Taranath Padhya Jaljala-8 11561.85 AP 7 A

35 Atma Hari KC Jaljala-8 6566.00 AP 6

36 Gajendra Bahadur Khatri Jaljala-8 7182.00 AP 6

37 Baburam KC Jaljala-8 7064.00 AP 6

38 Parshuram KC Jaljala-8 14636.00 AP 6

39 Hark Bahadur Chhetri Jaljala-8 426.8 AP 6

40 Kamal Prasad Regmi Jaljala-8 118000.00 AP 7

41 Tek Bahadur Karki Raghuganga -3 12104.02 AP 29

42 Guma Kumari Baruwal Jaljala-2 3233.00 Plot no.705/708

43 Bam Bahadur BK Jaljala-2 11222.58 Plot no.706/707

44 Chandra Bahadur Baruwal Jaljala-2 8405.46 Plot no.709

Page 48: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

45 Man Kumari Upadhyaya Jaljala-7 13937.52 Plot no.81

46 Durga Dutta Upadhyaya Jaljala-7 2587.74 Plot no.377

47 Jamuna Acharya Jaljala-7 2587.74 Plot no.343

TOTAL 615711.35

Parbat District (in October, 2018)

S.N Angle point

Foundation/ Erection

Name of official land owner

Address Total

Compensation Amount

1 24 Erection Guma Kumari Baruwal Jaljala-2 3,233/46

2 22 Foundation Bam Bahadur BK Jaljala-2 11,222/58

3 24 Erection Chandra Bahadur Baruwal Jaljala-2 8,405/46

4 13 Erection Man Kumari Upadhyaya Jaljala-7 13,937/52

5 15 Erection Durga Datta Upadhyaya Jaljala-7 2,587/74

6 15 Erection Jamuna Acharya Jaljala-7 2,587/74

Total 41,974.50

Details of the compensation distribution for tree loss in DKTLP

Myagdi (In August, 2018)

S.N. Name Address Received Amount

Remarks

1 Durga Dutta Upadhyaya Jaljala-7 20706.84 AP 15

Page 49: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Details of Compensation Distribution for Crop Loss

MKTLP:

