NCR_FIN_PGPL 09082014

Embed Size (px)

Citation preview

  • 8/11/2019 NCR_FIN_PGPL 09082014

    1/64

    Legend

    Gray Auto filled fields

    peach Drop downs fields

    Yellow Text box

    BU

    Project Name

    Project Code

    S.NO NCR/FOR/FIN No

    NCR/FOR/FIN

    Date

    1 3/10/2014

    2 2/7/2014

    3 2/7/2014

    4 2/5/2014

    5 2/5/2014

    6 FIN:28 25.12.13

    7 FIN:27 18.12.13

    8 NCR:01 18.12.13

    9 FIN:26 08.12.13

    10 FIN:25 07.12.13

    11 FIN:24 12/3/2013

    TATA PROJECTS L

  • 8/11/2019 NCR_FIN_PGPL 09082014

    2/64

    12 FIN:23 12/3/2013

    13 FIN:22 11/11/2013

    14 FIN:21 11/2/2013

    15 FIN:20 10/31/2013

    16 FIN 9/16/2013

    17 FIN 8/7/2013

    18 FIN 8/1/2013

    19 FIN 8/1/2013

    20 FIN on Subcontractor wor 6/21/2013

    21 FIN on Subcontractor wor 5/29/2013

    22 FIN on Subcontractor wor 5/25/2013

  • 8/11/2019 NCR_FIN_PGPL 09082014

    3/64

    23 FIN on Subcontractor wor 5/20/2013

    24 FIN on Subcontractor wor 5/20/2013

    25 FIN 001 3/28/2014

    26 FIN 002 12/12/2013

    27 FIN 001 2/14/2014

    28 FIN 001 2/10/2014

    29 FIN 001 10/17/2013

    30 FIN 002 11/9/2013

    31 FIN 002 3/4/2014

    32 FIN 003 12/28/2013

    33 FIN 004 1/11/2014

    34 FIN 005 1/30/2014

    35 FIN 005 2/2/2014

    36 FIN 006 3/18/2014

  • 8/11/2019 NCR_FIN_PGPL 09082014

    4/64

    37 FIN 007 4/2/2014

    38 NCR 001 11/19/2013

    39 NCR 002 12/19/2013

    40 NCR 003 2/26/2014

    41 PGPL/MECH/FIN/1 11-May-13

    42 PGPL/MECH/FIN/2 18-Mar-13

    43 PGPL/MECH/FIN/3 18-Mar-13

    44 PGPL/MECH/FIN/4 18-Mar-13

    45 PGPL/MECH/FIN/5 18-Mar-13

    46 PGPL/MECH/FIN/6 16-Mar-13

    47 PGPL/MECH/FIN/7 24-May-13

    48 PGPL/MECH/FIN/8 25-Jan-13

    49 PGPL/MECH/FIN/9 18-Jan-13

    50 PGPL/MECH/FIN/10 12-Mar-13

    51 PGPL/MECH/FIN/11 29-Apr-13

    52 PGPL/MECH/FIN/12 6-May-13

    53 PGPL/MECH/FIN/13 7-Sep-13

    54 PGPL/MECH/FIN/14 31-Oct-13

    55 PGPL/MECH/FIN/15 24-Sep-13

    56 PGPL/MECH/FIN/16 4-Oct-13

    57 PGPL/MECH/FIN/17 20-Sep-13

    58 PGPL/MECH/FIN/18 5-Nov-13

  • 8/11/2019 NCR_FIN_PGPL 09082014

    5/64

    59 PGPL/MECH/FIN/19 29-Nov-13

    60 PGPL/MECH/FIN/20 20-Sep-13

    61 PGPL/MECH/FIN/21 20-Sep-13

    62 PGPL/MECH/FIN/22 20-Sep-13

    63 PGPL/MECH/FIN/23 20-Sep-13

    64 PGPL/MECH/FIN/24 20-Sep-13

    65 PGPL/MECH/FIN/25 20-Sep-13

    66 PGPL/MECH/FIN/26 18-Oct-13

    67 PGPL/MECH/FIN/27 18-Oct-13

    68 PGPL/MECH/FIN/28 30-Oct-13

    69 PGPL/MECH/FIN/29 20-Dec-13

    70 PGPL/MECH/FIN/30 3-Jan-14

    71 PGPL/MECH/FIN/31 19-Feb-14

    72 PGPL/MECH/FIN/32 19-Feb-14

    73 PGPL/MECH/FIN/33 25-Feb-14

    74 PGPL/MECH/FIN/34 25-Jan-14

    75 PGPL/MECH/NCR01 10-Dec-13

    76 PGPL/MECH/NCR02 30-Jan-14

    77 PGPL/MECH/NCR03 1-Feb-14

    78 PGPL/MECH/NCR04 5-Dec-14

    79 PGPL/MECH/NCR05 10-Oct-13

    80 PGPL/MECH/NCR06 28-Nov-13

    81 PGPL/MECH/NCR07 14-Sep-13

    82 PGPL/MECH/NCR08 24-Dec-13

    83 PGPL/MECH/NCR09 23-Oct-13

  • 8/11/2019 NCR_FIN_PGPL 09082014

    6/64

    84 FIN 9/3/2012

    85 FIN 10/4/2012

    86 FIN 2/1/2013

    87 FIN 2/4/2013

    88 FIN 2/6/2013

    89 FIN 2/15/2013

    90 FIN 2/16/2013

    91 FIN 3/25/2013

