NCAR, FRGP, and NCAR, FRGP, and BiSON SLAs BiSON SLAs Scot Colburn – NCAR Scot Colburn – NCAR Quilt Fiber Workshop Quilt Fiber Workshop Friday the 13 Friday the 13 th th , October , October 2006 2006

NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Embed Size (px)

Citation preview

Page 1: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

NCAR, FRGP, and NCAR, FRGP, and BiSON SLAsBiSON SLAs

Scot Colburn – NCARScot Colburn – NCAR

Quilt Fiber WorkshopQuilt Fiber Workshop

Friday the 13Friday the 13thth, October 2006, October 2006

Page 2: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Key

Stateline, WY

BPOP Level3

Repeater/Amplifier

UW

CSU

Platteville, CO

DD

D

D

C

C

D

WDM

WDM

WDM

WDM

Longmont, CO

Denver, CO

Fort Collins, CO

Boulder, CO

Laramie, WY

WDMMovaz

DWDM D

C

CiscoSwitch

Repeater/Amplifier

WDMCWDM

M20M20

NLR CRS-1

FRGP l3-gw-1

TeraGrid T640

FRGP

FRGP l3-gs-1

NCAR

Gigabit Ethernet

NLR 6509

10G

tcom-gs-1

10G

BoulderCounty

M20M20

Bi-State Optical Network (BiSON)10/12/2006

M20M20

NOAA

CU

BRAN

Page 3: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

NETS SLANETS SLA NETS (Network Engineering and Technology Section) provides NETS (Network Engineering and Technology Section) provides

LAN/WAN support for UCARnet at NCARLAN/WAN support for UCARnet at NCAR Provides for maintenance window between 6 and 7 AMProvides for maintenance window between 6 and 7 AM

Legacy of NCAR's 6-8 AM "System Test Time”Legacy of NCAR's 6-8 AM "System Test Time” SLA doesn’t provide for punishment; just a guide of how things are SLA doesn’t provide for punishment; just a guide of how things are

expected to workexpected to work Customers can expect e-mails opening, during, and closing a Customers can expect e-mails opening, during, and closing a

problem.problem. Due to lengthy Cisco IPT server software upgrades, now have a Due to lengthy Cisco IPT server software upgrades, now have a

special IPT Maintenance window between 7 PM and 7 AMspecial IPT Maintenance window between 7 PM and 7 AM SLA written for a captive audience to manage expectationsSLA written for a captive audience to manage expectations Expectation of uptime dramatically improved since ATM LANE Expectation of uptime dramatically improved since ATM LANE

backbone removed!backbone removed!

Page 4: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Front Range GigaPop (and BiSON?) Front Range GigaPop (and BiSON?) SLASLA

Specifies 6-8 AM weekdays for maintenance windows Specifies 6-8 AM weekdays for maintenance windows Should be 7 AM – later than that gets complaintsShould be 7 AM – later than that gets complaints

Specifies no more than three contact people or numbers at Specifies no more than three contact people or numbers at each member to communicate problems from or to.each member to communicate problems from or to. ““Secondaries” behind “Primary” FRGP members not allowed to Secondaries” behind “Primary” FRGP members not allowed to

contact NOC or NETScontact NOC or NETS Specifies NOC monitoring and “9’s” uptime statsSpecifies NOC monitoring and “9’s” uptime stats ““Changes that are expected to cause no disruptions can be Changes that are expected to cause no disruptions can be

done during normal hours, at the discretion of the engineers”done during normal hours, at the discretion of the engineers” We try to send change control one week in advance for We try to send change control one week in advance for

changes expected to cause an outagechanges expected to cause an outage

Page 5: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Uptime StatsUptime Stats

minor religious battle about uptimes:minor religious battle about uptimes: do we include monitoring station downtime?do we include monitoring station downtime? do we include planned maintenance downtime?do we include planned maintenance downtime? do we include intermediate network downtime?do we include intermediate network downtime?

So we do all threeSo we do all three We use Tobias Oetiker’s SmokePingWe use Tobias Oetiker’s SmokePing

Pings every 3 seconds, records latency and lossPings every 3 seconds, records latency and loss FRGP Outages pages record outage detailsFRGP Outages pages record outage details

Page 6: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

SparesSpares

For NETS/UCAR, spares kept at Mesa LabFor NETS/UCAR, spares kept at Mesa Lab For FRGP spares also kept at Mesa LabFor FRGP spares also kept at Mesa Lab

Used to have “hot spares” at FRGP, but Used to have “hot spares” at FRGP, but Management Committee opted to spare Juniper Management Committee opted to spare Juniper gear from NCAR’s stock to save moneygear from NCAR’s stock to save money

FRGP Cisco gear mostly interchangeable with FRGP Cisco gear mostly interchangeable with NCAR gearNCAR gear

For BiSON, three Adva (aka Movaz) XCVR For BiSON, three Adva (aka Movaz) XCVR frequencies, plus SIMs and SFPsfrequencies, plus SIMs and SFPs

Page 7: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Service ContractsService Contracts

Next business day replacement with Cisco and Next business day replacement with Cisco and JuniperJuniper Painful to agree on covered Cisco serial numbersPainful to agree on covered Cisco serial numbers

Not sure about Movaz, but they’re fast tooNot sure about Movaz, but they’re fast too One weak XCVR and one unidirectional SIMOne weak XCVR and one unidirectional SIM

Have SLA’s with Qwest, ICG (Level3), and Have SLA’s with Qwest, ICG (Level3), and Level3. They’re generally hard to collect on.Level3. They’re generally hard to collect on.

Page 8: NCAR, FRGP, and BiSON SLAs Scot Colburn – NCAR Quilt Fiber Workshop Friday the 13 th, October 2006

Next!Next!

Scot ColburnScot Colburn

[email protected]@ucar.edu