NDIA SED Meeting February 12th, 2014

1

Systems Security EngineeringCommittee

February 2014

Holly Coulter Dunlap, RaytheonBeth Wilson, Raytheon

Industry Co-Chairs

Page 2: NDIA SED Meeting February 12 th, 2014 1 Systems Security Engineering Committee February 2014 Holly Coulter Dunlap, Raytheon Beth Wilson, Raytheon Industry

NDIA SED Meeting February 12th, 2014

2

Summary of SSE Committee2014 Plans

Topic Activity

SSE

PPP Workshop Follow-on to 2012 Workshop scheduled May 19-23Focus on Taxonomy, Metrics, & DT&E

Industry Inputs Comments on guideline documentsInputs into PPP implementation

INCOSE SSE Collaboration with INCOSE SSE on NIST SP 800-160

SED

Systems of Systems 2014: PPP leverage points in the SoS Wave Model

Developmental Test and Evaluation

2014: Cyber testing guidelines connections to Program Protection Planning (after PPP workshop and DT&E cyber testing guidelines project completion)

Completed Current Proposed

NEW

Page 3: NDIA SED Meeting February 12 th, 2014 1 Systems Security Engineering Committee February 2014 Holly Coulter Dunlap, Raytheon Beth Wilson, Raytheon Industry

NDIA SED Meeting February 12th, 2014

3

Date: May 19 – 22Location: Mitre, McLean, VA

Highlights:Day 1: • Half Day PPP Tutorial Session

Day 2: • Key Note from OSD SE & CIO• Deputy Director PPP• General Briefs from SwA, Supply Chain,

Anti-tamper Executive Agent• NIST 800-160 SSE SP • 3 Breakout Groups Ran in Parallel

(Supply Chain, AT, SwA)• Focus on Education & Awareness, Taxonomy

SSE Committee PPP Workshop 2014

Day 3: • Key Note from Service• Service Briefs or Panel Session TBD• DT&E Brief• 3 Breakout Groups Ran in Parallel

(Supply Chain, AT, SwA)• Focus on Metrics• Focus on RFP Language

Day 4:• 3 Breakout Groups Ran in Parallel

(Supply Chain, AT, SwA)• DT&E

• Out Brief from each Group• OSD & Service Response• Next Steps• Closing

Planning notes & thoughts:

Discussion on the breakout session groups. Since AT is more mature than the other 2 PPP disciplines, considering changing to “Process for CPI Identification and Horizontal Protection”.

DR

AF

TS

ub

jec

t T

o C

ha

ng

e

Page 4: NDIA SED Meeting February 12 th, 2014 1 Systems Security Engineering Committee February 2014 Holly Coulter Dunlap, Raytheon Beth Wilson, Raytheon Industry

NDIA SED Meeting February 12th, 2014

4

SSE Committee - 2014 Task PlanProjects Working Group

Proposed 2014 Tasks:

• PPP Implementation Workshop• Joint meetings with SED Committees

• Developmental Test and Evaluation: Connections between PPP and cyber testing guidelines

• Systems of Systems: PPP leverage points in the SoS Wave Model

Deliverables/Products

• Workshop Recommendations • NDIA SE Conference Progress Briefings• Comments on PPP related guidance

Schedule / Resources

• PPP Workshop May 19 - 22• Joint meetings with SED Committees Jun/Aug

• Developmental Test and Evaluation• Systems of Systems

Issues / Concerns:

• Encouraging military service participation and collaboration at the PPP workshop

• Requesting PPP RFP examples for the workshop.