Social Monitoring Report
Semiannual Report Project no: 44219-014 Loan/Grant: 3139/0397 Period Covered: July-Dec 2018 January 2019
NEP: South Asia Sub-regional Economic
Cooperation (SASEC) Power System Expansion
Project (On- Grid)- (Annexure 1-9,11,12,13)
Prepared by the Nepal Electricity Authority and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Annexure-1
Tower Foundation and Tower Erection Details
DKTLP
District: Parbat
S.N Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi Govt)
1 AP01 1 PVT 1 ku.na.pa-2
2 AP01A 1 PVT 1 ku.na.pa-2
3 AP01B 1 PVT 1 ku.na.pa-2
4 AP01C 1 PVT 1 ku.na.pa-2
5 AP02 1 Guthi 1 ku.na.pa-1
6 AP02/1 1 PVT 1 ku.na.pa-1
7 AP02/2 1 PVT 1 ku.na.pa-1
8 AP02A/0 1 PVT 1 ku.na.pa-1
9 AP03 1 PVT Forest 1 ku.na.pa-1
10 AP04 1 PVT Forest 1 ku.na.pa-1
11 AP05 1 PVT Forest 1 ku.na.pa-1
12 AP06 1 PVT 1 Jaljala-8
13 AP06A 1 PVT Guthi Jaljala-8
14 AP06B 1 PVT 1 Jaljala-8
15 AP07 1 PVT Forest 1 Jaljala-8
16 AP07A 1 PVT Jaljala-8
17 AP08 1 PVT Forest 1 Jaljala-8
18 AP08A 1 Forest Jaljala-8
19 AP09 1 Forest Jaljala-8
20 AP09A 1 Forest Jaljala-8
21 AP09B 1 Forest Jaljala-8
22 AP09C 1 Forest 1 Jaljala-8
23 AP10 1 PVT Forest 1 Jaljala-8
24 AP11 1 PVT Forest Jaljala-7
25 AP11A PVT Jaljala-7
26 AP12 1 PVT Jaljala-7
27 AP13 1 PVT 1 Jaljala-7
28 AP13/1 1 PVT Jaljala-7
29 AP13A 1 PVT 1 Jaljala-7
30 AP13B 1 Forest 1 Jaljala-7
31 AP13C 1 Forest 1 Jaljala-7
32 AP14 1 Forest 1 Jaljala-7
33 AP14/1 1 Forest 1 Jaljala-7
34 AP14A 1 Forest Jaljala-7
35 AP15 1 PVT 1 Jaljala-7
36 AP16 1
Forest 1 Jaljala-4
37 AP16A 1 Forest 1 Jaljala-4
38 AP17 1 PVT 1 Jaljala-4
39 AP17A 1 PVT 1 Jaljala-4
40 AP17B PVT Jaljala-4
41 AP18 1 PVT Jaljala-4
42 AP18A 1 PVT Jaljala-3
43 AP18B 1 Forest 1 Jaljala-3
44 AP18C 1 Forest 1 Jaljala-3
45 AP19 PVT Jaljala-3
46 AP20 1 Forest 1 Jaljala-3
47 AP21 1 PVT 1 Jaljala-3
48 AP21A 1 PVT 1 Jaljala-2
49 AP22 1 PVT Jaljala-2
50 AP23 1 PVT 1 Jaljala-2
51 AP24 1 PVT Jaljala-2
52 AP24A 1 PVT Jaljala-2
53 AP25 1 PVT 1 Jaljala-2
54 AP25A 1 PVT Jaljala-2
55 AP25B 1 PVT 1 Jaljala-2
56 AP26 1 PVT 1 Jaljala-1
Total 45 8 36 1
District: Myagdi
SN Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi Govt)
57 27/0 1 PVT 1 Rahuganga-3
58 27A/0 1 PVT 1 Rahuganga-3
59 27B/0 1 PVT 1 Rahuganga-3
60 28/0 1 PVT
1 Rahuganga-3
61 28A/0 1 PVT 1 Rahuganga-3
62 29/0 1 PVT Rahuganga-3
63 30/0 1 PVT
Rahuganga-2
64 31/0 PVT Rahuganga-2
65 32/0 1 PVT Rahuganga-2
66 32A/0 PVT Rahuganga-2
67 33/0 PVT Rahuganga-2
68 33A/0 PVT Rahuganga-2
69 33B/0 1 PVT 1 Rahuganga-2
70 34/0 1 PVT 1 Rahuganga-2
71 34A/0 1 PVT 1 Rahuganga-2
72 34B/0 1 PVT 1 Rahuganga-2
73 35/0 1 Forest 1 Rahuganga-1
74 35A/0 1 Forest Rahuganga-1
75 35B/0 1 PVT 1 Rahuganga-1
76 35C/0 1 PVT Rahuganga-1
77 36/0 1 PVT 1 Rahuganga-1
78 36A/0 1 PVT 1 Rahuganga-1
79 37/0 1 PVT 1 Annapurna-7
80 38/0 1 PVT 1 Annapurna-7
81 39/0 1 PVT Forest 1 Annapurna-7
82 39A/0 1 PVT Guthi 1 Annapurna-7
83 39B/0 1 PVT Guthi 1 Annapurna-7
84 39C/0 1 PVT Guthi 1 Annapurna-7
85 39D/0 1 PVT 1 Annapurna-1
86 40/0 1 Forest Annapurna-6
87 40A/0 1 PVT 1 Annapurna-1
88 41/0 1 PVT 1 Annapurna-1
89 41A/0 PVT ROW Annapurna-6
90 41B/0 PVT ROW Annapurna-6
91 42/0 PVT ROW Annapurna-6
92 42A/0 PVT ROW Annapurna-6
93 42B/0 PVT ROW Annapurna-6
94 43/0 PVT ROW Annapurna-6
95 44/0 1 PVT 1 Annapurna-2
96 44A/0 1 PVT Forest 1 Annapurna-2
97 45/0 1 Forest Annapurna-2
98 46/0 Govn Annapurna-2
99 46A/0 1 PVT 1 Annapurna-3
100 46B/0 1 Forest Annapurna-3
101 47/0 1 PVT Annapurna-3
102 47A/0 1 forest Annapurna-3
103 47B/0 1 PVT Annapurna-3
104 47C/0 1 PVT 1 Annapurna-3
105 48/0 1 Forest 1 Annapurna-3
106 48A/0 1 PVT 1 Annapurna-3
107 49/0 1 PVT 1 Annapurna-3
108 50/0 1 PVT 1 Annapurna-3
109 51/0 1 PVT 1 Annapurna-3
110 DE 1 PVT 1 Annapurna-3
Total 38 5 29 3
Grand Total 83 13 65 4
MKTLP
SN Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi-Govt)
1 TP 0 0 0 Bandbhanjyang, Ktm.
2 AP-0/0 DE 1 0 0 Bandbhanjyang
3 AP-1/0 1 0 0 Land Acquisition not done
Bandbhanjyang
4 AP-2/0 1 0 0 Land Acquisition not done
Bandbhanjyang
5 AP-2/A 1 0 0 Land Acquisition not done
Bandbhanjyang
Total 0 0 3 1 0 0 4
District: Dhading
SN Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi-Govt)
1 AP-2/B 1 Naubise,Dhunibesi
2 AP-2/C 1 Naubise,Dhunibesi
3 AP-3/0 1 Poultry form has constructed at foundation location.
Naubise,Dhunibesi
4 AP-4/0 1 Land has excavated by land owner about 12 m down than original.
Naubise,Dhunibesi
5 AP-5/0 1 Naubise,Dhunibesi
6 AP-5/A/0 1 Naubise,Dhunibes
i
7 AP-5/B/0 1 Naubise,Dhunibesi
8 AP-6/0 1 Naubise,Dhunibesi
9 AP-6/A/0 1 Naubise,Dhunibesi
10 AP-7/0 1 1 Naubise,Dhunibesi
11 AP-7/A 1
1 Naubise,Dhunibesi
12 AP-7/B 1 1 Naubise,Dhunibesi
13 AP-7/C 1 1 Naubise,Dhunibesi
14 AP-7/D 1 1 Naubise,Dhunibesi
15 AP-7/D/1 1 Not clear Naubise,Dhunibesi
16 AP-7/D/2 1 House at foundation
(ROW)
Naubise,Dhunibesi
17 AP-7/E 1 1 Naubise,Dhunibesi
18 AP8/0 1 1 Archale
19 AP8/1 1 0 1 Archale
20 AP8/2 1 1 Archale
21 AP-8/A 1 1 Ganishe
22 AP-8/B 1 1 Ganishe Chaur
23 AP-9/0 1 1 Ganishe Chaur
24 AP-10/0 1 1
Tower parts off loaded at
site
Pandit Pauwa
25 AP-11/0 1 1 Pandit Pauwa
26 AP-11/A 1 1 Pandit Pauwa
27 AP-11/B 1 1
Tower parts off loaded at
site
Pandit Pauwa
28 AP-11/C 1 1 Pandit Pauwa
29 AP-12/0 1 1 Pandit Pauwa
30 AP-12A 1 1
Kebalpur
31 AP-12/A/1 1 1 Kebalpur
32 AP-12/B 1 Angur Kheti Kebalpur
33 AP-13/0 1 1 Kebalpur
34 AP-13/A 1 1 Kebalpur
35 AP-13/B 1 1 Kebalpur
36 AP-13/C 1 1 Tower parts off loaded at
site
Kebalpur
37 AP-13/D 1 1 Kebalpur
38 AP-14/0 1 1 leg Kebalpur
39 AP-14/A 1 1 Kebalpur
40 AP-14/B 1 1 Kebalpur
41 AP-14/C 1 1 Kebalpur
42 AP-15/0 1 1 Tower parts off loaded at
site
Kebalpur
43 AP-16/0 1 1 Goganpani
44 AP-16/A 1 1 2 pit Goganpani
45 AP-16/B 1 1 Tower parts off loaded
Goganpani
46 AP-16/C 1 1 Tower parts off loaded
Goganpani
47 AP-17/0 1 1 Tower parts off loaded
Goganpani
48 AP-17/A 1 Goganpani
49 AP-17/B 1 Goganpani
50 AP-18/0 1 Goganpani
51 AP-18/A 1 Goganpani
52 AP-18/B 1 Goganpani
53 AP-18/B/1 1 2 pit Goganpani
54 AP-18/C 1
Goganpani
55 AP19/0 1 Goganpani
56 AP-19/A 1 Goganpani
57 AP-19/B 1 Goganpani
58 AP-19/C 1 Goganpani
59 AP-20/0 1 Galchhi
60 AP-20/A 1 Galchhi
61 AP-20/B 1 1 Galchhi
62 AP-20/C 1 1 Galchhi
63 AP-20/D 1 1 Galchhi (Kalleri)
64 AP-21/0 1 1 Galchhi
65 AP-21/1
1
ROW Issue Galchhi
66 AP-21/1/1 1 1 Galchhi
67 AP-21/A 1 1 Galchhi
68 AP-21/B 1 ROW Issue Galchhi
69 AP-21/C 1 1 3 pit Galchhi
70 AP-21/D 1 1 Galchhi
71 AP-21/E 1
Galchhi
72 AP-21/F 1 ROW Issue Galchhi
73 AP-21/G 1 1 Baireni
74 AP-21/H 1 1 Baireni
75 AP-21/I 1 1 Baireni
76 AP-21/J 1 1 Baireni
77 AP-22/0 1 Peda
78 AP-23/0 1
Peda
79 AP-23/A 1
1 Pipaltar,Kumpur
80 AP-24/0 1 1 Pipaltar,Kumpur
AP-24/1 1 3 pit Pipaltar,Kumpur
81 AP-24/A 1 Pipaltar,Kumpur
82 AP-24/B 1 Pipaltar,Kumpur
83 AP-24/C 1 Pipaltar,Kumpur
84 AP-24/D 1 1 2 pit Pipaltar,Kumpur
85 AP-24/D/1 1 1 Pipaltar,Kumpur
86 AP-24/D/2 1 1 Pipaltar,Kumpur
87 AP-24/D/3 1 1 Pipaltar,Kumpur
88 AP-24/E 1 Pipaltar,Kumpur
89 AP-24/F 1 Pipaltar,Kumpur
90 AP-24/G 1 Pipaltar,Kumpur
91 AP-25/0 1 1 Chhapdanda
92 AP-25/A 1 1 Chhapdanda
93 AP-25/B 1 1 Chhapdanda
94 AP-25/B/1 1 1 Tower parts off loaded
Chhapdanda
95 AP-25/C 1 1 Tower parts off loaded
Chhapdanda
96 AP-26/0 1 1 Tower parts off loaded
Chhapdanda
97 AP-26/A 1 1 Kumpur (Siddalek)
98 AP-26/B Kumpur
99 AP-27/0 1
1 Kumpur
100 AP-27/A 1 1 Kumpur
101 AP-27/A/1 1 Kumpur
102 AP-27/B 1 Kumpur
103 AP-27/C 1 Kumpur
104 AP-27/D 1 Kumpur
105 AP-27/E 1 Kumpur
106 AP-28/0 1 1 Kumpur
107 AP-28/A 1 Dhading Besi
Road
108 AP-29/0 1 Land excavated about 17 m
down by land owner new tower foundation
design to be done.
Malekhu
109 AP-29/A 1 Land rate now
finalized on19-08-
018
Malekhu
110 AP-29/B 1 do Malekhu
111 AP-30/0 1 do Malekhu
112 AP-30/A 1 do Malekhu
113 AP-31/0 1 1
Salang
114 AP-31/1 1 1 Salang
115 AP-31/2 1 1 Salang
116 AP-31/A 1 1 Salang
117 AP-32/0 1 1 Salang
118 AP-32/1 1 1 Salang
119 AP-33/0 1 1 Salang
120 AP-33/A 1 1 Salang
121 AP-33/B 1 1 Salang
122 AP-33/B/1 1 1 Salang
123 AP-34/0 1 1 Salang
124 AP-34/A 1 Land rate finalized(RO
W)
Benighat
125 AP-34/A/1 1 1 Salang
126 AP-35/0 1 1 Salang
127 AP-37/0 1 1 Bishaltar
128 AP-37/A 1 3 pit Bishaltar
129 AP-43/B 1 ROW Issue Jogimara
130 AP-44/0 1 1 Jogimara
131 AP-44/A 1 1 Tower parts off loaded
Jogimara
132 AP-45/0 1 1 Jogimara
133 AP-46/0 1 1 Jogimara
134 AP-46/1 1 1 Jogimara
135 AP-46/A 1 1 Jogimara
136 AP-46/B 1 1 Jogimara
137 AP-46/C 1 1 pit Jogimara
138 AP-47/0 1 1 Jogimara
139 AP-47/A 1 1 Jogimara
140 AP-47/B 1 1 Jogimara
141 AP-47/C 1 1 Jogimara
142 AP-47/D 1 1 Jogimara
143 AP-48/0 1 1 Jogimara
Total 101 14 24 4 76 13 143
District: Chitwan
SN Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi Gvt)
