ELECTRIC POWER
RESEARCH INSTITUTE
NDE Program update
Joe Donahue, Progress EnergyChairman, NDE APCGreg Selby, EPRIDirector, NDE
NRC/Industry Management MeetingJune 21. 2011
EPRI NDE advisory structure
- ~ ~ ~ ~-' V V - r: +;Nuclear Power - Co "mitte
Council Committee
Action PlanCommittee NDEAP VPs, senior managers
------------------------------------------------------------------ I -----------------------------------------------------------------
IntegrationCommittee
II] - I-I Supervisors and seniortechnical staff
TechnicalAdvisoryCommittees
I I IIC members
Research Compliance Technology Reliability
ELECTRIC POWER
rch Institute, Inc. All rights reserved. 2 c f f iIRSAC NTTT© 2011 Electric Power Resea
Contents
*RES/EPRI MOU
* Cast stainless steel
* Dissimilar metal welds NDE reliability
amI._ I 1 ELECTRIC POWERRESEARCH INSTITUTE
© 2011 Electric Power Research Institute, Inc. All rights reserved. 3
Regulatory collaboration
* Memorandum of Understanding
- Between EPRI and RES
- Several topical Addenda
* Addendum on NDE
- Several Attachments
* Visual examination
* Cast austenitic stainless steel
o UT/RT for repairs, replacements, and modificationse Documentation of the basis for Appendix VII
e RMSE - ID pipe examinations depth sizing
-Biweekly coordination call
ELECTRIC POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. 4 c I'~ I2 I RESEARCH INSTITUTE
Regulatory collaboration
*Addendum on NDE- Several Attachments
Visual examination
- RES conducting a round robin test on reliability ofremote visual examination for detecting cracks
- Invited industry collaboration
-Phase 1 complete- 'trial run' round robin-Phase 2 in 2012- round robin including qualified,
field examination teams
-Phase 3 in 2013 - opportunity for trying advancedtechnologies
© l o a iWEL RCINSTITUTE
Q 2011 Electric Power Research Institute, Inc. All rights reserved. aSr iIRSAC NTTTv
Cast stainless steel
o NDE is difficult but properties are good
o CASS is subject to thermal aging embrittlement
o EPRI is developing a PFM approach
- Determine the flaw size that NDE should detect
- Basis for Code changes allowing IWB-3000-style flawacceptance criteria
- Help resolve open license renewal issue faced by Wplants regarding commitments in GALL XI.M12
o EPRI contractor has requested RES provide access tounpublished background data held at ANL
ELECTRIC POWER
©2011 Electric Power Research Institute, Inc. All rights reserved. 6 = 1aI2 I RESEARCH INSTITUTE
Cast stainless steel
" RES proposed a trade
- EPRI provide all of the resulting work generated usingthe ANL data - e.g., all supporting documents andcalculations
" Industry is receptive - transmit data to RES at end 2011
" Now discussing:
- Definition of what RES will receive
- Legal aspects
IP* How to transmit the information to NRC (RES
proposed modifying the MOU)
EEI C POWER© 2011 Electric Power Research Institute, Inc. All rights reserved. RESEARCH INSTITUTE
Dissimilar metal weld NDE reliability
9 ASME Section XI, Appendix VIII qualified procedures are capableof performing high quality reliable examinations
Numerous examinations have been performed and the largemajority of flaws detected were effectively evaluated, repairedor mitigated
* Industry has several completed, executing, and proposedactivities to support continuous improvement
- Technical capability of the workforce
- Smoothness of industry response
ELECTRlc POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. 8 =I = I RESEARCH INSTITUTE
Industry actions for continuous improvement
Completed actions- 1) Dissimilar metal weld guideline was developed and published in June 2009
Nondestructive Evaluation: Guideline for Conducting Ultrasonic Examinations ofDissimilar Metal Welds; product ID 1018181; public
- 2) Several similar and dissimilar metal weld samples have been fabricated thatcontain embedded flaws; available for practice and training
- 3) NDE capability for embedded fabrication flaws was evaluated and thedocumented to support changes to the Section III acceptance criteriaAdvanced Nuclear Technology: Reduction of American Society of MechanicalEngineers Ill Weld Fabrication Repairs - Fitness for Purpose; product ID 1019217;public
- 4) Publishing OE annuallyNondestructive Evaluation: Dissimilar Metal Piping Weld Examination Guidance Volume8; product ID 1021149
- 5) Supported xLPR with statistical analysis of PDI qualification databasesMaterials Reliability Program: Development of Probability of Detection Curves forUltrasonic Examination of Dissimilar Metal Welds (MRP-262); product ID 1019088;public
ELECTRIC POWER
©2011 Electric Power Research Institute, Inc. All rights reserved. 9 ~I I I RESEARCH INSTITUTE
Industry actions for continuous improvement
Current actions- 1) Industry is preparing a Guideline for evaluating ultrasonic indications
Technical report September 2011, publicSeries of implementation workshops beginning Fall 2011
- 2) Continue to work with NRC on evaluating data in PDI databases" Currently working with RPV (for 10CFR50.61a) and weld overlay data• Future collaborations will be considered if a clear need is identified
- Data is secure and great care is needed to preserve integrity3) Continue to gather OE and transmit lessons learned to the fleetAnnual updates
" Future actions (proposed for funding in 2012)- 1) Embedded flaw NDE computer based training course- 2) Develop secure, QA'd database platform and interface to support future
statistical analyses of qualification databases
ELCTRIC POWER
©D 2011 Electric Power Research Institute, Inc. All rights reserved. 10 a f ri I RESEARCH INSTIRTUTE
Industry actions for continuous improvement
Smoothness of industry response- In isolated instances industry (utilities, Issue Programs, NRC) have
expended significant resources on ultimately inconsequentialconditions" Issue Programs and NRC begin closely monitoring before the NDE
procedure has been implemented fully
" Everyone reacts with too much energy, too quickly
- We have a 'red flag' response when we see the yellow flag
ELECTRIC POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. 1 1 aI a l RESEARCH INSTITUTE
Weld Inspection Task Flow* Non-relevant indication: Geometry, Weld
interface, etc.
* Relevant indication: Fabrication defect or
in-service defectP.1 A wfi('o I I ý I
Nlof Itoy
E , i_Nonrelevant
Indication
IPotentialRelevant
Indication
PotentialRelevant
Indication
-Gather supInformation
-Execute allanalysis atiprocedure
-Execute NEcontlngenc
NonralevantIndication
porting
the 7 Finalspe In the iK Results i'
Fabricationdefect
Was detected, 7 "\evaluated and . Section III N
accepted durlng- reords Zconstruction
In-service defect b
EPRI Report 101818NDE: Guideline for UT ofDissimilar Metal Welds
INonreleventIndication
I
ý ýPt
Not presentin records
,,"]ws•--o'\_.__RejectEvaluation/. z\
0 .. ____ uion-60r N evaluation 7
i
0,I--z0
Planning Initial Examination
03
CNNVI.. .. ..
Investigate the indication
i Nominali i ] Possibility of In-service defect or unallowable fabrication defect
Confirmed in-service defect or unallowable fabrication defect
ELECTRIC POWERF= 02 1 1RESEARCH INSTITUTE© 2011 Electric Power Research Institute, Inc. All rights reserved. 12
1 -1 LU7-
Together...Shaping the Future of Electricity
ELECTRIC POWER
©2011 Electric Power Research Institute, Inc. All rights reserved. 1 3 I 2 I RESEARCH INSTITUTE