78
November 1, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher Director, Rates & Regulatory tel 832.320.5675 fax 832.320.6675 email [email protected] web www.anrpl.com/company_info/ Re: ANR Pipeline Company Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to Section 4 of the Natural Gas Act (“NGA”) and Part 154 of the Federal Energy Regulatory Commission’s (“FERC” or “Commission”) regulations, 1 ANR Pipeline Company (“ANR”) respectfully submits for filing and acceptance three (3) tariff records to be housed in its FERC Gas Tariff, Third Revised Volume No. 1 (“Tariff”), that include two (2) amended Rate Schedule ETS (“ETS”) negotiated rate service agreements that ANR has entered into with Wisconsin Gas LLC (“WG”); and one (1) amended ETS negotiated rate service agreement that ANR has entered into with Wisconsin Public Service Company (“WPS”) (collectively, “Amendments”). ANR respectfully requests that the Commission accept the Amendments, included herein as Appendix A, 2 to be effective November 1, 2016. 1 18 C.F.R. Part 154 (2014). 2 Electronic Tariff Filings, 124 FERC ¶ 61,270 (2008) (“Order No. 714”). Order No. 714 at P 42. Order No. 714 states that “Negotiated rate agreements… need not be divided, but can be filed as entire documents.” ANR has elected to file the Agreement included herein as a whole document, in PDF format.

Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

  • Upload
    lethuan

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

November 1, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426

ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher Director, Rates & Regulatory tel 832.320.5675 fax 832.320.6675 email [email protected] web www.anrpl.com/company_info/

Re: ANR Pipeline Company Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to Section 4 of the Natural Gas Act (“NGA”) and Part 154 of the Federal Energy

Regulatory Commission’s (“FERC” or “Commission”) regulations,1 ANR Pipeline Company

(“ANR”) respectfully submits for filing and acceptance three (3) tariff records to be housed in its

FERC Gas Tariff, Third Revised Volume No. 1 (“Tariff”), that include two (2) amended Rate

Schedule ETS (“ETS”) negotiated rate service agreements that ANR has entered into with

Wisconsin Gas LLC (“WG”); and one (1) amended ETS negotiated rate service agreement that

ANR has entered into with Wisconsin Public Service Company (“WPS”) (collectively,

“Amendments”). ANR respectfully requests that the Commission accept the Amendments,

included herein as Appendix A,2 to be effective November 1, 2016.

1 18 C.F.R. Part 154 (2014). 2 Electronic Tariff Filings, 124 FERC ¶ 61,270 (2008) (“Order No. 714”). Order No. 714 at P 42. Order No. 714

states that “Negotiated rate agreements… need not be divided, but can be filed as entire documents.” ANR has elected to file the Agreement included herein as a whole document, in PDF format.

Page 2: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Correspondence

The names, titles, mailing addresses, and telephone numbers of those persons to whom

correspondence and communications concerning this filing should be addressed are as follows:

*

John A. Roscher Director, Rates & Regulatory Joan F. Collins Manager, Tariffs and Compliance ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 Tel. (832) 320-5651 E-mail: [email protected]

* David R. Hammel Senior Legal Counsel ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 Tel. (832) 320-5861 E-mail: [email protected]

* Persons designated for official service pursuant to Rule 2010.

Statement of the Nature, Reasons and Basis for Filing On May 28, 1999, in Docket No. RP99-301-000,3 the Commission approved, subject to

conditions, proposed Section 6.27 of the General Terms and Conditions of ANR’s Tariff, which

authorized ANR to enter into negotiated rate agreements with its customers.

In accordance with Tariff Section 6.27, paragraph 2, ANR is filing the Amendments to reflect

revisions to one (1) negotiated rate agreement between ANR and WPS and two (2) negotiated

rate agreements between ANR and WG, as more fully described below:

• ANR has agreed to allow WPS to change its primary receipt point for negotiated rate

ETS Contract No. 111864 to Alliance/ANR INT #277072 effective November 1, 2016,

and has updated the Primary Route Exhibit to reflect this change. Contract No. 111864 is

included in Appendix A as tariff record 8.64.4

• ANR has agreed to allow WG to increase the Maximum Delivery Quantity (“MDQ”) for

negotiated rate ETS Contract No. 108014 from 18,500 Dth to 21,500 Dth, effective

November 1, 2016, and has updated the Primary Route Exhibit to reflect this change.

3 ANR Pipeline Company, 87 FERC ¶ 61,241 (1999). 4 ANR originally filed ETS Contract No. 111864 with the Commission as a service agreement containing

negotiated rates in ANR Pipeline Company, Docket No. RP99-301-140 (April 12, 2006) (unpublished Director’s Letter Order).

2

Page 3: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

The MDQ increase of 3,000 Dth is being transferred from WG’s negotiated rate ETS

Contract No. 107784, as described below. Contract No. 108014 is included in Appendix

A as tariff record 9.27.5

• ANR has agreed to allow WG to reduce the MDQ for negotiated rate ETS Contract No.

107784 from 14,000 Dth to 11,000 Dth, effective November 1, 2016, and has updated the

Primary Route Exhibit to reflect this change. The MDQ reduction of 3,000 Dth is being

transferred to WG’s amended negotiated rate ETS Contract No. 108014, as described

above. Contract No.107784 is included in Appendix A as tariff record 9.25.6

ANR advises that no undisclosed agreements, etc., are linked to the Amendments, which are

included herein as Appendix A.

To conform with Order No. 714, ANR is submitting the Amendments7 in their entirety as a tariff

records 8.64, 9.25, and 9.27. ANR is requesting that the Commission accept the Amendments,

submitted herein as tariff records 8.64, 9.25, and 9.27, to be effective November 1, 2016.

Effective Date and Request for Waiver ANR respectfully requests that the Commission accept the Amendments to be effective

November 1, 2016, and respectfully requests waiver of Section 154.207 of the Commission’s

regulations to allow for this effective date.8

5 ANR filed ETS Contract Nos. 108014 and 107784 with the Commission as non-conforming agreements containing negotiated rates. ANR Pipeline Company, Docket No RP13-1366-000 (October 23, 2013) (unpublished Director’s letter Order). Additionally, the instant amendments to Contract Nos. 108014 and 107784 make further changes to conform with ANR’s current pro forma Section 7.1. These revisions do not alter any of the non-conforming provisions previously accepted by the Commission, but merely move the provisions to more appropriate locations within the agreements.

6 Id. 7 Order No. 714 at P 13. Order No. 714 states that “…all new…agreements must be filed using the standards.

Existing agreements need to be filed electronically only when they are revised.” 8 See Statement of Policy on Alternatives to Traditional Cost-of-Service Ratemaking for Natural Gas Pipelines and

Regulation of Negotiated Transportation Services of Natural Gas Pipelines, 74 FERC ¶ 61,176 at 61,241-242 (1996) (indicating that the Commission will “readily grant requests to waive the 30-day notice requirement”).

3

Page 4: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Other Filings Which May Affect This Proceeding There are no other filings before the Commission that may significantly affect the changes

proposed herein.

Contents of Filing In accordance with Section 154.7 of the Commission’s regulations and Order No. 714, ANR is

submitting the following XML filing package, which includes:

1. This transmittal letter;

2. Clean versions of the tariff records (Appendix A); and

3. Marked versions of the Amendments (Appendix B).

Certificate of Service As required by Sections 154.7(b) and 154.208 of the Commission’s regulations, copies of this

filing are being served on all of ANR’s existing customers and interested state regulatory

agencies. A copy of this letter, together with the other attachments, is available during regular

business hours for public inspection at ANR’s principal place of business.

Pursuant to Section 385.2005 and Section 385.2011(c) (5), the undersigned has read this filing

and knows its contents, and the contents are true as stated, to the best of his knowledge and

belief. The undersigned possesses full power and authority to sign such filing.

Any questions regarding this filing may be directed to Joan Collins at (832) 320-5651.

Respectfully submitted,

ANR PIPELINE COMPANY

John A. Roscher Director, Rates & Regulatory Enclosures

4

Page 5: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Appendix A

ANR Pipeline Company FERC Gas Tariff, Third Revised Volume No. 1

Clean Tariff

Tariff Records Section 8 – Negotiated Rate Agreements Tariff Rate Record Shipper Schedule Agreement Version

8.64 Wisconsin Public Service Company ETS #111864 v.1.0.0 Section 9 - Non-Conforming Agreements with Negotiated Rates

9.25 Wisconsin Gas LLC ETS #107784 v.2.0.0 9.27 Wisconsin Gas LLC ETS #108014 v.3.0.0

Page 6: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

ANR Pipeline Company PART 8.64 FERC Gas Tariff 8.64 – Neg Rate Agmt Third Revised Volume No. 1 Wisconsin Public Service Corporation (#111864) v.4.0.0

Enhanced Transportation Service Agreement Rate Schedule ETS

Wisconsin Public Service Corporation

(#111864)

Agreement Effective Date: November 1, 2007 Amendment No. 01 Effective Date: October 31, 2017 Amendment No. 02 Effective Date: January 1, 2013

Amendment No. 04 Effective Date: November 1, 2016

Issued: November 1, 2016 (Option Code A) Effective: November 1, 2016

Page 7: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005 Contract No.: 111864

ETS SERVICE AGREEMENT

This AGREEMENT is entered into by ANR PIPELINE COMPANY (Transporter) and WISCONSIN PUBLIC SERVICE CORP. (Shipper).

WHEREAS, Shipper has requested Transporter to transport Gas on its behalf and Transporter represents that it is willing to transport Gas under the terms and conditions of this Agreement.

NOW, THEREFORE, Transporter and Shipper agree that the terms below, together with the terms and conditions of Transporter's applicable Rate Schedule and General Terms and Conditions of Transporter's PERC Gas Tariff constitute the transportation service to be provided and the rights and obligations of Shipper and Transporter.

1. AUTHORITY FOR TRANSPORTATION SERVICE: (284B =Section 311; 284G =Blanket)

284G

2. RATE SCHEDULE: Enhanced Transportation Service (ETS)

3. CONTRACT QUANTITIES:

Primary Route- see Exhibit attached hereto.

Such Contract Quantities shall be reduced for scheduling purposes, but not for billing purposes, by the Contract Quantities that Shipper has released through Transporter's capacity release program for the period of any release.

4. TERM OF AGREEMENT:

This Agreement shall be effective as of November 1, 2007, and shall continue in full force and effect through October 31, 2017; provided, however, Transporter shall be under no obligation to receive or to deliver any quantities of natural gas hereunder prior to the "Commencement Date." The "Commencement Date" shall be the later of November 1, 2007, or the in-service date of the Wisconsin 2006 Expansion Project facilities as described in PERC Docket No. CPOS-364-000, which are necessary to provide the services hereunder. In no event shall the Commencement Date be prior to November 1, 2007, unless mutually agreed to in writing by Transporter and Shipper.

1

Page 8: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005 Contract No.: 111864

5. RATES:

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as referenced in the Further Agreement Section of this Agreement.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's PERC Gas Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to participate fully in rate or other proceedings by intervention or otherwise to contest increased rates in whole or in part.

6. INCORPORATION BY REFERENCE:

The provisions of Transporter's applicable Rate Schedule and the General Terms and Conditions of Transporter's PERC Gas Tariff are specifically incorporated herein by reference and made a part hereof.

