35
NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (4) (5) (3) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL CAPITAL REGION (Based on GAA) Name of Project/Location Scope of Work Physical Target Allocation (P'000) (1) NORTH MANILA DISTRICT ENGINEERING OFFICE 354,581 MANILA CITY, 1ST DISTRICT Cong. Benjamin D.R. Asilo I. Locally Funded 50,083 a. National Arterial and Secondary National Roads and Bridges 1. a. Preventive Maintenance (Intermittent Sections) 1. National Secondary a. CM Recto 1. Chainage 2116 - Chainage 2833 Overlay 50mm 0.34 km. 3,602 North Manila DEO b. 1. National Secondary 0.82 km. 39,181 a. Del Pan Extension Road 1. Chainage 0165 - Chainage 0325 Reconstruction PCC 230mm 0.16 km. 6,563 North Manila DEO b. Moriones 1. Chainage 0943 - Chainage 1116 Reconstruction PCC 300mm 0.17 km. 5,018 North Manila DEO c. Juan Luna Street (C.M. Recto to Morga Street) 1. Chainage 1314 - Chainage 1636 Rehab/Reconst./Upgrading 0.32 km. 14,600 North Manila DEO with Drainage Improvement d. H. Lopez Street (Kalakal to Marala C.L.) Assets Preservation of National Roads Generated from Pavement Management System/Highway Development and Management-4 (HDM-4) Rehabilitation, Reconstruction/Upgrading of Damaged Paved National Roads (Intermittent Sections) d. H. Lopez Street (Kalakal to Marala C.L.) 1. Chainage 1762 - Chainage 1926 Rehab/Reconst./Upgrading 0.16 km. 13,000 North Manila DEO with Drainage Improvement 2. National Bridges a. Rehabilitation/Reconstruction/Strengthening of Bridges along National Roads 1. Rodriguez Bridge along Retrofitting 85.55 lm. 7,300 North Manila DEO E. Rodriguez Road, Tondo

NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

  • Upload
    ngodien

  • View
    221

  • Download
    1

Embed Size (px)

Citation preview

Page 1: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

NORTH MANILA DISTRICT ENGINEERING OFFICE 354,581

MANILA CITY, 1ST DISTRICTCong. Benjamin D.R. Asilo

I. Locally Funded 50,083

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. CM Recto

1. Chainage 2116 - Chainage 2833 Overlay 50mm 0.34 km. 3,602 North Manila DEO

b.

1. National Secondary 0.82 km. 39,181

a. Del Pan Extension Road

1. Chainage 0165 - Chainage 0325 Reconstruction PCC 230mm 0.16 km. 6,563 North Manila DEO

b. Moriones

1. Chainage 0943 - Chainage 1116 Reconstruction PCC 300mm 0.17 km. 5,018 North Manila DEO

c. Juan Luna Street (C.M. Recto to Morga Street)

1. Chainage 1314 - Chainage 1636 Rehab/Reconst./Upgrading 0.32 km. 14,600 North Manila DEOwith Drainage Improvement

d. H. Lopez Street (Kalakal to Marala C.L.)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

d. H. Lopez Street (Kalakal to Marala C.L.)

1. Chainage 1762 - Chainage 1926 Rehab/Reconst./Upgrading 0.16 km. 13,000 North Manila DEOwith Drainage Improvement

2. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Rodriguez Bridge along Retrofitting 85.55 lm. 7,300 North Manila DEOE. Rodriguez Road, Tondo

Page 2: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANILA CITY, 2ND DISTRICTCong. Carlo V. Lopez

I. Locally Funded 100,043

a. National Arterial and Secondary National Roads and Bridges

1. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion 0.97 km. 50,000

1. Metro Manila

a. Upgrading of Earnshaw Street, Manila Upgrading 0.61 km. 35,000 North Manila DEO

b. Upgrading of Tindalo Street including Upgrading 0.27 km. 10,000 North Manila DEOdrainage, Manila

c. Upgrading of Cavite Street including Upgrading 0.09 km. 5,000 North Manila DEOdrainage, Manila

2. 50,043

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. JA Santos Ave

1. C0824 - C1202 Overlay 50mm 0.38 km. 4,552 North Manila DEO

b.

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

1. National Secondary 0.99 km. 45,491

a. C-2 Road

1. Chainage 0496 - Chainage 0629 Reconstruction PCC 230mm 0.13 km. 4,877 North Manila DEO

b. H Lopez Blvd

1. K0007+1715 - K0007+1925 Reconstruction PCC 230mm 0.21 km. 8,614 North Manila DEO

c. Hermosa Street

1. Chainage 0000 - Chainage 0643 Upgrading/Rehab/Reconst./ 0.64 km. 32,000 North Manila DEOUpgrading w/ Drainage Impv't.

Paved National Roads (Intermittent Sections)

Page 3: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANILA CITY, 3RD DISTRICTCongw. Ma. Zenaida B. Angping

I. Locally Funded 67,531

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 0.59 km. 6,893

a. Legarda St

1. Chainage 0361 - Chainage 0479 Overlay 50mm 0.12 km. 1,443 North Manila DEO

b. P Casal St

1. Chainage 0347 - Chainage 0510 Reblocking w/overlay 50mm 0.16 km. 2,063 North Manila DEO

c. Q Paredes St

1. Chainage 0000 - Chainage 0308 Overlay 50mm 0.31 km. 3,387 North Manila DEO

b.

1. National Secondary 1.87 km. 60,638

a. C Palanca St

1. Chainage 0000 - Chainage 0424 Reconstruction PCC 300mm 0.22 km. 7,316 North Manila DEO

b. CM Recto

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

b. CM Recto

1. Chainage 1224 - Chainage 1479 Reconstruction PCC 300mm 0.26 km. 7,545 North Manila DEO

c. J Rizal Ave

1. Chainage 3315 - Chainage 3415 Reblocking PCC 230mm w/ overlay 0.10 km. 2,389 North Manila DEO

d. Laon-Laan St

1. Chainage 0000 - Chainage 0350 (S02310LZ) Raising of grade & drainage (concrete) 0.35 km. 17,507 North Manila DEO

e. Legarda St

1. Chainage 0000 - Chainage 0361 Reblocking PCC 230mm w/ overlay 0.36 km. 11,287

North Manila DEO2. Chainage 1351 - Chainage 1445 Reblocking PCC 230mm w/ overlay 0.09 km. 2,611

f. V Fugoso

1. Chainage 0000 - Chainage 0170 Reblocking PCC 230mm w/ overlay 0.17 km. 6,583 North Manila DEO

g. C.M. Recto (S.H. Loyola to Legarda)

1. Chainage 2906 - Chainage 3227 Concreting w/ Drainage Impv't. 0.32 km. 5,400 North Manila DEO

Page 4: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANILA CITY, 4TH DISTRICTCongw. Ma. Theresa B. Bonoan-David

I. Locally Funded 129,511

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. Legarda St

1. Chainage 0479 - Chainage 1445 Overlay 50mm 0.34 km. 4,190 North Manila DEO

b.