1 AP-49/0 0 1 Darechowk
2 AP-49/A 0 1 Darechowk
3 AP-49/B 1 1 Darechowk
4 AP-50/0 1 1 Darechowk
5 AP-50/A 1 1 Darechowk
6 AP-51/0 1 1 Darechowk
7 AP-51/A 1 1 Darechowk
8 AP-51/B 1 Darechowk
9 AP-52/0 1 1 Darechowk
10 AP-52/A 0 1 Darechowk
11 AP-52/B 1 1 Darechowk
12 AP-53/0 1 1 Darechowk
13 AP-54/0 1 1 Darechowk
14 AP-54/A 1 1 Darechowk
15 AP-54/B 1 1 Darechowk
16 AP-54/C 0 1 House Darechowk
17 AP-55/0 1 Darechowk
18 AP-56/0 0 1 Darechowk
19 AP-56/A 0 1 2 pit Darechowk
20 AP-57/0 0 1 3 pit Darechowk
21 AP-57/A 0 0 1 Darechowk
22 AP-57/B 0 0 1 Darechowk
23 AP-57/C 1 1 Darechowk
24 AP-58/0 1 1 Darechowk
25 AP-58/A 1 Darechowk
26 AP-58/B 0 1 2 pit Darechowk
27 AP-58/C 0 1 1 pit Darechowk
28 AP-59/0 0 1 Darechowk
29 AP-60/0 1 Darechowk
Total 17 6 2 4 12 1 29
District: Gorkha
S. No.
Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi Gvt)
1 AP-35/1 1 1 Siurenitar
2 AP-35/A 1 1 Siurenitar
3 AP-36/0 1 1 Siurenitar
4 AP-37/B 1 1
Ghyalchowk
5 AP-37/C 1 1 Ghyalchowk
6 AP-37/D 1 1 Ghyalchowk
7 AP-38/0 1 1 Ghyalchowk
8 AP-38/1 1 1 Ghyalchowk
9 AP-38/A 1 1 Ghyalchowk
10 AP-38/B 1 1 Ghyalchowk
11 AP-39/0 1 1 Ghyalchowk
12 AP-39/A 1 1 Ghyalchowk
13 AP-40/0 1 1 Ghyalchowk
14 AP-40/A 1 1 Ghyalchowk
15 AP-41/0 1 Ghyalchowk
16 AP-42/0 1 1 Ghyalchowk
17 AP-43/0 1 1 Ghyalchowk
18 AP-43/A 1 1 Ghyalchowk
19 AP-60/A 1 Gyaja
20 AP-61/0 1 Gyaja
21 AP-61/1 1 3 pit Gyaja
22 AP-61/A 1 Gyaja
23 AP-61/B 1 Gyaja
24 AP-62/0 1 Gyaja
25 AP-63/0 1 Gyaja
26 AP-64/0 1 Gyaja
27 AP-65/0 1 Gyaja
28 AP-65/A 1 Gyaja
29 AP-65/B 1 Gyaja
30 AP-66/0 1 Gyaja
31 AP-67/0 1 1 Gyaja
32 AP-67/A 1 Manakamana
33 AP-68/0 1 1 Manakamana
34 AP-69/0 1 1 Manakamana
35 AP-69/1 1 1 Manakamana
36 AP-69/A 1 1 Manakamana
37 AP-70/0 1 1 Deurali
38 AP-70/A 1 Deurali
39 AP-70/B 1 Deurali
40 AP-70/C 1 Deurali
41 AP-70/D 1 1 Deurali
42 AP-71/0 1 1 Deurali
43 AP-72/0 1 1 Deurali
44 AP-72/A 1 Deurali
45 AP-72/B 1 1 Deurali
46 AP-73/0 1 Deurali
47 AP-73/A 1 3 leg completed 1 leg at house
Deurali
48 AP-74/0 1 1 Deurali
49 AP-74/1 1 1 Deurali
50 AP-74/2 1 3 leg complete 1 leg ROW
issue
Deurali
51 AP-75/0 1 1 Deurali
Total 43 6 0 2 27 3 51
District: Tanahun
S. No.
Angle Point Completed Foundation
Foundation Under Progress
Remaining Completed Erection
Erection Under
progress
Remarks Location
Private Land
Jungle Ailani (Semi Gvt)
1 AP-75/A 1 1
2 AP-75/B 1 1
3 AP-75/C 1 1
4 AP-76/0 1 0 0 Markichowk
Total 4 0 0 0 3 0 4
Grand Total 165 26 29 11 118 17 231
Annexure-2
Status of Compliance with Loan Covenants
Sch. Para No.
Description Current Status
4. 9. The Borrower shall ensure that no Works contract which involves involuntary resettlement impacts is awarded, until the Borrower and NEA have prepared and submitted to ADB the final RIPP based on the Project’s detailed design, and obtained ADB’s clearance of such RIPP.
Being complied
4. 10. The Borrower shall ensure that no Works contract which involves impacts on indigenous peoples is awarded until the Borrower and NEA have prepared and submitted to ADB the final RIPP, and obtained ADB’s clearance of such RIPP.
Being complied
5. 7. The Borrower shall establish and maintain, or cause NEA and AEPC to establish and maintain, a grievance redress mechanism acceptable to ADB for the purpose of addressing any grievances arising out of the Project, including those from affected peoples concerning land acquisition, environment and any other social issues in a timely manner.
Being complied
5. 12. The Borrower shall ensure, or cause NEA and AEPC, as applicable, to ensure, that all land and all rights-of-way required for the Project, each Subproject and all Project facilities are made available to the Works contractor in accordance with the schedule agreed under the related Works contract and all land acquisition and resettlement activities are implemented in compliance with (a) all applicable laws and regulations of the Borrower relating to land acquisition and involuntary resettlement; (b) the Involuntary Resettlement Safeguards; (c) the RF (for Subprojects); and (d) all measures and requirements set forth in the RIPP, as appropriate, and any corrective or preventative actions set forth in the Safeguards Monitoring Report.
Being complied
5. 13. Without limiting the application of the Involuntary Resettlement Safeguards or the RIPP, the Borrower shall ensure, or cause NEA to ensure, that no physical or economic displacement takes place in connection with the Project until: (a) compensation and other entitlements have been provided to affected people in accordance with the RIPP, as appropriate; and (b) a comprehensive income and livelihood restoration program has been established in accordance with the RIPP, as appropriate.
Being complied
5. 14. The Borrower shall ensure, or cause NEA and AEPC to ensure, as applicable, that the preparation, design, construction, implementation and operation of the Project, each Subproject and all project facilities comply with (a) all applicable laws and regulations of the Borrower relating to indigenous peoples; (b) the Indigenous Peoples Safeguards; and (c) the IPPF (for Subprojects); and (d) all measures and requirements set forth in the RIPP, as appropriate, and any corrective or preventative actions set forth in a Safeguards Monitoring Report.
Being complied
5. 15. The Borrower shall ensure that Part 3 of the Project does not have any indigenous peoples or involuntary resettlement impacts, all within the meaning of SPS. In the event that Part 3 of the Project does have any such impact, the Borrower shall take all steps to ensure that the Project complies with (a) the applicable laws and regulations of the Borrower; (b) the SPS; and (c) the IPPF and the RF, as applicable.
Being complied
5. 16. The Borrower shall make available, or cause NEA and AEPC to make available, necessary budgetary and human resources to fully implement the EMP and the RIPP.
Being complied
5. 17. The Borrower shall ensure, or cause NEA and AEPC to ensure, that all bidding documents and contracts for Works contain provisions that require contractors to: (a) comply with the measures relevant to the contractor set forth in the IEE, the EMP and the RIPP (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a Safeguards Monitoring Report; (b) make available a budget for all such environmental and social measures; (c) provide the Borrower with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP and the RIPP; (d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and (e) Reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction.
Being complied
5. 18. The Borrower shall do the following or cause NEA and AEPC to do the following: (a) submit semiannual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;
(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, and the RIPP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; (c) report any actual or potential breach of compliance with the measures and requirements set forth in the EMP and the RIPP promptly after becoming aware of the breach.
Being complied
Annexure 3
Rate Fixation for compensation
Compensation Rate Fixation in MKTLP- Chitwan district
Location
Land Rate (per Kaththa)
Access to earthen motor Way
Access to track way / Gully
No access to road
Ikchhakamana RM (Former Darechowk VDC, Ward N. 1 and 7)
8 Lakh 7 Lakh 6 Lakh
IkchhakamanaIkchhakamana RM (Former Darechowk VDC, Ward No.
2 and 3) 6.50 Lakh 5.50 Lakh 4.75 Lakh
Compensation Rate Fixation in MKTLP- Dhading district
Location
Land Rate (per Ropani)
Access to earthen motor Way
Access to track way / Gully
No access to road
Berighat Rorang RM ( Surrounding area of Malekhu Bazar of former Benighat VDC ward no-6)
24 Lakh 23 Lakh 22 Lakh
23 Lakh 22 Lakh 21 Lakh
Berighat Rorang RM ( Surrounding area of Benighat and Bishaltar of forrmer Benighat VDC
ward no-8)
22 Lakh 21 Lakh 20 Lakh
21 Lakh 20 Lakh 19 Lakh
Compensation Rate Fixation Meeting minutes of CDC, Dhading district
Land acquisition notice of Kathmandu district-MKTLP
Annexure 4 Status of Compensation Distribution and Land Acquisition
Details of Compensation Distribution due to land acquired in Myagdi-District (DKTLP)
S.N. Land Owner’s Name Address Tower No.
Received Amount
1 Dani Prasad Gauchan Annapurna-3 AP 51 1753906.00
2 Deu Bahadur Garbuja Annapurna-7 AP 38 209375.00
3 Man Bahadur Purja Annapurna-7 AP 37 1196875.00
4 Kum Bahadur Garbuja Annapurna-7 AP 38 175000.00
5 Gam Bahadur Biswakarma Annapurna-3 AP 52 603125.00
6 Mati Maya Thapa Annapurna-3 AP 48 A 218359.00
7 Chandra Prasad Sherchan Annapurna-3 AP 46 A 1828125.00
8 Gomati Bhanne Gau Devi Tilija
Raghuganga-1 AP 36 1371094.00
9 Krishan Prasad Tulachan Annapurna-3 AP 52 175000.00
10 Purna Bahadur Karki Raghuganga-3 AP 27 B 995313.00
11 Dhan Kumari Bhandari Raghuganga-2 AP 32 925000.00
12 Dil Kumari Pun Raghuganga-1 AP 36 A 462109.00
13 Dalfi Ramjali Magar Annapurna-1 AP 40 A 812500.00
14 Tul Bahadur KC Raghuganga-2 AP 30 415625.00
15 Om Prasad Pun Raghuganga-1 AP 36 A 345313.00
16 Tek BahadurTilija Raghuganga-1 AP 36 A 218359.00
17 Man Bahadur Pun Raghuganga-1 AP 49 96484.00
18 Nand Bahadur Katuwal Chhetri
Annapurna-3 AP 47 C 776953.00
19 Lil Bahadur Pun Annapurna-3 AP 49 817578.00
20 Tug Bahadur Mallla Raghuganga-3 AP 27
1911328.00 AP 28
21 Toran Kumari Karki Raghuganga-2 AP 33 B 162500.00
22 Karn Bahadur Karki Raghuganga-2 AP 33 B 890625.00
23 Hark Bahadur Ramjali Annapurna-3 AP 50 1002930.00
24 Nar Bahadur Purja Annapurna-3 AP 49 10156.00
25 Tilisara Thapa Magar Annapurna-3 AP 47 B 1015625.00
26 Rammaya Ramjali Annapurna-3 AP 47 A 271680.00
27 Chameli KC Raghuganga-2 AP 30 312500.00
28 Som Bahadur Bhandari Raghuganga-3 AP 27 A 502734.00
29 Indra Bahadur Karki Raghuganga-3 AP 28 18750.00
30 Bishnu Bahadur Karki,Ram Bahadur Karki
Raghuganga-3 AP 28 9375.00
31 Basant Karki KC, Rajan KC Raghuganga-2 AP 31 765625.00
32 Dirgha Bahadur Thapa Annapurna-3 AP 47 B 10156.00
33 Na Bahadur Purja Annapurna-1 AP 41 1546875.00
34 Rim Bahadur Karki Raghuganga-3 AP 298437.00
35 Jang Bahadur Rantija Pun, Nandsari
Annapurna-7 AP 39 653125.00
36 Harikala Sherchan Annapurna-3 AP 48 180273.00
37 Jang Bahadur Thapa Annapurna-3 AP 48 A 469727.00
38 Chandra Bahadur Garbuja Annapurna-3 AP 39 C 208203.00
39 Tekku Pun Annapurna-7 AP 39 C 203125.00
40 Ha Bahadur Purja Annapurna-1 AP 39 D 835352.00
41 Rabisha Purja Raghuganga-1 AP 36 A 335157.00
42 Dhan Bahadur Pun ,Sant Bahadur Garbuja
Annapurna-3 AP 47 343750.00
43 Thaman Bahadur Purja,Chha Bahadur Purja
Annapurna-7 AP 39 121875.00
44 Fulu Padhyaya Mangala-1 AP 30 456250.00
45 Raju Kumari Shahi Raghuganga-3 AP 27 A 523047.00
46 Takmati Purja Raghuganga-1 AP 35 B 593750.00
47 BalKumari Sunar Annapurna-2 AP 44 671875.00
48 Hira Bahadur Rantija ,Kum Bahadur
Annapurna-7 AP 38 821875.00
49 Tirth Bahadur and Dhan Bahadur Purja
Raghuganga-1 AP 35 B 898438.00
50 Samita Sherchan Annapurna-2 AP 44 A 212500.00
51 Ram Bahadur Sherchan Annapurna-2 AP 44 A 425000.00
52 Pritam Rantija Annapurna-7 AP 39 C 337695.00
53 Ruk Devi Sherpunja Annapurna-7 AP 39 C 337695.00
54 Min Bahadur Karki Chhetri Annapurna-2 AP 47 C 203125.00
TOTAL 30957226.00
Compensation Distribution of the land acquired for tower construction in Parbat District-DKTLP
S.N. Angel Point
Land Owner Address Compensation
Received Amount
1
AP1
Khantari Padhyaya
Kusma-2
46875/-
2 Chandra Datta Jaisi 31,250/-
3 Gayatri Devi Padhyani 11,09,375/-
4
AP1A
Padma Devi Sharma
Kusma-2
5,39,062/-
5 Ishwari Prasad Padhya 402343/-
6 Tej Kumari Padhyani 125000/-
7 Motikala Padhyani 93750/-
8 Gagan Raj Sharma 97656/-
9 AP1B
Putali Nepali Kusma -2
601562/-
10 Tara Devi Sharma 332031/-
11
AP1 C
Fanindra Paudel
Kusma-1
115625/-
12 Bhumiraj Paudel 271875/-
13 Loknath Paudel 109375/-
14 Pabitra Jaisi 159375/-
15 Rabilal Sharma Paudel 228125/-
16 Bal Krishna Upadhyaya 143750/-
17 Pitambar Das Bairagi 15625/-
18
AP2A
Sabitra Gharti
Kusma-1
58593/-
19 Ramakant Paudel 539062/-
20 Ishwari Prasad Rijal 31250/-
21 Gobind Prasad Rijal 171874/-
22 Kul Prasad Paudel 128906/-
23 Dhaka Ram Paudel 171875/-
24 Netra Lal Rijal 335937/-
25 AP2/1 Madan Prasad Paudel Kusma-1