7. NOTICES:

All notices can be given by telephone or other electronic means, however, such notices shall be confirmed in writing at the addresses below or through GEMStm· Shipper and Transporter may change the addresses below by written notice to the other without the necessity of amending this Agreement:

TRANSPORTER:

ANR PIPELINE COMPANY 1001 LOUISIANA STREET HOUSTON, TX 77002 Attention: TRANSPORTATION SERVICES

2

Page 9: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005

SHIPPER:

WISCONSIN PUBLIC SERVICE CORP. 700 N ADAMS ST P.O. Box 19002 GREEN BAY, WI 54307-9002 Attention: RONALD G. MOSNIK

Telephone: Fax:

920-433-1325 920-430-6806

INVOICES AND STATEMENTS:

WISCONSIN PUBLIC SERVICE CORP. 700 N ADAMS ST P.O. Box 19800 GREEN BAY, WI 54307-9004 Attention: ACCOUNTS PAYABLE, ANNUAL 1

Telephone: Fax:

920-433-2929 920-433-1436

8. FURTHER AGREEMENT:

Contract No.: 111864

A. The rate for the Primary Route MDQ ("MDQ") as listed in the attached Primary Route Exhibit during the primary term hereof shall be a Fixed Monthly Reservation Rate of $4.8580 per dth and a Fixed Commodity Rate of $0.0075 per dth. This rate shall be inclusive of any other fees or surcharges under Transporter's PERC Gas Tariff. In addition, Shipper shall be charged ACA and Transporter's Use (Fuel) in accordance with Transporter's PERC Gas Tariff.

B. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter's PERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Paragraph 8.A above, provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter's PERC Gas Tariff and Shipper changes its Primary Delivery Point to any Delivery Point within Transporter's ML-7 Zone.

3

Page 10: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005 Contract No.: 111864

C. For all transportation service under this Agreement, Shipper and any Replacement Shipper(s) shall have the right to utilize any Secondary Receipt Points and Secondary Delivery Points within Transporter's ML 7 Zon~ at the rate and other charges set forth in Section 8 .A.

D. Except as otherwise provided herein, the mutually agreed upon rate for the use of any point not addressed in Sections 8.A, 8.B or 8.C above, as well as deliveries in excess of the contract MDQ, shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter's Use and any other fees or surcharges under Transporter's FERC Gas Tariff.

E. Shipper shall be entitled to the Right of First Refusal provided for in Section 22 of the General Terms and Conditions of Transporter's FERC Gas Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 22.2.

F. Effective with the Commencement Date of this agreement, ANR and Wisconsin Public Service Corporation agree to make appropriate amendments pursuant to the provisions of the Minimum Delivery Pressure and Maximum Delivery Level Agreement dated October 27, 2004. Delivery capacity in the "Exhibit B" to the Minimum Delivery Pressure and :Maximum Deliver; Level Agreement will be ruuended as follows:

G. Except as provided in Paragraphs 8.A, 8.B, 8.C, and 8.D, the negotiated rate stated in Paragraph 8.A shall remain fixed during the term of this Agreement and shall not be subject to change or modification in a rate case filed pursuant to the Natural Gas Act.

4

I ~ 1 r •

Page 11: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005

Gate Station Name

Oshkosh

South Oshkosh

Crivitz

Rosholt

Stevens Point

Coleman

Lena

Menominee No. 2

Peshtigo

Crandon

Laona

Merrill

Monico

Mosinee

North Merrill Int.

South Wausau

Wausau

Manitowoc

North Manitowoc

Two Rivers

Total

(

Contract No.: 111864

ETS/MDL Quantity Increase

(Dth/d)

Winter Period Summer Period

500 300

500 300

150 90

1,000 600

250 150

100 60

100 60

200 120

100 60

50 33

50 33

100 60

50 33

200 120

250 150

1,700 1,020

500 300

400 240

400 240

400 240

7,000 4,209

5

Page 12: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: October 06, 2005 Contract No.: 111864

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed by their respective Officers or Representatives there unto duly authorized to be effective as of the date stated above.

SHIPPER: VICE CORP.

By:

Title: ~-Es.tl!.. Date: FtlJ 3 ;~ .2J2o6

TRANSPORTER: ANR PIPELINE COMPANY

;~he.L ~ent and Attorney-in-Fact

By:

Title:

Date: 01./ I) / o"

6

Page 13: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

PRIMARY ROUTE EXHIBIT To Agreement Between

ANR PIPELINE COMPANY (Transporter) AND WISCONSIN PUBLIC SERVICE CORP. (Shipper)

Receipt Location Name

277072 ALLIANCE/ ANR INT

FROM: November 01,2007

Delivery Location Name

139258 WPSC - GROUP 1

TO: October 31, 2017

Contract No: 111864 Rate Schedule: ETS Contract Date: October 06, 2005

Amendment Date:

Annual MDQ

(DTH)

7000

Winter MDQ

(DTH)

0

Summer MDQ (DTH)

0

'\ ;.

Page 14: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 111864 Amendment No: 01

AMENDMENT

Date: March 11, 2008

"Transporter": ANR PIPELINE COMPANY

"Shipper": WISCONSIN PUBLIC SERVICE CORP.

ETS Contract No. 111864 dated October 06, 2005 ("Agreement") between Transporter and Shipper is amended effective October 31, 2017 as follows:

1) To replace Further Agreement Section 8. E. in its entirety with the following:

8. E. None

All other terms and conditions of the Agreement shall remain in full force and effect.

WISCONSIN PUBLIC SERVICE CORP. "Shipper"

By: CL-A C(. ~ Title: .Pet '}1' L~ .1?-f)-f­

Date: . IY\"'J ~I "WQj)

ANR PIPELINE COMPANY

By:

Page 15: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

PRIMARY ROUTE EXHIBIT To Agreement Between

ANR PIPELINE COMPANY (Transporter) AND WISCONSIN PUBLIC SERVICE CORP. (Shipper)

Receipt Location Name

277072 ALLIANCE/ANR INT

FROM: November 01,2007

Delivery Location Name

139258 WPSC - GROUP 1

TO: October 31,2017

1

Contract No: 111864 Rate Schedule: ETS Contract Date: October 06, 2005

Amendment Date: March 11, 2008

Annual MDQ

(DTH)

7000

Winter MDQ

(DTH)

0

Summer MDQ (DTH)

0

Page 16: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

(

ContractNo: 111864 Amendment No: 02

AMENDMENT

Date:· November 29, 2012

"TranspOJter'': ANR PIPELINE COMPANY

"Shipper": WISCONSIN PUBLIC SERVICE CORPORATION

. . . . . BTS Contract No. 111864 dated October 06,2005 ("Agreement") between Transporter and Shipper fs

amended effective January 01, 2013 as follows:

shipper and Transporter have agreed to remove the :MDL Agreement refe~ence in Section 8. FURTHER AGR~EMENT, S.F and replace the language-in s .. F with None. .

All other terms and conditions of the Agreement shall remain in full force and effect.

WISCONSIN PUBLIC SERVICE CORPORATION "Shipper" . .

.,,·~Jc'A Title: ~~ 6Jr, 0u'11/

I Date: I .2. ~ / /,.- /)_,_

ANR PIPELINE COMPANY

Date: -----''~-<,_,1......:1......:.,_/(._:_t '~--'-~-- · ~ ~

Page 17: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 111864 Amendment No: 04

AMENDMENT

Date: Octo15or 19, 2016

"Transporter'': ANRPIPEL!NE CO.MPANY

"Shipper": WISCONSIN PUBLIC SERVICE CORPORATION

ETS Contract No. 111864 dated October 06, 2005 ("Agreement") between Transporter and Shipper is amended effective November 01,2016 as follows:

Shipper and Transporier have agreed to change the Prhnnry Receipt Point under this Agreement to Alliance/ANR Int (277072).

An update Primary Route Exhibit reflecting this chnnge is nttached.

All other terms atld conditions of the Agreement shall remah1 h1 full force and effect.

WISCONSIN PUBLIC SERVICE CORPORATION 11Shipper11

./

By: d'fflaJ /'

Title: ,dW!d/NI -b/s ~;?!'!'-/

Dote: ;o/nh I I

ANR PIPELINE COMPANY

"Transpor~= a· By: ~~f.~

D. C (7' lS ' Title: 1rector, ommercm ervtces

Date: __ .:_I;:_IJ_·---"',1_,_1_~ _1"'-1/----~

Page 18: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contt·act No: 11186•1 PRIMARY ROUTE EXHIBIT RatoSchedule: ETS

To Agreement Jletween Contract Date: October06, 2005 ANR PIPELINE COMPANY (Tt·nnsporter) Amendment Date: October 19,2016 AND WISCONSIN PUBLIC SERVICE CORPORATION (Shipper)

Receipt Location Name

277072 ALLIANCF)ANR !NT

FROM: NovemberOI, 2016

246067 WILL COUNTY !NT

FROM: November01, 2015

277072 ALLIANCEIANR !NT

J:'ROM: November 01,2007

Delivery Location Name

139258 WPSC- GROUP I

TO: October 31,2017

139258 WPSC- GROUP 1

TO: October 31,2016

139258 WPSC -GROUP 1

TO: October 31,2015

Annual MDQ (DTH)

7000

7000

7000

Winter MDQ

(DTH)

0

0

0

Summer MDQ (DTH)

0

0

0

Page 19: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

ANR Pipeline Company PART 9.25 FERC Gas Tariff 9.25 – NC/Neg Rate Agmt Third Revised Volume No. 1 Wisconsin Gas LLC ETS Agmt (#107784)

v.2.0.0

Enhanced Transportation Service Agreement Rate Schedule ETS

Wisconsin Gas LLC

(#107784)

Amendment No. 03 Effective Date: April 1, 2006 (Amended and Restated Agreement) Amendment No. 09 Effective Date: November 1, 2013 Amendment No. 10 Effective Date: November 1, 2013 Amendment No. 11 Effective Date: November 1, 2016

Issued: November 1, 2016 (Option Code A) Effective: November 1, 2016

Page 20: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 107784 Amendment No: 3

ETS SERVICE AGREEMENT

This AMENDED AND RESTATED ("AGREEMENT") is entered into by ANR PIPELINE r" n ·ut>"-"

COMPANY (Transporter) and WISCONSIN GAS LLC (Shipper), on ret" !if, to Become effective upon the later of i) April I, 2006 or, ii) the Effective Date of the tariff filing dated -:---:----· The provisions contained in this Amended and Restated Agreement represents the Agreement between the parties in its entirety and upon becoming effective supercedes any prior agreements associated with services provided hereunder, including the agreement with the same contract number dated June 26, 2002.

WHEREAS, Shipper has requested Transporter to transport Gas on its behalf and Transporter represents that it is willing to transport Gas under the terms and conditions of this Agreement.

NOW, THEREFORE, Transpo1ier and Shipper agree that the terms below, together with the terms and conditions of Transporter's applicable Rate Schedule and General Terms and Conditions of Transporter's FERC Gas Tariff constitute the transportation service to be provided and the rights and obligations of Shipper and Transporter.

I. AUTHORITY FOR TRANSPORTATION SERVICE: (284B =Section 311; 284G =Blanket)

284G

2. RATE SCHEDULE: Enhanced Transportation Service (ETS)

3. CONTRACT QUANTITIES:

Primary Route - see Exhibit attached hereto.