1. National Secondary 4.37 km. 105,321

a. Dapitan St

1. K0004+(-1336) - K0004+(-776) Reconstruction PCC 300mm 0.56 km. 13,256 North Manila DEO

b. Dimasalang St

1. K0005+455 - K0005+1096 Reconstruction PCC 300mm 0.65 km. 11,906 North Manila DEO

c. G Tuazon St

1. Chainage 1015 - Chainage 1416 Reconstruction PCC 300mm 0.40 km. 9,356 North Manila DEO

d. J Fajardo St

1. Chainage 0000 - Chainage 0419 Reconstruction PCC 300mm 0.42 km. 10,853 North Manila DEO

e. Laon-Laan St

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

e. Laon-Laan St

1. Chainage 0000 - Chainage 1478 (S02436LZ) Raising of grade and drainage 1.48 km. 41,046 North Manila DEO(concrete)

f. SH Loyola

1. Chainage 0000 - Chainage 0860 Reconstruction PCC 300mm 0.86 km. 18,904 North Manila DEO

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges

a. Drainage Improvement along Maceda Street, Sampaloc Drainage Improvement 0.42 lm. 20,000 North Manila DEO

Page 5: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANILA CITY, 6TH DISTRICTCongw. Rosenda Ann M. Ocampo

I. Locally Funded 7,413

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 0.39 km. 4,413

a. P Casal St

1. Chainage 0000 - Chainage 0284 Overlay 50mm with minor 0.28 km. 2,484 North Manila DEOcorrections

b. P Sanchez St

1. Chainage 0000 - Chainage 0475 Reblocking w/ overlay 50mm 0.11 km. 1,929 North Manila DEO

b.

1. National Secondary

a. Reposo St

1. Chainage 0000 - Chainage 0274 Reblocking PCC 230mm w/ overlay 0.11 km. 3,000 North Manila DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 6: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

SOUTH MANILA DISTRICT ENGINEERING OFFICE 1,875,443 GOP 967,156 LOAN 908,287

MANILA CITY, 5TH DISTRICTCong. Amado S. Bagatsing

I. Locally Funded 532,732

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 0.90 km. 17,840

a. P Burgos Street

1. K0001+540 - K0001+600 Overlay 50mm 0.06 km. 361 South Manila DEO

b. P Ocampo Sr

1. K0003+(-419) - K0003+908 Overlay 80mm w/ minor 0.84 km. 17,479 South Manila DEOcorrections

b.

1. National Secondary 1.64 km. 52,892

a. Bonifacio Drive

1. Chainage 0000 - Chainage 0488 Recon AC 100mm 0.49 km. 16,318

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

1. Chainage 0000 - Chainage 0488 Recon AC 100mm 0.49 km. 16,318

2. K0001+(-660) - K0001+(-150) Recon AC 100mm 0.51 km. 16,985

b. FB Harrison

1. Chainage 0002 - Chainage 0103 Recon AC 100mm 0.10 km. 2,498 South Manila DEO

c. P Ocampo Sr

1. K0004+511 - K0004+612 Reconstruction PCC 230mm 0.06 km. 1,113 South Manila DEO

d. Pres Quirino Ave

1. Chainage 1530 - Chainage 2010 Recon AC 100mm 0.48 km. 15,978 South Manila DEO

2. National Bridges

1. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

a. Ayala Bridge along Reconstruction 140.8 lm. 462,000 Regional Office

Ayala Boulevard

South Manila DEO

Page 7: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANILA CITY, 6TH DISTRICT 1,079,017 Congw. Rosenda Ann M. Ocampo GOP 170,730

LOAN 908,287

I. Locally Funded 23,801

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. M Roxas St

1. Chainage 0000 - Chainage 0160 Overlay 50mm 0.16 km. 1,000 South Manila DEO

b.

1. National Secondary

a. New Panaderos Street

1. K0005+000 - K0005+330 Reconstruction PCC 230mm 0.22 km. 5,701 South Manila DEO

2. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Jesus Bridge along Reconstruction 12.30 lm. 17,100 South Manila DEOJesus Street

II. Foreign-assisted Projects

a. Flood Control

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

a. Flood Control

1. Pasig-Marikina River Channel Improvement 21,060 lm 1,055,216 PMO-MFCDP CLUSTER I

Project, Phase II, JBIC, 26th YLP, (PH-P239) Construction/1 4,250 lm GOP 146,929 Rehabiitation/7 16,810 lm. LOAN 908,287

Page 8: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

PASAY CITY, LONE DISTRICTCongw. Imelda G. Calixto-Rusiano

I. Locally Funded 263,694

a. National Arterial and Secondary National Roads and Bridges

1. 81,865

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 4.31 km. 60,200

a. Aurora Blvd 8,739

1. Chainage 0550 - Chainage 0609 Overlay 100mm 0.06 km. 1,116

South Manila DEO2. Chainage 0698 - Chainage 1105 Overlay 100mm 0.41 km. 7,623

b. Electrical Rd 2,380

1. Chainage 0000 - Chainage 0131 (S03269LZ) Overlay 100mm 0.13 km. 1,538

South Manila DEO2. Chainage 0000 - Chainage 0070 (S02941LZ) Overlay 50mm 0.07 km. 842

c. FB Harrison

1. K0005+000 - K0005+587 Overlay 80mm 0.59 km. 5,291 South Manila DEO

d. Roxas Blvd.

1. K0003+559 - K0003+739 Overlay 50mm 0.18 km. 2,526 South Manila DEO

e. Gil Puyat Ave. 12,978

1. K0004+(-360) - K0004+(-116) (S03326LZ) Overlay 100mm 0.24 km. 6,703

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

1. K0004+(-360) - K0004+(-116) (S03326LZ) Overlay 100mm 0.24 km. 6,703

South Manila DEO2. K0004+279 - K0004+724 (S03325LZ) Overlay 50mm 0.45 km. 6,275

f. Balabag Road

1. Chainage 0000 - Chainage 0256 Overlay 80mm 0.26 km. 2,451 South Manila DEO

g. Taft Ave.1. K0005+(-963) - K0005+(-003) Overlay 80mm 0.96 km. 12,302 South Manila DEO

h. PICC Fat Perimeter Road 11,066 1. Chainage 0000 - Chainage 0415 (S03222LZ) Overlay 50mm 0.42 km. 5,894

South Manila DEO2. Chainage 1187 - Chainage 1601 (S03236LZ) Overlay 50mm 0.43 km. 5,172

i. Airport Road1. Chainage 0000 - Chainage 0106 Overlay 80mm 0.11 km. 2,467 South Manila DEO

b.

