NEIGHBORHOOD SLOW STREETS: CHINATOWN July 26, 2018 | Public Meeting China Trade Center Boston Transportation Department Gina N. Fiandaca, Commissioner

NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

NEIGHBORHOOD SLOW STREETS: CHINATOWN

July 26, 2018 | Public Meeting China Trade Center

Boston Transportation Department Gina N. Fiandaca, Commissioner

Page 2: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

MEETING GOALS

• Introduce more residents to the Neighborhood Slow Streets project

• Share our concept plans for your feedback

2

Page 3: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

VISION ZERO BOSTON

• Commitment to eliminate all fatal and serious injuries by 2030

• Designing for the most vulnerable benefits everyone

• “Early Action” policy in Go Boston 2030

3

Page 4: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

SLOWER SPEEDS, SAFER STREETS

Source: Impact Speed and a Pedestrian’s Risk of Severe Injury or Death, Brian Tefft, AAA Foundation for Traffic Safety, 2011 4

Page 5: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

NEIGHBORHOOD SLOW STREETS

A zone-based approach to traffic-calming requests • A bounded area of local streets • Speed limit reduced to 20 MPH • Self-enforced lower speeds through targeted

traffic-calming techniques

5

Page 6: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

WHY ZONE-BASED?

• Avoid the “transfer effect”

• Drivers seek alternate routes

• Traffic and/or speeds may increase on parallel routes without traffic calming

6

Page 7: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

PROGRAM GOALS

• Reduce vehicle speeds • Fewer crashes resulting in injury or

property damage • Improved perception of safety • Quality of life benefits

7

Page 8: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

Pilot zones: • Talbot-Norfolk Triangle • Stonybrook Selected in 2017: • Chinatown • Grove Hall-Quincy Corridor • Highland Park • Mt Hope/Canterbury • West of Washington

SEVEN ZONES TODAY

Selected in 2017 Pilot zones 8

Page 9: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CHINATOWN SLOW STREETS

Page 10: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CHINATOWN ZONE

• Slow Streets zone includes only the streets in white – and potential improvements at

Harrison Ave intersections

• Other nearby projects: – Phillips Square (purple streets) – Vision Zero Focus (light blue

streets) • Other streets (darker blue streets)

10

Page 11: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CHINATOWN ZONE

• Some facts about the area: – Nearly 1 in 4 households have a

child under 18 – 8% of residents are aged 65 or

older, 15% are aged 60 or older

11

Page 12: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

COMMUNITY INPUT AND OBSERVATIONS

• Group walk on October 3, 2017 helped identify key issues

• Community members submitted comments

• Multiple site visits by project team this spring (March-June) to observe how people use the streets

12

Page 13: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

• Poor visibility at crosswalks – People park right next to

crosswalks

• People driving do not yield to people in crosswalks

• Considerations for Emergency vehicles

13

CONCERNS WE HEARD

Page 14: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

ACTIVE COMMUTES

• Of working residents, vast majority are walking, taking transit, or bicycling regularly

• Many kids and older adults walking in the neighborhood

• Many people going to and from Tufts Medical Center 14

70%

72%

57%

Page 15: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

TRAFFIC COUNTS

• 5 mid-block counts – Mid-block counts include

vehicle speeds

• 7 intersection counts – Intersection counts tell us

if people turn or continue through

• Data collected in May 2018

Locations approximate 15

Page 16: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

VEHICLE SPEEDS IN CHINATOWN

STREET 85TH

PERCENTILE SPEED

% OF VEHICLES

TRAVELING 25+ MPH

Oak St (Eastbound) 18.1 1%

Pine St (Eastbound) 16.8 mph 0%

Tyler St (Northbound) 17.5 mph 1%

79 Hudson St (Southbound) 19.0 mph 7%

183 Hudson St (Southbound) 24.6 mph 18%

16

Locations approximate

Page 17: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CHINATOWN CONCEPT PLAN

Page 18: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways at entrances to 20 MPH zone

18

Page 19: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

GATEWAY SIGNS & MARKINGS

• Located as people enter the zone

• Signed for 20 MPH • Supplemented with

20 MPH pavement marking

Stonybrook Neighborhood Slow Streets Zone 19

Page 20: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways • Daylighting

20

Page 21: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

DAYLIGHTING

21 Talbot-Norfolk Triangle Neighborhood Slow Streets Zone

• Improves visibility for drivers, pedestrians

• Restricts parking 20’ from intersection, per City rules

• Generally only nearside approach to intersection

Page 22: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways • Daylighting

22

PARKING IMPACTS 1 – 1-hour parking, 8 am – 4 pm 8 – Resident parking 3 – Metered / resident 6 pm – 8 am, Mon - Sat 2 – Metered 1 – Tufts patient, 6 am – 6 pm, Mon – Fri 15 – Total *Existing no-parking regulations at Oak and Ash

