93
1

Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

1

Page 2: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 3: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Nebraska Asphalt Update

Updates Longitudinal Joint Density

Notched Wedge and Beveled Edge Thin Lift Overlay – SLX

Non-Nuclear Testing Warm Mix Update

New Topics

SRM Mix Hot Pour Sealers

Bridge Deck Membranes Superpave Software

UNL Research

3

Page 4: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Longitudinal Joint Density

Page 5: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Longitudinal Joint Density

Page 6: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Longitudinal Joint Density %

DEN

SITY

DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 7 8 9 10 11 12

Cold Side (Unconfined) Hot Side (Confined)

Pavers 2nd Pass

Confined Joint

Unconfined Joint Pavers 1st Pass

Page 7: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Why does it Matter?

“For every 1% drop in density, relative fatigue life decreases by 8-20%”

-NCHRP Report

Page 8: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Why does it Matter?

15 Years

14-15 Years

12-13 Years

11-12 Years

8-9 Years

Page 9: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

NDOR Specification

Average of 5 ≥ 92.5%

Edge Core Gets 2.5% Increase 3750 Tons of Asphalt

5 Cores

2014

Joint Density Test Lot Pay Factor Joint Density SPS SPR SPH 93.0 or greater 102% 102% 102% 92.0 to 92.9 100% 102% 102% 91.0 to 91.9 98% 100% 102% 90.0 to 90.9 98% 98% 100% 89.0 to 89.9 98% 98% 98% 88.9 or Less 98% 98% 98%

Page 10: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

86

87

88

89

90

91

92

93

94

95

SPH SPR SPS

AVG

. JO

INT

DEN

SITY

(%)

MIX TYPE

2014 AVG. JOINT DENSITY

92.0%

92.3% 91.4%

Page 11: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

75.0

80.0

85.0

90.0

95.0

100.0

JOIN

T DE

NSI

TY (%

)

SPR

2014 Joint Density

Page 12: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

75.0

80.0

85.0

90.0

95.0

100.0

JOIN

T DE

NSI

TY (%

)

SPH

2014 Joint Density

Page 13: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

75.0

80.0

85.0

90.0

95.0

100.0

AVG

. JO

INT

DEN

SITY

SPS

2014 Joint Density

Page 14: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

• Critical to Maintain Best Practices – May seem simple, yet most aren’t doing all of it

• Still see bridging, end gates up, etc.

• Two things every contractor should have: – Notched Wedge Joint – Non-Nuclear Gauge

• Nice Job done by the Industry

Page 15: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Random Sampling Schedule (RSS)

Page 16: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Notched Wedge & Beveled Edge

Page 17: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

The Notched Wedge at Centerline

The Beveled Edge on outside Edge

Page 18: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

The Notched Wedge

Page 22: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

The Beveled Edge

Page 25: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Thin Lift Overlays - SLX

Page 26: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Thin Lift Overlays - SLX

• 300 Miles • 13 Projects

• All 8 Districts

Page 27: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Thin Lift Overlays - SLX

• 1 Inch thickness • ¼ “ Minus Aggregate

• PG 64-34 • 20-35% Fractionated RAP

Page 28: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Thin Lift Overlays - SLX

• More coming soon !

Page 29: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Non-Nuclear Testing

Page 30: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

NDOR Going Non-Nuclear

• PQI (Asphalt Density) • LWD ( Soils Density)

Page 31: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Pavement Quality Indicator (PQI)

• Test run according to AASHTO TP 68 and as

directed • First 3 density locations on project cored

for correction factor, every 15th density after that

• Average of 5 readings at each location:

• Any density reading below 90% will require a core cut to be used for density at that location

Page 32: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Lightweight Deflectometer (LWD)

90

92

94

96

98

100

102

104

0 1 2 3 4 5 6 7 8

% C

ompa

ctio

n

Deflection (mm)

% Comp vs Save

% Comp vs Save

Log. (% Comp vs Save)

• Non-Nuclear • Testing and Acceptance based on Moisture and Deflection • Each District in 2013 • Implementation over next 2 years

Page 33: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Soil Moisture Testing Kit

Page 34: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Warm Mix Asphalt Update

Page 35: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

WMA Update

• 85% of Projects utilized WMA • Over 1.5 Million Tons

• 95% Evotherm • 5% Water-Foaming

2014

Page 36: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

WMA Update

• New Approved Additive: Cecabase RT 945 • Chemical Additive – Similar to Evotherm

• Utilized on Hwy. 75 – Decatur South

Approved Additives: • Zeolite • Sasobit • Evotherm • Akzonobel Rediset • Cecabase RT 945

• Water Injection

Page 37: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

New Type “SRM” Mix

Page 38: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

SRM – Special (Warm) Reclamation Mix

Page 39: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

ØHot Pour Sealers

Ø Expansion Joints – Bridge Deck Overlays

ØThin Lift Overlays - SLX

Ø HFE-300/HFE-1000 Demo

Page 40: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Hot Pour Sealers

Page 41: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Hot Pour Sealers Sealant Selection Chart

NE - 3405LMNE - 3405 NE - CR18BNE - 101

XCracks

Cracks and Joints

Best when majority of cracks are longitudinal. (Tracking and Pullout Issues) X X

Selection by crack width dimension. (Routing is recommended for cracks up to 3/8")

UP TO 3/8" MORE THAN 3/8"

UP TO 1/2" ROUTING IS REQUIRED FOR THESE TWO

TYPES. ROUT FOR ANY TYPE TO 1/2" WIDE AND 3/4" - 1" DEPTH.