1. National Secondary 0.77 km. 21,665

a. Aurora Blvd1. Chainage 0000 - Chainage 0550 Recon AC 100mm 0.55 km. 14,710

South Manila DEO2. Chainage 0609 - Chainage 0698 Recon AC 100mm 0.09 km. 2,373

b. Gil Puyat Ave

1. K0004+(-116) - K0004+013 Recon AC 100mm 0.13 km. 4,582 South Manila DEO

2. Roads to Address Critical Bottlenecks 77,000

a. National Roads Traffic Decongestion

1. Metro Manila

a. Construction of Diokno Boulevard including Construction 2.92 km 50,000 South Manila DEO

Bridge Approaches, Pasay City

3. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Nichols Field Road Overpass Retrofitting 79.15 lm. 27,000 South Manila DEO(Sales Bridge) along Nichols Field Road

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 9: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

b. Major Flood Control Projects 104,829

1. Drainage/Protection Works along National Roads and Bridges

a. Repair/Rehab./Improvement/Dredging/Desilting of Improvement/Rehabilitation/Dredging/ lm. 104,829 South Manila DEOdrainage system, Pasay City Desilting of drainage system

Page 10: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

QUEZON CITY FIRST DISTRICT ENGINEERING OFFICE 491,737

QUEZON CITY, 1ST DISTRICTCong. Vincent P. Crisologo

I. Locally Funded 137,483

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 0.71 km. 15,382

a. G Araneta Ave

1. K0010+308 - K0012+415 Reblocking w/overlay 50mm 0.15 km. 2,731

Quezon City 1st DEO2. Chainage 0352 - Chainage 1250 Overlay 100mm 0.56 km. 12,651

b.

1. National Secondary 1.48 km. 36,301

a. A Bonifacio Ave

1. K0008+(-201) - K0008+126 Reconstruction PCC 230mm 0.33 km. 8,482

2. K0008+(-2351) - K0008+(-1351) Reconstruction PCC 230mm 1.00 km. 23,575 Quezon City 1st DEO

3. K0008+(-351) - K0008+(-201) Reconstruction PCC 230mm 0.15 km. 4,244

2. National Bridges 135.10 lm. 85,800

a. Rehabilitation/Reconstruction/Strengthening

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. B. Aquino Bridge Retrofitting 54.90 lm. 14,000 Quezon City 1st DEOalong Del Monte Avenue

2. Dario Bridge (North Bound) Reconstruction 30.90 lm. 31,900 Quezon City 1st DEOalong EDSA

3. Dario Bridge (South Bound) Reconstruction 30.90 lm. 31,900 Quezon City 1st DEOalong EDSA, Balintawak

4. Mariablo Bridge I Reconstruction 18.40 lm. 8,000 Quezon City 1st DEOalong Roosevelt Avenue

Page 11: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

QUEZON CITY, 2ND DISTRICTCong. Winston T. Castelo

I. Locally Funded 354,254

a. National Arterial and Secondary National Roads and Bridges

1. 3.91 km. 56,454

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. Regalado Ave (North)

1. K0023+(-060) - K0025+698 Overlay 100mm 1.00 km. 23,486 Quezon City 1st DEO

b. Batasan Road NB

1. K0018+861 - K0021+613 Overlay 80mm 1.58 km. 17,210 Quezon City 1st DEO

c. IBP-San Mateo Road

1. K0019+881 - K0021+415 Overlay 80mm 1.33 km. 15,758 Quezon City 1st DEO

2. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion

1. Metro Manila

a. Construction/Improvement of Visayas Avenue Construction/Improvement 2.47 km. 250,000 Regional OfficeExtension including ROW, Quezon City

(Tandang Sora Avenue to Republic Avenue)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

3. National Bridges 169.80 lm. 32,200

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Ilang-Ilang Bridge Retrofitting 17.30 lm. 4,500 Quezon City 1st DEOalong Fairview Avenue

2. Regalado Bridge Reconstruction 14.00 lm. 17,000 Quezon City 1st DEOalong Regalado North

3. MNDR Flyover Reconstruction 138.50 lm. 10,700 Quezon City 1st DEOcrossing NLEX

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 364.70 lm. 15,600

a. Riprapping of Culiat Creek and Tributary Creek, Riprapping 204.00 lm. 5,000 Quezon City 1st DEOBarangay Bahay Toro and Barangay Project 6

b. Rehabilitation/Improvement of Pasong Tamo Creek, Rehabilitation/Improvement 160.70 lm 10,600 Quezon City 1st DEOBarangay Culiat

Page 12: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

QUEZON CITY SECOND DISTRICT ENGINEERING OFFICE 581,304

QUEZON CITY, 3RD DISTRICTCong. Jorge John B. Banal, Jr.

I. Locally Funded 233,341

a. National Arterial and Secondary National Roads and Bridges 102,189

1.

a. Preventive Maintenance (Intermittent Sections) 3.26 km. 38,999

1. National Secondary

a. Aurora Blvd 2.81 km. 34,582

1. K011+(-372) - K013+(-812) Reblocking w/overlay 50mm 2.08 km. 24,863

2. K013+(-130) - K013+(-046) Reblocking w/overlay 50mm 0.18 km. 3,505

Quezon City 2nd DEO3. K013+(-603) - K013+(-130) Overlay 50mm 0.34 km. 4,930

4. K013+(-812) - K013+(-603) Overlay 50mm 0.21 km. 1,284

b. 15th Ave.

1. K010+760 - K011+208 Reblocking w/overlay 50mm 0.45 km. 4,417 Quezon City 2nd DEO

b. 1.74 km. 32,790

1. National Arterial

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

1. National Arterial

a. Epifanio Delos Santos Ave (EDSA) Reblocking PCC 300mm

1. K0019+346 - K0019+725 with overlay 0.38 km. 7,286 Quezon City 2nd DEO

2. National Secondary 1.36 km. 25,504

a. Bonny Serrano

1. K0009+304 - K0008+279 Reblocking PCC 230mm 0.25 km. 13,065 Quezon City 2nd DEO

b. Camp Aguinaldo Road Network 12,439

1. Chainage 0620 - Chainage 1560 Recon AC 50mm 0.94 km. 10,560

Quezon City 2nd DEO

2. Chainage 0280 - Chainage 0450 Recon AC 50mm 0.17 km. 1,879

2. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Libis South Bridge Reconstruction 11.00 lm. 30,400 Quezon City 2nd DEOalong Libis Road

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 131,152

a. Rehabilitation of drainage along Aurora Boulevard 20,000 Quezon City 2nd DEO(from EDSA to Marikina Boundary)

b. Flood Control in Quezon City 111,152 Quezon City 2nd DEO

Page 13: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

QUEZON CITY, 4TH DISTRICTCong. Feliciano R. Belmonte Jr.

I. Locally Funded 347,963

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 13.47 km. 185,213

a. BIR Road 13,735

1. K011+711 - K011+073 (S05398LZ) Reblocking w/overlay 50mm 0.16 km. 1,723

2. K011+492 - K011+654 (S05398LZ) Reblocking w/overlay 50mm 0.36 km. 3,876

Quezon City 2nd DEO3. K012+(-287) - K012+168 (S05397LZ) Reblocking w/overlay 50mm 0.37 km. 3,925