    92 FIN 3/29/2013

    93 FIN 3/31/2013

    94 FIN 5/20/2013

    95 FIN 5/20/2013

    96 FIN 5/25/2013

    97 FIN 5/29/2013

    98 FIN 6/21/2013

    99 FIN 8/1/2013

    100 FIN 8/1/2013

    101 FIN 8/7/2013

    102 FIN 9/16/2013

    103 FIN 10/31/2013

    104 FIN 11/2/2013

    105 FIN 11/11/2013

    106 FIN 12/3/2013

    107 FIN 12/3/2013

    108 FIN 12/7/2013

    109 FIN 12/8/2013

    110 FIN 12/18/2013

    111 FIN 12/25/2013

    112 FIN 2/5/2014

    113 FIN 2/5/2014

    114 FIN 2/7/2014

    115 FIN 2/7/2014

  • 8/11/2019 NCR_FIN_PGPL 09082014

    7/64

    116 FIN 3/10/2014

    117

    118 NCR 12/18/2013

    119 NCR 2/15/2013

  • 8/11/2019 NCR_FIN_PGPL 09082014

    8/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    9/64

    PG

    1 X 388 MW CCPP

    100036

    Description Discipline

    NCR/FOR/

    FIN

    NCR/FOR/

    FIN Type

    Rejected/

    Rectifiable

    Switchyard Relay Room. Cracks observed in wall

    plastering Civil FIN Field Rectifiable

    Cracks found in FGCS pedestals Civil FIN Field Rectifiable

    Validity of Calibration Certificate of Total Station

    (Survey Instrument) is over. Civil FIN Field Rectifiable

    Water not changed in the curing tank of cubes, even

    level of water is lower than cubes top level. Civil FIN Field Rectifiable

    Poor quality of plastering observed in DM Plant building Civil FIN Field Rectifiable

    Switch Yard

    Near LCLM-3, 4 Backfilling work found having large

    boulders. Civil FIN Field Rectifiable

    PIPE RACK-9 :

    Pedestal orientation of 6 nos. of bolts were not as per

    drawing. Civil FIN Field Rectifiable

    CONTROL ROOM Exhaust Fan.

    As per mechanical drawing No.183-GA-07-R0 Mounting

    frame should be square shaped but in civil drawing

    round shape is shown. Civil NCR Field Rectifiable

    SWITCH YARD

    Bay No.1 & 2 in between grid A&B, about 25 nos.Pedestals settled down. Civil FIN Field Rectifiable

    GAS PIPE SUPPORTS PEDESTAL

    Pre-cast Gas Pipe Support Pedestals observed 80 to

    90mm down from the required level. Civil FIN Field Rectifiable

    Hot well tank

    Pedestal P4 Level of rebars up by 100 mm and level of

    insert plate up by 30 mm observed. Civil FIN Field Rectifiable

    IMITED

  • 8/11/2019 NCR_FIN_PGPL 09082014

    10/64

    PIPE RACK-9

    P1 Pedestatal are twisted 100mm. Civil FIN Field Rectifiable

    BY PASS STACK

    100 mm Cover in place of 50 mm observed for grade

    slab at end portion. Civil FIN Field Rectifiable

    BY PASS STACKPoor concreting without maintaining the level for grade

    slab observed Civil FIN Field Rectifiable

    HRSG

    Near north side settlement observed in grade slab. Civil FIN Field Rectifiable

    At Cable Trenches : Empty cement bags & wooden

    pieces found in back filling material. Civil FIN Field Rectifiable

    At Swithch Gear Control Room (3rd floor) : 02 Nos. of1000 x 800 mm openings for air intake were found

    missing for battery room. Civil FIN Field Rectifiable

    Cable Trench No 2

    at GTG :

    Exposed reinforcements obseved at cable trench walls

    outer surface. Civil FIN Field Rectifiable

    At Switchyard:

    Pedestal for Isolator equipment foundation at Grid-D7

    to D8 -2 Nos. found bulged . Civil FIN Field Rectifiable

    Raw water pump house- Column-B2

    1st lift & 2nd lift found twisted. Civil FIN Field Rectifiable

    Pipe rack-3 Pedestal P2

    Top of concrete found 100 mm less. Civil FIN Field Rectifiable

    Pipe Rack-4 Pedestal P3 Development length not

    provided as per drawing. Civil FIN Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    11/64

    Switch Gear Control Room 2nd Floor Slab

    Bottom finishing not good and honey comb found. Civil FIN Field Rectifiable

    Raw Water Pump House-Column & WallVertical Reinforcement in outer side of wall got

    displaced by 70mm laterally. Kink made in the vertical

    reinforcement to bring them into correct location Civil FIN Field Rectifiable

    DCS Panels are not bolted to base frame C & I FIN Field Rectifiable

    Canopies made of MS sheets were installed without

    painting C & I FIN Field Rectifiable

    VFD Room Earthing Flat required 65 X 10 MM , but 50 X6 MM Flat was used. Electrical FIN Field Rectifiable

    Switchyard Control Room - Panels:

    Bolts were not fitted properly on all panels, only two

    bolts were fixed. Electrical FIN Field Rectifiable

    Cable trays were discontinous and cable tray supports

    were not painted Electrical FIN Field Rectifiable

    Scaffolding material was inserted between the bus bars

    of open end of NSPBD Electrical FIN Field Rectifiable

    220 KV Swith Yard Control room

    Earthing Flat required 65 X 10 MM , but used 50 X 6 MM

    Flat Electrical FIN Field Rectifiable

    Cable trays for cable from battery bank to battery

    isolation box is erected on floor creating access issues Electrical FIN Field Rectifiable

    Cable tray installation at 9.85 el switch gear bldg is not

    as per drawing Electrical FIN Field Rectifiable

    STG metering panels were placed on base frame withoutbolting Electrical FIN Field Rectifiable

    Leak found in GTG transformer Tank Electrical FIN Field Rectifiable

    Control Building

    Power cable routed through control cable tray in 9.85

    elevation. Electrical FIN Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    12/64

    Cable is laid on cable trench floor without cable tray Electrical FIN Field Rectifiable

    Station service transformer centre line was not matching

    with switcg gear Electrical FIN Field Rectifiable

    GTG IPBD seal off bushing rubber seal was not matchingwith the IPBD dimensions. Making it impossible to bolt

    rubber seal to IPBD Electrical FIN Field Rectifiable

    Cable Termination at 4FC / 11 FC Feeder:

    630 mm lugs when bolted to B-Phase in 4FC & 11 FC,

    fouled with Neutral Bus Bar. Electrical NCR Field Rectifiable

    Holes mismatching in Evaporative coolersMechanical FIN Field Rectifiable

    Load compartment erection Mechanical FIN Field Rectifiable

    Plenum lower half Erection Mechanical FIN Field Rectifiable

    C Cone to turbine gasket Mechanical FIN Field Rectifiable

    River hawk tool Mechanical FIN Field Rectifiable

    Gen collector sole plate Mechanical FIN Field Rectifiable

    PEECC Holes mismatch Mechanical FIN Field Rectifiable

    Filter house bracing hole mismatch Mechanical FIN Field Rectifiable

    Base anchor plate. Mechanical FIN Field Rectifiable

    Fabrication of STG truss. Mechanical FIN Field Rectifiable

    ACC structural bracing joint. Mechanical FIN Field Rectifiable

    Welding of ss pipe to MS angle. Mechanical FIN Field Rectifiable

    Flange assembly of Pump shaft. Mechanical FIN Field Rectifiable

    Poor workmanship in columns and runners. Mechanical FIN Field Rectifiable

    Pipe rack 04 column Bolt not showing Mechanical FIN Field Rectifiable

    Pipe rack 2 column erected with mud and soil. Mechanical FIN Field Rectifiable

    Without beveling moment plate welding done. Mechanical FIN Field Rectifiable

    STG Building Internal platform Mechanical FIN Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    13/64

    Bypass Stack t Duct column Mechanical FIN Field Rectifiable

    Metering skid. Mechanical FIN Field Rectifiable

    Inlet line of Filter separator for gas conditioning Skid Mechanical FIN Field Rectifiable

    Gas scrubber to electric heater Mechanical FIN Field Rectifiable

    Stand pipe of filter separator Mechanical FIN Field Rectifiable

    Fuel gas conditioning skid pipe . Mechanical FIN Field Rectifiable

    Filter separator for fuel gas conditioning skid. Mechanical FIN Field Rectifiable

