Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
2013 NCHRP BRIDGE AND
STRUCTURE RESEARCH UPDATES
Waseem Dekelbab, PhD, PE, PMP2013 AASHTO SCOBS Meeting
Portland, ORJune 16-20, 2013
OUTLINE
NCHRP Program Cycle
FY 2014 NCHRP Program Funding
NCHRP Bridge and Structure Projects
Funded (FY 2014) Funded (FY 2014)
Awarded (FY 2013)
Completed/Published/In progress
NCHRP Products Developed for AASHTO HSCOBS
: NCHRP Group on Bridges and Structures
Submittal EvaluationProgram
Formulation
NCHRP PROGRAM CYCLE
ProgramApproval
PanelFormulation
Proposal Process
Agency SelectionProject
SurveillanceResults and
Implementations
Submittal &Evaluation
NCHRP PROGRAM CYCLE
NCHRP solicits problem statements fromauthorized sources: DOTs, AASHTOCommittees/Subcommittees, and FHWA(July-September)
FHWA and NCHRP evaluate problem FHWA and NCHRP evaluate problemstatements
SCOR and RAC rate the candidates in amail ballot to set priorities for the SCORmeeting in March
NCHRP sends a summary report to theSCOR
Formulation &Approval
SCOR meets to formulate theNCHRP Program (late March)
FHWA approves of conformancewith Federal-aid requirements
SCOR sends a report to the AASHTO
NCHRP PROGRAM CYCLE
Approval SCOR sends a report to the AASHTOBoard of Directors requestingapproval of the projects
AASHTO refers program to the NASfor administration
NAS reviews for acceptance
NCHRP solicits panel nominations(May-June)
NCHRP appoints panel members
Panel prepares RFP (July-September)
NCHRP solicits proposals
NCHRP PROGRAM CYCLE
Execution
NCHRP solicits proposals
Panel reviews the proposals and makesrecommendation for award of contract
NCHRP negotiates and executes acontract
NCHRP administers the project
FY 2014 NCHRP PROGRAM
FFUNDING
FY 2014 NCHRP PROGRAMMING
Projects Submitted (Million) Programmed (Million)
Continuations 15 ($9.296) 15 ($9.296)
New 125 ($51.840) 50 ($20.620)
Total 140 ($61.136) 65 ($29.916)
New Projects Submitted by:
Member Departments 44 ($20.300) 9 ($3.400)
AASHTO Committees 76 ($29.090) 38 ($15.370)
FHWA 5 ($2.450) 3 ($1.850)
FY 2014 NCHRP PROBLEM STATEMENTS
SUBMITTED BY AASHTO COMMITTEES
AASHTO Committee Submitted Programmed
Asset Management ( SCOAM) 2 0
Bridges and Structures (HSCOBS) 9 6
Construction (HSOC) 1 1
Design (HSOD) 23 8
Finance and Administration 1 0Finance and Administration 1 0
Environment (SCOE) 3 3
Planning (SCOP) 2 2
Maintenance (SOMn) 8 3
Materials (SOMt) 12 7
Traffic Engineering (SCOTE) 10 2
Traffic Safety (SCOHTS) 5 3
Transportation Information (SCOR) 0 3
Total 76 38
FY 2014 NCHRP SUBJECT MATTER
DISTRIBUTION
Problem Area Programmed Total Allocation $(Million)
Admin/Policy 6 2.550
Bridges 5 1.100
Construction 1 0.200
Design 4 1.700
Environment 5 2.220
Geotechnical 2 0.800
Innovations 1 1.250
Maintenance 3 1.100
Materials 6 3.350
Pavements 2 0.750
Planning 8 3.450
Public Transportation 1 0.450
Safety 4 1.696
Security/Emergency 1 0.600
Special (misc.) 4 3.600
Traffic/Operations 12 5.100
TOTAL 65 29.916
FY 2014 NCHRP PROGRAM
FUNDING
$29,916,000
Continuation
New
15 Projects
50 Projects
$9,296000
$20,620,000
FY 2014 NCHRP PROGRAM
CONTINUATION PROJECTS
Continuations
10 Special projects
$8,350,000
(90%)
Research for AASHTO SCO:Planning, Highways, Public
Transportation, andEnvironment
Synthesis, Legal Studies, IDEA,Continuations
15 Projects
$9,296,000
Synthesis, Legal Studies, IDEA,Domestic Scan, and NCHRP
Program Implementation
Surface Transportation SecurityResearch
Research for Administration ofHW&T Agencies (CEOs)
5 Continuationprojects
$946,000
(10%)
FY 2014 NCHRP NEW PROJECTS
New
Other areas
43
$18,520,000
(90%)
50 projects
$20,620,000 Bridges &Structures
7
$2,100,000
(10%)
FY 2014 NCHRP BRIDGE AND
S F PSTRUCTURE FUNDED PROJECTS
FY 2014 SUBMITTED PROBLEM
STATEMENTS
Project Title Funds