62,500/-
26 Yadav Prasad Paudel 421875/-
27
AP2/2
Sunil Rijal
Kusma-1
287500/-
28 Khyam Raj Rijal 106250/-
29 Jamuna Kadel 193750/-
30 Kopila Rijal 9375/-
31 AP3 Bishnu Prasad Upadhyaya Kusma-1 18750/-
32
Atma Hari KC
262500/-
33 Baburam KC 128906/-
S.N. Angel Point
Land Owner Address Compensation
Received Amount
34
AP6
Gajendra Bahadur Khatri
Jaljala-8
253125/-
35 Parshuram KC 229687/-
36 Bhim Bahadur Gharti
Chhetri 18750/-
37 Bisi Damini 9375/-
38 Hank Bahadur Chhetri 7031/-
39 Durga Bahadur Chhetri 7031/-
40 Khum Bahadur GC 4687/-
41
AP6A
Bhime Damai
Jaljala -8
378125/-
42 Purna Lal Sharma 134375/-
43 Rishiram Padhya 12500/-
44
AP6 B
Laxmi Prasad Upadhyaya
Jaljala-7
119531/-
45 Jayashwar Upadhyaya 241406/-
46 Narayan Prasad
Upadhyaya 7031/-
47
AP7
Dandpani Padhya
Jaljala-7
124609/-
48 Taranath Regmi 124609/-
49 Kamal Prasad Regmi 270703/-
50 AP11 Gokul Prasad Jaisi Jaljala-7 96679/-
51
AP12
Shiv Prasad Acharya
Jaljala-7
23437/-
52 Kedarnath Acharya 843750/-
53 Lilawati Rijal 73242/-
54
AP21
Dil Bahadur Damai
Jaljala-2
45410/-
55 Bagbir Damai 308007/-
56 Durge Damai 185546/-
57 AP21A
Bagbir Damai Jaljala-2
11132/-
58 Balbir Darji 55664/-
59 AP24
Guma Kumari Baruwal Jaljala-2
311717/-
60 Chandra Bahadur Baruwal 582617/-
61 AP25 Guman Singh Karki
Chhetri Jaljala-2 968750/-
62 AP2/1 Manarupa Rijal Kusma-2 Parbat 421875/-
63 AP12 Shiv Prasad Acharya Jaljala-7 Parbat 98437/-
64 AP13 Man Kumari Upadhyaya Jaljala-7 Parbat 219736/-
S.N. Angel Point
Land Owner Address Compensation
Received Amount
65 AP18A Shyam Bahadur Shrestha Jaljala-3 Parbat 205859/-
66 AP18 Durga Bahadur Karki Jaljala-4 Parbat 260351/-
67 AP1 Durga Bahadur Sharki Jaljala-4 Parbat 248632/-
68 AP18A Ishwari Kumari Shrestha 151366/-
69 AP13A Dandpani Upadhyaya Jaljala-7 Parbat 1084375/-
70 AP2/1 Dilli Raj Upadhyaya Kusma-1 Parbat 25000/-
71 AP22
Bam Bahadur Bishwakarma
Jaljala-3 Parbat 423046/-
72 AP17 Arjun Bahadur Malla Jaljala-4 Parbat 404492/-
73
AP18
Saraswati Karki Jaljala-4 Parbat 284570/-
74 Muna Damai Jaljala-4 Parbat 45410/-
Total 16,673,246.00/-
Details of Compensation Distribution due to land acquired in Dhading-District (MKTLP)
S.N Angle Point
Land Owner Name Vulnerable Groups Deed transf
er
Municipality/RM
Ward No
Plot No
Required Land Area
Total affected
land sq m
Compensation Amount
Month
IP Womenheaded
Dalit Below poverty line
Disabled
1 AP8/0 Raj Kumar Tamang 1 1 1 Thakre RM 8 371 0 10 3 0 341.85 839843.75 May
2 AP8/0 Bishnu Kumar Tamang 1 1 Thakre RM 8 373 0 10 3 2 345.83 849609.38 May
3 AP8/1 Ramesh Thapa 1 Thakre RM 8 405 0 11 3 0 373.65 917968.75 May
4 AP46/
0 Rudra Devi Mainali 1
Benighat Rorang
10 79 0 7 1 0 230.55 453125.2 May
5 AP8/2 Sani Maiya
Khadka/Hom Bdr Khadka
1 Thakre RM 8 235 0 8 3 0 278.25 683593.75 May
6 AP17/
0 Bishnu Bhujel 1 1 Thakre RM 11 118 0 13 2 0 429.3 1012500 May
7 AP24F
/0 Chandra B.Shrestha 1 1 Siddha Lek 7 182 0 1 3 2 59.63 134765.63 May
8 AP24D
/1 Sunita Khatiwada 1 Siddha Lek 7 133 0 14 3 0 469.05 1198437.5 May
9 AP25A
/0 Raj Kumar Shrestha 1 1 Siddha Lek 7 223 1 1 3 1 566.38 1280273.44 May
10 AP24G
/0 Samsere Sarki 1 1 Siddha Lek 7 272 0 13 0 1 415.39 938867.19 May
11 AP25C
/0 Rewati Prasad Pandey 1 Siddha Lek 7 9 0 15 2 2 496.88 1269531.25 May
12 8A/0 Kul Bahadur Thapa 1 Thakre RM 8 17 0 8 3 3 284.22 782031.25 May
13 AP33/
0 Hem Lal Sedai 1 Siddha Lek 3 134 0 10 1 2 329.93 713281.25 May
14 AP33/
0 Lila Nath Sedai 1 Siddha Lek 3 135 0 11 3 0 373.65 807812.5 May
15 AP33B
/0 Khun Prasad Sedai 1 Siddha Lek 3 120 0 10 2 3 339.87 734765.63 May
16 AP33A
/0 Deb Kumari Sedai/Than
Nath Sedai 1 Siddha Lek 3 122 0 2 3 3 93.42 201953.13 May
17 AP34/
0 Ram Prasad Pandey 1 Siddha Lek 3 181 0 2 3 1 89.44 193359.38 May
18 AP7D/
0 Duna Raj Koirala 1 Dhunibesi 6 104 0 9 3 0 310.05 731258 May
19 AP7/0 Dinesh Thapa Magar 1 1 Dhunibesi 6 529 0 3 1 2 107.33 253125 May
Sub Total 6 0 1 1 0 19 5934.67 13996101.98
20
AP12/0
Padam Kumari Pandit 1 Thakre RM 9 402 0 11 3 0 373.65 881258 June
AP12/0
Padam Kumari Pandit 1 Thakre RM 9 400 0 0 1 2 11.93 28125 June
21 AP2C/
0 Janak K.C 1 Dhunibesi 9 433 0 12 1 2 393.53 1,082,812.50 June
22 AP23A
/0 Mandira Khatiwada 1 Siddha Lek 7 123 0 15 2 1 494.89 1264453.13 June
23 AP46/
0 Buddhi Lal Shrestha 1 1
Benighat Rorang
10 80 1 1 1 0 548.49 1078125 June
24
AP13C/0
Rudra Prasad Adhikari 1 Thakre RM 10 105 0 2 3 1 89.44 210937.5 June
AP13C/0
Rudra Prasad Adhikari 1 Thakre RM 10 156 0 13 2 1 431.29 1017187.5 June
25 AP
8A/0 Durga Ba.Shrestha 1 1 Thakre RM 8 196 0 0 2 1 17.89 49218.75 June
26 AP
13/0 Saili Shrestha 1 1 Thakre RM 10 157 0 1 3 1 57.64 135937.5 June
27 AP25C
/0 Yedu Kumar Ghimire 1 Siddha Lek 7 10 0 6 1 2 202.73 458203.13 June
28 AP32/
1 Keshar Bahadur Thapa
Magar 1 1 Siddha Lek 4 43 0 15 0 1 478.99 941406.25 June
29 AP24G
/0 Yek Maya Mijar 1 1 Siddha Lek 7 271 0 10 2 0 333.9 853125 June
30 AP47A
/0 Om Pd. Shrestha 1 1
Benighat Rorang
10 9 0 3 0 0 95.4 187500 June
31 45/0 Dil Bahadur Parja 1 1 Benighat Rorang
10 271 1 4 1 1 645.88 1269531.25 June
Total 6 0 1 0 0 14 0 120 2656 2 93 22 13
4175.65 9457820.51
32 AP24G
/0 Krishne Sarki 1 1 Siddha Lek 7 270 0 1 3 3 61.62 157421 July
33
AP25/0
Chandra Bahadur Shrestha
1 Siddha Lek 7 125 0 8 1 0 262.35 670312.5 July
AP24F/0
Chandra B Shrestha 1 1 Siddha Lek 7 178 0 4 3 0 151.05 341406.25 July
34 AP28/ Kashi Bahadur Magar 1 1 Siddha Lek 6 4 0 9 2 0 302.10 771875 July
0
35
AP28/0
Nanda Kumari Darlami Magar
1 Siddha Lek 6 5 0 10 0 0 318.00 500000 July
AP28/0
Nanda Kumari Darlami Magar
1 1 Siddha Lek 6 3 0 0 2 3 21.87 49414.06 July
36 AP32/
0 Indra Kumari Tripathi 1 Siddha Lek 4 138 0 3 1 0 103.35 284375 July
37 AP32/
1 Yam Kumari Thapa
Magar 1 1 Siddha Lek 4 42 0 2 2 1 81.49 176171.88 July
38 AP32/
1 Satal Sing Magar 1 1 Siddha Lek 4 44 0 1 0 2 35.78 77343.75 July
39 31A/0 Nira Kumari Tripathi 1 1 Siddha Lake
4 376 1 1 1 0 548.49 1509375 July
40 AP33C
/0 Sita Devi Pandey 1 Siddha Lek 3 239 0 2 3 0 87.45 189062.5 July
41
AP34/0
Mohan Lal Thapa/Magagr
1 1 Siddha Lek 3 163 0 1 3 0 55.65 120312.5 July
AP34/0
Mohan Lal Thapa/Magar 1 Siddha Lek 164 0 12 1 2 393.53 850781.25 July
42
AP44/0
Bhim,Udaya, Keshara 1 Benighat Rorang
9 10 0 1 1 0 39.75 218750 July
AP44/0
Bhim,Udaya, Keshara 1 Benighat Rorang
9 13 0 9 1 0 294.15 218750 July
43 AP44A
/0 Tilak Ba. Malla Thakuri 1
Benighat Rorang
9 3 1 4 3 0 659.79 1296875 July
44 AP46B
/0 Dhan Kumari Saudi 1
Benighat Rorang
9 172 0 10 1 3 331.92 652343.75 July
45
AP47A/0
Om Pd. Shrestha 1 Benighat Rorang
10 11 1 0 2 2 528.62 1039062.5 July
AP47A/0
Om Pd. Shrestha 1 1 Benighat Rorang
10 113 0 0 0 2 3.98 7812.5 July
46
AP21I/0
Shyam L Shrestha(Anila Rana)
1 Galchhi
RM 4 283 0 12 1 0 389.55 995312.5 July
AP21I/0
Shyam L Shrestha(Anila Rana)
1 1 Galchhi
RM 4 282 0 0 0 1 1.99 5078.13 July
47
AP24/0
Krishna Giri 1 Siddha Lek 7 30 0 0 3 1 25.84 66015 July
AP24/0
Krishna Giri 1 Siddha Lek 7 346 0 13 2 2 433.28 1107031.25 July
48 AP24D
/3 Aannada Adhikari 1 Siddha Lek 7 502 0 14 3 1 471.04 1203515.63 July
49 AP24F
/0 Purna Lal Shrestha 1 1 Siddha Lek 7 179 0 4 2 0 143.10 323437.5 July
50 AP24F
/0 Bhawa Nath Bhatta 1 Siddha Lek 7 183 0 13 0 0 413.40 934375 July
51 33B/1 Ramesh Prasad Pandey 1 Siddha Lek 4 238 0 10 1 1 327.94 708984.38 July
52 AP2C/
0 Sarada Baral 1 Dhunibesi 9 434 0 3 3 0 119.25 281250 July
53 AP5A/
0 Sanu Babu Upreti 1 Dhunibesi 7 110 0 15 2 0 492.90 1162500 July
54 AP6A/
0 Aambar Ba.Upreti 1 Dhunibesi 7 87 0 4 2 2 147.08 346875 July
55 AP7A/
0 Danda Prasad Upreti 1 Dhunibesi 6 202 0 11 3 0 373.65 881250 July
56 AP
7B/0 Jagat Ba. Upreti 1 Dhunibesi 6 183 0 8 3 0 278.25 656250 July
57 AP
7B/0 Hari Maya Tiwari 1 Dhunibesi 6 203 0 6 0 0 190.80 450000 July
58 AP7C/
0 Krishna Ba. Khatri 1 1 Dhunibesi 6 10 0 4 3 2 155.03 365625 July
59
AP7C/0
Bishnu Prasad Upreti 1 Dhunibesi 6 15 0 7 1 0 230.55 543750 July
AP7C/0
Bishnu Prasad Upreti 1 Dhunibesi 6 16 0 3 2 0 111.30 262500 July
60 AP
7D/0 Krishna Prasad.Koirala 1 Dhunibesi 6 103 0 3 2 0 111.30 229687.5 July
61 AP7E/
0 Kaili Lama 1 1 Dhunibesi 6 22 0 2 0 3 69.57 164062.5 July
62 AP
7E/0 Keshab Basnet 1 Dhunibesi 6 23 1 2 3 0 596.19 1406250 July
63 AP8/1 Ram Chandra Thapa 1 1 Thakre RM 8 406 0 3 2 1 113.29 278320.31 July
64 AP 9/0 Bharat Dangol(Deb
Singh Dongol) 1 1 Thakre RM 8 143 1 0 3 0 532.59 1256250 July
65 AP10/
0 Siddhi Ba.Adhikari 1 Thakre RM 9 357 0 5 2 0 174.90 412500 July
66 AP13A
/0 Nani Ram Dongol 1 1 Thakre RM 10 13 0 12 2 1 399.49 942187.5 July
67 AP13B
/0 Arjun Tamang 1 1 Thakre RM 10 199 0 7 3 0 246.45 581250 July
68 AP13B
/0 Raj Kumar Tamang 1 1 Thakre RM 10 200 0 7 0 1 224.59 529687.5 July
69 14A/0 Asta Man Lama 1 1 Thakre RM 45 0 10 2 2 337.88 796875 July
70 AP17A
/0 Som Bdr Shrestha 1 1 Thakre RM 11 14 0 0 1 1 9.94 20507.81 July
Sub Total 16 2 1 0 1 47 5 256
81 37
11402.08 26042771.95
71 AP7/0 Bishnu Prasad Upreti 1 Dhunibesi 6 83 0 0 2 3 21.87 51562.5 August
72 AP7/0 Laxmi Thapa Magar 1 1 Dhunibesi 6 84 0 0 1 1 9.94 18750 August
73 AP8/2 Shyam Ba. Khadka 1 Thakre Rm 8 234 0 6 2 0 206.7 487500 August
74 AP10/
0 Bhakta K Adhikari(Lila
Nath Adhikari) 1 Thakre Rm 9 73 0 6 1 2 202.73 478125 August
75 AP10/
0 Ram Kumar Adhikari 1 Thakre Rm 9 356 0 3 2 1 113.29 267187.5 August
76 AP10/
0 Purnda Ba. Bhandari 1 Thakre Rm 9 75 0 13 0 0 413.4 975000 August
77 AP12A
/0 Anad Kumar koirala 1 Thakre Rm 9 52 0 13 2 0 429.3 1012500 August
78
AP 16B/0
Krishna Ba. Lama/Thuli Lama
1 1 Thakre RM 11 29 0 12 3 1 407.44 960937.5 August
AP16B/0
Krishna Ba. Lama/Thuli Lama
1 Thakre RM 11 30 0 3 1 3 109.32 225585.94 August
79 AP19C
/0 Bhim Pd. Khatiwada 1
Galchhi RM
8 4 1 2 2 0 588.24 1618750 August
80 AP31A
/0 Dambar Bahadur
Gurung 1 1
Siddha Lake
4 16 0 2 2 0 79.5 218750 August
81 AP33A
/0 Prem Nath Sedai 1
Siddha Lake
3 123 0 2 3 3 93.42 201953.13 August
82 AP33A
/0 Dhruba Prasad Sedai 1
Siddha Lake
3 257 0 3 2 3 117.27 253515.63 August
83 AP46/
1 Dor Ba. Shrestha 1 1
Benighat Ror-
10 120 0 11 2 0 365.7 695312.5 August
84 AP21H
/0 Kana Ba. Shrestha 1 1
Galchhi RM
4 295 0 2 3 0 87.45 206250 August
85 AP23A
/0 Khema Kumari Dhakal 1
Siddha Lake
7 124 0 5 2 0 174.9 446875 August
86 AP24D
/2 Laxmi Giri 1
Siddha Lake
7 45 0 4 3 0 151.05 341406.25 August
87
AP24D/2
Yek Kumar Sedai 1 Siddha Lake
7 167 0 0 1 2 11.93 30468.75 August
AP24D/2
Yek Kumar Sedai 1 Siddha Lake
7 171 0 0 2 0 15.9 40625 August
88 AP24D
/2 Bhoj Raj Sedai 1
Siddha Lake
7 169 0 5 2 0 174.9 446875 August
89 AP24D
/2 Som Natha Sedai 1
Siddha Lake
7 170 0 6 3 2 218.63 558593.75 August
Sub Total 5 21 3992.88 9536523.45
90 AP10/
0 Ranga Nath Adhikari 1 Thakre Rm 9 72 0 0 1 0 7.95 18750
September
91 AP25B
/0 Ram Maya Bhujel(Jana
Bahadur Bhujel) 1 1
Siddha Lake
7 118 0 7 1 2 230.19 530078.13 September
92 AP25B
/0 Hasta B Bhujel(Bhadra
Kumari Ghatri) 1 1
Siddha Lake
7 120 0 7 2 0 234.16 609375 September
93 AP32/
0 Lila Nath Tripathi 1
Siddha Lake
4 137 0 10 3 1 337.64 946093.75 September
94 AP44/
0 Bhakta Ba. Malla 1
Benighat Ror-
9 12 0 10 0 1 313.79 628906.25 September
95 AP24/
0 Pampha Devi Dhakal 1
Siddha Lake
7 31 0 1 3 2 59.01 101562.5 September
Sub Total 2 0 0 0 0 6 0 35 10 6 1182.74 2834765.63
96 AP3/0 Prasant Khadka 1 Dhunibesi 9 349/512
0 0 0 3 5.97 230850 Octobe
r
97 AP3/0 Ananda Kumar Agrawal 9 349/512
0 12 0 2 385.58 230859 Octobe
r
98 AP3/0 Rita Agrawal 9 349/512
230859 Octobe
r
99 AP3/0 Nanda Kishor Gupta 1 349/512
230859 Octobe
r
100 AP5/0 Kaji Babu.Shrestha 1 Dhunibesi 7 32 1 0 0 0 508.74 1170112 Octobe
r
101 AP5B/
0 Krishna prasad Upreti 1 Dhunibesi 7 459 0 6 3 3 220.62 515625
October
102 AP5B/
0 Gagan Upreti 1 Dhunibesi 7 460 0 8 2 1 272.29 642187.5
October
103 AP5B/
0 Binod Upreti 1 Dhunibesi 7 461 0 0 2 1 17.89 42187.5
October
104 AP11B
/0 Keshav Prasad Subedi 1 Thakre Rm 9 242 1 2 0 0 572.34 1316615
October
105 AP12/
0 Thakur Nath Pandit 1 Thakre Rm 9 401 0 2 0 3 69.57 164062.5
October
106 AP12/
0 Thakur Nath Pandit 1 Thakre Rm 9 403 0 4 2 1 145.09 342187.5
October
107 AP17A
/0 Gopi Lal Shrestha 1 Thakre RM 11 40 0 4 1 2 139.13 341796.88
October
AP17A/0
Gopi Lal Shrestha Thakre RM 11 41 0 7 3 0 246.45 605468.75 Octobe
r
108 AP31/