    Inlet line of performance heater Mechanical FIN Field Rectifiable

    Performance Heater Mechanical FIN Field Rectifiable

    Drain line to Condensate storage tank. Mechanical FIN Field Rectifiable

    AS we observed that pipe rack 08 without cleaning applied

    paint. Mechanical FIN Field Rectifiable

    ACW and DMCW pump hose support frame as per DWG not

    found Mechanical FIN Field Rectifiable

    Without MTC and IMIR clearance fitting as been used of fire

    fighting line Mechanical FIN Field Rectifiable

    Bypass Globe valve got damaged due to stuck in EOT cable

    while operating Mechanical FIN Field Rectifiable

    Withou Beveling and overlapping regd Mechanical FIN Field Rectifiable

    Without insp weld visual , wrapping coating ,DP Back filling

    done. Mechanical FIN Field Rectifiable

    Process ValvesMechanical NCR Field Rectifiable

    Hydraulic oil unit Nozzles Mechanical NCR Field Rectifiable

    ACW Pump bottom casing Sheared off Mechanical NCR Field Rectifiable

    Bearing Recd with damage Mechanical NCR Field Rectifiable

    Pipes erected without surface Preparation. Mechanical NCR Field Rectifiable

    Mismatch of DWG structural and side sheeting DWG. Mechanical NCR Field Rectifiable

    Unqualified welder welding Mechanical NCR Field Rectifiable

    Columns recd are flange type ,but recd welded type. Mechanical NCR Field Rectifiable

    ACC structure design problem Mechanical NCR Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    14/64

    Material rejected sand removed at batching plant CIVIL FIN Field Rectifiable

    Foundation Curing (HRSG) CIVIL FIN Field Rectifiable

    Honey comb found PCC Second lift (Switch Yard Relay

    Room) CIVIL FIN Field Rectifiable

    Reinforcement bar exposed South side of GTG CIVIL FIN Field Rectifiable

    Pedestal P3A Difference observed 60 mm in bolts (GTG

    Accoustic diffuser) CIVIL FIN Field Rectifiable

    Pedestal P4 Grid AZ1 lack of cover major honey combfound) CIVIL FIN Field Rectifiable

    Grid B3 to A3 and B4 to A4 Main beam bulging (SGB) CIVIL FIN Field Rectifiable

    First Floor slab water leakage found (SGB) CIVIL FIN Field Rectifiable

    W/o information backfilling work (Switchyard tower line) CIVIL FIN Field Rectifiable

    STG Deck slab CIVIL FIN Field Rectifiable

    Column and wall reinforcement kink observed CIVIL FIN Field Rectifiable

    2nd floor slab grid 6-7 beam no.14 water leakage found

    along with finishing problem in bottom side SGB CIVIL FIN Field RectifiablePedestal P3 Grid D Development length not provided as

    per drawing PR4 CIVIL FIN Field Rectifiable

    Pedestal P3 Grid D Development length not provided as

    per drawing PR3 CIVIL FIN Field Rectifiable

    Column B2 1st and II nd lift twisted RWPH CIVIL FIN Field Rectifiable

    Equipment Foundation grid D7 to D8 Isolator-2 No

    pedestal is tilted Switch yard equipment foundation CIVIL FIN Field Rectifiable

    Reinforcement exposed GTG Cable trench CIVIL FIN Field Rectifiable

    2 No. 1000 X 800 mm opening for air intake at EL 17.5 m

    missing in battery room CIVIL FIN Field Rectifiable

    ACW Road, Switch yard and FGCS to control building

    (Contaminated backfilling material) CIVIL FIN Field Rectifiable

    Near north side settlement in grade slab HRSG CIVIL FIN Field Rectifiable

    Level not mantained in concreting BYPASS STACK CIVIL FIN Field Rectifiable

    100 mm cover observed in Grade slab BYPASS STACK CIVIL FIN Field Rectifiable

    P1 Pedestal twisted 100 mm PR9 CIVIL FIN Field Rectifiable

    Pedestal P4 rebars 100 mm up and insert plate 30 mm lvl

    up observed HOTWELL TANK CIVIL FIN Field Rectifiable

    Level difference FGCS line pedestal CIVIL FIN Field Rectifiable

    Bay No 1 & 2 in between Grid A & B 25 No.Pedestal

    settle down CIVIL FIN Field Rectifiable

    PR9 , 6 No.pedestral bolts orientation not as per drawing CIVIL FIN Field Rectifiable

    Switch Yard , large boulders found in backfilling material CIVIL FIN Field Rectifiable

    Beams and column not in line in DM Plant CIVIL FIN Field Rectifiable

    Improper storage of cubes in curing tank CIVIL FIN Field Rectifiable

    Total station calibration not done CIVIL FIN Field Rectifiable

    FGCS Cracks in Pipe support CIVIL FIN Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    15/64