Such Contract Quantities shall be reduced for scheduling purposes, but not for billing purposes, by the Contract Quantities that Shipper has released through Transporter's capacity release program for the period of any release.

4. TERM OF AGREEMENT:

The term of this Agreement shall commence on April 0 I, 2006 and shall continue in full force and effect each Winter Period through March 31, 2007, and for the Winter period of every year thereafter unless terminated by Shipper upon two (2) years prior written notice.

Page 21: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004

RATES:

Contract No.: 107784 Amendment No: 3

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as referenced in the Further Agreement Section of this Agreement.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's FERC Gas Tariff, and Transporter shall have 1he right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to participate fully in rate or other proceedings by intervention or otherwise to contest changes in rates in whole or in part.

6. INCORPORATION BY REFERENCE:

The provisions of Transporter's applicable Rate Schedule and the General Terms and Conditions of Transporter's FERC Gas Tariff are specifically incorporated herein by reference and made a part hereof.

7. NOTICES:

All notices can be given by telephone or other electronic means, however, such notices shall be confirmed in writing at the addresses below or through GEMStm· Shipper and Transporter may change the addresses below by written notice to the other without the necessity of amending this Agreement:

TRANSPORTER:

ANR PIPELINE COMPANY I 001 Louisiana HOUSTON, TX 77002 Attention: TRANSPORTATION SERVICES

2

Page 22: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004

SHIPPER:

WISCONSIN GAS LLC 333 WEST EVERETT STREET -A308 MILWAUKEE, WI 53203 Attention: RICHARD QUICK

Telephone: Fax:

414-221-5345 414-221-5351

INVOICES AND STATEMENTS:

WISCONSIN GAS LLC 333 WEST EVERETT STREET -A308 MILWAUKEE, WI 53203 Attention: BOB PLATTETER

Telephone: Fax:

414-221-2895 414-221-5351

8. FURTHER AGREEMENT:

Contract No.: 107784 Amendment No: 3

A. Notwithstanding anything to the contrary in Section 5, the rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit during the primary term hereof, shall be the lesser of Transporter's maximum tariff rates or the following:

Term Monthly Reservation Rate Commodity Rate April I, 2006 through March 31, 2007 $4.8580 (100% LF rate: $0.1672) $0.0075 per Dth

These discounted rates shall be inclusive of all surcharges except Governmental Authority Surcharges, as defined below. Shipper shall be charged ACA and Transporter's Use (Fuel) in accordance with Transporter's FERC Gas Tariff. Governmental Authority Surcharges are surcharges that are mandated by FERC or by another regulatory body to be recovered from Shipper, and similarly situated shippers, are applied on a uniform basis to all interstate natural gas pipelines, and are required to be remitted to a governmental authority or a third party. The ACA surcharge would constitute a Governmental

3

Page 23: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 107784 Amendment No: 3

Authority Surcharge that Transporter is entitled to collect. New surcharges that are specific to Transporter's system and/or that have any relationship to the costs of operating Transporter's pipeline system, storage facilities, etc. and/or that have any relationship to costs paid by Transporter for services on other pipeline systems are not Governmental Authority Surcharges. In the event Transporter is required to charge Shipper a rate higher than a rate set forth in this Section 8.A due to the imposition of a charge that is not a Governmental Authority Surcharge, and in the event Transporter and Shipper do not otherwise agree, the Monthly Reservation Rate set forth herein shall be reduced by the amount of the difference between the higher rate and the rate set forth in this Section 8.A.

B. The rates listed above shall be in effect through the initial term of the contract. For periods after the initial term, Transporter will provide written notice ninety (90) days prior to date Shipper is required to provide notice of termination to Transporter pursuant to Article 4 of its intention to change the rate for the extension and, if so, the new rate, up to the maximum rate, at which the contract will be extended. Absent notice from Transporter, rates shall remain unchanged through the contract extension period.

C. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter's FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Paragraph 8.A, above provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter's FERC Gas Tariff and Shipper changes its Primary Delivery Point to any gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin; provided, however, Shipper shall not be permitted to change the Primary Receipt Point under this Agreement except as mutually agreed to otherwise.

D. The rate for Secondary Receipts and Deliveries within a zone that is traversed by Shipper's contract path shall be the rate and other charges set forth in Section 8.A. The rate for Secondary Receipts and Deliveries outside a zone that is traversed by Shipper's contract path shall be the rate and other charges set forth in Section 8.A plus the incremental Maximum Reservation and Commodity Rates under Rate Schedule ETS for all zones traversed that are outside the contract path.

4

Page 24: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 107784 Amendment No: 3

Except as otherwise provided herein, the mutually agreed upon rate for the use of any point not addressed in Section 8.A, 8.C, or 8.D, as well as deliveries in excess of the contract MDQ, shall be ANR's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter's Use, Dakota, Transition Costs and any other fees or surcharges under Transporter's PERC Gas Tariff.

E. In addition, if one rate component which was at or below the applicable Maximum Rate at the time this Agreement was executed subsequently exceeds the applicable Maximum Rate due to a change in Transporter's Maximum Rates so that such rate component must be adjusted downward to equal the new applicable Maximum Rate, then other rate components may be adjusted upward to achieve the agreed overall rate, as long as none of the resulting rate components exceeds the Maximum Rate applicable to that rate component. Such changes to rate components shall be applied prospectively, commencing with the date a Commission Order accepts revised tariff sheet rates. However, nothing contained herein shall be construed to alter a refund obligation under applicable law for any period during which rates that had been charged under a discount agreement exceeded rates, which ultimately are found to be just and reasonable.

F. Shipper shall be entitled to a contractual right of first refusal pursuant to Section 22 of Transporter's PERC Gas Tariff, regardless of whether Shipper might otherwise be ineligible for such right under Section 22.2 or any other section of the General Terms and Conditions of Transporter's PERC Gas Tariff.

G. Transporter will file this Agreement with PERC as an exhibit to the tariff filing made on i\- 11.- 1-oo4 . This Agreement shall be subject to PERC and Public Service

Commission of Wisconsin approval.

H. Shipper shall be entitled to elect reduction options under Section 35. I (Loss of Load) and 35.3 (Regulatory Unbundling Order) of Transporter's Tariff. To qualify for a reduction, Shipper must meet the notice, certification and/or other requirements stated in the tariff.

If Shipper reduces its delivery point requirements within the Marshfield Affected Area pursuant to Section 35.1 of Transporter's Tariff, Shipper may elect to reduce the MDQ of this Agreement by the amount of the delivery point requirement reduction.

5

Page 25: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 107784 Amendment No: 3

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed by their respective Officers or Representatives there unto duly authorized to be effective as of the date stated above.

SHIPPER: WISCONSIN GAS LLC

/~ j' I By: ()::?1#, V~t.L</)d--(~~-, \ Peter Newman

Title: ~General Manag~r-Gas Planning

Date: ·I·- · !f· l?t> <;'

TRANSPORTER: ANR PIPELINE COMPANY

By: (7~<f Title: 2/"Agent and Attorney-in-Fact

Date:

6

Page 26: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 Amendment No: 09

AMENDMENT

Date: July 22, 20 II

"Transporter'': ANR PIPELINE COMPANY

"Shipper'': WISCONSIN GAS LLC

ETS Contract No. 107784 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective the later of November 1, 2013, or, upon the in-service date of Transporter's Marshfield Reduction Project Facilities ("MRP Facilities"), as described in the settlement agreement dated March 28, 20 ll and filed with the Federal Energy Regulatory Commission ("FERC") in Docket No. RP I 0-517 ("Settlement Agreement") ("Amendment No. 9 Effective Date"), which is necessary to provide the services hereunder as follows:

I) As of the Amendment No.9 Effective Date, Shipper and Transporter have agreed to replace Section 4. TERM OF AGREEMENT in its entirety with the following:

The term of this Agreement will continue through October 31, 2023.

2) Shipper and Transporter have agreed to replace Section 5. RATES in its entirety with the following:

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as referenced in the Further Agreement Section of this Agreement.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to participate fully in rate or other proceedings by intervention or otherwise to contest increased rates in whole or in part.

3) Shipper and Transporter have agreed to replace Section 7. NOTICES in its entirety with the following:

All notices can be given by telephone or other electronic means, however, such notice shall be confirmed in writing at the addresses below or through GEMStm. Shipper or Transporter may change the "'ddresses below by written notice to the other without the necessity of amending this agreement:

Page 27: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

TRANSPORTER:

ANR Pipeline Company 717 Texas Street, Suite 2500 Houston, Texas 77002-2761 Attention: Commercial Services

SHIPPER:

WISCONSIN GAS LLC 333 W. Everett Street- A308 Milwaukee, Wisconsin 53203 Attention: RICHARD QUICK

Telephone: Fax:

414-221-5345 262-523-7908

INVOICES AND STATEMENTS:

WISCONSIN GAS LLC 231 W. Michigan Street- PSB-P277 Milwaukee, Wisconsin 53203 Attention: GLORIA GRABARCZYK

Telephone: Fax:

414-221-2408 262-523-7910

Contract No: 107784 Amendment No: 09

4) Shipper and Transporter have agreed to replace Section 8. FURTHER AGREEMENT in its entirety with the following:

A. The rate for the Prhnary Route MDQ as listed in the attached Prhnary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of$4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter's FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter's Use (Fuel%) and EPC Charge (Electtic Power Cost) in accordance with Transporter's FERC Gas Tariff.

Secondary Receipt(s): Secondary Delivery(ies):

All ML 7 Receipts All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November I, 2013, and will continue through October 31, 2023 ("MRP Facilities Cost Recovery Period").

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

2

Page 28: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: I 07784 Amendment No: 09

a) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] + 12 months. Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper's share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

b) If the in-service date of the MRP Facilities occurs later than November !, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

c) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the frrst monthly surcharge payment will be prorated based on the number of days remaining in the month.

d) Transporter will collect this Surcharge through Shipper's contract No. 108014.

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter's Use (Fuel%) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter's FERC Gas Tariff.

D. Shipper shall be entitled to the Right of First Refusal provided for in Section 6.22 of the General Terms and Conditions of Transporter's FERC Gas Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2.

E. Shipper and Transporter have agreed to move the primary receipt point for contract MDQ to Will County (246067). The effective date of the move will be the frrst day of the next month that is at least 30 days after the in-service date of the MRP Facilities (but not earlier than November I, 2013); provided, however, in the event the effective date would occur during the months of November through March, Shipper shall have the right to elect to delay the effective date of the move until the next April I. Shipper will have the right to request to move the primary receipt point for all or part of the capacity back to Marshfield at any time subject to the provisions of Transporter's Tariff.

F. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter's FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Section 8.A, of this Agreement provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter's FERC Gas Tariff and Shipper changes its Primary Delivery Point to any gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin.

1 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% ("Cost Factor") to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

3

Page 29: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: I 07784 Amendment No: 09

All other terms and conditions of the Agreement shall remain in full force and effect.