4. K012+(-627) - K012+(-334) (S05397LZ) Reblocking w/overlay 50mm 0.28 km. 4,211

b. CP Garcia 17,472

1. K014+(-660) - K014+618 Reblocking 1.28 km. 9,681

Quezon City 2nd DEO2. K014+690 - K014+1718 Reblocking 1.03 km. 7,791

c. G Araneta Ave 18,566

1. K009+(-442) - K009+(-175) Reblocking w/overlay 50mm 0.27 km. 4,488

2. K009+(-887) - K009+(-695) Overlay 80mm 0.19 km. 4,109

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

2. K009+(-887) - K009+(-695) Overlay 80mm 0.19 km. 4,109

Quezon City 2nd DEO3. K009+(-175) - K009+566 Overlay 100mm 0.20 km. 5,183

4. K009+(-695) - K009+(-442) Reblocking w/overlay 50mm 0.26 km. 4,786

d. N Domingo St 10,623

1. K0006+041 - K0006+315 Overlay 80mm 0.27 km. 3,460

Quezon City 2nd DEO2. K0007+218 - K0007+793 Reblocking w/overlay 50mm 0.58 km. 7,163

e. E Rodriguez Sr. 74,920

1. K0006+250 - K0006+324 Reblocking w/overlay 50mm 0.09 km. 2,451

2. K0006+(-597) - K0006+(-097) Reblocking w/overlay 50mm 0.50 km. 11,241

3. K0007+545 - K0010+372 Reblocking w/overlay 50mm 2.53 km. 39,081 Regional Office

4. K0010+369 - K0010+909 Reblocking w/overlay 50mm 0.54 km. 14,705

5. K0006+1007 - K0007+545 Overlay 50mm 0.55 km. 7,442

f. Quezon Avenue Reblocking w/overlay 50mm 1.65 36,311 Quezon City 2nd DEO

1. K0011+011 - K0011+511 (NB) 0.78 km. 17,150

2. K0010+951 - K0011+511 (EB) 0.87 km. 19,161

g. University Ave 13,586

1. K0014+(-098) - K0014+(-028) Overlay 100mm 0.07 km. 836

2. K0014+000 - K0014+520 Overlay 80mm 0.52 km. 9,995 Quezon City 2nd DEO

3. K0014+520 - K0014+635 Reblocking with overlay 50mm 0.12 km. 2,755

b.

1. National Secondary 3.48 km. 108,950

a. East Ave 91,515 1. K0011+114 - K0012+100 Reconstruction PCC 300mm 0.99 km. 29,850

2. K0012+232 - K0012+674 Reconstruction PCC 300mm 0.44 km. 13,267 Regional Office

3. K0013+(-105) - K0013+245 Reconstruction PCC 300mm 0.35 km. 10,356

4. K0013+385 - K0013+1605 Reconstruction PCC 300mm 1.22 km. 38,042

b. University Ave1. K0014+027 - K0014+097 Recon AC 100mm 0.07 km. 1,185 Quezon City 2nd DEO

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 14: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

c. N. Domingo St.

1. K0007+815 - K0007+885 Recon AC 100mm 0.07 km. 1,515 Quezon City 2nd DEO

d. CP Garcia

1. K0014+1718 - K0014+1779 Reconstruction PCC 300mm 0.06 km. 1,775 Quezon City 2nd DEO

e. Bonny Serrano

1. K0008+758 - K0009+304 Reblocking PCC 300mm 0.28 km. 12,960 Quezon City 2nd DEO

2. National Bridges 42.76 lm. 53,800

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Lagarian Bridge along Reconstruction 20.00 lm. 50,000 Quezon City 2nd DEOEpifanio delos Santos Avenue (EDSA)

2. Cubao Interchange along Retrofitting 22.76 lm. 3,800 Quezon City 2nd DEOAurora Boulevard

Page 15: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

FIRST METRO MANILA DISTRICT ENGINEERING OFFICE 1,498,658 GOP 1,260,823 LOAN 237,835

SAN JUAN CITY, LONE DISTRICTCong. Joseph Victor G. Ejercito

I. Locally Funded 50,052

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. P Guevarra-J Vargas St

1. K0009+(-023) - K0010+013 Overlay 80mm 0.24 km. 2,752 First Metro Manila DEO

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 47,300

a. Rehabiilitation/Improvement of Drainage System along:

1. Ortigas Avenue Rehab./Impv't. of Drainage System lm. 10,000 First Metro Manila DEO

2. M. Paterno Street Rehab./Impv't. of Drainage System lm. 5,000 First Metro Manila DEO

3. San Juan-Santolan Road Rehab./Impv't. of Drainage System lm. 10,000 First Metro Manila DEO

4. N. Domingo Street Rehab./Impv't. of Drainage System lm. 8,300 First Metro Manila DEO

5. F. Blumentritt Street Rehab./Impv't. of Drainage System lm. 9,000 First Metro Manila DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

5. F. Blumentritt Street Rehab./Impv't. of Drainage System lm. 9,000 First Metro Manila DEO

6. P. Guevarra Street Rehab./Impv't. of Drainage System lm. 5,000 First Metro Manila DEO

Page 16: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MANDALUYONG CITY, LONE DISTRICT 507,377 Cong. Neptali M. Gonzales II GOP 269,542

LOAN 237,835

I. Locally Funded 229,272

a.

1. 200,000 PMO-MFCDP CLUSTER I

b. Various Infrastructures Including Local Roads

1. Construction/Improvement/Repair/Rehabilitation of Public 29,272 a/ First Metro Manila DEOBuildings

II. Foreign-assisted Projects

a. Flood Control

1. Pasig-Marikina River Channel Improvement Construction 1,384 lm 278,105 PMO-MFCDP CLUSTER I

Project, Phase II, JBIC, 26th YLP, (PH-P239) GOP 40,270 LOAN 237,835

Note:a/ - Allocation of P29.272 Million from HDM-4 transferred to Various Infrastructures Including Local Roads

Flood Control and Water Impounding Structures along the following Major River Basin and Principal Rivers

Mandaluyog City Drainage/Improvement Project in Maysilo

Circle Area, Mandaluyong City

Page 17: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

PASIG CITY, LONE DISTRICTCong. Roman T. Romulo

I. Locally Funded 50,692

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 1.19 km. 17,330

a. Amang Rodriguez Road

1. K0020+115 - K0020+791 Overlay 80mm 0.68 km. 12,344 First Metro Manila DEO

b. Shaw Blvd

1. Chainage 0310 - Chainage 0823 Overlay 50mm 0.51 km. 4,986 First Metro Manila DEO

b.

1. National Secondary 0.85 km. 18,362

a. Imelda Ave

1. K0018+(-1323) - K0018+(-793) Recon AC 80mm 0.53 km. 8,593 First Metro Manila DEO

b. Manila East Road (Rosario-Cainta Road)

1. K0015+(-478) - K0015+(-158) Recon AC 100mm 0.32 km. 9,769 First Metro Manila DEO

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 15,000

a. Rehabilitation of Drainage System along 15,000 First Metro Manila DEORosario-Cainta Road, (Phase II)

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Rosario-Cainta Road, (Phase II)

Page 18: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

TAGUIG-PATEROS, 1ST DISTRICTCong. Arnel M. Cerafica

I. Locally Funded 220,031

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 1.87 km. 20,250

1. National Secondary

a. Tipas-Napindan Road

1. K0021+(-1133) - K0021+(-003) Overlay 50mm 1.13 km. 7,362 First Metro Manila DEO

b. Gen. Santos Ave.