    Cracks observed in Switch yard relay room CIVIL FIN Field Rectifiable

    Mismatch in Civil and Mechanical drawings for exhaust

    fan SGCRB CIVIL NCR Field Rectifiable

    Cracks observed in ACC Grouting CIVIL NCR Field Rectifiable

  • 8/11/2019 NCR_FIN_PGPL 09082014

    16/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    17/64

    Root Cause Details Issued by

    Agency

    Responsible

    Open/

    WIP/

    Closed

    Silt content is more in the sand. FQE SubContactor Open

    Poorworkman ship, lack of curing and erection materialhit the grout in green stage of concrete. FQE SubContactor Closed

    Supervision lapse from subcontractor side FQE SubContactor Closed

    Water level reduced due to damage in Pipeline FQE SubContactor Closed

    Silt content more in the sand. FQE SubContactor Open

    Poor supervision FQE SubContactor Closed

    Mistake of understanding the Drawing. FQE SubContactor Closed

    Mismatch of civil & Mechanical Drawing. FQE SubContactor

    Open

    (Work

    under

    progress

    )

    Due to heavy rain, soil settelement occured. FQE SubContactor Closed

    Cross verification of levels not carriedout prior to the

    Plain Cement Concrete work FQE SubContactor Closed

    Poor supervision & not maintained the reinforcement

    length as per BBS & error in giving top level for insert

    plates. FQE SubContactor Closed

  • 8/11/2019 NCR_FIN_PGPL 09082014

    18/64

    Inadequate supports resting on weak side strata got

    disturbed at the time of concreting and leads to twisting

    of the pedestal at one direction. FQE SubContactor Closed

    Due to movement of concrete labour and improper

    diameter of chairs used the cover at end portion of

    grade slab increases than the specified value. FQE SubContactor Closed

    Lack of supervision at the time concreting. FQE SubContactor Closed

    Due to incessant rain and erosion of soil beneath the

    grade slab caused the settelement. FQE SubContactor Closed

    Waste materials such as empty cement bags, wooden

    blocks etc were dumped at the area, which is used for

    backfilling near trenches, causing mixing of the same

    with fill material. FQE SubContactor Closed

    Drawing reading error by Site Engineer FQE SubContactor Closed

    Non provision of adequate numbers, size and strength

    of cover blocks, leading to exposure of reinforcements. FQE SubContactor Closed

    Side supports rested on loose soil and not able to

    withstand concrete pressure causing lateral bulging of

    pedestal foundations of Isolators. FQE SubContactor Closed

    Because of height and limited access, formwork was not

    checked properly. FQE SubContactor

    Closed

    Mistake by surveyor in level transferring. FQE SubContactor

    Closed

    Due to change in foundation top level, vertical rebars

    became short as they were cut as per approved drawing. FQE SubContactor

    Closed

  • 8/11/2019 NCR_FIN_PGPL 09082014

    19/64

    Shuttering Tape damaged during pouring. FQE SubContactor Closed

    Shift in centre line of wall reinforcement during pouring

    of concrete in raft. FQE SubContactor Closed

    Work in complete FQE SubContactor Open

    Sub contractor did not consider the issue of corrosion

    seriously. More over canopy was not in RFC drawing FQE SubContactor Closed

    Overlooked the drawing FQE SubContactor Closed

    Not provided the minimum gap required on rear side of

    panel. Front side of panel was resting in finished floor

    only.

    FQE SubContactor Closed

    Sub contractor over looked quality and wanted to pull

    cable to achieve milestone dates FQE SubContactor Closed

    Civil Sub contractor did not took care of electrical

    materials during scaffolding erection FQE SubContactor Closed

    Overlooked the drawing FQE SubContactor Open

    Sub contractor did not take design approval before

    making a drawing change FQE SubContactor Open

    sub contractor over looked drawing FQE SubContactor Closed

    Carelessness of sub contractor supervisor FQE SubContactor Closed

    Manufacturing related problems FQE Vendor Closed

    Overlooked the drawing FQE SubContactor Open

  • 8/11/2019 NCR_FIN_PGPL 09082014

    20/64

    HT Cable was laid by sub contractor, as tray material was

    unavailable. FQE SubContactor Open

    Mismatch in RFC drawing and actual panel dimensions FQE TPL Closed

    Vendor packed STG IPBD rubber seal in GTG IPBD

    packing. Hence the mismatch happened FQE TPL Closed

    Mismatch between provision for panel terminal lugs

    (300 Sq mm ) and Project Cable schedule ( 630 Sq mm ) . FQE SubContactor Closed

    Material Coming from M/s.GE with mismatch. FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    Tool got Stuck while operation. FQE SubContactor Closed