Dhading District

S.N

Angle point

Foundation/

Erection

Name of official land owner

Address Total

Compensated Amount

1

33/0 Erection Ram Pd Sedhai Siddhalek-3 43500

33/0 Erection Ram Pd Sedhai Siddhalek-3 17400

33/0 Erection Ram Pd Sedhai Siddhalek-3 22250

2 48/0 Foundation Maniraj Ghale Jogimara -3 297000

48/0 Foundation Maniraj Ghale Jogimara -3 48060

3 48/0 Foundation Sari Ghale Benighat - 3 13050

4 34A/1 Foundation Yeka Ba. Magar Salang -5 10930

5 34A/0 Foundation Yeka Ba. magar Jogimara-6 11712

6 35/0 Foundation Dip Ba.Magar Salang -6 16800

7 44/0 Foundation Hita Ba. Malla Jogimara -9 6336

8 34/0 Erection Mohan Lal Thapamar Siddhalek-4 22500

9 33A Erection Umakanta Sedhai Siddhalek-3 23887.5

10

33/0 Erection Khun Pd. Sedhai Siddhalek-3 27300

33/0 Erection Khun Pd. Sedhai Siddhalek-3 13750

33B/0 Foundation Khun Pd. Sedhai Salang -5 22932

11 33/0 Erection Ramsaran Sedhai Siddhalek-3 16312.5

33/0 Erection Ramsaran Sedhai Siddhalek-3 11375

33/0 Erection Ramsaran Sedhai Siddhalek-3 26700

12 33A Foundation Umakanta Sedhai Siddhalek-3 22500

13

31A/0 Foundation Subbha Pd. Trpathi Siddhalek-4 6125

31A/0 Foundation Subbha Pd. Trpathi Siddhalek-4 11250

31A/0 Foundation Subba Pd. Trpathi Siddhalek-4 11250

14 31A/0 Foundation Man Ba. Majhi Kalleri -2 32760

15 33/0 Erection Rebati Pd. Sedhai Siddhalek-3 26100

16 44A/0 Foundation Bhakta Ba. Malla Jogimara -9 6600

44A/0 Foundation Bhakta Ba. Malla Jogimara -9 4824

17

21/1/1 Erection Bhim Ba.Dhungana Galchhi- 1 9520

21/1/1 Erection Bhim Ba.Dhungana Galchhi- 1 20100

18 8/0 Erection Bishnu Tamang Thakre -9 4422.6

8/0 Erection Bishnu Tamang Thakre -9 1449

19 46/0 Foundation Buddhi Lal Shrestha Jogimara -10 3120

46/0 Foundation Buddhi Lal Shrestha Jogimara -10 20025

20 30A/0 Foundation Damber Ba. Gurung Siddhalek -6 997.5

21

7/0 Foundation Ganga Pd. Rijal Naubise- 9 2000

7/0 Foundation Ganga Pd. Rijal Naubise- 9 2250

7/0 Foundation Ganga Pd. Rijal Naubise- 9 5500

7/0 Foundation Ganga Pd. Rijal Naubise- 9 50000

7/0 Foundation Ganga Pd. Rijal Naubise- 9 16000

Page 50: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N

Angle point

Foundation/

Erection

Name of official land owner

Address Total

Compensated Amount

22 25B/0 Foundation Hasta Ba. Bhujel Kumpur-7 14418

25B/0 Foundation Hasta Ba. Bhujel Kumpur-7 10647

23 7E/0 Foundation Kaili Lama Naubise -1 605.15

7E/0 Foundation Kaili Lama Naubise -1 1245

24

8/0 Foundation Kalpana Lama Thakre -9 840

8/0 Foundation Kalpana Lama Thakre -9 1037.5

8/0 Erection Kalpana Tamang Thakre -9 4422.6

8/0 Erection Kalpana Tamang Thakre -9 3061.8

25

8A/0 Foundation Kul Ba. Thapa Thakre -9 4704

8A/0 Foundation Kul Ba. Thapa Thakre -9 1078.7

8A/0 Erection Kul Ba.Thapa Thakre -8 166.25

8A/0 Erection Kul Ba.Thapa Thakre -8 179.55

8A/0 Erection Kul Ba.Thapa Thakre -8 159.6

26 20C/0 Foundation Manoj Gautam Goganpani- 1 5607

20C/0 Foundation Manoj Gautam Goganpani- 1 550

27 34/0 Erection Ram Pd Pande Siddhalek -3 3412.5

33/0 Erection Ramesh Pd Pande Siddhalek -6 3150

33/0 Erection Ramesh Pd Pande Siddhalek-3 1181.6

33/0 Erection Ramesh Pd Pande Siddhalek-3 1181.6

33B/1 Erection Ramesh Pd. Pande Siddhalek - 3 2310

28 8/1 Erection Ramesh Thapa Naubise - 1 3325

29

25B/0 Foundation Ram maya Bhujel Kumpur-7 6942

25B/0 Foundation Rammaya Bhujel Kumpur-7 4368

30 10/0 Foundation Siddhi Pd. Adhikari Kewalpur- 9 581.7

10/0 Foundation Siddhi Pd. Adhikari Kewalpur- 9 17622

31 34/0 Erection Sudip Sedhai Siddhalek -3 2992.5

34/0 Erection Sudip Sedhai Siddhalek -3 3412.5

32 33B/0 Foundation Sun Pd. Sedhai Salang -5 3660

33B/0 Foundation Sun Pd. Sedhai Salang -5 22932

33 32D/0 Foundation Tulimaya Magar Salang-6 3294

34

11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 2573.55

11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 3211.95

11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 791.35

11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 359.1

35 10/0 Foundation Bikash Acharya Kewalpur- 9 2154.6

36 17/0 Foundation Bishnu Bhujel Goganpani -8 2880

17/0 Foundation Bishnu Bhujel Goganpani -8 2523.6

37 31/2 Foundation Maya Nath Silwal Salang-7 1602

31/2 Foundation Maya Nath Silwal Salang-7 4352.4

38 17B/0 Foundation Ram Chandra Lama Goganpani- 6 1874.8

Page 51: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N

Angle point

Foundation/

Erection

Name of official land owner

Address Total

Compensated Amount

17B/0 Foundation Ram Chandra Lama Goganpani -6 24000

17B/0 Foundation Ram Chandra Lama Goganpani -6 19000

39 10/0 Foundation Ram Kumar Adhikari Kewalpur- 9 1901.9

40 10/0 Foundation Sita Acharya Kewalpur- 9 791.35

41 10/0 Foundation Sita Acharya Kewalpur- 9 7610

42 8/2 Erection Mina Khadka Thakre-9 8675.7

43 8A/0 Foundation Kul Bahadur Thapa Thakre-9 5782

44 46/0 Foundation Buddhilal Shrestha Rorang-10 31660

45 44/0 Foundation Hit Bahadur Malla Rorang-9 9361

46 21/0 Erection Gitadatta Khatiwada Galchhi-1 3745

47 46/1 Erection Rupa Basnet Rorang-10 1820

48 46/0 Erection Kumar Rijal Roranh-10 2100

49 31B/1 Erection Bale Sarki Siddhalek-3 3500

50 31B/1 Erection Bimal Sarki Siddhalek-3 3500

51 7D/0 Foundation Laxmi Koirala Dhunibesi-6 1750

52 31B/1 Erection Purne sarki Siddhalek-3 1750

53 7A/0 Foundation Shyam Raja Thapa Dhunibesi-6 2765

54 46B Erection Kop Bahadur Saudi Rorang-10 15750

55 44/0 Erection Dev Kumari Malla

Thakuri Rorang-10 7000

56 44A/0 Erection Sita Malla Rorang-10 15570

57 44A/0 Erection Suntali Malla Rorang-10 28625

58 31B/0 Erection Sita RamThapa Magar Siddhalek-3 7115

59 31B/1 Erection Shanker Prasad sedai Siddhalek-3 31500

60 34/1 Erection Khelu Nepali Siddhalek-3 6300

61 23A/0 Erection Sita Majhi Siddhalek-7 26260.5

62 23A/0 Foundation Khem Khumari Dhakal Siddhalek-7 12232.5

63 24/0 Foundation Krishna Giri Siddhalek-7 33060

64 24/0 Foundation Ramsharan Giri Siddhalek-7 49310

65 9/0 Erection Kalpana Dangol Thakre-8 5250

66 8/0 Erection Raj Kumar Tamang Thakre-8 6329.5

67 33B/0 Erection Krishna Prasad Sedai Siddhalek-3 36000

68 33B/1 Erection Rewati Prasad Sedai Siddhalek-3 11250

69 33B/1 Erection Ram Hari Sedai Siddhalek-3 25850

70 32A/0 Erection Chiranjivi Sedai Siddhalek-3 7200

71 9/0 Erection Ram Bahadur Dangol Thakre-8 1575

72 9/0 Erection Samjhana Dangol Thakre-8 953.75

73 9/0 Erection Bharat Dangol Thakre-8 3780

74 9/0 Erection Mukunda Dangol Thakre-8 673.75

75 37/0 Foundation Nawa Raj Pandey Benighat Rorang-5 18750

76 37/0 Foundation Gopal Bahadur Bisural Benighat Rorang-5 18800

Page 52: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

S.N

Angle point

Foundation/

Erection

Name of official land owner

Address Total

Compensated Amount

77 37/0 Foundation Hari Bahadur Bisural Benighat Rorang-5 20250

78 37/0 Foundation Tep Bahadur Bisural Benighat Rorang-5 47000

79 46B/0 Erection Dor Bahadur Shrestha Benighat Rorang-

10 36360

80 44A/0 Foundation Parwati Singh Thakuri Benighat Rorang-9 21000

81 31A/0 Foundation Tek Bahadur Silwal Siddhalek-3 23240

82 7C/0 Erection Bishnu Prasad Upreti Dhunibesi-6 45775

83 44A/0 Erection Bhakta Bahadur Malla Benighat Rorang-9 7875

84 33A/0 Erection Dhruba Prasad Sedai Siddhalek-3 63900

85 33B/1 Foundation Ram Hari Sedai Siddhalek-3 29600

86 8/1 Foundation Binda KC Thakre-8 18305

87 34/0 Foundation Sita Sedai Siddhalek-3 10912

Total 1831867.95

Page 53: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Gorkha District

Page 54: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 55: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 7

Letter related to Livelihood Restoration Program (Skill Training implementation) -DKTLP

Page 56: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 8

Details related to trainings

Detail participant’s list of Driving Training in - DKTLP

S.