1. K0025+(-361) - K0025+379 Reblocking with overlay 50mm 0.74 km. 12,888 First Metro Manila DEO

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 710.00 lm. 199,781

a. Rehabilitation/Improvement of Drainage System along:

1. PPTA Road, Pateros, Metro Manila and Taguig City 32,500 First Metro Manila DEO

2. Tipas-Napindan Road, Taguig City 45,000 First Metro Manila DEO

3. Taguig-Labasan River Const. of gravity wall 355.00 lm. 15,000 PMO - IRROW

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

4. Pateros-Panday River Const. of gravity wall 355.00 lm. 15,000 PMO - IRROW

b. Flood Control in Taguig City and Pateros Various Projects lm. 92,281 First Metro Manila DEO

Page 19: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

TAGUIG CITY, 2ND DISTRICTCong. Sigfrido R. Tinga

I. Locally Funded 225,001

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 8.10 km. 116,431

1. National Secondary

a. Fort Bonifacio-Nichols Field Road 19,757

1. K0013+000 - K0013+1250 Overlay 50mm 1.25 km. 18,794

First Metro Manila DEO2. K0012+(-821) - K0012+(-757) Overlay 50mm 0.06 km. 963

b. C-5 Road 86,611

1. Chainage 1508 - Chainage 3352 (S03938LZ) Reblocking with Overlay 50mm 1.84 km. 33,719

2. Chainage 0927 - Chainage 1118 (S03938LZ) Reblocking with Overlay 50mm 0.19 km. 5,806

3. Chainage 1118 - Chainage 1508 (S03938LZ) Overlay 50mm 0.39 km. 4,183

Regional Office4. Chainage 0000 - Chainage 0380 (S03937LZ) Reblocking with Overlay 50mm 0.38 km. 3,610

5. Chainage 0380 - Chainage 1918 (S03937LZ) Overlay 50mm 1.54 km. 21,448

6. Chainage 2662 - Chainage 3907 (S03937LZ) Overlay 50mm 1.25 km. 17,845

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

c. Gen. Santos Ave. 7,776

1. K0025+379 - K0025+489 (S03968LZ) Overlay 50mm with minor corrections 0.11 km. 746

First Metro Manila DEO2. Chainage 0274 - Chainage 1014 (S03967LZ) Reblocking with overlay 50mm 0.74 km. 7,030

d. C-5 Service Road

1. Chainage 0000 - Chainage 0351 Overlay 50mm 0.35 km. 2,287 First Metro Manila DEO

b.

1. National Secondary

a. C-5 Road

1. Chainage 3352 - Chainage 3678 Recon AC 80mm 0.33 km. 4,836 First Metro Manila DEO

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 2,371.00 lm. 103,734

a. Rehabilitation/Improvement of Drainage System along:

1. C-5 Road Const. & Rehab. of Drainage System 1,061.00 lm. 25,000 First Metro Manila DEO

2. Libingan ng mga Bayani Road Const. & Rehab. of Drainage System lm. 6,500 First Metro Manila DEO

b. Construction & Rehabilitation of Drainage System along Const. & Rehab. of Drainage System 1,310.00 lm. 20,000 First Metro Manila DEO

C-5 Road, North

c. Taguig City, 2nd District Various Projects lm. 52,234 First Metro Manila DEO

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 20: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MARIKINA CITY, 1ST DISTRICTCong. Marcelino R. Teodoro

I. Locally Funded 220,418

a. National Arterial and Secondary National Roads and Bridges

1. 4.69 km. 110,418

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 0.14 km. 1,000

a. A Bonifacio Ave

1. K0014+(-1329) - K0014+(-1239) Overlay 50mm 0.09 km. 604 First Metro Manila DEO

b. Gil Fernando Ave.

1. K0019+000 - K0019+273 Reblocking with overlay 0.05 km. 396 First Metro Manila DEO

b.

1. National Secondary 4.55 km. 109,418

a. Gil Fernando Ave.

1. Chainage 0126 - Chainage 1255 Reblocking PCC 300mm w/ overlay 1.13 km. 46,724

First Metro Manila DEO2. Chainage 2564 - Chainage 2648 Reblocking PCC 300mm w/ overlay 0.08 km. 2,694

b. Shoe Avenue

1. Chainage 2755 - Chainage 5822 Reblocking PCC 300mm w/ overlay 3.34 km. 60,000 Regional Office

b. Major Flood Control Projects

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges - lm. 110,000

a. Dredging of Marikina River along Barangay Sta. Elena Dredging lm. 20,000 First Metro Manila DEOto Barangay Industrial Valley Complex

b. Dredging of Balanti Creek Dredging lm. 20,000 First Metro Manila DEO

c. Restoration of damaged dike along Kalumpang Side Const./Rehabilitation lm. 30,000 First Metro Manila DEOof Marikina River

d. Dredging of Marikina River along Provident Village Dredging lm. 40,000 First Metro Manila DEOto Marikina River Banks

Page 21: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MARIKINA CITY, 2ND DISTRICTCong. Romero Federico S. Quimbo

I. Locally Funded 225,087

a. National Arterial and Secondary National Roads and Bridges

1.

a.

1. National Secondary

a. Marikina-San Mateo Rd

1. K0019+669 - K0019+789 Recon AC 50mm 0.12 km. 3,044 First Metro Manila DEO

b. Major Flood Control Projects 397.00 lm. 222,043

1. Drainage/Protection Works along National Roads and Bridges 48,800

a. Rehabilitation of Drainage System along:

1. Marikina-San Mateo Road Rehab. of drainage system 183.30 lm. 6,000 First Metro Manila DEO

2. Bayan-Bayanan Avenue and Vicinity Rehab. of drainage system lm. 42,800 First Metro Manila DEO

b. Dredging of Bangkaan Creek Dredging lm. 35,000 First Metro Manila DEO

c. Repair/Rehabilitation of gravity wall along Nangka River, Rehabilitation of gravity wall 397.00 lm. 40,000 First Metro Manila DEOBarangay Nangka, Phase 2, Sta. 0+365 - Sta. 0+786

d. Construction of Slope Protection at Brgy. Fortune, Const. of Slope Protection lm. 50,000 First Metro Manila DEOSta. 0+000 - Sta. 1+290

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Sta. 0+000 - Sta. 1+290

e. SSS Flood Control and Pumping Station lm. 13,000 First Metro Manila DEO

f. Rehabilitation/Construction Slope Protection Rehabilitation/Construction lm. 35,243 First Metro Manila DEOalong Nangka River

Page 22: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

SECOND METRO MANILA DISTRICT ENGINEERING OFFICE 773,464 GOP 641,570 LOAN 131,894

MAKATI CITY, 1ST DISTRICT 150,000 Congw. Monique Yasmin Q. Lagdameo

I. Locally Funded

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 2.95 km. 50,342

1. National Secondary

a. Gil Puyat Ave

1. Chainage 0000 - Chainage 0840 Reblocking w/overlay 50mm 0.84 km. 11,969 Second Metro Manila DEO

b. Pasong Tamo 38,373

1. K0007+(-995) - K0007+(-135) Reblocking with overlay 50mm 0.86 km. 13,616

Second Metro Manila DEO2. Chainage 2428 - Chainage 3677 Reblocking with overlay 50mm 1.25 km. 24,757

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 99,658

a. Drainage improvement along P. Ocampo Sr. Extension Improvement of drainage system 940.00 lm. 5,500 Second Metro Manila DEO (Vito Cruz Extension)

b. Flood Control in Makati City, 1st District 94,158 Second Metro Manila DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Page 23: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MAKATI CITY, 2ND DISTRICT 158,994 Congw. Mar-Len Abigail S. Binay GOP 27,100

LOAN 131,894

I. Locally Funded

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. McKinley Road

1. Chainage 1403 - Chainage 1926 Reblocking with overlay 50mm 0.38 km. 4,767 Second Metro Manila DEO

II. Foreign-assisted Projects

a. Flood Control

1. Pasig-Marikina River Channel Improvement 767 lm 154,227 PMO-MFCDP CLUSTER I

Project, Phase II, JBIC, 26th YLP, (PH-P239) C/1 767 lm GOP 22,333 LOAN 131,894

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Page 24: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

PARAÑAQUE CITY, 1ST DISTRICTCong. Edwin DL. Olivares

I. Locally Funded 234,470

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 1.95 km. 29,378

1. National Secondary

a. NAIA Road (MIA Road)

1. Chainage 0100 - Chainage 0339 Overlay 100mm 0.24 km. 6,315 Second Metro Manila DEO

b. Roxas Blvd.