    FQE SubContactor Closed

    M/s.Ge Drawing error. FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

  • 8/11/2019 NCR_FIN_PGPL 09082014

    21/64

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Open

    FQE SubContactor Closed

    FQE SubContactor Open

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Open

    FQE SubContactor Closed

    FQE SubContactor Open

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Open

  • 8/11/2019 NCR_FIN_PGPL 09082014

    22/64

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Closed

    FQE SubContactor Open

    FQE SubContactor Closed

    FQE SubContactor Closed

  • 8/11/2019 NCR_FIN_PGPL 09082014

    23/64

    FQE SubContactor Open

    FQE SubContactor Open

    FQE SubContactor Closed

  • 8/11/2019 NCR_FIN_PGPL 09082014

    24/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    25/64

    Proposed

    Completion date

    of Resolution

    Actual Date of

    Completion of

    Resolution Details of Correction Done

    Chipping & Replastering to be done.

    Damaged support chipped off and regrouted

    Same Total station not used for the period it was not

    calibrated. Now, the calibration done and is beubg using

    in the field.

    Damged pipe line repaired and cleaned the Tank and

    water refilled.

    Removed the large boulders & compaction done.

    Chipped & recast as per drawing.

    Received revised civil Drwg with square shape.

    Effected portion being chipped & recasted as perrewised drawing from Engg .

    Pre-cast Gas Pipe Support Pedestals were removed and

    replaced again by using Hydra after raising the level of

    PCC as per drawing.

    Extra length of bars were cut and insert plate provided at

    correct level.

    CUM RESOLUTION REPORTS /

  • 8/11/2019 NCR_FIN_PGPL 09082014

    26/64

    Effected portion being chipped & recasted as per

    drawing

    The effected portion of grade slab chipped & exposed

    reinforcement level brought to desired level and grade

    slab recasting done.

    Existing concrete chipped & recast as per required levels

    mentioned in drawing

    Cement grout mix with 1:3 ratio Poured.

    Empty cement bags, wooden blocks etc which got mixed

    with the backfilling material, were removed. The

    backfilling done with proper material.

    Opening made for Air Intake pipes as per drawing by

    chipping the slab.

    The loose material chipped off and the exposed surface

    covered by using GP2 grouting material with finished

    surface.

    Reverified the bolt alignment and found OK.

    Chipped off the 2 nd lift and re cast by applying rich

    mortar.

    Top portion was hacked off and grouted to match the

    level.

    Welding done for short bars with an overlap of 10 D.

  • 8/11/2019 NCR_FIN_PGPL 09082014

    27/64

    Loose concrete chipped off and repaired using

    cementitious grout Conbextra GP2.

    20 mm dia holes with 150 to 200 mm depth were made

    at 150mm c/c along 3.0m wall length to bring the

    dislocated reinforcement at correct location . 16mm diarods of 1.0m length were inseted into the above holes

    and tied with the original reinforcement followed by

    fixing with Logfix grout at bottom .

    PGPL site E&I

    works suspended

    temporarily - Awaiting rectification by Subcontractor

    1/12/2014 1/28/2014 All canopies were painted using approved paint

    3/14/2014 3/22/2014Removed the old earthing flat and replaced with new

    flat size of 65 X 10 mm size.

    2/17/2014 2/19/2014

    Front side of panels were bolted to floor by anchor

    fasteners and cleats

    10/22/2013 10/24/2013

    Discontinous cable trays were connected using coupler

    plates, all tray supports were repainted

    11/12/2013 11/15/2013

    Exposed bus bars were wrapped up using protective

    covers

    PGPL site E&I

    works suspended

    temporarily

    -To be replaced after the work restarts. At present, work

    was stopped

    PGPL site E&I

    works suspended

    temporarily -

    An as built drawing was prepared and sent from TPL to

    TCE for approval, same is pending

    3/8/2014 3/10/2014

    Sub contractor did rework and rectified work as per

    drawing

    2/17/2014 2/19/2014Sub contractor re lifted the panel made holes on base

    frame, then placed panels and bolted them

    2/3/2014 2/3/2014

    Manufacturer came to site and welded the areas were

    oil seepage was found

    PGPL site E&I

    works suspended

    temporarily -

    Will be replaced after the work restarts. At present, work

    was stopped

  • 8/11/2019 NCR_FIN_PGPL 09082014

    28/64

    PGPL site E&I

    works suspended

    temporarily -

    Tray has to be fixed, then cable to be transferred to tray -

    To be done when work commences

    5/5/2014 5/10/2014

    NSPBD was erected between transformer and switch

    gear by small angular adjustments using flexible links

    1/22/2014 2/5/2014

    GTG IPBD rubber seal with proper dimensions was foundin STG packing when STG IPBD was unpacked at a later

    time .