N. Participants Name Address Land Owner’s Name

Relation on

Land Owner Gender Tower/SS/ROW/Structure Training

1 Binita Sharma Kusma MC 2 Birendra Paudel Daughter F Khurkot SS Driving

2 Lopchan Sherpunja Annapurna 7 Rupdevi Sherpunja Brother M Structure AP 39C Driving

3 Bibek Shepunja Annapurna 7 Gauseri Shrpunja Son M ROW Driving

4 Dinesh Karki Raghuganga 3 Tek Bahadur Karki Son M Structure AP 29 Driving

5 Pushpa Sharma Kusma MC 2 Taranath Paudel Daughter F Khurkot SS

Driving

6 Swikriti Ghamal BK Jaljala 2 BamBahadur

Biswakarma Daugher in Law F AP 22 Driving

7 Nabin Malla Jaljala 4 Chandra Bahadur Malla Son M AP 17A Driving

8 Mukund Prasad Acharya Jaljala 7 Bal Krishna Upadhyaya Son M AP 11 Driving

9 Sanjaya Bahadur Shahi Raghugaga 3 Dirgha Kumari Shahi Grand Son M AP 27A Driving

10 Arbinda Karki Jaljala 2 Nir Bahadur Karki Son M AP 24A Driving

11 Jivnath Subedi Kusma RM 2 Jivnath Subedi Self M Khurkot SS Driving

12 Yogendra Malla Jaljala 4 Hira Kumari Malla Son M AP 17 Driving

13 Sharmila Hamal Malla Jaljala 4 Tika Kumari Malla Daughter in law F AP 24 Driving

14 Tilak Prasad Rijal Jaljala 7 Him Lal Padhyaya Son M AP 13 Driving

15 Sagar Rijal Jaljala 7 Muktiram Upadhyaya Son M AP 13/1 Driving

16 Ranjita Malla Jaljala 4 Purna Kumari Malla Daughter in law F AP 17 Driving

17 Prasiddha Acharya Jaljala 7 Dand Pani Padhyaya Nephew M AP 13A Driving

18 Ganesh Acharya Jaljala 7 Jamuna Acharya Brother M AP 15 Driving

19 Sagar Acharya Jaljala 7 Yamnath Sharma Son M AP 11 Driving

20 Rajesh Rijal Jaljala 7 Man Kumari Upadhyaya Son M AP 13 Driving

21 Bishal Biswakarma Jaljala 2 Indra Bahadur

Biswakarma Son M ROW/Structure Driving

22 Bhojraj Acharya Jaljala 7 Kedarnath Acharya Brother M AP 12

Driving

23 Gokarna Bhandari Raghuganga 2 Dhan Kumari Bhandari Son M AP 32 /Structure Driving

24 Krishna Bahadur Thapa Jaljala 3 Lal Bahadur Thapa Son M AP 21 Driving

25 Tirth Nath Sharma Jaljala 7 Tirthnath Sharma Self M AP 15 Driving

Page 57: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Letter of Implementation of Driving Training in Parbat District- DKTLP

Page 58: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

List of Participants of Driving Training in Parbat District- DKTLP

Page 59: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 60: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

List of Participants of Beautician Training in Dhading District-MKTLP

Detail of participants’ list of Beautician Training in MKTLP

Name of Training event: Beautician (Basic Level)Training

Training Place: Dhunibesi Municipality-6,Dharke

Training Participants Date: 03 Mansir to 03 Magha 2075

SN Trainee Name Sex Ethnicity

Address Male Female Total IP Dalit Other

1 Bimala Upreti 1 1 1 Dhunibesi-6

2 Sapana Adhikari 1 1 1 Thakre-9

3 Santoshi Upreti 1 1 1 Dhunibesi-7

4 Anjana Acharya 1 1 1 Thakre-9

5 Dipa Dangol 1 1 1 Thakre-9

6 Shrijana Danjol 1 1 1 Thakre-9

7 Ambika Thapa 1 1 1 Thakre-8

8 Britney Bhandari 1 1 1 Dhunibeshi-7

9 Sunita Tamang 1 1 1 Thakre-11

10 Radhika Dhungana 1 1 1 Galchhi-1

11 Ganga Dhungana 1 1 1 Galchhi-1

12 Rabina Thapa 1 1 1 Gorkha

13 Rejina Thapa 1 1 1 Dhunibesi-6

14 Sabita Thapa 1 1 1 Dhunibesi-6

15 Mina Khatri 1 1 1 Dhunibesi -6

16 Mina Pandit 1 1 1 Dhunibesi-8

17 Samita Tamang 1 1 1 Thakre-11

18 Sabina Acharya 1 1 1 Thakre-11

19 Anu Lama 1 1 1 Dhunibesi-6

20 Usha Aryal 1 1 1 Thakre-8

21 Renuka Tamang 1 1 1 Dhunibeshi-6

22 Tulasha Pandit 1 1 1 Thakre-8

23 Bimala Khatiwada 1 1 1 Galchhi-8

24 Pramila Tamang 1 1 1 Dhunibeshi-6

25 Rita Tamang 1 1 1 Dhunibesi-6

26 Sarita BK 1 1 1 Gorkha

27 Asmita Tamang 1 1 1 Dhunibesi-6

Total 0 27 27 9 1 17

Page 61: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 62: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 63: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Detail of participants’ list of Seasonal and Off -seasonal Vegetable Production Training in

MKTLP

Name of Training event: Seasonal and Off-seasonal Vegetable Production Technology

Training Place: Siddhalek RM-4,Nibuwatar,Community building

Training Participants Date: 17-23 Mansir 2075

SN Trainee Name Sex Ethnicity

Address Male Female Total IP Dalit Others

1 Maya Nath Silwal 1 1 1 Siddhalek-4

2 Dambar Bahadur Gurung 1 1 1 Siddhalek-4

3 Ramsharan Tripathi 1 1 1 Siddhalek-4

4 Ram Prasad Pandey 1 1 1 Siddhalek-4

5 Yak Bahadur Thapa

Magar 1 1 1 Siddhalek-4

6 Nawa Raj Tripathi 1 1 1 Siddhalek-4

7 Raju Tripathi 1 1 1 Siddhalek-4

8 Dhruba Prasad Sedai 1 1 1 Siddhalek-4

9 Ram Prasad Sedai (Ka) 1 1 1 Siddhalek-4

10 Bimala Sedai (Ka) 1 1 1 Siddhalek-3

11 Tulasi Thapa Magar 1 1 1 Siddhalek-4

12 Kabita Rana Magar 1 1 1 Siddhalek-4

13 Ambika Sedai 1 1 1 Siddhalek-3

14 Manju Sedai 1 1 1 Siddhalek-3

15 Devaki Sedai 1 1 1 Siddhalek-4

16 Bimala Sedai (Kha) 1 1 1 Siddhalek-4

17 Dhan Maya Sedai 1 1 1 Siddhalek-3

18 Amrita Sedai 1 1 1 Siddhalek-3

19 Bhagawati Sedai 1 1 1 Siddhalek-4

20 Mina sedai 1 1 1 Siddhalek-3

21 Nirmala sedai 1 1 1 Siddhalek-3

22 Aam Maya Thapa Magar 1 1 1 Siddhalek-3

23 Ram Hari Pandey 1 1 1 Siddhalek-3

24 Ram Prasad Sedai (Kha) 1 1 1 Siddhalek-3

Total 12 12 24 6 0 18

Page 64: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Name of Training event: Seasonal and Off-seasonal Vegetable Production Technology