2 Tika Prasad Silwal 1
Siddha Lake
4 61 1 0 1 0 516.69 1089410.16 Octobe
r
109 AP31A
/0 Tek Bahadur Silwal 1
Siddha Lake
4 239 0 0 1 0 7.95 21885 Octobe
r
110 AP32/
0 Indra Kumari Tripathi 1
Siddha Lake
4 207 0 0 3 0 23.85 65625 Octobe
r
111 AP32/
0 Subba Tripathi 1
Siddha Lake
4 206 0 1 0 0 31.8 87500 Octobe
r Sub Total 0 14 3163.96 7328089.79
112 AP
11A/0 Guru Pd. Pandey 1 Thakre Rm 9 159 0 0 3 1 25.84 60937.5
November
113 AP19C
/0 Trilok Ba.Magar 1 1
Galchhi RM
8 12 0 0 1 0 7.95 21875 Novem
ber
114 AP26A
/0 Bishnu Koirala/Sarki 1 1
Siddha Lake
6 27 0 1 1 2 43.11 111718.75 Novem
ber
115 AP33B
/0 Khun prasad Sedai 1
Siddha Lake
3 117 0 0 1 3 13.92 30078.13 Novem
ber
116 AP37/
0 Bhola Bisural 1
Benighat Ror-
5 36 0 5 0 2 159.88 738281.25 Novem
ber Sub Total 1 0 1 0 0 5 250.7 962890.63
117 AP37/
0 Teka Bahadur Bisural 1
Benighat Ror-
5 400 0 6 3 3 216.9 910546.88 Decem
ber
118 33B/1 Dibya Kanta Sedai 1 Siddha Lake
4 31 0 5 0 3 161.87 356640 Decem
ber Sub Total 0 0 0 0 0 2 378.77 1267186.88
Total 36 2 4 1 1 128 30481.45 71426150.82
Compensation Distribution for land acquired in Chitwan-MKTLP
SN
Tower Number
Address Name of Aps Targeted
Amount (NRs.) Received
Status
1 AP 50 Ikchhchhakamana-3 Prithivi Gurung 820000.00 Received
2 AP51/0 Ikchhchhakamana-3 Dhanikala Gurung 340000.00 Received
3 AP51/0 Ikchhchhakamana-3 Harimaya Gurung 1470000.00 Received
4 AP51/0 Ikchhchhakamana-3 Sanbahadur Gurung 60000.00 Received
5 AP52B Ikchhchhakamana-3 Dipakraj Poudel 750000.00 Received
6 AP52B Ikchhchhakamana-3 Ramchandra Lamichane 830000.00 Received
7 AP54A Ikchhchhakamana-3 Uttam Gurung 1420000.00 Received
8 AP54A Ikchhchhakamana-3 Om Gurung 100000.00 Received
9 AP59/0 Ikchhchhakamana-4 Lekhbahadur Thapa 406250.00 Received
10 AP59/0 Ikchhchhakamana-4 SombahadurThapa 446875.00 Received
11 AP59/0 Ikchhchhakamana-4 Khilbahadur Thapa 146250.00 Received
12 AP 52 Ikchhchhakamana-3 Sukmaya Gurung 1023750.00 Received
13 AP 50A Ikchhchhakamana-3 Suryabahadur Gurung 460000.00 Received
14 AP 50A Ikchhchhakamana-3 Dhan Bahadur Gurung 270000.00 Received
15 AP51A Ikchhchhakamana-3 Narbahadur Gurung 1447800.00 Received
16 AP57 Ikchhchhakamana-4 Serbahadur Parja 804375.00 Received
17 APAP50A Ikchhchhakamana-3 Chepti Gurung 920000.00 Received
Total Amount 11715300.00
Compensation Distribution for land acquired in Gorkha-MKTLP
Compensation Distribution Status in Shahidlakhan RM, Gorkha District, MKTLP
S.N
Tower Number Address
AP Name Compensation
Status Present Former
1 69/ADDO Sahid
Lakhan RM -3
Manakamana- 6
Tam Bahadur Thapa Distributed
2 69/ADDO Sahid
Lakhan RM -3
Manakamana- 6
Buddhi bal Thapa Distributed
3 GMT Sahid
Lakhan RM -3
Manakamana- 6
Rikta Bahadur Thapa In process
4 69/1DDO Sahid
Lakhan RM -3
Manakamana- 6
Thakur Thapa Distributed
5 69DD9 Sahid
Lakhan RM -3
Manakamana- 6
Mangal sing Thapa Distributed
6 69DD10 Sahid
Lakhan RM -3
Manakamana- 6
Nar bahadur Gyami Distributed
7 68DD9 Sahid
Lakhan RM -3
Manakamana- 6
Yugananda Koirela Distributed
8 68DD9 Sahid
Lakhan RM -3
Manakamana- 6
Rameshwor Pokheral Distributed
9 68DD9 Sahid
Lakhan RM -3
Manakamana- 6
Narayan Prasad Pokheral
Distributed
10 67ADBO Sahid
Lakhan RM -3
Manakamana- 6
Kali Aamaghai Distributed
11 67ADBO Sahid
Lakhan RM -3
Manakamana- 6
Kabidatta Aryal Distributed
12 66DDO Sahid
Lakhan RM -3
Manakamana- 7
Setimaya Gurung Distributed
13 65/BDC3 Sahid
Lakhan RM -3
Manakamana- 7
Mahabir Gurung Distributed
14 65/BDC3 Sahid
Lakhan RM -3
Manakamana- 7
Chandra Bhadur Magar Distributed
15 65/BDC3 Sahid
Lakhan RM -3
Manakamana- 7
Man Bahadur Thapa Magar
Distributed
16 64DD9 Sahid
Lakhan RM -3
Manakamana- 8
Khadka Bahadur Thapa Distributed
17 64DD9 Sahid
Lakhan RM -3
Manakamana- 8
Tek Bahadur Thapa Distributed
S.N
Tower Number Address
AP Name Compensation
Status Present Former
18 64DD9 Sahid
Lakhan RM -3
Manakamana- 8
Thaman Bahadur Thapa Distributed
19 64DD9 Sahid
Lakhan RM -3
Manakamana- 8
Tek Bahadur Thapa Distributed
20 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Chandra bahadur Thapa Distributed
21 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Lil Bahadur Thapa Distributed
22 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Ran Bahadur Thapa Distributed
23 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Ram Bahadur Thapa In process
24 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Gyan Bahadur Thapa Distributed
25 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Kaman shing Thapa Distributed
26 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Kul Bahadur Thapa Distributed
27 63DC0 Sahid
Lakhan RM -3
Manakamana- 8
Hasta Bir Thapa Distributed
28 62DB9 Sahid
Lakhan RM -3
Manakamana- 8
Nar bahadur Thapa Distributed
29 62DB9 Sahid
Lakhan RM -3
Manakamana- 8
Indra bahadur Thapa Distributed
30 62DB9 Sahid
Lakhan RM -3
Manakamana- 8
Ekman Thapa Magar Distributed
31 62DB9 Sahid
Lakhan RM -3
Manakamana- 8
Suk bahadur Thapa Distributed
32 61/BDB6 Sahid
Lakhan RM -3
Manakamana- 8
Hasta Bahadur Gurung Distributed
33 61/BDB6 Sahid
Lakhan RM -3
Manakamana- 8
Gaj Bahadur Gurung Distributed
34 61/BDB6 Sahid
Lakhan RM -3
Manakamana- 8
Non-Title Holder 678
35 61/ADB3 Sahid
Lakhan RM -3
Manakamana- 8
Non-Title Holder 705
36 61/ADB3 Sahid Manakamana- Buddhiman Gurung Distributed
S.N
Tower Number Address
AP Name Compensation
Status Present Former
Lakhan RM -3
8
37 61/ADB3 Sahid
Lakhan RM -3
Manakamana- 8
Chitra Bahadur Gurung Distributed
38 61/1DB6 Sahid
Lakhan RM -3
Manakamana- 8
Dal Bahadur Gurung Distributed
39 61/1DB6 Sahid
Lakhan RM -3
Manakamana- 8
Keshar sing Gurung Distributed
40 61BDO Sahid
Lakhan RM -3
Manakamana- 8
Ishor Shrestha Distributed
41 61BDO Sahid
Lakhan RM -3
Manakamana- 8
Non-Title Holder 756
42 61BDO Sahid
Lakhan RM -3
Manakamana- 8
Khilman Shrestha Distributed
43 61BDO Sahid
Lakhan RM -3
Manakamana- 8
Chet Bahadur Thapa Distributed
44 60/ADDO Sahid
Lakhan RM -3
Manakamana- 8
Purnalal shrestha Distributed
45 60/ADDO Sahid
Lakhan RM -3
Manakamana- 8
Bhim bahadur Thapa Distributed
46 60/ADDO Sahid
Lakhan RM -3
Manakamana- 8
Krishna Babu Shrestha Distributed
Compensation Distribution Status in Gandaki RM, Gorkha District, MKTLP
SN Tower Name Address
AP Name
Compensation Status
Present Former
1 35/ADD0 Gandaki RM-7 Ghyalchowk 9 Shiva Bahadur Majhi Distributed
2 35/ADD0 Gandaki RM-7 Ghyalchowk 9 Non Tital Holder
3 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Santa bahadur Dabadi Distributed
4 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Dhakalman Shrestha Distributed
5 37/BDB12 Gandaki RM-7 Ghyalchowk 9 Ambar Bahadur Khadka Distributed
6 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dipendra Khadka Distributed
7 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed
8 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed
9 37/CDB12 Gandaki RM-7 Ghyalchowk 9 Dilnath Adhikari Distributed
10 37/DDB0 Gandaki RM-7 Ghyalchowk 9 In Kumari Regmi Distributed
11 37/DDB0 Gandaki RM-7 Ghyalchowk 9 Non Tital Holder
12 38DB0 Gandaki RM-7 Ghyalchowk 9 Ganga Bahadur Bhujel Distributed
13 38DB0 Gandaki RM-7 Ghyalchowk 9 Kulman Shrestha Distributed
14 38/1DB3 Gandaki RM-7 Ghyalchowk 9 Chanamati Sarkeni Distributed
15 38/1DB3 Gandaki RM-7 Ghyalchowk 9 Dal Narayan Shrestha Distributed
16 38/ADB9 Gandaki RM-7 Ghyalchowk 9 Lok Bahadur Ranamagar Distributed
17 38/ADB9 Gandaki RM-7 Ghyalchowk 9 Chanamaya Sharki Distributed
18 38/BDB0 Gandaki RM-8 Ghyalchowk 5 Purna Prasad Poudel Distributed
19 38/BDB0 Gandaki RM-8 Ghyalchowk 5 Purna Prasad Poudel Distributed
20 39DB0 Gandaki RM-8 Ghyalchowk 5 Yog Kumari Regmi Distributed
21 39DB0 Gandaki RM-8 Ghyalchowk 5 Pusparaj Rej Regmi Distributed
22 39DB0 Gandaki RM-8 Ghyalchowk 5 Mishra Regmi In Process
23 39DB0 Gandaki RM-8 Ghyalchowk 5 Non Tital Holder
24 39/ADBO Gandaki RM-8 Ghyalchowk 5 Bimaya Ranamagar Distributed
25 39/ADBO Gandaki RM-8 Ghyalchowk 5 Hit Bahadur Ranamagar Distributed
26 4QDB3 Gandaki RM-8 Ghyalchowk 5 Lalimaya BK Kami Distributed
27 4QDB3 Gandaki RM-8 Ghyalchowk 5 Non Tital Holder
28 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Bhup Bahadur Bhattarai Distributed
29 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Resam Bahadur Bhattarai Distributed
30 40/ADB9 Gandaki RM-8 Ghyalchowk 5 Rohini Kumari Chaapagai Distributed
31 42DD0 Gandaki RM-8 Ghyalchowk 5 Gagendar Prasad Regmi Distributed
32 43DB0 Gandaki RM-8 Ghyalchowk 5 Ishwor Prasad Regmi Distributed
33 43DB0 Gandaki RM-8 Ghyalchowk 5 Praksah Babu Regmi Distributed
34 43BDD0 Gandaki RM-8 Ghyalchowk 5 Govinda Prasad Regmi Distributed
35 43BDD0 Gandaki RM-8 Ghyalchowk 5 Sushila Regmi Distributed
36 43BDD0 Gandaki RM-8 Ghyalchowk 5 Bhubaneshwor Regmi In Process
Compensation Distribution Status in Gorkha Municipality, Gorkha District, MKTLP
S.N
Tower Number Address AP Name Compensation
status Present Former
1 74/2DBO Gorkha
Municipality -14 Deurali -4 Krishna Bahadur Sunar Distributed
2 74/2DBO Gorkha
Municipality -14 Deurali -4 Padm bahadur Sunar In Process
3 74/2DBO Gorkha
Municipality -14 Deurali -4 Kheme Kami Distributed
4 74/2DBO Gorkha
Municipality -14 Deurali -4 Non-Title Holder 474
5 74/2DBO Gorkha
Municipality -14 Deurali -4 Non-Title Holder 476
6 74/1DB1.5 Gorkha
Municipality -14 Deurali -4 Dhak Bahadur Bk Distributed
7 74/1DB1.5 Gorkha
Municipality -14 Deurali -4 Maite BK Distributed
8 74/1DB1.5 Gorkha
Municipality -14 Deurali -4 Mangal Bahadur BK Distributed
9 74DB9 Gorkha
Municipality -14 Deurali -4 Lila Bahadur Karki Distributed
10 73/ADBO Gorkha
Municipality -14 Deurali -4 Maiya Karakheti Distributed
11 73/ADBO Gorkha
Municipality -14 Deurali -4 Non-Title Holder 239
12 72/ADBO Gorkha
Municipality -13 Deurali -7 Bhim Kumari Mahat Distributed
13 72/ADBO Gorkha
Municipality -13 Deurali -7 Man Kumari Pulami Distributed
14 72/ADBO Gorkha
Municipality -13 Deurali -7 Rishiram Khanal Distributed
15 72DD3 Gorkha
Municipality -13 Deurali -7 Sudama Pandey Distributed
Details of Compensation Distribution in Chitwan District -MKTLP
Details of Compensation Distribution at MKTLP,-in Gorkha district
Land acquisition notice of Kathmandu district-MKTLP
Annexure 5
Details of Compensation Distribution for Structure Loss
DKTLP
Finalized Compensation by CDC for structure in Myagdi District
S.N. Land Owner’s Name Address Tower No. Received Amount
1 Dalfi Ramjali Annapurna 1 40 A 501608
2 Tek Bahadur Karki Raghuganga 3 29 2000211
3 Dudh Bahadur Purja Raghuganga 2 35 C 937500
4 Dhan Kumari Bhandari Raghuganga-2 32 1167211 Total 4606530
Compensation Distribution for structure loss at Parbat -DKTLP
S.N. Land Owner’s Name Address Tower No. Received Amount
1 Tike Damai Budhi Nepali Jaljala-8 10 61425
2 Sarala Padhyaya Jaljala-8 7A 838148
3 Gorkha Bahadur Karki Jaljala-2 24 A 1505117 Total 2404690
MKTLP
Finalized Compensation by CDC for structure in Dhading District
S.N Angle point
Name of official land
owner Address Property
Total Compensation Target Amount
1 6A/0 Guna Raj
Upreti
Aaru Bote, Dhunibesi-7
Tin Shade 241635.31
Cow Tin Shade 103382.35 Cow Tin Shade 35411.11 Sub Total 380428.77
2 6A/0 Ambar
Bahadur Uprety
Aaru Bote, Dhunibesi-7
Tin Shade 35651.81
Stone Masonry Toilet 46685.45 Sub Total 82337.26
3 7D/2 Shankar Tamang
Waibatol-Dhunibesi-6
Tin Shade 189907.82
Cow Tin Shade 45566.37 Sub Total 235474.19
4 7D/2 Saraswoti Tamang
Waibatol-Dhunibesi-6
Tin Shade 154011.48
Sub Total 154011.48
5 7D/2 Ram
Bahadur Tamang
Waibatol-Dhunibesi-6
Tin Shade 204540.81
Stone Masonry Toilet 54030.77 Sub Total 258571.58
6 7D/2 Subba
Tamang
Waibatol-Dhunibesi-6
Tin Shade 157573.22
Cow Tin Shade 37319.36 Sub Total 194892.58
7 7D/2
Roshan Tamang
Waibatol-Dhunibesi-6
Tin Shade 221477.2
Sub Total 221477.2
8 13B/0
Arjun Tamang / Raj Kumar Tamang
Thakre-10 Tin Shade 109965.59
Sub Total 109965.59
9 24/0 Ram Sharan
Giri
Siddhalek-7,Adamtar
Tin cow Shade 100630.77
Sub Total 100630.77
10 3/0 Sunrise
Breeding Center
Dhunibesi-9 Poultry Truss Works 3111559.17
Egg Collection Centre 114605.2 Sub Total 3226164.37
11 47C/0 Rajesh
Chepang
Benighat Rorang-10
Khar Shed 17974.78
CGI Sheet Shed 42505.43 Khar Shed 1 29438.44 Sub Total 89918.65