    3/15/2014 3/21/2014

    Cable of 300 sq mm in two runs connected and

    energised the panel.

  • 8/11/2019 NCR_FIN_PGPL 09082014

    29/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    30/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    31/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    32/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    33/64

    Corrective Action

    Curing arrangements to be strengthened.

    FQE to monitor for calibration of Instruments with

    subcontractor and ensure Calibration in time.

    Up keeping of curring tank to be checked regularly and

    TPL Exeuction Engineer / FQE to periodically check the

    same.

    Informed subcontractor to use proper back filling

    material instead of dumping waste and unapproved

    material.

    FQE to Recheck the orientations & levels by FQE before

    clearance for concrete work.

    _

    FQE had informed time to time that soil erosion may

    take place due to heavy rains and back filling with highclay content soil which is available at site.

    EE to cross verify the PCC levels before concreting.

    Cutting & Bending schedule given to Bar- Binder to be

    rechecked with respect to BBS by EE.

    IELD OBSERVATION RECORDS / FIELD INSPECTION NOTE

  • 8/11/2019 NCR_FIN_PGPL 09082014

    34/64

    The supporting system is to be checked throughly by

    EE / FQE and provision of extra supports as required to

    be made.

    The levels are to be checked / ensured by EE / FQE

    before & after concreting and before final finishing

    also.

    The levels are to be checked / ensured by EE / FQE

    before and after concreting .

    Balance Concrete work was completed all around non

    filling area to avoid future settlement.

    Instructions given to sub contractor to stack the waste

    material away from the site and empty cement bags to

    be bundled and stacked at batching plant itself to avoid

    mixing of the same with backfilling material.

    Site Engineer should read drawings carefully.

    Tool Box talks carriedout on importance of cover blocks

    to supervisors.

    Skilled manpower to be deployed to handle support

    work in loose strata. Extra Tie rods to be provided,

    where such type of strata involved.

    In any case proper approach & access are to be

    provided for checking .

    Top level to be checked by Execution Engineer as well

    as FQE, before finishing the job.

    Tool box talk given to site supervisor / Engineer to

    cross verify the BBS with field condition to avoid such

    shortages / mismatches in future.

  • 8/11/2019 NCR_FIN_PGPL 09082014

    35/64

    Putty and Tape to be used to seal the joints.

    Tool box talk given for 1) Taking proper precautions to

    prevent latteral displacement of reinforecement barsduring concrete pouring. 2) Not to

    make any kinks in the reinforcement bars/ foundation

    bolts to bring them in correct location.

    Subcontractor to make arrangement for proper

    fastening before erection of panel

    All canopies were painted using approved paint

    Subcontractors to adhere to RFC drawings strictly

    Subcontractor to make proper lay out arrangement of

    each panel before erection of panels

    Discontinous cable trays were connected using coupler

    plates, all tray supports were repainted

    Exposed bus bars were wrapped up using protective

    covers

    Subcontractors to adhere to RFC drawings strictly

    An as built drawing was prepared and sent from TPL to

    TCE for approval, same is pending

    Sub contractor did rework and rectified work as per

    drawing

    Sub contractor re lifted the panel made holes on baseframe, then placed panels and bolted them

    Manufacturer came to site and welded the areas were

    oil seepage was found

    Subcontractors to adhere to RFC drawings strictly

  • 8/11/2019 NCR_FIN_PGPL 09082014

    36/64

    Tray has to be fixed, then cable to be transferred to tray -

    To be done when work commences

    NSPBD was erected between transformer and switch

    gear by small angular adjustments using flexible links

    GTG IPBD rubber seal with proper dimensions was foundin STG packing when STG IPBD was unpacked at a later

    time .

    Cable of 300 sq mm in two runs connected and

    energised the panel.

  • 8/11/2019 NCR_FIN_PGPL 09082014

    37/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    38/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    39/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    40/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    41/64

    Preventive Action

    Associated Time

    Delay in project

    schedule due to

    NCR/FOR/FIN (in

    Days) (If any)

    Authorization/

    Approval for

    Rework

    Estimated

    Rework Cost

    (in Rs)

    1) Needle compactor to be placed at all possible

    sections of columns along with manual compaction by

    tamping with rod to aviod such workmanship errors.

    2) Strict site supervision by Execution Engineer

    Erection material not to be shifed before completion of

    curing of concrete works.

    Implementation of Protocol duly signed by all

    concerned to be ensured.

    Before releasing the civil drawings ,TPL Engg to verify &ensure the incorporation of related interface data.