12-98Guidelines for Tolerances for PrefabricatedBridge Elements and Systems
$150K
12-99Guidelines for Calculating Dynamic Effectsin Large-Scale Bridge Moves
$150K
12-100Identifying and Addressing Failures of SmallMovement Bridge Expansion Joints
$150K
FY 2014 SUBMITTED PROBLEM
STATEMENTS
Project Title Funds
12-101
Recommended AASHTO LRFD DesignSpecifications and Method of StructuralAnalysis for Bridge Structures withEnergy Dissipation Mechanism in Their
$250KEnergy Dissipation Mechanism in TheirColumns
12-102Development of an Accelerated BridgeConstruction (ABC) Design andConstruction Guide Specification,
$400K
FY 2014 SUBMITTED PROBLEM
STATEMENTS
Project Title Funds
10-94Prevention of Galvanized-Induced WeldCracking in Highway Structures
$500K
10-95Acceptable Heat Affected Zone Toughnessof A709 Bridge Steel
$500K
20-07/Task 348
Review, Summarize, and Update Needs ofthe AASHTO LRFD Movable HighwayBridge Design Specifications
$100k
FY 2013 NCHRP BRIDGE AND
S A PSTRUCTURE AWARDED PROJECTS
FY 2013 NCHRP BRIDGE AND
STRUCTURE FUNDED PROJECTS
Project Title Funds
12-92 Load and Resistance Factor Design Specificationsfor Bridges Carrying Rail Transit Loads
$375,000
12-93 Structural Testing and Design Methodology forSingle Column-Single Shaft Foundation Considering
$500,000Single Column-Single Shaft Foundation Consideringthe Flexural Capacity of Steel Casing
12-94 Minimum Flexural Reinforcement Laboratory Testing $550,000
12-95 Design Guidelines for Connection Details ofAdjacent Precast Concrete Box Beam Bridges
$500,000
12-96 Precast Full Depth Deck Panel Concept - PossibleNext Generation Solution
$400,000
FY 2013 NCHRP BRIDGE AND
STRUCTURE FUNDED PROJECTS
Project Title Funds
12-97 Design Guidelines for Field Deployment of CFRPPrestressed Beams in Bridge Construction
$500,000
14-29 Developing a Consistent Coding and TrainingSystem For Emergency Structure Inspections
$400,000System For Emergency Structure Inspections
14-30 Extending the Life of Highway Bridge CoatingSystems Through the Use of Spot Painting withMinimal Surface Preparation
$350,000
14-32 Proposed Revisions to the AASHTO Movable BridgeInspection, Evaluation and Maintenance Manual,1st Edition, 1998*NCHRP Project 20-07/Task 326 FY2012( Canceled)
$200,000+$50,000*
FY 2013 NCHRP BRIDGE AND
STRUCTURE FUNDED PROJECTS
Project Title Fund
20-07/Task335
Updating the Strategic Plan for theHighway Bridges and Structures
* FHWA provided additional funding
$80,000
* FHWA provided additional funding
20-59(47) Emergency Exit Signs and MarkingSystems for Highway Tunnels
*20-07/ Task 336 $50,000 FY2013( Canceled)
$150,000+$50,000*
20-07/Task337
Complex Bridge InspectionProcedures
$100,000
FY 2013 NCHRP BRIDGE AND
STRUCTURE FUNDED PROJECTS
Project Title Fund
20-07/Task342
Wind Turbulence-Structure Interactionand Aeroelastic Instability for Long-Span Flexible Girder Systems( Canceled)*
$100,000*
( Canceled)*
* Allocated funds will supplementNCHRP Project 20-07/Task 325
20-07/Task347
Test Methods to DetermineHydraulic Performance of CulvertJoints
$100,000
NCHRP BRIDGE AND STRUCTURE
P C /PPROJECTS COMPLETED/PUBLISHED
NCHRP BRIDGE AND STRUCTURE
PROJECTS PUBLISHED (2012)
Project Title Publication
10-72Bridge Deck Design Criteria andTesting Procedures
To be publishedas NCHRPReport 738
10-74Fatigue Loading and DesignMethodology for High-MastLighting Towers
NCHRP Report718
12-79
Guidelines for Analytical Methodsand Erection Engineering ofCurved and Skewed Steel Deck-Girder Bridges
NCHRP Report724
NCHRP BRIDGE AND STRUCTURE
PROJECTS COMPLETED/PUBLISHED
(2012/2013)
Project Title Publication
12-81Evaluation of Fatigue on theServiceability of Highway Bridges
NCHRPReport 721
Guidelines for the Load and NCHRP
12-84