Total 5053872.44
Details of Compensation Distribution for Structure Loss in Dhading District
SN Angle point
Name of official land owner
Address Property
Total Compensation
Target Amount
Total Compensated
Amount Remarks
1 3/0 Sunrise Breeding
Center
Dhunibesi-9
Poultry Truss Works 3111559.17
1613000
Egg Collection Centre 114605.2
2 13B/0 Arjun Tamang /
Raj Kumar Tamang Thakre-10 Tin Shade 109965.59 109965.59
3 24/0 Ram Sharan Giri Siddhalek-7,Adamtar
Tin cow Shade 100630.77 100630.77
4 47C/0 Rajesh Chepang
Benighat Rorang-10
Khar Shed 17974.78
89918.64 CGI Sheet Shed 42505.43
Khar Shed 1 29438.44
5 6A/0 Ambar Bahadur Upreti Aaru Bote, Dhunibesi-
7
Tin Shade 35651.81 82337.26
Stone Masonry Toilet 46685.45
Total
1,995,852.26
Details of APs for Structure Loss in Chitwan District
SN. House Owner Section House Details Address
1 Prem Bahadur Magar AP 59 to AP 58C Hut 1 Ichchhakaman -4
2 Fullmaya Chepang AP 55 to AP 54C House 1 Ichchhakaman -4
3 Kumar Chepang AP 55 to AP 54C House 2, Hut 1 Ichchhakaman -4
4 Santa Bahadur Chepang AP 55 to AP 54C House 1 Ichchhakaman -4
5 Fullmaya Chepang AP 54C House 2, Toilet 1 Ichchhakaman -4
6 Om Gurung AP 54A to AP 54 House 1, Hut 1 Ichchhakaman -4
7 Ramchandra Lamichane AP 53 to AP 52B Hut 1, Ichchhakaman -4
8 Kamal Bdr. Gurung AP 51A to AP 51 House 1, Hut 2,
Toilet 1, Ichchhakaman -3
9 Harimaya Gurung AP 51 to AP 50A House 1, Hut 3,
Toilet 1, Ichchhakaman -3
10 Surya Bahadur Gurung AP 50A to AP 50 Hut 1 Ichchhakaman -3
11 Min Bahadur Gurung AP 59 to AP 49B Hut 3 Ichchhakaman -3
Details of Compensation Distribution for Structure loss in Gorkha District
SN Angle Point Name of official land
owner Address
Total Compensated Amount
1 AP 40/0 Lalimaya BK Gyalchowk-5, Gandaki
Rural Municipality, Gorkha 458,077.11
2 AP 61 Gaj Bahadur Gurung Sahidlakhan Rural
Municipality, Gorkha 235,175.51
Total 693,252.62
Annexure 6
Details of Compensation Distribution for Crop Loss
DKTLP
Myagdi District
S.N. Name Address Received Amount
Remarks
1 Diwakar Subedi Kusma-1 2474.28
2 Kashi Ram Subedi Kusma-1 1592.64
3 Tika Kumari Malla Jaljala-4 5771.82
4 Purna Kumari Malla Jaljala-4 19283.13
5 Hira Kumari Malla Jaljala-4 6733.79
6 Hari Bahadur GC Jaljala-4 5063
7 Nand Kumari /Tirth Kumari
Malla Jaljala-4 3724.04
8 Resham Bahadur
Hamal(Putali Hamal) Jaljala-4 15373.62
9 Nar Bahadur Hamal (Putali
Hamal) Jaljala-4 3088.43
10 Dhan Kumari Bhandari Raghuganga-2 30580.08
11 Purna Kumari Malla Jaljala-4 10568.3
12 Ashok Malla Jaljala-4 15867.82
13 Chandra Bahadur Malla Jaljala-4 32417.74
14 Nar Bahadur Hamal(Lok
Bahadur Hamal) Jaljala-4 13416.95
15 Nar Bahadur Hamal(Indra
Bahadur Malla) Jaljala-4 12505.61
16 Chandra Bahadur Malla Jaljala-4 16594.86
17 Arjun Bahadur Malla Jaljala-4 22175.94
18 Tirth Bahadur Malla Jaljala-4 32621.43
19 Karn Bahadur KC Jaljala-3 7330.82
20 Lal Bahadur Thapa Jaljala-3 7120.87
21 Durga Bahadur Sharki Jaljala-3 8731.72
22 Baghbir Damai Jaljala-3 9481.71
23 Durge Damai Jaljala-3 6542.39
24 Seti Baruwal Jaljala-2 12850.62
25 Baghbir Damai Jaljala-2 405.32
26 Balbir Darji Jaljala-2 1727.24
27 Bam Bahadur Biswakarma Jaljala-2 2715.15
28 Bam Bahadur Biswakarma Jaljala-2 1652.07
29 Chakra Bahadur Kami Jaljala-2 6338.01
30 Tug Bahadur Malla Raghuganga-3 25640.72 Plot no.72
31 Tug Bahadur Malla Raghuganga-3 45787.29 Plot no.134
32 Dil KUmari KC Raghuganga-2 8462.40
33 Tika Bahadur KC Raghuganga-2 1556.84
34 Taranath Padhya Jaljala-8 11561.85 AP 7 A
35 Atma Hari KC Jaljala-8 6566.00 AP 6
36 Gajendra Bahadur Khatri Jaljala-8 7182.00 AP 6
37 Baburam KC Jaljala-8 7064.00 AP 6
38 Parshuram KC Jaljala-8 14636.00 AP 6
39 Hark Bahadur Chhetri Jaljala-8 426.8 AP 6
40 Kamal Prasad Regmi Jaljala-8 118000.00 AP 7
41 Tek Bahadur Karki Raghuganga -3 12104.02 AP 29
42 Guma Kumari Baruwal Jaljala-2 3233.00 Plot no.705/708
43 Bam Bahadur BK Jaljala-2 11222.58 Plot no.706/707
44 Chandra Bahadur Baruwal Jaljala-2 8405.46 Plot no.709
45 Man Kumari Upadhyaya Jaljala-7 13937.52 Plot no.81
46 Durga Dutta Upadhyaya Jaljala-7 2587.74 Plot no.377
47 Jamuna Acharya Jaljala-7 2587.74 Plot no.343
TOTAL 615711.35
Parbat District (in October, 2018)
S.N Angle point
Foundation/ Erection
Name of official land owner
Address Total
Compensation Amount
1 24 Erection Guma Kumari Baruwal Jaljala-2 3,233/46
2 22 Foundation Bam Bahadur BK Jaljala-2 11,222/58
3 24 Erection Chandra Bahadur Baruwal Jaljala-2 8,405/46
4 13 Erection Man Kumari Upadhyaya Jaljala-7 13,937/52
5 15 Erection Durga Datta Upadhyaya Jaljala-7 2,587/74
6 15 Erection Jamuna Acharya Jaljala-7 2,587/74
Total 41,974.50
Details of the compensation distribution for tree loss in DKTLP
Myagdi (In August, 2018)
S.N. Name Address Received Amount
Remarks
1 Durga Dutta Upadhyaya Jaljala-7 20706.84 AP 15
Details of Compensation Distribution for Crop Loss
MKTLP:
Dhading District
S.N
Angle point
Foundation/
Erection
Name of official land owner
Address Total
Compensated Amount
1
33/0 Erection Ram Pd Sedhai Siddhalek-3 43500
33/0 Erection Ram Pd Sedhai Siddhalek-3 17400
33/0 Erection Ram Pd Sedhai Siddhalek-3 22250
2 48/0 Foundation Maniraj Ghale Jogimara -3 297000
48/0 Foundation Maniraj Ghale Jogimara -3 48060
3 48/0 Foundation Sari Ghale Benighat - 3 13050
4 34A/1 Foundation Yeka Ba. Magar Salang -5 10930
5 34A/0 Foundation Yeka Ba. magar Jogimara-6 11712
6 35/0 Foundation Dip Ba.Magar Salang -6 16800
7 44/0 Foundation Hita Ba. Malla Jogimara -9 6336
8 34/0 Erection Mohan Lal Thapamar Siddhalek-4 22500
9 33A Erection Umakanta Sedhai Siddhalek-3 23887.5
10
33/0 Erection Khun Pd. Sedhai Siddhalek-3 27300
33/0 Erection Khun Pd. Sedhai Siddhalek-3 13750
33B/0 Foundation Khun Pd. Sedhai Salang -5 22932
11 33/0 Erection Ramsaran Sedhai Siddhalek-3 16312.5
33/0 Erection Ramsaran Sedhai Siddhalek-3 11375
33/0 Erection Ramsaran Sedhai Siddhalek-3 26700
12 33A Foundation Umakanta Sedhai Siddhalek-3 22500
13
31A/0 Foundation Subbha Pd. Trpathi Siddhalek-4 6125
31A/0 Foundation Subbha Pd. Trpathi Siddhalek-4 11250
31A/0 Foundation Subba Pd. Trpathi Siddhalek-4 11250
14 31A/0 Foundation Man Ba. Majhi Kalleri -2 32760
15 33/0 Erection Rebati Pd. Sedhai Siddhalek-3 26100
16 44A/0 Foundation Bhakta Ba. Malla Jogimara -9 6600
44A/0 Foundation Bhakta Ba. Malla Jogimara -9 4824
17
21/1/1 Erection Bhim Ba.Dhungana Galchhi- 1 9520
21/1/1 Erection Bhim Ba.Dhungana Galchhi- 1 20100
18 8/0 Erection Bishnu Tamang Thakre -9 4422.6
8/0 Erection Bishnu Tamang Thakre -9 1449
19 46/0 Foundation Buddhi Lal Shrestha Jogimara -10 3120
46/0 Foundation Buddhi Lal Shrestha Jogimara -10 20025
20 30A/0 Foundation Damber Ba. Gurung Siddhalek -6 997.5
21
7/0 Foundation Ganga Pd. Rijal Naubise- 9 2000
7/0 Foundation Ganga Pd. Rijal Naubise- 9 2250
7/0 Foundation Ganga Pd. Rijal Naubise- 9 5500
7/0 Foundation Ganga Pd. Rijal Naubise- 9 50000
7/0 Foundation Ganga Pd. Rijal Naubise- 9 16000
S.N
Angle point
Foundation/
Erection
Name of official land owner
Address Total
Compensated Amount
22 25B/0 Foundation Hasta Ba. Bhujel Kumpur-7 14418
25B/0 Foundation Hasta Ba. Bhujel Kumpur-7 10647
23 7E/0 Foundation Kaili Lama Naubise -1 605.15
7E/0 Foundation Kaili Lama Naubise -1 1245
24
8/0 Foundation Kalpana Lama Thakre -9 840
8/0 Foundation Kalpana Lama Thakre -9 1037.5
8/0 Erection Kalpana Tamang Thakre -9 4422.6
8/0 Erection Kalpana Tamang Thakre -9 3061.8
25
8A/0 Foundation Kul Ba. Thapa Thakre -9 4704
8A/0 Foundation Kul Ba. Thapa Thakre -9 1078.7
8A/0 Erection Kul Ba.Thapa Thakre -8 166.25
8A/0 Erection Kul Ba.Thapa Thakre -8 179.55
8A/0 Erection Kul Ba.Thapa Thakre -8 159.6
26 20C/0 Foundation Manoj Gautam Goganpani- 1 5607
20C/0 Foundation Manoj Gautam Goganpani- 1 550
27 34/0 Erection Ram Pd Pande Siddhalek -3 3412.5
33/0 Erection Ramesh Pd Pande Siddhalek -6 3150
33/0 Erection Ramesh Pd Pande Siddhalek-3 1181.6
33/0 Erection Ramesh Pd Pande Siddhalek-3 1181.6
33B/1 Erection Ramesh Pd. Pande Siddhalek - 3 2310
28 8/1 Erection Ramesh Thapa Naubise - 1 3325
29
25B/0 Foundation Ram maya Bhujel Kumpur-7 6942
25B/0 Foundation Rammaya Bhujel Kumpur-7 4368
30 10/0 Foundation Siddhi Pd. Adhikari Kewalpur- 9 581.7
10/0 Foundation Siddhi Pd. Adhikari Kewalpur- 9 17622
31 34/0 Erection Sudip Sedhai Siddhalek -3 2992.5
34/0 Erection Sudip Sedhai Siddhalek -3 3412.5
32 33B/0 Foundation Sun Pd. Sedhai Salang -5 3660
33B/0 Foundation Sun Pd. Sedhai Salang -5 22932
33 32D/0 Foundation Tulimaya Magar Salang-6 3294
34
11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 2573.55
11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 3211.95
11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 791.35
11/0 Foundation Tulsi Pd.Regmi Kewalpur -9 359.1
35 10/0 Foundation Bikash Acharya Kewalpur- 9 2154.6
36 17/0 Foundation Bishnu Bhujel Goganpani -8 2880
17/0 Foundation Bishnu Bhujel Goganpani -8 2523.6
37 31/2 Foundation Maya Nath Silwal Salang-7 1602
31/2 Foundation Maya Nath Silwal Salang-7 4352.4
38 17B/0 Foundation Ram Chandra Lama Goganpani- 6 1874.8
S.N
Angle point
Foundation/
Erection
Name of official land owner
Address Total
Compensated Amount
17B/0 Foundation Ram Chandra Lama Goganpani -6 24000
17B/0 Foundation Ram Chandra Lama Goganpani -6 19000
39 10/0 Foundation Ram Kumar Adhikari Kewalpur- 9 1901.9
40 10/0 Foundation Sita Acharya Kewalpur- 9 791.35
41 10/0 Foundation Sita Acharya Kewalpur- 9 7610
42 8/2 Erection Mina Khadka Thakre-9 8675.7
43 8A/0 Foundation Kul Bahadur Thapa Thakre-9 5782
44 46/0 Foundation Buddhilal Shrestha Rorang-10 31660
45 44/0 Foundation Hit Bahadur Malla Rorang-9 9361
46 21/0 Erection Gitadatta Khatiwada Galchhi-1 3745
47 46/1 Erection Rupa Basnet Rorang-10 1820
48 46/0 Erection Kumar Rijal Roranh-10 2100
49 31B/1 Erection Bale Sarki Siddhalek-3 3500
50 31B/1 Erection Bimal Sarki Siddhalek-3 3500
51 7D/0 Foundation Laxmi Koirala Dhunibesi-6 1750
52 31B/1 Erection Purne sarki Siddhalek-3 1750
53 7A/0 Foundation Shyam Raja Thapa Dhunibesi-6 2765
54 46B Erection Kop Bahadur Saudi Rorang-10 15750
55 44/0 Erection Dev Kumari Malla
Thakuri Rorang-10 7000
56 44A/0 Erection Sita Malla Rorang-10 15570
57 44A/0 Erection Suntali Malla Rorang-10 28625
58 31B/0 Erection Sita RamThapa Magar Siddhalek-3 7115
59 31B/1 Erection Shanker Prasad sedai Siddhalek-3 31500
60 34/1 Erection Khelu Nepali Siddhalek-3 6300
61 23A/0 Erection Sita Majhi Siddhalek-7 26260.5
62 23A/0 Foundation Khem Khumari Dhakal Siddhalek-7 12232.5
63 24/0 Foundation Krishna Giri Siddhalek-7 33060
64 24/0 Foundation Ramsharan Giri Siddhalek-7 49310
65 9/0 Erection Kalpana Dangol Thakre-8 5250
66 8/0 Erection Raj Kumar Tamang Thakre-8 6329.5
67 33B/0 Erection Krishna Prasad Sedai Siddhalek-3 36000
68 33B/1 Erection Rewati Prasad Sedai Siddhalek-3 11250
69 33B/1 Erection Ram Hari Sedai Siddhalek-3 25850
70 32A/0 Erection Chiranjivi Sedai Siddhalek-3 7200
71 9/0 Erection Ram Bahadur Dangol Thakre-8 1575
72 9/0 Erection Samjhana Dangol Thakre-8 953.75
73 9/0 Erection Bharat Dangol Thakre-8 3780
74 9/0 Erection Mukunda Dangol Thakre-8 673.75
75 37/0 Foundation Nawa Raj Pandey Benighat Rorang-5 18750
76 37/0 Foundation Gopal Bahadur Bisural Benighat Rorang-5 18800
S.N
Angle point
Foundation/
Erection
Name of official land owner
Address Total
Compensated Amount
77 37/0 Foundation Hari Bahadur Bisural Benighat Rorang-5 20250
78 37/0 Foundation Tep Bahadur Bisural Benighat Rorang-5 47000
79 46B/0 Erection Dor Bahadur Shrestha Benighat Rorang-
10 36360
80 44A/0 Foundation Parwati Singh Thakuri Benighat Rorang-9 21000
81 31A/0 Foundation Tek Bahadur Silwal Siddhalek-3 23240
82 7C/0 Erection Bishnu Prasad Upreti Dhunibesi-6 45775
83 44A/0 Erection Bhakta Bahadur Malla Benighat Rorang-9 7875
84 33A/0 Erection Dhruba Prasad Sedai Siddhalek-3 63900
85 33B/1 Foundation Ram Hari Sedai Siddhalek-3 29600
86 8/1 Foundation Binda KC Thakre-8 18305
87 34/0 Foundation Sita Sedai Siddhalek-3 10912
Total 1831867.95
Gorkha District
Annexure 7
Letter related to Livelihood Restoration Program (Skill Training implementation) -DKTLP
Annexure 8
Details related to trainings
Detail participant’s list of Driving Training in - DKTLP
S.