MEDIUM MED. - HIGH MED. - LOW LOW

OTHER PRACTICES ROUT TO 1/2" MIN. WIDE AND 5/8" MIN. DEPTH. (ONLY WITH NEWER PAVEMENT) SAWCUT CRACKS LESS THAN 1/4" WIDE.

Viscosity: Low = thin, High = thick

Concrete Pavement

For all cracks over 1/4" wide, remove old crack sealer and all foreign material by sand or air blasting. Full depth of edge surfaces need to be dry and clean.

X X

Bituminous Pavement

Longitudinal Joint of Mainline to Bituminous Shoulder X

X X X

• Eliminated CR22

• 4 Sealers Available • Most Common are CR-18B

and NE 3405

Page 42: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Expansion Joints – Bridge Deck Asphalt Membrane Overlays

Page 43: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 44: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 45: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 46: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 47: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 48: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 49: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 50: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Bridge Deck Membranes

Page 51: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

300 + Bridges

over next 2 years

Page 52: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

2 Options: 1) Prep with

Primer 2) Hot Applied

Page 53: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Looking at going back to allowing

pick up machines ?

Page 54: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Looking at going back to allowing

pick up machines ?

Page 55: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 56: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 57: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 58: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Membrane

Page 59: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Plug Joint

Page 60: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 61: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 62: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 63: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 64: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 65: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 66: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 67: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Asphalt Bridge Deck Plug Joint

On Project or District Wide ???

Page 68: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

2015 Research Areas of Study

Page 69: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

UNL Research Group out on project

Page 70: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Tack Coat Research

Page 71: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

• Emulsions • Emulsifiers • Cut Rates • Hot Applied PG

Binders • Bonding • Cohesion • Adhesion

Tack Coat Research

Page 72: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Thin Lift SLX vs Standard Lifts of SPH • ¾ to 1 inch lifts • Compare 2 inch • Life Cycle • Better fit for

overlays that have continuous Concrete Repair Problems

Page 73: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Rejuvenators for use in Hot Mix and RAP intensive Mixes

1. Natural Bio-Mass Product Name: Hydrogreen

Page 74: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Rejuvenators for use in Hot Mix and RAP intensive Mixes

2. Petroleum Based Maltene Phase Balancer Name: Hydrolene

Page 75: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Rejuvenators for use in Hot Mix and RAP Mixes

3. Agricultural Based Product – Highly Refined Soybeen Oil Producer: Cargill / ADM

Page 76: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

2015 SuperPave Software

Page 77: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

About the Software: - New Format – Similar to SOT Sheets - Used to enter all Contractor Laboratory

test data. - All in one file! - 6 Lots per Tab - Includes Tabs for Density Tests

Page 78: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Control Strip

Page 79: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 80: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 81: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 82: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)
Page 83: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Post Consumer Recycle Savings from RAP in 2014

Page 84: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Ø Average % RAP in 2014 (by Mix)

0

10

20

30

40

50

SPS SPH/SLX SPR

47.1%

31.8%

41.6%

Page 85: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Ø Average RAP Contents (Overall)

0

5

10

15

20

25

30

35

40

45

2007 2009 2010 2011 2012 2013 2014

Page 86: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Ø RAP Savings ($ millions)

05

101520253035404550

2007 2009 2010 2011 2012 2013 2014

Page 87: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Projected Asphalt Tons in 2015

Page 88: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Ø Projected Tons in 2015 (1,000 tons)

00.20.40.60.8

11.21.41.61.8

2

SRM SPS SPH/SLX SPR

220 K 150 K

1,790 K

98 K

Page 89: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Projected Savings in 2015

Page 90: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Ø Projected RAP Savings ($ millions)

05

101520253035404550

2007 2009 2010 2011 2012 2013 2014 2015

Page 91: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

On Project Plan Sets in 2014

Page 92: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)

Updates

Longitudinal Joint Density Notched Wedge and Beveled Edge

Thin Lift Overlay – SLX Non-Nuclear Testing

Warm Mix Update

New Topics SRM Mix

Hot Pour Sealers Bridge Deck Membranes

Superpave Software UNL Research

Page 93: Nebraska Asphalt UpdateLongitudinal Joint Density % DENSITY DISTANCE FROM LANE EDGE (FT) 0 1 2 3 4 5 6 . 7 . 8 9 10 11 12 Hot Side (Confined) Cold Side (Unconfined)