NCHRPNCHRP 1
NCHRP Bridge ResearchNCHRP Bridge Research
Report to
AASHTO Highway Subcommitteeon Bridges and Structures
National Cooperative Highway Research Program
Transportation Research Board
May 2008
NCHRPNCHRP 2
OverviewOverview
NCHRP Products
Program Description
FY 2009 Program
Active Projects
NCHRPNCHRP 3
Application of NCHRP BridgeApplication of NCHRP BridgeProductsProducts
2008 Agenda2008 Agenda
14 Ballot Items reference 21 NCHRPProjects or Reports
NCHRP Reports: 230, 290, 343, 350,406, 449, 469, 473, 496, 507, 596
NCHRPNCHRP 4
Coming NCHRP Bridge ProductsComing NCHRP Bridge Products
Concrete Strengths > 10 ksiConcrete Strengths > 10 ksi
NCHRP 12NCHRP 12--5656 (Report 579)(Agenda Item 14) Shear
NCHRP 12NCHRP 12--6060 (Report 603) Transfer anddevelopment length
NCHRP 12NCHRP 12--6464 (Report 595) Flexure andCompression
NCHRP 20NCHRP 20--07/Task 21607/Task 216 Everything Else
NCHRPNCHRP 5
Coming NCHRP Bridge ProductsComing NCHRP Bridge Products
NCHRP 12NCHRP 12--6868 (Report 596)(Agenda Item 78)
Rotational design capacity and quality
assurance of elastomeric bearings
NCHRP 12NCHRP 12--7070 (Report 611)
Seismic design of retaining walls, buriedstructures, slopes, and embankments
NCHRPNCHRP 6
Coming NCHRP Bridge ProductsComing NCHRP Bridge Products
NCHRP 12NCHRP 12--7171 (Report 620)
Horizontally curved concrete box-girderhighway bridges.
NCHRP 15NCHRP 15--2828 (Report 619)
CANDE-2007
NCHRPNCHRP 7
NCHRPNCHRP 8
Coming NCHRP Bridge ProductsComing NCHRP Bridge Products
Deflections (in)Deflections (in)
NCHRPNCHRP 9
Coming NCHRP Bridge ProductsComing NCHRP Bridge Products
NCHRP 20NCHRP 20--07/Task 24407/Task 244
LRFD design specifications andcommentary for pedestrian bridges
NCHRP 20NCHRP 20--07/Task 25207/Task 252
guidelines for implementingadvanced QC/QA procedures forbridge inspection
NCHRPNCHRP 10
The National AcademiesThe National Academies
National Academy ofSciences
National Academy ofEngineering
Institute of Medicine
National Research Council
The Keck Center
NCHRPNCHRP 11
Overview of NCHRP ProcessOverview of NCHRP Process
Program Selection - AASHTO
Program Funding - FHWA/States
Program Administration- NCHRP
NCHRPNCHRP 12
Program SelectionProgram Selection
AASHTOAASHTO
Problem Statements
Standing Committee on Research
States Ballot - 2/3 must approve project
NCHRPNCHRP 13
Program FundingProgram FundingFHWAFHWA
States Voluntary Contributions
» AASHTO negotiated agreement withStates
» 5-1/2% of SPR funds
» FHWA administers funds
NCHRPNCHRP 14
Program AdministrationProgram AdministrationNCHRPNCHRP
Set Up Project Panels
Develop Project Statements (RFP)
Contract with Research Agency
Project Surveillance
NCHRPNCHRP 15
0
2
4
6
8
10
12
14
16
18
96 97 98 99 00 01 02 03 04 05 06 07
Program Year
No
min
ee
sp
er
Pa
ne
l
Federal Agency
State Agency
University
Others
NCHRPNCHRP 16
FY 2009 ProgramFY 2009 Program
FY 2004 $25,311,000
FY 2005 $27,525,000
FY 2006 $27,615,000
FY 2007 $21,050,000
FY 2008 $26,880,000
FY 2009FY 2009 $28,170,000$28,170,000
NCHRPNCHRP 17
FY 2009 ProgramFY 2009 Program
Continuation Projects21 Projects $ 10,550,000
1 Bridge Related (scour)
New Projects31 Total $17,620,000
3 Bridge Related $ 1,620,000
1 Strategic Issues $ 5,000,000
NCHRPNCHRP 18
FY 2009 ProgramFY 2009 ProgramNew ProjectsNew Projects
•• 1212--8282 Developing ReliabilityDeveloping Reliability--basedbased BridgeBridgeInspection PoliciesInspection Policies $750,000 (Your #1 Priority)
•• 1212--8383 Calibration of LRFD Concrete BridgeCalibration of LRFD Concrete BridgeDesign Specifications for ServiceabilityDesign Specifications for Serviceability$500,000 (Your #2 Priority)
•• 1515--3838 Design Requirements for Culvert JointsDesign Requirements for Culvert Joints$370,000$370,000 (Your #4 Priority)
NCHRPNCHRP 19
2020--07 Research for the07 Research for theAASHTO Standing CommitteeAASHTO Standing Committee
on Highwayson Highways
$1,200,000 FY 2009 Funding
AASHTO Highway Committee orSubcommittees of SCOH can requestTask funding
20-07 panel selects tasks biannually
Informally appointed Task panels
NCHRPNCHRP 20
New 20New 20--0707
Task 261Task 261 - Best Practices forImplementing Quality Control andQuality Assurance for TunnelInspection
Task 262Task 262 - Review and Update of theAASHTO Guide Specifications forSeismic Isolation Design
NCHRPNCHRP 21
2020--05 Synthesis05 Synthesis
Managed Within TRB, but outsideNCHRP
$1,200,000 FY 2009 Funds
Topics selected by 20-05 panel
Informally appointed topic panels
NCHRPNCHRP 22
41 Projects of Interest
(last year 46)
Contract Value Exceeds
$18,900,000(last year $20,600,000)
Active ProjectsActive Projects
NCHRPNCHRP 23
Grand ChallengesGrand Challenges1. EXTENDING SERVICE LIFE
2. OPTIMIZING STRUCTURAL SYSTEMS
3. ACCELERATING BRIDGECONSTRUCTION
4. ADVANCING THE AASHTOSPECIFICATIONS
5. MONITORING BRIDGE CONDITION
6. CONTRIBUTING TO NATIONAL POLICY
7. MANAGING KNOWLEDGE
NCHRPNCHRP 24
Web SitesWeb Sites
NCHRPNCHRP
WWW4.nas.edu/trb/crp.nsfWWW4.nas.edu/trb/crp.nsf
TRBTRB
trb.orgtrb.org