N. Participants Name Address Land Owner’s Name
Relation on
Land Owner Gender Tower/SS/ROW/Structure Training
1 Binita Sharma Kusma MC 2 Birendra Paudel Daughter F Khurkot SS Driving
2 Lopchan Sherpunja Annapurna 7 Rupdevi Sherpunja Brother M Structure AP 39C Driving
3 Bibek Shepunja Annapurna 7 Gauseri Shrpunja Son M ROW Driving
4 Dinesh Karki Raghuganga 3 Tek Bahadur Karki Son M Structure AP 29 Driving
5 Pushpa Sharma Kusma MC 2 Taranath Paudel Daughter F Khurkot SS
Driving
6 Swikriti Ghamal BK Jaljala 2 BamBahadur
Biswakarma Daugher in Law F AP 22 Driving
7 Nabin Malla Jaljala 4 Chandra Bahadur Malla Son M AP 17A Driving
8 Mukund Prasad Acharya Jaljala 7 Bal Krishna Upadhyaya Son M AP 11 Driving
9 Sanjaya Bahadur Shahi Raghugaga 3 Dirgha Kumari Shahi Grand Son M AP 27A Driving
10 Arbinda Karki Jaljala 2 Nir Bahadur Karki Son M AP 24A Driving
11 Jivnath Subedi Kusma RM 2 Jivnath Subedi Self M Khurkot SS Driving
12 Yogendra Malla Jaljala 4 Hira Kumari Malla Son M AP 17 Driving
13 Sharmila Hamal Malla Jaljala 4 Tika Kumari Malla Daughter in law F AP 24 Driving
14 Tilak Prasad Rijal Jaljala 7 Him Lal Padhyaya Son M AP 13 Driving
15 Sagar Rijal Jaljala 7 Muktiram Upadhyaya Son M AP 13/1 Driving
16 Ranjita Malla Jaljala 4 Purna Kumari Malla Daughter in law F AP 17 Driving
17 Prasiddha Acharya Jaljala 7 Dand Pani Padhyaya Nephew M AP 13A Driving
18 Ganesh Acharya Jaljala 7 Jamuna Acharya Brother M AP 15 Driving
19 Sagar Acharya Jaljala 7 Yamnath Sharma Son M AP 11 Driving
20 Rajesh Rijal Jaljala 7 Man Kumari Upadhyaya Son M AP 13 Driving
21 Bishal Biswakarma Jaljala 2 Indra Bahadur
Biswakarma Son M ROW/Structure Driving
22 Bhojraj Acharya Jaljala 7 Kedarnath Acharya Brother M AP 12
Driving
23 Gokarna Bhandari Raghuganga 2 Dhan Kumari Bhandari Son M AP 32 /Structure Driving
24 Krishna Bahadur Thapa Jaljala 3 Lal Bahadur Thapa Son M AP 21 Driving
25 Tirth Nath Sharma Jaljala 7 Tirthnath Sharma Self M AP 15 Driving
Letter of Implementation of Driving Training in Parbat District- DKTLP
List of Participants of Driving Training in Parbat District- DKTLP
List of Participants of Beautician Training in Dhading District-MKTLP
Detail of participants’ list of Beautician Training in MKTLP
Name of Training event: Beautician (Basic Level)Training
Training Place: Dhunibesi Municipality-6,Dharke
Training Participants Date: 03 Mansir to 03 Magha 2075
SN Trainee Name Sex Ethnicity
Address Male Female Total IP Dalit Other
1 Bimala Upreti 1 1 1 Dhunibesi-6
2 Sapana Adhikari 1 1 1 Thakre-9
3 Santoshi Upreti 1 1 1 Dhunibesi-7
4 Anjana Acharya 1 1 1 Thakre-9
5 Dipa Dangol 1 1 1 Thakre-9
6 Shrijana Danjol 1 1 1 Thakre-9
7 Ambika Thapa 1 1 1 Thakre-8
8 Britney Bhandari 1 1 1 Dhunibeshi-7
9 Sunita Tamang 1 1 1 Thakre-11
10 Radhika Dhungana 1 1 1 Galchhi-1
11 Ganga Dhungana 1 1 1 Galchhi-1
12 Rabina Thapa 1 1 1 Gorkha
13 Rejina Thapa 1 1 1 Dhunibesi-6
14 Sabita Thapa 1 1 1 Dhunibesi-6
15 Mina Khatri 1 1 1 Dhunibesi -6
16 Mina Pandit 1 1 1 Dhunibesi-8
17 Samita Tamang 1 1 1 Thakre-11
18 Sabina Acharya 1 1 1 Thakre-11
19 Anu Lama 1 1 1 Dhunibesi-6
20 Usha Aryal 1 1 1 Thakre-8
21 Renuka Tamang 1 1 1 Dhunibeshi-6
22 Tulasha Pandit 1 1 1 Thakre-8
23 Bimala Khatiwada 1 1 1 Galchhi-8
24 Pramila Tamang 1 1 1 Dhunibeshi-6
25 Rita Tamang 1 1 1 Dhunibesi-6
26 Sarita BK 1 1 1 Gorkha
27 Asmita Tamang 1 1 1 Dhunibesi-6
Total 0 27 27 9 1 17
Detail of participants’ list of Seasonal and Off -seasonal Vegetable Production Training in
MKTLP
Name of Training event: Seasonal and Off-seasonal Vegetable Production Technology
Training Place: Siddhalek RM-4,Nibuwatar,Community building
Training Participants Date: 17-23 Mansir 2075
SN Trainee Name Sex Ethnicity
Address Male Female Total IP Dalit Others
1 Maya Nath Silwal 1 1 1 Siddhalek-4
2 Dambar Bahadur Gurung 1 1 1 Siddhalek-4
3 Ramsharan Tripathi 1 1 1 Siddhalek-4
4 Ram Prasad Pandey 1 1 1 Siddhalek-4
5 Yak Bahadur Thapa
Magar 1 1 1 Siddhalek-4
6 Nawa Raj Tripathi 1 1 1 Siddhalek-4
7 Raju Tripathi 1 1 1 Siddhalek-4
8 Dhruba Prasad Sedai 1 1 1 Siddhalek-4
9 Ram Prasad Sedai (Ka) 1 1 1 Siddhalek-4
10 Bimala Sedai (Ka) 1 1 1 Siddhalek-3
11 Tulasi Thapa Magar 1 1 1 Siddhalek-4
12 Kabita Rana Magar 1 1 1 Siddhalek-4
13 Ambika Sedai 1 1 1 Siddhalek-3
14 Manju Sedai 1 1 1 Siddhalek-3
15 Devaki Sedai 1 1 1 Siddhalek-4
16 Bimala Sedai (Kha) 1 1 1 Siddhalek-4
17 Dhan Maya Sedai 1 1 1 Siddhalek-3
18 Amrita Sedai 1 1 1 Siddhalek-3
19 Bhagawati Sedai 1 1 1 Siddhalek-4
20 Mina sedai 1 1 1 Siddhalek-3
21 Nirmala sedai 1 1 1 Siddhalek-3
22 Aam Maya Thapa Magar 1 1 1 Siddhalek-3
23 Ram Hari Pandey 1 1 1 Siddhalek-3
24 Ram Prasad Sedai (Kha) 1 1 1 Siddhalek-3
Total 12 12 24 6 0 18
Name of Training event: Seasonal and Off-seasonal Vegetable Production Technology
Training Place: Siddhalek RM-7,Pipaltar,Ward Office building
Training Participants Date:25 Mansir-02 Poush 2075
SN Trainee Name Sex Ethnicity
Address Male Female Total IP Dalit Other
1 Parbati Pokharel 1 1 1 Siddhalek-7
2 Yak kumari Giri 1 1 1 Siddhalek-7
3 Shova Sedai 1 1 1 Siddhalek-7
4 Samita Kandel 1 1 1 Siddhalek-7
5 Ram Maya Basel 1 1 1 Siddhalek-7
6 Bishnu Giri 1 1 1 Siddhalek-7
7 Mato Giri 1 1 1 Siddhalek-7
8 Rewati Pandey 1 1 1 Siddhalek-7
9 Mitra Lal Shrestha 1 1 1 Siddhalek-7
10 Raj Kumar Shrestha 1 1 1 Siddhalek-7
11 Ram Shran Bhujel 1 1 1 Siddhalek-7
12 Purna Lal Shrestha 1 1 1 Siddhalek-7
13 Indra Bahadur Bhujel 1 1 1 Siddhalek-7
14 Bhim Kumari Sedai 1 1 1 Siddhalek-7
15 Ram Bahadur Bhujel 1 1 1 Siddhalek-7
16 Tuk Bahadur Bhujel 1 1 1 Siddhalek-7
17 Lal Bahadur Bhujel 1 1 1 Siddhalek-7
18 Samsher Sarki 1 1 1 Siddhalek-7
19 Bed Nidhi Kandel 1 1 1 Siddhalek-7
20 Khem kumari Dhakal 1 1 1 Siddhalek-7
21 Samjhana Bhatta 1 1 1 Siddhalek-7
22 Nawa Raj Adhikari 1 1 1 Siddhalek-7
23 Rohini Prasad Khatiwada 1 1 1 Siddhalek-7
Total 15 8 23 8 2 13
Annexure 9
Grievance Redress Committee Meeting Matrix
SN Date No. of
Participants Type of Participants
Topics/ Issues discussed
Location Information Disseminated
DKTLP
1 2075/3/27
11 July 2018
Male-9 Female-1 Total-10
GRC committee members and coordinator of GRC Mr. Tungnath
Sharma and locals
Purpose to use the budget that has given to Jaljala Gandaki VDC
wardno.7 by ESSD
Jaljala, Gandaki VDC ward no. 7
2 2075/3/28
12 July 2018
Male-9 Female-1 Total-10
GRC committee members and coordinator of GRC Mr. Tungnath
Sharma and locals
Road construction at Majhigaun
Salghari Kushma RM ward no.2
3 2075/3/28
12 July 2018
Male-6 Female-1 Total-7
GRC committee members and coordinator of GRC Mr. Devendra
Prasad Subedi and locals
Purpose to use the budget given from
the project to Affected
households
Kushma RM ward no.1
4 2075/3/28
12 July 2018
Male-7 Female-1 Total-8
GRC committee members and coordinator of GRC Mr. Hari Bikash
J.C
Purpose to use the budget given from
the project Jaljala Ward no.8
5 2075/3/31
15 July 2018
Male-6 Female-1 Total-7
GRC committee members and coordinator of GRC Mr. Gam Bdr
Fagami and locals
Purpose to use the budget given from
the project to Affected
households
Annapurna VCD ward no. 7
6 2075/6/16 2 October
2018
Total-16 Male-14
Female -2
The ward chairman Mr. Yadu Nath Bastola, GRC members and others
GRC meeting Khurkot ,Kusma-
2,Bagaicha CSR budget,social issues,skill
development training,
7 2075/7/9
26 October 2018
Total -22 Male-11
Female -11
Annapurna RM vice chairman, Ward Deputy chairman, Annapurna RM Officer,contractor ,ESSD,Project
Officer and others.
GRC meeting Tatopani Bazar Police
chauki
Shifting the affected people and compensate the crop and
other losses
8 2075/8/3
19 November 2018
Total-24 Male-12
Female -12
The ward chairman GRC Mr. Gam Bdr Fagami, GRC members and others
GRC meeting Annapurna-7,Mahavir Crop compensation, social issues, skill development
training
9 2075/8/3
19 November 2018
Total -15 Male-13
Female -2
The ward chairman GRC Mr. Bil Bdr Fagami member ,Contractor, Project,
ESSD Beni unit and others GRC Meeting
Tiplyang Bazar Raghuganga-1
About crop compensation and skill training.
10 2075/8/24
10 December, 2018
Total-8 Male-7
Female-1
Raghuganga 2,GRC Chairman and Members
Demand of equipment
ESSD Beni Unit Office Demand on road construction
equipment (JCV) for excavation.
