NE REGIONAL STATISTICS AND DISCUSSION GUIDE REPORT SUMMARY
Ben BeermanRomeo GarciaKenny TongAbe RamirezFHWA PBES Implementation Team
1
2
7 Habits of highly successful people
Habit # 3 Start with the end in mind!
Steven Covey 10/24/32 – 7/16/12
Overview• Regional Characteristics• Policy • Safety• Design/Materials related slides• Research and Outreach • Success Stories • Recommendations for FHWA/Research• Round Table Discussion Questions• Next Steps 4
Regional Characteristics
•Bridge functions mostly centralized
•1 to 11 Districts/Regions per State
•Variable Inventories (6% - 25% SD)
•61% State owned Bridges (48% Nat’l)
•Opportunity for Organizational Change 5
Bridge Office Organization
6
Planning
Cost Esti
mating
Final Desig
n
Maint. &
Constr.
PBES/ABC
Standards
Research
Constructi
onNone
0
1
2
3
4
5
6
7
8
Policy
Closing the Gap Between Innovation & Implementation:
•Over half of States have policies in place.
•One State has a decision making tool.
•Remaining States have various activities and initiatives in place leading towards the ultimate establishment of policy and decision making processes.
•Some Challenges to overcome
•Some possible steps to pursue 7
Challenges to Overcome
8
Change Resistance
Lack of Education
DP Not Normal Practice
No Perceived Need
Quality/Durability
No Decision Process (DP)
Local Contractor Exp.
Lack of Standards
Fiscal Constraints
0 1 2 3 4 5 6 7
Other Challenges: Contractor “Buy-In”Not Implemented @ Districts Yet
Steps towards Normal Practice
9
More Bridge Funding
Cost-Delta Funding
Training
Help w/ Formal Policy
Help w/ Decision Process
Sample Calcs, Specs, Details
PBES/ABC Cost Data
Quality/Durability Research
0 1 2 3 4 5 6 7
Project Selection Procedure
13
Yes8%
No92%
Established Policy or Procedure for Selection of ABC/PBES
Enhance Worker SafetyNationally:• 44% of Bridge Construction Worker Injuries
Involve a Vehicle Travelling Through a Work Zone (OSHA Type 1622, 1984-2010)
• 2/3 of the 44% are Fatal• 28% of Worker Injuries Involve Construction
Vehicles• No Work Zone = No Accident
16
Some PBES Products Used In NE• MSE Walls, T-Walls• NEXT Beams• New England Bulb Tee (NEBT)• CONSPAN & BEBO• Inverset Systems• Deck Panels• Precast Columns and Caps• Others
18
Allow Alternative Technical Concepts
19
Self-Consolidating Concrete
Other State's Mix Design
Other State's Standard Details
None of the above0%
10%
20%
30%
40%
50%
60%
70%
80%
Materials
20
Self-consolidating concrete
UHPC
High early strength concrete
High early strength grouts
Rapid set overlays
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Prefab Certification
21
Not Applicable
In plant w/o Cert.
Near site w/o Cert.
On site w/o Cert.
On site w/ Cert.
Near site w/ Cert.
In Plant w/ Cert.
0 2 4 6 8 10 12
SIP Deck Forms• Types used in the region– Galvanized Steel– Steel Pans– Corrugated Metal– Concrete Panels– Any other?
24
25
Research and Outreach
• Interest in peer review of fabrication processes and procedures
• Interest in participating in scanning tours
• Public Relations – generally proactive
Media Relations
28
Social Media
Mass Media
311/511
Text Messaging
E-mail Alerts
VMS
Websites
Press
Newsletters
Public Meetings
0% 20% 40% 60% 80% 100% 120%
Recommendations for FHWA
• Allow flexibility in use of proprietary products• Allow use of UHPC in connections• Facilitate stakeholder meeting/ABC
implementation issues• Provide information on costs, details, & examples
from other States• Develop new technologies
31
Recommendations for FHWA Cont.
• Continue Showcases & Peer Exchanges• Training• Support for Pilot/Demonstration Projects• Cost-Delta Assistance (100% participation)• Provide status report on condition of completed
projects
32
Needed Research• Performance of ABC/PBES projects• Determination of deck panel size/shipping limits• Synthesis on Lessons learned from ABC/PBES
projects• Development of refined/objective decision making
matrix • Emulative and non-emulative connections • High early strength concrete & joint performance
issues• Longitudinal joint performance & connection detail 33
Needed Research Cont. • Overlay materials on longitudinal joints & performance of
overlay material• Durable connections details- design specification for
ABC/PBES projects• Match up technology with appropriate State needs.• Use of alternative construction materials/ bridges on low
volume local roads• Thin Bonded Polymer Overlay Service Life• Connection Strength• Decision Making Process/Policy• Customer satisfaction surveys 34
35
Round Table Questions• ABC/PBES project experience in NE• Increase project cost associated with ABC• Criteria other States use to select ABC projects• Joint Details• Ways to reduce cost of ABC/PBES construction• UHPC performance based spec for rapid set conc.• Contract language to enforce deadlines• Lane rental specs• QC/QA for prefab elements
36
Round Table Questions Cont.• How to handle contractor self-performing work• ABC/PBES difficulties tied to IBRD or HFL projects
(FHWA reporting requirements etc)• Performance of existing bridges with longitudinal
joints including overlay materials. What to avoid!• During superstructure replacement using steel
girders/beams share experience on anchor bolt.• Experience on any differential movement of
superstructure during transportation of using SPMT with remote control.
38
Next Steps
• Continue dialogue on items of mutual interest
• Establish/Maintain - Partnerships/Networks
• Organize and pursue a scanning tour
• Develop action plans
• Continue moving forward!
39
Vision
Expect the unexpected manifestation of the expected. Expectation foreshadows experience. Expect new things. Prepare for change, and it will come----and maybe suddenly.
Mettabel Okulaja, MD