1. K0006+355 - K0006+511 Reblocking with overlay 50mm 0.16 km. 3,976 Second Metro Manila DEO

c. Roxas Blvd. East Service Road 19,087

1. K0007+000 - K0006+168 Reblocking with overlay 50mm 1.17 km. 12,040

Second Metro Manila DEO2. K0007+(-417) - K0007+000 Reblocking with overlay 50mm 0.39 km. 7,047

2. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion

1. Metro Manila

a. Construction of Manila-Cavite Coastal Road Construction 1.24 km 40,000 Second Metro Manila DEO

(Service Road), Parañaque City

3. National Bridges

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

3. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Sto. Niño Bridge Retrofitting 95.30 lm. 20,800 Second Metro Manila DEOalong Ninoy Aquino Avenue

b. Major Flood Control Projects 144,292

1. Drainage/Protection Works along National Roads and Bridges

a. Improvement of Drainage System in Parañaque as follows: 1,269.00 lm. 35,000

1. Dr. A. Santos Avenue (Sucat Road), San Dionisio Const./Rehab. of drainage system 1,269.00 lm. 15,000 Second Metro Manila DEO

2. Quirino Avenue from Pelaez St. to Kabihasnan Road, Drainage Improvement lm. 10,000 Second Metro Manila DEOSan Dionisio

3. Ninoy Aquino Avenue, Sto. Niño Drainage Improvement lm. 10,000 Second Metro Manila DEO

b. Riprapping of the following River Banks and Creeks: 40,000

1. Back of Olivarez College River Bank, San Dionisio Riprapping lm. 10,000 Second Metro Manila DEO

2. Bank improvement Parañaque River (North), Riprapping & Bank Improvement lm. 20,000 Second Metro Manila DEOSto. Niño

3. Improvement Parañaque River (South), San Dionisio Riprapping & Bank Improvement lm. 10,000 Second Metro Manila DEO

c. Flood Control in 1st District Various Projects lm. 69,292 Second Metro Manila DEO

Page 25: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

PARAÑAQUE CITY, 2ND DISTRICTCong. Roilo S. Golez

I. Locally Funded

a. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 2,740.00 lm. 230,000

a. Riprapping of Creek, Airport Village, Barangay Moonwalk Riprapping lm. 2,500 Second Metro Manila DEO

b. Riprapping of Creek near Phase 3, Barangay BF Homes Riprapping lm. 2,500 Second Metro Manila DEO

c. Dredging and bank improvement of Moonwalk Creek, Dredging and bank improvement 2,740.00 lm. 30,000 Second Metro Manila DEOPhase 2, Brgy. Moonwalk

d. Parañaque Spillway Project lm. 15,000 Second Metro Manila DEO

e. Dredging and bank improvement along Baloc-Baloc Dredging and Bank Improvement lm. 10,000 Second Metro Manila DEOCreek, Barangay Moonwalk

f. Dredging and bank improvement along Sapang Buwaya, Dredging and Bank Improvement lm. 12,000 Second Metro Manila DEOBarangay San Antonio

g. Dredging and bank improvement along Sapang Buwaya, Dredging and Bank Improvement lm. 8,000 Second Metro Manila DEOBarangay Marcelo Green

h. Dredging and bank improvement along Baliuag Creek, Dredging and Bank Improvement lm. 12,000 Second Metro Manila DEOBarangay Merville

i. Flood Control in 2nd District Various Projects lm. 138,000 Second Metro Manila DEO

Page 26: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

SECOND METRO MANILA SUB-DISTRICT ENGINEERING OFFICE 309,771

LAS PIÑAS CITY, LONE DISTRICTCong. Mark A. Villar

I. Locally Funded 50,345

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. Quirino Avenue

1. K0012+411 - K0012+821 Overlay 100mm 0.16 km 3,212 Second Metro Manila Sub-DEO

b.

1. National Secondary 0.67 km. 12,733

a. International Receiver Road

1. Chainage 1514 - Chainage 2114 Recon AC 100mm 0.60 km. 10,158 Second Metro Manila Sub-DEO

b. Zapote-Alabang Road

1. K0019+482 - K0019+992 Recon AC 100mm 0.07 km. 2,575 Second Metro Manila Sub-DEO

b. Major Flood Control Projects

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

1. Drainage/Protection Works along National Roads and Bridges 34,400

a. Improvement/Desilting of the following Creeks:

a. Tungtong Creek, Gatchalian, Manuyo II Improvement/Desilting lm. 10,000 Second Metro Manila Sub-DEO

b. Marulas Creek, Pulanglupa II Improvement/Desilting lm. 10,000 Second Metro Manila Sub-DEO

c. Pasong Baka Creek, Talon V Improvement/Desilting lm. 9,400 Second Metro Manila Sub-DEO

d. Rorovic Creek, Pamplona III Improvement/Desilting lm. 5,000 Second Metro Manila Sub-DEO

Page 27: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MUNTINLUPA CITY, LONE DISTRICTCong. Rodolfo G. Biazon

I. Locally Funded 259,426

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 8.22 km. 96,701

1. National Arterial

a. Daang Maharlika (LZ) Overlay 80mm 1.00 km. 21,144 Second Metro Manila Sub-DEO

1. K0027+499 - K0028+501

2. National Secondary 7.22 km. 75,557

a. Paranaque-Sucat Road 2,680 1. K0020+(-570) - K0020+(-500) Overlay 80mm 0.07 km. 1,267

Second Metro Manila Sub-DEO2. Chainage 0154 - Chainage 0217 Overlay 80mm 0.06 km. 1,413

b. South Super H-way East Service Road 28,213 1. K0020+(-315) - K0020+051 (S03296LZ) Overlay 80mm 0.37 km. 8,351

2. K0022+863 - K0022+1193 (S03298LZ) Overlay 80mm 0.33 km. 8,457 Second Metro Manila Sub-DEO

3. K0020+(-429) - K0020+571 (S03298LZ) Overlay 80mm 1.00 km. 11,405

c. Zapote-Alabang Road 10,487 1. K0023+085 - K0023+535 Overlay 50mm 0.45 km. 6,315

2. K0024+435 - K0024+545 Overlay 50mm 0.11 km. 1,687 Second Metro Manila Sub-DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