WISCONSIN GAS LLC

~:~ipp~r~

Title: _ _,s..,c"'o""tt"""'C""."'M~o""s"c-che:-n-.a'""',.------­Manooe'?as Supply

Date: ~-"C)::._:_"i?'/'-" //.'-'6~7L4-~~~~~~~-~~ -m ~/

4

Page 30: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 Amendment No: l 0

AMEl'IDMENT

Date: October 14, 2013

- "Transporter": ANR PIPELINE COMPANY

"Shipper": \V1SCONSiN GAS LLC

ETS Contract No. 107784 dated J1me 26, 2002 ("Agreement") between Transporter and Shipper is amended eftect.ive November 0 l, 2013 as follmvs:

, COl\'TRACT.QUANTITIES:

Sl1ipper and Transporter have agreed to cbange the Primary Receipt Point f:fom Will County Int. (246067) to AJliance/ ANR Int. (277072). An updated Primary Route Exhibit reflecting this change is attached.

All oilier terms and conditions of'the Agreement shall remain in full force and effect

ANR PIPELINE COMPANY

"Tnwsporter/}~ --·

Bv: lL-~ · " Gary ar tte .

Title: DireVRJW~~ffi~6?~~~ ~gffc~~ns

Date: ----~~~-JJ:-_. -------·· /)J1IJ IO ft5" /{; ~ J0-28-13 t~ ,o-~1 --t3

Page 31: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: Amendment No:

AMENDMENT

107784 II

Date: Mny OS, 2016

"Transporter": ANR PIPELINE COMPANY

"Shipper": WlSCONSlN GAS LLC .

TITS Contract No. 107784 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective November 01, 2016 as follows:

l)

2) 4.

3) 5,

Shipper and Transporter l1ave agreed to decrease the MDQ under this Agreement fi'om 14,000 dth to 1 J ,000 dth. An updated PJ·imary Route Exhibit rellecting this change is altached.

TERM OF AGREEMENT: (amended and restated in its entirety)

November I, 2003 to

October 31,2023

Right of First Refusal:

Contractual (in accordance with Section 6.22 of the Gener<1l Terms and Conditions of Transporter's Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2)

RA. TES: (amended nud restated in Hs entirety)

Maximum rates, charges, and fees shall be applicable for the entillcments and quantities delivered pursuant to this Agreement unless Transpot1cr and Shipper have agreed otherwise as provided herein.

It is further agreed that Transporter may seek authorization ftom the Commission and/o1· other appropriate body at any time and from lime to time to change arty rates, charges or othe1· provisions in the applicable Rate Schedule and General Terms and Conditions of Transpotier's Tariff, nnd Transpo11er shall have the right to place such changes In effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of low and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gns Act, lnchrding the right to participate fully in rate or other proceedings by intervention or otherwise to contest changes in rates in whole or in part.

Page 32: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 Amendment No: ll

A The rate for the Primmy Route MDQ as listed in the attached Primary Route Exhibit and secondrtry receipts/deliveries as listed below shall ben Fixed Monthly Reservalion Rate of $4.858 per dth and a Fixed Commodity Rate of$0.0075. This rate shall be inclusive of any other fees or surcbal'gcs under TrnnSJlOrter's FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transpotier's Use (Fuel %) and EPC Charge (Electric Power Cost) in accordance with Transporter's PERC Gas Tariff.

SecondnryReceipt(s): All lvlL 7 Receipts Secondary Dei ivery(ies): All ML 7 Deliveries

B. The MRP Facilities cost' recovery period shall c01mnence on tlte in-service dat~ of the MRP Facilities, but 1nno event prior to November 1, 2013, and will continue through October 31, 2023 ("MRP Facilities Cost Recovery Period").

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an lncrement!ll monthly surcharge en leu Ia ted as follo\vs:

a) The incremental monthly surcharge in the aggregate will bo based on the following formula: (actual MRP Facilities construction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] + 12 months. Based on this formula and assuming 1111 MRP Facilities capital cost of $25 million, the resulting incremental monthly surchnrge in the aggregate is calculated to be $ 144,687,50 per month and Shipper's share is cnlculated to be:

Wisconsin Gns Share 32.15% or $46,517.03 per month

b) If the in-service date of the .MRJl Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will tnko place in the period commencing with the in-service date of the MRP Facilities and continuing tluough October 31, 2023.

c) If the MRP F!leilities Cost Recovery Period doe~ not commence on the first day of a month, the first monthly surcharge payment will be prorated based on the number of days remaining in the month.

d) Transporter will collect this Surcharge through Shipper's contract No. 108014.

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transpmier's Use (F11el %) ;:md EPC Charge (Electric Power Cost) and 'any other fees or surcharges under Transporter's FERC Gas Tariff.

1 The parties to the Settlement Agreement ogreed to use a f.1ctor equal to 13.89% ("Cost .Factor") to detennine the incremental monthly surcharge payment applicable to the Complainants in the Settlement .Agreement.

2

Page 33: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

<I) 8.

Contrnct No: 1 0'1784 Amendment No: l J

FUllTHRR A GUBEMENT: (nmcndcd ond t'cstntcd In Jts entirety)

A. Shlj)pcr nnd Transporter have agreed to move thu pdm11ry rccolpt· po lut Lot· controct1viDQ to Will Co"nty (24 6067). The effective dale of the move wlll bo the iirst dny of tho next month thnt is nt leant 30 dnys nner• the ln-servico dote of the MRP Fncllltlcs (but not cm·llcr than November l, 20 13); _l)l'OVJded, however, Ju the OVCI\l IJ1c effectiVe dnte \YOU[d OCClll' during the IHOillhs or Novcrnb~r through Murch, Shipper shall have the right lo elect to dclny lite oflcctlvo dole of thu move \llllil the next April I. Shipper· will hnve the ri'ghl to request to move the prinwy receipt point fol' nll or pmt of the cnpnoity bnck to Marshfield "' any time subject to tho provisions of Trnnsportcr·'s Tnrltf. 5' .tl)rf\ gB

B. Shipper shnll hove the right to chungc thu Pri111ary Dcll~·ry Point in nc~ordnnvo with TransJlOrlcr's FERC Ons Tariff as it mny he in effect fi·om tim ·to-time nnd 'frnnsportcr l\utl\cr ogt·ecs thol Shlflpc\r shall retoin the rater. set fortll in Scotlon . . A, of this Agreement lli'OVI<I~d Ship pet• ls nwarded lts requc~ted chnnged Delivery l'olnt in nccordnncc with Transporter's FERC Gas Tnl'ifl' <mel Shipper· chnngcs Its Primary Delivery Poiut to nny gulc stnllon or group of gate stations opcrntcd by Shipper und/or Wisconsin meet ric !'ower Co111pnny In the Stole of Wisconsin.

All other terms nud condltfons of tho AgrecmcHt shnllrcm~ln in full force nnd effect·,

WTSCONGGAS LLC 11 Shi[>l)Cl' 11

' \

By: j.~. ) ""--' ,, '9 :·:J Tltlo: Brian Marozas

Manager Dn to: --PiaftftiRg--&-Gontroet~----

~)-:'r/ I~~ ANR PIPELINE COM ANY

lly:

Tiller ___ Director, Commerclnl Services

Dntc: ~ '/.7--/~

~u ut~ft4

3

Page 34: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 PRIMARY ROUTE EXHIBJT Rate Schedule: ETS

To Agreement Between Contract Date: Juno 26, 2002 ANRPIPELINE COMPANY (Tnmspol'tet•) Amendment Date: May05, 2016 AND W1SCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS·GRP 1

FROM: April 01.2023 TO: October 31, 2023

277072 139255 0 11000 0 ALLfANCE/ANRJNT WISC GAS-GRP I

FROM: November 0 I, 2022 TO: March 31, 2023

277072 139255 0 0 0 ALLIANCE/ ANR JNT WlSC GAS-GRP 1

FROM: April 0 I, 2022 TO: Octo bet· 31, 2022

277072 139255 0 1)000 0 ALUANCE/ANR INT WISC GAS-GRP 1

FROM: November 01, 2021 TO: March 31, 2022

277072 139255 0 0 0 ALUANCE/ANR INT WISC GAS-GRP 1

FROM: April 01,2021 TO: October 31, 2021

277072 139255 0 11000 0 ALLfANCE/ANRJNT WISC GAS-GRP 1

FROM: November 01,2020 TO: March 31, 2021

277072 139255 0 0 0 ALLCANCE/ ANR INT WISC GAS-GRP 1

FROM: April 0 I, 2020 TO: October 31, 2020

277072 139255 0 11000 0 ALLIANCE/ANR !NT WISC GAS·GRP 1

FROM: November 01,2019 TO: March 31, 2020

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP I

FROM: April 01, 2019 TO: October 31, 2019

277072 139255 0 11000 0 ALLIANCE/ANRINT WISC GAS-GRP 1

FROM: November OJ, 2018 TO: March 31,2019

Page 35: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rnto Schedule: ETS

To Agreement Between Contract D«te: June 26, 2002

ANR PIPELINE COMPANY (Trunsportcr) Amendment Dote: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

277072 139255 0 0 0

ALLTANCE/ANRINT WISC GAS-GRP l FROM: April 01,2018 TO: October31, 2018

277072 139255 0 11000 0

ALLTANCE/ANR TNT WISC GAS-GRP 1 FROM: November 01,2017 TO: March 31,2018

277072 139255 0 0 0

ALLIANCE/ANR !NT WISC GAS-GRP 1 FROM: April 01, 2017 TO: October 31, 2017

277072 139255 0 11000 0

ALLIANCE/ ANR fNT WISC GAS-GRP I FROM: November 01, 2016 TO: March 31,2017

277072 139255 0 0 0

ALLIANCE/ANR INT WlSC GAS-GRP 1 FROM: April 01, 2016 TO: Octobet' 31,2016

277072 139255 0 14000 0

ALLIANCE/ ANR INT WISC GAS-GRP 1 FROM: November 0 I, 2015 TO: March 31,2016

277072 139255 0 0 0

ALLfANCE/ANR 1NT WISC GAS-GRP l FROM: April 01,2015 TO: October 31, 2015

277072 139255 0 14000 0

ALLIANCE/ ANR INT WISC GAS-GRP 1 FROM: November 01,2014 TO: March 31,2015

277072 1392.5-5 0 0 0

ALLIANCE/ANR.INT WISC GAS-GRP 1

FROM: April 01,2014 TO: October 31, 2014

277072 139255 0 14000 0

ALLIANCE/ ANR INT WISC GAS-GRP 1 FROM: November 01,2013 TO: March 31,2014

28873 139255 0 0 0

MARSHFJELDNIKING !NT WJSC GAS-GRP 1 FROM: April 01,2013 TO: October 31, 2013

2

Page 36: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 J>RIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agt·eemcnt Between Contract Dnte: June 26, 2002 ANR PJPELINE COMPANY (Transporter) Amendment Dale: May05, 2016 AND WISCONSiN GAS LLC (ShlpJler)

Receipt Delivery Annual Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GR.P l