11 2075/9/1
16 December, 2018
Total-25 Male-18
Female-7
GRC Chairman, GRC members, PAFs, Contractor and other local
person
CSR Implementation,AP 45 issues,AP 44A
issues
Annapurna RM 2 Tatopni ,
To construct the road which is affected by the AP 44A tower
foundation,Shifting AP 45 affected families and CSR
Budget implantation.
12 2075/9/3
18 December, 2018
Total-15 Male-13
Female-2
GRC Chairman,GRC members, Project Manager, PAFs, other local
person Various Demands
Annapurna 7,Histan,Ward Office
Demand on different 16 Topics for solving by the Project and
ESSD.
13 2075/9/10
25 December, 2018
Total-10 Male-9
Female-1
GRC Chairman, GRC members, Project Manager, PAFs, other local
person
CSR Implementation
Jaljala 2 CSR Implementation
S.N.
Date No. of
Participant Type of
Participants Topics/ issue
discussed Location Information disseminated
MKTLP
1 2075/3/21 5’th July
2018
Male – 6 Female – 0
Total - 6
GRC committee members
Land and compensation
issue
Siddhalek-7,Salang
Discussion was made on the issues of land for construction of tower no 31A/0.AP agreed to provide land and the meeting decided to start
the tower foundation work at site. Also decided to provide land compensation amount to AP as soon as possible.
2 2075/4/2 18’th July
2018
Male – 6 Female – 0
Total – 6
GRM committee members
Land and compensation
issue
Siddhalek
-7,Adamta
r
Discussed on the land and crop loss issue from the construction work of AP 23A/0 and 24/0.The meeting decided to measure the
crop loss area of APs and request to Project Management Office to make necessary arrangement for providing crop and land
compensation amount to APs immediately.
3
2075/4/16
01 August 2018
Male – 7 Female – 1
Total – 8
Project staffs, Wards
representative, Staffs of TATA
project and Community
Discussion on road issue
Siddhalek-
7,Adamtar,Dhading
The meeting decided to carryout survey and design work for the protection and maintenance of rural road as suggested by
community. Also decided to start the maintenance work immediately after the monsoon.
4 2075/4/7 23rd July,
2018
Male – 6 Female – 0
Total- 6
Project Staffs and community
Full affected Aps name list
was not published
During the
construction work road was damaged as well crop loss
of others agricultural
land.
Ikchhakamana RM
4, Chitwan
Land area which was used in tower construction work will be measured and compensated as per project for the loss of crops and road from the project as well. APs name and compensatory for all
those affected Aps whose name hasn’t been published in land acquisition notice
5 2075/4/14 30th July,
2018
Male- 8 Female-0 Total- 8
Project Staffs and community
Landslide by the leg of
AP50A from uses of JVC
crop loss was occur of Prithivi Gurung’s land.
Ikchhakamana RM
3, Chitwan
Right compensation for the loss of crops during the construction as well clearance of stone, muds and bricks. Construction of road with
broad turnings point which was damaged by JVC during the construction
6 2075/5/8
24 August 2018
Male – 10 Female – 0 Total – 10
GRM committee members
Land slide issue
Benighat Rorang
RM-10,Dhading district
It was informed that survey and design work for the protection of rural road and tower itself has been completed. The meeting decided
to start the protection work immediately.
7 2075/5/5
21/August / 2018
Male-7 Female-0 Total-7
NEA staffs, Contractor staffs, ESMU Officers
GRC Issues solved
Ichhakamana, RM-4 Chiwan
Meeting was about the issues solved of the GRC meeting formed on 2075-4-7
district
8
2075/5/20 05th
September, 2018
Male – 7 Female – 0
Total - 7
GRC committee members
Land compensation
Benighat Rorang, Dhading
Land owner Mr. Bhakta Bahadur Malla has stopped the tower erection work of AP 44/0 due to delay in providing land
compensation to his land. Discussion was held with him and GRC meeting was also organized to discuss the issues. It was decided to provide land compensation immediately to him and Mr. Malla agreed
to resume the tower erection work at his land. Now compensation was provided to him.
9
2075/5/21 06
September, 2018
Male – 7 Female – 0
Total - 7
GRC committee members
Rural Road
Siddhalek RM-
6,Dhading
Community and user committee of Parewatar-Khanibhayang rural road had complained that one leg of tower 28/0 lies on the road which obstacle in vehicle movement. It was discussed in GRC
meeting and decided to open the diversion track for vehicle movement during the foundation work. It was also decided to
rehabilitate the rural road as in previous condition with appropriate engineering design and structure after the foundation work is
completed.
10 2075/6/04
20 September
Male – 5 Female – 0
Total - 5
GRC committee members
Crop loss Siddhalek-3,Dhading
Crop loss area during the tower construction work which was left out as complained by community was carried out with participation of GRC members and local community. Regarding the payment due issue of labor gang during their stay at community which they used
fire wood and vegetables from community It was decided to communicate with TATA project office to settle the issue if any as
complained by community.
11 2075/6/15 01 October
Male – 6 Female – 0
Total - 6
GRC committee members
Implementation of livelihood restoration
activity
Siddhalek RM-
7,Dhading
Discussed on implementation of seasonal and off seasonal vegetable production training to 20 PAFs of ward no 7 of Siddhalek
RM.
12 2075/6/19 05 October
Male – 7 Female – 0
Total - 7
GRC committee members
Implementation of livelihood restoration
activity
Siddhalek RM-
3,Dhading
Discussed on implementation of seasonal and off seasonal vegetable production training to 20 PAFs of ward no 3 and 4 of
Siddhalek RM.
13
2075/7/20 06
November 2018
Male – 6 Female – 0
Total - 6
GRC committee members
Submission of application for
land compensation
Thakre RM-
11,Dhading
Decided to inform the APs to summit application to project office for land compensation. Also discussed on grievance received from Sanu Kanchha Tamang and decided to inform the project office for further
process.
14
2075/08/17 03
December 2018
Male – 6 Female – 0
Total - 6
GRC committee members
Commencement of vegetable farming training
Siddhalek RM-3
Decided for the commencement of 7 days long vegetable farming training to PAFs from 03 December 2018 at Siddhalek RM-3 under
project mitigation activity.
15
2075/08/25 11
December 2018
Male – 5 Female – 0
Total - 5
GRC committee members
Commencement of vegetable farming training
Siddhalek RM-7
Decided for the commencement of 7 days long vegetable farming training to PAFs from 11 December 2018 at Siddhalek RM-3 under
project mitigation activity.
16
2075/08/27 13
December 2018
Male – 5 Female – 0
Total - 5
GRC committee members
Site clearance and
implementation of CSR activity
Siddhalek RM-3 & 4
Decided to communicate with TATA project office for the immediate action to solve the issues raised by community. Also decided to
inform the PMO Office and ESSD to address the community demand under CSR activity.
17
2075/08/29 15
December 2018
Male – 5 Female – 0
Total - 5
GRC committee members
Land plot differ and additional
land used
Siddhalek RM-7
Decided to inform the issues to PMO office and will request for site visit with land measurement staff to solve the APs complaint.
18
2075/09/10 25
December 2018
Male – 10 Female – 0 Total - 10
GRC committee members
Land issue
Dhunibesi
Municipality-7
GRC committee members visited the site and discussed with the APs of tower no.6/0 and 6A/0. GRC committee members requested
the APs to provide land for the construction of towers as other people who are supporting to project activity. Also informed to the APs not to construct any structure in the land to be acquired for
project activity.
19
2075/8/12 28th
November, 2018
Male – 6 Female – 1
Total -7
GRC committee members
About selection of trainees for tailoring and agriculture
training
Gorkha municipality, ward
no 14
The PAF from Gorkha municipality of ward number 13 and 14 will be selected for the Skill development training -Tailoring and Seasonal and offseanosal vegetable growing training as identified by RIPP.
20
2075/9/3 18th
December, 2018
Male – 7 Female – 1
Total -8
GRC committee members
About selection of trainees for seasonal and non-seasonal
vegetable farming training
Gandaki RM, ward
no. 8, Gorkha
Total 25 trainees were selected of trainees for tailoring and agriculture training.
21
2075/9/4 19th
December, 2018
Male – 7 Female – 0
Total -7
GRC committee members
About training starting of non-
seasonal vegetable
farming training and trainer selection
IchhakamanaRM, ward no.
4 , Chitwan
Training was concluded to start from 4th January of 2019 in ward no 3 and 4 of Ichhakamana RM. Similarly the trainer for the training was
also selected.
22
2075/9/6 21st
December, 2018
Male – 8 Female – 3 Total -11
GRC committee members
Chautaro was Impacted while constructing AP
71/0 at Yangkot and
local track road was also
impacted by Tower Pad of
AP 71/0
Gorkha Municipality, ward no. 13
GRC team has decide to take application from community people with proposed location for the restoration of Chautaro. After taking
application GRC decided to process ahead for the application. Contractor is agreed to maintain impacted local track road after
finishing tower erection work.
S.N. Date
No. of
Participant
Type of
Participants
Topics/ issue
discussed Location Information disseminated
KNBTLP
1 2075/08/11
27th November, 2018
Male-10 Female-1 Dalit-3 Janjati-0 Others-8
Total -11
Executive ward chairperson, Local people, PAFs, Project staffs, Contractor and ESMU
GRC meeting: Final Confirmation of Alignment & Check Survey and Cadastral Survey
Baglung municipality-13, Baglung
With field observation of alignment; affected families informed about projects procedure, government policy, and land acquisition act 2034, compensation of land.
Annexure 11
Grievance Received Matrix
Recorded Grievances
S.N Location Recorded by Issue Type Issue Description Status
DKTLP
1 Annapurna 3, Myagdi Chandra Prasad Serchan
Land compensation
Need of compensation after land used for tower construction
Solved
2 Mallaz Jaljala- 3 Parbat
Krishna Bahadur Baruwal
Crop compensation
Need of Compensation for his crop destruction due to construction
Solved
3 Jaljalla -2, Parbat Bam Bahadur Bishwokarma
Re- mapping and surveying
of Land
Re- mapping and surveying of his land for the construction of tower
Solved
4 Jaljalla -8, Parbat Bal Bahadur Chhetri
Land and crop compensation
Need of compensation after land used and crop destruction for tower construction
Under process of solving
5 Jaljala-7, Parbat Dandapani Upadhyaya
Land and crop compensation
Need of compensation after land used and crop destruction for tower construction
Solved
6 Jaljala, Parbat Shiva Prasad Acharya
Land and crop Compensation
Need of compensation after land used and crop destruction for tower construction
Solved
7 Raghu RM-3, Myagdi Tunga Bahadur
Malla
Damage of Canal
Need to make new canal and also fill up the land which has been damaged.
Solved
8 Myagdi Dinesh Karki Temple and road
compensation
Need of compensation for temple and Road re-construction due to AP 29.
Solved
9 Jaljala- 7 Parbat Kedar Nath Acharya
Land compensation
& disable compensation
Need of Compensation for his land destruction due to construction and compensation for his disabled son
Under process of solving
10 Jaljala- 7 Parbat Kedar Nath Acharya
crop compensation
Need of Compensation for his crop destruction (maize and rice)
Under process of solving
11 Jaljala- 7 Parbat Kedar Nath Acharya
Private tree compensation
Need of his tree compensation on his private land
Under process of solving
MKTLP
1 Dhunibesi Municipality-6
Krishna Bahadur Khatri
Land area Land area used in tower construction work but name was not published in land acquisition notice.
Solved
2 Siddhalek RM-3 Ram Prasad Sedai
Rural road under tower pad
Rural road lies under tower pad of AP 34A/1 tower. Communities are demanding to support them in road diversion work.
Under process of solving
3 Siddhalek RM-3 Maya Nath Silwal
Clearance of excavated materials
Excavated materials produced during the tower construction to be cleared at site.
Under process of solving
4 Siddhalek RM-3 Kinara Rajya Laxmi Devi Malla
Protection and restoration of religious house (Pouwa)
A religious house (Pouwa) lies under RoW of tower no AP 35/0. Community is demanding support for restoration of Pouwa.
Under process of solving
5. Thakre RM-8 Arjun Gurung/Raju Gurung
Protection of IP cremation place
IPs (Gurung & Tamang) cremation place at AP 9/0 lies under RoW.
Solved
6 Siddhalek RM-7,Adamtar,Dhading
Ward Office of Siddhalek RM-7
Rural road Ward Office of Siddhalek RM-7 and community people had complaint that some part of the rural road was used in construction of AP 23A/0 as a result existing road is narrowed for vehicle movement. Necessary work to be carried out by the project for the maintenance of existing road.
Solved
7 Dhunibesi Municipality-6,Dhading
Krishna Bahadur Khatri
Soil erosion Mr Khatri complained that protection work to be implemented immediately to control the soil erosion at AP 7D/0. He was worried that land erosion could affect to his house and shed if protection work is not carried out immediately.
Solved
8 Siddhalek RM-3,Dhading
Community Crop loss Community of Siddhalek RM-3 and 4 complained that some AP’s crop loss area measurement has been left. Community has requested to measure the crop loss area whose crop area was left out to measure during the tower foundation and erection work.
Solved
9 Sahidlakhan RM-3, Banauti, Gorkha
Narayan Prasad Pokhrel
Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle
Solved
10 Sahidlakhan RM-3, Banauti, Gorkha
Bhim Prasad Pokhrel
Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle and land also use for labor camp
Solved
11 Sahidlakhan RM-3, Banauti, Gorkha
Madan Dutta Koirala
Impact on Land Impact on land during tower foundation work and erection work by the movement of the contractor vehicle
Solved
12 Benighat Rorang RM-9
Bhakta Bahadur Malla
Land compensation
Delay in providing land compensation which the land is used for the construction of tower no 44/0.
Solved
13 Siddhalek RM-6 Ram Kumar Shrestha
Disturbances to rural road
Construction of tower no 28/0 obstacles the vehicle movement in rural road.
Solved
14 Siddhalek RM-7 Lal Bahadur Bhujel
Damaged of house hold appliance and furniture
One table and one fan damaged by hit of boulder during the construction work of tower no 25B/0.No any compensation received against the damaged goods.
Solved
15 Galchhi RM-8
Bharat Bahadur Wagle
Disturbances to rural road
Construction of tower no 18C/0 is likely to affect the expansion of Galchhi-Mahadevbesi rural road.
Solved
16 Thakre RM-11, Dhading
Sanu Kanchha Tamang
Risk of landslide to house and shed
Affected to private house and shed due to construction of tower no 16A/0.Also generates risk of land slide to house and land.
Under process of solving
17 Benighat Rorang RM, Dhading
Santosh Dallakoti
Disturbances to Community Irrigation canal
Damaged of community irrigation canal due to tower construction work. No maintenance support receives from project.
Under process of solving
18 Thakre RM-11, Dhading
Chyante Praja
Land owner name not published in land acquisition notice
Private land belonging to Chyante Praja was used in tower construction work of 14C/0 but his name was not published in land acquisition notice.
Under process of solving
19 Ichchayakaman RM-3 Dil Bahadur Gurung
Land Compensation, ROW issue and Resettlement.
GRC meeting is in process Under process of solving
20 Gorkha Municipality-13 Basudev Shrestha and others
Impact on Chautaro and local track road by Tower Pad of AP 71/0
Chautaro was Impacted while constructing AP 71/0 at Yangkot and local track road was also impacted by Tower Pad of AP 71/0
Under process of solving
21 Siddhalek RM-4 Dambar Bahadur Gurung
Site clearance and crop damage
At AP 31/0, excavated soil during the tower foundation work has not been removed from his field.
Under process of solving
22 Siddhalek RM-7 Ram Bahadur Sarki
More land used and Land plot no differ
At AP 24D/3, tower has been constructed in new land plot no rather than the land plots no 502 which was published in land acquisition notice. Also more land has been used for the tower construction work.
Under process of solving
23 Siddhalek RM-3 Yak Bahadur Tumasi
Bank denied to provide cheque amount
Bank denied to provide cheque amount due to difference in title name written in cheque (cheque was provided him for crop compensation by PMO office) and account name maintained at bank. This has been solved now.