3. K0024+859 - K0025+098 Overlay 50mm 0.17 km. 2,485

d. Muntinlupa-Insular Prison Road1. K0029+147 - K0029+287 Overlay 50mm 0.14 km. 1,066 Second Metro Manila Sub-DEO

e. Parañaque-Sucat Road1. K0020+(-505) - K0020+(-047) Overlay 80mm 0.46 km. 8,594 Second Metro Manila Sub-DEO

f. PPTA Road1. K0025+(-618) - K0025+2442 Overlay 50mm 3.06 km. 18,403 Second Metro Manila Sub-DEO

g. Alabang-Muntinlupa Road1. K0030+896 - K0031+885 Overlay 50mm 1.00 km. 6,114 Second Metro Manila Sub-DEO

b. 2.52 km. 64,092

1. National Arterial

a. Daang Maharlika (LZ) 0.69 km. 22,288

1. Chainage 0000 - Chainage 0142 (S03286LZ) Reconstruction PCC 300mm 0.14 km. 4,014 Second Metro Manila Sub-DEO

2. K0026+(-988) - K0026+(-434) Reconstruction PCC 300mm 0.55 km. 18,274

2. National Secondary 1.84 km. 41,804

a. Muntinlupa-Insular Prison Road1. Chainage 0000 - Chainage 0204 Upgrade to concrete 230mm 0.20 km. 2,524 Second Metro Manila Sub-DEO

b. Paranaque-Sucat Road1. K0020+(-050) - K0020+355 Recon AC 100mm 0.41 km. 10,678 Second Metro Manila Sub-DEO

c. South Super H-way East Service Road 28,602 1. K0021+137 - K0022+035 Reconstruction PCC 300mm 1.00 km. 18,880

Second Metro Manila Sub-DEO2. K0023+337 - K0023+567 Reconstruction PCC 300mm 0.23 km. 9,722

2. National Bridges

a. Rehabilitation/Reconstruction/Strengtheningof Bridges along National Roads

1. Sucat Interchange (West Bound) Retrofitting 49.70 lm. 11,150 Second Metro Manila Sub-DEOalong MSDR East Service

2. Sucat Interchange (East Bound) Retrofitting 49.70 lm. 6,200 Second Metro Manila Sub-DEOalong MSDR East Service

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 28: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 81,283

a. Improvement/Desilting of the following Creeks:

a. Slope Protection of Tunasan River Slope Protection 1,220.00 lm. 3,500 Second Metro Manila Sub-DEO

b. Flood Control in Muntinlupa City Various Projects 77,783 Second Metro Manila Sub-DEO

Page 29: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

THIRD METRO MANILA DISTRICT ENGINEERING OFFICE 345,979

KALOOKAN CITY, 1ST DISTRICTCong. Oscar G. Malapitan

I. Locally Funded 95,350

a. National Arterial and Secondary National Roads and Bridges

1. 1.79 km. 39,050

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. Novaliches-Sn Jose Road

1. Chainage 2863 - Chainage 3258 Overlay 100mm 0.35 km. 9,493 Third Metro Manila DEO

b. 1.45 km. 29,557

1. National Arterial

a. Epifanio Delos Santos Avenu (EDSA)

1. Chainage 0000 - Chainage 0222 Reconstruction PCC 300mm 0.22 km. 6,203 Third Metro Manila DEO

2. National Secondary 1.23 km. 23,354

a. Congressional Road

1. Chainage 1224 - Chainage 2030 Reblocking PCC 230mm w/ overlay 0.81 km. 16,134 Third Metro Manila DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

b. North Expressway West Service Road (Caloocan)

1. Chainage 0000 - Chainage 0420 Reconstruction PCC 300mm 0.42 km. 7,220 Third Metro Manila DEO

2. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion

1. Metro Manila

a. Improvement/Rehabilitation of Congressional Road Improvement\Rehabilitation 0.60 km 20,000 Third Metro Manila DEO

including Drainage, Caloocan City

3. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Alat Bridge along Construction\Widening 37.30 lm. 35,000 Third Metro Manila DEOSan Jose-Novaliches Road

2. Deparo-Camarin Bridge Retrofitting 16.20 lm. 1,300 Third Metro Manila DEOalong Deparo-Camarin Road

Page 30: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

KALOOKAN CITY, 2ND DISTRICTCongw. Mary Mitzi L. Cajayon

I. Locally Funded 50,120

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. C-3 Road

1. K0010+431 - K0010+778 Overlay 100mm 0.30 km. 6,046 Third Metro Manila DEO

b. 0.13 km. 6,074

1. National Secondary

a. A Mabini St

1. K0008+1702 - K0008+1776 Reblocking PCC 230mm 0.07 km. 2,504

Third Metro Manila DEO2. K0008+(-589) - K0008+(-529) Raising of grade and drainage 0.06 km. 3,570

(concrete)

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 2,733.00 lm. 38,000

a. Rehabilitation/Improvement of Drainage System along:

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

1. Rizal Avenue Extension Rehab./Impv't. of Drainage System 567.00 lm. 7,400 Third Metro Manila DEO2. Mabini Street Rehab./Impv't. of Drainage System 403.00 lm. 8,600 Third Metro Manila DEO3. C-3 Road Rehab./Impv't. of Drainage System 720.00 lm. 10,200 Third Metro Manila DEO4. Samson Road Rehab./Impv't. of Drainage System 427.00 lm. 5,000 Third Metro Manila DEO5. Serrano Street Rehab./Impv't. of Drainage System 616.00 lm. 6,800 Third Metro Manila DEO

Page 31: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

VALENZUELA CITY, 1ST DISTRICTCong. Rexlon T. Gatchalian

I. Locally Funded 50,364

a. National Arterial and Secondary National Roads and Bridges

1. 50,364

a.

1. National Secondary

a. M.H. del Pilar Recon AC 100mm 1.40 km. 30,000 Third Metro Manila DEO

b. Coloong Road Recon AC 100mm 0.95 km. 20,364

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 32: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

VALENZUELA CITY, 2ND DISTRICTCong. Magtanggol T. Gunigundo

I. Locally Funded 150,145

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary 2.50 km. 16,677

a. Polo-Novaliches Road

1. K0017+706 - K0018+016 Overlay 100mm 0.15 km. 1,938 Third Metro Manila DEO

b. West Service Road (Valenzuela)

1. Chainage 0029 - Chainage 1029 Overlay 50mm 1.00 km. 7,016 Third Metro Manila DEO

c. East Service Road (Valenzuela) 0.51 km. 3,940

1. K0021+(-942) - K0021+(-782) Reblocking 0.16 km. 605

Third Metro Manila DEO2. K0021+(-1289) - K0021+(-942) Overlay 80mm 0.35 km. 3,335

d. G. Fernando St.

1. Chainage 0000 - Chainage 0263 Overlay 50mm 0.26 km. 1,582 Third Metro Manila DEO

e. Polo-Pugad Baboy Road

1. Chainage 0100 - Chainage 0454 Reblocking 0.35 km. 1,339 Third Metro Manila DEO

f. Gov. I. Santiago St.

1. Chainage 0428 - Chainage 0656 Reblocking 0.23 km. 862 Third Metro Manila DEO

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

1. Chainage 0428 - Chainage 0656 Reblocking 0.23 km. 862 Third Metro Manila DEO

b.