Training Place: Siddhalek RM-7,Pipaltar,Ward Office building

Training Participants Date:25 Mansir-02 Poush 2075

SN Trainee Name Sex Ethnicity

Address Male Female Total IP Dalit Other

1 Parbati Pokharel 1 1 1 Siddhalek-7

2 Yak kumari Giri 1 1 1 Siddhalek-7

3 Shova Sedai 1 1 1 Siddhalek-7

4 Samita Kandel 1 1 1 Siddhalek-7

5 Ram Maya Basel 1 1 1 Siddhalek-7

6 Bishnu Giri 1 1 1 Siddhalek-7

7 Mato Giri 1 1 1 Siddhalek-7

8 Rewati Pandey 1 1 1 Siddhalek-7

9 Mitra Lal Shrestha 1 1 1 Siddhalek-7

10 Raj Kumar Shrestha 1 1 1 Siddhalek-7

11 Ram Shran Bhujel 1 1 1 Siddhalek-7

12 Purna Lal Shrestha 1 1 1 Siddhalek-7

13 Indra Bahadur Bhujel 1 1 1 Siddhalek-7

14 Bhim Kumari Sedai 1 1 1 Siddhalek-7

15 Ram Bahadur Bhujel 1 1 1 Siddhalek-7

16 Tuk Bahadur Bhujel 1 1 1 Siddhalek-7

17 Lal Bahadur Bhujel 1 1 1 Siddhalek-7

18 Samsher Sarki 1 1 1 Siddhalek-7

19 Bed Nidhi Kandel 1 1 1 Siddhalek-7

20 Khem kumari Dhakal 1 1 1 Siddhalek-7

21 Samjhana Bhatta 1 1 1 Siddhalek-7

22 Nawa Raj Adhikari 1 1 1 Siddhalek-7

23 Rohini Prasad Khatiwada 1 1 1 Siddhalek-7

Total 15 8 23 8 2 13

Page 65: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 9

Grievance Redress Committee Meeting Matrix

SN Date No. of

Participants Type of Participants

Topics/ Issues discussed

Location Information Disseminated

DKTLP

1 2075/3/27

11 July 2018

Male-9 Female-1 Total-10

GRC committee members and coordinator of GRC Mr. Tungnath

Sharma and locals

Purpose to use the budget that has given to Jaljala Gandaki VDC

wardno.7 by ESSD

Jaljala, Gandaki VDC ward no. 7

2 2075/3/28

12 July 2018

Male-9 Female-1 Total-10

GRC committee members and coordinator of GRC Mr. Tungnath

Sharma and locals

Road construction at Majhigaun

Salghari Kushma RM ward no.2

3 2075/3/28

12 July 2018

Male-6 Female-1 Total-7

GRC committee members and coordinator of GRC Mr. Devendra

Prasad Subedi and locals

Purpose to use the budget given from

the project to Affected

households

Kushma RM ward no.1

4 2075/3/28

12 July 2018

Male-7 Female-1 Total-8

GRC committee members and coordinator of GRC Mr. Hari Bikash

J.C

Purpose to use the budget given from

the project Jaljala Ward no.8

5 2075/3/31

15 July 2018

Male-6 Female-1 Total-7

GRC committee members and coordinator of GRC Mr. Gam Bdr

Fagami and locals

Purpose to use the budget given from

the project to Affected

households

Annapurna VCD ward no. 7

6 2075/6/16 2 October

2018

Total-16 Male-14

Female -2

The ward chairman Mr. Yadu Nath Bastola, GRC members and others

GRC meeting Khurkot ,Kusma-

2,Bagaicha CSR budget,social issues,skill

development training,

Page 66: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

7 2075/7/9

26 October 2018

Total -22 Male-11

Female -11

Annapurna RM vice chairman, Ward Deputy chairman, Annapurna RM Officer,contractor ,ESSD,Project

Officer and others.

GRC meeting Tatopani Bazar Police

chauki

Shifting the affected people and compensate the crop and

other losses

8 2075/8/3

19 November 2018

Total-24 Male-12

Female -12

The ward chairman GRC Mr. Gam Bdr Fagami, GRC members and others

GRC meeting Annapurna-7,Mahavir Crop compensation, social issues, skill development

training

9 2075/8/3

19 November 2018

Total -15 Male-13

Female -2

The ward chairman GRC Mr. Bil Bdr Fagami member ,Contractor, Project,

ESSD Beni unit and others GRC Meeting

Tiplyang Bazar Raghuganga-1

About crop compensation and skill training.

10 2075/8/24

10 December, 2018

Total-8 Male-7

Female-1

Raghuganga 2,GRC Chairman and Members

Demand of equipment

ESSD Beni Unit Office Demand on road construction

equipment (JCV) for excavation.

11 2075/9/1

16 December, 2018

Total-25 Male-18

Female-7

GRC Chairman, GRC members, PAFs, Contractor and other local

person

CSR Implementation,AP 45 issues,AP 44A

issues

Annapurna RM 2 Tatopni ,

To construct the road which is affected by the AP 44A tower

foundation,Shifting AP 45 affected families and CSR

Budget implantation.

12 2075/9/3

18 December, 2018

Total-15 Male-13

Female-2

GRC Chairman,GRC members, Project Manager, PAFs, other local

person Various Demands

Annapurna 7,Histan,Ward Office

Demand on different 16 Topics for solving by the Project and

ESSD.

13 2075/9/10

25 December, 2018

Total-10 Male-9

Female-1

GRC Chairman, GRC members, Project Manager, PAFs, other local

person

CSR Implementation

Jaljala 2 CSR Implementation

S.N.

Date No. of

Participant Type of

Participants Topics/ issue

discussed Location Information disseminated

MKTLP

1 2075/3/21 5’th July

2018

Male – 6 Female – 0

Total - 6

GRC committee members

Land and compensation

issue

Siddhalek-7,Salang

Discussion was made on the issues of land for construction of tower no 31A/0.AP agreed to provide land and the meeting decided to start

the tower foundation work at site. Also decided to provide land compensation amount to AP as soon as possible.

Page 67: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

2 2075/4/2 18’th July

2018

Male – 6 Female – 0

Total – 6

GRM committee members

Land and compensation

issue

Siddhalek

-7,Adamta

r

Discussed on the land and crop loss issue from the construction work of AP 23A/0 and 24/0.The meeting decided to measure the

crop loss area of APs and request to Project Management Office to make necessary arrangement for providing crop and land

compensation amount to APs immediately.

3

2075/4/16

01 August 2018

Male – 7 Female – 1

Total – 8

Project staffs, Wards

representative, Staffs of TATA

project and Community

Discussion on road issue

Siddhalek-

7,Adamtar,Dhading

The meeting decided to carryout survey and design work for the protection and maintenance of rural road as suggested by

community. Also decided to start the maintenance work immediately after the monsoon.

4 2075/4/7 23rd July,

2018

Male – 6 Female – 0

Total- 6

Project Staffs and community

Full affected Aps name list

was not published

During the

construction work road was damaged as well crop loss

of others agricultural

land.

Ikchhakamana RM

4, Chitwan

Land area which was used in tower construction work will be measured and compensated as per project for the loss of crops and road from the project as well. APs name and compensatory for all

those affected Aps whose name hasn’t been published in land acquisition notice

5 2075/4/14 30th July,

2018

Male- 8 Female-0 Total- 8

Project Staffs and community

Landslide by the leg of

AP50A from uses of JVC

crop loss was occur of Prithivi Gurung’s land.

Ikchhakamana RM

3, Chitwan

Right compensation for the loss of crops during the construction as well clearance of stone, muds and bricks. Construction of road with

broad turnings point which was damaged by JVC during the construction

6 2075/5/8

24 August 2018

Male – 10 Female – 0 Total – 10

GRM committee members

Land slide issue

Benighat Rorang

RM-10,Dhading district

It was informed that survey and design work for the protection of rural road and tower itself has been completed. The meeting decided

to start the protection work immediately.

7 2075/5/5

21/August / 2018

Male-7 Female-0 Total-7

NEA staffs, Contractor staffs, ESMU Officers

GRC Issues solved

Ichhakamana, RM-4 Chiwan

Meeting was about the issues solved of the GRC meeting formed on 2075-4-7

Page 68: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

district

8

2075/5/20 05th

September, 2018

Male – 7 Female – 0

Total - 7

GRC committee members

Land compensation

Benighat Rorang, Dhading

Land owner Mr. Bhakta Bahadur Malla has stopped the tower erection work of AP 44/0 due to delay in providing land

compensation to his land. Discussion was held with him and GRC meeting was also organized to discuss the issues. It was decided to provide land compensation immediately to him and Mr. Malla agreed

to resume the tower erection work at his land. Now compensation was provided to him.

