Project Description
The project includes:
The existing 44 kV transmission line would remain in place and operational until
the new Eaton-area substation to Cloverly Substation segment is constructed and
energized; at which time the 44 kV line would be removed.
Station 3 : Project Description • Board 9
• A 230 kilovolt (kV) double-circuit transmission line from the Western Area Power Administration (WAPA) Ault Substation to the new Xcel Energy Husky Substation. One circuit would be installed initially and operated at 230 kV.
• The new Husky Substation would replace the Xcel Energy Ault 44 kV Substation, which would be decommissioned. (In November 2018, a site plan for the new Husky Substation in the Town of Ault was submitted and was approved in February 2019.)
• A 230 kV transmission line would be constructed to support two circuits (double-circuit) from the new Husky Substation to a new Eaton-area substation. A 115 kV circuit would be installed initially and a 230 kV circuit would be installed in the future when additional electric service is needed.
• The new Eaton-area substation would replace the existing Xcel Energy Eaton 44 kV Substation, which would be decommissioned. The new Eaton-area substation would accommodate upgrades to the local electrical distribution system.
• A transmission line would be constructed to support two circuits (double circuit) from the new Eaton-area substation to Xcel’s existing Cloverly Substation. A 115 kV circuit would be installed initially and a 230 kV circuit would be installed in the future when additional electric service is needed.
Station 3 : Project Description • Board 10
N
Project Study Area
The information contained herein is demonstrative only, believed to be accurate and suitable for limited, internal Xcel Energy use only. Maps are not to scale. All matters depicted including but not limited to utility facilities, locations, and materials are preliminary only and subject to change without notice. Xcel Energy/Public Service Company of Colorado makes no warranty as to the accuracy or suitability of any information contained herein for use by third parties or for any particular purpose. The accuracy of this map and the information depicted should be verified prior to use. The user shall assume all risk and responsibility for any and all damages including consequential damages, which may arise from the user’s reliance on this information.
Project Study Area
Town Boundary
44 kV Existing Transmission
115 kV Existing Transmission
230 kV Existing Transmission
345 kV Existing Transmission
Existing Substation
Existing Cloverly Tap Point/Switch Gear
Planned 230 kV Transmission
Planned Husky Substation
Date: 10/11/2019
0 21
Miles
COUNTY RD 82COUNTY RD 82
COU
NTY
RD
43
COU
NTY
RD
43
COU
NTY
RD
43
COU
NTY
RD
43
COU
NTY
RD
33
COU
NTY
RD
33
COU
NTY
RD
33
COU
NTY
RD
33
COUNTY RD 74COUNTY RD 74
COUNTY RD 68COUNTY RD 68 COUNTY RD 68COUNTY RD 68
COUNTY RD 74COUNTY RD 74
CloverlySubstationCloverlySubstation