1. National Secondary

a. East Service Road (Valenzuela) 0.86 km. 14,277

1. K0021+000 - K0021+530 Recon AC 100mm 0.53 km. 8,765

Third Metro Manila DEO2. K0021+906 - K0020+360 Reconstruction PCC 300mm 0.33 km. 5,512

b. Major Flood Control Projects

1. Drainage/Protection Works along National Roads and Bridges 4,610.00 lm. 119,191

a. Construction/Rehabilitation of Drainage System along:

1. East Service Road Const./Rehab. of Drainage System 1,200.00 lm. 10,000 Third Metro Manila DEO2. Gen. T. de Leon Street Const./Rehab. of Drainage System 1,650.00 lm. 14,000 Third Metro Manila DEO3. Polo-Novaliches Road Const./Rehab. of Drainage System 1,760.00 lm. 18,000 Third Metro Manila DEO

b. Flood Control in 2nd District Varous Projects lm. 77,191 Third Metro Manila DEO

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

Page 33: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

MALABON-NAVOTAS DISTRICT ENGINEERING OFFICE 779,029

MALABON CITY, LONE DISTRICTCongw. Josephine-Veronique R. Lacson-Noel

I. Locally Funded 322,383

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections) 1.49 km. 12,157

1. National Secondary

a. C-4 Road

1. K0012+(-423) - K0012+(-286) (S02153LZ) Overlay 80mm 0.14 km. 1,980

Malabon-Navotas DEO2. Chainage 0766 - Chainage 0968 (S02154LZ) Overlay 100mm 0.20 km. 3,523

b. Gen. Luna St.

1. K0012+000 - K0012+881 Reblocking 0.88 km. 3,887 Malabon-Navotas DEO

c. Road to Tanza

1. K0013+(-102) - K0013+168 Overlay 50mm 0.27 km. 2,767 Malabon-Navotas DEO

b.

1. National Secondary 4.14 km. 128,361

a. Don Basilio Bautista St. Raising of grade & drainage

1. K0014+(-357) - K0014+003 (concrete) 0.36 km. 12,511 Malabon-Navotas DEO

b. E Rodriguez St

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

b. E Rodriguez St

1. K0014+(-253) - K0014+(-003) Reblocking PCC 230mm w/ overlay 0.25 km. 4,552 Malabon-Navotas DEO

c. Gov W Pascual Ave Raising of grade & drainage

1. K0013+551 - K0014+824 (concrete) 1.12 km. 36,208 Malabon-Navotas DEO

d. Leono St Reblocking PCC 230mm

1. Chainage 0000 - Chainage 0515 with overlay 0.52 km. 10,919 Malabon-Navotas DEO

e. MH Del Pilar St Reblocking PCC 230mm 34,581

1. K0011+(-711) - K0011+149 with overlay 0.86 km. 30,818

Malabon-Navotas DEO2. K0013+309 - K0013+449 Reblocking PCC 230mm 0.14 km. 3,763

with overlay

f. Sanciangco St 29,590

1. K0012+(-777) - K0012+(-485) Raising of grade & drainage 0.29 km. 9,686 (concrete)

2. K0012+(-292) - K0012+113 Raising of grade & drainage 0.41 km. 13,435 Malabon-Navotas DEO(concrete)

3. K0012+203 - K0012+403 Raising of grade & drainage 0.20 km. 6,469 (concrete)

2. National Bridges 121.03 lm. 181,865

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Catmon Bridge Retrofitting 36.33 lm. 4,500 Malabon-Navotas DEOalong Sanciangco Street

2. Lambingan Bridge Reconstruction 75.00 lm. 76,950 Regional Officealong Gov. Pascual Avenue

3. Malabon Bridge Reconstruction 9.70 lm. 100,415 Regional Officealong P. Aquino Street/Letre Road

Page 34: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

NAVOTAS CITY, LONE DISTRICTCong. Tobias Reynald M Tiangco

I. Locally Funded 456,646

a. National Arterial and Secondary National Roads and Bridges

1.

a. Preventive Maintenance (Intermittent Sections)

1. National Secondary

a. C-3 Road

1. Chainage 0485 - Chainage 0645 (S02120LZ) Overlay 100mm 0.16 km. 2,839 Malabon-Navotas DEO

b.

1. National Secondary 0.63 km. 12,007

1. Cadorniga St

a. Chainage 0000 - Chainage 0460 Raising of grade (concrete) 0.46 km. 9,049 Malabon-Navotas DEO

2. Gov A Pascual St

a. Chainage 0000 - Chainage 0140 Reblocking PCC 230mm w/ overlay 0.14 km. 2,508 Malabon-Navotas DEO

3. Tanza-Gasak Road

a. Chainage 0000 - Chainage 0260 Reblocking PCC 230mm w/ overlay 0.03 km. 450 Malabon-Navotas DEO

2. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion

Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development and

Management-4 (HDM-4)

Rehabilitation, Reconstruction/Upgrading of Damaged

Paved National Roads (Intermittent Sections)

a. National Roads Traffic Decongestion

1. Metro Manila

a. Widening/Improvement of R-10 including ROW, Widening/concreting 0.25 km. 425,000 Regional OfficeManila-Navotas

3. National Bridges

a. Rehabilitation/Reconstruction/Strengthening

of Bridges along National Roads

1. Spine Bridge (Left & Right) Retrofitting 66.90 lm. 16,800 Malabon-Navotas DEOalong Lapu-lapu Avenue

Page 35: NCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM FY … C R.pdfNCR FY2012/PropFY2012 16-Feb-12 1:52:31 PM Implementing Office (2) (3) (4) (5) FY 2012 DPWH INFRASTRUCTURE PROGRAM NATIONAL

NCR FY2012/PropFY2012 16-Feb-12

1:52:31 PM

ImplementingOffice

(2) (4) (5)(3)

FY 2012 DPWH INFRASTRUCTURE PROGRAMNATIONAL CAPITAL REGION

(Based on GAA)

Name of Project/Location Scope of WorkPhysical Target

Allocation (P'000)

(1)

REGIONWIDE

I. Locally Funded Projects 1,403,000

a. National Arterial and Secondary Roads and Bridges 1,393,000

1. Roads to Address Critical Bottlenecks

a. National Roads Traffic Decongestion 38.416 km. 1,193,000

1. Metro Manila

a. Construction/Improvement/Rehabilitation Construction/Improvement/ 20.93 km. 450,000 PMO-URPO

of NAIA Expressway and other Major Roads Rehabilitation

in Metro Manila (Phase II) including ROW

b. Construction/Improvement of Mindanao Avenue Construction/Improvement 3.20 km. 243,000 Regional OfficeExtension, Segment 2-C (Phases I & II), Caloocan and

Valenzuela Cities including Right-of-Way Acquisition

c. Construction of C-6 Expressway and Extension Construction/Concreting 14.29 km 500,000 Regional Office

2. National Bridges

a. Construction/Completion of On-Going

Bridges (Including Approaches)

1. Construction 142.0 lm. 200,000 PMO-URPO

b. Preliminary Detailed Engineering Various 10,000 Regionwide

Construction of Bridge connecting Lawton Avenue, Makati