9

2075/5/21 06

September, 2018

Male – 7 Female – 0

Total - 7

GRC committee members

Rural Road

Siddhalek RM-

6,Dhading

Community and user committee of Parewatar-Khanibhayang rural road had complained that one leg of tower 28/0 lies on the road which obstacle in vehicle movement. It was discussed in GRC

meeting and decided to open the diversion track for vehicle movement during the foundation work. It was also decided to

rehabilitate the rural road as in previous condition with appropriate engineering design and structure after the foundation work is

completed.

10 2075/6/04

20 September

Male – 5 Female – 0

Total - 5

GRC committee members

Crop loss Siddhalek-3,Dhading

Crop loss area during the tower construction work which was left out as complained by community was carried out with participation of GRC members and local community. Regarding the payment due issue of labor gang during their stay at community which they used

fire wood and vegetables from community It was decided to communicate with TATA project office to settle the issue if any as

complained by community.

11 2075/6/15 01 October

Male – 6 Female – 0

Total - 6

GRC committee members

Implementation of livelihood restoration

activity

Siddhalek RM-

7,Dhading

Discussed on implementation of seasonal and off seasonal vegetable production training to 20 PAFs of ward no 7 of Siddhalek

RM.

12 2075/6/19 05 October

Male – 7 Female – 0

Total - 7

GRC committee members

Implementation of livelihood restoration

activity

Siddhalek RM-

3,Dhading

Discussed on implementation of seasonal and off seasonal vegetable production training to 20 PAFs of ward no 3 and 4 of

Siddhalek RM.

13

2075/7/20 06

November 2018

Male – 6 Female – 0

Total - 6

GRC committee members

Submission of application for

land compensation

Thakre RM-

11,Dhading

Decided to inform the APs to summit application to project office for land compensation. Also discussed on grievance received from Sanu Kanchha Tamang and decided to inform the project office for further

process.

14

2075/08/17 03

December 2018

Male – 6 Female – 0

Total - 6

GRC committee members

Commencement of vegetable farming training

Siddhalek RM-3

Decided for the commencement of 7 days long vegetable farming training to PAFs from 03 December 2018 at Siddhalek RM-3 under

project mitigation activity.

Page 69: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

15

2075/08/25 11

December 2018

Male – 5 Female – 0

Total - 5

GRC committee members

Commencement of vegetable farming training

Siddhalek RM-7

Decided for the commencement of 7 days long vegetable farming training to PAFs from 11 December 2018 at Siddhalek RM-3 under

project mitigation activity.

16

2075/08/27 13

December 2018

Male – 5 Female – 0

Total - 5

GRC committee members

Site clearance and

implementation of CSR activity

Siddhalek RM-3 & 4

Decided to communicate with TATA project office for the immediate action to solve the issues raised by community. Also decided to

inform the PMO Office and ESSD to address the community demand under CSR activity.

17

2075/08/29 15

December 2018

Male – 5 Female – 0

Total - 5

GRC committee members

Land plot differ and additional

land used

Siddhalek RM-7

Decided to inform the issues to PMO office and will request for site visit with land measurement staff to solve the APs complaint.

18

2075/09/10 25

December 2018

Male – 10 Female – 0 Total - 10

GRC committee members

Land issue

Dhunibesi

Municipality-7

GRC committee members visited the site and discussed with the APs of tower no.6/0 and 6A/0. GRC committee members requested

the APs to provide land for the construction of towers as other people who are supporting to project activity. Also informed to the APs not to construct any structure in the land to be acquired for

project activity.

19

2075/8/12 28th

November, 2018

Male – 6 Female – 1

Total -7

GRC committee members

About selection of trainees for tailoring and agriculture

training

Gorkha municipality, ward

no 14

The PAF from Gorkha municipality of ward number 13 and 14 will be selected for the Skill development training -Tailoring and Seasonal and offseanosal vegetable growing training as identified by RIPP.

20

2075/9/3 18th

December, 2018

Male – 7 Female – 1

Total -8

GRC committee members

About selection of trainees for seasonal and non-seasonal

vegetable farming training

Gandaki RM, ward

no. 8, Gorkha

Total 25 trainees were selected of trainees for tailoring and agriculture training.

21

2075/9/4 19th

December, 2018

Male – 7 Female – 0

Total -7

GRC committee members

About training starting of non-

seasonal vegetable

farming training and trainer selection

IchhakamanaRM, ward no.

4 , Chitwan

Training was concluded to start from 4th January of 2019 in ward no 3 and 4 of Ichhakamana RM. Similarly the trainer for the training was

also selected.

Page 70: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

22

2075/9/6 21st

December, 2018

Male – 8 Female – 3 Total -11

GRC committee members

Chautaro was Impacted while constructing AP

71/0 at Yangkot and

local track road was also

impacted by Tower Pad of

AP 71/0

Gorkha Municipality, ward no. 13

GRC team has decide to take application from community people with proposed location for the restoration of Chautaro. After taking

application GRC decided to process ahead for the application. Contractor is agreed to maintain impacted local track road after

finishing tower erection work.

S.N. Date

No. of

Participant

Type of

Participants

Topics/ issue

discussed Location Information disseminated

KNBTLP

1 2075/08/11

27th November, 2018

Male-10 Female-1 Dalit-3 Janjati-0 Others-8

Total -11

Executive ward chairperson, Local people, PAFs, Project staffs, Contractor and ESMU

GRC meeting: Final Confirmation of Alignment & Check Survey and Cadastral Survey

Baglung municipality-13, Baglung

With field observation of alignment; affected families informed about projects procedure, government policy, and land acquisition act 2034, compensation of land.

Page 71: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 11

Grievance Received Matrix

Recorded Grievances

S.N Location Recorded by Issue Type Issue Description Status

DKTLP

1 Annapurna 3, Myagdi Chandra Prasad Serchan

Land compensation

Need of compensation after land used for tower construction

Solved

2 Mallaz Jaljala- 3 Parbat

Krishna Bahadur Baruwal

Crop compensation

Need of Compensation for his crop destruction due to construction

Solved

3 Jaljalla -2, Parbat Bam Bahadur Bishwokarma

Re- mapping and surveying

of Land

Re- mapping and surveying of his land for the construction of tower

Solved

4 Jaljalla -8, Parbat Bal Bahadur Chhetri

Land and crop compensation

Need of compensation after land used and crop destruction for tower construction

Under process of solving

5 Jaljala-7, Parbat Dandapani Upadhyaya

Land and crop compensation

Need of compensation after land used and crop destruction for tower construction

Solved

6 Jaljala, Parbat Shiva Prasad Acharya

Land and crop Compensation

Need of compensation after land used and crop destruction for tower construction

Solved

7 Raghu RM-3, Myagdi Tunga Bahadur

Malla

Damage of Canal

Need to make new canal and also fill up the land which has been damaged.

Solved

8 Myagdi Dinesh Karki Temple and road

compensation

Need of compensation for temple and Road re-construction due to AP 29.

Solved

9 Jaljala- 7 Parbat Kedar Nath Acharya

Land compensation

& disable compensation

Need of Compensation for his land destruction due to construction and compensation for his disabled son

Under process of solving

10 Jaljala- 7 Parbat Kedar Nath Acharya

crop compensation

Need of Compensation for his crop destruction (maize and rice)

Under process of solving

11 Jaljala- 7 Parbat Kedar Nath Acharya

Private tree compensation

Need of his tree compensation on his private land

Under process of solving

MKTLP

1 Dhunibesi Municipality-6

Krishna Bahadur Khatri

Land area Land area used in tower construction work but name was not published in land acquisition notice.

