Upload
tvowels
View
99
Download
7
Tags:
Embed Size (px)
Citation preview
POWER PLANTDECOMMISSIONING SERVICES
TEL 800.547.0128 WEB ncmgroup.com
TURN-KEY DECOMMISSIONINGNCM offers professional turn-key
approach to decommissioning and
dismantling, providing all the services
you need from one vendor. NCM adhers
to the highest levels of safety and
environmental compliance owns and
maintains a large inventory of the most
sophisticated equipment.
ASSET RECOVERYOur industrial asset recovery experts
will integrate budgetary, operating
and scheduling considerations to bring
you significant savings and to offset
project costs through proven marketing
campaigns to our network of national
and international buyers.
Work together to identify assets for sale, reuse and
relocation
Market assets to NCM’s network of national and
international clients
Sell assets for top value domestically and
intenationally
Unlock greatest value to you the client as profit or
as project cost offset
MAXIMIZEDSALES
VALUEUNLOCKED
GLOBALBUYERS
CLIENT &NCM TEAM
ACCESS TO:
Industry-leading Safety Program w/ solid EMR
$50 Million in Heavy Equipment
2000+ Employees
Asset Recovery Solutions
C&D Recycling Programs
Waste Management
24/7 Disaster Response
Total Plant Decommissioning, Dismantling and Demolition
Stack Demolition & Dismantling
Asbestos Abatement
Decontamination of Structures and Equipment
Industrial and Hazardous Waste Transportation & Disposal
Heavy Metal Abatement
Industrial Rigging and Removal of Plant Equipment & Machinery
Soil & Groundwater Remediation
Final Grading
SERVICES
NCM Office
Major Project
Service Area
REPRESENTATIVE POWER PLANT PROJECTS
NV | Mohave Generating Station Abatement, dismantling & demolition for station & surrounding tanks, ponds & bldgs $65M
CA | Moss Landing Power Plant Demolition of 8 power boiler structures & surrounding oil, fuel & water tanks $22M
PA | AMTRAK Powerhouse Asbestos abatement, total demolition, 323 ft. stack implosion & removal of Fly-ash $5.7M
NY | Lovett Station Powerhouse ACM 80,000+ sq. ft. asbestos abatement on 3 coal boilers and water lines to the Hudson $4.5M
TX | Neches Station Electric Plant Asbestos & lead abatement, complete dismantling & recycling of 12k tons of metal $4.2M
AL | E.C. Gaston Steam Plant Manual demolition of 4, 250 ft. stacks during plant operation & recycling of materials $3.0M
ID | INEEL Reactor Research Facility Abatement & demolition of 4, super-solid bldgs at the US DoE atomic research facility $3.0M
FL | Bartow Steam Plant Removal of 13k LF of TSI & 40k sq. ft. of boiler/duct insulation in prep. for demolition $2.3M
NC | Allen Steam Plant Abatement & removal of precipitator #3 with uninterruption to all in-service systems $2.3M
TEL 800.547.0128 WEB ncmgroup.com
CASE STUDY OF A SAFE AND SUCCESSFUL POWERPLANT DECOMMISSIONING
Commissioned: 1971
Offline: December 31, 2005
Location: Laughlin, Nevada
December 2005: Plant taken offline as
newer, more efficient plant comes online.
June 2009: Owner selects NCM as
partner in demolition, decommissioning,
remediation and asset recovery.
October 2009: NCM begins the work
decommissioning this complex, 2,500-
acre site project, which includes early
collaboration with the owner to identify
and catalog all resalable and recyclable
assets to be recovered.
July 2012: More than 245,000 man
hours into the project, NCM has safely
completed the majority of the work
without a lost time incident. The client
has benefited from millions of dollars in
shared asset recovery, helping them pay
for a significant portion of the work.
#2 Demo. Company, N. America (D&RI)
#4 Demo. & Wrecking, U.S. (ENR)
#2 Asbestos Abatement, U.S. (ENR)
1st AGC National CSE Award 2012
Diamond Level ABC STEP Award 2012
#56 Top 600 Specialty Contractors (ENR)
INDUSTRY LEADERS
INduSTRy LOWEMR RATINGS
ExCEPTIONALSAFETY RECORD