Page 23: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways • Daylighting • Enhanced crosswalks

23

Page 24: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

ENHANCED CROSSWALK OPTIONS • Designs will consider

specific context of each location

• Looking into feasibility of different designs – Need to understand

drainage and accessibility issues

– Designs need to be approved by Engineering staff

24 Example intersection: Harrison Ave and Bennet St

Page 25: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

EXPLORING: RAISED CROSSWALKS

25

• Crosswalk is level or near-level with sidewalk – Slows drivers – Improves visibility – Easier for people with wheelchairs, walkers, strollers, carts

Rendering of a raised crosswalk at the example intersection, Harrison Ave and Bennet St.

Page 26: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

EXPLORING: RAISED CROSSWALKS

26 Rendering of a raised crosswalk at the example intersection, Harrison Ave and Bennet St.

Page 27: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

ALTERNATIVE: CURB EXTENSIONS AND SIGNS

27

• Curb extensions – Reduces crossing distance – Improves visibility by restricting parking at intersection

• Pedestrian crossing signs with lights – Alerts drivers that people are trying to cross the street – May be possible in some locations, cannot be installed at every

crosswalk

Rendering of curb extensions and signs with lights at Harrison Ave and Bennet St.

Page 28: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

ALTERNATIVE: CURB EXTENSIONS AND SIGNS

28 Rendering of curb extensions and signs with lights at Harrison Ave and Bennet St.

Page 29: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways • Daylighting • Enhanced crosswalks • Chicane on Hudson St

29

Page 30: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

HUDSON ST: VEHICLE SPEEDS

STREET 85TH

PERCENTILE SPEED

% OF VEHICLES

TRAVELING 25+ MPH

Oak St (Eastbound) 18.1 1%

Pine St (Eastbound) 16.8 mph 0%

Tyler St (Northbound) 17.5 mph 1%

79 Hudson St (Southbound) 19.0 mph 7%

183 Hudson St (Southbound) 24.6 mph 18%

30

Locations approximate

Page 31: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

HUDSON ST CHICANE

31

• Creates a gradual “S” curve on the street

• Slows drivers • Parking will flip sides

Parked cars Path of travel

EXISTING

Page 32: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

HUDSON ST CHICANE

32

• Creates a gradual “S” curve on the street

• Slows drivers • Parking will flip sides

Parked cars Path of travel

EXISTING

Page 33: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

HUDSON ST CHICANE

33

• Creates a gradual “S” curve on the street

• Slows drivers • Parking will flip sides

Parked cars Path of travel

WITH CHICANE

Sparks St, Cambridge, MA Image source: Google maps

Page 34: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

HUDSON ST CHICANE

34

• Creates a gradual “S” curve on the street

• Slows drivers • Parking will flip sides

Parked cars Path of travel

Sparks St, Cambridge, MA Image source: Google maps

WITH CHICANE

Page 35: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

CONCEPT PLAN

• Gateways • Daylighting • Enhanced crosswalks • Chicane on Hudson St • Nassau St

35

Page 36: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

NASSAU ST

• Exploring pavement markings and signs – Better organizes the street – Alerts drivers to the presence of people

walking

36

HA

RR

ISO

N A

VE

W

AS

HIN

GTO

N S

T

AS

H S

T

EXISTING

Page 37: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

NASSAU ST

• Exploring pavement markings and signs – Betters organize the street – Alerts drivers to the presence of people

walking

37

HA

RR

ISO

N A

VE

W

AS

HIN

GTO

N S

T

AS

H S

T

CONCEPTUAL SIGNS AND MARKINGS

Page 38: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

NASSAU ST

• Exploring pavement markings and signs – Better organizes the street – Alerts drivers to the presence of people

walking

38

HA

RR

ISO

N A

VE

W

AS

HIN

GTO

N S

T

AS

H S

T

POTENTIAL PARKING LOSS

Page 39: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

OUR NEXT STEPS JULY 2018 Public meeting #1 (Tonight)

Refine concepts, as needed, based on your and your neighbors’ feedback

FALL - WINTER 2018-19

Develop engineered design plans Internal review with BTD and PWD

LATE WINTER 2019 Public meeting #2 to share final plans Finish design Internal review with BTD and PWD

LATE SPRING 2019 Schedule construction with PWD, share anticipated schedule with public

39

Page 40: NEIGHBORHOOD SLOW STREETS: CHINATOWN...CHINATOWN ZONE •Slow Streets zone includes only the streets in white ... LATE WINTER 2019 Public meeting #2 to share final plans Finish design

THANK YOU

boston.gov/slow-streets/chinatown [email protected]