FROM: November 01,2012 TO: March 31,2013

28873 139255 0 0 0 MARSHFIELD/VIKING lNT WISC GAS-GJU' I

FROM: April01,~012 TO: October 31,2012

28873 139255 0 14000 0 MARSHFIELD/VIKING !NT WISC GAS-GRP 1

FROM: November 0 l, 20 II TO: March 31, 2012

28873 139255 0 0 0 MARSHFffiLDNIKTNG INT WISC GAS-GlU' I

FROM: April 01, 2011 TO: October 31, 20 I J

28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP I

FROM: November OJ, 2010 TO: March 31,2011

28873 139255 0 0 0 MARSHFIELDNIK!NG JNT WJSC GAS-GR.P 1

FROM: April01,20LO TO: October 31, 2010

28873 139255 0 14000 0 MARSHFlELDNCKING INT WJSC GAS·GR.P I

FROM: November 011 2009 TO: March 311 2010

28873 139255 0 0 0 MARSHFIELDNIKTNG TNT WISC GAS-GR.P 1

FROM: April 01, 2009 TO: October 31 1 2009

28873 139255 0 14000 0 MARSHFlELDNIKING !NT WISC GAS-GRP l

FROM: November 0 I, 2008 TO: March 31 1 2009

28873 139255 0 0 0 MARSHFIELDNIKING JNT WISC GAS-GRP 1

FROM: April 01 1 2008 TO: . October 31, 2008

3

Page 37: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784 PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Dntc: June 26, 2002 ANR PIPELINE COMPANY (Transporter) Amendment Dnte: May05,2016 AND WISCONSIN GAS LLC (Shlppe1·)

Receipt Delivery Annual Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

28873 139255 0 14000 0 MARSHFIELDIVIKTNO INT WISC GAS-GRP 1

FROM: November 01, 2007 TO: March31, 2008

28873 139255 0 0 0 MARSHFIELDIVIKJNG INT WISC GAS-GRP J

FROM: April OJ, 2007 TO: October31, 2007

28873 139255 0 14000 0 MARSHFIELD/VIKING !NT WISC GAS-GRP 1

FROM: November 01, 2006 TO: March 31, 2007

28873 139255 0 0 0 MARSHFJELDIVJKJNG TNT WISC GAS-GRP 1

PROM: April OJ, 2006 TO: October 31, 2006

28873 139255 14000 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP l

FROM: November 01, 2004 TO: March 31, 2006

28873 139376 14000 0 0 MARSHFIELD/VIKING INT WISC GAS-ORP 2

FROM: November 0 I, 2003 TO: Octo bet· 31, 2004

Page 38: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

ANR Pipeline Company PART 9.27 FERC Gas Tariff 9.27 – NC/Neg Rate Agmt Third Revised Volume No. 1 Wisconsin Gas LLC ETS Agmt (#108014)

v.3.0.0

Issued: November 1, 2016 (Option Code A) Effective: November 1, 2016

Enhanced Transportation Service Agreement Rate Schedule ETS

Wisconsin Gas LLC

(#108014)

Amendment No. 03 Effective Date: April 1, 2006 (Amended and Restated Agreement) Amendment No. 09 Effective Date: November 1, 2013 Amendment No. 11 Effective Date: November 1, 2014 Amendment No. 12 Effective Date: November 1, 2016

Page 39: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 108014 Amendment No: 3

ETS SERVICE AGREEMENT

This AMENDED AND RESTATED AGREEMENT ("Agreement") is entered into by ANR PIPELINE COMPANY (Transporter) and WISCONSIN GAS LLC (Shipper), on i:'if;/J~?i'r// become effective upon the later of i) April I, 2006 or, ii) the Effective Date of the tariff filing dated . The provisions contained in this Amended and Restated Agreement represent the agreement between the parties; in its entirety and upon becoming effective supersedes any prior agreements associated with services provided hereunder, inc! uding the agreement with the same contract number dated! June 26, 2002.

WHEREAS, Shipper has requested Transporter to transport Gas on its behalf and Transporter represents that it is willing to transport Gas under the terms and conditions of this Agreement.

NOW, THEREFORE, Transporter and Shipper agree that the terms below, together with the terms and conditions of Transporter's applicable Rate Schedule and General Terms and Conditions of Transporter's FERC Gas Tariff constitute the transportation service to be provided and the rights and obligations of Shipper and Transporter.

I. AUTHORITY FOR TRANSPORTATION SERVICE: (284B =Section 311; 284G =Blanket)

2840

2. RATE SCHEDULE: Enhanced Transportation Service (ETS)

3. CONTRACT QUANTITIES:

Primary Route- see Exhibit attached hereto.

Such Contract Quantities shall be reduced for scheduling purposes, but not for billing purposes, by the Contract Quantities that Shipper has released through Transporter's capacity release program for the period of any release.

4. TERM OF AGREEMENT:

The term of this Agreement shall commence on April 0 I, 2006 and shall continue in full force and effect each Winter Period through March 31,2010, and for the Winter period of every year thereafter unless terminated by Shipper upon three (3) years prior written notice.

Page 40: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004

5. RATES:

Contract No.: 108014 Amendment No: 3

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as referenced in the Further Agreement Section of this Agreement.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's FERC Gas Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to participate fully in rate or other proceedings by intervention or otherwise to contest changes in rates in whole or in part.

6. INCORPORATION BY REFERENCE:

The provisions of Transporter's applicable Rate Schedule and the General Terms and Conditions of Transporter's FERC Gas Tariff are specifically incorporated herein by reference and made a part hereof.

7. NOTICES:

All notices can be given by telephone or other electronic means, however, such notices shall be confirmed in writing at the addresses below or through GEMStm· Shipper and Transporter may change the addresses below by written notice to the other without the necessity of amending this Agreement:

TRANSPORTER:

ANR PIPELINE COMPANY 1 001 Louisiana HOUSTON, TX 77002 Attention: TRANSPORTATION SERVICES

2

Page 41: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 108014 Amendment No: 3

SHIPPER:

WISCONSIN GAS LLC 333 WEST EVERETT STREET -A308 MIL WAUKEE, WI 53203 Attention: RICHARD QUICK

Telephone: Fax:

414-221-5345 414-221-5351

INVOICES AND STATEMENTS:

WISCONSIN GAS LLC 333 WEST EVERETT STREET -A308 MIL WAUKEE, WI 53203 Attention: BOB PLATTETER

Telephone: Fax:

414-221-2895 414-221-5351

8. FURTHER AGREEMENT:

A. ETS Reservation rate: Notwithstanding anything to the contrary in Section 5, the rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit during the primary term hereof, shall be the lesser of the Transporter' maximum tariff rates or the rates below:

Term Monthly Reservation Rate Commodity Rate April I, 2006 through March 31, 2007 $4.8580 (100% LF rate: $0.1672) $0.0075 per Dth April 1, 2007 through March 31, 2008 $4.5560 (I 00% LF rate: $0.1573) $0.0075 per Dth April I, 2008 through March 31, 20 I 0 $4.2540 (I 00% LF rate: $0.1474) $0.0075 per Dth

These discounted rates shall be inclusive of all surcharges except Governmental Authority Surcharges, as defined below. Shipper shall be charged ACA and Transporter's Use (Fuel) in accordance with Transporter's FERC Gas Tariff. Governmental Authority Surcharges are surcharges that are mandated by FERC or by another regulatory body to be recovered from Shipper, and similarly situated shippers, are applied on a uniform basis to all interstate natural gas pipelines, and are required to be remitted to a governmental authority or a third party. The ACA surcharge would consti1tnte a Governmental

3

Page 42: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 108014 Amendment No: 3

Authority Surcharge that Transporter is entitled to collect. New surcharges that are specific to Transporter's system and/or that have any relationship to the costs of operating Transporter's pipeline system, storage facilities, etc. and/or that have any relationship to costs paid by Transporter for services on other pipeline systems are not Governmental Authority Surcharges. In the event Transporter is required to charge Shipper a rate higher than a rate set forth in this Section 8.A due to the imposition of a charge that is not a Governmental Authority Surcharge, and in the event Transporter and Shipper do not otherwise agree, the Monthly Reservation Rate set forth herein shall be reduced by the amount of the difference between the higher rate and the rate set forth in this Section 8.A.

B. The rates listed above shall be in effect through the initial term of the contract. For periods after the initial term, Transporter will provide written notice ninety (90) days prior to date Shipper is required to provide notice of termination to Transporter pursuant to Article 4 of its intention to change the rate for the extension and, if so, the new rate, up to the maximum rate, at which the contract will be extended. Absent notice from Transporter, rates shall remain rmchanged through the contract extension period.

C. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter's FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Paragraph 8.A, above provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter's FERC Gas Tariff and Shipper changes its Primary Delivery Point to any gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin; provided, however, Shipper shall not be permitted to change the Primary Receipt Point under this Agreement except as mutually agreed to otherwise.

D. The rate for Secondary Receipts and Deliveries within a zone that is traversed by Shipper's contract path shall be the rate and other charges set forth in Section 8.A. The rate for Secondary Receipts and Deliveries outside a zone that is traversed by Shipper's contract path shall be the rate and other charges set forth in Section 8.A plus the incremental Maximum Reservation and Commodity Rates under Rate Schedule ETS for all zones traversed that are outside the contract path.

Except as otherwise provided herein, the mutually agreed upon rate for the use of any point not addressed in Section 8.A, 8.C, or 8.D, as well as deliveries in excess of the contract MDQ, shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter's Use, Dakota, Transition Costs and any other fees or surcharges under Transporter's FERC Gas Tariff.

4

Page 43: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 108014 Amendment No: 3

E. In addition, if one rate component which was at or below the applicable Maximum Rate at the time this Agreement was executed subsequently exceeds the applicable Maximum Rate due to a change in Transporter's Maximum Rates so that such rate component must be adjusted downward to equal the new applicable Maximum Rate, then other rate components may be adjusted upward to achieve the agreed overall rate, as long as none of the resulting rate components exceeds the Maximum Rate applicable to that rate component. Such changes to rate components shall be applied prospectively, commencing with the date a Commission Order accepts revised tariff sheet rates. However, nothing contained herein shall be construed to alter a refund obligation under applicable law for any period during which rates that had been charged under a discount agreement exceeded rates, which ultimately are found to be just and reasonable.

F. Shipper shall be entitled to a contractual right of first refusal pursuant to Section 22 of Transporter's FERC Gas Tariff, regardless of whether Shipper might otherwise be ineligible for such right under Section 22.2 or any other section of the General Terms and Conditions of Transporter's FERC Gas Tariff.

G. Transporter will file this Agreement with FERC as an exhibit to the tariff filing made on 1\ -I '2. ~1-oo4 . This Agreement shall be subject to FERC and Public Service

Commission of Wisconsin approval.

H. Shipper shall be entitled to elect reduction options under Sections 35.1 (Loss of Load) and 35.3 (Regulatory Unbundling Order) of Transporter's Tariff. To qualify for a reduction, Shipper must meet the notice, certification and/or other requirements stated in the tariff.

If Shipper reduces its delivery point requirements within the Marshfield Affected Area pursuant to Section 35.1 of Transporter's Tariff, Shipper may elect to reduce the MDQ of this Agreement by the amount of the delivery point requirement reduction.

5

Page 44: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Date: September 27, 2004 Contract No.: 108014 Amendment No: 3

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed by their respective Officers or Representatives there unto duly authorized to be effective as of the date stated above.

