5
CURRICULUM VITAE NEHAL AHMED Email nehal.alam82@gmail. com Mobile No - +9647898138548 (WORK) +919661115817(INDIA) Address- Building No :124 Vill-Nawada Khas POST-Manik pur PS+DIST-Gopal ganj Bihar India Personal Data Father’s Name: Mr.F.IMAM DOB : 5/02/1985 Sex: Male Nationality: Indian Marital Status: Single Passport No: H9769534 Languages Known : English, Hindi, Urdu & Arabic Professional profile : Over all 7 and half years Experience (including 3 and half year Gulf experience) in the field of Refineries, Oil & Gas sector as a QA/QC INSPECTOR – Mechanical, in various Construction Projects of Fabrication & Erection of Piping, Storage Tankages, Pressure Vessels, Heat Exchangers, Static and Rotating equipment (FITUP AND WELDING) . Knowledge in referring the standards ASME section B31.1, B31.3, AWS D1.1, ASME IX and API 510 API 570 .Review and make the Welding procedure, Inspection test plan Final hand over documents as per ISO 90012008. Education: A First Division (63.57%) Bachelor in Mechanical Engineering from (Jwahar lal Nehru university Andhra Pradesh) passed out in 2007. Intermediate passed in 2001 with first class. SSC passed in 1999 with first class. Professional course: CSWIP 3.1 Welding inspector. ISO 9001-2008 Lead auditor. ASNT LEVEL-2 courses in Radiography Testing (RT), Ultrasonic Testing (UT), Magnetic Particle Testing (MPT), Liquid Penetrate Testing (LPT). Assets: Highly motivated & enthusiastic to work in a team. Adjustable to any environment. Effective Communication skill and leadership qualities.

NEHAL_BIODATA-01

Embed Size (px)

Citation preview

Page 1: NEHAL_BIODATA-01

CURRICULUM VITAE

NEHAL AHMED Email [email protected] Mobile No- +9647898138548 (WORK) +919661115817(INDIA) Address- Building No :124 Vill-Nawada Khas POST-Manik pur PS+DIST-Gopal ganj Bihar India Personal Data Father’s Name: Mr.F.IMAM DOB : 5/02/1985 Sex: Male Nationality: Indian Marital Status: Single Passport No: H9769534 Languages Known : English, Hindi, Urdu & Arabic

Professional profile :

Over  all  7  and  half    years  Experience  (including  3  and 

half year Gulf experience) in the field of Refineries, Oil & 

Gas  sector  as  a QA/QC  INSPECTOR    – Mechanical,    in 

various Construction Projects of Fabrication & Erection 

of  Piping,  Storage  Tankages,  Pressure  Vessels,  Heat 

Exchangers, Static and Rotating equipment  (FITUP AND 

WELDING) . Knowledge in referring the standards ASME 

section B31.1, B31.3, AWS D1.1, ASME  IX  and API  510 

API  570  .Review  and  make  the  Welding  procedure, 

Inspection  test plan  Final hand over documents as per 

ISO 9001‐2008. 

Education:

A First Division (63.57%) Bachelor in Mechanical

Engineering from (Jwahar lal Nehru university Andhra Pradesh) passed out in 2007.

Intermediate passed in 2001 with first class. SSC passed in 1999 with first class.

Professional course:

CSWIP 3.1 Welding inspector. ISO 9001-2008 Lead auditor.

ASNT LEVEL-2 courses in Radiography Testing

(RT), Ultrasonic Testing (UT), Magnetic Particle Testing (MPT), Liquid Penetrate Testing (LPT).

Assets:

Highly motivated & enthusiastic to work in a team.

Adjustable to any environment.

Effective Communication skill and leadership qualities.

Page 2: NEHAL_BIODATA-01

Technical Exposure:

Concepts Technology Tools/Languages Basic concepts MS OFFICE Operating System WIN XP , 2000, XP, VISTA. Programming Language C

Functional REVIEW AND APPROVED THE INSPECTION TEST PLAN AS PER ISO 9001‐2008. 

PRODUCTION/PROJECT COORDINATION. 