Solved

Page 72: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

2 Siddhalek RM-3 Ram Prasad Sedai

Rural road under tower pad

Rural road lies under tower pad of AP 34A/1 tower. Communities are demanding to support them in road diversion work.

Under process of solving

3 Siddhalek RM-3 Maya Nath Silwal

Clearance of excavated materials

Excavated materials produced during the tower construction to be cleared at site.

Under process of solving

4 Siddhalek RM-3 Kinara Rajya Laxmi Devi Malla

Protection and restoration of religious house (Pouwa)

A religious house (Pouwa) lies under RoW of tower no AP 35/0. Community is demanding support for restoration of Pouwa.

Under process of solving

5. Thakre RM-8 Arjun Gurung/Raju Gurung

Protection of IP cremation place

IPs (Gurung & Tamang) cremation place at AP 9/0 lies under RoW.

Solved

6 Siddhalek RM-7,Adamtar,Dhading

Ward Office of Siddhalek RM-7

Rural road Ward Office of Siddhalek RM-7 and community people had complaint that some part of the rural road was used in construction of AP 23A/0 as a result existing road is narrowed for vehicle movement. Necessary work to be carried out by the project for the maintenance of existing road.

Solved

7 Dhunibesi Municipality-6,Dhading

Krishna Bahadur Khatri

Soil erosion Mr Khatri complained that protection work to be implemented immediately to control the soil erosion at AP 7D/0. He was worried that land erosion could affect to his house and shed if protection work is not carried out immediately.

Solved

8 Siddhalek RM-3,Dhading

Community Crop loss Community of Siddhalek RM-3 and 4 complained that some AP’s crop loss area measurement has been left. Community has requested to measure the crop loss area whose crop area was left out to measure during the tower foundation and erection work.

Solved

9 Sahidlakhan RM-3, Banauti, Gorkha

Narayan Prasad Pokhrel

Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle

Solved

Page 73: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

10 Sahidlakhan RM-3, Banauti, Gorkha

Bhim Prasad Pokhrel

Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle and land also use for labor camp

Solved

11 Sahidlakhan RM-3, Banauti, Gorkha

Madan Dutta Koirala

Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle

Solved

12 Benighat Rorang RM-9

Bhakta Bahadur Malla

Land compensation

Delay in providing land compensation which the land is used for the construction of tower no 44/0.

Solved

13 Siddhalek RM-6 Ram Kumar Shrestha

Disturbances to rural road

Construction of tower no 28/0 obstacles the vehicle movement in rural road.

Solved

14 Siddhalek RM-7 Lal Bahadur Bhujel

Damaged of house hold appliance and furniture

One table and one fan damaged by hit of boulder during the construction work of tower no 25B/0.No any compensation received against the damaged goods.

Solved

15 Galchhi RM-8

Bharat Bahadur Wagle

Disturbances to rural road

Construction of tower no 18C/0 is likely to affect the expansion of Galchhi-Mahadevbesi rural road.

Solved

16 Thakre RM-11, Dhading

Sanu Kanchha Tamang

Risk of landslide to house and shed

Affected to private house and shed due to construction of tower no 16A/0.Also generates risk of land slide to house and land.

Under process of solving

17 Benighat Rorang RM, Dhading

Santosh Dallakoti

Disturbances to Community Irrigation canal

Damaged of community irrigation canal due to tower construction work. No maintenance support receives from project.

Under process of solving

18 Thakre RM-11, Dhading

Chyante Praja

Land owner name not published in land acquisition notice

Private land belonging to Chyante Praja was used in tower construction work of 14C/0 but his name was not published in land acquisition notice.

Under process of solving

19 Ichchayakaman RM-3 Dil Bahadur Gurung

Land Compensation, ROW issue and Resettlement.

GRC meeting is in process Under process of solving

20 Gorkha Municipality-13 Basudev Shrestha and others

Impact on Chautaro and local track road by Tower Pad of AP 71/0

Chautaro was Impacted while constructing AP 71/0 at Yangkot and local track road was also impacted by Tower Pad of AP 71/0

Under process of solving

Page 74: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

21 Siddhalek RM-4 Dambar Bahadur Gurung

Site clearance and crop damage

At AP 31/0, excavated soil during the tower foundation work has not been removed from his field.

Under process of solving

22 Siddhalek RM-7 Ram Bahadur Sarki

More land used and Land plot no differ

At AP 24D/3, tower has been constructed in new land plot no rather than the land plots no 502 which was published in land acquisition notice. Also more land has been used for the tower construction work.

Under process of solving

23 Siddhalek RM-3 Yak Bahadur Tumasi

Bank denied to provide cheque amount

Bank denied to provide cheque amount due to difference in title name written in cheque (cheque was provided him for crop compensation by PMO office) and account name maintained at bank. This has been solved now.

Solved

24 Galchhi RM-8 Sher Bahadur Nepal

Simpani Kalika CF areas and CF Office building to be affected

Simpani Kalika CF building lies under the RoW of MKTLP transmission line. CF members explained that compensation to be provided soon to construct new building in safe site

Solved

KNBTLP

1 Bihadi-3 Ranipani, Parbat

Janak Prasad Bhattrai

Shifting the alignment way

Transmission line directly affect his residential plot (Ghaderi) so need of shifting.

Solved

Page 75: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 12

Grievance Received Letters

DKTLP

Page 76: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 77: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 78: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 79: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 80: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 81: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 82: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 83: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 84: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 85: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 86: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

MKTLP

Page 87: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 88: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 89: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 90: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 91: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 92: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 93: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 94: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 95: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 96: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 97: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 98: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 99: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 100: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 101: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 102: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 103: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 104: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 105: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 106: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 107: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 108: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 109: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 110: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

KNBTLP

Page 111: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the
Page 112: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

Annexure 13

Public Consultation Matrix

SN Date No. of Participants

Type of Participants Topics/ Issues discussed

Location Information Disseminated

DKTLP

1 2075/3/28 12th July, 2018

Male-6 Female-0 Total-6

Ward chief, TATA, ward Staffs

GRC Formation

Kushma RM ward no.1

2 2075/3/31 15 July 2018

Male-5 Female-0 Total-5

Ward chief Mr. Gam Bdr. Fagami , ESSD and local

GRC Formation

Annapurna VCD ward no. 7

3 2075/4/10 26 July 2018

Male-13 Total-13

Kusma MC Mayor ,Project Manager ,ESSD Unit and others

Landslide issues for NayaPulKusma MC -2

Kusma MC Office Kusma Parbat

Clean the drainage and field visit on landslide site.

4 2075/4/15 31 July 2018

Male -11 Total-11

Kusma MC Mayor ,Project Manager ,ESSD Unit and others

Landslide issues for NayaPulKusma MC -2

Kusma MC Office Kusma Parbat

Cost Esrimate and Construction by the Project

5 2075/5/22 7 September 2018

Total-13 Male-12 Female-1

CFUG, Forest officer, ESSD, Project

About Tree cutting for AP 27 A

Raghuganga -3 ,ward office

About all the issues solved and not any issues remaining for AP 27 A

6 2075/5/24 9 September 2018

Total-18 Male-18

Ward chairman Annapurna-6, ESSD, Project, and other stakeholders.