SHIPPER: WISCONSIN GAS LLC

B v)! 11 /()J, vil-y: ( 'J..t:r...fy·_." / v . .-t-IA./)-"7' .......- Vi

Peter Newman Title: General Mana er-Gas Plannin

Date: 2 ·· ;Y · · 2co;.-

TRANSPORTER: ANR PIPELINE COMPANY

By: ~.,,~~_£ Title: agent and Attorney-in-Fact

Date:

6

Page 45: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 Amendment No: 09

AMENDMENT

Date: July 22, 2011

"Transporter": ANR PIPELINE COMPANY

"Shipper": WISCONSIN GAS LLC

ETS Contract No. 108014 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective the later of November 1, 2013, or, upon the in-service date of Transporter's Marshfield Reduction Project Facilities ("MRP Facilities"), as described in the settlement agreement dated March 28, 2011 and filed with the Federal Energy Regulatory Commission ("FERC") in Docket No. RP!0-517 ("Settlement Agreement") ("Amendment No.9 Effective Date"), which is necessary to provide the services hereunder as follows:

1) As of the Amendment No.9 Effective Date, Shipper and Transporter have agreed to replace Section 4. TERM OF AGREEMENT in its entirety with the following:

The term of this Agreement will continue through October 31, 2023.

2) Shipper and Transporter have agreed to replace Section 5. RATES in its entirety with the following:

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as referenced in the Further Agreement Section of this Agreement

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to participate fully in rate or other proceedings by intervention or otherwise to contest increased rates in whole or in part.

3) Shipper and Transporter have agreed to replace Section 7. NOTICES in its entirety with the following:

All notices can be given by telephone or other electronic means, however, such notice shall be confirmed in writing at the addresses below or through GEMSrm. Shipper or Transporter may change the addresses below by written notice to the other without the necessity of amending this agreement

1

Page 46: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

TRANSPORTER:

ANR Pipeline Company 717 Texas Street, Suite 2500 Houston, Texas 77002-2761 Attention: Commercial Services

SHIPPER:

WISCONSIN GAS LLC 333 W. Everett Street- A308 Milwaukee, Wisconsin 53203 Attention: RICHARD QUICK

Telephone: Fax:

414-221-5345 262-523-7908

INVOICES AND STATEMENTS:

WISCONSIN GAS LLC 231 W. Michigan Street- PSB-P277 Milwaukee, Wisconsin 53203 Attention: GLORIA GRABARCZYK

Telephone: Fax:

414-221-2408 262-523-7910

Contract No: 108014 Amendment No: 09

4) Shipper and Transporter have agreed to replace Section 8. FURTHER AGREEMENT in its entirety with the following:

A. The rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of$4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter's FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter's Use (Fuel%) and EPC Charge (Electric Power Cost) in accordance with Transporter's FERC Gas Tariff.

Secondary Receipt(s): Secondary Delivery(ies):

All ML 7 Receipts All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November I, 2013, and will continue through October 31, 2023 ("MRP Facilities Cost Recovery Period").

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

2

Page 47: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 Amendment No: 09

a) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities-cost percentage· agreed to by· the -parties to the Settlement· Agreement)]+ 12 months.· Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper's share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

b) If the in-service date of the MRP Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

c) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the frrst monthly surcharge payment will be prorated based on the number of days remaining in the month.

d) Transporter will collect this surcharge through this Agreement.

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter's Use (Fuel%) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter's FERC Gas Tariff.

D. Shipper shall be entitled to the Right of First Refusal provided for in Section 6.22 of the General Terms and Conditions of Transporter's FERC Gas Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2.

E. Shipper and Transporter have agreed to move the primary receipt point for contract MDQ to Will County (246067). The effective date of the move will be the first day of the next month that is at least 30 days after the in-service date of the MRP Facilities (but not earlier than November 1, 2013); provided, however, in the event the effective date would occur during the months of November through March, Shipper shall have the right to elect to delay the effective date of the move until the next April I. Shipper will have the right to request to move the primary receipt point for all or part of the capacity back to Marshfield at any time subject to the provisions of Transporter's Tariff.

F. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter's FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Section 8.A, of this Agreement provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter's FERC Gas Tariff and Shipper changes its Primary Delivery Point to any·gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin.

1 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% ("Cost Factor") to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

3

Page 48: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 Amendment No: 09

All other tenns and conditions of the Agreement shall remain.in fulL force and effect.

WISCONSIN GAS LLC

"Shippe~"

By: ·~L ~~.~oschea

::::: ~as Supply

ANR PIPELINE COMPANY "Transporter"

By: ~~~./h..·/. Title: p Director,· Commercial Sexvices

Date: 9/ ~:Jl / 11

4

Page 49: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

ConttactNo: !08014 Amendment No: 11

AMENDMENT

Date: August 19, 2014

"Transporter'': ANRPIPELINE COMPANY

"Shipper": WISCONSIN GAS LLC

ETS Contract No. 1 0&014 dated June 26, 2002 ("Agreement") bet\veen Transpmter and Shipper !s amended effective November 01, 2014 as follmvs:

Shipper and Transporter have agreed to change the Primary Receipt Point from Alliance (277072) to Will County (246067). An updated Primary Route Exhibit reflecting this change is attached.

AU other terms and conditions ~f the Agreement shal I rem a~ in. ful I force ap.d effect.

WISCONSIN GAS LLC

::~PP""~ 71

scott c. Moschea pak /V Title: ----~:::-:;-;--...:---o-:--:--:-----

0 Date: Manager Gas Supply /J · ~ ANR PIPELINE COMPANY

By:

Title: -'-,c._~==:i..::::~~=~=~~--

Date: 9/ ..:~.y }y

#1)3 f: 11-b /ltf

1

Page 50: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 Amendment No: 12

AMENDMENT

Date: May 05, 2016

"Transporter": ANR PIPELINE COMPANY

"Shipper": WISCONSIN GAS LLC

ETS Contract No. lOBO 14 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective November 0 I, 2016 as follows:

1)

2) 4.

3) 5.

Shipper and Transpmter have agreed to increase the MDQ tmder t11is Agreement fi·om 18,500 dth to 21,500 dth. An 11pdated Primary Route Exhibit reflecting this change is attached.

TERIH OF AGREEMENT: (amended and restated in its entirety)

November 1, 2003 to

October 31, 2023

Right of First Refusal:

Contractunl (in accordance with Section 6.22 of the General Terms and Conditions of Transporter's Tariff, notwithstanding the fact that Shipper WO\tld otherwise be ineligible for tlus rlgltt under Section 6.22.2)

RATit:S: (amended and restated in its entirety)

Mnximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transpo1ter and Shipper lmve agreed otherwise as provided herein.

It is fmther agreed that Transporter may seek authorizntion from the Commission ancVor other appropriate body nt any time and from time to time to change a11y rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transpot1er's Tariff, and Trnnsporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operatio.n of !nw nnd Commission order. Nothing cont11ined herein shall be constrned to deny Shipper any rights it may have under the Natural Gas Act, including the right to pa11lcipate fully in rate or othet· proceedings by intervention or otherwise to contest changes in Iates in whole or in port.

Page 51: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 Amendment No: 12

II.. The rate for the Primary Route MDQ as listed in the attached Primary Route ExJ1ibit and secondary receipts/deliveries as listed below shnll be a Fixed Monthly Reservation Rate of $4.858 per dth. and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcllargcs. under Transporter's FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter's Use (Fuel %) nnd EPC Charge (Electric Power Cost) in accordance with Transporter's FERC Gas Tariff.

Secondary Receipt(s): All ML 7 Receipts Secondary Dclivery(ics): All ML 7 Deliveries

B. The MRP Facilities cost recove1y period shall commence on the in-service date of the MRP Facilities, but in uo event prior to November 1, 2013, and will continue through October 31, 2023 ("MRP Facilities Cost Recovery Period"). .

During the MRP Facilities Cost Recove1y Period, Shipper agrees to pny an incremental monthly surcharge calculated as follows:

a) The incremental monthly surclH1rge in the aggregate will be based on the following formula: [actual MRP Facilities const111ction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] + !2 months. Based on this formula and assuming an MRP Facilities capital cost of S25 rolllion, the resulting Incremental monthly surcharge bl !he aggregate is calculated to be $144,687.50 per month and Shipper's share is calculnted to be:

Wisconsin Gas Share 32.15% or $46,517.03 per mouth

b) If the in-service date of the MRP Facilit ies occurs Inter than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recove1y wiii take place in the period commencing with the in-service date of tile MRP Facilities and continuing through October 31, 2023,

c) If the MRP Fncj)jtics Cost Recovery Period does not conunence on the fLrst day of a month, the first monthly surcharge payment will be prorated based on th.e number of days remaining In the month.

d) Transporter will collect this Surcharge through this Agreement.

C. The mutually agreed upon rate for the usc of any point not listed in Paragraph A above shall be Transporter's Maximum Applicable Reservation and Maximum Applicable Commodity l{atcs under ETS service. In addition, Shipper shall be charged ACA, Transp01ter's Use (Fuel %) nnd EPC Chmge (Electric Power Cost) and any other fees or surcharges under Transporter's FERC Gas Tariff.

1 Tl1e p<u1ies to the Settlement Agreement agreed to usc n factor equnl to 13.89% C'Cost Factor") to detennine the incremental monthly surch~rge payment applicable to tho Complainants in the Settlement Agreement.

2

Page 52: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

4) 8.

Controct No: 1 ORO I •I Amendment No: 12

li'URTHEit AGREEMENT: (mnendcd 1md rcslntcd in its cuth'<lty)

A. Shipper nnd TJnnsporte1' hnve ngrecd fo move the pr!mHty receipt point fo r contract MDQ to Will County (24GOG7). The effecti ve <Into of the move wlll be tho first dny of tho next month tlml is nl least 30 days after the In-service date of tho MRP Focll itlcs (but not earlier than Novcmb~1· I, 20 13}; provided, however, ln the evant tho effcctlvo dote wou ld cccm· during tho months of Novombet: thl'Ough March, Shipper ~hu ll have tho xlghl to elect to clclny the offcctlvo date of' the move until the 11oxt April 1. Shippc!' wlll hove the right lo request to move the prl mnry receipt point for nil ot· t>nrt of the capacity back to Mnr.~hneld nt nny time subject to the provisions of Ttansporter's Tmin: 5 f?.::;tf\ fJ;

B. Shipper shnll hnve tho 1lght to clulllgc the· Prlmnry DolivcJy Point lH nccordnnco wlth Trnusporter's ]1ERC Ons Tnl'itT ns It mny be Jn effect Jl·om time· o-tlmc and Transporter f\trthcr ngrcc$ tllut Shlppe1· shnll retain the rntes set forth in Scctlon_rA, of this Agreement provided Shipper is awarded its requested chnngcd Doli very Point J.n nccordnnc~ wllh Trnnsportor's JIHRC Gns Tnrlff nnd· Shipper ohnnges Its Primary Dcllvcry·PoJnt to uny gate station or group of gate Rfations operated by Shipper nncl/or \Visconsin Electric Power Company in the Stutc of Wisconsin.

All other terms ancl conditions of tho Agreement shu II rcnwil1 ~t 1itll force nud effect.

WISCONS0,JN ~S LLC "Shlppct•" AI.

~-· I J ··'- t/ '\ .. --. liy: --lj'~___::x.;--_ _ _ Title: _Br!an.Mamzas'-(~_) ______ .

Manager Da tc: ---ptannJng-&eontraots-- - --

. S' IJ--·-:1- I{ ), ANR. J>ll.'ELINE COMl' A~ Y

Title: Director, CommerQial Servlces

3

Page 53: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contmcl No: 108014 PRIMARY ROUTE EXHIUIT Rnte Schedule: ETS

To Agreement Between Contract Date: June 26, 2002 ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05,2016 AND WISCONSIN GAS LLC (Sltipper)

Receipt Delivery Annun1 Winter Summer Location Location MDQ MDQ MDQ Name Nnmo (DTH) (DTH) (DTH)

246067 139255 0 0 0 WILL COUNTY !NT WISC GAS-GRP 1

FROM: April 0 l, 2023 TO: October 3 I, 2023

246067 139255 0 21500 0 WILL COUNTY INT WJSC OAS-ORP 1

PROM: November 01,2022 TO: March 31, 2023

246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP I

FROM: April 0!, 2022 TO: October 31, 202-2

246067 139255 0 21500 0 WILL COUNTY INT WISC OAS-GRP I

FROM: November 01,2021 TO: Marclt3 1, 2022

246067 139255 0 0 0 WrLL COUNTY INT W(SC GAS-GRP l

FROM: April 01,2021 TO: October 31, 202J

246067 139255 0 21500 0 WILL COUNTY INT WJSC OAS-GRP I

FROM: NovemberOl, 2020 TO: March 31, 2021

246067 139255 0 0 0 WILL COUNTY INT WJSC OAS-GRP 1

FROM: April 01, 2020 TO: October 31, 2020

246067 139255 0 2 1500 0 WILL COUNTY lNT WISC GAS-GRP I

FROM: NovemberOI, 2019 TO: M11rch 31, 2020

246067 139255 0 0 0 WILL COUNTY TNT WJSC OAS-GRP 1

FROM: April01,2019 TO: October 31, 2019

246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1

FROM: November 01,2018 TO: March 31,2019

Page 54: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Controct No: 108014 PRIMARY ROUTE EXHIDIT Rate Schedule: ETS

To Agreement Between Contract Dnte: June 26, 2002 ANRPIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016 AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annufli Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

246067 139255 0 0 0 WILL COUNTY TNT WISC GAS-GRP 1

FROM: April 01,2018 TO: October 31, 20 18

246067 139255 0 21500 0 WILL COUNTY INT WISC OAS-ORP 1

FROM: November 01,2017 TO: Marclt31, 2018

246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP I

FROM: April 01,2017 TO: October 31, 2017

246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP I

FROM: November 01, 2016 TO: M11rch 31, 2017

2tl6067 139255 0 0 0 WILL COUNTY TNT WISC GAS-GRP I

FROM: April 01,2016 TO: October31, ·2016

246067 139255 0 18500 0 WILL COUNTY TNT WISC GAS-GRP I

FROM: November 01, 2015 TO: March31,2016

246067 139255 0 0 0 WILL COUNTYINT WISC GAS-GRP I

FROM: April 01,20 15 TO: October 3 I, 20 15

246067 139255 0 18500 0 WILL COUNTY INT WISC GAS-GRP I

FROM: November 01,2014 TO: March 31, 2015

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1

FROM: April 01,2014 TO: October31,2014

277072 139255 0 18500 0 ALLIANCE/ANR INT WISC OAS-GRP 1

FROM: NovembcrOI, 20 13 TO: March 3 J, 2014

28873 139255 0 0 0 MARSHFIELDNIKlNG INT WJSC GAS-GRP 1

FROM: April 0 I, 20 13 TO: October 31,2013

2

Page 55: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contrncl No: 108014 PRJMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agt·eement Detween Contract Date: June 26, 2002 ANR PlPELINE COMPANY (Transporter) Amendment Date: Mny 05,2016 AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS·GRP 1

FROM: November 01,2012 TO: Mnrch 31,2013

28873 139255 0 0 0 MARSHFIELD/VIKING TNT WISC GAS-ORP 1

FROM: April01, 2012 TO: October 31, 2012

28873 139255 0 18500 0 MARSHFIELD/VIKING lNT WJSC GAS-GRP I

FROM: November OJ, 2011 TO: March 31,2012

28873 139255 0 0 0 MARSHFJBLDIVIKING INT WlSC GAS-GRP I

FROM: April 01,2011 TO: October 31, 2011

28873 139255 0 18500 0 MARSHFIELDIVU<.ING TNT WfSC GAS-GRP I

FROM: November OJ, 2010 TO: March 31,201 1

28873 139255 0 0 0 MARSHF.IELDIVIKTNG TNT WlSC GAS-GRP 1

FROM: April 01,2010 TO: Octobcr3 1, 2010

28873 139255 0 18500 0 MARSHFIELD/VIKING INT WJSC OAS-GRP l

FROM: November 0 I, 2009 TO: March 31,2010

28873 139255 0 0 0 :tvlARSHFIELD/VlKING INT WISC GAS·GRP 1

FROM: Apl'il 01,2009 TO: October 31,2009

28873 139255 0 18500 0 MARSHFIELDIVIKlNG INT WISC OAS-GRP 1

FROM: November 01, 2008 TO: Mnrch 31, 2009

28873 139255 0 0 0 MARSHFI.ELDIVIKING INT WJSC GAS·GRP I

PROM: April 01,2008 TO: October 3 L, 2008

3

Page 56: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014 PlUMARY ROUTE EXHIDIT Rate Schedule: ETS

To Agreement llctwccn Contract Date: June 26, 2002 ANR PIPELINE COMPANY (Transpol'ter) Amendment Date: Mny 05,2016 AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Amilia! Winter Summer Location Location MDQ MDQ MDQ Name Name (DTH) (DTH) (DTH)

28873 139255 0 18500 0 MARSHFIELDIVJKING INT W!SC GAS-GRP I

FROM: November 01,2007 TO: March 31, 2008

28873 139255 0 0 0 MARSHFIELD/VIKING lNT WISC GAS-GRP l

FROM: April OJ, 2007 TO: October 31, 2007

28873 139255 0 18500 0 MARSHFIELD/VlKING INT WISC GAS-GRP 1

FROM; November 01, 2006 TO: March 31, 2007

28873 139255 0 0 0 MARSHFIELD/VIKING !NT WfSC GAS-GRP l

FROM: April 01,2006 TO: October 31 , 2006

28873 139255 18500 0 0 MARSHFIELD/VIKING lNT WI~C GAS-GRP 1

FROM: November 01,2004 TO: March 31, 2006 ·

28873 139376 18500 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 2 .

FROM: November 0 l, 2003 TO: October 31, 2004

4

Page 57: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Appendix B

ANR Pipeline Company

Marked Amendments

1) Wisconsin Public Service Company Rate Schedule ETS Service Agreement #111864 Amendment No. 4 1) Wisconsin Gas LLC Rate Schedule ETS Service Agreement #107784 Amendment No. 10 2) Wisconsin Gas LLC Rate Schedule ETS Service Agreement #108014 Amendment No. 11

Page 58: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 111864

Amendment No: 04

AMENDMENT

Date: October 19, 2016

"Transporter'': ANRPIPELINE COMPANY

"Shipper": WISCONSIN PUBLIC SERVICE CORPORATION

ETS Contract No. 111864 dated October 06, 2005 ("Agreement") between Transporter and Shipper is amended effective November 01,2016 as follows:

Shipper and Transporter have agreed to change the Primary Receipt Point under this Agreement to Alliance/ANR Int (277072).

An update Primary Route Exhibit reflecting this change is attached.

All other terms and conditions of the Agreement shall remain in full force and effect.

WISCONSIN PUBLIC SERVICE CORPORATION "Shipper"

By: ___________________________________________ Title: ___________________________________________ Date: ___________________________________________ ANR PIPELINE COMPANY "Transporter" By: ___________________________________________ Title: _______Director, Commercial Services______ Date: ___________________________________________

Page 59: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

PRIMARY ROUTE EXHIBIT Contract No: 111864

Rate Schedule: ETS To Agreement Between Contract Date: October 06, 2005

ANR PIPELINE COMPANY (Transporter) Amendment Date: October 19,2016 AND WISCONSIN PUBLIC SERVICE CORPORATION (Shipper)

Receipt Location Name

Delivery Location Name

Annual MDQ (DTH)

Winter MDQ (DTH)

Summer MDQ (DTH)

277072 ALLIANCE/ANR INT

FROM: November 01, 2016

139258 WPSC - GROUP I

TO: October31,2017

7000 0 0

246067 WILL COUNTY !NT

FROM: November 01,2015

139258 WPSC- GROUP I

TO: October 31,2016

7000 0 0

277072 139258 ALLIANCE/ANRINT WPSC- GROUP I

FROM: November 01,2007 TO: October 31, 2015

7000 0 0

Page 60: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

Amendment No: 11

AMENDMENT Date: May 05, 2016 “Transporter”: ANR PIPELINE COMPANY “Shipper”: WISCONSIN GAS LLC

ETS Contract No. 107784 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective November 01, 2016 as follows: 1) Shipper and Transporter have agreed to decrease the MDQ under this Agreement from 14,000 dth

to 11,000 dth. An updated Primary Route Exhibit reflecting this change is attached. 2) 4. TERM OF AGREEMENT: (amended and restated in its entirety)

The term of this Agreement will continue through October 31, 2023 November 1, 2003 to October 31, 2023 Right of First Refusal: Contractual (in accordance with Section 6.22 of the General Terms and Conditions of Transporter’s Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2)

3) 5. RATES: (amended and restated in its entirety)

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as provided herein.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to

1

Page 61: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

Amendment No: 11

participate fully in rate or other proceedings by intervention or otherwise to contest changes in rates in whole or in part.

A. The rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of $4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter’s FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) in accordance with Transporter’s FERC Gas Tariff.

Secondary Receipt(s): All ML 7 Receipts Secondary Delivery(ies): All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November 1, 2013, and will continue through October 31, 2023 (“MRP Facilities Cost Recovery Period”).

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

a) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] ÷ 12 months. Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper’s share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

b) If the in-service date of the MRP Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

c) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the first monthly surcharge payment will be prorated based on the number of days remaining in the month.

d) Transporter will collect this Surcharge through Shipper’s contract No. 108014.

1 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% (“Cost Factor”) to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

2

Page 62: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

Amendment No: 11

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter’s Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter’s FERC Gas Tariff.

4) 8. FURTHER AGREEMENT: (amended and restated in its entirety)

A. The rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of $4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter’s FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) in accordance with Transporter’s FERC Gas Tariff.

Secondary Receipt(s): All ML 7 Receipts Secondary Delivery(ies): All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November 1, 2013, and will continue through October 31, 2023 (“MRP Facilities Cost Recovery Period”).

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

e) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%2 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] ÷ 12 months. Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper’s share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

f) If the in-service date of the MRP Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

2 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% (“Cost Factor”) to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

3

Page 63: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

Amendment No: 11

g) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the first monthly surcharge payment will be prorated based on the number of days remaining in the month.

h) Transporter will collect this Surcharge through Shipper’s contract No. 108014.

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter’s Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter’s FERC Gas Tariff.

D. Shipper shall be entitled to the Right of First Refusal provided for in Section 6.22 of the General Terms and

Conditions of Transporter’s FERC Gas Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2.

A. Shipper and Transporter have agreed to move the primary receipt point for contract MDQ to Will County (246067). The effective date of the move will be the first day of the next month that is at least 30 days after the in-service date of the MRP Facilities (but not earlier than November 1, 2013); provided, however, in the event the effective date would occur during the months of November through March, Shipper shall have the right to elect to delay the effective date of the move until the next April 1. Shipper will have the right to request to move the primary receipt point for all or part of the capacity back to Marshfield at any time subject to the provisions of Transporter’s Tariff.

B. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter’s FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Section 8.A, of this Agreement provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter’s FERC Gas Tariff and Shipper changes its Primary Delivery Point to any gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin.

All other terms and conditions of the Agreement shall remain in full force and effect. WISCONSIN GAS LLC "Shipper" By: ___________________________________________ Title: ___________________________________________ Date: ___________________________________________

4

Page 64: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

Amendment No: 11

ANR PIPELINE COMPANY "Transporter" By: ___________________________________________ Title: _______Director, Commercial Services______ Date: ___________________________________________

5

Page 65: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2023 TO: October 31, 2023 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2022 TO: March 31, 2023 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2022 TO: October 31, 2022 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2021 TO: March 31, 2022 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2021 TO: October 31, 2021 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2020 TO: March 31, 2021 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2020 TO: October 31, 2020 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2019 TO: March 31, 2020

1

Page 66: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2019 TO: October 31, 2019 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2018 TO: March 31, 2019 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2018 TO: October 31, 2018 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2017 TO: March 31, 2018 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2017 TO: October 31, 2017 277072 139255 0 11000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2016 TO: March 31, 2017 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2016 TO: October 31, 2016 277072 139255 0 14000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2015 TO: March 31, 2016

2

Page 67: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2015 TO: October 31, 2015 277072 139255 0 14000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2014 TO: March 31, 2015 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2014 TO: October 31, 2014 277072 139255 0 14000 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2013 TO: March 31, 2014 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2013 TO: October 31, 2013 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2012 TO: March 31, 2013 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2012 TO: October 31, 2012 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2011 TO: March 31, 2012

3

Page 68: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2011 TO: October 31, 2011 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2010 TO: March 31, 2011 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2010 TO: October 31, 2010 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2009 TO: March 31, 2010 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2009 TO: October 31, 2009 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2008 TO: March 31, 2009 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2008 TO: October 31, 2008 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2007 TO: March 31, 2008

4

Page 69: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 107784

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2007 TO: October 31, 2007 28873 139255 0 14000 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2006 TO: March 31, 2007 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2006 TO: October 31, 2006 28873 139255 14000 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2004 TO: March 31, 2006 28873 139376 14000 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 2 FROM: November 01, 2003 TO: October 31, 2004

5

Page 70: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

Amendment No: 12

AMENDMENT Date: May 05, 2016 “Transporter”: ANR PIPELINE COMPANY “Shipper”: WISCONSIN GAS LLC

ETS Contract No. 108014 dated June 26, 2002 ("Agreement") between Transporter and Shipper is amended effective November 01, 2016 as follows:

1) Shipper and Transporter have agreed to increase the MDQ under this Agreement from 18,500 dth

to 21,500 dth. An updated Primary Route Exhibit reflecting this change is attached. 2) 4. TERM OF AGREEMENT: (amended and restated in its entirety)

The term of this Agreement will continue through October 31, 2023 November 1, 2003 to October 31, 2023 Right of First Refusal: Contractual (in accordance with Section 6.22 of the General Terms and Conditions of Transporter’s Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2)

3) 5. RATES: (amended and restated in its entirety)

Maximum rates, charges, and fees shall be applicable for the entitlements and quantities delivered pursuant to this Agreement unless Transporter and Shipper have agreed otherwise as provided herein.

It is further agreed that Transporter may seek authorization from the Commission and/or other appropriate body at any time and from time to time to change any rates, charges or other provisions in the applicable Rate Schedule and General Terms and Conditions of Transporter's Tariff, and Transporter shall have the right to place such changes in effect in accordance with the Natural Gas Act. This Agreement shall be deemed to include such changes and any changes which become effective by operation of law and Commission order. Nothing contained herein shall be construed to deny Shipper any rights it may have under the Natural Gas Act, including the right to

1

Page 71: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

Amendment No: 12

participate fully in rate or other proceedings by intervention or otherwise to contest changes in rates in whole or in part.

A. The rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of $4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter’s FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) in accordance with Transporter’s FERC Gas Tariff.

Secondary Receipt(s): All ML 7 Receipts Secondary Delivery(ies): All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November 1, 2013, and will continue through October 31, 2023 (“MRP Facilities Cost Recovery Period”).

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

a) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%1 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] ÷ 12 months. Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper’s share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

b) If the in-service date of the MRP Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

c) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the first monthly surcharge payment will be prorated based on the number of days remaining in the month.

d) Transporter will collect this Surcharge through this Agreement.

1 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% (“Cost Factor”) to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

2

Page 72: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

Amendment No: 12

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter’s Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter’s FERC Gas Tariff.

4) 8. FURTHER AGREEMENT: (amended and restated in its entirety)

A. The rate for the Primary Route MDQ as listed in the attached Primary Route Exhibit and secondary receipts/deliveries as listed below shall be a Fixed Monthly Reservation Rate of $4.858 per dth and a Fixed Commodity Rate of $0.0075. This rate shall be inclusive of any other fees or surcharges under Transporter’s FERC Gas Tariff. In addition, Shipper shall be charged any applicable ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) in accordance with Transporter’s FERC Gas Tariff.

Secondary Receipt(s): All ML 7 Receipts Secondary Delivery(ies): All ML 7 Deliveries

B. The MRP Facilities cost recovery period shall commence on the in-service date of the MRP Facilities, but in no event prior to November 1, 2013, and will continue through October 31, 2023 (“MRP Facilities Cost Recovery Period”).

During the MRP Facilities Cost Recovery Period, Shipper agrees to pay an incremental monthly surcharge calculated as follows:

e) The incremental monthly surcharge in the aggregate will be based on the following formula: [actual MRP Facilities construction costs (capped at $25 million) x 13.89%2 (Cost Factor) x 50% (MRP Facilities cost percentage agreed to by the parties to the Settlement Agreement)] ÷ 12 months. Based on this formula and assuming an MRP Facilities capital cost of $25 million, the resulting incremental monthly surcharge in the aggregate is calculated to be $144,687.50 per month and Shipper’s share is calculated to be:

Wisconsin Gas Share 32.15% or $46,517.03 per month

f) If the in-service date of the MRP Facilities occurs later than November 1, 2013, the incremental monthly surcharge shall not be adjusted but recovery will take place in the period commencing with the in-service date of the MRP Facilities and continuing through October 31, 2023.

g) If the MRP Facilities Cost Recovery Period does not commence on the first day of a month, the first monthly surcharge payment will be prorated based on the number of days remaining in the month.

h) Transporter will collect this surcharge through this Agreement.

2 The parties to the Settlement Agreement agreed to use a factor equal to 13.89% (“Cost Factor”) to determine the incremental monthly surcharge payment applicable to the Complainants in the Settlement Agreement.

3

Page 73: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

Amendment No: 12

C. The mutually agreed upon rate for the use of any point not listed in Paragraph A above shall be Transporter’s Maximum Applicable Reservation and Maximum Applicable Commodity Rates under ETS service. In addition, Shipper shall be charged ACA, Transporter’s Use (Fuel %) and EPC Charge (Electric Power Cost) and any other fees or surcharges under Transporter’s FERC Gas Tariff.

D. Shipper shall be entitled to the Right of First Refusal provided for in Section 6.22 of the General Terms and

Conditions of Transporter’s FERC Gas Tariff, notwithstanding the fact that Shipper would otherwise be ineligible for this right under Section 6.22.2.

A. Shipper and Transporter have agreed to move the primary receipt point for contract MDQ to Will County (246067). The effective date of the move will be the first day of the next month that is at least 30 days after the in-service date of the MRP Facilities (but not earlier than November 1, 2013); provided, however, in the event the effective date would occur during the months of November through March, Shipper shall have the right to elect to delay the effective date of the move until the next April 1. Shipper will have the right to request to move the primary receipt point for all or part of the capacity back to Marshfield at any time subject to the provisions of Transporter’s Tariff.

B. Shipper shall have the right to change the Primary Delivery Point in accordance with Transporter’s FERC Gas Tariff as it may be in effect from time-to-time and Transporter further agrees that Shipper shall retain the rates set forth in Section 8.A, of this Agreement provided Shipper is awarded its requested changed Delivery Point in accordance with Transporter’s FERC Gas Tariff and Shipper changes its Primary Delivery Point to any gate station or group of gate stations operated by Shipper and/or Wisconsin Electric Power Company in the State of Wisconsin.

All other terms and conditions of the Agreement shall remain in full force and effect.

WISCONSIN GAS LLC "Shipper" By: ___________________________________________ Title: ___________________________________________ Date: ___________________________________________ ANR PIPELINE COMPANY "Transporter" By: ___________________________________________ Title: _______Director, Commercial Services______ Date: ___________________________________________

4

Page 74: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2023 TO: October 31, 2023 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2022 TO: March 31, 2023 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2022 TO: October 31, 2022 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2021 TO: March 31, 2022 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2021 TO: October 31, 2021 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2020 TO: March 31, 2021 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2020 TO: October 31, 2020 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2019 TO: March 31, 2020

1

Page 75: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2019 TO: October 31, 2019 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2018 TO: March 31, 2019 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2018 TO: October 31, 2018 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2017 TO: March 31, 2018 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2017 TO: October 31, 2017 246067 139255 0 21500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2016 TO: March 31, 2017 246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2016 TO: October 31, 2016 246067 139255 0 18500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2015 TO: March 31, 2016

2

Page 76: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

246067 139255 0 0 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: April 01, 2015 TO: October 31, 2015 246067 139255 0 18500 0 WILL COUNTY INT WISC GAS-GRP 1 FROM: November 01, 2014 TO: March 31, 2015 277072 139255 0 0 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: April 01, 2014 TO: October 31, 2014 277072 139255 0 18500 0 ALLIANCE/ANR INT WISC GAS-GRP 1 FROM: November 01, 2013 TO: March 31, 2014 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2013 TO: October 31, 2013 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2012 TO: March 31, 2013 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2012 TO: October 31, 2012 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2011 TO: March 31, 2012

3

Page 77: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2011 TO: October 31, 2011 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2010 TO: March 31, 2011 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2010 TO: October 31, 2010 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2009 TO: March 31, 2010 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2009 TO: October 31, 2009 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2008 TO: March 31, 2009 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2008 TO: October 31, 2008 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2007 TO: March 31, 2008

4

Page 78: Negotiated Rate Amendments - ANR Pipelineanrebb.transcanada.com/.../anr_negotiated_rate_amendments.pdf · Negotiated Rate Amendments Docket No. RP17- - . Dear Ms. Bose: Pursuant to

Contract No: 108014

PRIMARY ROUTE EXHIBIT Rate Schedule: ETS

To Agreement Between Contract Date: June 26, 2002

ANR PIPELINE COMPANY (Transporter) Amendment Date: May 05, 2016

AND WISCONSIN GAS LLC (Shipper)

Receipt Delivery Annual Winter Summer

Location Location MDQ MDQ MDQ

Name Name (DTH) (DTH) (DTH)

28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2007 TO: October 31, 2007 28873 139255 0 18500 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2006 TO: March 31, 2007 28873 139255 0 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: April 01, 2006 TO: October 31, 2006 28873 139255 18500 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 1 FROM: November 01, 2004 TO: March 31, 2006 28873 139376 18500 0 0 MARSHFIELD/VIKING INT WISC GAS-GRP 2 FROM: November 01, 2003 TO: October 31, 2004

5