QUALITY CONTROL. 

QUALITY ASSURANCE. 

REVIEW AND MAKE THE WELDING PROCEDURE. 

WELDING INSPECTION (NDT). 

PIPING INSPECTION. 

QUALITY DOCUMENTATION AS PER ISO 9001‐2008. 

SUPPLIER END INSPECTION. 

PRE DESPATCH INSPECTION. 

FINAL DOCUMENTION AS PER ISO 9001‐2008. 

RESPONSIBLTIES & ACHIEVEMENTS

Around 7 and half years of experience in QA/QC Mechanical Inspector with reputed oil and      Petrochemicals Company in India and abroad for quality assurance and quality control under project management team. 

Conversant with the Codes and Standards. API. ASME‐SEC. IX, V, and AWS D1.1. 

Have comprehensive knowledge  in  leading and accepted  industry codes and standard  from  like  the  American  welding  society  (AWS),  the  American  society  of  mechanical  engineers (ASME),  the  American  society  for  testing  and  materials  (ASTM),  the  American  national standard  institute  (ANSI), the American petroleum  institute  (API), and the American society for non‐destructive testing (ASNT). 

Having good knowledge in verifying and implementing QCP (Quality Control Plan,) Approved 

Quality control procedure,  ITP (Inspection & Test Plan),  Inspection & Test Plant),  Inspection 

check list and Inspection test reports. 

Have Comprehensive knowledge in non‐destructive examination and welding system (NEWS) 

Program Capable of news data input, piping test package review and clearing. 

Review and Preparation of Method statement and ITPs. 

Fully Conversant with Pneumatic testing, Hydrostatic testing of Storage tanks, Piping etc. 

Familiar with Painting and insulation for all types of Static equipments, Tanks and Piping. 

Familiar with Non‐Destructive testing (RT, UT, PT&MT).Inspects processing as well as storage tanks,  pipelines  fittings  and  also  pumping  units  for  defects,  following  specified  inspection procedures. 

Page 3: NEHAL_BIODATA-01

inspects static and rotating equipments for e.g. Drums, exchanger, columns, compressor, pumps (alignment, soft foot, dbse) etc. 

Test witness for PSV & ball valves (Hydro & Pneumatic).                         

Verifying of the controlling of welding consumables and documents. 

Knowledge in final hand over documentation. 

Knowledge in Underground piping inspection and documentation. 

Knowledge about the piping project requirement.  

Knowledge aloud purchases order & delivery notes. 

Receiving inspection of pipe and fitting by referring MTC. 

Knowledge in pipe laying on sleepers, pipe racks, and trenches. 

Knowledge in shop pipe spool fabrication and implementing spool identification systems 

Knowledge in coordination with shop fabrication and field fabrication crew for performing 

sequence pipe installation. 

Knowledge in flange bolt tightening. 

Knowledge in metallic and non metallic gasket verification and installation. 

Knowledge in insulation gasket verification and installation. 

Knowledge in spacer, spectacles, orifices & ventures, and thermo wells. 

Knowledge in preparing pre‐punch list of piping system. 

Knowledge in hydro test package and it’s routings. 

Witnessing of hydro test / service test / leak test / & pneumatic tests. 

Knowledge in preparation of hydro test repots. 

Knowledge in piping documentation. 

Knowledge in coordination for internal & external audits. 

Knowledge in calibration of hydro test related equipments. 

Quality control as per QA plan. 

Visual and dimensional inspection of piping. 

Review of test packages. 

Day to day co‐ordination and regular inspection activities with third party and client. 

Inspection of pipe and fabrication. 

Preparation the punch items (Before and after pressure test) for each pressure test packages 

related to piping and static equipments.   

Co‐ordinate with construction, testing groups and contractor QC Department in the 

preparation test requirement of each test pack and facilitate close out of outstanding punch 

items before and after test. 

Witness tests (Hydrostatic, pneumatic and Hydro‐Pneumatic) of piping systems. 

Witness of surface preparation, painting and insulation work of tanks, column, vessels, heat 

exchanger and piping systems. 

