18
2019 AASHTO COBS Annual Meeting T-11: TC for Research Waseem Dekelbab, PhD, PE, PMP Montgomery, AL June 25, 2019 NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES

NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

2019 AASHTO COBS Annual Meeting

T-11: TC for Research

Waseem Dekelbab, PhD, PE, PMP

Montgomery, AL

June 25, 2019

NCHRP BRIDGE AND STRUCTURE

RESEARCH UPDATES

Page 2: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

OUTLINE

• FY 2020 NCHRP Program Funding

• NCHRP Bridge and Structure Projects– Funded (FY 2020)

– Completed/Published/In progress

Page 3: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NATIONAL

COOPERATIVE

HIGHWAY

RESEARCH

PROGRAM

FY 2020 NCHRP Program Funding

Page 4: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP Submitted

Problem Statements127 Problem Statements

($56 M)

New Problem Statements: 114 ($46 M)

AASHTO Committees: 77

($31 M)

Member Departments:

34 ($14 M)

FHWA: 3

($1 M)

Continuations: 13 ($10 M)

Page 5: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31
Page 6: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP Programming

Problem Statements Submitted (Million) Programmed (Million)

Continuations 13 ($10) 11 ($7.740)New 114 ($46) 58 ($25.590)Total 127 ($56) 69 ($33.330)

New Problem Statements Submitted by:

AASHTO Committees 77 ($31) 46 ($20.195)Member Departments 34 ($14) 11 ($5.045)FHWA 3 ($1) 1 (0.350)

Page 7: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

Continuations

11 Projects

$7,740,000

7 Special projects

$6,620,000 (86%)

Synthesis, IDEA, Domestic Scan, Legal Studies, NCHRP Implementation, and Research for Administration of Highway &Transportation Agencies (CEOs)

4 Continuation projects

$1,120,000 (14%)

Page 8: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

AASHTO Committees # of Problems Submitted # of Problems Programmed

Active Transportation 2 1

Bridges and Structures 4 3

Design 1 1

Design - Geometric Design 5 4

Design - Roadside Safety 5 3

Environment and Sustainability 10 3

Funding and Finance 2 1

Knowledge and Management 1 1

Maintenance 5 2

Materials and Pavement 4 4

Planning 1 1

Performance-Based Management 3 3

Public Transportation 5 3

Research and Innovation 6 2

Research and Innovation & Planning 1 1

Right of Way, Utilities and Outdoors 5 2

Safety 5 5

Traffic Engineering 2

Transportation System Security and Resilience 3 3

Data Management and Analytics and Trasp. System Security and Resilience

1 1

Transportation Systems Management and Operations 4 2

Urban Freight 2 1

Total 77 46

Page 9: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP New Projects

New

58 projects

$25,590,000

Other areas

55

$23,840,000

(93.2%)

CBS

3

$1,750,000

(6.8%)

Page 10: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NATIONAL

COOPERATIVE

HIGHWAY

RESEARCH

PROGRAM

NCHRP Bridge and Structure Projects

Page 11: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2019 Funded Projects -Off cycle

Project Title Funds

22-41 Proposed Modification to AASHTO LRFD Bridge Design Specifications, Section 13—Railing (CBS, Off-cycle)

$250K

Page 12: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 Funded Projects

Project Title Funds

C-01(12-119

Bridge Deck Overhangs with MASH-Compliant Railings(CBS#1)

$500K

C-05(12-120)

Developing High Strength Corrosion Resistant Steel Strands for Prestressing( COBS#2)

$600K+$150K

Page 13: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 Funded Projects

Project Title Funds

C-04Rational Tolerances for Fabrication of Steel Bridge Members.(CBS#3)

$400K-contingency

C-23(14-45)

Model Procedures for Post-Event Bridge Damage Assessment and Engineering Evaluation (CBS#4)

$300K +$200K

Page 14: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP Bridge and Structure Projects Completed/Published/In progress

http://www.trb.org/Main/Blurbs/178610.aspx

Page 15: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS

Project Title

12-94LRFD Minimum Flexural Reinforcement RequirementsTo be published as NCHRP Research Report 906

12-96Simplified Full-Depth Precast Concrete Deck Panel Systems NCHRP Research Report 895

14-35Contribution of Steel Casing to Single Shaft Foundation Structural ResistanceNCHRP Research Report 908

Page 16: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS –TO BE COMPLETED IN JULY 2019

Project Title

12-105Proposed AASHTO Seismic Specifications for ABC Column Connections

12-108Guide Specification for Service Life Design of Highway Bridges --Ballot

15-54Proposed Modifications to AASHTO Culvert Load Rating Specifications

Page 17: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS

Project Title

14-34,Part I

Proposed AASHTO Guide for Bridge Preservation Actions --Ballot

Page 18: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NEED HELP?

Waseem Dekelbab, PhD, PE, PMP

202-334-1409

[email protected]

Transportation Research Board

The National Academies of Sciences,

Engineering, and Medicine