About GRC formation

Annapurna-6,Pokharebagar

Meeting about the GRC formation

7 2075/6/11 27 September 2018

Total-6 Male-6

Bidhyajyoti SS principal ,social persons ESSD, Project

About Grievances and social issues.

Beni unit office,Beni Meeting was held about the Playground, Children park and Helipad construction.

Page 113: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

8 2075/6/2 28 September 2018

Total-24 Male-19 Female-5

Ward chairman, ESSD, Contractor Representative ,Project and others

About Grievances and CSR.

Annapurna -3 ward office ,Dana

About the issue on CSR budget. As APs are demanding more budget. Not any decision was made as their demands were very high which cannot solved by ESSD

9 2075/6/14 30 September 2018

Total -26 Male-23 Female-3

Chief district officer, DSP, District coordination committee chief, Annapurna Rural Municipality Chairman, Project manager, Ward Chairman, ESSD Beni unit, Affected persons, press reporter and others

About social issues Annapurna-6, Pokhrebagar.

At CDO office Beni, Myagdi.

Reporting for shifting alignment, compensation and other issues within a week by the project.

10 2075/6/23 9 October 2018

Total -35 Male-33 Female-2

Annapurna Chairman,CDO Myagdi, Ward Chairman, Project Manager, ESSD Beni unit, Contractor, PAFs and Social Person.

Public Consultation Meeting

Annapurn -6,Pokharebagar,RM Hall

About Compensation Alignment shifting,and other issues.

11 2075/6/24 10 October 2018

Total -17 Male -12 Female-5

Annapurna Chairman, Ward chairman, Project Officer, Contractor affected people, and others

Public Consultation Meeting

Tatopani Bazar About the AP 45 Affected shifting and protection.

12 2075/7/9 26 October 2018

Total -22 Male-11 Female -11

Annapurna RM vice chairman, Ward chairman, Annapurna RM Officer,contractor ,ESSD,Project Officer and others.

GRC Formation

Tatopani Bazar Police chauki

GRC formation.

13 2075/8/13 29 November

Total -21 Male-3

Community forest user group ,temple

Public Consultation

Jaljala 7 ,Parbat About social issues

Page 114: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

2018 Female-18 chairman ,Contractor and ESSD Beni unit

Meeting

14 2075/9/1 16th Dec, 2018

Total-24 Male-18 Female-6

ADB Consultant ,ESSD Beni, PAFs, Other Local people

Shifting Alignment

Annapurna 6,Pokhrebagar About shifting alignment.

15 2075/9/6 21 Dec, 2018

Total-11 Male-11 Female-0

Project Manager, PSC, ESSD, ESSD Beni

CSR Implementation and data collection

Project Office Beni Technical Estimate for CSR Demands.

16 2075/9/6 21 Dec, 2018

Total-13 Male-11 Female-2

ESSD, Project ,Civil technical person, ESSD Beni

CSR Estimate Annapurna 1 ,Bega CSR Estimate

17 2075/9/6 21 Dec, 2018

Total-13 Male-12 Female-1

ESSD, Project ,Civil technical person, ESSD Beni

CSR Estimate Annapurna 7 CSR Estimate

18 2075/9/7 22 Dec, 2018

Total-6 Male-6 Female-0

ESSD, Project ,Civil technical person, ESSD Beni

CSR Estimate Annapurna 2

CSR Estimate

19 2075/9/8 23 Dec, 2018

Total-10 Male-5 Female-5

ESSD, Project ,Civil technical person, ESSD Beni

CSR Estimate Jaljala 4 CSR Estimate

20 2075/9/9 24 Dec

Total-15 Male-15 Female-0

ESSD, Project ,Civil technical person, ESSD Beni

Social and Environment issues

Jaljala 8 About Social and Environment issues

21 2075/8/21 7th Dec 2018

Total-19 Male-18 Female-1

Ward Chief, PSC, ESSD, ESSD Beni

Rate fixation of land

Beni Rate fixation of land

MKTLP

1 2075/3/28 12 July, 2018

Male – 8 Female – 1 Total – 9

Project staffs and Community

Discussion on land issue

Dhunibesi-6,Dhading Land area which was used in tower construction work will be measured and compensated as per project rules.APs name was not published in land acquisition notice.

2 2075/4/8 24’th July 2018

Male – 4 Female – 0 Total – 4

Project staffs and community

Support for construction of cremation place

Ganise Chour, Thakre RM-8,Dhading

APs were informed that application received from them has already been submitted to project Management Office and ESSD for necessary action. IPs

Page 115: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

(Gurung & Tamang) cremation place at AP 9/0 lies under RoW and requested for support construct cremation place at safe site.

3 2075/4/10 26 July, 2018

Male – 15 Female – 1 Total – 16

Project Staffs and community

Tower foundation site clearance, rural road under tower

Siddhalek RM-3,Dhading Communities were informed that the issues will be discussed with TATA project staffs and Project Management Office for proper solution.

4 2075//18 3rd Sep, 2018

Male – 6 Female – 2 Total – 8

Project staffs and Community

Discussion on land issue

Dhunibesi-6,Dhading Land area which was used in tower construction work will be measured and compensated as per project rules.APs name was not published in land acquisition notice.

5 2075/4/16 01 August 2018

Male – 25 Female – 3 Total – 28

Project staffs, Wards representative, Staffs of TATA project and Community

Discussion on road issue

Siddhalek-7,Adamtar, Dhading

The meeting decided to carryout survey and design work for the protection and maintenance of rural road as suggested by community. Also decided to start the maintenance work immediately after the monsoon.

6 2075/4/22 7 August 2018

Male= 8 Female=2 Total=10

Contractor staffs, ESMU Officer, Project affected villagers

Improvement of local road section (Chumling-Dahaki); Improvement of water source by providing required cement

Dahaki, Ichchhakamana RM-3, Chitwan district

Suggestion for local road maintenance and improvement of drinking water source has been forwarded to concerned stakeholder (TATA, ESSD, and Project Office) for further actions.

7 2075/6/11 27 September 2018

Male – 22 Female – 2 Total –24

Project staffs, Wards representative, Staffs of TATA project and Community

Discussion on rural road issue at AP 18C/0

Galchhi-8,Dhading The meeting with community was decided to request PMO office to carryout site inspection at AP 18C/0 by the concerned specialist from PMO office for the protection and maintenance of rural road as suggested by community.

Page 116: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

8 2075/5/25 10 September, 2018

Male-12 Female-0 Total-12

Project staffs, Wards representative, Staffs of TATA project and Community

Discussion Land issue

Sahidlakhan-3, Gorkha The issues of land has been observed with meeting attendants.

9 2075/8/3 19 November 2018

Male – 0 Female – 30 Total – 30

Trainee of skill development training (Beautician training)

Discussion on implementation of training

Dhunibesi Municipality-7,Dhading

10 2075/8/11 27 November, 2018

Male=14 Female=1 Total=15

Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people.

Consultation meeting was done for issue regarding land acquisition and obstacle for construction on AP 74/2

Gorkha Municipality Ward 14 Yankot, Gorkha

11 2075/8/1 17 November, 2018

Male -5 Female-1 Total-6

Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people.

Consultation meeting was done regarding compensation of structure and assistance for resettlement in AP73/A

Gorkha Municipality Ward 14 Yankot, Gorkha

12 2075/8/18 04 December 2018

Male – 25 Female – 11 Total – 36

Beni Pakha Community forest user group

Discussion on implementation of training

Siddhalek RM-3 Discussion was made with the members of Beni Pakha CF user group to start the stringing work at forest area and agreed to support some aid to CF on behalf of TATA project Ltd.

Page 117: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

13 2075/8/25 11 December 2018

Male – 18 Female – 10 Total – 28

Trainee of Vegetable farming

Agriculture tools support

Siddhalek RM-7 Regarding the query of trainee to support them agriculture tools ie.Plastic tunnel, hand tractor, pesticide spray pump etc, It was informed them that their demand will be communicated and submitted to PMO Office.

14 2075/8/14 30 November 2018

Male -7 Female -0 Total 0-7

SSO, ESO, and Workers

Consultation was done regarding issues of wages and health facilities

Markichowk Substation Aabukhaireni RM - Tanahu

Contractor was advised to provide regular health checkup facilities for labour inside Substation and also adviced to pay wages in time

15 2075/8/24 10 Decemebr 2018

Male -7 Female-0 Total -7

Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, 5NEA, Project Affected people

Water supply for construction of tower

Sahid Lakhan RM -3 Banauti Gorkha

Contractor was agreed to make water supply route and maintain properly by using 1000 m pipe provided to community under CSR program.

16 2075/9/6 21 Decemebr 2018

Male -7 Female -1 Total-8

Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people

Compensation for land which was used by contractor for vehicle movement and issues of crops

Sahid Lakhan RM -3 Banauti Gorkha

Contractor was agreed to provide 6 hour JCB support for restore of land which was impacted while vehicle movement.

17 2075/9/8 23 December 2018

Male -9 Female -0 Total-9

Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people

Compliance of EHS

TATA office at Aabukhaireni’ Tanahu

Contractor was advised to comply the issues regarding Environment Health and safety.

KNBTLP

Page 118: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

1 2075/04/16 1/August/ 2018

Male-13 Female-4 Janjati-1 Others-16 Total-17

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Tansen Municipality-9, Palpa District.

A committee was formed in the Chairmanship of Ward Chairperson Tika ram Gaudel

2 2075/04/23 8/August / 2018

Male-13 Female-0 Total-13

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Palpa -1, Palpa District. A committee was formed in the Chairmanship of Ward Chairperson Som Bdr.Jhedi

3 2075/04/30 15/August / 2018

Male-17 Female-4 Tota-21

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Galyang Municipality -5, Syanja District

A committee was formed in the Chairmanship of Ward Chairperson Bishnu Basyal Cheetri

4 2075/06/5 21/September / 2018

Male-7 Female-0 Janjati-1 Dalit-0 Others-6

Ward Chairperson, Local people, Project staffs, NEA representatives, Contractor and ESSD Unit & APs

GRC Formation

Tinahu Rural municipality (RM) -5, Palpa District.

A committee was formed in the Chairmanship of Ward Chairperson chairperson Mr. Dal Bahadur Darlami.

5 2075/6/18 4th October, 2018

Male-14 Female-3 Dalit-3 Janjati-3 Others-11 Total -17

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Bihadi rural municipality- 6, Parbat District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Tek Bahadur Thapa.

Page 119: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

6 2075/6/19 5th October, 2018

Male-14 Female-3 Dalit-0 Janjati-4 Others-13 Total -17

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Bihadi rural municipality- 3, Parbat District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Rana Bahadur Aale

7 2075/6/19 5th October, 2018

Male-18 Female-1 Dalit-2 Janjati-0 Others-17 Total -19

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Bihadi rural municipality- 2, Parbat District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Om Prakash Kunwar

8 2075/7/6 23rd October, 2018

Male-20 Female-6 Dalit-0 Janjati-23 Others-3 Total -26

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Tinahu Rural Municipality-4, Palpa District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Dan Bahadur Gaha

9 2075/7/8 25th October, 2018

Male-11 Female-3 Dalit-2 Janjati-6 Others-6 Total -14

Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs

GRC Formation

Bagnaskali Rural Municipality-9, Palpa District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Thaneshwar Timilsena

10 2075/7/9 26th October, 2018

Male -14 Female-8 Total-22

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Bagnasakali Rural Municipality, Ward no-5

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Ishwor Kumar Rana

Page 120: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

11 2075/7/9 26th October, 2018

Male -14 Female-7 Total-21

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Bagnasakali Rural Municipality, Ward no-6

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Laxmi Prasad Adhikari

12 2075/7/12 29th October, 2018

Male -31 Female-6 Total-37

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Mathagadi Rural Municipality, Ward no-5

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Bel Bahadur Denga

13 2075/7/30 15th November, 2018

Male -21 Female-1 Total-22

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Sunwal Rural Municipality, Ward No 11, Nawalparasi District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Devi Lal Dungre

14 2075/8/4 20th November, 2018

Male -16 Female-4 Total-20

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Devraha Municipality, Ward no 6 andd 5, Rupandehi District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Damodar Chhettri

15 2075/7/16 2nd November, 2018

Male -5 Female-2 Total-7

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Sunwal Rural Municipality, Ward No 13, Nawalparasi District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Upendra Raj Poudel

Page 121: NEP: South Asia Sub-regional Economic …...Cooperation (SASEC) Power System Expansion Project (On- Grid)- (Annexure 1-9,11,12,13) Prepared by the Nepal Electricity Authority and the

16 2075/8/3 19th November, 2018

Male -9 Female-2 Total-11

Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs

GRC Formation

Sunwal Rural Municipality, Ward No 13, Nawalparasi District

Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Krishna Prasad Devkota

17 2075/08/11 27th Nov, 2018

Male-12 Female-2 Total -14

Ward Chairperson, Local people, PAFs, Project staffs, Contractor and ESMU

GRC Formation Alignment and site clearance

Parbat, Bihadi-14 Informed about KNBTLP and discussed on objectives of GRC formation, Its role and responsibilities and project implementation modality and procedure, site clearance

18 2075/08/10 26th Nov, 2018

Male-23 Female-2 Total -25

Ward Chairperson, Local people, PAFs, Project staffs, Contractor and ESMU

Coordination committee meeting for GRC formation : Alignment Shift and land compensation under TL

Parbat, Bihadi-1 The alignment proposed by local does not seem feasible technically and economically, then to address the issues meeting have concluded for discussion on compensation amount of land in next meeting.

19 2075/8/21 7th Dec 2018

Total -13 Male-13 Female-0

Project representative, ESMU unit Butwal, Contractor, PAFs and Social intellectual persons.

Demanding the grievances AP Tower & Alignment shifting from cultivation land.

AP 41d and AP 42Galyang-5, Syangja

Conducted community consultation meeting,

Giving information about project and trying to maximum compensation of cultivation land by project.

20 2075/8/23 9th Dec 2018

Total -12 Male-11 Female-1

Ward chairperson, ESMU unit Butwal, Contractor, PAFs and Social intellectual persons.

Demanding the AP Tower & Alignment shifting from purposes residential plot which has joined the lokmarg

AP34-AP35 Bihadi-3 Ranipani

Conducted community consultation meeting,

Giving information about project.

Retry to shifting the alignment way if technically possible,

Trying to maximum compensation of purpose residential plot according to land acquisition act.