Meetings with our inspectors, contractor to implement corrective actions. 

Interface with maintenance and operation for their inspection. 

Report daily inspection activities to QA/QC Managers. 

  Project Management 

Page 4: NEHAL_BIODATA-01

Handling project activities and drawing specifications with the clients to ensure drawings are per the specifications of clients. 

Preparing and reviewing progress reports on daily / weekly and monthly basis as well as recorded and maintaining documentation as per project requirement. 

Managing supervision of pipeline construction and inspection of paint system on piping at related installation.  

QMS Implementation   Handling QA/QC  and installation/ construction/ fabrication of piping according to ASME 

Sections,   Devising and implementing process & quality plan & reviewing analytical documents, 

SOF general test procedures, protocols and their summary reports.  Reviewing and ensuring all contract documents that per tin to the quality aspects of the 

work be performed under the contract.  Compliance/ Safety   Ensuring adherence to various quality standards as well as monitoring and evaluating all 

Maintaining HSE plans as per company policy and interacting with site management and sectional heads on safety issues. 

Liaising with contractors design, quantity, planning, QA/QC and safety department. 

PROJECT DETAILS:- 1. Working with Samsung engineering in GAZPROME NEFT BADRA

project in EAST IRAQ since march 2015 to till continue, as a QA/QC ENGINEER , Handling Mechanical inspection (Static & rotating) Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection. Review and approved the all quality document as per ISO 9001-2008.

        Project name           :      CPF BADRA OIL FIELD PHASE 2                       Position            :      QA/QC ENGINEER                      Client                             :        GAZPROM 

        Time Period                 :        MARCH 2015 TO TILL CONTINUE  

2. Working with Samsung engineering in LUK OIL WEST QURNA PHASE -2 project in SOUTH IRAQ since April 2013 to March 2014 , as a QA/QC INSPECTOR , Handling Mechanical inspection (Static & rotating) Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection. Witness leak pressure test, Material inspection, Welder qualification test and Review and approved the all quality document as per ISO 9001-2008.

                      Project name             :       WEST QURNA PHASE 2  

        Position              :       QA/QC INSPECTOR         Client                               :       LUK OIL 

                     Time Period                    :       APRIL 2013 TO MARCH 2014 

Page 5: NEHAL_BIODATA-01

3. Working with GS ENGINEERING in TAKREER EXPANSION project in ABU DHABI since April 2012 to March 2013, as a QA/QC INSPECTOR , Handling Mechanical inspection (Static & rotating) Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection.

             Project name                :   RUWAISH REINARY EXPENTION PROJECT        Position                 :   QA/QC INSPECTOR        Project Type               :    OIL REFINAERY       Client                                    :             TAKREER       Time Period               :   APRIL 2012 to MARCH 2013  

4. Working with CCED in PDO OMAN since Feb 2011 to Sep 2011, as a QA/QC INSPECTOR, I am working in SAIWAN and FARHA. Handling Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection RT, UT, VT, MT, PT.

          Project name     :  CC ENERGY        Position                  :  QA/QC INSPECTOR       Project Type    :   OIL REFINAERY      Client                                      :            CCED      Time Period                :  FEB 2011 to SEP 2011   

5. Working with CEAT RADIAL PVT LTD ISO 9001- 2008 certified company in INDIA since Sep 2009 to Dec 2010, as a QA/QC ENGINEER, Handling Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection. Project name : CEAT RADIAL 

       Position                 :  QC ENGG         Project Type                       :   RADIAL PLANT       Time Period               :  SEP 2009 to Dec 2010   

6. Working with KAYPEE MECHANICAL PVT. LTD. ISO 9001- 2008 certified company in INDIA since Dec 2007 to Aug 2009, as a QA/QC ENGINEER, Handling Tank fit up & welding and piping related any type of activity. Witness & review various NDT inspection.

Project name     :            TATA POWER PLANT PHASE 2 

       Position                 :   QC ENGG        Project Type    :  POWER PLANT        Time Period    :    Dec 2007 to Aug 2009 

 

PLACE: SIGNATURE

DATE: