Needs Assessment & Master PlanSavage Field
Needs Assessment & Master Plan Results
Proposed Plan
Costs
Needs
Safety Issues
About Savage Field
Environmental Impact
Discussion Points
Proposed Plan
Gale Associates Hired in Fall 2013 to conduct assessment
& survey property Needs Assessment & Master Plan
completed May 2014 $9,000 funded through Revolving Fund Two plans presented along with complete
facility evaluation & feasibility study
Proposed Plan Reconstruct Softball field in new location Renovated Little League field New parking area for 77 cars Athletic field lighting for all amentities Skatepark, Playground/Splash Pad, Deck
hockey Rink, and picnic pavillion Walking path around property
Consulting Services $45,000 Town Meeting Article Covers phases 1-4 (of 5 phases) for consulting services for proposed Master Plan
Phase 1 – Background Investigation, Facility Assessment & Survey Phase 2 –Program Development, Schematic Design, and Cost estimates Phase 3 – Design Development and Preparation of Contract Documents Phase 4 – Permitting Assistance Services (Conservation Commission, Town of Clinton Planning Board, Tennessee Gas Co., NPDES
General Permit, Railroad Easement)
Project Construction ~$1,653,700.00 to complete Conceptual Layout Option 2 PARC Grant Funding, private donations, & Town funds would be sought for construction phase Project could be divided into phases if needed Varying costs include Skatepark & Playground design and materials
Ongoing Maintenance Existing Field Maintenance Costs – watering, mowing, fertilizing New Maintenance Costs – Safety Inspections, Playground & Splash Pad repairs
Income Potential Establish fee structure for all leagues & teams that use and rent fields New program development – tournaments, skate park events, recreational activities Parties, Functions, Special Events
Costs
Park Facilities EvaluationResults from Needs Assessment:• Turf on both fields is in fair condition
• Standing water an issue on both infields – neither field has formal under drainage system
• Backstop and all fencing in poor condition
• Spectator Seating at both fields in poor condition with no ADA accessibility
• Both pitching and home plate areas in poor condition
• Dugouts in poor condition
• Field Lighting is outdated and not meeting safety lighting standards for play
• No organized parking for park
• Skatepark in poor condition
• Basketball in good condition – recently re-built
• Electrical Shed in good condition
Overall, the fields & other park amenities are all in poor to fair condition. Safety hazards are present, ADA requirements are not being met, and
programming needs are not being served.
Needs
Player Wellbeing
Structural soundness of existing amenities
Site Security
ADA Requirements
Lighting
Safety Issues
Savage Field is located at the intersection of Water Street & Vale Street. It has home to many youth baseball and adult softball games, as well as recreational basketball and skate boarding.
Total Savage field property: ~7 acres Maintained and managed by Parks & Recreation department Current property used for recreation purposes Property located within 100-year flood zone of Nashua River Tennessee Gas Line runs through property with easement
restrictions Old Railroad bed runs through property with easement
restrictions
About Savage Field
Drainage improvements Parking improvementsLight “spillage” improved with new lighting
systemVisual IntegritySite SecurityEasement restrictions
Environmental Impact