Solved
24 Galchhi RM-8 Sher Bahadur Nepal
Simpani Kalika CF areas and CF Office building to be affected
Simpani Kalika CF building lies under the RoW of MKTLP transmission line. CF members explained that compensation to be provided soon to construct new building in safe site
Solved
KNBTLP
1 Bihadi-3 Ranipani, Parbat
Janak Prasad Bhattrai
Shifting the alignment way
Transmission line directly affect his residential plot (Ghaderi) so need of shifting.
Solved
Annexure 12
Grievance Received Letters
DKTLP
MKTLP
KNBTLP
Annexure 13
Public Consultation Matrix
SN Date No. of Participants
Type of Participants Topics/ Issues discussed
Location Information Disseminated
DKTLP
1 2075/3/28 12th July, 2018
Male-6 Female-0 Total-6
Ward chief, TATA, ward Staffs
GRC Formation
Kushma RM ward no.1
2 2075/3/31 15 July 2018
Male-5 Female-0 Total-5
Ward chief Mr. Gam Bdr. Fagami , ESSD and local
GRC Formation
Annapurna VCD ward no. 7
3 2075/4/10 26 July 2018
Male-13 Total-13
Kusma MC Mayor ,Project Manager ,ESSD Unit and others
Landslide issues for NayaPulKusma MC -2
Kusma MC Office Kusma Parbat
Clean the drainage and field visit on landslide site.
4 2075/4/15 31 July 2018
Male -11 Total-11
Kusma MC Mayor ,Project Manager ,ESSD Unit and others
Landslide issues for NayaPulKusma MC -2
Kusma MC Office Kusma Parbat
Cost Esrimate and Construction by the Project
5 2075/5/22 7 September 2018
Total-13 Male-12 Female-1
CFUG, Forest officer, ESSD, Project
About Tree cutting for AP 27 A
Raghuganga -3 ,ward office
About all the issues solved and not any issues remaining for AP 27 A
6 2075/5/24 9 September 2018
Total-18 Male-18
Ward chairman Annapurna-6, ESSD, Project, and other stakeholders.
About GRC formation
Annapurna-6,Pokharebagar
Meeting about the GRC formation
7 2075/6/11 27 September 2018
Total-6 Male-6
Bidhyajyoti SS principal ,social persons ESSD, Project
About Grievances and social issues.
Beni unit office,Beni Meeting was held about the Playground, Children park and Helipad construction.
8 2075/6/2 28 September 2018
Total-24 Male-19 Female-5
Ward chairman, ESSD, Contractor Representative ,Project and others
About Grievances and CSR.
Annapurna -3 ward office ,Dana
About the issue on CSR budget. As APs are demanding more budget. Not any decision was made as their demands were very high which cannot solved by ESSD
9 2075/6/14 30 September 2018
Total -26 Male-23 Female-3
Chief district officer, DSP, District coordination committee chief, Annapurna Rural Municipality Chairman, Project manager, Ward Chairman, ESSD Beni unit, Affected persons, press reporter and others
About social issues Annapurna-6, Pokhrebagar.
At CDO office Beni, Myagdi.
Reporting for shifting alignment, compensation and other issues within a week by the project.
10 2075/6/23 9 October 2018
Total -35 Male-33 Female-2
Annapurna Chairman,CDO Myagdi, Ward Chairman, Project Manager, ESSD Beni unit, Contractor, PAFs and Social Person.
Public Consultation Meeting
Annapurn -6,Pokharebagar,RM Hall
About Compensation Alignment shifting,and other issues.
11 2075/6/24 10 October 2018
Total -17 Male -12 Female-5
Annapurna Chairman, Ward chairman, Project Officer, Contractor affected people, and others
Public Consultation Meeting
Tatopani Bazar About the AP 45 Affected shifting and protection.
12 2075/7/9 26 October 2018
Total -22 Male-11 Female -11
Annapurna RM vice chairman, Ward chairman, Annapurna RM Officer,contractor ,ESSD,Project Officer and others.
GRC Formation
Tatopani Bazar Police chauki
GRC formation.
13 2075/8/13 29 November
Total -21 Male-3
Community forest user group ,temple
Public Consultation
Jaljala 7 ,Parbat About social issues
2018 Female-18 chairman ,Contractor and ESSD Beni unit
Meeting
14 2075/9/1 16th Dec, 2018
Total-24 Male-18 Female-6
ADB Consultant ,ESSD Beni, PAFs, Other Local people
Shifting Alignment
Annapurna 6,Pokhrebagar About shifting alignment.
15 2075/9/6 21 Dec, 2018
Total-11 Male-11 Female-0
Project Manager, PSC, ESSD, ESSD Beni
CSR Implementation and data collection
Project Office Beni Technical Estimate for CSR Demands.
16 2075/9/6 21 Dec, 2018
Total-13 Male-11 Female-2
ESSD, Project ,Civil technical person, ESSD Beni
CSR Estimate Annapurna 1 ,Bega CSR Estimate
17 2075/9/6 21 Dec, 2018
Total-13 Male-12 Female-1
ESSD, Project ,Civil technical person, ESSD Beni
CSR Estimate Annapurna 7 CSR Estimate
18 2075/9/7 22 Dec, 2018
Total-6 Male-6 Female-0
ESSD, Project ,Civil technical person, ESSD Beni
CSR Estimate Annapurna 2
CSR Estimate
19 2075/9/8 23 Dec, 2018
Total-10 Male-5 Female-5
ESSD, Project ,Civil technical person, ESSD Beni
CSR Estimate Jaljala 4 CSR Estimate
20 2075/9/9 24 Dec
Total-15 Male-15 Female-0
ESSD, Project ,Civil technical person, ESSD Beni
Social and Environment issues
Jaljala 8 About Social and Environment issues
21 2075/8/21 7th Dec 2018
Total-19 Male-18 Female-1
Ward Chief, PSC, ESSD, ESSD Beni
Rate fixation of land
Beni Rate fixation of land
MKTLP
1 2075/3/28 12 July, 2018
Male – 8 Female – 1 Total – 9
Project staffs and Community
Discussion on land issue
Dhunibesi-6,Dhading Land area which was used in tower construction work will be measured and compensated as per project rules.APs name was not published in land acquisition notice.
2 2075/4/8 24’th July 2018
Male – 4 Female – 0 Total – 4
Project staffs and community
Support for construction of cremation place
Ganise Chour, Thakre RM-8,Dhading
APs were informed that application received from them has already been submitted to project Management Office and ESSD for necessary action. IPs
(Gurung & Tamang) cremation place at AP 9/0 lies under RoW and requested for support construct cremation place at safe site.
3 2075/4/10 26 July, 2018
Male – 15 Female – 1 Total – 16
Project Staffs and community
Tower foundation site clearance, rural road under tower
Siddhalek RM-3,Dhading Communities were informed that the issues will be discussed with TATA project staffs and Project Management Office for proper solution.
4 2075//18 3rd Sep, 2018
Male – 6 Female – 2 Total – 8
Project staffs and Community
Discussion on land issue
Dhunibesi-6,Dhading Land area which was used in tower construction work will be measured and compensated as per project rules.APs name was not published in land acquisition notice.
5 2075/4/16 01 August 2018
Male – 25 Female – 3 Total – 28
Project staffs, Wards representative, Staffs of TATA project and Community
Discussion on road issue
Siddhalek-7,Adamtar, Dhading
The meeting decided to carryout survey and design work for the protection and maintenance of rural road as suggested by community. Also decided to start the maintenance work immediately after the monsoon.
6 2075/4/22 7 August 2018
Male= 8 Female=2 Total=10
Contractor staffs, ESMU Officer, Project affected villagers
Improvement of local road section (Chumling-Dahaki); Improvement of water source by providing required cement
Dahaki, Ichchhakamana RM-3, Chitwan district
Suggestion for local road maintenance and improvement of drinking water source has been forwarded to concerned stakeholder (TATA, ESSD, and Project Office) for further actions.
7 2075/6/11 27 September 2018
Male – 22 Female – 2 Total –24
Project staffs, Wards representative, Staffs of TATA project and Community
Discussion on rural road issue at AP 18C/0
Galchhi-8,Dhading The meeting with community was decided to request PMO office to carryout site inspection at AP 18C/0 by the concerned specialist from PMO office for the protection and maintenance of rural road as suggested by community.
8 2075/5/25 10 September, 2018
Male-12 Female-0 Total-12
Project staffs, Wards representative, Staffs of TATA project and Community
Discussion Land issue
Sahidlakhan-3, Gorkha The issues of land has been observed with meeting attendants.
9 2075/8/3 19 November 2018
Male – 0 Female – 30 Total – 30
Trainee of skill development training (Beautician training)
Discussion on implementation of training
Dhunibesi Municipality-7,Dhading
10 2075/8/11 27 November, 2018
Male=14 Female=1 Total=15
Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people.
Consultation meeting was done for issue regarding land acquisition and obstacle for construction on AP 74/2
Gorkha Municipality Ward 14 Yankot, Gorkha
11 2075/8/1 17 November, 2018
Male -5 Female-1 Total-6
Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people.
Consultation meeting was done regarding compensation of structure and assistance for resettlement in AP73/A
Gorkha Municipality Ward 14 Yankot, Gorkha
12 2075/8/18 04 December 2018
Male – 25 Female – 11 Total – 36
Beni Pakha Community forest user group
Discussion on implementation of training
Siddhalek RM-3 Discussion was made with the members of Beni Pakha CF user group to start the stringing work at forest area and agreed to support some aid to CF on behalf of TATA project Ltd.
13 2075/8/25 11 December 2018
Male – 18 Female – 10 Total – 28
Trainee of Vegetable farming
Agriculture tools support
Siddhalek RM-7 Regarding the query of trainee to support them agriculture tools ie.Plastic tunnel, hand tractor, pesticide spray pump etc, It was informed them that their demand will be communicated and submitted to PMO Office.
14 2075/8/14 30 November 2018
Male -7 Female -0 Total 0-7
SSO, ESO, and Workers
Consultation was done regarding issues of wages and health facilities
Markichowk Substation Aabukhaireni RM - Tanahu
Contractor was advised to provide regular health checkup facilities for labour inside Substation and also adviced to pay wages in time
15 2075/8/24 10 Decemebr 2018
Male -7 Female-0 Total -7
Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, 5NEA, Project Affected people
Water supply for construction of tower
Sahid Lakhan RM -3 Banauti Gorkha
Contractor was agreed to make water supply route and maintain properly by using 1000 m pipe provided to community under CSR program.
16 2075/9/6 21 Decemebr 2018
Male -7 Female -1 Total-8
Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people
Compensation for land which was used by contractor for vehicle movement and issues of crops
Sahid Lakhan RM -3 Banauti Gorkha
Contractor was agreed to provide 6 hour JCB support for restore of land which was impacted while vehicle movement.
17 2075/9/8 23 December 2018
Male -9 Female -0 Total-9
Local Representative, NEA Representative, SSO, ESO, TATA Project Representative, NEA, Project Affected people
Compliance of EHS
TATA office at Aabukhaireni’ Tanahu
Contractor was advised to comply the issues regarding Environment Health and safety.
KNBTLP
1 2075/04/16 1/August/ 2018
Male-13 Female-4 Janjati-1 Others-16 Total-17
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Tansen Municipality-9, Palpa District.
A committee was formed in the Chairmanship of Ward Chairperson Tika ram Gaudel
2 2075/04/23 8/August / 2018
Male-13 Female-0 Total-13
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Palpa -1, Palpa District. A committee was formed in the Chairmanship of Ward Chairperson Som Bdr.Jhedi
3 2075/04/30 15/August / 2018
Male-17 Female-4 Tota-21
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Galyang Municipality -5, Syanja District
A committee was formed in the Chairmanship of Ward Chairperson Bishnu Basyal Cheetri
4 2075/06/5 21/September / 2018
Male-7 Female-0 Janjati-1 Dalit-0 Others-6
Ward Chairperson, Local people, Project staffs, NEA representatives, Contractor and ESSD Unit & APs
GRC Formation
Tinahu Rural municipality (RM) -5, Palpa District.
A committee was formed in the Chairmanship of Ward Chairperson chairperson Mr. Dal Bahadur Darlami.
5 2075/6/18 4th October, 2018
Male-14 Female-3 Dalit-3 Janjati-3 Others-11 Total -17
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Bihadi rural municipality- 6, Parbat District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Tek Bahadur Thapa.
6 2075/6/19 5th October, 2018
Male-14 Female-3 Dalit-0 Janjati-4 Others-13 Total -17
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Bihadi rural municipality- 3, Parbat District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Rana Bahadur Aale
7 2075/6/19 5th October, 2018
Male-18 Female-1 Dalit-2 Janjati-0 Others-17 Total -19
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Bihadi rural municipality- 2, Parbat District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Om Prakash Kunwar
8 2075/7/6 23rd October, 2018
Male-20 Female-6 Dalit-0 Janjati-23 Others-3 Total -26
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Tinahu Rural Municipality-4, Palpa District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Dan Bahadur Gaha
9 2075/7/8 25th October, 2018
Male-11 Female-3 Dalit-2 Janjati-6 Others-6 Total -14
Ward Chairperson, Local people, Project staffs, Contractor and ESSD Unit & APs
GRC Formation
Bagnaskali Rural Municipality-9, Palpa District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Thaneshwar Timilsena
10 2075/7/9 26th October, 2018
Male -14 Female-8 Total-22
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Bagnasakali Rural Municipality, Ward no-5
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Ishwor Kumar Rana
11 2075/7/9 26th October, 2018
Male -14 Female-7 Total-21
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Bagnasakali Rural Municipality, Ward no-6
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Laxmi Prasad Adhikari
12 2075/7/12 29th October, 2018
Male -31 Female-6 Total-37
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Mathagadi Rural Municipality, Ward no-5
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Bel Bahadur Denga
13 2075/7/30 15th November, 2018
Male -21 Female-1 Total-22
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Sunwal Rural Municipality, Ward No 11, Nawalparasi District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Devi Lal Dungre
14 2075/8/4 20th November, 2018
Male -16 Female-4 Total-20
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Devraha Municipality, Ward no 6 andd 5, Rupandehi District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Damodar Chhettri
15 2075/7/16 2nd November, 2018
Male -5 Female-2 Total-7
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Sunwal Rural Municipality, Ward No 13, Nawalparasi District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Upendra Raj Poudel
16 2075/8/3 19th November, 2018
Male -9 Female-2 Total-11
Ward Chairperson, Local people, Project staffs, Contractor, ESSD Unit & APs
GRC Formation
Sunwal Rural Municipality, Ward No 13, Nawalparasi District
Discussed on objectives of GRC formation, its role and responsibilities and then GRC formed with the leadership of Ward Chairperson Mr. Krishna Prasad Devkota
17 2075/08/11 27th Nov, 2018
Male-12 Female-2 Total -14
Ward Chairperson, Local people, PAFs, Project staffs, Contractor and ESMU
GRC Formation Alignment and site clearance
Parbat, Bihadi-14 Informed about KNBTLP and discussed on objectives of GRC formation, Its role and responsibilities and project implementation modality and procedure, site clearance
18 2075/08/10 26th Nov, 2018
Male-23 Female-2 Total -25
Ward Chairperson, Local people, PAFs, Project staffs, Contractor and ESMU
Coordination committee meeting for GRC formation : Alignment Shift and land compensation under TL
Parbat, Bihadi-1 The alignment proposed by local does not seem feasible technically and economically, then to address the issues meeting have concluded for discussion on compensation amount of land in next meeting.
19 2075/8/21 7th Dec 2018
Total -13 Male-13 Female-0
Project representative, ESMU unit Butwal, Contractor, PAFs and Social intellectual persons.
Demanding the grievances AP Tower & Alignment shifting from cultivation land.
AP 41d and AP 42Galyang-5, Syangja
Conducted community consultation meeting,
Giving information about project and trying to maximum compensation of cultivation land by project.
20 2075/8/23 9th Dec 2018
Total -12 Male-11 Female-1
Ward chairperson, ESMU unit Butwal, Contractor, PAFs and Social intellectual persons.
Demanding the AP Tower & Alignment shifting from purposes residential plot which has joined the lokmarg
AP34-AP35 Bihadi-3 Ranipani
Conducted community consultation meeting,
Giving information about project.
Retry to shifting the alignment way if technically possible,