    1.Stone pitching to be provided at slope area to avoid

    soil erosion 2.Soil stabilisation measures to be taken as

    to minimise settlement due to poor quality soil

    available at site (clay content is more)

    S

  • 8/11/2019 NCR_FIN_PGPL 09082014

    42/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    43/64

    Putty and Tape to be used to seal the joints.

    Tool box talk given for 1) Taking proper precautions to

    prevent latteral displacement of reinforecement barsduring concrete pouring. 2) Not to

    make any kinks in the reinforcement bars/ foundation

    bolts to bring them in correct location.

    Advised the electrical contractor to follow standard

    procedure while erection 0 YES 2000

    Informed sub contractor to not to erect any structural

    material without paint 0 YES 0

    TPL-Execution Engineer / FQE to periodically check &ensure the drg. requirements. 1 YES 1800

    TPL-Execution Engineer / FQE to periodically check &

    ensure the drg. Requirements. 0 YES 1500

    Strictly ordered sub contractor, not to install tray

    without support inspection. And instructed not to pull

    cable without tray inspection 1 YES 2000

    Advised civil contractor to keep in mind the safety of

    materials of other discipline too. Conducted a tool box

    meeting 0 YES 200

    TPL-Execution Engineer / FQE to periodically check &

    ensure the drg. requirements.

    0 YES 1200

    Take written approval from TPL before making drawing

    changes 0 NO 10000

    Informed sub contractor to adhere to RFC drawings 0 YES 1200

    Advised the electrical contractor to follow standardprocedure while erection 1 YES 1000

    Advance learning on Storage and handling of heavy

    equipments 0 YES 0

    Advised the electrical contractor to follow standard

    procedure while erection 1 YES 600

  • 8/11/2019 NCR_FIN_PGPL 09082014

    44/64

    Advised the electrical contractor to follow standard

    procedure while erection 1 YES 1200

    TPL design to update drawings (Both electrical and civil)

    promptly when there is some changes in

    Panel/equipment As built. 2 YES 1200

    Vendor shall take responsibility of cross checking

    materials once before dispatch 2 YES 0

    Engg has to review the drawing properly before

    preparing the cable schedules / BOM. 0 NO 0

  • 8/11/2019 NCR_FIN_PGPL 09082014

    45/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    46/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    47/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    48/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    49/64

    Actual

    Rework

    Cost (in Rs)

    Rework Cost

    Borne by Remarks

    Drawing

    Revision /

    Modification

    Mismatch ofCivil drawing

    with

    Mechanical /

    Electrical

    drawing

    Defective

    Workmanship /

    Materials /

    Equipments

    Transit

    Damage

    s

  • 8/11/2019 NCR_FIN_PGPL 09082014

    50/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    51/64

    DCS Vendor

    Honeywell

    -

    NO NO YES NO

    0 Subcontractor

    -

    NO NO YES NO

    1800 Subcontractor-

    YES NO NO NO

    1500 Subcontractor

    -

    YES NO YES NO

    2000 Subcontractor

    -

    NO NO YES NO

    200 Subcontractor

    -

    NO NO YES NO

    Subcontractor

    -

    NO NO YES NO

    Subcontractor/TP

    L

    Rework not

    required if as

    built drawing is

    accepted by TCE

    and Client YES NO NO NO

    1200 Subcontractor-

    NO NO YES NO

    1000 Subcontractor-

    NO NO YES NO

    0 Subcontractor-

    NO NO YES NO

    Subcontractor

    -

    NO NO YES NO

  • 8/11/2019 NCR_FIN_PGPL 09082014

    52/64

    Subcontractor

    -

    NO NO YES NO

    1200 Subcontractor

    -

    NO YES NO NO

    0 Subcontractor

    -

    NO NO NO NO

    0 TPL ENGG

    Rework avoided

    due to proactive

    identification YES NO NO NO

  • 8/11/2019 NCR_FIN_PGPL 09082014

    53/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    54/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    55/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    56/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    57/64

    Mishandli

    ng of

    items at

    sites

    Improper

    Storage

    Inspection

    Error

    Approved

    Procedures /

    FQP / QAP

    not followed

    Natural

    Calamity

    Inadequate

    Inputs /

    Resources /

    QA Systems

  • 8/11/2019 NCR_FIN_PGPL 09082014

    58/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    59/64

    NO NO NO YES NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO YES NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO YES NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

  • 8/11/2019 NCR_FIN_PGPL 09082014

    60/64

    NO NO NO YES NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

    NO NO NO NO NO NO

  • 8/11/2019 NCR_FIN_PGPL 09082014

    61/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    62/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    63/64

  • 8/11/2019 NCR_FIN_PGPL 09082014

    64/64