Guidelines for the Load andResistance Factor Design and Ratingof Riveted and Bolted Gusset-PlateConnections for Steel Bridges
NCHRPWeb-OnlyDocument197
18-15High-Performance/High-StrengthLightweight Concrete for BridgeGirders and Decks
NCHRP Report733
NCHRP BRIDGE AND STRUCTURE
PROJECTS COMPLETED (2012/2013)
Task Title
20-07/Task 306
Revision of Strut-and-Tie Provisions in theAASHTO LRFD Bridge Design Specifications andExamples (T-10)
20-07/Task 307
Updated Research for Collision Damage andRepair of Prestessed Concrete Beams (T-10)
NCHRP BRIDGE AND STRUCTURE
P PPROJECTS IN PROGRESS
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
10-80New Specifications for Structural Supports for HighwaySigns, Luminaires, and Traffic Signals (Sept. 2013)
12-83Calibration of LRFD Concrete Bridge DesignSpecifications for Serviceability (Sept. 2013)
12-85Roadway Bridges Fire Hazard Assessment (Aug.2013)
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
12-86Bridge System Reliability for Redundancy (Sept.2013)
12-87Development of System Fracture AnalysisMethods for Fracture Critical Steel Bridges12-87 Methods for Fracture Critical Steel Bridges(Termination pending)
12-89Recommended AASHTO LRFD Tunnel Design andConstruction Specifications (Jun. 2014)
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
12-90 Guidelines for Shielding Bridge Piers (Oct. 2015)
12-91Strand Debonding for Pretensioned Girders(Sept.2015)
12-91(Sept.2015)
12-103
24-38
Bridge Superstructure Tolerance to Total and
Differential Foundation Movements (In
Development)
(Development of Bridge Foundation Movement
Criteria)
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
14-23Practical Bridge Preservation Actions andInvestment Strategies (Mar. 2015)
Culvert and Storm Drain System Inspection Manual14-26
Culvert and Storm Drain System Inspection Manual(Nov. 2014)
14-27A Guide for the Preservation of Highway TunnelSystems (Mar. 2015)
14-28Condition Assessment of Bridge Post-Tensioning andStay Cable Systems Using NDE Methods (May 2015)
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
18-16Self-Consolidating Concrete for Cast-in-Place BridgeComponents (Jun. 2014)
24-34Risk-Based Approach for Bridge Scour Prediction (Jun.
24-34Risk-Based Approach for Bridge Scour Prediction (Jun.2013)
NCHRP BRIDGE AND STRUCTURE
PROJECTS IN PROGRESS
Project Title
20-07/Task
316
Establishment of Appropriate Guidelines for
Use of the Direct and Indirect Design Methods
for Reinforced Concrete Pipe (Oct. 2013)
20-07/Task
325
Updating the AASHTO LRFD Wind Loads
Provisions (Mar. 2014)
20-07/Task
335
Updating the Strategic Plan for the Highway
Bridges and Structures (Oct. 2013)
SUMMARY STATUS OF NCHRP BRIDGE
AND STRUCTURE PROJECTS
8
11
18
10
12
14
16
18
20
8
1 10
2
4
6
8
10
FY 2014 newprojects
Indevelopment
Contractpending
In progress In publication
NCHRP PRODUCTS DEVELOPED
AASHTO HSCOBSFOR AASHTO HSCOBS
NCHRP PRODUCTS DEVELOPED FOR
AASHTO HSCOBS (1978-2013) -195 PRODUCTS
48
69
3940
50
60
70
80
30
9
39
0
10
20
30
40
Of Interest Adopted ActionRequired
2012 AgendaItems
"Status"
Active/InDevelopment
:NCHRP GROUP ON
BRIDGES AND STRUCTURES*
The goal is to involve group members in keepingthe design, construction, and maintenance of theNation’s bridges and structures at the cuttingedge.
Feedback is encouraged for the benefit of the
inLinked
Feedback is encouraged for the benefit of theNCHRP and for discussion purposes.
*This is an individual staff effort. The opinions and conclusions expressedor implied herein are not necessarily those of the Transportation ResearchBoard, the National Academies, or the program sponsors.
ACKNOWLEDGEMENTS
Members of AASHTOHSCOBS and itsTechnical Committees
Members of TRBCommitteesCommittees
FHWA
NCHRP Panel Members
Research Teams
HTTP://WWW.TRB.ORG/NCHRP